Integrated roadbed paver and construction method thereof

By designing an integrated roadbed paver that integrates sand and gravel grading, dry and wet separation, roughening and compaction systems, the problem of low integration level in roadbed construction is solved and high-efficiency, high-quality construction results are achieved.

CN118727554AActive Publication Date: 2024-10-01CHINA MCC22 GROUP CORP LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202411120236.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-15
Publication Date
2024-10-01
Estimated Expiration
2044-08-15

AI Technical Summary

Technical Problem

In highway projects, the level of integration of roadbed construction is low, resulting in difficulty in controlling the construction quality, long construction period, complicated processes, and lack of integrated construction equipment and methods.

Method used

An integrated roadbed paver is designed, including a sand and gravel grading conveying system, a dry and wet separation and blending system, an earthwork roughing system and an earthwork compaction system. These systems are connected through a conveyor frame to achieve roughening, watering and layering. The compaction process is integrated and electrified control and dynamic adjustment technology are used to ensure construction quality.

Benefits of technology

It improves construction efficiency, shortens the construction period, reduces the impact of human factors on quality, reduces labor costs, and improves construction quality and economic benefits.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118727554A_ABST
    Figure CN118727554A_ABST
Patent Text Reader

Abstract

The invention relates to road construction machinery, in particular to an integrated roadbed paver and a construction method thereof. Comprising a gravel grading conveying system, a dry-wet separation blending system, an earthwork rough leveling system and an earthwork compaction system, the gravel grading conveying system is arranged at the front part of a conveying frame, the dry-wet separation blending system is arranged at the rear part of the conveying frame, and a traction beam is arranged at the front end of the conveying frame and is connected with a transport vehicle; the rear end of the conveying frame is connected with an earthwork rough leveling system; and the rear end of the earthwork rough leveling system is connected with an earthwork compaction system. The processes of rough leveling, rolling, watering, layered compaction and the like in roadbed construction are integrated, the construction efficiency can be improved, the construction interval waiting time is shortened, and the construction period is shortened; the loose paving thickness and the moisture content of roadbed paving are strictly controlled through an electrification means, and dynamic adjustment is performed, so that the influence of human subjective factors on the construction quality in the process is reduced, and the construction quality is improved; manpower is greatly saved, labor cost is reduced, and economic benefits are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a road construction machine, in particular to an integrated roadbed paver and a construction method thereof. Background Art

[0002] In the field of highway engineering, roadbed construction is particularly important, and the construction quality of roadbed engineering is related to the service life of the highway. Roadbed engineering is the longest-lasting sub-project in highway construction. There are many quality control indicators during the construction process, such as compaction, moisture content, deflection value, thickness, etc. There are many processes in the roadbed construction process, such as unloading, rough leveling, sprinkling, rolling, layered compaction, etc. Any process will affect the overall construction quality of the roadbed. At present, the level of integration of roadbed construction is low, so there are more complex construction nodes that need to be controlled in terms of quality control. The overall construction period is long and the processes are complicated. There is a lack of construction equipment and construction methods that can integrate roadbed construction into one. Summary of the invention

[0003] The present invention aims to solve the above technical problems, thereby providing an integrated roadbed paver and a construction method thereof, thereby improving the integration level of roadbed construction and improving construction efficiency.

[0004] The present invention solves the technical problem and adopts the following technical solution: An integrated roadbed paver includes a sand and gravel grading conveying system, a dry and wet separation and mixing system, an earthwork rough leveling system and an earthwork compaction system. The sand and gravel grading conveying system is placed at the front of the conveying frame, the dry-wet separation and mixing system is placed at the rear of the conveying frame, and a traction beam is provided at the front end of the conveying frame and is connected to the transport vehicle; The rear end of the conveyor frame is connected to a rough earthwork leveling system; The rear end of the earthwork rough leveling system is connected with an earthwork compaction system.

[0005] The construction method of the above-mentioned integrated roadbed paver is carried out according to the following steps: S1. Preparation Check whether the equipment can operate normally, take soil and distribute it to the transport vehicle in different levels, and fill the water tank with water; S2: The roadbed paver starts and construction begins; S3, the transport vehicle slowly lifts the bucket and pours the graded sand and gravel into the lower hopper through the conveyor belt; S4, the soil thickness monitor monitors in real time and feeds back the data to the master control display screen to adjust the feeding speed, the moisture content monitor monitors the moisture content of sand and gravel in real time and feeds back the data to the master control display screen to adjust the moisture content of graded sand and gravel; S5. After the thickness and water content of the gravel are adjusted according to the construction requirements, the drainage pipe starts to work, spraying water evenly on the surface of the gravel, and the gravel is evenly spread on the roadbed through the discharge port; S6, the earthwork rough leveling system works synchronously, and the sand and gravel laid loose on the roadbed pass through the rough leveling claw, rough leveling shovel and rough leveling wheel in sequence to achieve preliminary leveling; S7, finally leveling and rolling by single-axle three-wheel smooth roller, sheep foot roller and vibrating flat roller; S8. Complete the integrated paving operation of the roadbed and carry out measurement and slope finishing.

