Semiconductor vacuum transmission valve structure and processing method
By designing the valve cavity, sealing surface and piston structure in the semiconductor vacuum transfer valve, combined with fine machining and locking mechanism, the problem of poor sealing performance is solved, higher sealing and reliability are achieved, and air leakage is reduced.
Patent Information
- Application Number
- CN202410809997.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-21
- Publication Date
- 2024-10-01
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing semiconductor vacuum transfer valve has poor sealing performance and is prone to air leakage, affecting the stability of silicon wafer transfer and vacuum environment.
A semiconductor vacuum transmission valve structure is designed, which uses a valve cavity and sealing surface on the valve seat, combined with the structure of the piston and airbag sealing ring, improves the sealing performance through fine processing and sealing surface design, and ensures the valve plate's sealing performance through a locking mechanism. reliability.
It effectively improves the sealing performance of the semiconductor vacuum transfer valve, reduces the occurrence of air leakage, and ensures the reliability of the equipment and the stability of the vacuum environment.
Smart Images

Figure CN118728985A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to semiconductor processing equipment, and more particularly to a semiconductor vacuum transmission valve structure and a processing method. Background Art
[0002] The semiconductor vacuum transfer valve is the most widely used vacuum component in the silicon wafer transmission channel, and is an important component for silicon wafer transmission and vacuum assurance in the modern semiconductor industry. The semiconductor vacuum transfer valve ensures the continuity of the channel during the transportation of silicon wafers, and ensures the vacuum and cleanliness of the chamber during the process of silicon wafers. And due to the structural characteristics of the semiconductor vacuum transfer valve, it can not only ensure a high vacuum environment, but also ensure the particle size under this environment, which presents obvious advantages in the transmission process. Among them, the sealing requirements of the semiconductor vacuum transfer valve are particularly important, but many existing semiconductor vacuum transfer valves have poor sealing performance and are prone to leakage during use. Summary of the invention
[0003] In order to overcome the above-mentioned shortcomings, the present invention provides a semiconductor vacuum transmission valve structure and a processing method. The semiconductor vacuum transmission valve has good sealing performance and is not prone to leakage during use.
[0004] In order to solve the above technical problems, the present invention adopts the following technical solutions: a semiconductor vacuum transmission valve structure, including a valve seat, a valve cavity is arranged on the valve seat, opening windows connected to the valve cavity are arranged on the front and rear side walls of the valve seat, and a circle of valve sealing surface is arranged on the edge of the front opening window on the inner wall of the valve cavity.
[0005] The two opening windows on the valve seat are connected to the vacuum end and the pipeline end respectively. The valve sealing surface arranged on the valve seat can improve the sealing performance, ensure the sealing of the semiconductor vacuum transmission valve during use, and prevent air leakage during use.
[0006] Preferably, the valve sealing surface is in a rectangular frame structure, and the corner radius of the valve sealing surface is enlarged to form a corner sealing portion.
[0007] The corner radius at the corner of the valve sealing surface is enlarged to form a corner sealing part, which not only ensures the sealing area requirements of the product, but also makes the cutter head of the processing tool larger to avoid defects caused by interference with the tool handle.
[0008] Preferably, a circle of front sealing surface is provided on the edge of the opening window on the outer wall of the front side of the valve seat.
[0009] The provision of the front sealing surface can improve the sealing performance of the connection between the front outer wall of the valve seat and the vacuum end.
[0010] Preferably, a circle of rear sealing surface is provided on the edge of the opening window on the rear outer wall of the valve seat.
[0011] The arrangement of the rear sealing surface can improve the sealing performance of the connection between the rear outer wall of the valve seat and the pipeline end.
[0012] Preferably, a valve plate is installed in the valve cavity, the valve plate can be raised and lowered, and the valve plate is in contact with the valve sealing surface and seals the front opening window.
[0013] The valve plate moves up and down in the valve cavity to close and open the semiconductor vacuum transmission valve. When the semiconductor vacuum transmission valve is closed, the valve plate fits against the valve sealing surface and seals the front opening window.
[0014] Preferably, the valve seat is connected to the mounting seat, the mounting seat is connected to the piston, the piston divides the interior of the mounting seat into an upper chamber and a lower chamber, a piston rod is connected between the piston and the valve plate, and an upper air nozzle and a lower air nozzle are arranged on the mounting seat, and the upper air nozzle and the lower air nozzle are respectively connected to the upper chamber and the lower chamber.
[0015] The valve plate is pushed up and down by the lifting of the piston, thereby realizing the closing and opening of the semiconductor vacuum transmission valve. A high-pressure airflow is input into the lower chamber through the lower air nozzle, so that the pressure in the lower chamber is greater than the pressure in the upper chamber, thereby pushing the piston upward, and then pushing the valve plate upward to cover the front opening window. A high-pressure airflow is input into the upper chamber through the upper air nozzle, so that the pressure in the upper chamber is greater than the pressure in the lower chamber, thereby pushing the piston downward, and then pushing the valve plate downward to open the front opening window.
[0016] Preferably, a locking mechanism is provided on the mounting seat and corresponding to the upper air nozzle, the locking mechanism includes a locking pin and a positioning spring, the positioning spring is pressed against the locking pin, a locking hole is provided on the piston, and an inclined pushing surface is provided on the end of the locking pin; after the piston moves toward the valve seat and into position, the locking hole and the end of the locking pin are inserted and positioned; a boosting chamber is provided on the mounting seat and corresponding to the locking mechanism, and the pressure increase in the boosting chamber pushes the locking pin to move outward and disengage from the locking hole.
[0017] After the piston moves upward to its position, the locking hole and the end of the locking pin are inserted and positioned. At this time, even if there is air leakage, the piston movement will not cause the valve plate to move, thereby ensuring the reliability of the semiconductor vacuum transmission valve. When it is necessary to unlock the locking pin, a high-pressure airflow is input into the boosting chamber to increase the air pressure in the boosting chamber, thereby pushing the locking pin outward and disengaging from the locking hole to achieve unlocking, which is convenient to operate. An inclined pushing surface is set at the end of the locking pin, so that the piston can hit the pushing surface to push the locking pin outward, so that the locking hole and the locking hole are aligned and inserted together.
