Sludge drying, gasifying and incinerating integrated treatment method
Through the integrated treatment method of sludge drying, gasification and incineration, the use of thermal oil and heat cascade utilization solves the high investment and high cost problems caused by the low calorific value of sludge, achieves efficient sludge drying and incineration, and reduces pollution. Mud disposal costs.
Patent Information
- Application Number
- CN202411050331.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-01
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-08-01
AI Technical Summary
The existing sludge incineration technology has high initial investment and operating costs due to the low calorific value of sludge. Moreover, the drying and incineration processes consume high energy and the equipment is complex, making it difficult to popularize and apply it.
Adopting the integrated treatment method of sludge drying, gasification and incineration, through the combination of preheating process, vaporization drying process, incineration process and waste heat recovery process, using thermal oil for preheating and drying, spray drying furnace and gasification incinerator Carry out cascade utilization of heat to improve the calorific value of sludge entering the furnace and the incineration efficiency.
It significantly reduces the operating costs of sludge incineration, improves sludge treatment efficiency, reduces initial investment in equipment, reduces operating costs, and achieves efficient sludge drying and incineration.
Smart Images

Figure CN118724418A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of sludge treatment, and in particular to a sludge drying, gasification and incineration integrated treatment method. Background Art
[0002] Sludge, represented by municipal sewage sludge, has a high water content (generally around 72% after mechanical dehydration), low calorific value, low calorific value (200-400kCal / kg), takes up space in landfill treatment, is difficult to maintain in the later stage, is easy to clog the drainage system, and has high maintenance costs; currently, the more thorough treatment method is incineration. The calorific value of sludge after mechanical dehydration is too low to reach the lower limit of the calorific value required for normal combustion of solid fuel (generally 800-1200kCal / kg), so it needs to be dried and dehydrated to increase the calorific value.
[0003] Most of the existing sludge incineration technologies use a process of drying first and then incineration. The heat source medium used for drying is mostly thermal oil or steam. There are also processes that use heat pumps for low-temperature drying, but the drying effect and power consumption are its shortcomings. In the existing sludge treatment system, drying and incineration are generally carried out separately. The overall energy consumption of drying and incineration is high, and the equipment is complex, the initial investment is high, and the operating cost is high. The current operating cost is often higher than the sludge disposal cost that can be afforded or paid, so it is difficult to promote and apply.
[0004] Therefore, based on the demand for improving energy utilization efficiency and reducing initial investment and operating costs, the present invention provides an integrated treatment method for sludge drying, gasification and incineration. Summary of the invention
[0005] In view of the above analysis, the present invention aims to provide an integrated treatment method for sludge drying, gasification and incineration to solve the problem of high initial investment and high operating cost of sludge treatment due to low calorific value of sludge. The integration of drying and incineration can effectively reduce the initial investment of equipment; in the entire integrated drying, incineration and heat recovery process, the energy is utilized in a cascade manner in full accordance with the requirements of the second law of thermodynamics, which can effectively reduce the operating cost of sludge incineration.
[0006] The purpose of the present invention is mainly achieved through the following technical solutions:
[0007] A sludge drying, gasification and incineration integrated treatment method, comprising:
[0008] S1 preheating process: After the sludge is preheated by the sludge pump pipe, it is sprayed into the spray drying furnace in an atomized state through the sprayer;
[0009] S2 Vaporization and drying process: The spray drying furnace bakes the mist sludge in the furnace to vaporize the water in the sludge and achieve sludge drying;
[0010] S3 Incineration process: the solids produced after the sludge gasification and drying treatment are introduced into the gasification incinerator 30 for incineration; the gasification incinerator 30 is provided with a third heat transfer oil pipe, and the third heat transfer oil pipe is filled with heat transfer oil; the sludge pump pipe 3 and the spray drying furnace 5 can be heated and heated by the heat transfer oil, thereby realizing the preheating and drying of the sludge;
[0011] S4 waste heat recovery process: the gasification incinerator 30 is connected to the waste heat boiler 34, so that the intermediate ash and flue gas after incineration can be discharged through the waste heat boiler 34; the waste heat boiler 34 recovers heat through a gas preheater, and preheats the air before passing it into the spray drying furnace 5 and the gasification incinerator.
[0012] Furthermore, in the S1 preheating process, a first heat transfer oil pipe is provided on the outside of the sludge pump pipe, and the first heat transfer oil pipe is connected to the third heat transfer oil pipe in the S3 incineration process; and then, the first heat transfer oil pipe preheats the sludge pump pipe and the sludge inside it through the heat transfer oil flowing inside.
[0013] Furthermore, in the S2 vaporization and drying process, a second heat transfer oil pipe connected to the third heat transfer oil pipe in the S3 incineration process is provided on the inner wall of the spray drying furnace; the second heat transfer oil pipe heats and insulates the furnace cavity of the spray drying furnace through the heat transfer oil flowing inside.
[0014] Furthermore, in the S2 vaporization and drying process, the gas (containing water vapor and non-condensable gas) generated by the sludge being baked in the spray drying furnace is passed into a condenser for condensation; after condensation, liquid sewage and gaseous non-condensable gas are generated; wherein, the sewage is discharged and purified through biochemical treatment and meets emission standards; the non-condensable gas is passed into the gasification incinerator in the S3 incineration process for incineration.
[0015] Furthermore, in the S4 waste heat recovery process, a first gas preheater and a second gas preheater are nested and installed on the waste heat boiler, and the first gas preheater and the second gas preheater can heat the gas flowing through them by absorbing the waste heat of the flue gas in the waste heat boiler.
[0016] Furthermore, the non-condensable gas generated in the S2 vaporization and drying process is first introduced into the first gas preheater in the S4 waste heat recovery process for preheating, and then introduced into the gasification incinerator in the S3 incineration process for combustion.
[0017] Furthermore, air is introduced into the second gas preheater in the S4 waste heat recovery process, and the low-temperature air is heated by the high-temperature flue gas in the waste heat boiler to obtain high-temperature air.
[0018] Furthermore, the high-temperature air obtained in the S4 waste heat recovery process is introduced into a spray drying furnace and a gasification incinerator, respectively, to perform vaporization and drying and incineration on the sludge, respectively.
[0019] Furthermore, a material guide pipe and a first air inlet pipe are provided at the bottom of the spray drying furnace; the upper end of the material guide pipe is connected to the inner cavity of the spray drying furnace, and the lower end is connected to a cage conveyor, and then the dried sludge is sent to the gasification incinerator for incineration through the cage conveyor.