[0006] Compared with the prior art, the present invention using the above technical solution has the following beneficial effects: 1) Integrating the rough leveling, rolling, watering and layered compaction processes in roadbed construction can improve construction efficiency, reduce construction interval waiting time and shorten construction period; 2) Strictly control the loose paving thickness and moisture content of the roadbed through electrification, and make dynamic adjustments to reduce the impact of subjective human factors on the construction quality during the process, thereby improving the construction quality; 3) Different types of rolling rollers are set up, and the appropriate compaction roller can be selected according to construction needs. At the same time, the rolling process can be carried out immediately after watering to further ensure that compaction can be carried out at a qualified moisture content and improve construction quality; 4) Save a lot of manpower, reduce labor costs and improve economic benefits.

[0007] Furthermore, the optimization scheme of the present invention is: The sand and gravel grading conveying system includes a guide plate, a first transmission shaft, a second transmission shaft, a transmission wheel, a conveyor belt, a reduction motor and a sand and gravel conveying trough. The first transmission shaft and the second transmission shaft are respectively placed at both ends of the guide plate and are rotatably connected to the guide plate. Transmission wheels are respectively installed at both ends of the first transmission shaft. The conveyor belt is wrapped around the first transmission shaft and the second transmission shaft and driven by the transmission wheel. The first transmission shaft is driven by the reduction motor. The sand and gravel conveying trough is located at the front end of the conveyor belt.

[0008] The dry-wet separation and mixing system includes a bearing base, a lower hopper, an upper hopper and a sprinkler device. The rear end of the bearing base is provided with a lower hopper, the upper part of the lower hopper is provided with an upper hopper, the inlet end of the upper hopper is rotatably mounted with a spring cover plate, the outlet ends of the lower hopper and the upper hopper are respectively provided with material doors, and the upper part of the inlet end of the lower hopper is installed with a sprinkler device.

[0009] The sprinkler device includes a drain pipe, a support, a nozzle and a water tank. There are two drain pipes that are symmetrically arranged. The drain pipe is arc-shaped and has multiple nozzles installed at the bottom. One end of the drain pipe is rotatably connected to the support. The support is in an inverted U shape and is connected to the lower hopper. The other end of the drain pipe is rotatably connected to the fixed shaft through a rotating sleeve. The fixed shaft is fixedly connected to the support and a knob for tightening the rotating sleeve is screwed on the inner end. The drain pipe is connected to the water tank through a pipeline.

[0010] The earthwork rough leveling system includes a frame, a rotating chassis, a steering tie rod, a rough leveling claw, a rough leveling shovel, a rough leveling wheel and a control mechanism. The frame is in an inverted L shape, and first wheels are respectively installed on both sides of the vertical part of the frame. A rotating chassis is provided below the horizontal part of the frame. The rotating chassis is sequentially installed with rough leveling claws, a rough leveling shovel and a rough leveling wheel from front to back. The rotating chassis is connected to one end of the steering tie rod, and the other end of the steering tie rod is hinged to the vertical part of the frame. A control mechanism is provided between the rotating chassis and the horizontal part of the frame.

[0011] The control mechanism includes a connecting seat, a control arm, a steering rod and a hydraulic arm. The horizontal part of the frame is provided with a connecting seat, and connecting ear seats are respectively provided on both sides of the connecting seat. The connecting ear seat is hinged to one end of the steering rod, one side of the steering rod is hinged to the upper end of the hydraulic arm, the lower end of the hydraulic arm is hinged to the rotating chassis, and a control arm is provided at the lower end of the steering rod. The control arms on both sides are hinged through an arc-shaped connecting rod.

[0012] The rotating chassis includes a chassis body and a connecting hook. The chassis body is in a semicircular arc shape. Connecting structures are respectively provided at both ends of the chassis body. The chassis body is connected to the rough flat claw through a rough flat connector and a rough flat connecting shaft, and the rough flat shovel is connected to the connecting structure. String beams are respectively provided at both ends of the rough flat connector, and the rear end of the string beam is rotatably connected to the triangular rough flat wheel through a connecting frame.

