Pipeline joint structure

By designing a combination of threaded rod and gear structure in the pipe joint, the connection force between the pipe and the joint is enhanced when the hydraulic pressure increases, solving the problem of the pipe joint being easily flushed open in the existing technology, and significantly improving the stability of the connection. sex.

CN118729063AInactive Publication Date: 2024-10-01EQUIP INSTALLATION TANCHENG COUNTY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411075102.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-07
Publication Date
2024-10-01
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing pipe joints are easily flushed open when the hydraulic pressure increases, and the connection cannot be effectively strengthened, resulting in the separation of the pipe and the joint base.

Method used

A pipe joint structure is designed, including a first clamping and fixing component and a second clamping and fixing component, using a threaded rod, a belt and a gear structure to increase the squeezing force on the pipe body as the hydraulic pressure increases, and through a half The gear structure remains fixed during changes in hydraulic pressure to avoid disengagement.

Benefits of technology

It effectively avoids the separation of the pipe and the joint base caused by excessive hydraulic pressure, increases the firmness of the connection, and ensures a stable connection between the pipe and the joint base.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118729063A_ABST
    Figure CN118729063A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of pipeline connecting equipment, in particular to a pipeline joint structure. The first clamping and fixing assembly is arranged in the connector base, so that connection between the connector base and the pipeline body can be continuously enhanced along with increase of hydraulic pressure, the pressure of water flow can drive a first pressure block to move downwards, and a second threaded rod and a first threaded rod drive a first clamping plate to continuously extrude the pipeline body; in addition, through a semi-gear structure of a second gear, a second rack, a third rack and the second gear are alternately connected in a meshed mode, so that no matter a second pressure block moves upwards or downwards, the pipeline body and the joint base are prevented from being broken away, and the pipeline body and the joint base are prevented from being broken away. Therefore, when the joint base and the pipeline body are rushed open, the second clamping plate can prevent the pipeline body from being further separated from the joint base.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of pipeline connection equipment, in particular to a pipeline joint structure. Background Art

[0002] A pipe joint is a connection tool between pipes and is a detachable connection point between components and pipes. It plays an indispensable and important role in pipe fittings. It is one of the two main components of a liquid delivery system. The pipes connected at both ends of a pipe joint usually have a large hydraulic pressure, and as the hydraulic pressure increases, the connection between the pipe interface and the pipe is easily broken. Therefore, there is an urgent need for a pipe joint structure that can continuously strengthen the connection between the pipe joint and the pipe as the hydraulic pressure increases. Summary of the invention

[0003] (I) Technical Problem: The purpose of the present invention is to provide a pipe joint structure to solve the problems mentioned in the above background technology.

[0004] (II) Technical solution: To achieve the above-mentioned purpose, the present invention provides the following technical solution: A pipe joint structure, comprising a joint base and a pipe body, wherein the joint base is used to connect two of the pipe bodies, and further comprises a first clamping and fixing assembly and a second clamping and fixing assembly, wherein the first clamping and fixing assembly comprises a first clamping plate, a connecting block, a first threaded rod, a belt, a second threaded rod and a first pressure block, wherein one end of the first clamping plate is an arcuate surface adapted to the pipe body, the first clamping plate abuts against the pipe body, the connecting block is fixedly arranged at a side end of the first clamping plate, the first threaded rod is threadedly connected to the connecting block, the first threaded rod is movably connected to the second threaded rod via the belt, one end of the second threaded rod is threadedly connected to the first pressure block, and one end of the first pressure block away from the second threaded rod is an inclined surface; The second clamping and fixing assembly includes a second clamping plate, a first rack, a first gear, a second gear, a second pressure block, a second rack, a third rack, a rotating shaft and a telescopic column, one end of the second clamping plate is an arcuate surface adapted to the pipe body, the second clamping plate abuts against the pipe body, one end of the first rack is fixedly connected to the bottom end of the second clamping plate, the first gear and the second gear are both fixedly sleeved on the rotating shaft, the first rack is meshed with the first gear, the second gear is a half gear structure, the second rack and the third rack are both fixedly arranged at the bottom end of the second pressure block, the second rack and the third rack are alternately meshed with the second gear, the telescopic column is also fixedly arranged at the bottom end of the second pressure block, and the top of the second pressure block is an inclined surface.