[0018] Preferably, a circle of airbag sealing ring is installed on the surface of the valve plate, and the airbag sealing ring is connected to the inflation tube. After the valve plate covers the front opening window, the airbag sealing ring is inflated through the inflation tube so that the airbag sealing ring fits tightly on the inner wall of the valve cavity outside the valve sealing surface.
[0019] During the movement of the valve plate, the airbag sealing ring is in a deflated state, and at this time the airbag sealing ring will not be higher than the surface of the valve plate, which facilitates the movement of the valve plate. When the valve plate moves into position and fits the valve sealing surface and seals the front opening window, the airbag sealing ring is inflated through the inflation tube, so that the airbag sealing ring bulges outward and fits tightly against the inner wall of the valve cavity outside the valve sealing surface, thereby adding a seal and improving the sealing effect.
[0020] A method for processing a semiconductor vacuum transmission valve, which realizes processing of a valve seat, comprises the following steps: S1, rough processing of a valve sealing surface on the valve seat; S2, heat treatment of the valve seat to relieve stress; S3, fine processing of the valve sealing surface on the valve seat; S4, grinding processing of the valve sealing surface on the valve seat; S5, completing processing of the valve sealing surface on the valve seat after inspection.
[0021] The products are divided into rough processing and fine processing. Heat treatment is added after rough processing to relieve stress, improve the machining performance of materials, reduce product deformation and ensure product quality.
[0022] Preferably, S1, S3 and S4 all use a T-shaped tool to process the valve sealing surface, the T-shaped tool passes through the opening window on the rear side, and the large diameter end of the T-shaped tool contacts the valve sealing surface for processing.
[0023] The use of T-shaped tools for processing ensures that the tool path is consistent with the direction of the sealing surface, avoids the intersection of the processing lines and the sealing surface direction, and reduces the risk of leakage on the sealing surface.
[0024] Compared with the prior art, the present invention has the following beneficial effects: (1) the semiconductor vacuum transmission valve has good sealing performance and is not prone to air leakage during use; (2) after the piston moves upward into position, the locking hole and the end of the locking pin are inserted and positioned. At this time, even if air leakage occurs, the piston movement will not cause the valve plate to move, thereby ensuring the reliability of the semiconductor vacuum transmission valve; (3) after the valve plate moves into position and fits in with the valve sealing surface and seals the front opening window, the airbag sealing ring is inflated through the inflation tube, so that the airbag sealing ring bulges outward and fits tightly against the inner wall of the valve cavity outside the valve sealing surface, thereby adding a seal and improving the sealing effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a schematic diagram of the valve seat structure of the present invention.
[0026] Figure 2 It is a cross-sectional view of Example 1 of the present invention.
[0027] Figure 3 It is a cross-sectional view of Example 2 of the present invention.
[0028] Figure 4It is a connection schematic diagram of the locking mechanism of the present invention.
[0029] Figure 5 It is a cross-sectional view of Example 3 of the present invention.
[0030] Figure 6 It is a schematic diagram of processing the valve sealing surface on the valve seat of the present invention.
[0031] Figure 7 It is a schematic diagram of valve seat processing and clamping of the present invention.
[0032] In the figure: 1, valve seat, 2, valve cavity, 3, opening window, 4, end cover, 5, valve sealing surface, 6, corner sealing part, 7, front sealing surface, 8, rear sealing surface, 9, valve plate, 10, mounting seat, 11, piston, 12, upper chamber, 13, lower chamber, 14, piston rod, 15, partition, 16, guide sleeve, 17, lower cover, 18, return spring, 19, upper air nozzle, 20, lower air nozzle, 21, locking pin, 22, positioning spring, 23, locking hole, 24, push surface, 25, locking block , 26, connecting section, 27, pressurization chamber, 28, vent, 29, connecting sleeve, 30, positioning ring, 31, sliding seat, 32, one-way exhaust valve, 33, airbag sealing ring, 34, inflation tube, 35, contact switch, 36, workbench, 37, clamping seat, 38, turntable, 39, clamping groove, 40, front correction hole, 41, rear correction hole, 42, correction piston cylinder, 43, correction column, 44, rotating motor, 45, turntable, 46, boss, 47, clamping block, 48, clamping piston cylinder. DETAILED DESCRIPTION
[0033] The technical solution of the present invention is further described in detail below through specific embodiments and in conjunction with the accompanying drawings: Embodiment 1: A semiconductor vacuum transfer valve structure (see attached Figure 1 , Attachment Figure 2 ), including a valve seat 1, a valve cavity 2 is arranged on the valve seat 1, opening windows 3 communicating with the valve cavity 2 are arranged on the front and rear side walls of the valve seat 1, the upper and lower ends of the valve seat 1 are connected, the upper end of the valve seat 1 is tightly connected to the end cover 4, and a circle of valve sealing surface 5 is arranged on the edge of the front opening window 3 on the inner wall of the valve cavity 2. The valve sealing surface 5 is a rectangular frame structure, and the corner radius of the valve sealing surface 5 is enlarged to form a corner sealing part 6. The corner radius of the valve sealing surface 5 is enlarged to form a corner sealing part 6, which not only ensures the product sealing area requirements, but also can enlarge the tool head of the processing tool to avoid defects that cannot be processed in place due to interference with the tool handle.
[0034] A front sealing surface 7 is arranged at the edge of the opening window 3 on the front outer wall of the valve seat 1. A rear sealing surface 8 is arranged at the edge of the opening window 3 on the rear outer wall of the valve seat 1. The two opening windows 3 on the valve seat 1 are connected to the vacuum end and the pipeline end respectively. The arrangement of the front sealing surface 7 can improve the sealing performance of the connection between the front outer wall of the valve seat 1 and the vacuum end. The arrangement of the rear sealing surface 8 can improve the sealing performance of the connection between the rear outer wall of the valve seat 1 and the pipeline end.