[0013] The earth compaction system comprises a rear frame, a second wheel, a connecting guide rail, a vibrating roller, a sheep-foot roller and a single-axis three-wheel smooth roller. The second wheel is installed at the bottom of the rear frame, and connecting guide rails are symmetrically arranged on both sides of the rear frame. The front end of the connecting guide rail is connected to the earth rough leveling system. The single-axis three-wheel smooth roller, the sheep-foot roller and the vibrating roller are rotatably connected to the connecting guide rails in sequence from front to back. The two ends of the sheep-foot roller are respectively connected to the connecting guide rails through radial lifting mechanisms. An eccentric vibrator is arranged at the bottom of the rear frame.

[0014] It also includes a main control monitoring system, which includes a master controller, a display screen, a soil thickness monitor and a moisture content monitor. The moisture content monitor is placed on the side plate of the lower hopper, and the soil thickness monitor is placed on the guide plate of the sand and gravel grading and conveying system. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 is an axonometric diagram of an embodiment of the present invention; Figure 2It is a front view of an embodiment of the present invention; Figure 3 A schematic diagram of a sand and gravel grading and conveying system according to an embodiment of the present invention; Figure 4 A schematic diagram of a dry-wet separation and mixing system according to an embodiment of the present invention; Figure 5 A schematic diagram of a rough earthwork leveling system according to an embodiment of the present invention; Figure 6 A schematic diagram of a control mechanism of a rough earthwork leveling system according to an embodiment of the present invention; Figure 7 for Figure 6 The main view; Figure 8 A schematic diagram of an earthwork compaction system according to an embodiment of the present invention; Fig. 9 A schematic diagram of a radial lifting mechanism of an earthwork compaction system according to an embodiment of the present invention; Fig.10 Schematic diagram of a main control monitoring system according to an embodiment of the present invention.

[0016] In the figure: conveying frame 1; traction beam 101; sand and gravel grading conveying system 2; track bolt 201; transmission track 202; first transmission shaft 203; locking screw 204; second transmission shaft 205; sand and gravel conveying trough 206; trough edge 207; transmission wheel 208; conveyor belt 209; guide plate 210; reduction motor 211; dry-wet separation and mixing system 3; fixed connection 301; material door 302; upper hopper 303; spring cover 304; rotating shaft 305; water inlet pipe 306; lower bearing hopper 307; connecting bolt 308; support 309; direction adjustment knob 310; drain pipe 311; nozzle 312; bearing base 313; water tank cover 314; connecting clamp 315; water tank 316; water outlet 317; earthwork rough leveling system 4; frame 401; control arm 402; connecting rod 4021; connecting seat 403; steering rod 404; hydraulic arm 405; chord beam 406; ball head 407; rotating chassis 408; chassis body 4081; connecting hook 4082; rough leveling connection connector 409; rough flat connecting shaft 410; steering wheel 411; control panel 412; central control 413; driver's seat 414; fixing bolt 415; mudguard 416; first wheel 417; connecting plate 418; driving shaft 419; bearing 420; connecting block 421; steering tie rod ball joint 422; steering tie rod 423; rough flat wheel 424; rough flat shovel 425; rough flat claw 426; earthwork compaction system 5; rear frame 501; coil spring 502; shock absorber 503; first Two wheels 504; eccentric vibrator 505; radial lifting mechanism 506; first linear module 5061; second linear module 5062; vibrating flat roller 507; sheep's foot roller 508; connecting guide rail 509; single-axis three-wheel smooth roller 510; main control monitoring system 6; master controller 601; sand and gravel transport speed adjustment knob 602; water flow speed adjustment knob 603; soil thickness monitor 604; display screen 605; switch assembly 606; moisture content monitor 607; transport vehicle 7; rear axle 701. DETAILED DESCRIPTION

[0017] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.

[0018] In the description of the present invention, it is necessary to understand that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0019] See also Figure 1 , Figure 2 The present embodiment provides an integrated roadbed paver, which is mainly composed of a conveyor frame 1, a gravel grading conveying system 2, a dry-wet separation and mixing system 3, an earthwork rough leveling system 4, an earthwork compaction system 5 and a main control monitoring system 6. The conveyor frame 1 is a welded component, the bottom of which is rectangular and the top of which is arc-shaped. Traction beams 101 are installed on both sides of the front end of the conveyor frame 1. The traction beam 101 is inverted L-shaped, and the lower end of the vertical portion thereof is rotatably connected to the rear axle 701 of the transport vehicle 7.

