Large longitudinal slope water-rich high-water-pressure sand shale interbed shield rapid tunneling construction method

By grading and classifying complex strata, and matching construction parameters and methods based on stratum characteristics at different levels, the problem of construction parameter mismatch in the existing technology is solved, and the efficiency and safety of shield tunnel construction are improved, especially It is the construction effect in a complex and changeable environment with high water pressure.

CN118774849APending Publication Date: 2024-10-15THE THIRD ENG CO LTD OF THE HIGHWAY ENG BUREAU OF CCCC +2

Patent Information

Application Number
CN202410995880.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-24
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

Existing shield tunnel construction methods are difficult to adapt to complex and changeable strata with high water content, resulting in improper matching of construction parameters and affecting project quality and safety.

Method used

The rapid excavation construction method of interbedded sand and mudstone shields with large longitudinal slopes, rich in water and high hydraulic pressure, is used to grade and classify the strata, and match the construction parameters and methods based on the stratigraphic characteristics of different grades, including water inflow from drilling units, groundwater Pressure, sand-mudstone interbedded classification, end reinforcement methods such as freezing method, jet grouting pile, grouting reinforcement combination, etc., and the segment type is selected through the shield tail intelligent monitoring system.

Benefits of technology

It improves construction efficiency and safety, ensures the matching and applicability of construction parameters, reduces construction costs, and improves tunnel quality and safety, especially in extremely water-rich and high-water pressure environments.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118774849A_ABST
    Figure CN118774849A_ABST
Patent Text Reader

Abstract

The invention discloses a large-longitudinal-slope water-rich high-water-pressure sand shale interbed shield rapid tunneling construction method which comprises the following steps: S1, grading a water-rich high-water-pressure sand shale interbed, S2, preparing before shield launching and reinforcing an end stratum by adopting different combination methods, S3, setting shield tunneling thrust according to stratum characteristics and construction environment, and S4, performing shield tunneling. The method comprises the following steps: S1, tunneling thrust is set, S2, the tunneling speed is further set according to the tunneling thrust, S5, the synchronous grouting slurry type and proportion are divided according to the stratum grade, S6, the grouting pressure is controlled, S7, the grouting amount is controlled, S8, the shield tail gap is adjusted to control the shield posture, S9, duct piece type selection is conducted through an intelligent type selection system, and S10, duct piece deviation is controlled in the construction process. The water-rich high-water-pressure sand shale interbed grade division comprises water-rich grade division, water pressure grade division and sand shale interbed type division; through cooperative operation of the steps, the rapid shield tunneling construction method under complex construction conditions is formed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of shield tunnel engineering construction, and in particular to a shield rapid excavation construction method for a large longitudinal slope, water-rich, high-water-pressure sand-mudstone interlayer. Background Art

[0002] With the continuous development of modernization, the connection between cities and regions is becoming closer and closer. Focusing on the construction of transportation infrastructure and building an inter-city transportation network system are important factors in promoting modernization. Shield tunnels play a vital role in coping with modern urbanization and maintaining urban coherence. At present, the shield method is one of the mainstream methods of tunnel excavation. However, the geological conditions and construction environment traversed by shield tunnel projects are becoming more and more complex, such as complex and changeable strata and high water content in the strata. Especially when traversing complex and changeable strata with high water content, the adaptation of the shield synchronous grouting slurry to the stratum is the core factor to ensure the stability of the surrounding rock, control stratum deformation, and inhibit the floating effect of the pipe segment. The complex geological environment, combined with high-difficulty construction requirements such as long distance, large longitudinal slope, and large diameter, puts forward higher requirements for the rapid excavation of shield tunnels. How to complete the excavation safely and quickly and achieve a high level of engineering quality is an urgent problem to be solved in this field.

[0003] The existing shield tunnel construction methods have the following problems:

[0004] 1. Most shield tunnel construction methods are only applicable to single strata or strata with little stratum change, and do not require stratum division. Therefore, the division of strata with high water content and complex or variable strata is unclear.

[0005] 2. Synchronous grouting is a key technology in shield tunnel construction, and the selection of slurry is the key to synchronous grouting. However, the compatibility of synchronous grouting slurry with the stratum is still unclear.