[0035] The valve plate 9 is adapted to be installed in the valve cavity 2, and the valve plate 9 can be lifted and moved. The valve plate 9 is attached to the valve sealing surface 5 and seals the front opening window 3. The valve seat 1 is connected to the mounting seat 10, and the mounting seat 10 is connected to the piston 11. The mounting seat 10 is provided with a piston 11 cavity, and the piston 11 is installed in the piston 11 cavity. A sealing ring is set on the outer wall of the piston 11. The piston 11 divides the piston 11 cavity inside the mounting seat 10 into an upper chamber 12 and a lower chamber 13. The piston 11 and the valve plate 9 are connected with a piston rod 14. A partition 15 is provided in the mounting seat 10, and a guide sleeve 16 is provided on the partition 15. The piston rod 14 is connected with the guide sleeve 16 in a sealing sleeve. The upper end of the mounting seat 10 is tightly connected to the valve seat 1, and the lower end of the mounting seat 10 is connected to the lower cover 17. The piston rod 14 is set with a reset spring 18, and the reset spring 18 is pressed between the piston 11 and the partition 15 in the mounting seat 10. An upper air nozzle 19 and a lower air nozzle 20 are provided on the mounting seat 10, and the upper air nozzle 19 and the lower air nozzle 20 are respectively connected with the upper chamber 12 and the lower chamber 13. The upper end of the piston rod 14 is pressed against the lower end surface of the valve plate 9, and a connecting section 26 is provided on the upper end of the piston rod 14. A connecting hole is provided on the valve plate 9, and the connecting section 26 is plug-in-connected with the connecting hole. An expansion groove is provided at the upper opening of the connecting hole. The upper end of the connecting section 26 is connected with a fastening nut, and the fastening nut is placed in the expansion groove, and the fastening nut abuts against the bottom surface of the slot.
[0036] A method for processing a semiconductor vacuum transmission valve, such as Figure 6 As shown, the valve seat 1 is processed, including the following steps: S1, rough processing of the valve sealing surface 5 on the valve seat 1; S2, heat treatment of the valve seat 1 to relieve stress; S3, fine processing of the valve sealing surface 5 on the valve seat 1; S4, grinding processing of the valve sealing surface 5 on the valve seat 1; S5, completing the processing of the valve sealing surface 5 on the valve seat 1 after inspection. S1, S3 and S4 all use T-type tools to process the valve sealing surface 5, the T-type tool passes through the opening window 3 on the rear side, and the large diameter end of the T-type tool contacts the valve sealing surface 5 for processing.
[0037] The valve seat 1 is clamped on a clamping fixture for processing, such as Figure 7As shown, the clamping fixture is installed on the workbench 36, and the clamping fixture includes a clamping seat 37 and a turntable 38. The clamping seat 37 is provided with a clamping groove 39, and the valve seat 1 is clamped at the position of the clamping groove 39. The turntable 38 is rotatably installed on the workbench 36. The front and rear sides of the clamping seat 37 are respectively provided with a front correction hole 40 and a rear correction hole 41. The correction piston cylinder 42 is installed on the workbench 36. The correction piston cylinder 42 is connected to the correction column 43 by a telescopic rod. The front correction hole 40 and the rear correction hole 41 are both adapted to the correction column 43. The end of the correction column 43 is conical. The correction column 43 is inserted into the front correction hole 40 or the rear correction hole 41 to correct the position of the clamping seat 37. A rotating motor 44 is installed on the workbench 36, and a driving gear is installed on the output shaft of the rotating motor 44. The lower end of the turntable 38 is connected to a turntable 45, and a circle of meshing teeth is provided on the edge of the turntable 45. The driving gear is connected to the meshing teeth by transmission. Bearings are installed between the turntable 38 and the worktable 36 .
[0038] A boss 46 is provided on the clamping seat 37, and a movable clamping block 47 is provided on the clamping seat 37 in correspondence with the boss 46. The boss 46 and the clamping block 47 are provided in correspondence with each other in front and back, and a clamping groove 39 is formed in the space between the boss 46 and the clamping block 47 on the clamping seat 37. The boss 46 is in an L-shaped structure, which is convenient for positioning the valve seat 1. A clamping piston cylinder 48 is installed on the clamping seat 37, and the telescopic rod of the clamping piston cylinder 48 is connected to the clamping block 47. Through this structural setting, the clamping groove 39 can adapt to the clamping of valve seats 1 of different sizes.
[0039] In addition to the processing of the valve sealing surface 5 on the valve seat 1, the front sealing surface 7 and the rear sealing surface 8 need to be processed. Through the setting of the clamping fixture, the three sealing surfaces can be processed synchronously. The direction of the main shaft is certain, so through the rotation of the clamping seat 37, the processing surface is facing the main shaft.
[0040] At S1, after the valve seat 1 is clamped to the clamping fixture, the front side of the valve seat 1 faces the main shaft, and the correction piston cylinder 42 works to insert the correction column 43 into the front correction hole 40 or the rear correction hole 41 to correct the position of the clamping seat 37. The front sealing surface 7 is first rough-machined using a rough machining tool, and then the correction column 43 returns to its original position. After the clamping seat 37 rotates 180 degrees, the correction piston cylinder 42 works to insert the correction column 43 into the rear correction hole 41 or the front correction hole 40 to correct the position of the clamping seat 37, and the rough machining tool performs rough machining on the valve sealing surface 5 and the rear sealing surface 8.