[0020] Furthermore, the gasification incinerator includes: a gasification incineration chamber and a flue gas furnace; the gasification incineration chamber is used to gasify and incinerate combustible dried sludge and non-condensable gas; the flue gas furnace is connected to the waste heat boiler to introduce the high-temperature flue gas generated by combustion into the waste heat boiler.
[0021] The technical solution of the present invention can achieve at least one of the following effects:
[0022] 1. The integrated sludge drying, gasification and incineration treatment method of the present invention uses the heat generated by incineration to heat the heat transfer oil. The heat transfer oil pipe is arranged in the sludge pump pipe to pressurize and preheat the sludge. In addition, a heat transfer oil pipe is also arranged in the atomizing gasifier to maintain the furnace temperature of the atomizing gasifier, thereby improving the drying effect, which is beneficial to significantly improve the calorific value of the sludge entering the gasification incinerator, making the subsequent incineration more sufficient and thorough, and improving the efficiency of sludge treatment.
[0023] 2. The integrated sludge drying, gasification and incineration treatment method of the present invention is that the sludge is sprayed into the atomizing gasification drying furnace by atomizing explosion, and the atomizing gasification drying furnace is heated by heat transfer oil, so that the atomized sludge sprayed into the furnace can be quickly dried and dried, thereby improving the sludge drying efficiency, achieving good drying effect, and removing more water after drying, which is beneficial to reducing the energy consumption of subsequent incineration processes.
[0024] 3. The integrated sludge drying, gasification and incineration treatment method of the present invention comprises a gasification incineration chamber in the front section, a flue gas furnace in the middle section, and a waste heat boiler in the rear section. The gas preheater structure is nested with the waste heat boiler to heat the air to a certain high temperature (such as 400 degrees Celsius or higher). Then, the high-temperature air is introduced into the gasification incinerator to increase the incineration temperature, improve the incineration gasification effect, make up for the low calorific value of the sludge (even after drying), further improve the calorific value (temperature) of the dried sludge, promote its combustion effect, and save costs while improving the sludge treatment efficiency.
[0025] 4. The integrated sludge drying, gasification and incineration treatment method of the present invention adopts the TFB gasification and incineration method, firstly preheating the sludge by heat transfer oil to promote sludge drying, and then high-temperature combustion by the gasification incinerator to achieve low-temperature gasification and high-temperature incineration, which can achieve low CO and NOx, greatly reducing the cost of flue gas purification.
[0026] In the present invention, the above-mentioned technical solutions can also be combined with each other to achieve more preferred combination solutions. Other features and advantages of the present invention will be described in the subsequent description, and some advantages can become obvious from the description, or can be understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained through the contents particularly pointed out in the description and the drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] The drawings are only for the purpose of illustrating particular embodiments and are not to be considered limiting of the present invention. Like reference symbols denote like components throughout the drawings.
[0028] Figure 1 It is a schematic diagram of the principle of the integrated treatment method of sludge drying, gasification and incineration of the present invention;
[0029] Figure 2 This is a heat transfer oil circulation principle diagram of the integrated sludge drying, gasification and incineration treatment method of the present invention;
[0030] Figure 3 It is a schematic diagram of the structure of a spray drying furnace of the sludge drying, gasification and incineration integrated treatment method of the present invention;
[0031] Figure 4 It is a schematic diagram of the structure of the sludge preheating component and the atomizer of the sludge drying, gasification and incineration integrated treatment method of the present invention;
[0032] Figure 5 This is a cross-sectional effect diagram of an atomizer of the sludge drying, gasification and incineration integrated treatment method of the present invention;
[0033] Figure 6 It is a structural schematic diagram of a condenser of the integrated treatment method of sludge drying, gasification and incineration of the present invention;
[0034] Figure 7 It is a schematic diagram of the structural composition of the gasification incinerator and the waste heat boiler of the sludge drying, gasification and incineration integrated treatment method of the present invention;
[0035] Figure 8 It is a schematic diagram of the arrangement of the preheating tubes of the air preheater of the present invention;
[0036] Fig. 9 It is a schematic structural diagram of the preheating tube of the present invention.
[0037] Reference numerals:
[0038] 1-feeding trough; 2-feeder; 3-sludge pump pipe; 4-first heat transfer oil pipe; 5-spray drying furnace; 6-sprayer; 601-first high-pressure air inlet; 602-second high-pressure air inlet; 603-third high-pressure air inlet; 7-second heat transfer oil pipe; 8-air outlet pipe; 9-first oil inlet interface; 10-first oil outlet interface; 11-feeding pipe; 12-first air inlet pipe; 13-cage conveyor; 14-driving motor; 15-first solenoid valve; 16-first oil pump; 17-bellows box; 18-condenser; 1 9- condenser air inlet interface; 20- condenser air outlet interface; 21- drainage interface; 22- heat exchange air duct; 23- air distribution plate; 24- air distribution plate; 25- first flue gas chamber; 26- second flue gas chamber; 27- connecting chamber; 28- second oil inlet interface; 29- second oil outlet interface; 30- gasification incinerator; 31- second air inlet duct; 32- water inlet interface; 33- water outlet interface; 34- waste heat boiler; 35- first gas preheater; 36- second gas preheater; 37- dust outlet; 38- flue gas outlet. DETAILED DESCRIPTION
[0039] The preferred embodiments of the present invention will be described in detail below in conjunction with the accompanying drawings, wherein the accompanying drawings constitute a part of the present invention and are used together with the embodiments of the present invention to illustrate the principles of the present invention, but are not used to limit the scope of the present invention.
[0040] Example 1
[0041] A specific embodiment of the present invention discloses a sludge drying, gasification and incineration integrated treatment method, such as Figure 1 , Figure 2 As shown, including:
[0042] S1 preheating process: after the sludge is preheated by the sludge pump pipe 3, it is sprayed into the spray drying furnace in an atomized state through the sprayer 6;
[0043] S2 Vaporization and drying process: The spray drying furnace 5 bakes the mist sludge in the furnace to vaporize and dry the sludge;
[0044] S3 Incineration process: the solids produced after the sludge gasification and drying treatment are introduced into the gasification incinerator 30 for incineration; the gasification incinerator 30 is provided with a third heat transfer oil pipe, and the third heat transfer oil pipe is filled with heat transfer oil; the sludge pump pipe 3 and the spray drying furnace 5 can be heated and heated by the heat transfer oil, thereby realizing the preheating, drying and gasification of the sludge;
[0045] S4 waste heat recovery process: the gasification incinerator 30 is connected to the waste heat boiler 34, so that the intermediate ash and flue gas after incineration can be discharged through the waste heat boiler 34; the waste heat boiler 34 recovers heat through a gas preheater, and preheats the air before passing it into the spray drying furnace 5 and the gasification incinerator.
