Construction steel pipe bundling device

By combining the gathering mechanism and the limiting plate, the building steel pipe bundling device gathers and tightly tightens the steel pipes, solving the problem of uneven bundling and improving the stability and transportation safety of the steel pipe assembly.

CN118723180BActive Publication Date: 2024-11-26JIANGSU XINYING ASSEMBLY BUILDING TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411236079.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-04
Publication Date
2024-11-26
Estimated Expiration
2044-09-04

AI Technical Summary

Technical Problem

During the bundling process of building steel pipes, the number of steel pipes at the bottom is greater than that at the top, resulting in uneven bundling, large gaps, and an increased risk of loosening and falling during transportation.

Method used

The building steel pipe bundling device, which uses a gathering mechanism and a limiting plate, gathers and tightly tightens the steel pipes through an arc-shaped toothed plate and a drive mechanism, and uses bundling components and electromagnetic blocks to achieve accurate winding and fixing of the iron wire.

Benefits of technology

This enhances the overall stability of the steel pipe assembly, ensuring the safety and reliability of the transportation process and reducing the risk of gaps and loosening between the steel pipes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118723180B_ABST
    Figure CN118723180B_ABST
Patent Text Reader

Abstract

The present application discloses a construction steel pipe bundling device, comprising a conveying platform, two supporting arc plates, two gathering mechanisms, a plurality of limiting plates, a second driving mechanism and a bundling assembly, wherein the gathering mechanism is arranged in the space between the supporting arc plates and the conveying platform, and the gathering mechanism comprises a first driving mechanism and two arc-shaped tooth plates, wherein the first driving mechanism is arranged inside a box body, a connecting roller is rollingly connected with a first slide groove, and the two arc-shaped tooth plates are respectively connected with the first driving mechanism; a groove is arranged on the arc-shaped concave surface of the arc-shaped tooth plate, and a plurality of limiting plates are respectively arranged inside the corresponding grooves; the second driving mechanism is arranged on the outer wall of the arc-shaped tooth plate, a horizontal plate is arranged on the slide of the slide module, and the bundling assembly is arranged on the horizontal plate. Thus, the loose steel pipes can be gathered and tightly tightened, the gaps between the steel pipes are reduced, the overall stability of the steel pipe group is enhanced, and the safety and reliability of the steel pipe transportation process are ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of steel pipe bundling devices, and in particular to a construction steel pipe bundling device. Background Art

[0002] Construction steel pipes are mainly used for the construction of scaffolding and the stable construction of cement pouring bases in construction projects. In the production process of steel pipes, in order to ensure the convenience of lifting or transporting steel, they are usually bundled with wires and packaged into bundles.

[0003] At present, the bundling process of construction steel pipes is usually to stack the steel pipes on a conveying mechanism through a feeding mechanism, and then transport the stacked steel pipes to a baler through the conveying mechanism, and use the baler to bundle them.

[0004] However, when the pipes are stacked, since there are more steel pipes at the bottom than at the top, when one end is bundled, the other end is still loose. The unbalanced bundling method easily leads to large gaps between the steel pipes, and the overall structure appears loose, which greatly increases the risk of the steel pipes falling due to looseness during transportation. Summary of the invention

[0005] The present application aims to solve one of the technical problems in the related art at least to some extent.

[0006] To this end, one purpose of the present application is to propose a construction steel pipe bundling device that can gather loose steel pipes and tighten them tightly, thereby reducing the gaps between the steel pipes, enhancing the overall stability of the steel pipe group, and ensuring the safety and reliability of the steel pipe transportation process.

[0007] To achieve the above-mentioned purpose, the first embodiment of the present application proposes a construction steel pipe bundling device, including a conveying platform, two supporting arc plates, two gathering mechanisms, multiple limit plates, a second driving mechanism and a bundling assembly, wherein the conveying platform is provided with multiple conveying rollers; the two supporting arc plates are symmetrically arranged on the upper surface of the conveying platform; the gathering mechanism is arranged in the space between the supporting arc plates and the conveying platform, and the gathering mechanism includes a first driving mechanism and two arc-shaped tooth plates, wherein the lower surface of the conveying platform is provided with a box body, and the first driving mechanism is arranged inside the box body; connecting rollers are respectively provided at both ends of the arc-shaped tooth plate. , the inner wall of the supporting arc plate is provided with a first slide groove, the connecting roller is rollingly connected to the first slide groove, and the two arc-shaped tooth plates are respectively connected to the first driving mechanism; a groove is provided on the arc-shaped concave surface of the arc-shaped tooth plate, and a plurality of limit plates are respectively arranged inside the corresponding grooves; the second driving mechanism is arranged on the outer wall of the arc-shaped tooth plate, and the second driving mechanism is connected to the limit plate; a vertical plate is provided on one side of the conveying platform, a slide module is provided on the vertical plate, a horizontal plate is provided on the slide of the slide module, the baling assembly is arranged on the horizontal plate, and the baling assembly is located between the two gathering mechanisms.

