Building platform quick-mounting edge guardrail and mounting method thereof

By using the structure of vertical brackets, upper splints, lower splints and guide plates in the edge guardrail, combined with hinge connections and hinged structures, the existing edge guardrail installation structure is solved in terms of firmness and adaptability to irregular edges. problem, achieving a more stable and efficient installation effect.

CN118728119APending Publication Date: 2024-10-01ZHEJIANG JINCHEN CONSTRUCT CO LTD
0 Cites 1 Cited by

Patent Information

Application Number
CN202411039689.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-31
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

The installation structure of the existing edge guardrails is not strong enough, and it is difficult to apply to the construction of irregular edges.

Method used

It adopts a structure including vertical brackets, upper plywood, lower plywood, guide plates, pins, bolts and slots. The bracket and the guard plate are firmly connected through clamping and sliding mechanisms, and through hinge connections and hinged structures. Adapt to irregular edge shapes.

Benefits of technology

It achieves a stronger and more reliable edge guardrail installation, is suitable for irregular edge construction, and improves the convenience and efficiency of installation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118728119A_ABST
    Figure CN118728119A_ABST
Patent Text Reader

Abstract

The invention relates to a building platform fast-assembly type edge guardrail and an installation method thereof.The building platform fast-assembly type edge guardrail comprises a vertical support, an upper clamping plate, a lower clamping plate and a protection plate, the vertical support is perpendicularly fixed to the upper clamping plate, a vertical plate is arranged on one side of the upper clamping plate, a guide plate with a vertical sliding hole is fixedly arranged on one side of the vertical plate, and one end of the lower clamping plate is arranged in the vertical sliding hole in a hinged and sliding mode through a pin shaft; the lower clamping plate close to the middle part is locked and connected with the upper clamping plate through a first bolt piece; a lower clamping plate is fixedly arranged on the upper end face of the upper clamping plate, a lower clamping groove is formed between the lower clamping plate and the vertical support, an upper clamping plate vertically and relatively sliding is arranged on the top of the vertical support, an upper clamping groove is formed between the upper clamping plate and the vertical support, and the upper clamping plate and the vertical support are locked and fixed through a second bolt piece. During installation, the upper clamping plate and the lower clamping plate are locked, clamped and fixed to the edge through the first bolt pieces, then the protection plates are limited between the upper clamping plate and the lower clamping plate, the adjacent protection plates are connected through the hinges, and then the edge guardrail structure is formed, construction is easy as a whole, and use is safe and reliable.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of construction and is a quick-install edge guardrail for a construction platform and an installation method thereof. Background Art

[0002] In existing construction sites, when there is no fence facility at the edge of the working surface or the height of the fence is lower than 800mm, the high-altitude work is called edge work. Edge work often needs to be protected by temporary guardrails to prevent falling objects or people from falling. Existing edge protection railings, such as the authorization announcement number CN220978903U published in Chinese patent documents, the authorization announcement date is May 17, 2024, and the utility model name is "clamp-type edge protection railings", which include clamp-type vertical poles, guardrail crossbars and skirting boards. The clamp-type vertical poles include: upper vertical poles, lower vertical poles and locking wedge plates. The upper vertical poles and the lower vertical poles are used to slide vertically relative to each other, and a clamping space is formed between the upper vertical poles and the lower vertical poles for clamping the edge. After clamping, the relative state of the two is locked by the locking wedge plate to achieve the fixation of the clamp-type vertical pole relative to the edge, and then the corresponding guardrail crossbars and skirting boards are installed between adjacent upper vertical poles to complete the installation and construction of the edge protection railings. Although the overall structure of the above scheme is relatively simple and convenient to install, the reliability of the wedge-shaped plate clamping is still poor, and it is easy to get loose. In addition, the guardrail is mainly suitable for regular straight edges, and it is difficult to install and apply to irregular edges such as curves. Therefore, it is necessary to improve the existing edge protection structure of the building platform construction. Summary of the invention

[0003] In order to overcome the above shortcomings, the purpose of the present invention is to provide a construction platform quick-install edge guardrail and its installation method to the art, so as to solve the technical problems that the installation structure of the existing similar edge guardrails is not strong enough and is difficult to be applied to the installation construction of irregular edges. The purpose is achieved through the following technical solutions.