[0046] I. S1 preheating process:
[0047] Specifically, one end of the sludge pump pipe 3 is connected to the feeding tank 1, and the sludge enters the sludge pump pipe 3 through the feeding tank 1; and a feeder 2 is provided between the sludge pump pipe 3 and the feeding tank 1, and the feeder 2 is used to introduce the sludge into the sludge pump pipe 3. Preferably, the feeder 2 is a double screw feeder.
[0048] In the S1 preheating process, a first heat transfer oil pipe 4 is provided on the outside of the sludge pump pipe 3, and the first heat transfer oil pipe 4 is connected to the third heat transfer oil pipe in the S3 incineration process; furthermore, the first heat transfer oil pipe 4 preheats the sludge pump pipe 3 and the sludge inside thereof through the heat transfer oil flowing inside.
[0049] In the preheating process S1, multiple groups of first heat transfer oil pipes 4 are arranged on the sludge pump pipe 3; multiple groups of first heat transfer oil pipes 4 are coiled outside the sludge pump channel 3 to preheat the sludge in the sludge pump channel 3. The sludge is heated in the sludge pump pipe 3 by the heat transfer oil in the first heat transfer oil pipe 4; the temperature of the heat transfer oil in the first heat transfer oil pipe 4 is between 300°C and 380°C, and the temperature of the sludge in the sludge pump pipe 3 after heating is controlled to be above 110°C.
[0050] Furthermore, a plurality of temperature sensors are provided on the first heat transfer oil pipe 4, and the preheating state of the sludge in the sludge pump channel 3 is determined by taking an average of a plurality of temperature values measured by the temperature sensors. Exemplarily, the temperatures of a plurality of positions of the first heat transfer oil pipe 4 measured by the plurality of temperature sensors are t1, t2, t3, ..., respectively, and then the plurality of temperature values are averaged to determine the heating temperature of the sludge pump pipe 3.
[0051] Furthermore, a first solenoid valve 15 and a first oil pump 16 are arranged between the first heat transfer oil pipe 4 and the third heat transfer oil pipe of the waste heat boiler 34. The first solenoid valve 15 is used to adjust the flow rate of the heat transfer oil in the first heat transfer oil pipe 4, and the first oil pump 16 is used to control the flow rate of the heat transfer oil, thereby achieving temperature control of the heat transfer oil.
[0052] Furthermore, a sludge pump is provided on the sludge pump channel 3 for controlling the speed at which the sludge is introduced into the spray drying furnace 5 .
[0053] II. S2 Vaporization and drying process:
[0054] In a specific embodiment of the present invention, in the S2 vaporization and drying process, a sprayer 6 is used to spray the wet sludge in the sludge pump pipe 3 into the spray drying furnace 5 .
[0055] Furthermore, in the S2 vaporization and drying process, a second heat transfer oil pipe 7 connected to the third heat transfer oil pipe in the S3 incineration process is provided on the inner wall of the spray drying furnace 5; the second heat transfer oil pipe 7 heats or keeps warm the furnace cavity of the spray drying furnace 5 through the heat transfer oil flowing inside.
[0056] In a specific embodiment of the present invention, Figure 3 As shown, a plurality of groups of second heat-conducting oil pipes 7 are arranged on the furnace body of the spray drying furnace 5 .
[0057] Preferably, if Figure 3 As shown, the furnace body of the spray drying furnace 5 is a circular or rectangular structure.
[0058] Furthermore, a plurality of groups of second heat transfer oil pipes 7 are arranged on the inner wall surface of the spray drying furnace 5 ; each group of second heat transfer oil pipes 7 is connected to the first oil inlet interface 9 and the second oil inlet interface 10 installed on the outer wall surface of the spray drying furnace 5 .
[0059] Specifically, the first oil inlet interface 9 is connected to the third heat transfer oil pipe of the gasification incinerator 30, and the heat transfer oil flows between the third heat transfer oil pipe and the second heat transfer oil pipe 7, thereby transferring heat between the spray drying furnace 5 and the gasification incinerator 30, thereby heating the internal cavity of the spray drying furnace 5. In the present invention, by providing the second heat transfer oil pipe 7 and the heat transfer oil therein, the temperature of the air inside the spray drying furnace 5 is increased, and after the sludge is sprayed into the spray drying furnace 5 through the sprayer 6, it can be quickly dried, and most of the water vapor in the sludge can be separated, so that the sludge is quickly dried.
[0060] In a specific embodiment of the present invention, multiple groups of second heat transfer oil pipes 7 are arranged in an annular shape on the spray drying furnace 5, and the multiple groups of second heat transfer oil pipes 7 are parallel to each other.
[0061] In this embodiment, in the S2 vaporization and drying process, the temperature of the heat transfer oil in the second heat transfer oil pipe 7 is 300° C. to 380° C.
[0062] Furthermore, in order to achieve the regulation of the internal temperature of the spray drying furnace 5, a second solenoid valve and a second oil pump are provided between the second heat conducting oil pipe 7 and the third heat conducting oil pipe, so as to control the flow rate of the heat conducting oil in the second heat conducting oil pipe 7. Specifically, the greater the flow rate of the heat conducting oil, the higher the internal temperature of the spray drying furnace 5; when the flow rate of the second heat conducting oil pipe 7 is adjusted to the maximum, the flow rate of the heat conducting oil is adjusted by controlling the rotation speed of the oil pump, thereby achieving the regulation of the internal temperature of the spray drying furnace 5.
[0063] In the present invention, a PID controller is provided to adjust the oil pump speed and valve opening in the heat transfer oil circuit, so as to control the flow rate of the heat transfer oil and the amount of oil entering the first heat transfer oil pipe 4 and the second heat transfer oil pipe 7, thereby realizing the regulation of the heat transfer oil temperature, the sludge pump channel 3 temperature, and the furnace chamber temperature of the spray drying furnace 5.
