Scaffold connecting system and method for shear wall part
By reserving the tension screw hole in the shear wall, the engagement of the adjustable connecting wall unit and the middle telescopic unit, combined with fasteners to adjust the spacing, solves the problem of precise installation of scaffolding connections at the shear wall and improves construction safety. safety and efficiency, reducing costs and disruption.
Patent Information
- Application Number
- CN202410853056.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-28
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-06-28
AI Technical Summary
In shear walls and other special parts, it is difficult to achieve rapid and accurate installation of scaffolding with existing technology, and the construction accuracy and safety are low. In addition, there are problems such as high precision requirements for embedded parts, difficulty in construction, and high cost.
The adjustable connecting wall unit matched with the reserved tension screw hole in the shear wall is used to form a stable connection through the engagement and spring compression of the middle telescopic unit and the adjustable scaffolding connection unit, and the spacing is adjusted through fasteners to achieve Stable connection of scaffolding to shear walls.
It achieves rapid and precise installation at shear walls, improves installation efficiency and construction safety, reduces construction difficulty and cost, adapts to shear walls of different sizes and shapes, and reduces structural damage.
Smart Images

Figure CN118728055A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of scaffold safety construction, and more specifically, relates to a scaffold connection system and method for a shear wall. Background Art
[0002] In the field of scaffolding construction, it is very difficult to connect the scaffolding wall parts in shear walls and other special parts. There are currently three methods. One is to embed the embedded parts in advance during the construction of the shear wall, and then connect the wall parts to the embedded parts through a special device. This method requires high embedding accuracy of the embedded parts, and it is very easy to cause component position deviation and concrete shear wall leakage or embedded parts to be buried during embedding, which makes construction difficult. Another method is to set a hole-locking rod at the hole opening, and connect the hole-locking rod and the scaffolding by adding relevant rods. This method is not suitable for connecting at large shear walls. The third method is to add a small hole to the shear wall, and then connect through the small hole. This method is very easy to cause shear wall force deviation and steel bar deviation, which has a great impact on the durability of the building. The later hole blocking is very easy to cause shear wall leakage, and the construction is difficult; these three methods have extremely high construction accuracy requirements, are very easy to have quality problems, and are not suitable for later dismantling, and the construction is difficult and dangerous. Moreover, the above three methods waste manpower, materials, and machinery, increase construction costs, and affect construction accuracy. How to achieve fast and accurate installation of wall ties at shear walls while improving installation efficiency, construction safety, and installation accuracy is a problem that the industry has been unable to solve. Summary of the invention
[0003] In view of the above defects or improvement needs of the prior art, the present invention provides a scaffolding connection system and method for shear wall parts. By setting an adjustable wall connection unit matching the reserved hole of the tension screw of the shear wall, no other slots are required, and no other components need to be embedded, which greatly ensures the stability of the overall structure; a middle telescopic unit is provided at the other end of the adjustable wall connection unit, and a press-through rotation connection is formed through the clever engagement of the clamping piece on the adjustable wall connection unit and the clamping disc in the steel pipe of the middle telescopic unit, and the reaction force generated by the spring in the steel pipe after being compressed, thereby forming a more stable structure; at the same time, by setting a fastener on the wall connection rod, the fastener is tightened to achieve The spring on the middle telescopic unit is compressed, and then the distance between the shear wall and the scaffold is finely adjusted; an adjustable scaffolding connection unit is arranged between the middle telescopic unit and the scaffolding, and the end of the third connecting rod on the adjustable scaffolding connection unit can be engaged with different fixing clips on the second connecting rod to achieve rough adjustment of the distance between the scaffolding and the shear wall; the present invention does not require embedded parts, has a simple structure, is quick and convenient to install and disassemble, can adapt to shear walls of different sizes and shapes, and can reduce damage to the shear wall structure; can achieve rapid and accurate installation of the wall connection system at the shear wall, and at the same time improve installation efficiency, construction safety and installation accuracy.