[0004] The top of the vertical bracket is provided with an upper handle which is fixedly provided with a toothed plate, and the lower handle is provided with a toothed plate which is fixedly provided with a toothed plate and a toothed plate. Through the above structure, the distance between the lower clamping plate and the upper clamping plate is adjusted by the sliding of the pin shaft relative to the vertical sliding hole, and the first bolt is used to clamp the upper clamping plate and the lower clamping plate, and the clamping is relatively firm and reliable; the installation of the guard plate is achieved by clamping and limiting the upper clamping plate and the lower clamping plate, and the installation is relatively convenient and efficient.

[0005] The edge guardrail is composed of a bracket and a guard plate as a unit guardrail, which is connected by several unit guardrails, and the two adjacent guard plates of each unit guardrail are connected by hinges. Through this structure, the required angle is formed between adjacent guard plates, which is suitable for installation and construction of irregular edges.

[0006] The top end of the vertical cam is provided with a toothed plate, and the toothed plate is fixedly mounted on the top of the vertical cam, and the toothed plate is connected with the toothed plate at the bottom to form a toothed structure. This structure is another structural solution for connecting the bracket and the guard plate. The butt connection of adjacent guard plates is more convenient and efficient, the angle adjustment of adjacent guard plates is more convenient, and it is better compatible with the irregular edges of the building platform.

[0007] The vertical bracket is provided with a vertical strip-shaped sliding hole, and the upper clamping plate is slidably matched in the strip-shaped sliding hole through the second bolt member, and when the upper clamping plate slides into place, it is locked and fixed with the vertical bracket through the second bolt member. Through this structure, the vertical adjustment of the upper clamping plate relative to the vertical bracket is convenient, and it is suitable for the installation of guard plates of different height sizes.

[0008] The vertical sliding hole of the guide plate is evenly provided with a limit opening that forms a non-slipping with the pin shaft, and the lower end surface of the lower clamping plate is a gradually changing inclined surface, and the gradually changing inclined surface is gradually increased from the end where the lower clamping plate is connected to the pin shaft toward the other end. Through this structure, when the first bolt member is locked, the first bolt member pushes the inclined surface below the lower clamping plate, so that the pin shaft connected to the lower clamping plate and a limit opening in the vertical sliding hole of the guide plate form a tension limit, thereby forming a seesaw structure, so that the clamping surface of the lower clamping plate and the lower side of the adjacent edge form an effective clamping force, and the clamping is more reliable and stable, and not easy to loosen.

[0009] The clamping surfaces of the upper clamping plate and the lower clamping plate are toothed surfaces. With this structure, when the upper clamping plate and the lower clamping plate clamp the edge, they are not easy to come loose, and are relatively stable and firm.

[0010] A stiffening plate is provided between one side of the vertical support and the upper clamping plate. Through this structure, the firmness of the vertical support relative to the upper clamping plate is ensured, and the stability of the support is improved.

[0011] The top of the vertical support is provided with a lifting lug. This structure facilitates the lifting construction, reduces the labor intensity and improves the construction efficiency.

[0012] The installation method of the building platform quick-install edge guardrail comprises the following steps: Step 1: first loosen the first bolt to make the clamping distance between the upper and lower plates match the thickness of the edge of the building platform, insert the upper and lower plates into the edge, make the first bolt and the edge press against the limit position, and tighten the first bolt to achieve the clamping of the upper and lower plates against the edge.

[0013] Step 2: Adjust the position of the upper clamping plate at the upper end of the vertical bracket, insert the lower end of the guard plate into the corresponding lower clamping groove of the lower clamping plate, then slide the upper clamping plate so that the upper clamping groove corresponding to the upper clamping plate cooperates with the upper end of the guard plate to limit the position, and then tighten the second bolt to fix the upper clamping plate to the vertical bracket.

[0014] Step three, repeat the methods of steps one and two above to install the next set of the brackets and guard plates, and form a movable connection between adjacent guard plates through hinges until the guardrail is installed along the edge according to the shape of the edge.

