Transport vehicle scheduling optimization method for smart port

By setting up a drop-and-pull transportation system and building a vehicle dispatching model at the port, and using optimization algorithms to optimize the transportation path of the tractor, the problem of idle vehicle resources and environmental pollution in port transportation has been solved, and transportation efficiency and resource utilization have been improved.

CN118735068APending Publication Date: 2024-10-01CHONGQING UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410864127.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-30
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

In port transportation, a large number of container trucks carry out one-way transportation between the port and the cargo point, resulting in idle vehicle resources, half-empty driving, and roundabout transportation, causing environmental pollution and resource waste, and affecting transportation efficiency.

Method used

Using a drop-and-pull transportation system, including a control center, multiple tractors and trailers, by constructing a vehicle scheduling model for drop-and-pull transportation and using an optimization algorithm (such as an ant colony algorithm) to solve the scheduling plan, the transportation path and loading and unloading time of the tractors can be optimized. Realize drop-and-hook transportation scheduling.

Benefits of technology

It reduces the parking time of tractors and waiting time for loading and unloading, improves transportation efficiency and container turnover rate, reduces environmental pollution and transportation costs, and improves port cargo transportation efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118735068A_ABST
    Figure CN118735068A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of transport vehicle scheduling optimization, and particularly relates to a transport vehicle scheduling optimization method for an intelligent port, and the method comprises the following steps: S1, arranging a drop and pull transport system at the port, and the drop and pull transport system comprises a control center, a plurality of tractors and a plurality of trailers; the trailer is used for loading a cargo container and is matched with the tractor to transport cargos in a drop and pull transportation mode; s2, constructing a drop and pull transport vehicle scheduling model used for outputting a drop and pull transport scheduling scheme of port transport vehicles; s3, solving the vehicle scheduling model constructed in the step S2 by using an optimization algorithm according to actual cargo transportation requirements to obtain a drop and pull transportation scheduling scheme; and S4, carrying out drop and pull transport scheduling on the drop and pull transport system by using the drop and pull transport scheduling scheme obtained in the step S3. According to the method, the transportation cost can be reduced, meanwhile, the transportation efficiency of port cargos is effectively improved, and environmental pollution and resource waste are reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of transport vehicle scheduling optimization, and in particular relates to a transport vehicle scheduling optimization method for a smart port. Background Art

[0002] With the globalization of the market economy and the development of the country's foreign economy, my country's import and export trade volume has grown rapidly, and port throughput has increased year by year, which has driven the development of the port transportation industry and put higher requirements on the transportation efficiency of the port transportation system.

[0003] At present, in the transportation work of ports, in order to complete the transportation of goods, the conventional method is to use container trucks to load and transport cargo containers. In this way, the safety and flexibility of the cargo transportation process can be guaranteed. However, in this way, in port transportation, container trucks are required to travel back and forth between the port and the cargo point for one-way transportation, which will cause problems such as idle port vehicle resources, half-way empty driving, and roundabout transportation, which not only causes environmental pollution, but also wastes resources, increases transportation costs, and seriously affects the transportation efficiency of the port.

[0004] Therefore, how to reduce transportation costs while effectively improving the transportation efficiency of port cargo and reducing environmental pollution and resource waste has become a problem that needs to be solved urgently. Summary of the invention

[0005] In view of the above-mentioned deficiencies in the prior art, the present invention provides a method for optimizing the scheduling of transport vehicles in a smart port, which can effectively improve the transportation efficiency of port cargo while reducing transportation costs, and reduce environmental pollution and waste of resources.

[0006] In order to solve the above technical problems, the present invention adopts the following technical solutions:

[0007] A method for optimizing the dispatching of transport vehicles in a smart port comprises the following steps:

[0008] S1. A drop-and-hook transport system is set up at the port, including a control center, multiple tractors and multiple trailers; the trailers are used to load cargo containers and cooperate with the tractors to transport cargo through drop-and-hook transport;

[0009] S2. Construct a vehicle scheduling model for drop-and-hook transport to output a drop-and-hook transport scheduling plan for port transport vehicles;

[0010] S3, according to the actual demand for cargo transportation, use the optimization algorithm to solve the vehicle scheduling model constructed in S2 to obtain the drop-and-hook transportation scheduling plan;

[0011] S4. Use the drop-and-hook transport scheduling plan obtained in S3 to perform drop-and-hook transport scheduling on the drop-and-hook transport system.

