Power control method and device of energy storage system
By obtaining the external DC bus voltage and the real-time operating data of the supercapacitor cells, the power flow direction and size of the power converter are controlled, which solves the problem of low power utilization of the supercapacitor cells in the existing technology and achieves more efficient power utilization. and capacitor balancing.
Patent Information
- Application Number
- CN202410804560.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-20
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-06-20
AI Technical Summary
Existing supercapacitor converter control methods fail to effectively improve the utilization rate of electric energy stored in the supercapacitor cell, mainly because they only consider the overall status and DC bus status and fail to fully utilize the real-time operating data of the supercapacitor cell.
By obtaining the external DC bus voltage and the real-time operating data of the supercapacitor cells, the working status of each balancing circuit is determined, and the power flow direction and size of the power converter are controlled based on these data, so that it changes with the changes of the supercapacitor cells. Improve power utilization.
It achieves efficient utilization of electric energy in the supercapacitor unit, improves the overall performance of the energy storage system, and avoids overvoltage or undervoltage of the capacitor.
Smart Images

Figure CN118739482A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of energy storage technology, and in particular to a power control method and device for an energy storage system. Background Art
[0002] At present, supercapacitors can be put into use at a faster speed than batteries, reducing the impact of power failure anomalies. Therefore, supercapacitors are often used as backup power sources in energy storage systems, and are connected to the DC bus by connecting to corresponding converters.
[0003] However, due to slight differences caused by production and other factors, the time it takes for each supercapacitor in the supercapacitor to charge to the rated voltage is not the same, which may easily lead to capacitor overvoltage or capacitor undervoltage. It is usually necessary to set up a balancing circuit to balance the supercapacitors. The existing supercapacitor converter control method usually only considers the overall state of the supercapacitor and the changes in the DC bus state to design the control logic, which results in low utilization of the electrical energy stored in the supercapacitor. Summary of the invention
[0004] Based on this, it is necessary to provide a power control method and device for an energy storage system that can improve the utilization rate of the electric energy stored in the supercapacitor in order to solve the above technical problems.
[0005] In a first aspect, the present application provides a power control method for an energy storage system, which is applied to a control unit in the energy storage system, wherein the energy storage system further comprises a supercapacitor module, a sampling circuit, a balancing circuit and a power converter; the supercapacitor module comprises a plurality of supercapacitor cells connected in series, each supercapacitor cell is connected in parallel with a sampling circuit, the sampling circuit is used to connect to an external DC bus, a balancing circuit is connected in parallel between every two adjacent supercapacitor cells, and a power converter is connected between the supercapacitor module and the external DC bus; the sampling circuit, the balancing circuit and the power converter are all connected to the control unit; the method comprises:
[0006] Obtain the external DC bus voltage and real-time operating data of each supercapacitor cell within the target period;
[0007] Determine the working status of each balancing circuit within the target period according to the external DC bus voltage and real-time operation data;
[0008] Determine the power flow direction and power size of the power converter within the target time period according to the external DC bus voltage and the working state of each balancing circuit within the target time period;
[0009] Based on the power flow direction and power amount, the power converter is controlled.
[0010] In one embodiment, determining the working state of each balancing circuit within a target period of time according to the external DC bus voltage and the real-time operation data includes:
[0011] Determining a target power value according to a difference between a preset bus voltage and an external DC bus voltage;
[0012] According to the target power value and the real-time operation data, the target operation data of each supercapacitor cell in the target period is obtained;
[0013] Based on the target operation data, the working status of each balancing circuit within the target time period is obtained.
[0014] In one embodiment, the target operation data includes a target power value; based on the target operation data, obtaining the working state of each balancing circuit in the target time period includes:
[0015] Determine the integral corresponding to each supercapacitor cell within the target period according to the target power value, and the integral corresponding to the supercapacitor cell is used to characterize the operating state of each supercapacitor;
[0016] If the integral corresponding to the supercapacitor cell is not within the preset interval, the balancing circuit corresponding to the supercapacitor cell is enabled during the target period;
[0017] If the integral corresponding to the supercapacitor cell is within a preset interval, the balancing circuit corresponding to the supercapacitor cell is in a disabled state during the target period.
[0018] In one embodiment, determining the power flow direction and power size of the power converter within the target time period according to the external DC bus voltage and the working state of each balancing circuit within the target time period includes:
[0019] Determining a target power value according to a difference between a preset bus voltage and an external DC bus voltage;
[0020] The power size of the power converter within the target time period is determined based on the target power value, the external DC bus voltage, and the working state of each balancing circuit within the target time period.
[0021] In one embodiment, based on the target power value, the external DC bus voltage and the working state of each balancing circuit in the target time period, determining the power size of the power converter in the target time period includes:
[0022] When the variance of the external DC bus voltage in the target period is greater than the preset variance and all balancing circuits in the target period are in a disabled state, the target power value is determined as the power size of the power converter in the target period.