[0020] The gravel grading conveying system 2 is installed at the front of the conveying frame 1. The gravel grading conveying system 2 is mainly composed of a track bolt 201, a transmission track 202, a first transmission shaft 203, a locking screw 204, a second transmission shaft 205, a gravel conveying trough 206, a trough edge 207, a transmission wheel 208, a conveyor belt 209, a guide plate 210 and a reduction motor 211 ( Figure 3 As shown). Two guide rail plates 210 are arranged in parallel and connected to the conveyor frame 1 through outer locking screws 204 respectively. A first transmission shaft 203 is rotatably installed between the front ends of the two guide rail plates 210 through a bearing seat. Transmission wheels 208 are installed at both ends of the first transmission shaft 203. The transmission wheels 208 are sprocket wheels. Two second transmission shafts 205 are rotatably installed between the rear ends of the two guide rail plates 210 through a bearing seat. The diameter of the second transmission shaft 205 is smaller than the diameter of the first transmission shaft 203. A conveyor belt 209 is wrapped around the first transmission shaft 203 and the two second transmission shafts 205. The conveyor belt 209 is driven by the transmission wheel 208. The first transmission shaft 203 is driven by a reduction motor 211. The reduction motor 211 is installed on the outer side of the guide rail plate 210.

[0021] A longitudinal transmission track 202 is arranged on the inner side of each guide plate 210. The transmission track 202 is located at the bottom of the edge of the conveyor belt 209 and supports the conveyor belt 209. Both ends of the transmission track 202 are connected to the support rods through track bolts 201, and the support rods are fixedly connected to the track plate 210. The gravel conveying trough 206 is located at the front end of the conveyor belt 209. The gravel conveying trough 206 is fixedly connected to the conveying frame 1. The two sides of the bottom of the gravel conveying trough 206 are respectively provided with trough edges 207. The gravel conveying trough 206 is connected to the bucket of the transport vehicle through a chute. When in use, the sand and gravel conveying trough is placed obliquely below the bucket of the transport vehicle 7. The transport vehicle 7 is a dump truck. After the bucket is tilted, the sand and gravel can fall into the conveyor belt 209 along the chute and the sand and gravel conveying trough 206. The trough edges 207 on both sides can block the sand and gravel. At the same time, the reduction motor 211 is started by the master controller to provide a power source for the conveyor belt 209, so that the conveyor belt 209 moves forward along the transmission track 202, and finally the graded sand and gravel are poured into the dry-wet separation and blending system 3.

[0022] The dry-wet separation and mixing system 3 is installed at the rear of the conveying frame 1. The dry-wet separation and mixing system 3 is mainly composed of a fixed connection 301, a material door 302, an upper hopper 303, a spring cover 304, a rotating shaft 305, a lower hopper 307, a connecting bolt 308, a bearing base 313 and a sprinkler ( Figure 4 As shown). The bearing base 313 is rectangular and is installed on the conveying frame 1. A lower hopper 307 is installed at the rear end of the bearing base 313, and an upper hopper 303 is installed on the upper part of the lower hopper 307. The cross-sections of the lower hopper 307 and the upper hopper 303 are both rectangular. The outlet ends of the lower hopper 307 and the upper hopper 303 are both installed with material gates 302. The outlet ends of the lower hopper 307 and the upper hopper 303 are respectively connected to the conveying frame 1 through fixed connectors 301. A spring cover plate 304 is installed on the outer side of the inlet end of the upper hopper 303, and rotating shafts 305 are respectively welded to the two ends of the bottom of the spring cover plate 304. The rotating shaft 305 is rotatably connected to the fixed plate, and the fixed plate is welded to the side plate of the upper hopper 303. A positioning plate is arranged on the outer side of the lower part of the spring cover plate 304, and the positioning plate is welded to the fixed plate. The positioning plate is installed with connecting bolts 308, and the connecting bolts 308 are used for positioning the spring cover plate 304. The spring cover plate 304 is used to distinguish between dry materials and wet materials.