[0008] The construction steel pipe bundling device of the embodiment of the present application can gather loose steel pipes and tighten them tightly through the cooperation between the gathering mechanism, the limit plate and the second driving mechanism, thereby reducing the gaps between the steel pipes, enhancing the overall stability of the steel pipe group, and ensuring the safety and reliability of the steel pipe transportation process.

[0009] In addition, the construction steel pipe bundling device proposed in the present application may also have the following additional technical features:

[0010] In one embodiment of the present application, the first driving mechanism includes a motor, a first bevel gear, a first rotating shaft, two second bevel gears, a bushing and two first gears, wherein the motor is mounted on the inner wall of the housing; the first bevel gear is connected to the output end of the motor; the two ends of the first rotating shaft are respectively rotatably connected to the inner wall of the housing; the bushing is rotatably arranged on the outside of the first rotating shaft; the two second bevel gears are respectively arranged on the bushing and the first rotating shaft, and the two second bevel gears are respectively meshed and connected with the first bevel gear; the two first gears are respectively arranged on the bushing and the first rotating shaft, and the two first gears are respectively meshed and connected with the corresponding arc-shaped toothed plates.

[0011] In one embodiment of the present application, the second driving mechanism includes a driving shaft, a second gear, a straight tooth plate and a sliding rod, wherein the driving shaft is rotatably arranged on the arc-shaped tooth plate; the second gear is arranged on the driving shaft, and the second gear is meshingly connected with the straight tooth plate; a second sliding groove is opened on the arc-shaped tooth plate, and the second sliding groove is communicated with the groove, the sliding rod is slidably connected with the second sliding groove, and the two ends of the sliding rod are respectively connected with the straight tooth plate and the limiting plate.

[0012] In one embodiment of the present application, the baling assembly includes a second rotating shaft, a transmission assembly, two baling arms and an electromagnetic block, wherein the second rotating shaft is rotatably arranged on the lower surface of the cross plate; a connecting frame is provided on the lower surface of the second rotating shaft, and the transmission assembly is arranged inside the connecting frame; the two baling arms are respectively connected to the transmission assembly; a notch is provided at the bottom of the baling arm, and the electromagnetic block is embedded and installed on the inner upper wall of the notch.

[0013] In one embodiment of the present application, the transmission assembly includes two transmission shafts and two third gears, wherein the two transmission shafts are respectively rotatably arranged inside the connecting frame, and the two baling arms are respectively arranged on the corresponding transmission shafts; the two third gears are respectively arranged on the corresponding transmission shafts, and the two third gears are meshed and connected.

[0014] In one embodiment of the present application, the construction steel pipe bundling device of the present application further includes a feeding mechanism, which includes two conveying rollers and a guide plate, wherein a side arm of the conveying platform is provided with a support plate, and the two conveying rollers are rotatably arranged on the support plate; the guide plate is arranged on the conveying platform, and a guide channel is provided inside the guide plate.

[0015] Compared with the prior art, the present invention has at least the following beneficial effects:

[0016] (1) The two gathering mechanisms can gather the loose steel pipes together, making it easier to bundle them;

[0017] (2) Through the cooperation between the limit plate and the second driving mechanism, the gathered steel pipes can be tightened, the gaps between the steel pipes are reduced, and the overall stability of the steel pipe group is enhanced when they are bundled;

[0018] (3) The feeding mechanism can guide the iron wire and keep it in a straight line, ensuring that the iron wire can be accurately adsorbed to the slot.