[0015] Based on the above-mentioned structural scheme of another bracket and guard plate connection, the installation method of the building platform quick-install edge guardrail includes the following steps: Step 1: first, loosen the first bolt member (6) so that the clamping distance between the upper clamping plate (2) and the lower clamping plate (3) matches the thickness of the edge (1) of the building platform, insert the upper clamping plate and the lower clamping plate into the edge, make the first bolt member contact the edge to limit the position, and tighten the first bolt member to achieve the upper clamping plate and the lower clamping plate clamping the edge; Step 2: adjust the position of the upper limit plate (15) at the upper end of the vertical bracket (8), insert the hinge shafts at one end of each lower edge of the adjacent guard plates (13) into the pair of lower hinge holes corresponding to the upper clamping plate, then slide the upper limit plate so that the hinge shafts at one end of each upper edge of the adjacent guard plates are inserted into the pair of upper hinge holes of the upper limit plate, and then tighten the second bolt member (11) to fix the upper limit plate to the vertical bracket; Step three, repeat the methods of steps one and two above, so that adjacent guard plates are connected through the bracket, and after connection, adjust the angle between adjacent guard plates to adapt to the shape of the edge. After all guard plates are installed, the head and tail guard plates are independently connected to the bracket to be fixed, and the installation of the edge guardrail is completed.

[0016] The bracket forms a swing adjustment relative to the edge, that is, before the upper clamping plate and the lower clamping plate are clamped with the edge, the upper clamping plate and the lower clamping plate form a rotation adjustment with the first bolt as the swing axis. The above is suitable for the construction and installation of irregular edges, which is more convenient, safe and reliable.

[0017] The overall structure of the present invention is relatively simple, the assembly and construction is relatively convenient and efficient, the protective performance is relatively stable and reliable, and it is suitable for use in irregular building platform edge guardrail structures, or for the improvement of similar edge guardrail structures and installation methods. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a side structural schematic diagram of the present invention.

[0019] Figure 2 yes Figure 1 Schematic diagram of the three-dimensional structure.

[0020] Figure 3 yes Figure 2 Schematic diagram of the structure for installing the guard plate.

[0021] Figure 4 yes Figure 3 Schematic diagram of the front structure of the guard plate.

[0022] Figure 5 yes Figure 1 Schematic diagram of the structure of the local improvement plan.

[0023] Figure 6 It is a schematic diagram of another bracket and guard plate installation structure of the present invention.

[0024] Figure 7 yes Figure 6 Schematic diagram of the three-dimensional structure of the guard plate.

[0025] Figure 8 yes Figure 6 Schematic diagram of the front structure.

[0026] The serial numbers and names in the figure are: 1. edge, 2. upper clamping plate, 201. vertical plate, 202. lower hinge hole, 3. lower clamping plate, 301. gradual slope, 4. pin shaft, 5. guide plate, 501. vertical sliding hole, 502. limit opening, 6. first bolt member, 7. stiffening plate, 8. vertical bracket, 801. strip sliding hole, 9. lower clamping plate, 901. lower clamping groove, 10. upper clamping plate, 1001. upper clamping groove, 11. second bolt member, 12. lifting ear, 13. guard plate, 1301. hinge shaft, 14. hinge, 15. upper limit plate, 1501. upper hinge hole. Implementation

[0027] The present invention will now be further described with reference to the accompanying drawings.

[0028] like Figure 1-Figure 4 As shown, the building platform quick-install edge guardrail includes a bracket and a guard plate 13. The bracket includes a vertical bracket 8, an upper clamping plate 2, and a lower clamping plate 3. The vertical bracket is vertically welded and fixed to the upper end surface of the upper clamping plate, and a triangular stiffening plate 7 is welded between one side of the vertical bracket and the upper clamping plate to improve stability. One end of the upper clamping plate is vertically bent to form a vertical plate 201, and one side of the vertical plate is welded and fixed with a symmetrically distributed guide plate 5 with vertical sliding holes 501. One end of the lower clamping plate is provided with two symmetrical connecting arms with holes, and the two connecting arms with holes and the two symmetrical vertical sliding holes are connected with a pin shaft 4 to form a sliding hinge. The lower clamping plate is locked and connected to the upper clamping plate near the middle by a vertical first bolt 6. The clamping surfaces of the upper clamping plate and the lower clamping plate are both anti-slip toothed surfaces. A vertical lower clamping plate 9 is welded on the upper end surface of the upper clamping plate, and a lower clamping groove 901 for inserting and limiting the lower end of the guard plate is formed between the lower clamping plate and the vertical bracket. An upper clamping plate 10 that slides vertically relative to each other is arranged on the top of the vertical bracket, that is, the vertical bracket is provided with a vertical strip-shaped sliding hole 801. The upper clamping plate is slidably matched in the strip-shaped sliding hole through the second bolt member 11, and when the upper clamping plate slides into place, it is locked and fixed with the vertical bracket through the second bolt member. An upper clamping groove 1001 for inserting and limiting the upper end of the guard plate is formed between the upper clamping plate and the vertical bracket, and the guard plate is effectively clamped and limited by the upper and lower clamping grooves.