[0005] Specifically, a handle is fixedly provided at the top end of the first threaded rod, and threads in opposite directions are provided on the first threaded rod.

[0006] Specifically, four of the first clamping plates, the connecting blocks and the belts are provided, each of the first clamping plates is fixedly connected to one of the connecting blocks, and every two of the first clamping plates are symmetrically arranged up and down about one of the pipe bodies.

[0007] Specifically, two of the first threaded rod, the second threaded rod and the first pressure block are each provided, every two connecting blocks are threadedly connected to one of the first threaded rods, each of the first pressure blocks is threadedly connected to one of the second threaded rods, and each of the second threaded rods is movably connected to the two first threaded rods via the two belts.

[0008] Specifically, two groups of the second clamping and fixing components are provided, and each two groups of the second clamping and fixing components are symmetrically arranged with respect to one of the pipe bodies.

[0009] Specifically, the joint base is provided with a pipe placement cavity, a first clamping plate movable groove, a second clamping plate movable groove, a first sliding groove, a second sliding groove and a pipe connecting protrusion, the diameter of the pipe connecting protrusion is smaller than the diameter of the pipe placement cavity, the pipe body is placed in the pipe placement cavity, and the side end of the pipe body contacts the side end of the pipe connecting protrusion.

[0010] Specifically, there are two of each of the first clamp plate movable groove, the second clamp plate movable groove and the second sliding groove, and the two first clamp plate movable grooves, the two second clamp plate movable grooves and the two second sliding grooves are symmetrically arranged on both sides of the pipe connecting protrusion, and the first sliding groove is located on the pipe connecting protrusion.

[0011] Specifically, the first clamping plate and the connecting block are both movably arranged in the first clamping plate movable groove, the second threaded rod and the first pressure block are both movably arranged in the first sliding groove, and the end of the second threaded rod away from the first pressure block is movably connected to the bottom wall of the first sliding groove.

[0012] Specifically, the second clamping plate, the first rack and the first gear are all movably arranged in the second clamping plate movable groove, and the second gear, the second pressure block, the second rack, the third rack and the telescopic column are all movably arranged in the second sliding groove.

[0013] Specifically, one end of the telescopic column away from the second pressure block is fixedly connected to the bottom wall of the second sliding groove, one end of the rotating shaft is movably connected to the side wall of the second sliding groove, and the other end of the rotating shaft passes through the joint base and is movably connected to the side wall of the second splint movable groove.

[0014] (III) Beneficial effects: The present invention sets a first clamping and fixing component in the joint base, so that the device can continuously strengthen the connection between the joint base and the pipe body as the hydraulic pressure increases. The pressure of the water flow will drive the first pressure block to move downward, and drive the first clamping plate to continuously squeeze the pipe body through the second threaded rod and the first threaded rod, and the squeezing force will increase with the continuous increase of the hydraulic pressure, thereby avoiding the pipe body and the joint base from being flushed apart due to excessive hydraulic pressure. In addition, through the half-gear structure of the second gear, the second rack and the third rack are alternately meshed and connected with the second gear, so that the second pressure block can further strengthen the fixation of the pipe body whether it moves upward or downward. Therefore, when the joint base and the pipe body are flushed apart, the second clamping plate can avoid further separation of the pipe body and the joint base, greatly increasing the firmness between the joint base and the pipe body. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] The technical solutions and beneficial effects of the present invention will be made apparent by describing in detail the specific embodiments of the present invention in conjunction with the accompanying drawings.

[0016] Figure 1 It is a structural schematic diagram of a pipeline joint structure of the present invention; Figure 2 This is a schematic diagram of the internal structure of a pipe joint structure of the present invention; Figure 3 It is a schematic structural diagram of the pipeline body, the first clamping and fixing assembly and the second clamping and fixing assembly of the present invention; Figure 4 It is a structural schematic diagram of the first clamping and fixing assembly of the present invention; Figure 5 It is a schematic structural diagram of the second clamping and fixing assembly of the present invention; Figure 6 It is a structural schematic diagram of the second clamping and fixing assembly of the present invention from another perspective; Figure 7 It is a schematic diagram of the internal structure of the joint base of the present invention.

