Drainage equipment for dredging accumulated water on tunnel pavement and use method of drainage equipment

By using positioning technology that combines electric running wheels and detectors in the tunnel, combined with dredging measures of protective covers and impurity removal components, the problem of submerged sewer covers and blockages due to accumulated water in the tunnel has been solved, and effective drainage channel cleaning and dredging has been achieved. , improve drainage efficiency.

CN118757218AInactive Publication Date: 2024-10-11黄彦春
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410892154.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-04
Publication Date
2024-10-11
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

During heavy rainfall, the sewer cover is submerged by accumulated water in the tunnel. There is insufficient light and it is difficult to determine the location of the drain outlet, making it extremely difficult to clean the drain outlet. The sewer cover is clogged and cannot drain water.

Method used

A drainage equipment for tunnel road area water diversion is designed, including electric running wheels, protective covers, telescopic ropes, impurity removal components and circulation grilles. The position of the sewer cover is determined through the combination of detector vision and metal detection, and the protective cover moves and is pushed away The debris removal component deeply handles the remaining debris, and the top plate moves up and down repeatedly to unblock blocked drainage channels with hydraulic pressure.

Benefits of technology

It achieves accurate positioning and cleaning of sewer covers in tunnels with insufficient light, restores drainage functions, avoids water blockage, improves drainage efficiency, and reduces blockages caused by accumulation of debris.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118757218A_ABST
    Figure CN118757218A_ABST
Patent Text Reader

Abstract

The invention relates to the field of road ponding treatment, in particular to drainage equipment for dredging tunnel pavement ponding and a using method of the drainage equipment. The drainage equipment comprises electric walking wheels, a first linear driving part, a protective cover and an impurity removing assembly; a plurality of first linear driving pieces are mounted on the electric walking wheels; the moving parts of all the first linear driving pieces are jointly and fixedly connected with a protective cover. The protective cover is connected with a top plate; the top plate is connected with an impurity removal assembly for deeply treating impurities at the sewer cover. When the protective cover moves, a large number of sundries blocking the upper side of the sewer cover are pushed away rightwards, so that the upper portion of the sewer cover is not blocked by the sundries any more, and then the sewer cover can drain water normally.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of road waterlogging treatment, and in particular to a drainage device for dredging waterlogging on a tunnel road and a use method thereof. Background Art

[0002] During heavy rainfall, water on the ground continuously gathers to form a flow that flows toward the drain outlet, especially in the tunnel section. A large amount of rainwater pours down from the mountain above, mixed with various debris, and flows toward the road drain outlet with the accumulated water. It accumulates on the sewer cover of the drain outlet for a long time, causing blockage. The drain outlet is completely blocked, and the water level of the accumulated water continues to rise, submerging the sewer cover. At this time, if the debris is to be removed and dredged, it is difficult to determine the location of the drain outlet based on the direction of the water flow, which causes great difficulties in cleaning the drain outlet. In addition, the tunnel is not well lit, and it is difficult to find the drain outlet with reference to the surrounding environment, which aggravates the obstacles in finding the drain outlet.

[0003] When the inside of the drainage channel covered by the sewer cover is clogged, the accumulated water cannot be drained away even if there is no debris blocking the sewer cover. Summary of the invention

[0004] In order to overcome the shortcomings of insufficient light in the tunnel, accumulated water submerging the sewer cover, difficulty in determining the location of the drain outlet, great difficulty in cleaning the drain outlet, blockage inside the drainage channel, and inability to drain the accumulated water, the present invention provides a drainage device for dredging tunnel pavement water and a method of using the same.

[0005] The technical solution is as follows: A drainage device for draining water on a tunnel road surface, comprising an electric running wheel and a first linear drive component; a plurality of first linear drive components are mounted on the electric running wheel; further comprising a protective cover, a telescopic rope and a debris removal component; a protective cover is fixedly connected to the moving parts of all the first linear drive components; the first linear drive component drives the protective cover to move up and down; a rubber ring is provided on the lower side of the protective cover; three flow grids are provided on the protective cover; an inclined portion is provided on the protective cover; the protective cover is connected to a top plate; a debris removal component for deep treatment of debris at the sewer cover is connected to the top plate.