[0064] Furthermore, in order to achieve rapid vaporization and drying of the sludge in the spray drying furnace 5, in the present invention, a first air inlet pipe 12 is connected to the bottom of the spray drying furnace 5, and the first air inlet pipe 12 can blow high-temperature air heated by the waste heat boiler 34 and the second gas heating preheater from the bottom of the spray drying furnace 5, thereby quickly drying the sludge by the high-temperature air.
[0065] In the present invention, the first air inlet pipe 12 uses a bottom blowing air supply method to blow high-temperature air; in the S2 gasification and drying process, the temperature of the high-temperature air in the first air inlet pipe 12 is not less than 400°C. The present invention dries the sludge after spraying by bottom blowing high-temperature air, which can prevent the atomized and dried sludge debris from being deposited at the bottom of the spray drying furnace 5, and can promote the sludge debris after spraying to circulate up and down in the spray drying furnace 5, prolong the retention time of the sludge debris in the spray drying furnace 5, and then promote its drying effect, and can dry and take away more water vapor in the sludge to the maximum extent, improve the sludge calorific value, and make the sludge have a higher temperature before entering the gasification incinerator 30.
[0066] Furthermore, in order to monitor the internal temperature of the spray drying furnace 5, a plurality of temperature sensors are installed on the furnace wall of the spray drying furnace 5 to monitor the temperature inside the cavity of the spray drying furnace 5; specifically, the plurality of temperature sensors are arranged at intervals along the height direction of the spray drying furnace 5.
[0067] Preferably, if Figure 3 As shown, a temperature sensor is respectively arranged on the first air inlet pipe 12 and the air outlet pipe 8; four temperature sensors are arranged on the furnace body of the spray drying furnace 5; the temperatures monitored from bottom to top by the multiple temperature sensors are T0, T1, T2, T3, T4, and T5 respectively; the above five temperature values are weighted and averaged to obtain the parameter T representing the temperature of the spray drying furnace 5.
[0068] Exemplarily, according to the correlation between the temperatures at different positions and the temperature inside the furnace cavity, the weighted value adopts a value between 0.8 and 1.2.
[0069] Specifically, the amount of mud sprayed in the spray drying furnace 5 (sludge pump speed) is related to the entire temperature distribution of T1-T5. T1, T2, T3, T4, and T5 are weighted (average value) and used to adjust the air volume of the first air inlet pipe 12 at the bottom. When the air volume is the largest, the speed of the sludge pump is adjusted in turn.
[0070] In a specific embodiment of the present invention, a material guide pipe 11 is provided at the bottom of the spray drying furnace 5; the upper end of the material guide pipe 11 is connected to the inner cavity of the spray drying furnace 5, and the lower end is connected to the cage conveyor 13, and then the dried sludge is sent to the gasification incinerator 30 for incineration through the cage conveyor 13.
[0071] Specifically, in the S2 vaporization and drying process, the lower end of the spray drying furnace 5 is connected to the guide pipe 11, the upper end of the guide pipe 11 is connected to the inner cavity of the spray drying furnace 5, and the lower end is connected to the cage conveyor 13. The guide pipe 11 is used to guide the vaporized and dried sludge into the cage conveyor 13; and then the cage conveyor is driven to rotate by the drive motor 14 to transport the dried sludge to the gasification incinerator 30 for incineration.
[0072] Furthermore, the pressure of the high-temperature air in the first air inlet pipe 12 is Po, the gas pressure of the spray drying furnace 5 is lower than that of the first air inlet pipe 12, and the pressure value in the cavity of the spray drying furnace 5 is Ped; the difference △P between Po and Ped is used as a variable for controlling the conveying volume of the bottom cage conveyor 13, △P = Po-Ped, and in actual application, the upper and lower limits △Pmax and △Pmin of △P are given. During implementation, the material guide flow rate of the guide pipe 11 is controlled by calibrating △Pmax and △Pmin on site, and △P is controlled to be between △Pmax and △Pmin. When the pressure difference is too large, the speed of the cage conveyor 13 is reduced; when the pressure difference is too low, the conveying efficiency of the cage conveyor 13 is increased.
[0073] Specifically, in the S2 vaporization and drying process, the gas generated by sludge drying is discharged through the air outlet pipe 8 arranged at the upper end of the spray drying furnace 5; by controlling the flow of the second heat transfer oil pipe 7 on the spray drying furnace 5, the temperature of the gas discharged from the air outlet pipe 8 is controlled to be greater than 100°C; preferably, the temperature of the gas discharged from the air outlet pipe 8 is 120°C±5°.
[0074] Furthermore, a second solenoid valve and a second oil pump are provided between the second heat-conducting oil pipe 7 and the third heat-conducting oil pipe. In the present invention, the oil quantity control in the first heat-conducting oil pipe 4 and the second heat-conducting oil pipe 7 is controlled by a PID controller. Specifically, the PID controller controls the flow of the first solenoid valve and the second solenoid valve and the rotation speed of the first oil pump 16 and the second oil pump to achieve the oil quantity and temperature control of the first heat-conducting oil pipe 4 and the second heat-conducting oil pipe 7.
[0075] Furthermore, in the S2 vaporization and drying process, the gas generated by the sludge being baked in the spray drying furnace 5 is passed into the condenser for condensation; after condensation, liquid sewage and gaseous non-condensable gas are generated; wherein, the sewage is discharged and purified through biochemical treatment; the non-condensable gas is passed into the gasification incinerator 30 in the S3 incineration process for incineration.
[0076] Considering that the non-condensable gas discharged from the condenser has a low temperature (low enthalpy value), directly passing it into the gasification incinerator 30 will reduce the furnace temperature of the gasification incinerator 30 and increase the combustion energy consumption of the gasification incinerator 30. Therefore, in the present invention, the non-condensable gas is heat exchanged through the waste heat boiler 34, absorbs the heat of the combustion flue gas to increase the enthalpy value, and then is passed into the gasification incinerator 30 for combustion.
[0077] III. S3 Incineration Process:
[0078] like Figure 7 As shown, the gasification incinerator 30 includes: a gasification incineration chamber and a flue gas furnace; the gasification incineration chamber is used to incinerate combustible dried sludge and non-condensable gas; the flue gas furnace is connected to the waste heat boiler 34 to introduce the high-temperature flue gas generated by combustion into the waste heat boiler 34.
[0079] Specifically, the gasification incineration chamber is used to incinerate the dried sludge, and its internal incineration temperature reaches 900°C.