[0019] Additional aspects and advantages of the present application will be given in part in the description below, and in part will become apparent from the description below, or will be learned through the practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] The above and / or additional aspects and advantages of the present application will become apparent and easily understood from the following description of the embodiments in conjunction with the accompanying drawings, in which:

[0021] Figure 1 This is a schematic structural diagram of a construction steel pipe bundling device according to an embodiment of the present application;

[0022] Figure 2 This is a schematic structural diagram of a gathering mechanism in a construction steel pipe bundling device according to an embodiment of the present application;

[0023] Figure 3 This is a schematic structural diagram of a first driving mechanism in a construction steel pipe bundling device according to an embodiment of the present application;

[0024] Figure 4 This is a schematic diagram of the structure of the second driving mechanism in the construction steel pipe bundling device according to one embodiment of the present application;

[0025] Figure 5 This is a schematic structural diagram of a bundling assembly in a construction steel pipe bundling device according to an embodiment of the present application;

[0026] Figure 6 For this application Figure 5 Schematic diagram of the enlarged structure of area A in the middle;

[0027] Figure 7 This is a schematic diagram of the bottom structure of a construction steel pipe bundling device according to an embodiment of the present application.

[0028] As shown in the figure: 1. conveyor platform; 2. supporting arc plate; 3. gathering mechanism; 4. limiting plate; 5. second driving mechanism; 6. bundling assembly; 7. feeding mechanism; 8. vertical plate; 9. slide module; 10. conveyor roller; 11. box; 12. horizontal plate; 13. connecting roller; 15. supporting plate; 20. first slide; 30. first driving mechanism; 31. arc tooth plate; 310. groove; 311. second slide; 300. motor; 301. first bevel gear; 302, first rotating shaft; 303, second bevel gear; 304, bushing; 305, first gear; 50, drive shaft; 51, second gear; 52, tooth plate; 53, slide rod; 60, second rotating shaft; 61, transmission assembly; 62, baling arm; 63, electromagnetic block; 64, connecting frame; 620, notch; 610, transmission shaft; 611, third gear; 70, conveying roller; 71, guide plate; 710, guide channel. DETAILED DESCRIPTION

[0029] Embodiments of the present application are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present application, and should not be construed as limiting the present application.

[0030] The construction steel pipe bundling device according to an embodiment of the present application is described below with reference to the accompanying drawings.

[0031] like Figures 1 to 7 As shown, the construction steel pipe bundling device of the embodiment of the present application may include a conveying platform 1, two supporting arc plates 2, two gathering mechanisms 3, a plurality of limiting plates 4, a second driving mechanism 5 and a bundling assembly 6.

[0032] A plurality of conveying rollers 10 are disposed on the conveying platform 1 , two supporting arc plates 2 are symmetrically arranged on the upper surface of the conveying platform 1 , and a gathering mechanism 3 is arranged in the space between the supporting arc plates 2 and the conveying platform 1 .

[0033] The gathering mechanism 3 includes a first driving mechanism 30 and two arc-shaped tooth plates 31, wherein a box body 11 is provided on the lower surface of the conveying platform 1, the first driving mechanism 30 is arranged inside the box body 11, connecting rollers 13 are respectively provided at both ends of the arc-shaped tooth plate 31, and a first slide groove 20 is provided on the inner wall of the supporting arc plate 2, the connecting roller 13 is rollingly connected to the first slide groove 20, and the two arc-shaped tooth plates 31 are respectively connected to the first driving mechanism 30, wherein the first driving mechanism 30 is used to drive the two arc-shaped tooth plates 31 to rotate in opposite directions, and the two arc-shaped tooth plates 31 are used to gather loose steel pipes.

[0034] It should be noted that the conveying rollers 10 described in this embodiment are grouped into three, and each group includes a horizontally placed conveying roller 10 and two obliquely placed conveying rollers 10 , and the conveying rollers 10 can convey the steel pipes.

[0035] Furthermore, the two arc-shaped tooth plates 31 are arranged in parallel. When the first driving mechanism 30 drives the two arc-shaped tooth plates 31 to rotate in opposite directions, the two arc-shaped tooth plates 31 can form a circular ring structure, thereby gathering the loose steel pipes together.

[0036] In the embodiment of the present application, the connecting roller 13 can support the arc-shaped toothed plate 31 , thereby improving the stability of the arc-shaped toothed plate 31 during rotation.

[0037] A groove 310 is provided on the arc concave surface of the arc tooth plate 31 , and a plurality of limit plates 4 are respectively arranged inside the corresponding grooves 310 . The second driving mechanism 5 is arranged on the outer wall of the arc tooth plate 31 , and the second driving mechanism 5 is connected to the limit plates 4 .