[0004] One aspect of the present invention provides a scaffolding connection system for a shear wall, comprising an adjustable wall connection unit connected to the shear wall, a middle telescopic unit connected to the adjustable wall connection unit, and an adjustable scaffolding connection unit connected to the middle telescopic unit; wherein:
[0005] The adjustable wall connection unit includes a wall connection rod, a fastener and a clamping piece arranged on the wall connection rod; the middle telescopic unit includes a steel pipe, a spring arranged inside the steel pipe and a chuck matching the clamping piece; the adjustable scaffolding connection unit includes an adjustable triangular structure connected to the steel pipe, and an elastic connecting piece arranged on the adjustable triangular structure and matching the scaffolding steel pipe; by adjusting the inner angle of the adjustable triangular structure, a coarse adjustment of the distance between the scaffolding and the shear wall is achieved; by adjusting the position of the fastener on the wall connection rod, a fine adjustment of the distance between the scaffolding and the shear wall is achieved.
[0006] Furthermore, a tension screw hole is reserved on the shear wall; the size of the wall connecting rod is adapted to the tension screw hole; and the wall connecting rod is a threaded rod.
[0007] Furthermore, the clamping member includes a chassis fixed to the wall connecting rod and supporting legs arranged around the chassis; the supporting legs are arranged along the radial direction of the chassis.
[0008] Furthermore, the chuck includes a sliding disk, a cavity provided at the center of the sliding disk, and a clamping groove provided at the periphery of the cavity and matching with the supporting leg;
[0009] The number of the slots is the same as that of the legs; after the clamping member contacts the chuck, the legs pass through the slots and form a buckle with the sliding disk through rotation, thereby fixing the clamping member and the chuck.
[0010] Further, the adjustable triangular structure includes a first connecting rod connected to the steel pipe, a second connecting rod and a third connecting rod connected to the first connecting rod;
[0011] A fastener is provided on one end of the third connecting rod away from the first connecting rod;
[0012] The second connecting rod is evenly spaced and provided with a plurality of fixing clips matched with the fasteners.
[0013] Furthermore, the elastic connecting member is arranged at an end of the second connecting rod away from the first connecting rod; and the buckle is an inwardly concave arc structure arranged at the end of the third connecting rod.
[0014] Furthermore, the first connecting rod and the second connecting rod, and the first connecting rod and the third connecting rod are both hingedly connected; the second connecting rod and the third connecting rod are snap-fittedly connected.
[0015] Furthermore, the lengths of the first connecting rod and the third connecting rod are both shorter than the length of the second connecting rod.
[0016] Furthermore, the scaffolding elastic connecting piece is a semicircular elastic clamp.
[0017] Another aspect of the present invention provides a scaffolding connection method for a shear wall, which is implemented by using the scaffolding connection system for a shear wall, and comprises the following steps:
[0018] S1: According to the design drawings and size requirements, make components including adjustable wall connection units, middle telescopic units and scaffolding connection units;
[0019] S2: Ensure that the external scaffolding is constructed to each floor, and clean the holes for the tension screws on the shear wall after the concrete strength of the shear wall reaches the requirements;
[0020] S3: connecting the scaffolding elastic connector of the adjustable scaffolding connection unit to the steel pipe of the scaffolding; adjusting the position of the third connecting rod on the second connecting rod so that the adjustable scaffolding connection unit is close to the shear wall;
[0021] S4: Connect the steel pipe of the middle telescopic unit and the first connecting rod of the adjustable scaffolding connecting unit; insert the wall connecting rod into the steel pipe so that the clamping piece on the adjustable wall connecting unit and the chuck on the middle telescopic unit are clamped tightly;
[0022] S5: According to the site conditions, pass the end of the wall connecting rod of the adjustable wall connecting unit away from the clamp through the hole of the tension screw on the shear wall, and install the fastener on the wall connecting rod on the other side of the shear wall to achieve the overall connection of the shear wall, the adjustable wall connecting unit, the middle telescopic device, the adjustable scaffolding connection unit and the scaffolding;
[0023] S6: Re-adjust the connection position of the third connecting rod and the second connecting rod, roughly adjust the distance between the scaffolding and the shear wall to make the structure of each part more compact; rotate the fastener to finely adjust the distance between the scaffolding and the shear wall, and complete the installation of the scaffolding connection system at the shear wall;
[0024] S7: Repeat steps S2 to S6 to complete the installation of the scaffolding connection system at other shear wall locations;
[0025] S8: After the operation is completed, loosen the fasteners, rotate and pull out the clips to disengage the clips from the chucks, and remove the scaffolding elastic connectors of the adjustable scaffolding connection units from the steel pipes of the scaffolding to achieve efficient removal of the scaffolding connection system at the shear wall.