[0017] In the figure: 10. joint base; 11. pipe placement cavity; 12. first clamping plate movable groove; 13. second clamping plate movable groove; 14. first sliding groove; 15. second sliding groove; 16. pipe connecting protrusion; 20. pipe body; 30. first clamping and fixing assembly; 31. first clamping plate; 32. connecting block; 33. first threaded rod; 331. handle; 34. belt; 35. second threaded rod; 36. first pressure block; 40. second clamping and fixing assembly; 41. second clamping plate; 42. first rack; 43. first gear; 44. second gear; 45. second pressure block; 46. second rack; 47. third rack; 48. rotating shaft; 49. telescopic column. DETAILED DESCRIPTION

[0018] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present application.

[0019] like Figure 1 — Figure 7 As shown, a pipe joint structure described in the present invention includes a joint base 10 and a pipe body 20. The joint base 10 is used to connect two pipe bodies 20, and also includes a first clamping and fixing component 30 and a second clamping and fixing component 40. When the hydraulic pressure in the pipe body 20 continues to increase, the first clamping and fixing component 30 can continuously increase the fixing effect on the pipe body 20 as the hydraulic pressure increases, thereby preventing the pipe body 20 from separating from the joint base 10. When the pipe body 20 begins to separate from the joint base 10, the fixation of the pipe body 20 by the second clamping and fixing component 40 can be strengthened to prevent the pipe body 20 from further separating from the joint base 10.

[0020] Among them, the first clamping and fixing assembly 30 includes a first clamping plate 31, a connecting block 32, a first threaded rod 33, a belt 34, a second threaded rod 35 and a first pressure block 36, one end of the first clamping plate 31 is an arcuate surface adapted to the pipe body 20, the first clamping plate 31 abuts against the pipe body 20, the connecting block 32 is fixedly arranged on the side end of the first clamping plate 31, the first threaded rod 33 is threadedly connected to the connecting block 32, the first threaded rod 33 is movably connected to the second threaded rod 35 through the belt 34, one end of the second threaded rod 35 is threadedly connected to the first pressure block 36, and the end of the first pressure block 36 away from the second threaded rod 35 is an inclined surface, and the inclined surface is in the direction of the water flow.

[0021] When the hydraulic pressure in the joint base 10 is large, the pressure of the water flow will drive the first pressure block 36 to move, thereby driving the second threaded rod 35 to rotate. The second threaded rod 35 drives the first threaded rod 33 to rotate through the belt 34. The first threaded rod 33 drives the first clamping plate 31 to move toward the pipe body 20 through the connecting block 32, thereby increasing the squeezing force on the pipe body 20, and the squeezing force will increase with the continuous increase of the hydraulic pressure, thereby avoiding the pipe body 20 and the joint base 10 from being flushed apart due to excessive hydraulic pressure.

[0022] Furthermore, a handle 331 is fixedly provided at the top end of the first threaded rod 33. When the joint base 10 and the pipe body 20 are connected, the handle 331 can be rotated to drive the first clamping plate 31 to abut against the pipe body 20 through the first threaded rod 33, thereby realizing the initial fixation of the first clamping plate 31 to the pipe body 20. The first threaded rod 33 is provided with threads in opposite directions.

[0023] Among them, the second clamping and fixing assembly 40 includes a second clamping plate 41, a first rack 42, a first gear 43, a second gear 44, a second pressure block 45, a second rack 46, a third rack 47, a rotating shaft 48 and a telescopic column 49. One end of the second clamping plate 41 is an arcuate surface adapted to the pipeline body 20, the second clamping plate 41 abuts against the pipeline body 20, one end of the first rack 42 is fixedly connected to the bottom end of the second clamping plate 41, the first gear 43 and the second gear 44 are both fixedly sleeved on the rotating shaft 48, the first rack 42 is meshedly connected with the first gear 43, the second gear 44 is a semi-gear structure, the second rack 46 and the third rack 47 are both fixedly arranged at the bottom end of the second pressure block 45, the second rack 46 and the third rack 47 are alternately meshedly connected with the second gear 44, the telescopic column 49 is also fixedly arranged at the bottom end of the second pressure block 45, a spring is arranged in the telescopic column 49, and the top of the second pressure block 45 is an inclined surface.