[0080] like Figure 7 As shown, the flue gas furnace is an inverted U-shaped structure, which is used to guide the flue gas after sludge incineration. A dust outlet is provided at the lower end of the flue gas furnace to guide the medium ash after sludge incineration. A separator is provided on the side of the flue gas furnace, the separator is connected to the side of the flue gas furnace, and a dust outlet is provided at the bottom of the separator to guide the medium ash.
[0081] Specifically, the flue gas duct includes: a first flue gas duct 25, a second flue gas duct 26 and a connecting duct 27; wherein the lower end of the first flue gas duct 25 is connected to the gasification and incineration chamber and is arranged parallel to the second flue gas duct 26; the upper end of the first flue gas duct 25 is connected to the upper end of the second flue gas duct 26 through the connecting duct 27.
[0082] In the present invention, the sludge is gasified in the gasification chamber of the gasification incineration furnace 30 to generate gasification gas, and the gasification gas is burned in the gasification chamber; the gasification gas is also burned in the first flue gas furnace 25.
[0083] Furthermore, a third heat transfer oil pipe is arranged on the wall of the first flue gas furnace 25, and the third heat transfer oil pipe recovers the heat generated by the gasification incinerator 30 through the heat transfer oil, and then passes the heat transfer oil into the first heat transfer oil pipe 4 and the second heat transfer oil pipe 7 to preheat and dry the sludge.
[0084] The third heat-conducting oil pipe is provided with a second oil inlet interface 28 and a second oil outlet interface 29, wherein the second oil inlet interface 28 is used to introduce the heat-conducting oil refluxed from the first heat-conducting oil pipe 4 and the second heat-conducting oil pipe 7 into the third heat-conducting oil pipe; the second oil outlet interface 29 is used to provide the first heat-conducting oil pipe 4 and the second heat-conducting oil pipe 7 with the heat-conducting oil heated by the gasification incinerator 30.
[0085] Furthermore, the heat transfer oil in the third heat transfer oil pipe is heated by the gasification incinerator 30 and divided into three paths: one path is supplied to the first heat transfer oil pipe 4 in the S1 preheating process for preheating the sludge; one path is supplied to the second heat transfer oil pipe 7 in the S2 vaporization and drying process for gasifying and drying the sprayed sludge; one path is supplied to the air cooler for cooling, and the flow rate of the heat transfer oil supplied to the air cooler is adjusted by a valve, thereby controlling the temperature of the heat transfer oil.
[0086] Preferably, the temperature of the heat transfer oil in the first heat transfer oil pipe 4 and the second heat transfer oil pipe 7 is controlled to be 300° C.-380° C.
[0087] Furthermore, a cooling liquid circulation loop is provided at the end of the second flue gas duct 26; the cooling liquid circulation loop includes: a liquid cooling pipeline, a water inlet interface 32 and a water outlet interface 33; the liquid cooling pipeline is wound around the outer wall of the end of the second flue gas duct 26, and the two ends are respectively connected to the water inlet interface 32 and the water outlet interface 33; a water tank and a water pump are connected between the interface 32 and the water outlet interface 33, which are used to introduce cooling liquid into the liquid cooling pipeline, thereby cooling the second flue gas duct 26, and the flue gas inside the second flue gas duct 26 is discharged in the form of medium ash after cooling.
[0088] IV. S4 waste heat recovery process:
[0089] Furthermore, the upper end of the flue gas furnace or the upper end of the separator is connected to the waste heat boiler 34, and the high-temperature flue gas generated by the incineration enters the waste heat boiler 34. Preferably, the temperature of the high-temperature flue gas in the waste heat boiler 34 is 550°C±10°.
[0090] In a specific embodiment of the present invention, Figure 7 As shown, the waste heat boiler 34 is an inverted U-shaped structure, one end of which is connected to the flue gas furnace, and the other end is provided with a dust outlet 37 and a flue gas outlet 38.
[0091] In the S4 waste heat recovery process, the waste heat boiler 34 is nested with a first gas preheater 35 and a second gas preheater 36 . The first gas preheater 35 and the second gas preheater 36 can heat the gas flowing through them by absorbing the waste heat of the flue gas in the waste heat boiler 34 .
[0092] Furthermore, the first gas preheater 35 is used to preheat the non-condensable gas discharged from the condenser; and the second gas preheater 36 is used to preheat the air.
[0093] like Figure 1As shown, in the S2 vaporization and drying process, the non-condensable gas condensed by the condenser 18 is first introduced into the first gas preheater 35 in the S4 waste heat recovery process for preheating, and then introduced into the gasification incinerator 30 in the S3 incineration process for combustion. Preferably, the temperature of the non-condensable gas after preheating by the first gas preheater 35 reaches at least 200°C.
[0094] like Figure 1 , Figure 7 As shown, air is introduced into the second gas preheater 36 in the S4 waste heat recovery process, and the low-temperature air is heated by the high-temperature flue gas in the waste heat boiler 34 to obtain high-temperature air. Furthermore, the high-temperature air obtained in the S4 waste heat recovery process is respectively introduced into the spray drying furnace 5 of the S2 gasification and drying process and the gasification incinerator 30 of the S3 incineration process, thereby achieving gasification, drying and incineration of the sludge.
[0095] Specifically, the second gas preheater 36 preheats the air to not less than 400°C; the high-temperature air of not less than 400°C is divided into two paths, one path is passed into the furnace cavity through the first air inlet pipe 12 at the bottom of the spray drying furnace 5 to dry the sludge, and the other path is passed into the gasification incineration chamber through the second air inlet pipe 31 at the bottom of the gasification incineration furnace 30 to incinerate the dried sludge.
[0096] In the present invention, the gas outlet of the second gas preheater 36 is arranged upstream of the first gas preheater 35 , so that the temperature of the gas preheated by the second gas preheater 36 is higher than that of the first gas preheater 35 .
[0097] Specifically, the principles of the first gas preheater 35 and the second gas preheater 36 are the same.
[0098] Combine the following Figure 7 Explain the structure and principle of the gas preheater:
[0099] Exemplarily, the second gas preheater 36 includes: a box body 361 and a connecting air duct 362; wherein a plurality of box bodies 361 are provided, and the box bodies 361 are covered on the outside of the waste heat boiler 34; the connecting air duct 362 is used to connect the plurality of box bodies 361, and when the air flows through the plurality of box bodies 361 in sequence, it can exchange heat with the waste heat boiler 34 and the high-temperature flue gas therein.