[0026] In general, the above technical solutions conceived by the present invention can achieve the following beneficial effects compared with the prior art:
[0027] 1. A scaffolding connection system and method for a shear wall of the present invention uses the original tension screw holes on the shear wall without the need for other slots or pre-embedded other components, thereby greatly ensuring the stability of the overall structure and making installation convenient and quick. At the same time, fasteners are provided on the wall connecting rods to finely adjust the distance between the shear wall and the scaffolding, making the overall installation convenient, fast, stable and reliable.
[0028] 2. A scaffolding connection system and method for a shear wall of the present invention forms a push-through rotation connection through the clever engagement of a clamp on the wall connecting rod and a chuck in the steel pipe of the middle telescopic unit, as well as the reaction force generated by the spring in the steel pipe after being compressed, thereby forming a more stable structure. The operation is simple and quick, which greatly saves costs. The device is easy and quick to install and can be recycled, thereby achieving the purpose of saving money, time, labor and effort.
[0029] 3. A scaffolding connection system and method for a shear wall of the present invention realizes a rough adjustment of the spacing between the scaffolding and the shear wall by making the end of the third connecting rod on the adjustable scaffolding connection unit engage with different fixing clips on the second connecting rod; and the first connecting rod, the second connecting rod and the third connecting rod together form a stable triangular structure with higher connection stability and wider adaptability; at the same time, the scaffolding elastic connector arranged at the end of the second connecting rod is a semi-elastic semicircular clamping ring, and the base can perform elastic buckle connection on scaffolding steel pipes of different sizes, which can be suitable for scaffolds of different sizes, and has high installation accuracy and is easy to control.
[0030] 4. A scaffolding connection system and method for a shear wall portion of the present invention does not require multiple people to operate during the installation and connection process of the entire connection system, and the installation and disassembly are convenient and quick, which greatly reduces the working time of workers on the external scaffolding; and during installation, through the mutual coordination of fine adjustment and coarse adjustment, the force connection can be better performed, thereby improving the stability of the entire wall connection system, with strong adaptability and easy control of installation; the present invention can effectively reduce the degree of damage to the shear wall, and at the same time make the force more comprehensive, and the elastic connection can also be used for construction during earthquake-prone periods to avoid uneven settlement of scaffolding and buildings due to force, and the structural connection is more stable and reliable, which is suitable for promotion. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 This is a schematic diagram of the installation structure of a scaffolding connection system at a shear wall between a shear wall and a scaffolding according to an embodiment of the present invention;
[0032] Figure 2 This is a schematic diagram of the overall structure of a scaffolding connection system at a shear wall according to an embodiment of the present invention;
[0033] Figure 3 It is an enlarged schematic diagram of the connection structure of an adjustable wall connection unit and a middle telescopic unit of a scaffold connection system at a shear wall according to an embodiment of the present invention;
[0034] Figure 4 This is a schematic structural diagram of an adjustable wall connection unit of a scaffold connection system at a shear wall according to an embodiment of the present invention;
[0035] Figure 5 This is a schematic structural diagram of a middle telescopic unit of a scaffolding connection system at a shear wall according to an embodiment of the present invention;
[0036] Figure 6 This is a structural schematic diagram of an adjustable scaffolding connection unit of a scaffolding connection system at a shear wall portion according to an embodiment of the present invention;
[0037] Figure 7 The present invention is a flowchart of a method for connecting scaffolding in a shear wall according to an embodiment of the present invention.