[0006] More preferably, the protective cover is trapezoidal in shape, and the side in contact with the road shoulder is made of a deformable material.

[0007] More preferably, a plurality of rollers are installed on the side of the protective cover in contact with the road shoulder.

[0008] More preferably, the debris removal component includes a second linear drive, a mounting box, a detector, a second electric push rod, a DD motor, a connecting shaft, a mounting frame, a spring telescopic rod and a cutting blade; a plurality of second linear drives are installed on the lower side of the top plate; the moving parts of all second linear drives are commonly fixed to the mounting box; a plurality of detection heads are respectively installed on the lower side of the mounting box; the detailed position of the sewer cover is determined by combining the vision of the detection heads and metal detection; a plurality of second electric push rods are arranged in the mounting box; the telescopic ends of all second electric push rods are commonly fixed to the DD motor; the rotating part of the DD motor is fixed to the connecting shaft; the connecting shaft passes through the lower side of the mounting box; the mounting frame is fixed to the lower side of the connecting shaft; a plurality of spring telescopic rods are fixed to the mounting frame; and a cutting blade is fixed to the telescopic end of each spring telescopic rod.

[0009] More preferably, a sealing ring is provided at the connection between the connecting shaft and the installation box.

[0010] More preferably, all the cutting blades are staggered as a whole.

[0011] More preferably, the impurity removal component further comprises blades; and a plurality of blades are fixedly connected to the connecting shaft.

[0012] More preferably, it also includes a first electric push rod and a baffle; a plurality of first electric push rods are installed on the protective cover; a plurality of baffles are slidably connected to the protective cover; a cutter is fixedly connected to the lower side of the baffle; the baffle covers the flow grid; and the baffle is fixedly connected to the output end of the first electric push rod.

[0013] More preferably, it also includes a third electric push rod and a rubber membrane; the top plate and the protective cover are slidably connected; a plurality of third electric push rods are installed on the protective cover; the telescopic ends of all third electric push rods are fixedly connected to the top plate; and a rubber membrane is fixedly connected between the protective cover and the top plate.

[0014] The method for using the drainage equipment for tunnel road surface water diversion includes the following steps:

[0015] Step 1: Remove debris, push away the large amount of debris accumulated on the surface of the sewer cover by moving the protective cover, and restore the basic drainage function of the sewer cover;

[0016] Step 2: Positioning: Use the visual detection function of the detector head and the metal detection function to determine the location of the manhole cover;

[0017] Step 3: Deep cleaning, the debris removal component deeply handles the debris remaining on the sewer cover;

[0018] Step 4: Unclogging: The top plate moves up and down repeatedly, so that the water pressure in the protective cover impacts the drainage channel, which plays the role of a toilet plug to unclog the blocked drainage channel.

[0019] The beneficial effects of the present invention are as follows: the present invention realizes that when the protective cover moves, a large amount of debris blocking the upper side of the sewer cover is pushed to the right, so that the upper part of the sewer cover is no longer blocked by the debris, and the sewer cover can drain water normally;

[0020] By timing the baffle to move downward, the lower cutter cuts off the debris wrapped around the flow grille, allowing the debris to move inward through the flow grille smoothly, avoiding accumulation on the outside of the flow grille and causing blockage;

[0021] The cutting blade is rotated to cut and crush the debris, and the small amount of debris remaining and entangled on the surface of the sewer cover is removed to avoid poor drainage effect;

[0022] The blades are driven to rotate by the connecting shaft, so that the water flows to the blades and gathers, and then is discharged through the sewer cover, which speeds up the drainage effect and stirs the water flow to prevent the broken debris from accumulating again and causing blockage;

[0023] By repeatedly moving the top plate up and down, the water pressure in the protective cover impacts the drainage channel, which plays a role like a toilet plug, clearing the blocked drainage channel to prevent the accumulation of water from being unable to drain away. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a schematic diagram of the three-dimensional structure of the drainage equipment for draining water on the tunnel road surface of the present invention;