[0023] In one embodiment, based on the target power value, the external DC bus voltage and the working state of each balancing circuit in the target time period, determining the power size of the power converter in the target time period includes:
[0024] If any balancing circuit is in an enabled state during the target period, and the variance of the external DC bus voltage during the target period is less than or equal to the preset variance, the product of the proportional value and the target power value is used as the power size of the power converter during the target period, and the proportional value is determined by the variance of the external DC bus voltage during the target period;
[0025] If the balancing circuits are all in an enabled state during the target period, the power size of the power converter during the target period is determined according to the target operation data.
[0026] In one embodiment, obtaining the external DC bus voltage within a target time period includes:
[0027] constructing a prediction model for predicting external DC bus voltage;
[0028] The voltage data in the historical period is input into the prediction model to obtain the external DC bus voltage in the target period, wherein the historical period is a period before the target period.
[0029] In a second aspect, the present application further provides a control unit, including a memory and a processor, wherein the memory stores a computer program, and the processor implements the steps of the above method when executing the computer program.
[0030] In a third aspect, the present application also provides an energy storage system, which further includes a supercapacitor module, a sampling circuit, a balancing circuit and a power converter; the supercapacitor module includes a plurality of supercapacitor cells connected in series, each supercapacitor cell is connected in parallel with a sampling circuit, the sampling circuit is used to connect to an external DC bus, and a balancing circuit is connected in parallel between every two adjacent supercapacitor cells, and the power converter is connected between the supercapacitor module and the external DC bus; the sampling circuit, the balancing circuit and the power converter are all connected to the control unit;
[0031] Wherein, the control unit is used to execute the steps of the above method.
[0032] In a fourth aspect, the present application also provides a computer-readable storage medium having a computer program stored thereon, which implements the steps of the above method when the computer program is executed by a processor.
[0033] The power control method and device of the above-mentioned energy storage system determine the working state of each balancing circuit in the target time period according to the external DC bus voltage and the real-time operating data of each supercapacitor cell in the target time period obtained, and determine the power flow direction and power size of the power converter in the target time period according to the external DC bus voltage and the working state of each balancing circuit in the target time period, thereby realizing control of the power converter; the present application realizes power control of the power converter by considering the real-time operating data of each supercapacitor cell in the supercapacitor module and combining the working state of each balancing circuit, so that it can change with the change of the supercapacitor cell, thereby improving the utilization rate of the electric energy stored in the supercapacitor cell. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] In order to more clearly illustrate the technical solutions in the embodiments of the present application or related technologies, the drawings required for use in the embodiments of the present application or related technical descriptions will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.
[0035] FIG1 is a schematic diagram of the structure of an energy storage system in one embodiment;
[0036] FIG2 is a schematic flow chart of a power control method for an energy storage system in one embodiment;
[0037] FIG3 is a structural block diagram of a power control device of an energy storage system in one embodiment;
[0038] FIG. 4 is a diagram showing the internal structure of a control unit in one embodiment. DETAILED DESCRIPTION
[0039] In order to facilitate understanding of the present application, the present application will be described more fully below with reference to the relevant drawings. Embodiments of the present application are provided in the drawings. However, the present application can be implemented in many different forms and is not limited to the embodiments described herein. On the contrary, the purpose of providing these embodiments is to make the disclosure of the present application more thorough and comprehensive.
[0040] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art to which this application belongs. The terms used herein in the specification of this application are only for the purpose of describing specific embodiments and are not intended to limit this application.
[0041] When used herein, the singular forms "a", "an", and "said / the" may also include plural forms, unless the context clearly indicates otherwise. It should also be understood that the terms "include / comprise" or "have" etc. specify the presence of stated features, wholes, steps, operations, components, parts or combinations thereof, but do not exclude the possibility of the presence or addition of one or more other features, wholes, steps, operations, components, parts or combinations thereof.
[0042] At present, supercapacitors are a new type of energy storage device that has the dual characteristics of secondary batteries and electrostatic capacitors. They have outstanding advantages such as safety and reliability, high power density, fast charging, high discharge power, long service life, maintenance-free, wide operating temperature range, and clean and environmentally friendly. They are particularly suitable for long-life power supplies and are widely used in many fields such as distributed power generation and public transportation. Compared with batteries, supercapacitors can be put into use at a faster speed and reduce the impact of power failure anomalies. Therefore, they are widely used as backup power supplies, connected to corresponding power converters, and connected to the DC bus.
[0043] However, due to slight differences caused by production and other factors, the time it takes for each supercapacitor to charge to the rated voltage is different, which can easily lead to capacitor overvoltage or capacitor undervoltage. It is usually necessary to set up a balancing circuit to balance each supercapacitor. The existing supercapacitor converter control usually only considers the overall state of the supercapacitor and the changes in the DC bus state to design the control logic. The converter's charge and discharge power control process still needs to be improved, and there is a problem of low utilization of the electrical energy stored in the supercapacitor.