[0038] In all the drawings, the same figure marks represent the same technical features, specifically: 1-shear wall, 2-adjustable wall connection unit, 21-wall connection rod, 22-fastener, 23-clamp, 231-chassis, 232-leg, 3-middle telescopic unit, 31-steel pipe, 32-clamp, 321-sliding plate, 322-slot, 33-spring, 4-adjustable scaffolding connection unit, 41-first connecting rod, 42-second connecting rod, 43-third connecting rod, 44-fastener, 45-scaffolding elastic connector, 46-fixed card, 5-scaffolding. DETAILED DESCRIPTION
[0039] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention. In addition, the technical features involved in the various embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0040] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, when an element is referred to as being "fixed to", "disposed on" or "provided on" another element, it may be directly on the other element or indirectly on the other element. When an element is referred to as being "connected to" another element, it may be directly connected to the other element or indirectly connected to the other element; the terms "installed", "connected", "connected" and "provided with" should be understood in a broad sense, for example, it may be a fixed connection, a detachable connection, or an integral connection; it may be a mechanical connection or an electrical connection; it may be directly connected or indirectly connected through an intermediate medium, and it may be the internal connection of the two elements or the interaction relationship between the two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to the specific circumstances.
[0041] In addition, the terms "first", "second", etc. are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0042] like Figure 1-Figure 6As shown, one aspect of the present invention provides a scaffold connection system for a shear wall, comprising an adjustable wall connection unit 2 connected to a shear wall 1, a middle telescopic unit 3 connected to the adjustable wall connection unit 2, and an adjustable scaffold connection unit 4 connected to the middle telescopic unit 3; the adjustable scaffold connection unit 4 is connected to a scaffold 5; the adjustable wall connection unit 2 comprises a wall connection rod 21, a fastener 22 and a clamp 23 arranged on the wall connection rod 21; the middle telescopic unit The element 3 includes a steel pipe 31, a chuck 32 arranged inside the steel pipe 31 and matched with the clamp 23, and a spring 33 arranged inside the steel pipe 31; the adjustable scaffolding connection unit 4 includes an adjustable triangular structure connected to the steel pipe 31, and an elastic connector 45 arranged on the adjustable triangular structure and matched with the scaffolding steel pipe; the present invention provides an adjustable wall connection unit matched with the reserved hole of the tension screw of the shear wall, without other slots, and without pre-embedded other components, which is extremely convenient. The stability of the overall structure is ensured; a middle telescopic unit is arranged at the other end of the adjustable wall connecting unit, and a press-through rotation connection is formed by the clever engagement of the clamp on the adjustable wall connecting unit and the clamp in the steel pipe of the middle telescopic unit, as well as the reaction force generated by the spring in the steel pipe after being compressed, thereby forming a more stable structure; the coarse adjustment of the distance between the scaffolding 5 and the shear wall 1 is achieved by adjusting the inner angle of the adjustable triangular structure; the fine adjustment of the distance between the scaffolding 5 and the shear wall 1 is achieved by adjusting the position of the fastener 22 on the wall connecting rod 21; the present invention does not require embedded parts, has a simple structure, and is quick and convenient to install and disassemble. It takes into account different building sizes and shapes that may be encountered during the construction process, and provides a safe and flexible solution; it can adapt to shear walls of different sizes and shapes, and at the same time can reduce damage to the shear wall structure; it can achieve rapid and accurate installation of the wall connecting system at the shear wall, and at the same time improve installation efficiency, construction safety and installation accuracy.