[0025] Figure 2 A schematic diagram of a first three-dimensional structure of the baffle in an open state of the present invention;

[0026] Figure 3 A second three-dimensional structural schematic diagram of the baffle of the present invention in an open state;

[0027] Figure 4 is a cross-sectional view of the protective cover of the present invention;

[0028] Figure 5 It is a schematic diagram of the three-dimensional structure of the electric travel wheel and the protective cover combination of the present invention;

[0029] Figure 6 It is a three-dimensional structural schematic diagram of the installation box and the detection head combination of the present invention;

[0030] Figure 7 is a cross-sectional view of the installation box of the present invention;

[0031] Figure 8 It is a schematic diagram of the three-dimensional structure of the top plate of the present invention in a rising state;

[0032] Fig. 9 It is a schematic diagram of the three-dimensional structure of the third electric push rod and rubber membrane combination of the present invention.

[0033] Among them, the above-mentioned drawings include the following figure marks: 1-electric walking wheel, 2-protective cover, 2001-circulation grille, 2002-inclined part, 2003-top plate, 31-baffle, 4-installation box, 5-detection head, 101-first linear drive member, 102-first electric push rod, 103-second linear drive member, 21-second electric push rod, 22-DD motor, 23-connecting shaft, 24-mounting frame, 25-spring telescopic rod, 26-cutting disc, 27-blade, 41-third electric push rod, 42-rubber membrane, 1111-ground, 2222-shoulder, 3333-sewer cover. DETAILED DESCRIPTION

[0034] The present invention is further described below in conjunction with specific embodiments. It should also be noted that, unless otherwise clearly specified and limited, terms such as: setting, installing, connecting, and connecting should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0035] Example 1

[0036] like Figure 1-Figure 7 As shown, a drainage device for draining water on a tunnel road surface includes an electric running wheel 1 and a first linear driving member 101; two first linear driving members 101 are installed on the electric running wheel 1; the first linear driving member 101 is composed of an electric slide rail and a slider;

[0037] It also includes a protective cover 2, a telescopic rope and a debris removal component; the protective cover 2 is fixedly connected to the moving parts of all the first linear drive members 101; the first linear drive members 101 drive the protective cover 2 to move up and down; a rubber ring is arranged on the lower side of the protective cover 2 to ensure the sealing when the inside and outside of the protective cover 2 are isolated; three circulation grilles 2001 are arranged on the protective cover 2; the circulation grilles 2001 connect the inside and outside of the protective cover 2; an inclined portion 2002 is arranged on the lower side of the protective cover 2; a top plate 2003 is connected to the upper side of the protective cover 2; and a debris removal component is connected to the lower side of the top plate 2003.

[0038] The protective cover 2 is trapezoidal in shape, and the side in contact with the shoulder 2222 is made of deformable material. When the protective cover 2 moves left and right, the trapezoidal slope guides and pushes away the debris, avoiding excessive resistance caused by excessive debris in the left and right moving directions. At the same time, the long side of the deformable material deforms according to the shape of the shoulder 2222 during the movement to ensure fit.

[0039] A plurality of rollers are installed on the side of the protective cover 2 that contacts the road shoulder 2222 to reduce the friction between the rear side of the protective cover 2 and the front side of the road shoulder 2222 during movement.

[0040] The debris removal component includes a second linear drive member 103, a mounting box 4, a detector, a second electric push rod 21, a DD motor 22, a connecting shaft 23, a mounting frame 24, a spring telescopic rod 25 and a cutting blade 26; two second linear drives 103 are installed on the lower side of the top plate 2003; the second linear drive member 103 is composed of an electric slide rail and a slider; the moving parts of all second linear drives 103 are fixedly connected to the mounting box 4; two detection heads 5 are respectively installed on the lower side of the mounting box 4; the detailed position of the sewer cover 3333 is determined by combining the vision and metal detection of the detection heads 5; two second electric push rods 21 are arranged in the mounting box 4; the telescopic ends of all second electric push rods 21 are fixedly connected to the DD motor 22; the rotating part of the DD motor 22 is fixedly connected to the connecting shaft 23; the connecting shaft 23 passes through the lower side of the mounting box 4; the mounting frame 24 is welded to the lower side of the connecting shaft 23; a number of spring telescopic rods 25 are fixedly connected to the mounting frame 24; a cutting blade 26 is fixedly connected to the telescopic end of each spring telescopic rod 25.