[0023] A sprinkler is installed on the upper part of the inlet end of the lower hopper 307. The sprinkler is mainly composed of a water inlet pipe 306, a support 309, a direction adjustment knob 310, a drain pipe 311, a nozzle 312, a water tank cover 314, a connecting clamp 315 and a water tank 316 ( Figure 4 As shown). There are two drain pipes 311 arranged symmetrically, and the drain pipes 311 are arc-shaped. One end of the drain pipe 311 is rotatably connected to the support 309, and the support 309 is an inverted U shape, which is connected to the top plate of the lower hopper 307. The other end of the drain pipe 311 is rotatably connected to the fixed shaft through a rotating sleeve, and the fixed shaft is fixedly connected to the support 309. The angle of the drain pipe 311 is adjustable, and the inner end of the fixed shaft is screwed with a direction adjustment knob 310 that presses the rotating sleeve. A plurality of nozzles 312 are installed at the bottom of the drain pipe 311. The drain pipe 311 is connected to the water inlet pipe 306 through a pipeline. The water inlet pipe 306 runs through the side plate of the lower hopper 307. The water inlet pipe 306 is connected to the water outlet 317 of the water tank 316 through a pipeline. The water tank 316 is installed on the bearing base 313 through a connecting clamp 315, and a water tank cover 314 is provided on the top of the water tank 316.

[0024] After the sand and gravel are poured into the lower hopper 307, the dry-wet separation and mixing system starts to work. The upper hopper 303 mainly spreads dry sand and gravel. The specific type of sand and gravel to be laid can be controlled by rotating the cover of the spring cover 304 around the rotating shaft 305. If it enters the lower hopper 307, the water in the water tank 316 is pumped into the drainage pipe 311 through the water outlet 317 through the water pipe, and then sprayed on the surface of the sand and gravel under the control of the master controller, and finally falls onto the roadbed through the material gate 302. The rotating shaft 305 at one end of the spring cover 304 can also be installed with a connecting rod and a hydraulic cylinder, and the spring cover 304 is controlled by the hydraulic cylinder.

[0025] The rear end of the conveyor frame 1 is provided with a rough earthwork leveling system 4. The rough earthwork leveling system 4 ( Figure 5 404, a steering rod 405, a chord beam 406, a ball head 407, a rotating chassis 408, a rough-level connector 409, a rough-level connecting shaft 410, a steering wheel 411, a control panel 412, a central control unit 413, a driver's seat 414, a fixing bolt 415, a fender 416, a first wheel 417, a connecting plate 418, a driving shaft 419, a bearing 420, a connecting block 421, a steering tie rod ball joint 422, a steering tie rod 423, a rough-level wheel 424, a rough-level shovel 425 and a rough-level claw 426. The frame 401 is in an inverted L shape, and the front end of its horizontal part is fixedly connected to the conveyor frame 1. A driving shaft 419 is installed on both sides of the vertical part of the frame 401. The first wheel 417 is installed on the driving shaft 419 through a bearing 420. A connecting plate 418 is rotatably installed on the outer side of the driving shaft 419, and a fender 416 is arranged above the first wheel 417. The upper part of the vertical part of the frame 401 is installed with a central control unit 413, a steering wheel 411 and a driver's seat 414 from front to back. The driver's seat 414 is connected to the frame 401 through a fixing bolt 415.

[0026] A rotating chassis 408 is provided below the horizontal portion of the frame 401. The rotating chassis 408 is composed of a chassis body 4081 and a connecting structure 4082. The chassis body 4081 is semicircular in shape and the open end faces the vertical portion of the frame 401. The bottoms of both ends of the chassis body 4081 are provided with connecting structures 4082. The front end of the bottom of the chassis body 4081 is connected to a transverse rough flat connecting shaft 410 through a rough flat connector 409. A plurality of rough flat claws 426 are installed at the bottom of the rough flat connecting shaft 410. A rough flat shovel 425 is installed at the front side of the connecting structure 4082. Longitudinal string beams 406 are installed at both ends of the rough flat connector 409. The rear end of the string beam 406 is rotatably connected to a rough flat wheel 424 through a door-shaped connecting frame. The rough flat wheel 424 is triangular in shape.

[0027] A steering tie rod 423 is arranged between the rotating chassis 408 and the vertical part of the frame 401. The steering tie rod 423 is V-shaped and arranged horizontally. The front end of the steering tie rod 423 is connected to the two ends of the chassis body 4081, and the rear end of the steering tie rod 423 is installed with a steering tie rod ball joint 422. The steering tie rod ball joint 422 is hinged to the connecting block 421, and the connecting block 421 is fixedly connected to the vertical part of the frame 401.