[0043] Furthermore, if Figure 1-Figure 6As shown, the shear wall 1 is provided with a hole for tensioning screws; the wall connecting rod 21 is a screw rod; the clamp 23 is arranged at the other end of the wall connecting rod 21; the design of the screw rod form allows the length of the wall connecting rod 21 to be adjusted to meet different construction requirements; the fastener 22 plays a role in fixing the wall connecting rod 21 to ensure the stability of the device; the clamp 23 is located at the other end of the wall connecting rod 21, passes through the hole for tensioning screws of the shear wall, and is connected to the middle telescopic unit 2, so that the adjustable wall connecting unit 1 forms a unified whole with the shear wall and the middle telescopic unit 2, thereby playing a connecting and fixing role; the design of the clamp 23 helps to improve the stability of the connection and the efficiency of force transmission; since the middle telescopic unit 2 is connected to the clamp 23, the force is transmitted to the wall connecting rod 21 and the fastener 22 through the clamp 23, and then the force is transmitted to the scaffolding connection unit 3 through the middle telescopic unit 2, further forming a unified force transmission whole.
[0044] Furthermore, if Figure 1-Figure 6 As shown, the fastener 22 is provided with an internal thread that is compatible with the external thread on the wall connecting rod 21; the clamp 23 includes a chassis 231 fixed to the wall connecting rod 21 and supporting legs 232 arranged around the chassis 231; the supporting legs 232 are arranged along the radial direction of the chassis 231; each supporting leg 232 is preferably distributed in a cross; the size of the chassis 231 is compatible with the end of the wall connecting rod 21.
[0045] Furthermore, if Figure 1-Figure 6 As shown, the wall connecting rod 21 passes through the spring 33 and extends into the bottom of the steel pipe 31, so that the clamping piece 23 contacts the clamping disc 32 and rotates to achieve locking; the elastic characteristics of the spring 33 allow the wall connecting rod 21 to have a certain expansion and contraction space when subjected to external force, thereby adapting to different connection requirements; the clamping disc 32 includes a sliding disc 321, a cavity provided in the center of the sliding disc 321, and a clamping groove 322 provided on the periphery of the cavity and matching with the supporting legs 232; the clamping groove 322 is provided on the surface of the sliding disc 321, and the number of the clamping groove 322 is the same as that of the supporting legs 232; The wall connecting rod 21 passes through the spring 33 and extends into the bottom of the steel pipe 31. After the clamping member 23 contacts the chuck 32, the leg 232 passes through the clamping groove 322 and forms a buckle with the sliding disk 321 by rotation, thereby fixing the clamping member 23 and the chuck 32. When the fastening member 22 is rotated to fix the wall connecting rod 21 and the middle telescopic unit 3, the chuck 32 moves in the direction of the fastening member 22, so that the spring 33 is compressed and exerts a reaction force on the chuck 32, thereby making the connection between the wall connecting rod 21 and the middle telescopic unit 3 tighter.
[0046] Furthermore, if Figure 1-Figure 6As shown, the adjustable triangular structure includes a first connecting rod 41 connected to the steel pipe 31, a second connecting rod 42 and a third connecting rod 43 connected to the first connecting rod 41; a fastener 44 is provided on the end of the third connecting rod 43 away from the first connecting rod 41; a plurality of fixing clips 46 matching the fastener 44 are evenly spaced on the second connecting rod 42; the elastic connecting member 45 is provided at the end of the second connecting rod 42 away from the first connecting rod 41; the fastener 44 is an arc-shaped structure concave inwardly arranged at the end of the third connecting rod 43; a hinge hole 34 is provided at the end of the steel pipe 31 away from the wall connecting rod 21; the fastener 44 is an arc-shaped sheet structure concave inwardly arranged at the end of the third connecting rod 43, which is made of steel sheet with high toughness and can be fitted and opened by force. It is the main component of the third connecting rod 43 and the second connecting rod 42. The connection point plays a fixing role and eliminates the force in other directions at the same time, which is stable and reliable; the first connecting rod 41 and the second connecting rod 42, and the first connecting rod 41 and the third connecting rod 43 are all hinged connections; the second connecting rod 42 and the third connecting rod 43 are snap-fit connections; the lengths of the first connecting rod 41 and the third connecting rod 43 are both smaller than the length of the second connecting rod 42; by rotating the third connecting rod 43, the fastener 44 at its end is engaged with the different fixing clips 46 on the second connecting rod 42, so as to achieve a rough adjustment of the distance between the scaffolding 5 and the shear wall 1; the scaffolding elastic connecting piece 45 is a semicircular elastic snap ring, which is connected to the scaffolding 5 so that it is stuck on the scaffolding 5, mainly for fixing the scaffolding 5, is an important end device connecting the scaffolding and the shear wall, is the main connection point, plays a fixing role, and is stable and reliable.