[0012] Compared with the prior art, the present invention has the following beneficial effects:

[0013] 1. This method uses a drop-and-pull transport system (multiple tractors and multiple trailers) to transport the centralized containers obtained at the port. Drop-and-pull transport refers to an organizational method in which a main vehicle (tractor) with power drops off and hangs on a designated trailer at each loading and unloading operation point according to a predetermined plan and continues to operate. Compared with the prior art of using centralized container trucks for cargo transportation, drop-and-pull transport can minimize the downtime of the truck (or tractor), thereby maximizing the use of traction capacity and improving transportation efficiency.

[0014] 2. This method constructs a vehicle scheduling model for drop-and-hook transport and obtains a drop-and-hook transport scheduling plan through an optimization algorithm. This can significantly reduce the time that tractors wait for loading and unloading, improve the transportation efficiency of tractors, and the turnover rate of containers. It can also reduce environmental pollution during container transportation and speed up the collection and distribution of port containers.

[0015] In summary, this method can effectively improve the transportation efficiency of port cargo while reducing transportation costs, reducing environmental pollution and waste of resources.

[0016] Preferably, the objective function of the vehicle scheduling model is:

[0017]

[0018] Where Z represents the overall cost; ρ1 represents the startup cost of a tractor, ρ2 represents the power consumption cost per unit time during the tractor transportation process, and ρ3 represents the unit power consumption cost per unit waiting time during the tractor waiting process; K represents the number of tractors, k represents the tractor number; T represents the vertex transportation task, 0 represents the virtual task of returning to the depot and starting from the depot, i,j∈T represents the transportation task number; t ij represents the connection time between tasks i and j; y i represents the task start time; τ i represents the service time of task i; and is the decision variable.

[0019] In this way, the cost of the obtained drop-and-hook transport scheduling plan can be minimized, thereby ensuring the effective utilization of resources as much as possible while taking into account the transportation efficiency of the goods.

[0020] Preferably, the decision variable and the task start time y i The following relations are satisfied:

[0021] y i =[0,P];

[0022]

[0023] in, Decision variables When tractor k executes arc task (0, i), it is 1, otherwise it is 0, that is, when calculating the overall cost Z, the tractor startup cost only considers the executed arc task; decision variable It is 1 when tractor k executes arc task (i, j), otherwise it is 0; P is the maximum working time of the tractor.

[0024] Preferably, the constraints of the vehicle scheduling model include:

[0025] Restrictions on the number of tractors used:

[0026]

[0027] All tractors must start from the parking lot when performing tasks:

[0028]

[0029] Restrict the arc task connecting two vertex tasks to only be executed once by one tractor:

[0030]

[0031] Vertex transport tasks other than dummy tasks can only be accessed once:

[0032]

[0033] Flow conservation constraints for the tractor:

[0034]

[0035] Task start time interval:

[0036]

[0037] Connection time constraints of continuous tasks:

[0038]

[0039] Wherein, M is a sufficiently large positive number;

[0040] Predecessor task constraints of a task:

[0041]

[0042] Among them, ωi It is the predecessor task of i.

[0043] In this way, the feasibility of the obtained drop-and-hook transport solution can be guaranteed.

[0044] Preferably, in S3, the optimization algorithm used is an optimized ant colony algorithm, which includes the following solution process:

[0045] The first step is to initialize the parameters in the algorithm; the initialized parameters include the number of ants, the maximum number of iterations, and the pheromone volatilization factor;

[0046] The second step is to construct the solution space. All ants are randomly arranged at different starting points, and the next city node to be visited by each ant is calculated according to the preset state transition strategy until all cities are visited.

[0047] The third step is to calculate the path length of each ant and record the optimal solution among all current paths; update the pheromone concentration of the paths between the city nodes according to the preset pheromone concentration update strategy;

[0048] The fourth step is to determine whether the preset number of iterations has been reached. If not, return to the second step; if reached, terminate the iteration and output the current optimal solution as the drop-and-hook transport scheduling plan.

[0049] In the drop-and-hook transport scheduling problem, since the transportation environment and demand may change at any time, the algorithm needs to be able to adjust and optimize the scheduling plan in real time. Through such settings, the optimization algorithm has a faster convergence speed and better dynamic adjustment ability, which can meet the requirements of real-time and dynamic.