[0028] A control mechanism is provided between the rotating chassis 408 and the horizontal portion of the frame 1, and the control mechanism is mainly composed of a control arm 402, a connecting seat 403, a steering rod 404, a hydraulic arm 405 and a connecting rod 4021 ( Figure 6 , Figure 7 As shown in the figure, the connecting seat 403 is U-shaped and is mounted on the horizontal part of the frame 401. Connecting ears are provided on both sides of the open end of the connecting seat 403. The two connecting ears are respectively hinged to the inner end of the steering rod 404. One side of the outer end of the steering rod 404 is hinged to the upper end of the hydraulic arm 405. The hydraulic arm 405 is a hydraulic cylinder. The lower ends of the two hydraulic arms 405 are hinged to the two ends of the chassis body 4081 respectively. The lower end of the steering rod 404 is fixedly connected to the control arm 402. The control arms 402 on both sides are hinged by an arc-shaped connecting rod 4021.

[0029] The earthwork rough leveling system 4 is equipped with three different rough leveling devices through the frame 401. The rough leveling claw 426 at the front end can dig out the relatively large gravel in the earthwork and roughly plow the ground. The rough leveling shovel 425 in the middle is similar to an ordinary grader, but the steering wheel 411 can be manually controlled through the feedback of the cab central controller and the control panel 412 to drive the rotating chassis 408 connected to the control arm 402, the hydraulic arm 405 and the steering rod 404 to realize the axial movement of the rough leveling shovel 425, so as to realize the oblique pushing of the large gravel plowed out by the rough leveling claw 426 to both sides of the road and roughly flatten the ground. The steering wheel 411 is connected to the hydraulic control valve. The rear part adopts a triangular flat wheel 424, and its radial movement can be adjusted through the central controller according to the earthwork thickness fed back by the control panel 412, so as to achieve the purpose of controlling the earthwork thickness of the roadbed.

[0030] The rear end of the earthwork rough leveling system 4 is connected to the earthwork compaction system 5, which is mainly composed of a rear frame 501, a coil spring 502, a shock absorber 503, a second wheel 504, an eccentric vibrator 505, a radial lifting mechanism 506, a vibrating roller 507, a sheep's foot roller 508, a connecting guide rail 509 and a single-axis three-wheel smooth roller 510 ( Figure 8As shown). A second wheel 504 is installed at the bottom of the rear frame 501. The tire of the second wheel 504 is a special rubber tire. Connecting guide rails 509 are symmetrically arranged on both sides of the rear frame 501. The front end of the connecting guide rail 509 is fixedly connected to the connecting plate 418 of the earthwork rough leveling system 4. The single-axis three-wheel smooth roller 510, the sheep-foot roller 508 and the vibrating roller 507 are rotatably connected to the connecting guide rail 509 in sequence from front to back. The vibrating roller 507 is located at the front end of the connecting guide rail 509. An eccentric vibrator 505 is provided at the bottom of the rear frame 501. The eccentric vibrator 505 is a prior art. The two ends of the sheep-foot roller 508 are respectively connected to the connecting guide rail 509 through a radial lifting mechanism 506. The radial lifting mechanism 506 is composed of a symmetrically arranged first linear module 5061 and a second linear module 5062 ( Fig. 9 As shown in the figure, each linear module is composed of a base, a screw, a screw nut, a slide, a slide rail, a driving wheel and a servo motor. The first linear module 5061 and the second linear module 5062 are commercially available products. The first linear module 5061 and the second linear module 5062 are arranged vertically and the bases are fixedly connected to the connecting guide rails 509 respectively. The two ends of the rolling shaft of the sheep's foot roller 508 are connected to the slides of the two linear modules through bearing seats respectively.

[0031] During on-site construction, the radial lifting mechanism 506 can be used to adjust the up and down movement of the sheep's foot roller 508 to decide whether to use it according to needs. Generally, the final rolling flatness, accuracy and compaction requirements are the highest, so a vibrating roller 507 is used. The rear frame 501 has an eccentric vibrator 505 built in as a vibration power source, and the vibration kinetic energy is transmitted to the special rubber tire of the second wheel 504 through the coil spring 502 and the shock absorber 503 for kinetic energy reduction, so as to prevent the loosening of parts due to excessive vibration amplitude of the entire equipment.

