Composite lining structure with adjustable water pressure for hard rock tunnel and construction method of composite lining structure

By using hollow grouting anchors and high-adhesion spray-film waterproofing layers in hard rock tunnels, combined with drainage dead pipe systems, the problems of over-under-excavation and waterproofing membrane leakage caused by drill-and-blast construction have been solved, and construction efficiency and load-bearing capacity have been improved. capabilities, reduces costs, and achieves uniform water pressure distribution.

CN118728418APending Publication Date: 2024-10-01SHANDONG EXPRESSWAY INFRASTRUCTURE CONSTR CO LTD +1
View PDF 0 Cites 3 Cited by

Patent Information

Application Number
CN202410948323.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-16
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

The drilling and blasting method leads to over-under-excavation of hard rock tunnels and uneven laying of waterproof membranes, which results in easy damage to the waterproof membrane and many hidden dangers of leakage. It is difficult for traditional waterproofing systems to effectively solve these problems.

Method used

Hollow grouting anchors are used to form the grouting support layer, and a double-sided high-adhesion spray film waterproof layer is sprayed between the initial support layer and the secondary lining layer, combined with circumferential, longitudinal, and transverse drainage blind pipes and central ditches A drainage mechanism is formed to ensure that the waterproof membrane adheres closely to the base surface to reduce leakage, and the water pressure is adjusted through a pressure gauge.

Benefits of technology

It effectively solves the problems of uneven laying of waterproof membrane and leakage, improves the construction speed and load-bearing capacity, reduces the thickness of the secondary lining, significantly reduces the cost, and effectively discharges leakage water through the drainage mechanism to form a uniform water pressure distribution.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118728418A_ABST
    Figure CN118728418A_ABST
Patent Text Reader

Abstract

The invention discloses a composite lining structure with adjustable water pressure for a hard rock tunnel and a construction method of the composite lining structure, and relates to a tunnel formed through drilling and blasting construction in the technical field of hard rock tunnel water prevention and drainage and supporting, the tunnel is provided with a surrounding rock, and the composite lining structure comprises a hollow grouting anchor rod embedded in the surrounding rock, and the grouting end of the hollow grouting anchor rod extends into the tunnel; the interior of the surrounding rock is grouted through a hollow grouting anchor rod to form a grouting supporting layer; the primary supporting layer is arranged on the inner surface of the surrounding rock, and the grouting end of the hollow grouting anchor rod is embedded into the primary supporting layer; the film spraying waterproof layer is arranged on the inner surface of the primary support layer in a spraying manner; and the secondary lining layer is arranged on the inner surface of the film spraying waterproof layer. The hollow grouting anchor rod is adopted for grouting the surrounding rock to form the grouting supporting layer, the spraying film waterproof layer is formed between the primary supporting layer and the secondary lining layer in a spraying mode, and the problems that after drilling and blasting construction of the hard rock tunnel, waterproof film laying is not uniform, and the number of joints is large are effectively solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of drainage and support for hard rock tunnels, and in particular to a composite lining structure with adjustable water pressure for hard rock tunnels and a construction method thereof. Background Art

[0002] The drilling and blasting method is a commonly used construction method in tunnel construction. It has the characteristics of high flexibility, wide application range, and good economy. It is widely used in hard rock tunnel excavation. When the drilling and blasting method is used in hard rock tunnel construction, due to the high hardness of the surrounding rock of the hard rock tunnel, the degree of development of joints and fissures, and the different degrees of rock fragmentation, the drilling and blasting method construction generally has serious over-excavation and under-excavation phenomena.

[0003] The phenomenon of tunnel over-excavation and under-excavation affects the surface flatness of the initial shotcrete and also affects the uniformity of the later waterproof membrane laying. Traditional composite linings mostly use polymer waterproof membrane + geotextile between the primary support and the secondary lining for waterproofing. However, due to the phenomenon of over-excavation and under-excavation in the drilling and blasting construction method, the surface of the primary support is uneven and has large voids. The waterproof membrane cannot fit tightly with the initial support base surface, and the extrusion pressure generated during the pouring of the secondary lining easily causes the waterproof membrane to be stretched and damaged.