[0044] The power control method of the energy storage system provided in the embodiment of the present application can be applied to the energy storage system shown in Figure 1. The energy storage system includes a supercapacitor module 11, a sampling circuit 12, a balancing circuit 13, a power converter 14 and a control unit 15; the supercapacitor module 11 includes a plurality of supercapacitor cells connected in series; each supercapacitor cell is connected in parallel with a sampling circuit 12; the energy storage system is also provided with a sampling circuit 12 connected to an external DC bus; an balancing circuit 12 is connected in parallel between every two adjacent supercapacitor cells; the power converter 14 is connected between the supercapacitor module 11 and the external DC bus; the sampling circuit 12, the balancing circuit 13, and the power converter 14 are all connected to the control unit 15.
[0045] Exemplarily, the power converter may be a DC / DC converter.
[0046] In an exemplary embodiment, as shown in FIG2 , a power control method for an energy storage system is provided. The method is described by taking the application of the method to the energy storage system in FIG1 as an example. The method includes:
[0047] S202, obtaining real-time operation data of the external DC bus voltage and each supercapacitor cell within a target period.
[0048] Among them, the target period can be set according to the actual situation. For example, if the supercapacitor module is currently charging, the target period can be the period from the current time to the end of charging; correspondingly, if the supercapacitor module is currently discharging, the target period can be the period from the current time to the end of discharging.
[0049] Specifically, the control unit can obtain the external DC bus voltage and the real-time operation data of each supercapacitor cell within the target time period collected by the sampling circuit.
[0050] Exemplarily, the real-time operating data of the supercapacitor cells may include the voltage, current, power, and remaining power of each supercapacitor cell, etc., which is not limited in the embodiments of the present application.
[0051] In one embodiment, obtaining the external DC bus voltage within a target time period includes:
[0052] Constructing a prediction model for predicting external DC bus voltage;
[0053] The voltage data in the historical period is input into the prediction model to obtain the external DC bus voltage in the target period, wherein the historical period is a period before the target period.
[0054] The voltage data may include historical operation data of the external DC bus (including the external DC bus voltage); and the prediction model may be a long short-term memory network model.
[0055] Specifically, the control unit can train a long short-term memory network model based on the historical operation data of the external DC bus, and input the external DC bus voltage in the historical period into the trained long short-term memory network model to obtain the external DC bus voltage in the target period.
[0056] Exemplarily, if the target period is a charging period, the historical period may be one or more charging periods before the current period; if the target period is a discharging period, the historical period may be one or more discharging periods before the current period.
[0057] S204, determining the working state of each balancing circuit within the target time period according to the external DC bus voltage and the real-time operation data.
[0058] Specifically, the control unit can determine the target operating data of each supercapacitor cell within the target period based on the real-time operating data of each supercapacitor cell and the external DC bus voltage; and determine the working state of the balancing circuit corresponding to each supercapacitor cell within the target period based on the target operating data.
[0059] In one embodiment, determining the working state of each balancing circuit within a target period of time according to the external DC bus voltage and the real-time operation data includes:
[0060] Determining a target power value according to a difference between a preset bus voltage and an external DC bus voltage;
[0061] According to the target power value and the real-time operation data, the target operation data of each supercapacitor cell in the target period is obtained;
[0062] Based on the target operation data, the working status of each balancing circuit within the target time period is obtained.
[0063] Among them, the preset bus voltage can be set according to actual conditions and can be a standard bus voltage.
[0064] Specifically, the voltage of the DC bus can reflect the power generation situation of the (new energy) power grid. For example, when the sunlight is sufficient and the temperature is high, the DC bus voltage (external DC bus voltage) is usually higher than the standard bus voltage. At this time, the supercapacitor cells used as energy storage usually need to consume part of the electric energy. Conversely, the DC bus voltage will be lower than the standard bus voltage. At this time, the supercapacitor cells used as energy storage usually need to supplement part of the electric energy to the DC bus. Therefore, the power that the supercapacitor module needs to release or absorb when the DC bus is adjusted from the current voltage to the standard bus voltage can be determined in advance. After measuring the voltage difference on the DC bus, the target power value can be determined. Based on the real-time operating data of the current supercapacitor cell, after simulating the operation according to the target power value, the target operating data of each supercapacitor cell in the target time period can be calculated, and based on the target operating data, the working status of each balancing circuit in the target time period can be obtained.
[0065] It should be noted that the power flow direction of the power converter connected to the supercapacitor module can be determined by determining in advance whether the DC bus voltage is adjusted from the current voltage to the standard bus voltage to determine whether the supercapacitor module needs to release or absorb power.