[0032] The main control monitoring system 6 is mainly composed of a master controller 601, a sand and gravel transport speed adjustment knob 602, a water flow speed adjustment knob 603, a soil thickness monitor 604, a display screen 605, a switch assembly 606 and a moisture content monitor 607 ( Fig.10 As shown). The master controller 601 is installed on the conveying frame 1. The master controller 601 is provided with a control panel and a display screen 605. The control panel is provided with a gravel conveying speed adjustment knob 602, a water flow speed adjustment knob 603 and a switch assembly 606. The gravel conveying speed adjustment knob 602 is used to control the speed of the reduction motor 211. The water flow speed adjustment knob 603 is used to control the flow control valve. The flow control valve is installed on the water inlet pipe 306. The moisture content monitor 607 is placed on the side plate of the lower hopper 307, and the soil layer thickness monitor 604 is placed on the guide plate 210 of the gravel grading conveying system 2. The master controller 601 is the central brain of the entire equipment. It can control the switch and operation of each system mechanism, and can be adjusted in real time through monitoring feedback data to ensure that the moisture content and compaction degree of the roadbed paving meet the construction requirements. The construction method of the above-mentioned integrated roadbed paver is carried out according to the following steps: S1. Construction preparation Check whether the equipment can operate normally, take soil and distribute it to the transport vehicle 7 in layers, and fill the water tank 316 with water; S2: The roadbed paver starts and construction begins; S3, the transport vehicle 7 slowly lifts the bucket, and pours the graded sand and gravel into the lower hopper 307 and the upper hopper 303 through the conveyor belt 209; S4, the soil layer thickness monitor 604 monitors in real time and feeds back the data to the master control display screen to adjust the feeding speed, the lower layer moisture content monitor 607 monitors the sand and gravel moisture content in real time and feeds back the data to the master control display screen to adjust the graded sand and gravel moisture content; S5. After the thickness and water content of the gravel are adjusted according to the construction requirements, the drainage pipe 312 starts to work, spraying water evenly on the surface of the gravel, and the gravel is evenly spread on the roadbed through the discharge port; S6, the earthwork rough leveling system 4 works synchronously, and another person cooperates in the operation in the cab, and the sand and gravel laid loose on the roadbed passes through the rough leveling claw 426, the rough leveling shovel 425 and the rough leveling wheel 424 in sequence to achieve preliminary leveling; S7, finally, the single-axis three-wheel smooth roller 510, the sheep-foot roller 508, and the vibrating flat roller 507 are used for final leveling and rolling. The three rollers can be lifted or lowered by the radial lifting mechanism 506 according to the needs for operation; S8. Complete the integrated paving operation of the roadbed and carry out measurement and slope finishing.

[0033] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited by the above embodiments, and the above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, and these changes and improvements all fall within the scope of the present invention to be protected.

Claims

1. An integrated roadbed paver, characterized in that: It includes sand and gravel grading and conveying system, dry and wet separation and mixing system, earthwork rough leveling system and earthwork compaction system. The sand and gravel grading conveying system is placed at the front of the conveying frame, the dry-wet separation and mixing system is placed at the rear of the conveying frame, and a traction beam is provided at the front end of the conveying frame and is connected to the transport vehicle; The rear end of the conveyor frame is connected to a rough earthwork leveling system; The rear end of the earthwork rough leveling system is connected with an earthwork compaction system.

2. The integrated roadbed paver according to claim 1, characterized in that: The sand and gravel grading conveying system includes a guide plate, a first transmission shaft, a second transmission shaft, a transmission wheel, a conveyor belt, a reduction motor and a sand and gravel conveying trough. The first transmission shaft and the second transmission shaft are respectively placed at both ends of the guide plate and are rotatably connected to the guide plate. Transmission wheels are respectively installed at both ends of the first transmission shaft. The conveyor belt is wrapped around the first transmission shaft and the second transmission shaft and driven by the transmission wheel. The first transmission shaft is driven by the reduction motor. The sand and gravel conveying trough is located at the front end of the conveyor belt.

3. The integrated roadbed paver according to claim 1, characterized in that: The dry-wet separation and mixing system includes a bearing base, a lower hopper, an upper hopper and a sprinkler device. The rear end of the bearing base is provided with a lower hopper, the upper part of the lower hopper is provided with an upper hopper, the inlet end of the upper hopper is rotatably mounted with a spring cover plate, the outlet ends of the lower hopper and the upper hopper are respectively provided with material doors, and the upper part of the inlet end of the lower hopper is installed with a sprinkler device.

4. The integrated roadbed paver according to claim 3, characterized in that: The sprinkler device includes a drain pipe, a support, a nozzle and a water tank. There are two drain pipes that are symmetrically arranged. The drain pipe is arc-shaped and has multiple nozzles installed at the bottom. One end of the drain pipe is rotatably connected to the support. The support is in an inverted U shape and is connected to the lower hopper. The other end of the drain pipe is rotatably connected to the fixed shaft through a rotating sleeve. The fixed shaft is fixedly connected to the support and a knob for tightening the rotating sleeve is screwed on the inner end. The drain pipe is connected to the water tank through a pipeline.