[0050] Preferably, in the second step, the preset state transition strategy includes:

[0051] First, the transition probability p from task node i to node j is calculated by the following formula: ij :

[0052]

[0053] In the formula, represents the pheromone concentration level of the feasible arc (i, j); α represents the pheromone heuristic factor, and β represents the expected heuristic factor; ΔZ is the objective function value; is the pheromone factor;

[0054] After that, the next city node to be visited is selected through the elite strategy or roulette strategy; in the elite strategy, the transition probability p is selected ij The largest feasible arc (i, j); in the roulette strategy, the probability of each feasible arc being selected corresponds to its transition probability pij .

[0055] In this way, in the ant colony algorithm, the transition probability from the current visited node to all possible next visited nodes will be calculated first, so as to select the next visited node. At the same time, the search performance of the ant colony algorithm can be improved through the elite strategy or roulette strategy to prevent falling into the local optimal solution.

[0056] Preferably, in the third step, the process of the preset pheromone concentration update strategy includes:

[0057] 1) Randomly select an arbitrary solution;

[0058] 2) Randomly select a row from the code. If all elements of the selected row are zero, reselect until a row that is not all zero is selected, and extract all non-zero task numbers in order;

[0059] 3) Determine the subsequence of the tractor transport task;

[0060] 4) If the target value of the ant is less than the current optimal solution, the maximum minimum ant colony MMAS update strategy is used to update the pheromone of the ant's subsequence; otherwise, the pheromone of the entire subsequence of each ant is updated; when updating the pheromone, the pheromone update amount is Q / ΔZ, where ΔZ is the target function value and Q is the pheromone update value;

[0061] 5) Repeat the above steps 2)-4) until the pheromone concentrations of all tractor task subsequences are updated.

[0062] When ants are searching for the optimal path, they will release certain pheromones on the road they pass. The subsequent ants can choose the next path according to the pheromone concentration of the path. However, when the pheromone concentrations of multiple paths are comparable, it will interfere with the ants' choice and affect the performance of the algorithm. Therefore, a certain strategy is needed to update the pheromone of the path. This setting uses the maximum and minimum ant colony MMAS update strategy. First, by strengthening the pheromone concentration of the global optimal and current optimal paths, the algorithm convergence speed is effectively improved; secondly, the maximum and minimum values ​​of the pheromone concentration of each path are set to avoid the local optimal solution caused by too high or too low pheromone concentration; finally, by setting the pheromone concentration to the maximum value, the volatilization of the path pheromone concentration is slowed down. Compared with traditional strategies, this method is more effective and optimal. BRIEF DESCRIPTION OF THE DRAWINGS

[0063] In order to make the purpose, technical solution and advantages of the invention more clear, the present invention will be further described in detail below with reference to the accompanying drawings, in which:

[0064] Figure 1Flowchart of this method. DETAILED DESCRIPTION

[0065] The following is a further detailed description through specific implementation methods:

[0066] Embodiment 1

[0067] like Figure 1 As shown, this embodiment discloses a method for optimizing the transportation vehicle scheduling of a smart port, comprising the following steps:

[0068] S1. A drop-and-hook transport system is set up at the port, including a control center, multiple tractors and multiple trailers; the trailers are used to load cargo containers and cooperate with the tractors to transport cargo through drop-and-hook transport.

[0069] Drop and Pull Transport refers to a method of organization in which a powered main vehicle (tractor) drops off and hooks on a designated trailer at each loading and unloading operation point according to a predetermined plan and then continues to operate. Compared with the existing technology of using concentrated box trucks for cargo transportation, drop and pull transport can minimize the downtime of the truck (or tractor), thereby maximizing the use of traction capacity and improving transportation efficiency.

[0070] S2. Construct a vehicle scheduling model for drop-and-hook transport to output a drop-and-hook transport scheduling plan for port transport vehicles.

[0071] In specific implementation, the objective function of the vehicle scheduling model is:

[0072]

[0073] Where Z represents the overall cost; ρ1 represents the startup cost of a tractor, ρ2 represents the power consumption cost per unit time during the tractor transportation process, and ρ3 represents the unit power consumption cost per unit waiting time during the tractor waiting process; K represents the number of tractors, k represents the tractor number; T represents the vertex transportation task, 0 represents the virtual task of returning to the depot and starting from the depot, i,j∈T represents the transportation task number; t ij represents the connection time between tasks i and j; y i represents the task start time; τ i represents the service time of task i; and is the decision variable.