[0041] A sealing ring is provided at the connection between the connecting shaft 23 and the installation box 4 to scrape off the sewage and impurities adhering to the surface of the connecting shaft 23 when the connecting shaft 23 moves upward, thereby preventing the sewage and impurities from being brought into the installation box 4 and causing failure of the electric components.

[0042] All the cutting blades 26 are staggered as a whole, so that when the debris is cut and crushed, the coverage area of ​​the processing area is ensured while the crushed debris can flow smoothly.

[0043] The debris removal component also includes blades 27; a plurality of blades 27 are welded on the connecting shaft 23 in a circular array; the connecting shaft 23 drives the blades 27 to rotate so that the water flow forms a vortex, speeds up drainage, and stirs the water flow to prevent debris from accumulating again and causing blockage.

[0044] When water accumulates in the tunnel and the drain outlet is completely blocked, due to insufficient light in the tunnel, the accumulated water submerges the sewer cover 3333, making it difficult to determine the location of the drain outlet, which causes great difficulties in cleaning the drain outlet.

[0045] When using, the staff will present the present invention as Figure 1 As shown, the protective cover 2 is in contact with the ground 1111 through the electric walking wheel 1, and the protective cover 2 is loaded with a battery to power the present invention. The rear side wall of the protective cover 2 fits the front side wall of the shoulder 2222, and the roller installed on the rear side of the protective cover 2 reduces the friction force between the rear side of the protective cover 2 and the front side of the shoulder 2222 during movement; the second linear drive member 103 is controlled to drive the protective cover 2 to move, so that the lower side of the protective cover 2 is close to the ground 1111 but does not contact the ground 1111.

[0046] The present invention below is based on moving to the right:

[0047] The electric walking wheel 1 drives the parts on it to move to the right. When the protective cover 2 moves to the right to the sewer cover 3333, it continues to move to the right, pushing a large amount of debris blocking the upper side of the sewer cover 3333 to the right, so that the top of the sewer cover 3333 is no longer blocked by debris, and the sewer cover 3333 can drain normally. The right side of the protective cover 2 is inclined. When the protective cover 2 moves to the right, it guides and pushes the debris forward to avoid excessive resistance in the rightward moving direction.

[0048] As the present invention continues to move to the right, the normal drainage function is restored at the sewer cover 3333. The drainage vortex formed at the sewer cover 3333 is detected by the visual detection function of the detection head 5. At the same time, the metal component of the sewer cover 3333 is detected by the metal detection function of the detection head 5, thereby determining the position of the sewer cover 3333. Then the detection head 5 sends a signal, and the electric walking wheel 1 stops moving. At this time, the sewer cover 3333 is surrounded by the protective cover 2. The protective cover 2 is successfully positioned to surround the sewer cover 3333, and a large amount of debris on the sewer cover 3333 has been pushed away and removed, and the sewer cover 3333 restores its normal drainage function.

[0049] After the protective cover 2 surrounds and positions the sewer cover 3333, the first linear drive component 101 is controlled to drive the protective cover 2 to move downward so that the lower side of the protective cover 2 is completely in contact with the ground 1111, so that the accumulated water cannot enter the interior through the lower side of the protective cover 2. At this time, the protective cover 2 surrounds the sewer cover 3333, and the accumulated water enters the protective cover 2 through the circulation grille 2001, while the impurities carried by the flowing accumulated water are blocked by the circulation grille 2001, thereby avoiding the sewer cover 3333 from being blocked again.