[0038] It should be noted that the limit plate 4 described in this embodiment is a semicircular ring structure. The distance between the two limit plates 4 in the same supporting arc plate 2 can be adjusted through the second driving mechanism 5, so that the multiple pipes after being gathered are tightly fitted, the gap between the pipes is reduced, and the loosening of the pipes after bundling is avoided.

[0039] A vertical plate 8 is provided on one side of the conveying platform 1 , a slide module 9 is provided on the vertical plate 8 , a cross plate 12 is provided on the slide of the slide module 9 , a baling assembly 6 is arranged on the cross plate 12 , and the baling assembly 6 is located between the two gathering mechanisms 3 .

[0040] In the embodiment of the present application, the height of the bundling assembly 6 can be adjusted by the slide module 9, and the bundling assembly 6 can bundle a plurality of pipes into a single bundle of steel pipes for easy transportation and placement.

[0041] In order to further clarify the above embodiment, in one embodiment of the present application, Figure 2 and Figure 3 As shown, the first driving mechanism 30 includes a motor 300, a first bevel gear 301, a first rotating shaft 302, two second bevel gears 303, a sleeve 304 and two first gears 305, wherein the motor 300 is mounted on the inner wall of the housing 11, the first bevel gear 301 is connected to the output end of the motor 300, both ends of the first rotating shaft 302 are respectively rotatably connected to the inner wall of the housing 11, the sleeve 304 is rotatably arranged on the outside of the first rotating shaft 302, the two second bevel gears 303 are respectively arranged on the sleeve 304 and the first rotating shaft 302, and the two second bevel gears 303 are respectively meshed with the first bevel gear 301, the two first gears 305 are respectively arranged on the sleeve 304 and the first rotating shaft 302, and the two first gears 305 are respectively meshed with the corresponding arc-shaped toothed plates 31.

[0042] It should be noted that a through slot is formed through the conveying platform 1 , and the first gear 305 passes through the through slot and is meshed and connected with the arc-shaped gear plate 31 .

[0043] In an embodiment of the present application, the motor 300 can drive the first bevel gear 301 to rotate, and with the cooperation of the two second bevel gears 303, the shaft sleeve 304 and the first rotating shaft 302 are driven to rotate in the opposite direction, and the two first gears 305 are driven to rotate in the opposite direction, thereby driving the two arc-shaped tooth plates 31 to rotate in the opposite direction, and finally the two arc-shaped tooth plates 31 form a circular ring structure, and the formed circular ring is coaxially arranged with the supporting arc plate 2.

[0044] Furthermore, if Figure 4As shown, the second driving mechanism 5 includes a driving shaft 50, a second gear 51, a straight tooth plate 52 and a sliding rod 53, wherein the driving shaft 50 is rotatably set on the arc-shaped tooth plate 31, the second gear 51 is set on the driving shaft 50, and the second gear 51 is meshingly connected with the straight tooth plate 52, a second sliding groove 311 is opened on the arc-shaped tooth plate 31, the second sliding groove 311 is communicated with the groove 310, the sliding rod 53 is slidably connected with the second sliding groove 311, and the two ends of the sliding rod 53 are respectively connected to the straight tooth plate 52 and the limit plate 4.

[0045] In an embodiment of the present application, the drive shaft 50 is connected to an external drive mechanism (such as a motor), which can drive the drive shaft 50 to rotate through the external drive mechanism, and through the cooperation between the second gear 51 and the straight tooth plate 52, the corresponding two limit plates 4 can be driven to move out of the groove 310. When the two arc-shaped tooth plates 31 form a circular ring structure, the two limit plates 4 move toward each other to tighten the gathered pipes.

[0046] In one embodiment of the present application, Figure 5 As shown, the baling assembly 6 includes a second rotating shaft 60, a transmission assembly 61, two baling arms 62 and an electromagnetic block 63, wherein the second rotating shaft 60 is rotatably arranged on the lower surface of the transverse plate 12, a connecting frame 64 is arranged on the lower surface of the second rotating shaft 60, the transmission assembly 61 is arranged inside the connecting frame 64, the two baling arms 62 are respectively connected to the transmission assembly 61, a notch 620 is arranged at the bottom of the baling arm 62, and the electromagnetic block 63 is embedded and installed on the inner upper wall of the notch 620.

[0047] It should be noted that when the electromagnetic block 63 is energized, magnetism is generated to attract the tying wires, so that the tying wires are adsorbed on the notches 620 of the baling arms 62 .