[0100] Exemplarily, the second gas preheater 36 includes: a preheating pipe 363 and a connecting air duct 362; specifically, the preheating pipe 363 is arranged throughout the interior of the waste heat boiler 34, and its two ends are connected to the connecting air duct 362 / inlet air duct / outlet air duct. When in use, the preheating pipe 363 is in direct contact with the high-temperature flue gas inside the waste heat boiler 34, thereby heating the gas circulating inside the preheating pipe 363. Specifically, multiple groups of preheating pipes 363 are arranged, and two groups of preheating pipes 363 are connected by the connecting air duct 362. Preferably, multiple preheating pipes 363 of the same group are arranged in multiple rows and columns inside the waste heat boiler 34, and two adjacent rows of preheating pipes 363 are staggered in the direction of flue gas circulation, such as Figure 8 shown.
[0101] Preferably, in this embodiment, the preheating tube 363 is configured as a gradually shrinking and expanding tube; Fig. 9 As shown, the preheating tube 363 is a rectangular tube with at least one spherical expansion chamber arranged in the middle. The gas circulates in the preheating tube 363. When the gas flows through the spherical expansion chamber of the preheating tube 363, a vortex phenomenon is generated, which promotes heat exchange between the gas and the wall of the preheating tube 363, thereby improving the heat exchange efficiency and achieving the expected temperature of the gas after passing through the gas preheater.
[0102] In the present invention, a built-in preheating pipe 363 is provided to exchange heat with the high-temperature flue gas (550°C) to improve the preheating effect and preheating efficiency of the air, so that the low-temperature air can reach the expected temperature (400°C) in a short time, so as to supply the gasification incineration chamber with sufficient oxygen for combustion, and supply the spray drying furnace 5 with sufficient high-temperature air to dry the sludge, thereby improving the treatment efficiency and treatment quality of the sludge.
[0103] In a specific embodiment of the present invention, Figure 7 As shown, the second gas preheater 36 is provided with four boxes 361, and the four boxes 361 are connected through the connecting air duct 362. Among them, three groups are provided from bottom to top at the tail section (low temperature section) of the U-shaped waste heat boiler 34, and the bottommost box 361 is connected to the air inlet duct, and at the same time, a box 361 is provided at the front section (high temperature section) of the waste heat boiler 34, and the box 361 at the front section of the waste heat boiler 34 is connected to the air outlet duct. Specifically, the front section and the tail section of the preheating boiler 34 are divided according to the flow order of the high temperature flue gas inside them.
[0104] Or, if Figure 7 As shown, the second gas preheater 36 is provided with four groups of preheating pipes 363, and the four groups of preheating pipes 363 are connected through the connecting air duct 362. Among them, three groups of preheating pipes 363 are arranged from bottom to top in the tail section (low temperature section) of the U-shaped waste heat boiler 34, and one group of preheating pipes 363 is arranged in the head section (high temperature section) of the heat boiler 34. In addition, the group of preheating pipes 363 at the bottom of the tail section is connected to the air inlet duct, and the preheating pipes 363 at the head section are connected to the air outlet duct.
[0105] When in use, the air flows through the three boxes 631 / three groups of preheating pipes 363 at the tail section of the waste heat boiler 34 in sequence, and then enters the box 361 / preheating pipe 363 at the head section, realizing step-by-step preheating of the air, gradually increasing the air temperature, and achieving the optimal preheating effect.
[0106] Correspondingly, the first gas preheater 35 for preheating the non-condensable gas is arranged in the middle section of the waste heat boiler 34, such as Figure 7 shown.
[0107] Furthermore, by controlling the length and flow rate of the flow path of the non-condensable gas / air in the first gas preheater 35 / the second gas preheater 36, the temperature of the non-condensable gas / air after being preheated by the first gas preheater 35 / the second gas preheater 36 is controlled. In the present invention, the temperature of the non-condensable gas after preheating is controlled to be not less than 200°C, and the temperature of the air after preheating is controlled to be not less than 400°C.
[0108] Compared with the prior art, the technical solution provided by this embodiment has at least one of the following beneficial effects:
[0109] 1. In this embodiment, the preheated sludge is sprayed and flashed in the cavity formed by the second heat transfer oil pipe 7 (300°C) inside the spray drying furnace 5, and hot air (400°C) is introduced through the bottom of the spray drying furnace 5 for ventilation and drying. After drying, the moisture content of the sludge is reduced from 72% to 60% or even lower. After entering the TFB gasification incinerator, it is first gasified and then incinerated.
[0110] 2. The sludge incineration equipment of the present invention realizes a solution with high energy efficiency and low operating cost; the current direct operating cost can be as low as 150 yuan / t, while the operating cost of the prior art is generally 350-400 yuan / t, and the present invention is 200-250 yuan / t lower than the existing method.
[0111] 3. The relevant equipment of the present invention has a simple structure and is easy to manufacture, and the initial investment can be significantly reduced. The practice of the processing method of the present invention shows that the initial investment in the technical equipment of the present invention is about 200,000 yuan / t / d, while the existing technology is generally 350,000-400,000 yuan / t / d.
[0112] 4. In the present invention, according to the principle of cascade utilization of heat and the principle of minimization of auxiliary fuel, the drying and incineration integrated system is arranged, the heat utilization rate is high, the energy consumption of sludge treatment is greatly reduced, and the comprehensive treatment cost is reduced.
[0113] Example 2
[0114] A specific embodiment of the present invention provides a specific structure of the sprayer 6 in Example 1.
[0115] like Figure 3, Figure 4 As shown, the sprayer 6 in the present invention is a cone-shaped structure.
[0116] Specifically, the upper end of the sprayer 6 is connected to the lower end of the sludge pump pipe 3. The lower end of the sprayer 6 has a conical bell mouth, and the bell mouth and the sludge pump pipe 3 are connected through a connecting pipe at the upper end of the sprayer 6.
[0117] like Figure 4 , Figure 5 As shown, the upper end of the sprayer 6 is connected to a first high-pressure air inlet 601 and a second high-pressure air inlet 602; specifically, the first high-pressure air inlet 601 and the second high-pressure air inlet 602 are both connected to the connecting pipe at the upper end of the sprayer 6, and are symmetrically arranged on both sides of the connecting pipe.
[0118] Furthermore, if Figure 4 , Figure 5 As shown, a plurality of third high-pressure air inlets 603 are arranged outside the conical bell mouth at the lower end of the sprayer 6.