[0050] The above steps are used to determine the location of the sewer cover 3333, which facilitates subsequent work and prevents the sewer cover 3333 from being submerged by accumulated water and the inability to determine the location of the sewer cover 3333 based on the direction of the water flow, which causes great difficulties in cleaning the sewer cover 3333. At the same time, there is no need to find the sewer cover 3333 through reference objects and it is not affected by insufficient light in the tunnel.

[0051] When the accumulated water enters the protective cover 2 through the circulation grille 2001, a small amount of slender impurities pass through the circulation grille 2001. At the same time, due to the flow force of the accumulated water, the slender debris moves toward the sewer cover 3333 and is entangled on the sewer cover 3333. At the same time, due to the flow of the accumulated water, the debris is closely attached to the surface of the sewer cover 3333, affecting drainage.

[0052] At this time, the installation box 4 has been positioned at the center of the sewer cover 3333. In the initial state, the second electric push rod 21 is in a retracted state. When the protective cover 2 moves in the above steps, the lower side of the cutting blade 26 does not contact the ground 1111, and the DD motor 22 is controlled to start working, driving the connecting shaft 23 to rotate. The connecting shaft 23 drives the mounting frame 24, the spring telescopic rod 25 and the cutting blade 26 to rotate. At the same time, the second electric push rod 21 is controlled to be pushed downward, driving the DD motor 22 and its connecting parts to move to the sewer cover 3333, until the lower side of the cutting blade 26 contacts the debris remaining on the sewer cover 3333, and the cutting blade 26 rotates to cut and break the debris. The cutting blades 26 are crushed while the cutting blades 26 continue to move downward to ensure the cutting force and cutting depth. When the cutting blades 26 contact the sewer cover 3333, the upward extrusion force causes the spring telescopic rod 25 to contract, thereby preventing the cutting blades 26 from being excessively squeezed on the sewer cover 3333 and affecting the rotation. The cutting blades 26 are staggered. When the debris is cut and crushed, the coverage area of ​​the processing area is ensured while the crushed debris can flow smoothly. During the working process of the cutting blades 26, the crushed impurities are discharged through the sewer cover 3333 together with the accumulated water, thereby removing a small amount of debris remaining and entangled on the surface of the sewer cover 3333 to avoid poor drainage effect.

[0053] In addition, when the cutting blade 26 rotates to cut and crush the debris, the second linear drive member 103 is controlled to drive the installation box 4 to move back and forth left and right, thereby ensuring that the processing area of ​​the cutting blade 26 can completely cover the sewer cover 3333.

[0054] During the drainage process, the connecting shaft 23 drives the blades 27 to rotate so that the water flow forms a vortex. The rotation direction is to push the water flow upward, thereby guiding the accumulated water to gather at the location of the blades 27, and then draining it through the sewer cover 3333, thereby accelerating the drainage effect and stirring the water flow to prevent broken debris from accumulating again and causing blockage.

[0055] Example 2

[0056] On the basis of Example 1, Figure 1-Figure 3 As shown, it also includes a first electric push rod 102 and a baffle 31; six first electric push rods 102 are installed on the protective cover 2; three baffles 31 are slidably connected to the protective cover 2; a cutter is welded on the lower side of the baffle 31, and when the baffle 31 moves downward, the cutter cuts off the debris wrapped around the circulation grille 2001, so that the debris can pass through the circulation grille 2001 smoothly and move inward, avoiding accumulation on the outside of the circulation grille 2001 and causing blockage; the baffle 31 covers the circulation grille 2001; each baffle 31 is fixedly connected to the output ends of two first electric push rods 102 respectively.

[0057] When the protective cover 2 surrounds the sewer cover 3333 and intercepts the debris outside, the flow of accumulated water drives the debris to gather on the outside of the circulation grille 2001. The debris is entangled and stacked for a long time, causing the circulation grille 2001 to be blocked, affecting the drainage; during the drainage process, the first electric push rod 102 is controlled to drive all the baffles 31 to move downward to close the circulation grille 2001. At the same time, the cutter on the lower side of the baffle 31 cuts off the debris entangled on the circulation grille 2001, so that the debris can smoothly pass through the circulation grille 2001 and move inward. The large debris that cannot be cut off is squeezed away from the circulation grille 2001 by the inclined surface of the cutter, and the debris is dispersed with the help of the flow of accumulated water to avoid accumulation on the outside of the circulation grille 2001 and blockage.