[0029] like Figure 5As shown, in order to further improve the reliability and stability of the clamping of the upper clamping plate 2 and the lower clamping plate 3, a stopper 502 is evenly arranged on one side of the vertical sliding hole 501 of the guide plate 5 to form a non-slip stop with the pin shaft 4, and the lower end surface of the lower clamping plate is a gradual slope, and the gradual slope is formed from the end where the lower clamping plate is connected to the pin shaft to the other end. In order to facilitate the alignment and installation of the upper clamping plate, the lower clamping plate and the edge 1, the top of the vertical bracket can also be provided with a lifting ear 12, which is convenient for the auxiliary suspension of external equipment, saves manpower operation, and makes the construction more convenient and efficient.

[0030] Combined with the above structure, the specific installation method of the building platform quick-install edge guardrail is: a bracket and a guard plate 13 are used as a unit guardrail, and the edge guardrail is formed by connecting a plurality of unit guardrails, and the two adjacent guard plates of each unit guardrail are connected by hinges. Specifically, the following installation steps are included.

[0031] Step 1, first loosen the first bolt 6, so that the clamping distance between the upper clamp 2 and the lower clamp 3 is adapted to the thickness of the edge 1 of the building platform, put the upper and lower clamps into the edge, make the side of the first bolt 6 close to the edge and tighten the first bolt. When the first bolt pulls the lower clamp, because one end of the lower clamp is limited in the vertical sliding hole of the guide plate, the toothed surface at the other end of the lower clamp and the toothed surface of the upper clamp form an effective clamping fixation to the edge of the building platform.

[0032] Step 2, adjust the position of the upper clamping plate 10 at the upper end of the vertical bracket 8, insert the lower end of the guard plate 13 into the lower clamping groove 901 corresponding to the lower clamping plate 9, and then slide the upper clamping plate so that the upper clamping groove 1001 corresponding to the upper clamping plate cooperates with the upper end of the guard plate to limit the position, and then tighten the second bolt 11 to fix the upper clamping plate and the vertical bracket, thus completing the alignment installation of a guard plate and the bracket.

[0033] Step three, repeat the methods of steps one and two above to install the next set of brackets and guard plates 13. Since the upper clamp plate 2 and the lower clamp plate 3 are locked with the first bolt member 6, before the upper clamp plate and the lower clamp plate are clamped with the edge 1, the upper clamp plate and the lower clamp plate are rotated and adjusted to the required angle with the first bolt member as the swing axis, so that the installation angle of the guard plate adapts to the shape of the edge, and the adjacent guard plates of each group are movably connected by hinges 14 to complete the installation of the edge guardrail.

[0034] like Figure 6-Figure 8As shown, as another structural scheme for connecting the bracket and the guard plate 13, compared with the above-mentioned connection scheme of the bracket and the guard plate, the main differences are: the lower clamping plate 9 of the upper clamping plate 2 is cancelled, and a pair of lower hinge holes 202 are provided on the upper end face of the upper clamping plate; the upper clamping plate 10 of the vertical bracket 8 is replaced by an upper limit plate 15, and the connection method between the upper limit plate and the vertical bracket is the same as the connection method between the upper clamping plate and the vertical bracket; the upper limit plate is provided with a pair of upper hinge holes 1501 vertically aligned with the lower hinge holes; the guard plate is changed to have raised hinge shafts 1301 at both ends of the top edge and the bottom edge that cooperate with the above-mentioned upper hinge holes and lower hinge holes.