[0074] Among them, the decision variables and the task start time y i The following relations are satisfied:

[0075] y i =[0,P];

[0076]

[0077] in, Decision variables When tractor k executes arc task (0, i), it is 1, otherwise it is 0, that is, when calculating the overall cost Z, the tractor startup cost only considers the executed arc task; decision variable It is 1 when tractor k executes arc task (i, j), otherwise it is 0; P is the maximum working time of the tractor.

[0078] The constraints of the vehicle scheduling model include:

[0079] Restrictions on the number of tractors used:

[0080]

[0081] All tractors must start from the parking lot when performing tasks:

[0082]

[0083] Restrict the arc task connecting two vertex tasks to only be executed once by one tractor:

[0084]

[0085] Vertex transport tasks other than dummy tasks can only be accessed once:

[0086]

[0087] Flow conservation constraints for the tractor:

[0088]

[0089] Task start time interval:

[0090]

[0091] Connection time constraints of continuous tasks:

[0092]

[0093] Wherein, M is a sufficiently large positive number;

[0094] Predecessor task constraints of a task:

[0095]

[0096] Among them, ω i is the predecessor task of i. This constraint means that the task can only be executed after its predecessor task is completed.

[0097] S3. According to the actual demand for cargo transportation, the vehicle scheduling model constructed in S2 is solved using the optimization algorithm to obtain a drop-and-hook transport scheduling plan.

[0098] In the specific implementation, the optimization algorithm used is the optimized ant colony algorithm, which includes the following solution process:

[0099] The first step is to initialize the parameters in the algorithm; the initialized parameters include the number of ants, the maximum number of iterations, and the pheromone volatilization factor;

[0100] The second step is to construct the solution space. All ants are randomly arranged at different starting points, and the next city node to be visited by each ant is calculated according to the preset state transition strategy until all cities are visited.

[0101] The third step is to calculate the path length of each ant and record the optimal solution among all current paths; update the pheromone concentration of the paths between the city nodes according to the preset pheromone concentration update strategy;

[0102] The fourth step is to determine whether the preset number of iterations has been reached. If not, return to the second step; if reached, terminate the iteration and output the current optimal solution as the drop-and-hook transport scheduling plan.

[0103] In the drop-and-hook transport scheduling problem, since the transportation environment and demand may change at any time, the algorithm needs to be able to adjust and optimize the scheduling plan in real time. Through such settings, the optimization algorithm has a faster convergence speed and better dynamic adjustment ability, which can meet the requirements of real-time and dynamic.

[0104] Among them, in the second step, the preset state transition strategy includes:

[0105] First, the transition probability p from task node i to node j is calculated by the following formula: ij :

[0106]

[0107] In the formula, represents the pheromone concentration level of the feasible arc (i, j); α represents the pheromone heuristic factor, and β represents the expected heuristic factor; ΔZ is the objective function value, which includes the number of tractors used, tractor transportation, and relevant cost information during the waiting process; is the pheromone factor;

[0108] After that, the next city node to be visited is selected through the elite strategy or roulette strategy; in the elite strategy, the transition probability p is selected ijThe largest feasible arc (i, j); in the roulette strategy, the probability of each feasible arc being selected corresponds to its transition probability p ij .

[0109] In this way, in the ant colony algorithm, the transition probability from the current visited node to all possible next visited nodes will be calculated first, so as to select the next visited node. At the same time, the search performance of the ant colony algorithm can be improved through the elite strategy or roulette strategy to prevent falling into the local optimal solution.

[0110] In the third step, the process of the preset pheromone concentration update strategy includes:

[0111] 1) Randomly select an arbitrary solution;

[0112] 2) Randomly select a row from the code. If all elements of the selected row are zero, reselect until a row that is not all zero is selected, and extract all non-zero task numbers in order;

[0113] 3) Determine the subsequence of the tractor transport task;

[0114] 4) If the target value of the ant is less than the current optimal solution, the maximum minimum ant colony MMAS update strategy is used to update the pheromone of the ant's subsequence; otherwise, the pheromone of the entire subsequence of each ant is updated; when updating the pheromone, the pheromone update amount is Q / ΔZ, where ΔZ is the target function value and Q is the pheromone update value;

[0115] 5) Repeat the above steps 2)-4) until the pheromone concentrations of all tractor task subsequences are updated.