[0024] like Figure 3 , Figure 5 and Figure 6 As shown, when the pipe body 20 is placed in the joint base 10, the pipe body 20 will squeeze the second pressure block 45, thereby driving the second pressure block 45 to move downward, and the second pressure block 45 drives the second rack 46 and the third rack 47 to move downward, and the second rack 46 drives the second gear 44 to rotate counterclockwise. Because the second gear 44 is a half-gear structure, the third rack 47 is not meshed with the second gear 44 at this time, that is, the third rack 47 does not hinder the rotation of the second gear 44, and the second gear 44 drives the first gear 43 to rotate counterclockwise through the rotating shaft 48, and the first gear 43 drives the first rack 42 to move upward, thereby driving the second clamping plate 41 to move upward and abut against the pipe body 20. It should be noted that the moving direction of the second pressure block 45 and the rotation directions of the second gear 47 and the first gear 43 described here are all based on Figure 6 The directions shown are for reference only and are only for the convenience of describing the working principle, and are not intended to limit the moving directions of the other three second pressure blocks 45 and the rotating directions of the second gear 47 and the first gear 43 in the present application.

[0025] When the pipe body 20 is connected to the joint base 10, the second gear 44 is just in a critical state where it ends the meshing connection with the second rack 46 and starts the meshing connection with the third rack 47. Therefore, when the joint base 10 and the pipe body 20 are pushed apart due to excessive hydraulic pressure, the squeezing of the second pressure block 45 by the pipe body 20 is released. Under the elastic force of the spring in the telescopic column 49, the second pressure block 45 moves upward. At this time, the third rack 47 is meshed with the second gear 44, and the third rack 47 drives the second gear 44 to rotate counterclockwise. The second gear 44 drives the first gear 43 to rotate counterclockwise through the rotating shaft 48. The first gear 43 drives the second clamping plate 41 to continue to move upward through the first rack 42, thereby increasing the squeezing force of the second clamping plate 41 on the pipe body 20 to prevent the pipe body 20 from further separating from the joint base 10.

[0026] Furthermore, four first clamping plates 31 , connecting blocks 32 and belts 34 are provided, each first clamping plate 31 is fixedly connected to a connecting block 32 , and every two first clamping plates 31 are symmetrically arranged about a pipe body 20 , which can strengthen the fixation of the pipe body 20 .

[0027] Furthermore, two of the first threaded rod 33, the second threaded rod 35 and the first pressure block 36 are each provided, each two connecting blocks 32 are threadedly connected to a first threaded rod 33, each first pressure block 36 is threadedly connected to a second threaded rod 35, and each second threaded rod 35 is movably connected to the two first threaded rods 33 through two belts 34.

[0028] There are two groups of second clamping and fixing components 40 , and each two groups of second clamping and fixing components 40 are symmetrically arranged about one pipe body 20 . This arrangement can also strengthen the fixation of the pipe body 20 .

[0029] Among them, the joint base 10 is provided with a pipe placement cavity 11, a first clamping plate movable groove 12, a second clamping plate movable groove 13, a first sliding groove 14, a second sliding groove 15 and a pipe connecting protrusion 16. The diameter of the pipe connecting protrusion 16 is smaller than the diameter of the pipe placement cavity 11 and is adapted to the inner diameter of the pipe body 20. The pipe body 20 is placed in the pipe placement cavity 11, and the side end of the pipe body 20 contacts the side end of the pipe connecting protrusion 16. This arrangement can prevent the water flow in the pipe body 20 from leaking into the first clamping plate movable groove 12, the second clamping plate movable groove 13 and the second sliding groove 15.