[0035] The installation method of the building platform quick-install edge guardrail combined with the above-mentioned solution structure includes the following steps: Step 1: first loosen the first bolt 6 to make the clamping distance between the upper clamp 2 and the lower clamp 3 match the thickness of the edge 1 of the building platform, insert the upper clamp and the lower clamp into the edge, make the first bolt and the edge press against the limit position, and tighten the first bolt to achieve the clamping of the upper clamp and the lower clamp.

[0036] Step 2, adjust the position of the upper limit plate 15 at the upper end of the vertical bracket 8, insert the hinge shaft 1301 at one end of the lower edge of each adjacent guard plate 13 into a pair of lower hinge holes 202 corresponding to the upper clamping plate 2 to form a hinge, then slide the upper limit plate 15, so that the hinge shaft at one end of the upper edge of each adjacent guard plate is inserted into a pair of upper hinge holes 1501 of the upper limit plate to form a hinge, and then tighten the second bolt 11 to fix the upper limit plate to the vertical bracket.

[0037] Step three, repeat the methods of steps one and two above, so that adjacent guard plates 13 are connected through the bracket, and after connection, adjust the angle between adjacent guard plates to adapt to the shape of the edge. After all guard plates are installed, the head and tail guard plates are independently connected to the upper hinge hole 1501 and the lower hinge hole 202 in the bracket through the hinge shaft 1301 to be fixed, and the installation of the edge guardrail is completed.

[0038] The above contents are intended to illustrate the technical means of the present invention, but not to limit the technical scope of the present invention. Those skilled in the art can make obvious improvements to the present invention in combination with existing common knowledge, which also fall within the protection scope of the claims of the present invention.

Claims

1. A quick-install edge guardrail for a building platform, the edge guardrail comprising a bracket and a guard plate (13), characterized in that The bracket comprises a vertical bracket (8), an upper clamping plate (2), and a lower clamping plate (3), wherein the vertical bracket is vertically fixed to the upper end surface of the upper clamping plate, a vertically bent vertical plate (201) is integrated on one side of the upper clamping plate, and a guide plate (5) with a vertical sliding hole (501) is fixed on one side of the vertical plate, one end of the lower clamping plate is hinged and slidably placed in the vertical sliding hole of the guide plate through a pin shaft (4), and the lower clamping plate is locked and connected with the upper clamping plate near the middle by a vertical first bolt member (6), and the clamping surfaces of the upper clamping plate and the lower clamping plate are both anti-slip surfaces; a lower clamping plate (9) is fixedly provided on the upper end surface of the upper clamping plate, and a lower clamping groove (901) for inserting and limiting the lower end of the guard plate (13) is formed between the lower clamping plate and the vertical bracket, and an upper clamping plate (10) is arranged on the top of the vertical bracket for vertical relative sliding, and an upper clamping groove (1001) for inserting and limiting the upper end of the guard plate is formed between the upper clamping plate and the vertical bracket, and the upper clamping plate and the vertical bracket are locked and fixed by a second bolt member (11).

2. The construction platform quick-install edge guardrail according to claim 1 is characterized in that The edge guardrail is composed of a bracket and a guard plate (13) as a unit guardrail, which is formed by connecting a plurality of unit guardrails, and two adjacent guard plates of each unit guardrail are connected by a hinge (14).

3. A quick-install edge guardrail for a building platform, the edge guardrail comprising a bracket and a guard plate (13), characterized in that The bracket comprises a vertical bracket (8), an upper clamping plate (2), and a lower clamping plate (3). The vertical bracket is vertically fixed to the upper end surface of the upper clamping plate. A vertically bent vertical plate (201) is integrated on one side of the upper clamping plate. A guide plate (5) with a vertical sliding hole (501) is fixed on one side of the vertical plate. One end of the lower clamping plate is hinged and slidably placed in the vertical sliding hole of the guide plate through a pin shaft (4). The lower clamping plate is locked and connected to the upper clamping plate near the middle by a vertical first bolt member (6). The upper clamping plate and the lower clamping plate are respectively The clamping surfaces are all anti-slip surfaces; a pair of lower hinge holes (202) are provided on the upper end surface of the upper clamping plate, an upper limit plate (15) that slides vertically relative to each other is provided on the top of the vertical bracket, the upper limit plate is provided with a pair of upper hinge holes (1501) that are vertically aligned with the lower hinge holes, the upper limit plate and the vertical bracket are locked and fixed by a second bolt member (11), and both ends of the top edge and the bottom edge of the guard plate (13) are provided with raised hinge shafts (1301) that cooperate with the upper hinge holes and the lower hinge holes.