[0116] When ants are searching for the optimal path, they will release certain pheromones on the path they pass. The subsequent ants can choose the next path according to the pheromone concentration of the path. However, when the pheromone concentrations of multiple paths are comparable, it will interfere with the ants' choice and affect the performance of the algorithm. Therefore, a certain strategy is needed to update the pheromone of the path. When the ants finish searching for a single path, they need to adopt the selected update strategy to update the pheromone concentrations of all paths that the ants have passed. With this setting, the maximum and minimum ant colony MMAS update strategy is used. First, by strengthening the pheromone concentrations of the global optimal and current optimal paths, the algorithm convergence speed is effectively improved; secondly, the maximum and minimum values ​​of the pheromone concentration of each path are set to avoid the local optimal solution caused by too high or too low pheromone concentration; finally, by setting the pheromone concentration to the maximum value, the volatilization of the path pheromone concentration is slowed down. Compared with traditional strategies, this method is more effective and optimal.

[0117] S4. Use the drop-and-hook transport scheduling plan obtained in S3 to perform drop-and-hook transport scheduling on the drop-and-hook transport system.

[0118] This method uses a drop-and-pull transport system (multiple tractors and multiple trailers) to carry out drop-and-pull transport of the centralized containers obtained at the port. Drop-and-pull transport refers to an organizational method in which a powered main vehicle (tractor) continues to operate after dropping and hanging a designated trailer at each loading and unloading operation point according to a predetermined plan. Compared with the prior art of using centralized container trucks for cargo transportation, drop-and-pull transport can minimize the downtime of trucks (or tractors), thereby maximizing the use of traction capacity and improving transportation efficiency. In addition, this method constructs a vehicle scheduling model for drop-and-pull transport, and obtains a drop-and-pull transport scheduling plan through an optimization algorithm. In this way, the time waiting for loading and unloading by tractors can be greatly reduced, the transportation efficiency of tractors and the turnover rate of containers can be improved. It can also reduce environmental pollution during container transportation and speed up the collection and distribution transportation operation of port containers. In summary, this method can effectively improve the transportation efficiency of port cargo while reducing transportation costs, reducing environmental pollution and waste of resources.

[0119] Embodiment 2

[0120] In order to better illustrate the effectiveness of the drop-and-hook transport scheduling scheme obtained by this method, the following experimental verification is carried out.

[0121] The Solomon standard data set was used to generate a test case, and the drop-and-hook transport scheduling scheme of the present invention was compared and analyzed with the traditional container truck transport.

[0122] Table 1 Different task schemes

[0123]

[0124] Table 1 shows the contents of different task plans. In the table, R is a randomly distributed data point in the parameter setting. Assume that the tractor's transportation speed is 40km / h when the single head is empty, the head is driving with a trailer, the head is driving with an empty box, and the head is driving with a heavy box. The Euclidean distance between two customer points is used as the tractor's transportation route. Set the use cost of a tractor ρ1 to 300 yuan, the power consumption cost of the tractor during transportation and the power consumption cost of the tractor during waiting ρ2 = 4.32 yuan / h, ρ3 = 0.972 yuan / h. In addition, during the tractor's mission, the time for unhooking and loading is 0.2h, and the time for delivering and picking up boxes at the terminal is 0.5h. The experimental verification results are shown in Table 2.

[0125] Table 2 Cost analysis and objective function values ​​corresponding to different task plans

[0126]

[0127] In the experimental verification, customer points in the data R are randomly selected, and examples with task scales between 20 and 200 are generated. The cost of this method is significantly better than the traditional model, and the cost gap between the two increases with the increase in scale, which verifies the advantages of the drop-and-hook transportation scheduling scheme of this method, which can greatly reduce the time for tractors to wait for loading and unloading, improve the transportation efficiency of tractors, and the turnover rate of containers. It can not only reduce the company's operating costs, but also reduce the pollution to the environment during container transportation, and speed up the collection and distribution transportation operation of port containers.

[0128] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit the technical solution. Those skilled in the art should understand that those modifications or equivalent substitutions of the technical solution of the present invention that do not depart from the purpose and scope of the technical solution should be included in the scope of the claims of the present invention.