[0004] In addition, the waterproof membranes used in existing tunnel construction have many joints and many potential leakage risks in the waterproof system; the anchor heads on the base surface and the subsequent steel bar binding process can easily cause puncture and damage to the waterproof membrane, making it difficult to repair.

[0005] In view of this, how to provide a tunnel construction method that can partially or completely solve the above-mentioned technical problems is an issue that technical personnel in this field urgently need to solve. Summary of the invention

[0006] The purpose of the present invention is to provide a composite lining structure with adjustable water pressure for a hard rock tunnel and a construction method thereof, so as to solve the problems existing in the prior art.

[0007] To achieve the above object, the present invention provides the following solution: The present invention provides a composite lining structure with adjustable water pressure for a hard rock tunnel, wherein the tunnel is formed by drilling and blasting, and the tunnel has surrounding rock, including:

[0008] A hollow grouting anchor rod, wherein the hollow grouting anchor rod is embedded in the surrounding rock, and the grouting end thereof extends into the tunnel, and the surrounding rock is grouted by the hollow grouting anchor rod to form a grouting support layer;

[0009] An initial support layer, wherein the initial support layer is arranged on the inner surface of the surrounding rock, and the grouting end of the hollow grouting anchor rod is embedded in the initial support layer;

[0010] A sprayed waterproof layer, the sprayed waterproof layer is sprayed and arranged on the inner surface of the initial support layer;

[0011] A secondary lining layer is arranged on the inner surface of the sprayed waterproof layer.

[0012] Furthermore, the hollow grouting anchor comprises:

[0013] A rod body, one end of the rod body being a grouting end, and the other end of the rod body extending into a grouting area in the surrounding rock;

[0014] Anchor nut, the rod body is fixed to the surrounding rock through the anchor nut, and a pad is arranged between the anchor nut and the surrounding rock.

[0015] Furthermore, the sprayed waterproof layer is a double-sided high-adhesion waterproof layer.

[0016] Furthermore, it also includes a drainage mechanism, which can drain the leakage water of the initial supporting layer and groundwater.

[0017] Furthermore, the drainage mechanism includes:

[0018] An annular drainage blind pipe, the sprayed waterproof layer is arranged corresponding to the side wall and the arch of the tunnel, one end of the annular drainage blind pipe is close to the arch bottom of the tunnel, and the other end extends upward along the inner surface of the initial support layer, and part of the annular drainage blind pipe is located between the initial support layer and the sprayed waterproof layer;

[0019] A longitudinal drainage blind pipe, which is located at the arch foot of the tunnel and is arranged along the length direction of the tunnel;

[0020] A transverse drainage blind pipe, which is arranged along the width direction of the tunnel, one end of which is connected to the longitudinal drainage blind pipe and the annular drainage blind pipe through a first tee, and the connection point is close to the arch foot of the tunnel; the other end extends to the middle of the tunnel, and the transverse drainage blind pipe is connected to the annular drainage blind pipe through a second tee, and the connection point is close to one end of the annular drainage blind pipe;

[0021] A central ditch is arranged in the middle of the tunnel along the length direction of the tunnel, and the other end of the transverse drainage blind pipe is connected to the central ditch.

[0022] Furthermore, the central ditch is lower than the longitudinal drainage blind pipe and is arranged at the center of the tunnel arch bottom.

[0023] Furthermore, a pressure gauge and a valve are provided on the transverse drainage blind pipe.

[0024] The present invention also provides a construction method of a composite lining structure with adjustable water pressure for a hard rock tunnel, comprising the following steps:

[0025] S1: insert a hollow grouting anchor rod into the surrounding rock of the tunnel and fix it with anchor bolts, and inject grout into the grouting area in the surrounding rock through the hollow grouting anchor rod to form a grouting support layer;

[0026] S2: Open a central ditch, and lay annular drainage blind pipes, longitudinal drainage blind pipes and transverse drainage blind pipes at the same time, and connect the transverse drainage blind pipes with the central ditch;

[0027] S3: Spray concrete on the inner surface of the surrounding rock to form an initial support layer. The concrete covers the hollow grouting anchor rods and the annular drainage blind pipe;

[0028] S4: Spray waterproof material on the inner surface of the initial support layer at the position corresponding to the tunnel side wall and the arch to form a spray film waterproof layer;

[0029] S5: A secondary lining layer is formed by pouring on the inner surface of the sprayed waterproof layer and at the position corresponding to the tunnel invert.