[0030] Furthermore, two first clamp plate movable grooves 12, two second clamp plate movable grooves 13 and two second sliding grooves 15 are each provided, and the two first clamp plate movable grooves 12, two second clamp plate movable grooves 13 and two second sliding grooves 15 are respectively symmetrically arranged on both sides of the pipe connecting protrusion 16, and the first sliding groove 14 is located on the pipe connecting protrusion 16.

[0031] Furthermore, the first clamping plate 31 and the connecting block 32 are both movably arranged in the first clamping plate movable groove 12, the second threaded rod 35 and the first pressure block 36 are both movably arranged in the first sliding groove 14, and the end of the second threaded rod 35 away from the first pressure block 36 is movably connected to the bottom wall of the first sliding groove 14.

[0032] Furthermore, the second clamping plate 41 , the first rack 42 and the first gear 43 are all movably disposed in the second clamping plate movable groove 13 , and the second gear 44 , the second pressure block 45 , the second rack 46 , the third rack 47 and the telescopic column 49 are all movably disposed in the second sliding groove 15 .

[0033] Furthermore, one end of the telescopic column 49 away from the second pressure block 45 is fixedly connected to the bottom wall of the second sliding groove 15, one end of the rotating shaft 48 is movably connected to the side wall of the second sliding groove 15, and the other end of the rotating shaft 48 passes through the joint base 10 and is movably connected to the side wall of the second splint movable groove 13.

[0034] The working principle of the present invention is as follows: when the hydraulic pressure in the joint base 10 is relatively large, the pressure of the water flow will drive the first pressure block 36 to move, thereby driving the second threaded rod 35 to rotate, the second threaded rod 35 drives the first threaded rod 33 to rotate through the belt 34, and the first threaded rod 33 drives the first clamping plate 31 to move toward the direction close to the pipe body 20 through the connecting block 32, thereby increasing the squeezing force on the pipe body 20, and the squeezing force will increase with the continuous increase of the hydraulic pressure, thereby preventing the pipe body 20 and the joint base 10 from being washed apart due to excessive hydraulic pressure; when the joint base 10 and the pipe body 20 are separated due to excessive hydraulic pressure, the pressure on the pipe body 20 will be increased. When the pipeline body 20 is flushed open, the squeezing of the pipeline body 20 on the second pressure block 45 is released, and under the elastic force of the spring in the telescopic column 49, the second pressure block 45 moves upward. At this time, the third rack 47 is meshed and connected with the second gear 44, and the third rack 47 drives the second gear 44 to rotate counterclockwise. The second gear 44 drives the first gear 43 to rotate counterclockwise through the rotating shaft 48, and the first gear 43 drives the second clamping plate 41 to continue to move upward through the first rack 42, thereby increasing the squeezing force of the second clamping plate 41 on the pipeline body 20 to prevent the pipeline body 20 from further separating from the joint base 10.

[0035] The present invention sets a first clamping and fixing component in the joint base, so that the device can continuously strengthen the connection between the joint base and the pipeline body as the hydraulic pressure increases. The pressure of the water flow will drive the first pressure block to move downward, and drive the first clamping plate to continuously squeeze the pipeline body through the second threaded rod and the first threaded rod, and the squeezing force will increase with the continuous increase of the hydraulic pressure, thereby avoiding the pipeline body and the joint base from being flushed apart due to excessive hydraulic pressure. In addition, through the half-gear structure of the second gear, the second rack, the third rack and the second gear are alternately meshed and connected, so that the second pressure block can further strengthen the fixation of the pipeline body whether it moves upward or downward. Therefore, when the joint base and the pipeline body are flushed apart, the second clamping plate can avoid further separation of the pipeline body and the joint base, greatly increasing the firmness between the joint base and the pipeline body.

[0036] The above are only implementation methods of the present application, and are not intended to limit the patent scope of the present application. Any equivalent structure or equivalent process transformation made using the contents of the present application specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present application.