[0006] 3. Segment selection is an important factor affecting the shield posture and the quality of the formed segments. At present, in shield construction, segment selection mainly relies on the construction experience of on-site construction personnel, which can easily lead to unreasonable and non-standard selection.

[0007] 4. For shield construction, shield excavation parameters are also a key issue. Therefore, it is necessary to optimize the shield excavation parameters for complex geological environments and complex construction requirements.

[0008] 5. Less attention has been paid to the matching of construction parameters and disaster management issues in highly water-rich and high-water-pressure strata, which can easily lead to mismatch of construction parameters under harsh construction conditions. Summary of the invention

[0009] The purpose of the present invention is to provide a shield rapid excavation construction method for large longitudinal slope water-rich and high-water pressure sand-mudstone interlayers. The method can realize the classification of water-rich and high-water pressure sand-mudstone interlayers and the classification of the construction methods corresponding to each grade. Rapid excavation can be carried out under complex construction conditions, thereby improving the safety and stability of the project and having a certain guiding role in actual projects.

[0010] A shield tunneling construction method for rapid excavation in interlayered sand and mudstone with large longitudinal slope, rich in water and high water pressure, characterized in that it comprises the following steps:

[0011] S1. Classification of interbedded sandstone and mudstone with high water pressure and rich water:

[0012] ① According to the unit water yield of the borehole (q), the water-richness of the aquifer is divided into:

[0013] Weak water-rich: q≤0.1L / (s·m);

[0014] Medium water content: 0.1L / (s·m)<q≤1.0L / (s·m);

[0015] Strong water-richness: 1.0L / (s·m)<q≤5.0L / (s·m);

[0016] Extremely water-rich: q>5.0L / (s·m);

[0017] Furthermore, weak water-richness and moderate water-richness are level 1 water-richness, and strong water-richness and extremely strong water-richness are level 2 water-richness.

[0018] ② According to the groundwater pressure (p), the aquifer water pressure is divided into:

[0019] Low water pressure: p<0.4MPa;

[0020] Medium water pressure: 0.4MPa <p≤0.6MPa;

[0021] High water pressure: 0.6MPa <p≤1.0MPa;

[0022] Extremely high water pressure: p>1.0MPa;

[0023] Furthermore, low water pressure and medium water pressure are Level I water pressure, and high water pressure and extremely high water pressure are Level II water pressure.

[0024] ③ Classify sandstone and mudstone interbedded strata according to the relative content of sandstone and mudstone in the strata:

[0025] Type I sandstone-mudstone interbeds (soft rock layers dominated by sandstone): sandstone content > 50%, mudstone content < 50%;

[0026] Type II sandstone-mudstone interlayers (hard rock layers dominated by mudstone): sandstone content <50%, mudstone content >50%.

[0027] ④ Combine ①, ②, and ③: Level 1 water-rich level I water pressure soft rock formation (A1B1C1), level 2 water-rich level II water pressure hard rock formation (A2B2C2), level 1 water-rich level II water pressure hard rock formation (A1B2C2), level 1 water-rich level II water pressure soft rock formation (A1B2C1), level 1 water-rich level I water pressure hard rock formation (A1B1C2), level 2 water-rich level I water pressure soft rock formation (A2B1C1), level 2 water-rich level II water pressure soft rock formation (A2B2C1), level 2 water-rich level I water pressure hard rock formation (A2B1C2).

[0028] S2. Before the shield machine starts excavation, the construction site is cleaned and the construction platform and support structure are built. Then, according to the classification of the strata in S1, the corresponding combination method is used to reinforce the starting end of the shield machine, which is characterized by:

[0029] ①A1B1C1: The end of the 1st level water-rich and Ⅰth level water pressure soft rock layer is reinforced by a combination of freezing and grouting reinforcement.