[0058] Example 3

[0059] On the basis of Example 2, Figure 1 and Figure 8-Figure 9 As shown, it also includes a third electric push rod 41 and a rubber membrane 42; the top plate 2003 is slidably connected to the protective cover 2; four third electric push rods 41 are installed on the protective cover 2; the telescopic ends of all the third electric push rods 41 are fixedly connected to the top plate 2003; and the rubber membrane 42 is fixedly connected between the protective cover 2 and the top plate 2003.

[0060] During the drainage process, a small amount of debris enters the drainage channel under the sewer cover 3333 and causes the channel to be blocked. Even if the sewer cover 3333 is not blocked by debris, it still affects the drainage effect. Therefore, the present invention regularly dredges the drainage channel during the drainage process.

[0061] The following is the specific process:

[0062] The baffles 31 on both sides are controlled to move downward to close the protective cover 2. The front baffle 31 moves downward but does not completely close the flow grille 2001, providing a flow space for the accumulated water. As shown in the figure, the third electric push rod 41 is then controlled to quickly push upward to drive the top plate 2003 to move upward. When the top plate 2003 moves upward, the rubber film 42 is pulled to stretch and deform, thereby changing the space pressure inside the protective cover 2. At this time, the accumulated water outside the protective cover 2 is sucked into the protective cover 2 through the flow space reserved by the front flow grille 2001. Then the front baffle 31 is controlled to move upward to close the flow grille 2001. The plate 31 moves downward to completely close the corresponding flow grille 2001, so that the protective cover 2 is in a completely closed state. Then the third electric push rod 41 is controlled to drive the top plate 2003 to reset downward, thereby compressing the accumulated water in the protective cover 2, and the accumulated water rushes into the drainage channel. The debris in the drainage channel is impacted by water pressure, and the blocked debris is flushed away, so that the protective cover 2 plays a role of unclogging in the form of a toilet plug. This operation is repeated many times to dredge the blocked drainage channel, thereby avoiding the drainage channel being blocked and affecting the removal effect of the accumulated water.

[0063] The method for using the drainage equipment for tunnel road surface water diversion includes the following steps:

[0064] Step 1: removing debris, pushing away a large amount of debris accumulated on the surface of the sewer cover 3333 by moving the protective cover 2, and restoring the basic drainage function of the sewer cover 3333;

[0065] Step 2: Positioning, using the visual detection function of the detection head 5 in conjunction with the metal detection function to determine the location of the sewer cover 3333;

[0066] Step 3: Deep cleaning, the debris removal component deeply handles the debris remaining at the sewer cover 3333;

[0067] Step 4: Unblocking. The top plate 2003 moves up and down repeatedly, so that the water pressure in the protective cover 2 impacts the drainage channel, which plays the role of a toilet plug to dredge the blocked drainage channel.

[0068] The above embodiments are only for illustrating the technical concept and features of the present invention, and their purpose is to enable people familiar with the technology to understand the content of the present invention and implement it accordingly, and they cannot be used to limit the protection scope of the present invention. Any equivalent changes or modifications made according to the spirit of the present invention should be included in the protection scope of the present invention.

Claims

1. A drainage device for draining water from a tunnel road surface, comprising an electric running wheel (1) and a first linear drive member (101); a plurality of first linear drive members (101) are mounted on the electric running wheel (1); wherein: The invention also comprises a protective cover (2), a retractable rope and a debris removal component; the protective cover (2) is fixedly connected to the moving parts of all the first linear drive members (101); the first linear drive members (101) drive the protective cover (2) to move up and down; a rubber ring is arranged on the lower side of the protective cover (2); three flow grilles (2001) are arranged on the protective cover (2); an inclined portion (2002) is arranged on the protective cover (2); the protective cover (2) is connected to a top plate (2003); and a debris removal component for deep processing of debris at the sewer cover (3333) is connected to the top plate (2003).