[0041] At S3, after the valve seat 1 is clamped to the clamping fixture, the front side of the valve seat 1 faces the main shaft, and the correction piston cylinder 42 works to insert the correction column 43 into the front correction hole 40 or the rear correction hole 41 to correct the position of the clamping seat 37. The front sealing surface 7 is first rough-machined using a finishing tool, and then the correction column 43 returns to its original position. After the clamping seat 37 rotates 180 degrees, the correction piston cylinder 42 works to insert the correction column 43 into the rear correction hole 41 or the front correction hole 40 to correct the position of the clamping seat 37, and the finishing tool finishes the valve sealing surface 5 and the rear sealing surface 8. After the spindle switches the grinding tool, S4 is directly performed. First, the valve sealing surface 5 and the rear sealing surface 8 are ground, and then the correction column 43 returns to its position. After the clamping seat 37 rotates 180 degrees, the correction piston cylinder 42 works to insert the correction column 43 into the front correction hole 40 or the rear correction hole 41 to correct the positioning of the clamping seat 37, and then the front sealing surface 7 is ground.
[0042] The processing of multiple sealing surfaces can be completed in one clamping, which greatly improves the work efficiency. Moreover, processing multiple sealing surfaces at one time is conducive to ensuring the parallelism requirements of the sealing surfaces.
[0043] Embodiment 2: A semiconductor vacuum transfer valve structure (see attached Figure 1 , Attachment Figure 3 , Attachment Figure 4 ), including a valve seat 1, a valve cavity 2 is arranged on the valve seat 1, opening windows 3 communicating with the valve cavity 2 are arranged on the front and rear side walls of the valve seat 1, the upper and lower ends of the valve seat 1 are connected, the upper end of the valve seat 1 is tightly connected to the end cover 4, and a circle of valve sealing surface 5 is arranged on the edge of the front opening window 3 on the inner wall of the valve cavity 2. The valve sealing surface 5 is a rectangular frame structure, and the corner radius of the valve sealing surface 5 is enlarged to form a corner sealing part 6. The corner radius of the valve sealing surface 5 is enlarged to form a corner sealing part 6, which not only ensures the product sealing area requirements, but also can enlarge the tool head of the processing tool to avoid defects that cannot be processed in place due to interference with the tool handle.
[0044] A front sealing surface 7 is arranged at the edge of the opening window 3 on the front outer wall of the valve seat 1. A rear sealing surface 8 is arranged at the edge of the opening window 3 on the rear outer wall of the valve seat 1. The two opening windows 3 on the valve seat 1 are connected to the vacuum end and the pipeline end respectively. The arrangement of the front sealing surface 7 can improve the sealing performance of the connection between the front outer wall of the valve seat 1 and the vacuum end. The arrangement of the rear sealing surface 8 can improve the sealing performance of the connection between the rear outer wall of the valve seat 1 and the pipeline end.
[0045] The valve plate 9 is adapted to be installed in the valve cavity 2, and the valve plate 9 can be lifted and moved. The valve plate 9 is attached to the valve sealing surface 5 and seals the front opening window 3. The valve seat 1 is connected to the mounting seat 10, and the mounting seat 10 is connected to the piston 11. The mounting seat 10 is provided with a piston 11 cavity, and the piston 11 is installed in the piston 11 cavity. A sealing ring is set on the outer wall of the piston 11. The piston 11 divides the piston 11 cavity inside the mounting seat 10 into an upper chamber 12 and a lower chamber 13. The piston 11 and the valve plate 9 are connected with a piston rod 14. A partition 15 is provided in the mounting seat 10, and a guide sleeve 16 is provided on the partition 15. The piston rod 14 is connected with the guide sleeve 16 in a sealing sleeve. The upper end of the mounting seat 10 is tightly connected to the valve seat 1, and the lower end of the mounting seat 10 is connected to the lower cover 17. The piston rod 14 is set with a reset spring 18, and the reset spring 18 is pressed between the piston 11 and the partition 15 in the mounting seat 10. An upper air nozzle 19 and a lower air nozzle 20 are provided on the mounting seat 10, and the upper air nozzle 19 and the lower air nozzle 20 are respectively connected with the upper chamber 12 and the lower chamber 13. The upper end of the piston rod 14 is pressed against the lower end surface of the valve plate 9, and a connecting section 26 is provided on the upper end of the piston rod 14. A connecting hole is provided on the valve plate 9, and the connecting section 26 is plug-in-connected with the connecting hole. An expansion groove is provided at the upper opening of the connecting hole. The upper end of the connecting section 26 is connected with a fastening nut, and the fastening nut is placed in the expansion groove, and the fastening nut abuts against the bottom surface of the slot.
[0046] The mounting seat 10 and the upper air nozzle 19 are provided with a locking mechanism, which includes a locking pin 21 and a positioning spring 22. The positioning spring 22 is pressed against the locking pin 21. The piston 11 is provided with a locking hole 23, and the end of the locking pin 21 is provided with an inclined pushing surface 24; the upper edge of the piston 11 is provided with a locking block 25, and the locking hole 23 is provided on the locking block 25. After the piston 11 moves in the direction close to the valve seat 1, the locking hole 23 and the end of the locking pin 21 are inserted and positioned; the mounting seat 10 and the locking mechanism are provided with a boosting chamber 27, and the pressure in the boosting chamber 27 increases to push the locking pin 21 to move outward and disengage from the locking hole 23. The boost chamber 27 is connected to the upper air nozzle 19, and a vent hole 28 is provided on the locking pin 21. When the inner end of the locking pin 21 is placed in the upper chamber 12, the vent hole 28 deviates from the boost chamber 27 and is closed; when the upper air nozzle 19 inflates the upper chamber 12, the air pressure in the boost chamber 27 increases, thereby pushing the locking pin 21 to move outward and disengage from the locking hole 23, so that the vent hole 28 is connected between the boost chamber 27 and the upper chamber 12, so that the air flow enters the upper chamber 12 through the vent hole 28, and the air pressure in the upper chamber 12 increases, thereby pushing the piston 11 to move downward and return to its original position.