[0030] Furthermore, in step S4, after the spraying of the film-spraying waterproof layer is completed, a composite self-adhesive waterproof membrane is laid at the position corresponding to the tunnel invert, and the composite self-adhesive waterproof membrane is connected with the film-spraying waterproof layer to form a full-ring waterproof structure.

[0031] Further, step S5 includes:

[0032] S501: pouring concrete at the position corresponding to the tunnel invert;

[0033] S502: Install water-swellable waterstop strips and self-adhesive butyl rubber steel plate waterstop strips in the construction joints;

[0034] S503: Spray concrete on the inner surface of the sprayed waterproof layer.

[0035] The present invention discloses the following technical effects:

[0036] 1. In order to solve the problems of over-excavation and under-excavation caused by drilling and blasting construction, as well as the problem of uneven laying of waterproof membrane, this application adopts hollow grouting anchor rods to inject grout into the surrounding rock to form a grouting support layer, and forms a sprayed waterproof layer between the initial support layer and the secondary lining layer by spraying, which effectively solves the problems of uneven laying of waterproof membrane and many joints after drilling and blasting construction of hard rock tunnels.

[0037] 2. The sprayed waterproof layer adopts a double-sided high-adhesion waterproof layer with high adhesion and durability, which can effectively improve the construction speed, block the permeable paths on both sides, and solve the difficulties of traditional waterproof membrane construction and easy water leakage in hard rock tunnels. At the same time, it is bonded with the initial support and secondary lining from the tunnel side wall to the arch to form a composite structure, which jointly bears external loads, effectively improves the bearing capacity of the composite lining, reduces the thickness of the secondary lining, and significantly reduces costs. The composite self-adhesive waterproof membrane is laid at the position corresponding to the tunnel invert, and the composite self-adhesive waterproof membrane is connected with the sprayed waterproof layer to form a full-ring waterproof structure.

[0038] 3. An annular drainage blind pipe is set between the initial support layer and the sprayed waterproof layer. Combined with the longitudinal drainage blind pipe and the transverse drainage blind pipe, the leakage water of the initial support layer can be drained to the central ditch for discharge, which effectively solves the difficulties in the construction of traditional waterproof membranes in hard rock tunnels and the problem of easy leakage of waterproof membranes. Pressure gauges and valves are set on the transverse drainage blind pipe to adjust the drainage water pressure, so that the water pressure distribution acting on the composite lining is more reasonable. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0040] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0041] Figure 2 for Figure 1 A magnified schematic diagram of the middle A area;

[0042] Figure 3 It is a schematic diagram of the hollow grouting anchor rod of the present invention;

[0043] Figure 4 It is a schematic diagram of the layout of the drainage mechanism of the present invention along the length direction of the tunnel;

[0044] Among them, 1. surrounding rock; 2. initial support layer; 3. sprayed waterproof layer; 4. secondary lining layer; 5. hollow grouting anchor rod; 6. annular drainage blind pipe; 7. longitudinal drainage blind pipe; 8. second tee; 9. transverse drainage blind pipe; 10. central ditch; 11. pressure gauge; 12. valve; 13. grouting end; 14. anchor nut; 15. pad; 16. rod body; 17. grouting area. DETAILED DESCRIPTION

[0045] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0046] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.