2. A drainage device for draining water from a tunnel road surface according to claim 1, characterized in that: The protective cover (2) is trapezoidal in shape, and the side in contact with the road shoulder (2222) is made of a deformable material.

3. A drainage device for draining water from a tunnel road surface according to claim 2, characterized in that: A plurality of rollers are installed on the side of the protective cover (2) that contacts the road shoulder (2222).

4. A drainage device for draining water from a tunnel road surface according to claim 1, characterized in that: The impurity removal component comprises a second linear drive member (103), a mounting box (4), a detector, a second electric push rod (21), a DD motor (22), a connecting shaft (23), a mounting frame (24), a spring telescopic rod (25) and a cutting blade (26); a plurality of second linear drives (103) are mounted on the lower side of the top plate (2003); the moving parts of all second linear drives (103) are fixedly connected to the mounting box (4); a plurality of detection heads (5) are mounted on the lower side of the mounting box (4); and the detection heads (5) are combined with vision and metal detection to detect the impurities. The detailed position of the manhole cover (3333) is determined; a plurality of second electric push rods (21) are arranged in the installation box (4); the telescopic ends of all the second electric push rods (21) are fixedly connected to a DD motor (22); the rotating part of the DD motor (22) is fixedly connected to a connecting shaft (23); the connecting shaft (23) passes through the lower side of the installation box (4); the lower side of the connecting shaft (23) is fixedly connected to a mounting frame (24); a plurality of spring telescopic rods (25) are fixedly connected to the mounting frame (24); and a cutting piece (26) is fixedly connected to the telescopic end of each spring telescopic rod (25).

5. A drainage device for draining water from a tunnel road surface according to claim 4, characterized in that: A sealing ring is provided at the connection between the connecting shaft (23) and the installation box (4).

6. A drainage device for draining water from a tunnel road surface according to claim 4, characterized in that: All the cutting pieces (26) are arranged in a staggered manner as a whole.

7. A drainage device for draining water from a tunnel road surface according to claim 6, characterized in that: The impurity removal component also includes blades (27); a plurality of blades (27) are fixedly connected to the connecting shaft (23).

8. A drainage device for draining surface water on a tunnel road according to claim 7, characterized in that: It also includes a first electric push rod (102) and a baffle (31); a plurality of first electric push rods (102) are mounted on the protective cover (2); a plurality of baffles (31) are slidably connected to the protective cover (2); a cutter is fixedly connected to the lower side of the baffle (31); the baffle (31) covers the circulation grille (2001); and the baffle (31) is fixedly connected to the output end of the first electric push rod (102).

9. A drainage device for draining surface water on a tunnel road according to claim 8, characterized in that: It also includes a third electric push rod (41) and a rubber membrane (42); the top plate (2003) and the protective cover (2) are slidably connected; a plurality of third electric push rods (41) are mounted on the protective cover (2); the telescopic ends of all the third electric push rods (41) are fixedly connected to the top plate (2003); and the rubber membrane (42) is fixedly connected between the protective cover (2) and the top plate (2003).

10. A method for using a drainage device for draining water from a tunnel road surface, characterized by: The method of using the drainage device for tunnel road surface water diversion according to claim 9 comprises the following steps: Step 1: removing debris, by moving the protective cover (2) to push away a large amount of debris accumulated on the surface of the sewer cover (3333), thereby restoring the basic drainage function of the sewer cover (3333); Step 2: Positioning, the visual detection function of the detection head (5) cooperates with the metal detection function to determine the location of the sewer cover (3333); Step 3: Deep cleaning, the debris removal component deeply handles the debris remaining on the sewer cover (3333); Step 4: Unclogging: the top plate (2003) is repeatedly moved up and down, so that the water pressure in the protective cover (2) impacts the drainage channel, playing the role of unclogging in the form of a toilet plug, and unclogging the blocked drainage channel.