[0047] A connecting sleeve 29 is provided on the side wall of the mounting seat 10, and the end of the connecting sleeve 29 is connected to a positioning ring 30, and the positioning spring 22 is installed in the connecting sleeve 29. A sliding seat 31 is provided at the outer end of the locking pin 21, and the sliding seat 31 is adapted to the connecting sleeve 29 and slides in the connecting sleeve 29, and the positioning spring 22 is pressed between the positioning ring 30 and the sliding seat 31. The inner diameter of the connecting sleeve 29 is larger than the inner diameter of the boost chamber 27, so that the sliding seat 31 is limited at the inner end of the connecting sleeve 29. A one-way exhaust valve 32 is installed at the inner end of the upper air nozzle 19.
[0048] After the piston 11 moves upward to its position, the locking hole 23 and the end of the locking pin 21 are inserted and positioned. At this time, even if there is air leakage, the movement of the piston 11 will not cause the valve plate 9 to move, thereby ensuring the reliability of the operation of the semiconductor vacuum transmission valve. When it is necessary to unlock the locking pin 21, a high-pressure airflow is input into the boosting chamber 27 through the upper air nozzle 19 to increase the air pressure in the boosting chamber 27. Due to the setting of the one-way exhaust valve 32 at the inner end of the upper air nozzle 19, the airflow can only flow to the boosting chamber 27, thereby pushing the locking pin 21 to move outward and disengage from the locking hole 23, achieving unlocking, and convenient operation. An inclined pushing surface 24 is set at the end of the locking pin 21, so that the piston 11 can push against the pushing surface 24 to push the locking pin 21 outward, so that the locking hole 23 is aligned with the locking hole 23 and inserted together. After the locking pin 21 is unlocked, the vent hole 28 is connected to the pressure chamber 27 and the upper chamber 12, so that air flows into the upper chamber 12 through the vent hole 28, and the air pressure in the upper chamber 12 increases, thereby pushing the piston 11 to move downward and return to its original position.
[0049] A method for processing a semiconductor vacuum transmission valve, such as Figure 6 As shown, the valve seat 1 is processed, including the following steps: S1, rough processing of the valve sealing surface 5 on the valve seat 1; S2, heat treatment of the valve seat 1 to relieve stress; S3, fine processing of the valve sealing surface 5 on the valve seat 1; S4, grinding processing of the valve sealing surface 5 on the valve seat 1; S5, completing the processing of the valve sealing surface 5 on the valve seat 1 after inspection. S1, S3 and S4 all use T-type tools to process the valve sealing surface 5, the T-type tool passes through the opening window 3 on the rear side, and the large diameter end of the T-type tool contacts the valve sealing surface 5 for processing.
[0050] The valve seat 1 is clamped on a clamping fixture for processing, such as Figure 7As shown, the clamping fixture is installed on the workbench 36, and the clamping fixture includes a clamping seat 37 and a turntable 38. The clamping seat 37 is provided with a clamping groove 39, and the valve seat 1 is clamped at the position of the clamping groove 39. The turntable 38 is rotatably installed on the workbench 36. The front and rear sides of the clamping seat 37 are respectively provided with a front correction hole 40 and a rear correction hole 41. The correction piston cylinder 42 is installed on the workbench 36. The correction piston cylinder 42 is connected to the correction column 43 by a telescopic rod. The front correction hole 40 and the rear correction hole 41 are both adapted to the correction column 43. The end of the correction column 43 is conical. The correction column 43 is inserted into the front correction hole 40 or the rear correction hole 41 to correct the position of the clamping seat 37. A rotating motor 44 is installed on the workbench 36, and a driving gear is installed on the output shaft of the rotating motor 44. The lower end of the turntable 38 is connected to a turntable 45, and a circle of meshing teeth is provided on the edge of the turntable 45. The driving gear is connected to the meshing teeth by transmission. Bearings are installed between the turntable 38 and the worktable 36 .
[0051] A boss 46 is provided on the clamping seat 37, and a movable clamping block 47 is provided on the clamping seat 37 in correspondence with the boss 46. The boss 46 and the clamping block 47 are provided in correspondence with each other in front and back, and a clamping groove 39 is formed in the space between the boss 46 and the clamping block 47 on the clamping seat 37. The boss 46 is in an L-shaped structure, which is convenient for positioning the valve seat 1. A clamping piston cylinder 48 is installed on the clamping seat 37, and the telescopic rod of the clamping piston cylinder 48 is connected to the clamping block 47. Through this structural setting, the clamping groove 39 can adapt to the clamping of valve seats 1 of different sizes.
[0052] In addition to the processing of the valve sealing surface 5 on the valve seat 1, the front sealing surface 7 and the rear sealing surface 8 need to be processed. Through the setting of the clamping fixture, the three sealing surfaces can be processed synchronously. The direction of the main shaft is certain, so through the rotation of the clamping seat 37, the processing surface is facing the main shaft.
[0053] At S1, after the valve seat 1 is clamped to the clamping fixture, the front side of the valve seat 1 faces the main shaft, and the correction piston cylinder 42 works to insert the correction column 43 into the front correction hole 40 or the rear correction hole 41 to correct the position of the clamping seat 37. The front sealing surface 7 is first rough-machined using a rough machining tool, and then the correction column 43 returns to its original position. After the clamping seat 37 rotates 180 degrees, the correction piston cylinder 42 works to insert the correction column 43 into the rear correction hole 41 or the front correction hole 40 to correct the position of the clamping seat 37, and the rough machining tool performs rough machining on the valve sealing surface 5 and the rear sealing surface 8.
[0054] At S3, after the valve seat 1 is clamped to the clamping fixture, the front side of the valve seat 1 faces the main shaft, and the correction piston cylinder 42 works to insert the correction column 43 into the front correction hole 40 or the rear correction hole 41 to correct the position of the clamping seat 37. The front sealing surface 7 is first rough-machined using a finishing tool, and then the correction column 43 returns to its original position. After the clamping seat 37 rotates 180 degrees, the correction piston cylinder 42 works to insert the correction column 43 into the rear correction hole 41 or the front correction hole 40 to correct the position of the clamping seat 37, and the finishing tool finishes the valve sealing surface 5 and the rear sealing surface 8. After the spindle switches the grinding tool, S4 is directly performed. First, the valve sealing surface 5 and the rear sealing surface 8 are ground, and then the correction column 43 returns to its position. After the clamping seat 37 rotates 180 degrees, the correction piston cylinder 42 works to insert the correction column 43 into the front correction hole 40 or the rear correction hole 41 to correct the positioning of the clamping seat 37, and then the front sealing surface 7 is ground.