Claims

1. A pipe joint structure, comprising a joint base and a pipe body, wherein the joint base is used to connect two pipe bodies, characterized in that: It also includes a first clamping and fixing assembly and a second clamping and fixing assembly, wherein the first clamping and fixing assembly includes a first clamping plate, a connecting block, a first threaded rod, a belt, a second threaded rod and a first pressure block, one end of the first clamping plate is an arcuate surface adapted to the pipe body, the first clamping plate abuts against the pipe body, the connecting block is fixedly arranged at a side end of the first clamping plate, the first threaded rod is threadedly connected to the connecting block, the first threaded rod is movably connected to the second threaded rod through the belt, one end of the second threaded rod is threadedly connected to the first pressure block, and one end of the first pressure block away from the second threaded rod is an inclined surface; The second clamping and fixing assembly includes a second clamping plate, a first rack, a first gear, a second gear, a second pressure block, a second rack, a third rack, a rotating shaft and a telescopic column, one end of the second clamping plate is an arcuate surface adapted to the pipe body, the second clamping plate abuts against the pipe body, one end of the first rack is fixedly connected to the bottom end of the second clamping plate, the first gear and the second gear are both fixedly sleeved on the rotating shaft, the first rack is meshed with the first gear, the second gear is a half gear structure, the second rack and the third rack are both fixedly arranged at the bottom end of the second pressure block, the second rack and the third rack are alternately meshed with the second gear, the telescopic column is also fixedly arranged at the bottom end of the second pressure block, and the top of the second pressure block is an inclined surface.

2. The pipe joint structure according to claim 1, characterized in that: A handle is fixedly arranged at the top end of the first threaded rod, and threads in opposite directions are arranged on the first threaded rod.

3. The pipe joint structure according to claim 1, characterized in that: Four of the first clamping plates, the connecting blocks and the belts are provided, each of the first clamping plates is fixedly connected to one of the connecting blocks, and every two of the first clamping plates are symmetrically arranged about one of the pipe bodies.

4. The pipe joint structure according to claim 3, characterized in that: There are two of each of the first threaded rod, the second threaded rod and the first pressure block, and every two connecting blocks are threadedly connected to one of the first threaded rods, each of the first pressure blocks is threadedly connected to one of the second threaded rods, and each of the second threaded rods is movably connected to the two first threaded rods via the two belts.

5. The pipe joint structure according to claim 1, characterized in that: The second clamping and fixing components are provided in two groups, and each two groups of the second clamping and fixing components are symmetrically arranged with respect to one of the pipe bodies.

6. The pipe joint structure according to claim 1, characterized in that: The joint base is provided with a pipe placement cavity, a first clamping plate movable groove, a second clamping plate movable groove, a first sliding groove, a second sliding groove and a pipe connecting protrusion, the diameter of the pipe connecting protrusion is smaller than the diameter of the pipe placement cavity, the pipe body is placed in the pipe placement cavity, and the side end of the pipe body contacts the side end of the pipe connecting protrusion.

7. The pipe joint structure according to claim 6, characterized in that: There are two of each of the first clamp plate movable groove, the second clamp plate movable groove and the second sliding groove, and the two first clamp plate movable grooves, the two second clamp plate movable grooves and the two second sliding grooves are symmetrically arranged on both sides of the pipe connecting protrusion, and the first sliding groove is located on the pipe connecting protrusion.

8. The pipe joint structure according to claim 7, characterized in that: The first clamping plate and the connecting block are both movably arranged in the first clamping plate movable groove, the second threaded rod and the first pressure block are both movably arranged in the first sliding groove, and one end of the second threaded rod away from the first pressure block is movably connected to the bottom wall of the first sliding groove.

9. The pipe joint structure according to claim 8, characterized in that: The second clamping plate, the first rack and the first gear are all movably arranged in the second clamping plate movable groove, and the second gear, the second pressure block, the second rack, the third rack and the telescopic column are all movably arranged in the second sliding groove.

10. The pipe joint structure according to claim 9, characterized in that: One end of the telescopic column away from the second pressure block is fixedly connected to the bottom wall of the second sliding groove, one end of the rotating shaft is movably connected to the side wall of the second sliding groove, and the other end of the rotating shaft passes through the joint base and is movably connected to the side wall of the second clamping plate movable groove.