Claims

1. A method for optimizing the dispatching of transport vehicles in a smart port, characterized in that: The following steps are involved: S1. A drop-and-hook transport system is set up at the port, including a control center, multiple tractors and multiple trailers; the trailers are used to load cargo containers and cooperate with the tractors to transport cargo through drop-and-hook transport; S2. Construct a vehicle scheduling model for drop-and-hook transport to output a drop-and-hook transport scheduling plan for port transport vehicles; S3, according to the actual demand for cargo transportation, use the optimization algorithm to solve the vehicle scheduling model constructed in S2 to obtain the drop-and-hook transportation scheduling plan; S4. Use the drop-and-hook transport scheduling plan obtained in S3 to perform drop-and-hook transport scheduling on the drop-and-hook transport system.

2. The method for optimizing the dispatching of transport vehicles in a smart port according to claim 1, characterized in that: The objective function of the vehicle scheduling model is: Where Z represents the overall cost; ρ1 represents the startup cost of a tractor, ρ2 represents the power consumption cost per unit time during the transportation process of the tractor, and ρ3 represents the unit power consumption cost per unit waiting time during the waiting process of the tractor; K represents the number of tractors, k represents the tractor number; T represents the vertex transport task, 0 represents the virtual task of returning to the depot and departing from the depot, and i, j∈T represents the transport task number; t ij represents the connection time between tasks i and j; y i represents the task start time; τ i represents the service time of task i; and is the decision variable.

3. The method for optimizing the dispatching of transport vehicles in a smart port according to claim 2, characterized in that: Decision variables and the task start time y i The following relations are satisfied: and i =[0,P]; in, Decision variables It is 1 when tractor k performs arc task (0, i), otherwise it is 0; decision variable When tractor k executes arc task (i, j), 8 is 1, otherwise it is 0; P is the maximum working time of the tractor.

4. The method for optimizing the dispatching of transport vehicles in a smart port according to claim 3, characterized in that: The constraints of the vehicle scheduling model include: Restrictions on the number of tractors used: All tractors must start from the parking lot when performing tasks: Restrict the arc task connecting two vertex tasks to only be executed once by one tractor: Vertex transport tasks other than dummy tasks can only be accessed once: Flow conservation constraints for the tractor: Task start time interval: Connection time constraints of continuous tasks: Wherein, M is a sufficiently large positive number; Predecessor task constraints of a task: Among them, ω i It is the predecessor task of i.

5. The method for optimizing the dispatching of transport vehicles in a smart port according to claim 4, characterized in that: In S3, the optimization algorithm used is the optimized ant colony algorithm, which includes the following solution process: The first step is to initialize the parameters in the algorithm; the initialized parameters include the number of ants, the maximum number of iterations, and the pheromone volatilization factor; The second step is to construct the solution space. All ants are randomly arranged at different starting points, and the next city node to be visited by each ant is calculated according to the preset state transition strategy until all cities are visited. The third step is to calculate the length of the path currently traveled by each ant and record the optimal solution among all the current paths; Update the path pheromone concentration between each city node according to the preset pheromone concentration update strategy; The fourth step is to determine whether the preset number of iterations has been reached. If not, return to the second step; if reached, terminate the iteration and output the current optimal solution as the drop-and-hook transport scheduling plan.

6. The method for optimizing the dispatching of transport vehicles in a smart port according to claim 5, characterized in that: In the second step, the preset state transition strategies include: First, the transition probability p from task node i to node j is calculated by the following formula: ij : In the formula, represents the pheromone concentration level of the feasible arc (i, j); α represents the pheromone heuristic factor, and β represents the expected heuristic factor; ΔZ is the objective function value; is the pheromone factor; After that, the next city node to be visited is selected through the elite strategy or roulette strategy; in the elite strategy, the transition probability p is selected ij The largest feasible arc (i, j); in the roulette strategy, the probability of each feasible arc being selected corresponds to its transition probability p ij .

7. The method for optimizing the dispatching of transport vehicles in a smart port according to claim 5, characterized in that: In the third step, the process of the preset pheromone concentration update strategy includes: 1) Randomly select an arbitrary solution; 2) Randomly select a row from the code. If all elements of the selected row are zero, reselect until a row that is not all zero is selected, and extract all non-zero task numbers in order; 3) Determine the subsequence of the tractor transport task; 4) If the target value of the ant is less than the current optimal solution, the maximum minimum ant colony MMAS update strategy is used to update the pheromone of the ant's subsequence; otherwise, the pheromone of the entire subsequence of each ant is updated; when updating the pheromone, the pheromone update amount is Q / ΔZ, where ΔZ is the target function value and Q is the pheromone update value; 5) Repeat the above steps 2)-4) until the pheromone concentrations of all tractor task subsequences are updated.