4. The construction platform quick-install edge guardrail according to claim 1 or 3, characterized in that The vertical bracket (8) is provided with a vertical strip-shaped sliding hole (801), and the upper clamping plate (10) is slidably fitted in the strip-shaped sliding hole via the second bolt member (11), and when the upper clamping plate slides into place, it is locked and fixed with the vertical bracket via the second bolt member.

5. The construction platform quick-install edge guardrail according to claim 1 or 3, characterized in that One side of the vertical sliding hole (501) of the guide plate (5) is provided with a stopper opening (502) for forming a stopper with the pin shaft (4), and the lower end surface of the lower clamping plate is a gradually changing inclined surface (301), and the gradually changing inclined surface is formed from the end of the lower clamping plate where the pin shaft is connected to the other end to form a gradually increasing setting.

6. The construction platform quick-install edge guardrail according to claim 1 or 3, characterized in that The clamping surfaces of the upper clamping plate (2) and the lower clamping plate (3) are toothed surfaces.

7. The construction platform quick-install edge guardrail according to claim 1 or 3, characterized in that The top of the vertical support (8) is provided with a lifting lug (12).

8. A method for installing a quick-install edge guardrail for a building platform as claimed in claim 1, characterized in that The installation method includes the following steps: Step 1: first, loosen the first bolt member (6) so that the clamping distance between the upper clamping plate (2) and the lower clamping plate (3) matches the thickness of the edge (1) of the building platform, insert the upper clamping plate and the lower clamping plate into the edge, make the first bolt member contact the edge to limit the position, and tighten the first bolt member to achieve the upper clamping plate and the lower clamping plate clamping the edge; Step 2: adjust the position of the upper clamping plate (10) at the upper end of the vertical bracket (8), insert the lower end of the guard plate (13) into the corresponding lower clamping groove (901) of the lower clamping plate (9), then slide the upper clamping plate so that the upper clamping groove (1001) corresponding to the upper clamping plate and the upper end of the guard plate are matched and limited, and then tighten the second bolt member (11) to fix the upper clamping plate to the vertical bracket; Step three, repeat the method of steps one and two above to install the next set of the brackets and guard plates, and form a movable connection between adjacent guard plates through hinges (14) until the guardrail is installed along the edge according to the shape of the edge.

9. A method for installing a quick-install edge guardrail for a building platform as claimed in claim 3, characterized in that The installation method includes the following steps: Step 1: first, loosen the first bolt member (6) so that the clamping distance between the upper clamping plate (2) and the lower clamping plate (3) matches the thickness of the edge (1) of the building platform, insert the upper clamping plate and the lower clamping plate into the edge, make the first bolt member contact the edge to limit the position, and tighten the first bolt member to achieve the upper clamping plate and the lower clamping plate clamping the edge; Step 2: adjust the position of the upper limit plate (15) at the upper end of the vertical bracket (8), insert the hinge shafts at one end of each lower edge of the adjacent guard plates (13) into a pair of lower hinge holes (202) corresponding to the upper clamping plate, then slide the upper limit plate (15) so that the hinge shafts (1301) at one end of each upper edge of the adjacent guard plates are inserted into a pair of upper hinge holes (1501) of the upper limit plate, and then tighten the second bolt member (11) to fix the upper limit plate to the vertical bracket; Step three, repeat the methods of steps one and two above, so that adjacent guard plates are connected through the bracket, and after connection, adjust the angle between adjacent guard plates to adapt to the shape of the edge. After all guard plates are installed, the head and tail guard plates are independently connected to the bracket to be fixed, and the installation of the edge guardrail is completed.

10. The method for installing a quick-install edge guardrail of a building platform according to claim 8 or 9, characterized in that The bracket is swivelled and adjusted relative to the edge (1), that is, before the upper clamping plate (2) and the lower clamping plate (3) are clamped to the edge, the upper clamping plate and the lower clamping plate are swivelled and adjusted with the first bolt member (6) as the swivelling axis.

Citation Information

Cited By

  • High-altitude edge masonry construction protection device and construction method

    CN119616237A