[0119] Specifically, the plurality of third high-pressure air inlets 603 are arranged in an array with equal spacing in the circumferential direction outside the bell mouth of the sprayer 6, and the plurality of third high-pressure air inlets 603 are located at the same height, such as Figure 5 shown.
[0120] Preferably, the number of the third high-pressure air inlets is 6.
[0121] like Figure 5 As shown, the angle between the blowing direction of the plurality of third high-pressure air inlets 603 and the radial direction of the sprayer 6 is α; 10°≤α≤30°; the diameter of the inscribed circle in the blowing direction of the plurality of third high-pressure air inlets 603 is d in .
[0122] Specifically, the blowing direction of the third high-pressure air inlet 603 is set to be inclined downward; Figure 4 As shown, the third high-pressure air inlet 603 is arranged at an angle with the horizontal direction; the angle between the blowing direction of the third high-pressure air inlet 603 and the horizontal direction is 20° to 30°.
[0123] Preferably, the cone angle of the inner cavity of the bell mouth of the sprayer 6 is 60°.
[0124] Specifically, the internal flow channel diameter of the connecting pipe at the upper end of the sprayer 6 is D0; the pipe opening diameters of the first high-pressure air inlet 601 and the second high-pressure air inlet 602 are the same, both 2D0; the height H of the bell mouth of the sprayer 6 is (5-7)D0; the outer diameter D of the position where the third high-pressure air inlet 603 of the bell mouth is located is (4-6)D0, and the diameter D1 of the internal cavity is (3-4)D0, D1 <D。
[0125] Specifically, the cross section of the sprayer 6 at the height of the third high-pressure air inlet 603 is a circular ring, and the inner diameter of the circular ring is D1; the diameter of the inscribed circle in the blowing direction of the third high-pressure air inlet 603 is d in Moreover, the inner cavity diameter of the sprayer 6 is larger than the inscribed circle diameter of the third high-pressure air inlet 631 in the blowing direction, that is, D 1> d in Preferably, d in =1 / 4D=(1~1.5)D0.
[0126] In the present invention, high-pressure air is introduced into the first high-pressure air inlet 601 and the second high-pressure air inlet 602, and high-pressure air is introduced into the upper end of the atomizer 6 to create a high-pressure environment inside the internal conical space of the atomizer 6 to promote the atomization and injection of sludge.
[0127] In the present invention, by providing a plurality of third high-pressure air inlet interfaces 603, high-pressure air is sprayed into the bell mouth of the sprayer 6, and the high-pressure air is distributed circumferentially, so that the sludge inside the bell mouth can be circumferentially pressurized and vortex-crushed. In other words, the multiple streams of high-pressure air blown in by the third high-pressure air inlet interface 603 can form a highly vortex airflow in the circumferential direction of the sludge, thereby promoting the decomposition and atomization of the sludge, and the decomposed and atomized sludge particles have a certain speed, so that they are sprayed into the inner cavity of the spray drying furnace 5.
[0128] Example 3
[0129] A specific embodiment of the present invention provides a specific structure of the condenser in Example 1.
[0130] In a specific embodiment of the present invention, the structure of the condenser is as follows: Figure 6 shown.
[0131] like Figure 6 As shown, the condenser includes: a wind box 17, a condenser tube 18, a condenser tube air inlet interface 19, a condenser tube air outlet interface 20, a drain interface 21 and a heat exchange air duct 22.
[0132] Specifically, the condenser pipe 18 is a tapered pipe or a trapezoidal pipe with a gradually expanding size.
[0133] Specifically, one end of the condenser 18 is provided with a condenser air inlet interface 19, and the other end is provided with a condenser air outlet interface 20. The gas discharged from the spray drying furnace 5 enters the condenser 18 through the condenser air inlet interface 19 and is discharged through the condenser air outlet interface 20. Preferably, the condenser air outlet interface 20 opens upward.
[0134] Specifically, the liquid discharge port 21 is disposed below the condenser 18 and is located at one end close to the condenser air outlet port 20 .
[0135] Specifically, a wind box 17 is arranged on the side of the condenser 18, and the wind box 17 is fixedly connected to the condenser 18 but not connected. A plurality of heat exchange air ducts 22 are embedded inside the condenser 18, and the heat exchange air ducts 22 are arranged perpendicular to the condenser 18 and penetrate the condenser 18; one end of the heat exchange air duct 22 is connected to the wind box 17, and the other end is connected to the external space; preferably, the plurality of heat exchange air ducts 22 are arranged at equal intervals along the axial direction of the condenser 18.
[0136] Furthermore, an air pump is installed at the air inlet of the bellows 17 , and cold air can be introduced into the bellows 17 through the air pump.
[0137] During implementation, cold air is introduced into the bellows 17 through the air pump, enters the heat exchange air duct 22 through the bellows 17, and then exchanges heat with the gas flowing in the condenser 18 through the heat exchange air duct 22 to condense the gas discharged from the spray drying furnace 5. The liquid produced after condensation is discharged from the drain interface 21; the non-condensable gas (combustible gas in the sludge) that does not change its state after condensation is introduced into the gasification incinerator 30 for incineration.
[0138] Furthermore, in order to improve the condensation effect of the condenser, in the present invention, an air distribution plate 23 is provided in the condensation tube 18 , and an air distribution plate 24 is provided in the wind box 17 .
[0139] Specifically, the air distribution plate 24 is arranged parallel to the condensing tube 18 and is located below the multiple heat exchange air ducts 22; the surface of the air distribution plate 24 is provided with uneven air holes, so that the air volume in the heat exchange air duct 22 can be adjusted through the air distribution plate 24, thereby realizing the stepped distribution of cold air and improving the condensation effect.
[0140] Preferably, the size of the air holes on the air distribution plate 24 gradually decreases from the condenser air inlet interface 19 to the condenser air outlet interface 20. As a result, the air volume flowing into the multiple heat exchange air ducts 22 is reduced in a step-by-step manner. The air volume on the side close to the condenser air inlet interface 19 is large, which can quickly exchange heat with the gas discharged from the spray drying furnace 5, and then quickly cool the gas. After the gas exchanges heat with the multiple heat exchange air ducts 22 in turn, the temperature decreases step by step, and the air volume in the heat exchange air duct 22 is gradually reduced in coordination with the gas temperature in the condenser 18; the present invention can reduce the amount of cold air on the premise of achieving rapid condensation of the gas through reasonable air distribution, thereby reducing equipment power and saving sludge treatment costs.