[0047] like Figure 7 As shown, the second aspect of the present invention provides a scaffolding connection method at a shear wall, which is implemented by using the aforementioned adjustable scaffolding connection unit at a shear wall, and includes the following steps:
[0048] S1: According to the design drawings and size requirements, make components including adjustable wall connection units, middle telescopic units and scaffolding connection units;
[0049] S2: Ensure that the external scaffolding is constructed to each floor and that the concrete strength of the shear wall meets the requirements; clean the holes of the tension screws on the shear wall 1 to prevent them from being blocked;
[0050] S3: Connect the scaffolding elastic connector 45 of the adjustable scaffolding connection unit 4 to the steel pipe of the scaffolding 5; adjust the position of the third connecting rod 43 on the second connecting rod 42 so that the adjustable scaffolding connection unit 4 is close to the shear wall;
[0051] S4: Connect the steel pipe 31 of the middle telescopic unit 3 and the first connecting rod 41 of the adjustable scaffolding connecting unit 4; insert the wall connecting rod 21 into the steel pipe 31, so that the clamping piece 23 on the adjustable wall connecting unit 2 and the clamping disc 32 on the middle telescopic unit 3 are clamped;
[0052] S5: According to the site conditions, the end of the wall connecting rod 21 of the adjustable wall connecting unit 2 away from the clamp 23 is passed through the hole of the tension screw on the shear wall 1, and the fastener 22 is installed on the wall connecting rod 21 on the other side of the shear wall 1 to achieve the overall connection of the shear wall 1, the adjustable wall connecting unit 2, the middle telescopic device 3, the adjustable scaffolding connection unit 4 and the scaffolding 5;
[0053] S6: Re-adjust the connection position of the third connecting rod 43 and the second connecting rod 42, roughly adjust the distance between the scaffolding 5 and the shear wall 1 to make the structure of each part more compact; rotate the fastener 22 to finely adjust the distance between the scaffolding 5 and the shear wall 1, and complete the installation of the scaffolding connection system at the shear wall;
[0054] S7: After the construction is completed, repeat steps S2 to S6 to complete the installation of the scaffolding connection system of the shear wall parts of other parts;
[0055] S8: After the operation is completed, loosen the fastener 22, rotate and pull out the clamp 23, so that the clamp 23 is separated from the chuck 32, and the scaffolding elastic connector 45 of the adjustable scaffolding connection unit 4 is removed from the steel pipe of the scaffolding 5, so as to realize the efficient removal of the scaffolding connection system at the shear wall part.