[0055] The processing of multiple sealing surfaces can be completed in one clamping, which greatly improves the work efficiency. Moreover, processing multiple sealing surfaces at one time is conducive to ensuring the parallelism requirements of the sealing surfaces.
[0056] Embodiment 3: A semiconductor vacuum transfer valve structure (see attached Figure 1 , Attachment Figure 5 ), including a valve seat 1, a valve cavity 2 is arranged on the valve seat 1, opening windows 3 communicating with the valve cavity 2 are arranged on the front and rear side walls of the valve seat 1, the upper and lower ends of the valve seat 1 are connected, the upper end of the valve seat 1 is tightly connected to the end cover 4, and a circle of valve sealing surface 5 is arranged on the edge of the front opening window 3 on the inner wall of the valve cavity 2. The valve sealing surface 5 is a rectangular frame structure, and the corner radius of the valve sealing surface 5 is enlarged to form a corner sealing part 6. The corner radius of the valve sealing surface 5 is enlarged to form a corner sealing part 6, which not only ensures the product sealing area requirements, but also can enlarge the tool head of the processing tool to avoid defects that cannot be processed in place due to interference with the tool handle.
[0057] A front sealing surface 7 is arranged at the edge of the opening window 3 on the front outer wall of the valve seat 1. A rear sealing surface 8 is arranged at the edge of the opening window 3 on the rear outer wall of the valve seat 1. The two opening windows 3 on the valve seat 1 are connected to the vacuum end and the pipeline end respectively. The arrangement of the front sealing surface 7 can improve the sealing performance of the connection between the front outer wall of the valve seat 1 and the vacuum end. The arrangement of the rear sealing surface 8 can improve the sealing performance of the connection between the rear outer wall of the valve seat 1 and the pipeline end.
[0058] The valve plate 9 is adapted to be installed in the valve cavity 2, and the valve plate 9 can be lifted and moved. The valve plate 9 is attached to the valve sealing surface 5 and seals the front opening window 3. The valve seat 1 is connected to the mounting seat 10, and the mounting seat 10 is connected to the piston 11. The mounting seat 10 is provided with a piston 11 cavity, and the piston 11 is installed in the piston 11 cavity. A sealing ring is set on the outer wall of the piston 11. The piston 11 divides the piston 11 cavity inside the mounting seat 10 into an upper chamber 12 and a lower chamber 13. The piston 11 and the valve plate 9 are connected with a piston rod 14. A partition 15 is provided in the mounting seat 10, and a guide sleeve 16 is provided on the partition 15. The piston rod 14 is connected with the guide sleeve 16 in a sealing sleeve. The upper end of the mounting seat 10 is tightly connected to the valve seat 1, and the lower end of the mounting seat 10 is connected to the lower cover 17. The piston rod 14 is set with a reset spring 18, and the reset spring 18 is pressed between the piston 11 and the partition 15 in the mounting seat 10. An upper air nozzle 19 and a lower air nozzle 20 are provided on the mounting seat 10, and the upper air nozzle 19 and the lower air nozzle 20 are respectively connected with the upper chamber 12 and the lower chamber 13. The upper end of the piston rod 14 is pressed against the lower end surface of the valve plate 9, and a connecting section 26 is provided on the upper end of the piston rod 14. A connecting hole is provided on the valve plate 9, and the connecting section 26 is plug-in-connected with the connecting hole. An expansion groove is provided at the upper opening of the connecting hole. The upper end of the connecting section 26 is connected with a fastening nut, and the fastening nut is placed in the expansion groove, and the fastening nut abuts against the bottom surface of the slot.
[0059] The mounting seat 10 and the upper air nozzle 19 are provided with a locking mechanism, which includes a locking pin 21 and a positioning spring 22. The positioning spring 22 is pressed against the locking pin 21. The piston 11 is provided with a locking hole 23, and the end of the locking pin 21 is provided with an inclined pushing surface 24; the upper edge of the piston 11 is provided with a locking block 25, and the locking hole 23 is provided on the locking block 25. After the piston 11 moves in the direction close to the valve seat 1, the locking hole 23 and the end of the locking pin 21 are inserted and positioned; the mounting seat 10 and the locking mechanism are provided with a boosting chamber 27, and the pressure in the boosting chamber 27 increases to push the locking pin 21 to move outward and disengage from the locking hole 23. The boost chamber 27 is connected to the upper air nozzle 19, and a vent hole 28 is provided on the locking pin 21. When the inner end of the locking pin 21 is placed in the upper chamber 12, the vent hole 28 deviates from the boost chamber 27 and is closed; when the upper air nozzle 19 inflates the upper chamber 12, the air pressure in the boost chamber 27 increases, thereby pushing the locking pin 21 to move outward and disengage from the locking hole 23, so that the vent hole 28 is connected between the boost chamber 27 and the upper chamber 12, so that the air flow enters the upper chamber 12 through the vent hole 28, and the air pressure in the upper chamber 12 increases, thereby pushing the piston 11 to move downward and return to its original position.
[0060] A connecting sleeve 29 is provided on the side wall of the mounting seat 10, and the end of the connecting sleeve 29 is connected to a positioning ring 30, and the positioning spring 22 is installed in the connecting sleeve 29. A sliding seat 31 is provided at the outer end of the locking pin 21, and the sliding seat 31 is adapted to the connecting sleeve 29 and slides in the connecting sleeve 29, and the positioning spring 22 is pressed between the positioning ring 30 and the sliding seat 31. The inner diameter of the connecting sleeve 29 is larger than the inner diameter of the boost chamber 27, so that the sliding seat 31 is limited at the inner end of the connecting sleeve 29. A one-way exhaust valve 32 is installed at the inner end of the upper air nozzle 19.