[0066] In an embodiment of the present application, the target power value is determined based on the difference between the preset bus voltage and the external DC bus voltage, and the target operation data of each supercapacitor cell in the target time period is obtained based on the target power value and the real-time operation data, and finally the working state of each balancing circuit in the target time period is obtained, which is convenient for the subsequent power control of the power converter and improves the utilization rate of the electric energy stored in the supercapacitor cell.
[0067] In one embodiment, the target operation data includes a target power value; based on the target operation data, obtaining the working state of each balancing circuit in the target time period includes:
[0068] Determine the integral corresponding to each supercapacitor cell within the target period according to the target power value, and the integral corresponding to the supercapacitor cell is used to characterize the operating state of each supercapacitor;
[0069] If the integral corresponding to the supercapacitor cell is not within the preset interval, the balancing circuit corresponding to the supercapacitor cell is enabled during the target period;
[0070] If the integral corresponding to the supercapacitor cell is within a preset interval, the balancing circuit corresponding to the supercapacitor cell is in a disabled state during the target period.
[0071] Among them, the preset interval can be set according to actual conditions and is not limited in the embodiments of the present application.
[0072] Specifically, if the integral corresponding to the supercapacitor cell is not in the preset interval, it can be indicated that each supercapacitor cell is at risk of overcharging or over-discharging, and at this time the working state of the balancing circuit corresponding to each supercapacitor cell is enabled; if the integral corresponding to the supercapacitor cell is in the preset interval, it can be indicated that each supercapacitor cell is not at risk of overcharging or over-discharging, and at this time the working state of the balancing circuit corresponding to each supercapacitor cell is disabled.
[0073] It should be noted that the integral corresponding to each supercapacitor cell in the target time period can be obtained by obtaining a power curve corresponding to the supercapacitor cell and integrating the time based on the power curve.
[0074] S206, determining the power flow direction and power size of the power converter within the target time period according to the external DC bus voltage and the working status of each balancing circuit within the target time period.
[0075] Specifically, the control unit may determine the power flow direction and power size of the power converter within the target time period according to the external DC bus voltage and the working status of each balancing circuit within the target time period.
[0076] In one embodiment, determining the power flow direction and power size of the power converter within the target time period according to the external DC bus voltage and the working state of each balancing circuit within the target time period includes:
[0077] Determining a target power value according to a difference between a preset bus voltage and an external DC bus voltage;
[0078] The power size of the power converter within the target time period is determined based on the target power value, the external DC bus voltage, and the working state of each balancing circuit within the target time period.
[0079] Specifically, the control unit can first determine the initial target power value based on the difference between the preset bus voltage and the external DC bus voltage, and then determine the power size of the power converter within the target time period based on the target power value, the external DC bus voltage and the working status of each balancing circuit within the target time period.
[0080] In an embodiment of the present application, the power size of the power converter within the target time period is determined based on the acquired target power value, the external DC bus voltage, and the working status of each balancing circuit within the target time period, so as to subsequently perform power control of the power converter so that it can change with the change of the supercapacitor cell, thereby improving the utilization rate of the electric energy stored in the supercapacitor cell.
[0081] In one embodiment, based on the target power value, the external DC bus voltage and the working state of each balancing circuit in the target time period, determining the power size of the power converter in the target time period includes:
[0082] When the variance of the external DC bus voltage in the target period is greater than the preset variance and all balancing circuits in the target period are in a disabled state, the target power value is determined as the power size of the power converter in the target period.
[0083] Among them, the method of obtaining the variance of the external DC bus voltage is an existing method and is not limited in the embodiment of the present application; the preset variance can be set according to actual conditions and is not limited in the embodiment of the present application.
[0084] Specifically, the variance of the external DC bus voltage during the target time period is greater than the preset variance, and all balancing circuits are in a disabled state during the target time period. This can be indicated that the new energy power generation system connected to the external DC bus has large fluctuations and needs to supplement or absorb energy. At this time, there is no risk of overcharging or over-discharging the supercapacitor module. Therefore, the target power value can be used as the power size of the power converter during the target time period.
[0085] In the embodiment of the present application, by considering the state of the external DC bus and combining the operating state of the supercapacitor cell (the operating state of the balancing circuit), the power size of the power converter within the target time period is determined so that it can change with the changes of the supercapacitor cell, thereby improving the utilization rate of the electrical energy stored in the supercapacitor cell.
[0086] In one embodiment, based on the target power value, the external DC bus voltage and the working state of each balancing circuit in the target time period, determining the power size of the power converter in the target time period includes:
[0087] If any balancing circuit is in an enabled state during the target period, and the variance of the external DC bus voltage during the target period is less than or equal to the preset variance, the product of the proportional value and the target power value is used as the power size of the power converter during the target period, and the proportional value is determined by the variance of the external DC bus voltage during the target period;
[0088] If the balancing circuits are all in an enabled state during the target period, the power size of the power converter during the target period is determined according to the target operation data.