[0056] The present invention provides a scaffolding connection system and method for a shear wall. Through modular and adjustable design, the adjustable scaffolding connection unit can be quickly installed and adjusted, thereby reducing construction time and labor requirements. By adjusting the connection position of the third connecting rod 43 on the adjustable scaffolding connection unit 4 and the second connecting rod 42 and the position of the fastener 22 on the adjustable wall connecting unit 2 on the wall connecting rod 21, the close fit between the scaffolding and the shear wall is ensured, thereby improving the stability of the overall structure. By setting the adjustable wall connecting unit 2 and the middle telescopic unit 3, the scaffolding can be quickly installed and adjusted, thereby reducing construction time and labor requirements. The present invention can adapt to shear walls of different sizes and shapes, thereby increasing the flexibility of application; by arranging an easy-to-operate fastener 22 on the wall connecting rod 21 and arranging an elastic scaffolding connector 45 at the end of the second connecting rod 42 of the adjustable scaffolding connection unit 4 for easy installation and removal with the steel pipe of the scaffolding 5, the installation and removal process of the scaffolding connection system at the shear wall is simplified, and the construction difficulty is reduced; the present invention has the advantages of simple structure, stability and reliability, high installation accuracy, rapid installation and removal, and at the same time, it has the advantages of safety, reliability and stability for the connection of scaffolding at large-area shear walls.
[0057] When installing the components of the present invention, the adjustable wall connection unit 2 can also be installed in the reserved hole of the tension screw of the shear wall 1 first, and then the connector device is fixed from the inside, and then the adjustable scaffolding connection unit and the scaffolding are connected through the middle telescopic unit, so that the adjustable wall connection unit and the adjustable scaffolding connection unit and the middle telescopic unit form a whole, and finally the scaffolding and the shear wall are connected and fixed. The method of the present invention installs the adjustable wall connection unit in the reserved hole of the tension screw of the shear wall, and no pre-buried pipes are required, which is convenient for construction. Secondly, the middle telescopic unit is used to connect scaffolds of different sizes, which has a wider applicability and can quickly connect scaffolds of different sizes. It has high installation efficiency and fast speed, and can realize the rapid installation and removal of scaffolding wall connection parts, reduce the working time of workers on the scaffolding, and improve safety performance; it also improves installation efficiency and reduces construction costs.
[0058] It will be easily understood by those skilled in the art that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A scaffolding connection system for shear walls. Features: It comprises an adjustable wall connection unit (2) connected to a shear wall (1), a middle telescopic unit (3) connected to the adjustable wall connection unit (2), and an adjustable scaffold connection unit (4) connected to the middle telescopic unit (3); wherein: The adjustable wall connection unit (2) comprises a wall connection rod (21), a fastener (22) and a clamp (23) arranged on the wall connection rod (21); the middle telescopic unit (3) comprises a steel pipe (31), a spring (33) arranged inside the steel pipe (31) and a clamp (32) matched with the clamp (23); the adjustable scaffold connection unit (4) comprises an adjustable triangular structure connected to the steel pipe (31), and an elastic connection member (45) matched with the scaffold steel pipe arranged on the adjustable triangular structure; the distance between the scaffold (5) and the shear wall (1) can be roughly adjusted by adjusting the inner angle of the adjustable triangular structure; the distance between the scaffold (5) and the shear wall (1) can be finely adjusted by adjusting the position of the fastener (22) on the wall connection rod (21).
2. A shear wall scaffolding connection system according to claim 1, Features: The shear wall (1) is provided with a hole for a tension screw rod; the size of the wall connecting rod (21) is adapted to the hole for the tension screw rod; and the wall connecting rod (21) is a threaded rod.
3. A shear wall scaffolding connection system according to claim 2, Features: The clamping member (23) comprises a chassis (231) fixed to the wall connecting rod (21) and supporting legs (232) arranged around the chassis (231); the supporting legs (232) are arranged along the radial direction of the chassis (231).
4. A shear wall scaffolding connection system according to claim 3, Features: The chuck (32) comprises a sliding disk (321), a cavity arranged at the center of the sliding disk (321), and a chuck groove (322) arranged at the periphery of the cavity and matched with the supporting leg (232); The number of the clamping slots (322) is the same as that of the supporting legs (232); after the clamping member (23) contacts the chuck (32), the supporting legs (232) pass through the clamping slots (322) and form a buckle with the sliding disk (321) through rotation, thereby achieving the fixation of the clamping member (23) and the chuck (32).