[0061] After the piston 11 moves upward to its position, the locking hole 23 and the end of the locking pin 21 are inserted and positioned. At this time, even if there is air leakage, the movement of the piston 11 will not cause the valve plate 9 to move, thereby ensuring the reliability of the operation of the semiconductor vacuum transmission valve. When it is necessary to unlock the locking pin 21, a high-pressure airflow is input into the boosting chamber 27 through the upper air nozzle 19 to increase the air pressure in the boosting chamber 27. Due to the setting of the one-way exhaust valve 32 at the inner end of the upper air nozzle 19, the airflow can only flow to the boosting chamber 27, thereby pushing the locking pin 21 to move outward and disengage from the locking hole 23, achieving unlocking, and convenient operation. An inclined pushing surface 24 is set at the end of the locking pin 21, so that the piston 11 can push against the pushing surface 24 to push the locking pin 21 outward, so that the locking hole 23 is aligned with the locking hole 23 and inserted together. After the locking pin 21 is unlocked, the vent hole 28 is connected to the pressure chamber 27 and the upper chamber 12, so that air flows into the upper chamber 12 through the vent hole 28, and the air pressure in the upper chamber 12 increases, thereby pushing the piston 11 to move downward and return to its original position.
[0062] A circle of airbag sealing ring 33 is installed on the surface of valve plate 9, and airbag sealing ring 33 is connected to inflation tube 34, and inflation tube 34 is a hose. A circle of sinking groove is arranged on the front side of valve plate 9 corresponding to airbag sealing ring 33, and airbag sealing ring 33 is placed in the sinking groove, and an inflation nozzle is arranged on airbag sealing ring 33, and an inflation hole is arranged on valve plate 9, one end of the inflation hole is sealed and connected with the inflation nozzle, and the other end of the inflation hole extends to the lower end of valve plate 9 and is connected with inflation tube 34. Inflation tube 34 passes through mounting seat 10, and inflation tube 34 is connected to two-position three-way solenoid valve to realize gas path switching. Contact switch 35 is installed on end cover 4 at the upper end of valve seat 1. After the valve plate 9 covers the front opening window 3, the upper end of the valve plate 9 touches the contact switch 35, and the two-position three-way solenoid valve receives the signal to switch, realizing the switching of the gas path, so that the high-pressure airflow inflates the airbag sealing ring 33 through the inflation tube 34, so that the airbag sealing ring 33 is tightly attached to the inner wall of the valve cavity 2 outside the valve sealing surface 5. When the valve plate 9 needs to move downward, the two-position three-way solenoid valve first changes direction, so that the airbag sealing ring 33 is exhausted outward and retracted into the sinking groove.
[0063] A method for processing a semiconductor vacuum transmission valve, such as Figure 6As shown, the valve seat 1 is processed, including the following steps: S1, rough processing of the valve sealing surface 5 on the valve seat 1; S2, heat treatment of the valve seat 1 to relieve stress; S3, fine processing of the valve sealing surface 5 on the valve seat 1; S4, grinding processing of the valve sealing surface 5 on the valve seat 1; S5, completing the processing of the valve sealing surface 5 on the valve seat 1 after inspection. S1, S3 and S4 all use T-type tools to process the valve sealing surface 5, the T-type tool passes through the opening window 3 on the rear side, and the large diameter end of the T-type tool contacts the valve sealing surface 5 for processing.
[0064] The valve seat 1 is clamped on a clamping fixture for processing, such as Figure 7 As shown, the clamping fixture is installed on the workbench 36, and the clamping fixture includes a clamping seat 37 and a turntable 38. The clamping seat 37 is provided with a clamping groove 39, and the valve seat 1 is clamped at the position of the clamping groove 39. The turntable 38 is rotatably installed on the workbench 36. The front and rear sides of the clamping seat 37 are respectively provided with a front correction hole 40 and a rear correction hole 41. The correction piston cylinder 42 is installed on the workbench 36. The correction piston cylinder 42 is connected to the correction column 43 by a telescopic rod. The front correction hole 40 and the rear correction hole 41 are both adapted to the correction column 43. The end of the correction column 43 is conical. The correction column 43 is inserted into the front correction hole 40 or the rear correction hole 41 to correct the position of the clamping seat 37. A rotating motor 44 is installed on the workbench 36, and a driving gear is installed on the output shaft of the rotating motor 44. The lower end of the turntable 38 is connected to a turntable 45, and a circle of meshing teeth is provided on the edge of the turntable 45. The driving gear is connected to the meshing teeth by transmission. Bearings are installed between the turntable 38 and the worktable 36 .
[0065] A boss 46 is provided on the clamping seat 37, and a movable clamping block 47 is provided on the clamping seat 37 in correspondence with the boss 46. The boss 46 and the clamping block 47 are provided in correspondence with each other in front and back, and a clamping groove 39 is formed in the space between the boss 46 and the clamping block 47 on the clamping seat 37. The boss 46 is in an L-shaped structure, which is convenient for positioning the valve seat 1. A clamping piston cylinder 48 is installed on the clamping seat 37, and the telescopic rod of the clamping piston cylinder 48 is connected to the clamping block 47. Through this structural setting, the clamping groove 39 can adapt to the clamping of valve seats 1 of different sizes.
[0066] In addition to the processing of the valve sealing surface 5 on the valve seat 1, the front sealing surface 7 and the rear sealing surface 8 need to be processed. Through the setting of the clamping fixture, the three sealing surfaces can be processed synchronously. The direction of the main shaft is certain, so through the rotation of the clamping seat 37, the processing surface is facing the main shaft.