5. The integrated roadbed paver according to claim 1, characterized in that: The earthwork rough leveling system includes a frame, a rotating chassis, a steering tie rod, a rough leveling claw, a rough leveling shovel, a rough leveling wheel and a control mechanism. The frame is in an inverted L shape, and first wheels are respectively installed on both sides of the vertical part of the frame. A rotating chassis is provided below the horizontal part of the frame. The rotating chassis is sequentially installed with rough leveling claws, a rough leveling shovel and a rough leveling wheel from front to back. The rotating chassis is connected to one end of the steering tie rod, and the other end of the steering tie rod is hinged to the vertical part of the frame. A control mechanism is provided between the rotating chassis and the horizontal part of the frame.

6. The integrated roadbed paver according to claim 5, characterized in that: The control mechanism includes a connecting seat, a control arm, a steering rod and a hydraulic arm. The horizontal part of the frame is provided with a connecting seat, and connecting ear seats are respectively provided on both sides of the connecting seat. The connecting ear seat is hinged to one end of the steering rod, one side of the steering rod is hinged to the upper end of the hydraulic arm, the lower end of the hydraulic arm is hinged to the rotating chassis, and a control arm is provided at the lower end of the steering rod. The control arms on both sides are hinged through an arc-shaped connecting rod.

7. The integrated roadbed paver according to claim 5, characterized in that: The rotating chassis includes a chassis body and a connecting hook. The chassis body is in a semicircular arc shape. Connecting hooks are respectively provided at both ends of the chassis body. The chassis body is connected to the rough flat claw through a rough flat connector and a rough flat connecting shaft, and the rough flat shovel is connected to the connecting structure; string beams are respectively provided at both ends of the rough flat connector, and the rear end of the string beam is rotatably connected to the triangular rough flat wheel through a connecting frame.

8. The integrated roadbed paver according to claim 1, characterized in that: The earth compaction system comprises a rear frame, a second wheel, a connecting guide rail, a vibrating roller, a sheep-foot roller and a single-axis three-wheel smooth roller. The second wheel is installed at the bottom of the rear frame, and connecting guide rails are symmetrically arranged on both sides of the rear frame. The front end of the connecting guide rail is connected to the earth rough leveling system. The single-axis three-wheel smooth roller, the sheep-foot roller and the vibrating roller are rotatably connected to the connecting guide rails in sequence from front to back. The two ends of the sheep-foot roller are respectively connected to the connecting guide rails through radial lifting mechanisms. An eccentric vibrator is arranged at the bottom of the rear frame.

9. The integrated roadbed paver according to claim 1, characterized in that: It also includes a main control monitoring system, which includes a master controller, a display screen, a soil thickness monitor and a moisture content monitor. The moisture content monitor is placed on the side plate of the lower hopper, and the soil thickness monitor is placed on the guide plate of the sand and gravel grading and conveying system.

10. A construction method of the integrated roadbed paver according to any one of claims 1 to 9, comprising the following steps: S1. Preparation Check whether the equipment can operate normally, take soil and distribute it to the transport vehicle in different levels, and fill the water tank with water; S2: The roadbed paver starts and construction begins; S3, the transport vehicle slowly lifts the bucket and pours the graded sand and gravel into the lower hopper through the conveyor belt; S4, the soil thickness monitor monitors in real time and feeds back the data to the master control display screen to adjust the feeding speed, the moisture content monitor monitors the moisture content of sand and gravel in real time and feeds back the data to the master control display screen to adjust the moisture content of graded sand and gravel; S5. After the thickness and water content of the gravel are adjusted according to the construction requirements, the drainage pipe starts to work, spraying water evenly on the surface of the gravel, and the gravel is evenly spread on the roadbed through the discharge port; S6, the earthwork rough leveling system works synchronously, and the sand and gravel laid loose on the roadbed pass through the rough leveling claw, rough leveling shovel and rough leveling wheel in sequence to achieve preliminary leveling; S7, finally leveling and rolling by single-axle three-wheel smooth roller, sheep foot roller and vibrating flat roller; S8. Complete the integrated paving operation of the roadbed and carry out measurement and slope finishing.

Citation Information

Patent Citations

  • Material spreading device and paving vehicle for filling subgrade earthworks and pavement materials

    CN110258253A

  • Operation method based on a roadbed filling intelligent command system and system thereof

    CN111593625A

  • Road grader for paving highway base stable soil, and paving method thereof

    CN112458841A

  • Roadbed paver and paving operation monitoring method

    CN112921750A

  • Lime soil roadbed laying construction device and construction technology thereof

    CN115976914A