5. A shear wall scaffolding connection system according to any one of claims 1 to 4, Features: The adjustable triangular structure comprises a first connecting rod (41) connected to the steel pipe (31), a second connecting rod (42) and a third connecting rod (43) connected to the first connecting rod (41); A fastener (44) is provided on one end of the third connecting rod (43) away from the first connecting rod (41); A plurality of fixing clips (46) matching the fasteners (44) are evenly spaced on the second connecting rod (42).
6. A shear wall scaffolding connection system according to claim 5, Features: The elastic connecting member (45) is arranged at an end of the second connecting rod (42) away from the first connecting rod (41); The fastener (44) is an inwardly concave arc structure provided at the end of the third connecting rod (43).
7. A shear wall scaffolding connection system according to claim 6, Features: The first connecting rod (41) and the second connecting rod (42), and the first connecting rod (41) and the third connecting rod (43) are both hingedly connected; the second connecting rod (42) and the third connecting rod (43) are snap-fittedly connected.
8. A shear wall scaffolding connection system according to claim 7, Features: The lengths of the first connecting rod (41) and the third connecting rod (43) are both shorter than the length of the second connecting rod (42).
9. A shear wall scaffolding connection system according to claim 8, Features: The elastic connecting piece (45) is a semicircular elastic clamping ring.
10. A method for connecting scaffolding in shear wall area. It is characterized in that The scaffolding connection system for shear walls according to any one of claims 1 to 9 is used to achieve the above, comprising the following steps: S1: According to the design drawings and size requirements, make components including adjustable wall connection units, middle telescopic units and scaffolding connection units; S2: Ensure that the external scaffolding is constructed to each floor and that the shear wall concrete strength meets the requirements; clean the holes for the tension screws on the shear wall (1); S3: connecting the elastic connecting piece (45) of the adjustable scaffolding connection unit (4) to the steel pipe of the scaffolding (5); adjusting the position of the third connecting rod (43) on the second connecting rod (42) so that the adjustable scaffolding connection unit (4) is close to the shear wall; S4: connecting the steel pipe (31) of the middle telescopic unit (3) and the first connecting rod (41) of the adjustable scaffolding connecting unit (4); inserting the wall connecting rod (21) into the steel pipe (31), so that the clamping piece (23) on the adjustable wall connecting unit (2) and the clamping disc (32) on the middle telescopic unit (3) are clamped tightly; S5: According to the site conditions, the end of the wall connecting rod (21) of the adjustable wall connecting unit (2) away from the clamp (23) is passed through the hole of the tension screw on the shear wall (1), and the fastener (22) is installed on the wall connecting rod (21) on the other side of the shear wall (1), so as to realize the overall connection of the shear wall (1), the adjustable wall connecting unit (2), the middle telescopic device (3), the adjustable scaffolding connection unit (4) and the scaffolding (5); S6: Re-adjust the connection position of the third connecting rod (43) and the second connecting rod (42), roughly adjust the distance between the scaffolding (5) and the shear wall (1) to make the structure of each part more compact; rotate the fastener (22) to finely adjust the distance between the scaffolding (5) and the shear wall (1), and complete the installation of the scaffolding connection system at the shear wall; S7: Repeat steps S2 to S6 to complete the installation of the scaffolding connection system at other shear wall locations; S8: After the operation is completed, loosen the fastener (22), rotate and pull out the clamp (23), so that the clamp (23) is separated from the chuck (32), and the elastic connector (45) of the adjustable scaffolding connection unit (4) is removed from the steel pipe of the scaffolding (5), thereby realizing efficient removal of the scaffolding connection system at the shear wall part.
Citation Information
Patent Citations
Wall connecting piece structure of scaffold and construction method thereof
CN112727062A
Scaffold wall connecting device
CN203939227U