[0089] Among them, the proportional value can be set according to actual conditions. In the embodiment of the present application, the proportional value is less than 1.
[0090] Specifically, when the working state of the balancing circuit is enabled, it can be indicated that the supercapacitor module has a risk of overcharging or overdischarging. At this time, the charging power or discharging power of the power converter is reduced according to a proportional value; the proportional value k can be obtained by the following formula:
[0091] ;
[0092] in, Expressed as the variance of the external DC bus voltage; Expressed as the preset variance.
[0093] Exemplarily, when the working state of the balancing circuit is enabled during the target time period and the variance of the external DC bus voltage during the target time period is greater than the preset variance, the difference between the external DC bus voltage and the standard bus voltage at each moment during the target time period can be calculated. If the difference is greater than the preset difference, the operation is performed according to the target power value. If the difference is not greater than the preset difference, the operation is performed according to the product of the target power value and the proportional value. The preset difference can be set according to actual conditions and is not limited in the embodiments of the present application.
[0094] When the working states of all balancing circuits in the target time period are enabled, it indicates that overcharging or over-discharging is about to occur. At this time, the demand of the external DC bus is no longer considered, and the power size of the power converter in the target time period is determined directly according to the remaining charging capacity or remaining discharging capacity of each supercapacitor cell and the current operating voltage. Specifically, each supercapacitor cell can stop outputting after reaching the maximum or minimum cut-off voltage, and the integral value of the power size of the power converter in the target time period is not greater than the sum of the remaining charging capacity or the sum of the remaining discharging capacity of each supercapacitor cell.
[0095] In the embodiment of the present application, by considering the state of the external DC bus and combining the operating state of the supercapacitor cell (the operating state of the balancing circuit), the power size of the power converter within the target time period is determined so that it can change with the changes of the supercapacitor cell, thereby improving the utilization rate of the electrical energy stored in the supercapacitor cell.
[0096] S208, controlling the power converter based on the power flow direction and power size.
[0097] Specifically, after obtaining the power flow direction and power size, the control unit can modulate the corresponding duty cycle signal through a conventional logic circuit and send it to the gate of each switch tube in the power converter, thereby controlling the power converter.
[0098] It should be noted that the power flow direction can be determined by the external DC bus voltage.
[0099] In the power control method of the energy storage system, the working state of each balancing circuit in the target time period is determined according to the external DC bus voltage and the real-time operation data of each supercapacitor cell in the target time period, and the power flow direction and power size of the power converter in the target time period are determined according to the external DC bus voltage and the working state of each balancing circuit in the target time period, so as to realize the control of the power converter so that it can change with the change of the supercapacitor cell, thereby improving the utilization rate of the electric energy stored in the supercapacitor cell.
[0100] It should be understood that, although the various steps in the flowcharts involved in the above-mentioned embodiments are displayed in sequence according to the indication of the arrows, these steps are not necessarily executed in sequence according to the order indicated by the arrows. Unless there is a clear explanation in this article, the execution of these steps does not have a strict order restriction, and these steps can be executed in other orders. Moreover, at least a part of the steps in the flowcharts involved in the above-mentioned embodiments can include multiple steps or multiple stages, and these steps or stages are not necessarily executed at the same time, but can be executed at different times, and the execution order of these steps or stages is not necessarily to be carried out in sequence, but can be executed in turn or alternately with other steps or at least a part of the steps or stages in other steps.
[0101] Based on the same inventive concept, the embodiment of the present application also provides a power control device for an energy storage system for implementing the power control method for the energy storage system involved above. The implementation scheme for solving the problem provided by the device is similar to the implementation scheme recorded in the above method, so the specific limitations in the embodiments of the power control device for one or more energy storage systems provided below can refer to the limitations of the power control method for the energy storage system above, and will not be repeated here.
[0102] In an exemplary embodiment, as shown in FIG3 , a power control device 300 of an energy storage system is provided, which is applied to a control unit in the energy storage system. The energy storage system also includes a supercapacitor module, a sampling circuit, a balancing circuit and a power converter; the supercapacitor module includes a plurality of supercapacitor cells connected in series, each supercapacitor cell is connected in parallel with a sampling circuit, the sampling circuit is used to connect to an external DC bus, a balancing circuit is connected in parallel between every two adjacent supercapacitor cells, and a power converter is connected between the supercapacitor module and the external DC bus; the sampling circuit, the balancing circuit and the power converter are all connected to the control unit; the device 300 includes:
[0103] An acquisition module 301 is used to acquire the external DC bus voltage and real-time operation data of each supercapacitor cell within a target period;
[0104] A state determination module 302, for determining the working state of each balancing circuit within a target period according to the external DC bus voltage and real-time operation data;
[0105] The power determination module 303 is used to determine the power flow direction and power size of the power converter within the target period according to the external DC bus voltage and the working state of each balancing circuit within the target period;
[0106] The control module 304 is used to control the power converter based on the power flow direction and power size.