[0141] Specifically, Figure 6 As shown, the air equalizing plate 23 is arranged inside the condenser tube 18 and has evenly distributed pores on its surface. After the gas in the condenser tube 18 is condensed through the heat exchange air pipe 22, it is evenly distributed through the air equalizing plate 23 and then discharged from the condenser tube air outlet interface 20.
[0142] During implementation, the high-temperature gas discharged from the outlet pipe 8 of the spray drying furnace 5 is condensed by the condenser, the gas temperature is reduced, and part of the vapor is liquefied into liquid and discharged as sewage, and the chemical substances dissolved in the sewage are purified by biochemical treatment. After condensation, the non-condensable gas is passed into the gasification incinerator 30 for incineration.
[0143] In this embodiment, a plurality of heat exchange air pipes 22 are provided to exchange heat with high-temperature gas, and the flow rate of cold air in the plurality of heat exchange air pipes 22 is adjusted by an air distribution plate 24, thereby realizing step heat exchange. As the temperature of the gas decreases step by step, the amount of cold air introduced is reduced to avoid excessive consumption of cold air, reduce the power of the fan and / or refrigeration equipment, reduce energy consumption, and reduce processing costs.
[0144] It is worth noting that the "high temperature" and "low temperature" in the present invention refer to the temperature change before and after the gas / heat transfer oil is heated, or before and after heat exchange, and are used to distinguish the endothermic or exothermic state of the substance, and do not indicate a specific temperature range.
[0145] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily conceived by any technician familiar with the technical field within the technical scope disclosed by the present invention should be covered within the protection scope of the present invention.
Claims
1. A sludge drying, gasification and incineration integrated treatment method, It is characterized in that include: S1 preheating process: after the sludge is preheated by the sludge pump pipe (3), it is sprayed into the spray drying furnace in an atomized state through the sprayer (6); S2 Vaporization and drying process: The spray drying furnace (5) bakes the mist sludge in the furnace to vaporize and dry the sludge; S3 incineration process: the solids after sludge vaporization and drying are introduced into the gasification incinerator (30) for incineration; the gasification incinerator (30) is provided with a third heat transfer oil pipe, and the third heat transfer oil pipe is filled with heat transfer oil; the sludge pump pipe (3) and the spray drying furnace (5) can both be heated and heated by the heat transfer oil, thereby achieving preheating, drying and vaporization of the sludge; S4 waste heat recovery process: The gasification incinerator (30) is connected to the waste heat boiler (34), so that the intermediate ash and flue gas after incineration can be discharged through the waste heat boiler (34); the waste heat boiler (34) recovers heat through a gas preheater, and preheats the air before passing it into the spray drying furnace (5) and the gasification incinerator.
2. The sludge drying, gasification and incineration integrated treatment method according to claim 1, It is characterized in that In the S1 preheating process, a first heat transfer oil pipe (4) is provided outside the sludge pump pipe (3), and the first heat transfer oil pipe (4) is connected to the third heat transfer oil pipe in the S3 incineration process; furthermore, the first heat transfer oil pipe (4) preheats the sludge pump pipe (3) and the sludge inside thereof through the heat transfer oil flowing inside.
3. The integrated treatment method for sludge drying, gasification and incineration according to claim 2, It is characterized in that In the S2 vaporization and drying process, a second heat transfer oil pipe (7) is provided on the inner wall of the spray drying furnace (5) and is connected to the third heat transfer oil pipe in the S3 incineration process; the second heat transfer oil pipe (7) heats and keeps warm the furnace cavity of the spray drying furnace (5) through the heat transfer oil flowing inside.
4. The sludge drying, gasification and incineration integrated treatment method according to any one of claims 1 to 3, It is characterized in that In the S2 vaporization and drying process, the gas generated by the sludge being baked in the spray drying furnace (5) is introduced into a condenser for condensation; after condensation, liquid sewage and gaseous non-condensable gas are generated; wherein the sewage is discharged and purified through biochemical treatment; and the non-condensable gas is introduced into a gasification incinerator (30) in the S3 incineration process for incineration.
5. The sludge drying, gasification and incineration integrated treatment method according to claim 4, It is characterized in that In the S4 waste heat recovery process, a first gas preheater (35) and a second gas preheater (36) are nested and installed on the waste heat boiler (34), and the first gas preheater (35) and the second gas preheater (36) can heat the gas flowing through them by absorbing the waste heat of the flue gas in the waste heat boiler (34).
6. The integrated treatment method of sludge drying, gasification and incineration according to claim 5, It is characterized in that The non-condensable gas generated in the S2 vaporization and drying process is first introduced into the first gas preheater (35) in the S4 waste heat recovery process for preheating, and then introduced into the gasification incinerator (30) in the S3 incineration process for combustion.
7. The sludge drying, gasification and incineration integrated treatment method according to claim 6, It is characterized in that Air is introduced into the second gas preheater (36) in the S4 waste heat recovery process, and the low-temperature air is heated by the high-temperature flue gas in the waste heat boiler (34) to obtain high-temperature air.
8. The integrated treatment method for sludge drying, gasification and incineration according to claim 7, It is characterized in that The high-temperature air obtained in the S4 waste heat recovery step is introduced into the spray drying furnace (5) and the gasification incineration furnace (30) respectively to vaporize, dry and incinerate the sludge.
9. The integrated treatment method for sludge drying, gasification and incineration according to claim 1, It is characterized in that A material guide pipe (11) and a first air inlet pipe (12) are provided at the bottom of the spray drying furnace (5); the upper end of the material guide pipe (11) is connected to the inner cavity of the spray drying furnace (5), and the lower end is connected to a cage conveyor (13), and then the dried sludge is sent to the gasification incinerator (30) for incineration through the cage conveyor (13).
10. The integrated treatment method of sludge drying, gasification and incineration according to claim 9, It is characterized in that The gasification incinerator (30) comprises: a gasification incineration chamber and a flue gas furnace duct; the gasification incineration chamber is used for gasifying and incinerating combustible dried sludge and non-condensable gas; the flue gas furnace duct is connected to the waste heat boiler (34) to guide the high-temperature flue gas generated by combustion into the waste heat boiler (34).
Citation Information
Patent Citations
Wet sludge drying, incinerating and treating device
CN101387404A
Wet sludge drying and incinerating treatment device
CN102531324A
Method using drying and incineration to treat sludge