[0048] Furthermore, the second rotating shaft 60 is connected to an external driving mechanism (such as a motor), and the external driving mechanism can drive the baling arms 62 to rotate around the second rotating shaft 60 to wrap the wires together. The transmission assembly 61 can drive the two baling arms 62 to rotate toward or away from each other to make the two ends of the wires approach each other.

[0049] In the embodiment of the present application, the two baling arms 62 are staggered. When the two baling arms 62 rotate toward each other, no interference is formed, so that the iron wire can fit tightly on the steel pipe group.

[0050] In one embodiment of the present application, Figure 5 As shown, the transmission assembly 61 includes two transmission shafts 610 and two third gears 611, wherein the two transmission shafts 610 are rotatably arranged inside the connecting frame 64, the two baling arms 62 are respectively arranged on the corresponding transmission shafts 610, and the two third gears 611 are respectively arranged on the corresponding transmission shafts 610, and the two third gears 611 are meshed and connected.

[0051] In the embodiment of the present application, by driving one of the third gears 611 to rotate, the other third gear 611 can be driven to rotate, and the two third gears 611 rotate in opposite directions, thereby driving the two baling arms 62 to rotate in opposite directions.

[0052] In one embodiment of the present application, Figure 1 As shown, the construction steel pipe bundling device of this embodiment also includes a feeding mechanism 7, which includes two conveying rollers 70 and a guide plate 71, wherein a side arm of the conveying platform 1 is provided with a support plate 15, the two conveying rollers 70 are rotatably set on the support plate 15, the guide plate 71 is set on the conveying platform 1, and a guide channel 710 is provided inside the guide plate 71.

[0053] It should be noted that the two conveying rollers 70 described in this embodiment rotate in opposite directions, and one end of the iron wire is wound on the winding disk. By controlling the rotation of the conveying roller 70, the iron wire can be transported to the inside of the guide channel 710.

[0054] Furthermore, the cross section of the guide plate 71 is a U-shaped structure, and the guide plate 71 can keep the iron wire in a straight state to ensure that it is accurately adsorbed by the electromagnetic block 63 .

[0055] It can be understood that in order to facilitate cutting of the iron wire, a cutting mechanism is provided on the support plate 15, and the iron wire can be cut by the cutting mechanism, thereby facilitating the feeding of the iron wire.

[0056] Specifically, in the process of bundling steel pipes, relevant personnel stack multiple steel pipes and place them on the conveying roller 10, and convey the steel pipes toward the direction of the supporting arc plate 2 through the conveying roller 10. When the steel pipes pass through the two supporting arc plates 2, relevant personnel control the motor 300 to start, and the motor 300 drives the first bevel gear 301 to rotate, and through the cooperation of the two second bevel gears 303, drives the sleeve 304 and the first rotating shaft 302 to rotate in the opposite direction, and then drives the two arc-shaped tooth plates 31 to rotate in the opposite direction with the cooperation of the two first gears 305, so that the two arc-shaped tooth plates 31 form a circular ring structure, thereby gathering the loose steel pipes together.

[0057] Then, the relevant personnel control the driving shaft 50 to rotate, and the driving shaft 50 drives the second gear 51 to rotate. Through the cooperation of the straight tooth plate 52, it drives the two limit plates 4 in the same supporting arc plate 2 to move toward each other, so as to clamp the gathered pipes, reduce the gap between the pipes, and prevent the pipes from loosening.

[0058] Finally, the relevant personnel energize the electromagnetic block 63, which generates magnetic attraction and adsorbs the ferromagnetic in the guide channel 710 into the slot 620. At this time, the slide module 9 is started by controlling the slide module 9, which drives the two baling arms 62 to move upward. When the bottom of the baling arm 62 is higher than the top pipe, one of the transmission shafts 610 is controlled to rotate. With the cooperation of the two third gears 611, the two baling arms 62 rotate towards each other and drive the two ends of the iron wire to approach each other. At the same time, the iron wire fits the outer wall of the steel pipe group. At this time, the second rotating shaft 60 is controlled to rotate, and the two baling arms 62 are driven to rotate around the second rotating shaft 60, so that the two ends of the steel wire are entangled together, and the baling process of the steel pipe is realized.