[0107] In one embodiment, the state determination module 302 is further configured to determine the target power value according to the difference between the preset bus voltage and the external DC bus voltage;
[0108] According to the target power value and the real-time operation data, the target operation data of each supercapacitor cell in the target period is obtained;
[0109] Based on the target operation data, the working status of each balancing circuit within the target time period is obtained.
[0110] In one embodiment, the target operation data includes a target power value; the state determination module 302 is further used to determine the integral corresponding to each supercapacitor cell within the target period according to the target power value, and the integral corresponding to the supercapacitor cell is used to characterize the operation state of each supercapacitor;
[0111] If the integral corresponding to the supercapacitor cell is not within the preset interval, the balancing circuit corresponding to the supercapacitor cell is enabled during the target period;
[0112] If the integral corresponding to the supercapacitor cell is within a preset interval, the balancing circuit corresponding to the supercapacitor cell is in a disabled state during the target period.
[0113] In one embodiment, the power determination module 303 is further configured to determine the target power value according to the difference between the preset bus voltage and the external DC bus voltage;
[0114] The power size of the power converter within the target time period is determined based on the target power value, the external DC bus voltage, and the working state of each balancing circuit within the target time period.
[0115] In one embodiment, the power determination module 303 is also used to determine the target power value as the power size of the power converter within the target time period when the variance of the external DC bus voltage within the target time period is greater than a preset variance and all balancing circuits within the target time period are in a disabled state.
[0116] In one embodiment, the power determination module 303 is further configured to use the product of the proportional value and the target power value as the power size of the power converter in the target period if any balancing circuit is in an enabled state in the target period and the variance of the external DC bus voltage in the target period is less than or equal to the preset variance, and the proportional value is determined by the variance of the external DC bus voltage in the target period;
[0117] If the balancing circuits are all in an enabled state during the target period, the power size of the power converter during the target period is determined according to the target operation data.
[0118] In one embodiment, the acquisition module 301 is further used to construct a prediction model for predicting the external DC bus voltage;
[0119] The voltage data in the historical period is input into the prediction model to obtain the external DC bus voltage in the target period, wherein the historical period is a period before the target period.
[0120] Each module in the power control device of the energy storage system can be implemented in whole or in part by software, hardware, or a combination thereof. Each module can be embedded in or independent of a processor in a computer device in the form of hardware, or can be stored in a memory in a computer device in the form of software, so that the processor can call and execute operations corresponding to each module.
[0121] In an exemplary embodiment, a control unit is provided, including a memory and a processor, wherein the memory stores a computer program, and the processor implements the steps of the above method when executing the computer program.
[0122] Specifically, as shown in FIG4 , the control unit 4 may include a processor 40, a memory 41, and a computer program 42 stored in the memory 41 and executable on the processor 40. When the processor 40 executes the computer program 42, the steps in the power control method embodiment of the energy storage system described above are implemented, such as the steps shown in FIG2 . Alternatively, when the processor 40 executes the computer program 42, the functions of the modules / units in the above-mentioned system embodiments are implemented, such as the functions of the modules shown in FIG3 .
[0123] Exemplarily, the computer program 42 may be divided into one or more modules / units, one or more modules / units are stored in the memory 41, and are executed by the processor 40 to implement the present invention. One or more modules / units may be a series of computer program instruction segments capable of implementing specific functions, and the instruction segments are used to describe the execution process of the computer program 42 in the control unit 4.
[0124] The control unit 4 may be a terminal or a server, and the control unit 4 may include, but is not limited to, a processor 40 and a memory 41. Those skilled in the art may understand that FIG4 is only an example of the control unit 4 and does not constitute a limitation on the control unit 4, and may include more or less components than shown in the figure, or combine certain components, or different components, for example, a terminal may also include input and output devices, network access devices, buses, etc.
[0125] The processor 40 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc.
[0126] The memory 41 may be an internal storage unit of the control unit 4, such as a hard disk or memory of the control unit 4. The memory 41 may also be an external storage device of the control unit 4, such as a plug-in hard disk, a smart media card (SMC), a secure digital (SD) card, a flash card, etc. equipped on the control unit 4. Further, the memory 41 may also include both an internal storage unit of the control unit 4 and an external storage device. The memory 41 is used to store computer programs and other programs and data required by the terminal. The memory 41 may also be used to temporarily store data that has been output or is to be output.