[0047] Example 1

[0048] like Figure 1-Figure 4 The embodiment of the present invention provides a composite lining structure with adjustable water pressure for a hard rock tunnel. The tunnel is formed by drilling and blasting. The tunnel has a surrounding rock 1, including: a hollow grouting anchor rod 5, the hollow grouting anchor rod 5 is embedded in the surrounding rock 1, and its grouting end 13 extends into the tunnel. The interior of the surrounding rock 1 is grouted by the hollow grouting anchor rod 5 to form a grouting support layer; an initial support layer 2, the initial support layer 2 is arranged on the inner surface of the surrounding rock 1, and the grouting end 13 of the hollow grouting anchor rod 5 is embedded in the initial support layer 2; a sprayed waterproof layer 3, the sprayed waterproof layer 3 is sprayed and arranged on the inner surface of the initial support layer 2, the sprayed waterproof layer 3 is a double-sided high-adhesion waterproof layer, and is made of a waterproof material mainly composed of polymer and cement; a secondary lining layer 4, the secondary lining layer 4 is arranged on the inner surface of the sprayed waterproof layer 3.

[0049] like Figure 3 As shown, the hollow grouting anchor rod 5 includes: a rod body 16, one end of the rod body 16 is a grouting end 13, and the other end of the rod body 16 extends into a grouting area 17 in the surrounding rock 1; an anchor nut 14, the rod body 16 is provided with an outer surface thread near the grouting end 13, and is fixed to the surrounding rock 1 through the anchor nut 14, and a pad 15 is provided between the anchor nut 14 and the surrounding rock 1.

[0050] Spray membrane waterproof layer 3 Figure 1 and Figure 4As shown, it also includes a drainage mechanism, which can drain the leakage water of the initial supporting layer 2 and groundwater. The drainage mechanism includes: an annular drainage blind pipe 6, the sprayed waterproof layer 3 is arranged corresponding to the side wall and the arch of the tunnel, one end of the annular drainage blind pipe 6 is close to the arch bottom of the tunnel, and the other end extends upward along the inner surface of the initial support layer 2, and part of the annular drainage blind pipe 6 is located between the initial support layer 2 and the sprayed waterproof layer 3; a longitudinal drainage blind pipe 7, the longitudinal drainage blind pipe 7 is located at the arch foot of the tunnel and is arranged along the length direction of the tunnel; a transverse drainage blind pipe 9, the transverse drainage blind pipe 9 is arranged along the width direction of the tunnel, one end of the transverse drainage blind pipe 9 is connected with the longitudinal drainage blind pipe 7 and the annular drainage blind pipe 6 through a first tee, and the connection point is close to the arch foot of the tunnel; the other end extends to the middle of the tunnel, the transverse drainage blind pipe 9 is connected with the annular drainage blind pipe 6 through a second tee 8, and the connection point is close to one end of the annular drainage blind pipe 6; a central ditch 10, the central ditch 10 is arranged in the middle of the tunnel along the length direction of the tunnel, and the other end of the transverse drainage blind pipe 9 is connected with the central ditch 10. The central water ditch 10 is lower than the longitudinal drainage blind pipe 7 and is arranged at the center of the tunnel arch bottom. A pressure gauge 11 and a valve 12 are arranged on the transverse drainage blind pipe 9.

[0051] The following is a detailed description of the construction method in conjunction with Example 1. The construction site is Tunnel A in Shandong Province, and the method includes the following steps:

[0052] S1: inserting a hollow grouting anchor rod 5 into the surrounding rock 1 of the tunnel and fixing it with anchor bolts, and injecting grout into the grouting area 17 in the surrounding rock 1 through the hollow grouting anchor rod 5 to form a grouting support layer;

[0053] S2: Open a central ditch 10, and lay annular drainage blind pipes 6, longitudinal drainage blind pipes 7 and transverse drainage blind pipes 9 at the same time, connect the transverse drainage blind pipes 9 with the central ditch 10, and arrange mesh holes on the wall of the longitudinal drainage blind pipes 7 to introduce the initial support leakage water into the central ditch 10 through the transverse drainage blind pipes 9 and the secondary lining to relieve the water pressure on the lining;