[0059] In summary, the construction steel pipe bundling device of the embodiment of the present application, through the cooperation between the gathering mechanism, the limit plate and the second driving mechanism, can gather the loose steel pipes and tighten them tightly, thereby reducing the gaps between the steel pipes, enhancing the overall stability of the steel pipe group, and ensuring the safety and reliability of the steel pipe transportation process.

[0060] In the description of this specification, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of this application, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0061] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.

[0062] Although the embodiments of the present application have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limitations on the present application. Ordinary technicians in this field can change, modify, replace and deform the above embodiments within the scope of the present application.

Claims

1. A construction steel pipe bundling device, characterized in that: It includes a conveying platform, two supporting arc plates, two gathering mechanisms, a plurality of limit plates, a second driving mechanism and a bundling assembly, wherein: The conveying platform is provided with a plurality of conveying rollers; The two supporting arc plates are symmetrically arranged on the upper surface of the conveying platform; The gathering mechanism is arranged in the space between the supporting arc plate and the conveying platform, and the gathering mechanism comprises a first driving mechanism and two arc-shaped tooth plates, wherein: A box is provided on the lower surface of the conveying platform, and the first driving mechanism is arranged inside the box; Both ends of the arc-shaped toothed plate are provided with connecting rollers respectively, the inner wall of the supporting arc plate is provided with a first sliding groove, the connecting roller is rollingly connected to the first sliding groove, and the two arc-shaped toothed plates are respectively connected to the first driving mechanism; A groove is provided on the arc-shaped concave surface of the arc-shaped tooth plate, and a plurality of the limit plates are respectively arranged inside the corresponding grooves; The second driving mechanism is arranged on the outer wall of the arc-shaped tooth plate, and the second driving mechanism is connected to the limiting plate; A vertical plate is provided on one side of the conveying platform, a slide module is provided on the vertical plate, a horizontal plate is provided on the slide of the slide module, the baling assembly is arranged on the horizontal plate, and the baling assembly is located between the two gathering mechanisms; The first driving mechanism comprises a motor, a first bevel gear, a first rotating shaft, two second bevel gears, a shaft sleeve and two first gears, wherein the motor is mounted on the inner wall of the box; the first bevel gear is connected to the output end of the motor; the two ends of the first rotating shaft are respectively rotatably connected to the inner wall of the box; the shaft sleeve is rotatably arranged on the outside of the first rotating shaft; the two second bevel gears are respectively arranged on the shaft sleeve and the first rotating shaft, and the two second bevel gears are respectively meshed and connected with the first bevel gear; the two first gears are respectively arranged on the shaft sleeve and the first rotating shaft, and the two first gears are respectively meshed and connected with the corresponding arc-shaped toothed plates; The second driving mechanism includes a driving shaft, a second gear, a straight tooth plate and a sliding rod, wherein the driving shaft is rotatably arranged on the arc-shaped tooth plate; the second gear is arranged on the driving shaft, and the second gear is meshed and connected with the straight tooth plate; a second sliding groove is provided on the arc-shaped tooth plate, and the second sliding groove is communicated with the groove, the sliding rod is slidably connected with the second sliding groove, and the two ends of the sliding rod are respectively connected with the straight tooth plate and the limiting plate.

2. The construction steel pipe bundling device according to claim 1, characterized in that: The baling assembly includes a second rotating shaft, a transmission assembly, two baling arms and an electromagnetic block, wherein: The second rotating shaft is rotatably arranged on the lower surface of the horizontal plate; A connecting frame is provided on the lower surface of the second rotating shaft, and the transmission assembly is arranged inside the connecting frame; The two baling arms are respectively connected to the transmission assembly; A notch is provided at the bottom of the baling arm, and the electromagnetic block is embedded and installed on the inner upper wall of the notch.

3. The construction steel pipe bundling device according to claim 2, characterized in that: The transmission assembly includes two transmission shafts and two third gears, wherein: The two transmission shafts are rotatably arranged inside the connection frame, and the two baling arms are arranged on the corresponding transmission shafts respectively; The two third gears are respectively arranged on the corresponding transmission shafts, and the two third gears are meshed and connected.

4. The construction steel pipe bundling device according to claim 3, characterized in that: It also includes a feeding mechanism, which includes two conveying rollers and a guide plate, wherein: A support plate is provided on one side arm of the conveying platform, and the two conveying rollers are rotatably arranged on the support plate; The guide plate is arranged on the conveying platform, and a guide channel is arranged inside the guide plate.