[0127] Exemplarily, the control unit may be a server, and the control unit (computer device) includes a processor, a memory, an input / output interface (Input / Output, referred to as I / O) and a communication interface. The processor, the memory and the input / output interface are connected via a system bus, and the communication interface is connected to the system bus via the input / output interface. The processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store external DC bus voltage and real-time operation data. The input / output interface of the computer device is used to exchange information between the processor and the external device. The communication interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, a power control method of an energy storage system is implemented.
[0128] The control unit can also be a terminal, and the control unit (computer device) includes a processor, a memory, an input / output interface, a communication interface, a display unit and an input device. Among them, the processor, the memory and the input / output interface are connected through a system bus, and the communication interface, the display unit and the input device are connected to the system bus through the input / output interface. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The input / output interface of the computer device is used to exchange information between the processor and the external device. The communication interface of the computer device is used to communicate with an external terminal in a wired or wireless manner, and the wireless manner can be implemented through WIFI, a mobile cellular network, near field communication (Near Field Communication, NFC) or other technologies. When the computer program is executed by the processor, a power control method of an energy storage system is implemented.
[0129] In an exemplary embodiment, an energy storage system is provided, which further includes a supercapacitor module, a sampling circuit, a balancing circuit and a power converter; the supercapacitor module includes a plurality of supercapacitor cells connected in series, each supercapacitor cell is connected in parallel with a sampling circuit, the sampling circuit is used to connect to an external DC bus, a balancing circuit is connected in parallel between every two adjacent supercapacitor cells, and the power converter is connected between the supercapacitor module and the external DC bus; the sampling circuit, the balancing circuit and the power converter are all connected to a control unit;
[0130] Wherein, the control unit is used to execute the steps of the above method.
[0131] Specifically, as shown in Figure 1, the energy storage system includes a supercapacitor module 11, a sampling circuit 12, a balancing circuit 13, a power converter 14 and a control unit 15; the supercapacitor module 11 includes a plurality of supercapacitor cells connected in series; each supercapacitor cell is connected in parallel with a sampling circuit 12; the energy storage system is also provided with a sampling circuit 12 connected to an external DC bus; a balancing circuit 12 is connected in parallel between every two adjacent supercapacitor cells; the power converter 14 is connected between the supercapacitor module 11 and the external DC bus; the sampling circuit 12, the balancing circuit 13 and the power converter 14 are all connected to the control unit 15.
[0132] Exemplarily, the power converter may be a DC / DC converter.
[0133] It should be noted that the sampling circuit 12 can be used to collect the real-time operating data of each supercapacitor cell and the operating data of the DC bus and send them to the control unit 15; the control unit can be an MCU (MicroController Unit), a single-chip microcomputer, etc., which is not limited here. The balancing circuit 13 can be used to balance the two connected supercapacitor cells according to the working state to avoid overcharging or overdischarging of the supercapacitor cells during the charging and discharging process.
[0134] In one embodiment, a computer-readable storage medium is provided, on which a computer program is stored. When the computer program is executed by a processor, the power control method of the energy storage system described above is implemented.
[0135] Exemplarily, as shown in FIG4 , a computer-readable storage medium may store a computer program 42, which includes program instructions. When the program instructions are executed by the processor 40, all or part of the processes in the above-mentioned embodiment method are implemented. The computer program 42 may also be used to instruct the relevant hardware to complete the process. The computer program 42 may be stored in a computer-readable storage medium. When the computer program 42 is executed by the processor 40, the steps of each of the above-mentioned method embodiments may be implemented. Among them, the computer program 42 includes computer program code, which may be in the form of source code, object code, executable file or some intermediate form. The computer-readable medium may include: any entity or device capable of carrying computer program code, recording medium, U disk, mobile hard disk, magnetic disk, optical disk, computer memory, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), electrical carrier signal, electrical signal and software distribution medium, etc.
[0136] The computer-readable storage medium may be an internal storage unit of the terminal of any of the foregoing embodiments, such as a hard disk or memory of the terminal. The computer-readable storage medium may also be an external storage device of the terminal, such as a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), etc. equipped on the terminal. Further, the computer-readable storage medium may also include both an internal storage unit of the terminal and an external storage device. The computer-readable storage medium is used to store computer programs and other programs and data required by the terminal. The computer-readable storage medium may also be used to temporarily store data that has been output or is to be output.
[0137] It should be noted that the data involved in this application (including but not limited to data used for analysis, stored data, displayed data, etc.) are all information and data authorized by the user or fully authorized by all parties, and the collection, use and processing of relevant data must comply with relevant regulations.
[0138] A person of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiment method can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided in the present application can include at least one of non-volatile memory and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetic random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM). The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. Non-relational databases may include distributed databases based on blockchains, etc., but are not limited to this. The processor involved in each embodiment provided in this application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, an artificial intelligence (AI) processor, etc., but are not limited to this.
[0139] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this application.
[0140] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.