[0054] S3: Spray concrete on the inner surface of the surrounding rock 1 to form an initial support layer 2. The concrete is C30 concrete mixed with steel fiber to ensure the strength of the initial support concrete. Wet spraying is performed through a nozzle perpendicular to the rock surface. The spraying distance of the sprayer is 1.5 to 2.0 m. The hollow grouting anchor rod 5 and the annular drainage blind pipe 6 are used to process the initial support layer 2. The protrusions such as the anchor rod head and the steel bar head that are leaking are cut off so that the concrete covers the hollow grouting anchor rod 5 and the annular drainage blind pipe 6, and the non-woven fabric layer is laid;

[0055] S4: Check the flatness of the base layer, spray waterproof material on the inner surface of the initial support layer 2 corresponding to the tunnel side wall and the arch to form a spray film waterproof layer 3. During operation, the spray gun is perpendicular to the base surface and moves at a constant speed. The spray distance is about 40 to 60 cm. The spraying order is from bottom to top, first the side wall and then the arch, and the spraying is carried out twice. The spray film is uniform and the thickness is not less than 3 mm; after the spray film waterproof layer 3 is sprayed, the composite self-adhesive waterproof membrane is laid at the position corresponding to the tunnel invert. The composite self-adhesive waterproof membrane is connected with the spray film waterproof layer 3 to form a full-ring waterproof structure;

[0056] S5: Casting a secondary lining layer 4 on the inner surface of the sprayed waterproof layer 3 and at the position corresponding to the tunnel invert. The sprayed waterproof layer 3 specifically includes:

[0057] S501: pouring concrete at the position corresponding to the tunnel invert;

[0058] S502: Install water-swellable waterstop strips and self-adhesive butyl rubber steel plate waterstop strips in the construction joints;

[0059] S503: spraying concrete on the inner surface of the sprayed waterproof layer 3.

[0060] After testing, the composite lining structure formed by the above construction method can form a sprayed waterproof membrane with good uniformity, and the leakage water of the initial support layer 2 can be smoothly discharged into the central ditch 10, which effectively solves the difficulties in the construction of traditional waterproof membranes in hard rock tunnels and the problem of easy leakage of waterproof membranes. The water pressure around the lining is evenly distributed, and the thickness of the secondary lining layer 4 is reduced by more than 20% compared with the traditional construction method.

[0061] In the description of the present invention, it should be understood that the terms "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0062] The embodiments described above are only descriptions of the preferred modes of the present invention, and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should all fall within the protection scope determined by the claims of the present invention.

Claims

1. A composite lining structure with adjustable water pressure for a hard rock tunnel, wherein the tunnel is formed by drilling and blasting, and the tunnel has surrounding rock (1), characterized in that: include: A hollow grouting anchor rod (5), wherein the hollow grouting anchor rod (5) is embedded in the surrounding rock (1), and a grouting end (13) thereof extends into the tunnel, and the interior of the surrounding rock (1) is grouted by the hollow grouting anchor rod (5) to form a grouting support layer; An initial support layer (2), the initial support layer (2) being arranged on the inner surface of the surrounding rock (1), and the grouting end (13) of the hollow grouting anchor rod (5) being embedded in the initial support layer (2); A sprayed waterproof layer (3), wherein the sprayed waterproof layer (3) is sprayed on the inner surface of the initial support layer (2); A secondary lining layer (4), wherein the secondary lining layer (4) is arranged on the inner surface of the sprayed waterproof layer (3).

2. A composite lining structure with adjustable water pressure for a hard rock tunnel according to claim 1, characterized in that: The hollow grouting anchor rod (5) comprises: A rod body (16), one end of the rod body (16) being a grouting end (13), and the other end of the rod body (16) extending into a grouting area (17) in the surrounding rock (1); Anchor nut (14), the rod body (16) is fixed to the surrounding rock (1) through the anchor nut (14), and a pad (15) is provided between the anchor nut (14) and the surrounding rock (1).

3. The composite lining structure with adjustable water pressure for hard rock tunnel according to claim 1, characterized in that: The sprayed waterproof layer (3) is a double-sided high-adhesion waterproof layer.

4. The composite lining structure with adjustable water pressure for hard rock tunnel according to claim 1, characterized in that: It also comprises a drainage mechanism, which can drain the leakage water of the initial supporting layer (2) and groundwater.