[0067] At S1, after the valve seat 1 is clamped to the clamping fixture, the front side of the valve seat 1 faces the main shaft, and the correction piston cylinder 42 works to insert the correction column 43 into the front correction hole 40 or the rear correction hole 41 to correct the position of the clamping seat 37. The front sealing surface 7 is first rough-machined using a rough machining tool, and then the correction column 43 returns to its original position. After the clamping seat 37 rotates 180 degrees, the correction piston cylinder 42 works to insert the correction column 43 into the rear correction hole 41 or the front correction hole 40 to correct the position of the clamping seat 37, and the rough machining tool performs rough machining on the valve sealing surface 5 and the rear sealing surface 8.
[0068] At S3, after the valve seat 1 is clamped to the clamping fixture, the front side of the valve seat 1 faces the main shaft, and the correction piston cylinder 42 works to insert the correction column 43 into the front correction hole 40 or the rear correction hole 41 to correct the position of the clamping seat 37. The front sealing surface 7 is first rough-machined using a finishing tool, and then the correction column 43 returns to its original position. After the clamping seat 37 rotates 180 degrees, the correction piston cylinder 42 works to insert the correction column 43 into the rear correction hole 41 or the front correction hole 40 to correct the position of the clamping seat 37, and the finishing tool finishes the valve sealing surface 5 and the rear sealing surface 8. After the spindle switches the grinding tool, S4 is directly performed. First, the valve sealing surface 5 and the rear sealing surface 8 are ground, and then the correction column 43 returns to its position. After the clamping seat 37 rotates 180 degrees, the correction piston cylinder 42 works to insert the correction column 43 into the front correction hole 40 or the rear correction hole 41 to correct the positioning of the clamping seat 37, and then the front sealing surface 7 is ground.
[0069] The processing of multiple sealing surfaces can be completed in one clamping, which greatly improves the work efficiency. Moreover, processing multiple sealing surfaces at one time is conducive to ensuring the parallelism requirements of the sealing surfaces.
[0070] The above-described embodiments are only preferred solutions of the present invention and are not intended to limit the present invention in any form. Other variations and modifications are possible without exceeding the technical solutions described in the claims.
Claims
1. A semiconductor vacuum transfer valve structure, characterized in that: The valve seat comprises a valve cavity, the front and rear side walls of the valve seat are both provided with opening windows connected with the valve cavity, and a circle of valve sealing surface is provided on the edge of the front opening window on the inner wall of the valve cavity.
2. A semiconductor vacuum transfer valve structure according to claim 1, characterized in that: The valve sealing surface is in a rectangular frame structure, and the corner radius of the valve sealing surface is enlarged to form a corner sealing part.
3. A semiconductor vacuum transfer valve structure according to claim 1, characterized in that: A circle of front sealing surface is arranged on the edge of the opening window on the outer wall of the front side of the valve seat.
4. A semiconductor vacuum transfer valve structure according to claim 1, characterized in that: A circle of rear sealing surface is arranged on the edge of the opening window on the outer wall at the rear side of the valve seat.
5. A semiconductor vacuum transfer valve structure according to any one of claims 1 to 4, characterized in that: A valve plate is adapted to be installed in the valve cavity, and the valve plate can be lifted and moved, and the valve plate is attached to the valve sealing surface and seals the front opening window.
6. A semiconductor vacuum transfer valve structure according to claim 5, characterized in that: The valve seat is connected to the mounting seat, and the mounting seat is connected to the piston. The piston divides the interior of the mounting seat into an upper chamber and a lower chamber. A piston rod is connected between the piston and the valve plate. An upper air nozzle and a lower air nozzle are arranged on the mounting seat, and the upper air nozzle and the lower air nozzle are connected to the upper chamber and the lower chamber respectively.
7. A semiconductor vacuum transfer valve structure according to claim 6, characterized in that: A locking mechanism is correspondingly arranged on the mounting seat and the upper air nozzle, and the locking mechanism includes a locking pin and a positioning spring. The positioning spring presses on the locking pin, a locking hole is arranged on the piston, and an inclined pushing surface is arranged on the end of the locking pin; after the piston moves toward the valve seat to be in position, the locking hole and the end of the locking pin are inserted and positioned; a boosting chamber is correspondingly arranged on the mounting seat and the locking mechanism, and the pressure in the boosting chamber increases to push the locking pin to move outward and disengage from the locking hole.
8. A semiconductor vacuum transfer valve structure according to claim 5, characterized in that: A circle of airbag sealing ring is installed on the surface of the valve plate, and the airbag sealing ring is connected to the inflation tube. After the valve plate covers the front opening window, the airbag sealing ring is inflated through the inflation tube, so that the airbag sealing ring is tightly fitted on the inner wall of the valve cavity outside the valve sealing surface.
9. A method for processing a semiconductor vacuum transfer valve, characterized in that: Processing the valve seat as claimed in any one of claims 1 to 8 comprises the following steps: S1, rough processing of the valve sealing surface on the valve seat; S2, heat treatment of the valve seat to relieve stress; S3, fine processing of the valve sealing surface on the valve seat; S4, grinding processing of the valve sealing surface on the valve seat; S5, completing the processing of the valve sealing surface on the valve seat after passing the inspection.
10. The method for processing a semiconductor vacuum transfer valve according to claim 9, characterized in that: S1, S3 and S4 all use T-type cutters to process the valve sealing surface. The T-type cutter passes through the opening window on the rear side, and the large diameter end of the T-type cutter contacts the valve sealing surface for processing.
Citation Information
Patent Citations
Gate valve
CN105020423A
Gate-valve attaching structure
CN109296768A
Mounting Structure Of Valve Plate With Respect To Valve stem
CN110017384A
Low noise gate valve
CN111379877A
Vacuum transmission device and processing method thereof
CN117570213A
Cited By
Ultrahigh vacuum isolation transmission valve for semiconductor CVD (Chemical Vapor Deposition) equipment
CN119982990A
Ultra-high Vacuum Isolation Transfer Valve for Semiconductor CVD Equipment
CN119982990B
Double-door transmission valve of semiconductor processing etching equipment
CN121206241A