Claims
1. A power control method for an energy storage system, characterized in that: A control unit applied to the energy storage system, wherein the energy storage system further comprises a supercapacitor module, a sampling circuit, a balancing circuit and a power converter; the supercapacitor module comprises a plurality of supercapacitor cells connected in series, each of the supercapacitor cells is connected in parallel with the sampling circuit, the sampling circuit is used to connect to an external DC bus, the balancing circuit is connected in parallel between every two adjacent supercapacitor cells, and the power converter is connected between the supercapacitor module and the external DC bus; the sampling circuit, the balancing circuit and the power converter are all connected to the control unit; the method comprises: Acquire the external DC bus voltage and real-time operation data of each supercapacitor cell within a target period; Determining the operating state of each of the balancing circuits within the target time period according to the external DC bus voltage and the real-time operation data; Determining the power flow direction and power size of the power converter within the target time period according to the external DC bus voltage and the working state of each of the balancing circuits within the target time period; Based on the power flow direction and the power magnitude, the power converter is controlled.
2. The method according to claim 1, characterized in that The determining the working state of each of the balancing circuits within the target time period according to the external DC bus voltage and the real-time operation data includes: Determining a target power value according to a difference between a preset bus voltage and the external DC bus voltage; According to the target power value and the real-time operation data, the target operation data of each supercapacitor cell within the target time period is obtained; Based on the target operation data, the working status of each of the balancing circuits within the target time period is obtained.
3. The method according to claim 2, characterized in that The target operation data includes the target power value; and obtaining the working state of each of the balancing circuits within the target time period based on the target operation data includes: Determine the integral corresponding to each of the supercapacitor cells within the target time period according to the target power value, where the integral corresponding to the supercapacitor cell is used to characterize the operating state of each of the supercapacitors; If the integral corresponding to the supercapacitor cell is not within the preset interval, the balancing circuit corresponding to the supercapacitor cell is in an enabled state within the target time period; If the integral corresponding to the super capacitor cell is within the preset interval, the balancing circuit corresponding to the super capacitor cell is in a disabled state during the target time period.
4. The method according to claim 2, characterized in that: Determining the power flow direction and power size of the power converter within the target time period according to the external DC bus voltage and the working state of each of the balancing circuits within the target time period includes: Determining a target power value according to a difference between a preset bus voltage and the external DC bus voltage; The power size of the power converter within the target time period is determined based on the target power value, the external DC bus voltage, and the working state of each of the balancing circuits within the target time period.
5. The method according to claim 4, characterized in that The determining the power of the power converter within the target time period based on the target power value, the external DC bus voltage, and the working state of each of the balancing circuits within the target time period includes: When the variance of the external DC bus voltage in the target time period is greater than a preset variance and all the balancing circuits in the target time period are in a disabled state, the target power value is determined as the power size of the power converter in the target time period.
6. The method according to claim 4, characterized in that The determining the power of the power converter within the target time period based on the target power value, the external DC bus voltage, and the working state of each of the balancing circuits within the target time period includes: If any of the balancing circuits is in an enabled state within the target period, and the variance of the external DC bus voltage within the target period is less than or equal to a preset variance, the product of a proportional value and the target power value is used as the power size of the power converter within the target period, and the proportional value is determined by the variance of the external DC bus voltage within the target period; If the balancing circuits are all in an enabled state during the target time period, the power size of the power converter during the target time period is determined according to the target operation data.
7. The method according to claim 1, characterized in that The step of obtaining the external DC bus voltage within the target time period includes: Constructing a prediction model for predicting the external DC bus voltage; The voltage data in a historical period is input into the prediction model to obtain the external DC bus voltage in the target period, wherein the historical period is a period before the target period.
8. A control unit, comprising a memory and a processor, wherein the memory stores a computer program, characterized in that: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 7 are implemented.
9. An energy storage system, characterized in that: The energy storage system further comprises a supercapacitor module, a sampling circuit, a balancing circuit and a power converter; the supercapacitor module comprises a plurality of supercapacitor cells connected in series, each of the supercapacitor cells is connected in parallel with the sampling circuit, the sampling circuit is used to connect to an external DC bus, the balancing circuit is connected in parallel between every two adjacent supercapacitor cells, and the power converter is connected between the supercapacitor module and the external DC bus; the sampling circuit, the balancing circuit and the power converter are all connected to the control unit; The control unit is used to execute the steps of the method according to any one of claims 1 to 7.
10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 7 are implemented.
Citation Information
Patent Citations
Heat dissipation from a balancing circuit for an ultracapacitor module
CN110770861A
Battery system with equalization management function
CN113489096A
Energy storage unit based on super capacitor
CN113824183A
Battery electric energy equalization circuit and method and energy storage system
CN114530910A
Super capacitor equalization circuit, control method, device and storage medium
CN115776156A
Cited By
Power control method and apparatus for energy storage system
WO2025260640A1