5. The composite lining structure with adjustable water pressure for hard rock tunnel according to claim 4, characterized in that: The drainage mechanism comprises: An annular drainage blind pipe (6), the sprayed waterproof layer (3) is arranged corresponding to the side wall and the arch of the tunnel, one end of the annular drainage blind pipe (6) is close to the arch bottom of the tunnel, and the other end extends upward along the inner surface of the initial support layer (2), and part of the annular drainage blind pipe (6) is located between the initial support layer (2) and the sprayed waterproof layer (3); A longitudinal drainage blind pipe (7), the longitudinal drainage blind pipe (7) being located at the arch foot of the tunnel and arranged along the length direction of the tunnel; A transverse drainage blind pipe (9), wherein the transverse drainage blind pipe (9) is arranged along the width direction of the tunnel, one end of the transverse drainage blind pipe (9) is connected to the longitudinal drainage blind pipe (7) and the annular drainage blind pipe (6) through a first tee, and the connection point is close to the arch foot of the tunnel; the other end extends to the middle of the tunnel, and the transverse drainage blind pipe (9) is connected to the annular drainage blind pipe (6) through a second tee (8), and the connection point is close to one end of the annular drainage blind pipe (6); A central water ditch (10) is arranged in the middle of the tunnel along the length direction of the tunnel, and the other end of the transverse drainage blind pipe (9) is connected to the central water ditch (10).

6. The composite lining structure with adjustable water pressure for hard rock tunnel according to claim 5, characterized in that: The central water ditch (10) is lower than the longitudinal drainage blind pipe (7) and is arranged at the center of the tunnel arch bottom.

7. The composite lining structure with adjustable water pressure for hard rock tunnel according to claim 5, characterized in that: The transverse drainage blind pipe (9) is provided with a pressure gauge (11) and a valve (12).

8. A construction method for a composite lining structure with adjustable water pressure in a hard rock tunnel, characterized in that: The following steps are involved: S1: inserting a hollow grouting anchor rod (5) into the surrounding rock (1) of the tunnel and fixing it with anchor bolts, and injecting grout into the grouting area (17) in the surrounding rock (1) through the hollow grouting anchor rod (5) to form a grouting support layer; S2: a central water ditch (10) is opened, and at the same time, an annular drainage blind pipe (6), a longitudinal drainage blind pipe (7) and a transverse drainage blind pipe (9) are laid, and the transverse drainage blind pipe (9) is connected with the central water ditch (10); S3: spraying concrete on the inner surface of the surrounding rock (1) to form an initial support layer (2), wherein the concrete covers the hollow grouting anchor rod (5) and the annular drainage blind pipe (6); S4: spraying waterproof material on the inner surface of the initial support layer (2) at positions corresponding to the tunnel side walls and the arch to form a spray film waterproof layer (3); S5: pouring a secondary lining layer (4) on the inner surface of the sprayed waterproof layer (3) and at a position corresponding to the tunnel invert.

9. The construction method of a composite lining structure with adjustable water pressure for a hard rock tunnel according to claim 8, characterized in that: In step S4, after the spraying of the film-spraying waterproof layer (3) is completed, a composite self-adhesive waterproofing membrane is laid at the position corresponding to the tunnel invert, and the composite self-adhesive waterproofing membrane is connected to the film-spraying waterproof layer (3) to form a full-ring waterproofing structure.

10. The construction method of a composite lining structure with adjustable water pressure for a hard rock tunnel according to claim 8, characterized in that: Step S5 includes: S501: pouring concrete at the position corresponding to the tunnel invert; S502: Install water-swellable waterstop strips and self-adhesive butyl rubber steel plate waterstop strips in the construction joints; S503: spraying concrete on the inner surface of the sprayed waterproof layer (3).

Citation Information

Cited By

  • Waterproof structure for tunnel and construction method

    CN119145890A

  • Waterproof and drainage system for water-rich tunnel in fault fracture zone

    CN120968685A

  • A drainage system for water-rich tunnels in fault fracture zones

    CN120968685B