[0030] ②A1B1C2: The end of the water-rich and hydraulically hard rock formation of level 1 is reinforced by the combination of jet grouting piles and tunnel portal plain wall;

[0031] ③A1B2C2: The end of the water-rich and water-pressure hard rock formation of level 1 is reinforced by a combination of high-pressure jet grouting piles and grouting reinforcement;

[0032] ④A1B2C1: The first-level water-rich and second-level water-pressure soft rock formations are reinforced by a combination of high-pressure jet grouting piles, grouting reinforcement, and freezing method.

[0033] ⑤A2B1C1: The end of the 2nd level water-rich and Ⅰ-level water pressure soft rock formation is reinforced by a combination of double-tube high-pressure jetting piles and grouting reinforcement;

[0034] ⑥A2B1C2: The end of the 2nd level water-rich and Ⅰth level water pressure hard rock formation is reinforced by the combined method of tunnel portal plain wall, pipe bite pile and backward grouting;

[0035] ⑦A2B2C1: The end of the 2nd level water-rich Ⅱ-level water pressure soft rock layer is reinforced by a combination of triple-tube high-pressure jet grouting piles and vertical freezing method;

[0036] ⑧A2B2C2: The end of the 2nd level water-rich and 2nd level water pressure hard rock formation is reinforced by using triple-tube high-pressure rotary jet piles and vertical freezing combination method.

[0037] S3. Before the shield machine excavates, the thrust of the shield machine is set according to its geological and hydrological characteristics, longitudinal slope angle, soil arch effect of the reinforcement body at the starting end, and the bearing capacity of the reaction frame. Its characteristics are as follows:

[0038] ① When the longitudinal slope is between 1% and 3%, the shield thrust is set to: A1B1C2, A1B1C1: 11000-13000 kN, A2B1C1, A2B1C2: 8800-11000 kN, A1B2C1, A1B2C2: 8000-10000 kN, A2B2C1, A2B2C2: 6600-9000 kN.

[0039] ②When the longitudinal slope is greater than 3%, the shield thrust is set to: A1B1C2, A1B1C1: 10000-12000kN, A2B1C1, A2B1C2: 8000-10000kN, A1B2C1, A1B2C2: 7500-9000kN, A2B2C1, A2B2C2: 6000-8800kN.

[0040] S4. According to the setting of the thrust of the shield machine in S3, the tunneling speed of the shield machine is further set, and its characteristics are as follows:

[0041] ①When the longitudinal slope is 1%-3%, the average speed is set as: A1B1C2: 30-35mm / min, A1B1C1: 35-40mm / min, A2B1C2: 20-25mm / min, A2B1C1: 25-30mm / min, A1B2C2: 15-20mm / min, A1B2C1: 20-25mm / min, A2B2C2: 10-15mm / min, A2B2C1: 15-20mm / min;

[0042] ②When the longitudinal slope is greater than 3%, the average speed is set to: A1B1C2: 25-30mm / min, A1B1C1: 30-35mm / min, A2B1C2: 15-20mm / min, A2B1C1: 20-25mm / min, A1B2C2: 10-15mm / min, A1B2C1: 15-20mm / min, A2B2C2: 10-12mm / min, A2B2C1: 12-15mm / min.

[0043] S5. After completing the preliminary preparations and setting the parameters, the shield machine starts to excavate. During the excavation process, the gap between the segment lining and the soil layer needs to be grouted synchronously. In terms of the selection of slurry for synchronous grouting, different levels of strata are matched with different types of slurry according to the classification results in S1. The characteristics are:

[0044] (1) A1B1C1: 1st grade water-rich Ⅰ-water pressure soft rock formation, A1B1C2: 1st grade water-rich Ⅰ-water pressure hard rock formation, A1B2C2: 1st grade water-rich Ⅱ-water pressure hard rock formation, A1B2C1: 1st grade water-rich Ⅱ-water pressure soft rock formation, A2B1C1: 2nd grade water-rich Ⅰ-water pressure soft rock formation, A2B1C2: 2nd grade water-rich Ⅰ-water pressure hard rock formation all adopt single liquid slurry for synchronous grouting, and the slurry proportion is as follows:

[0045] ①A2B1C1, A2B1C2: water-cement ratio (water / ((cement + fly ash) 0.45-1.51, mortar-sand ratio (cement + fly ash) / sand aggregate) 0.22-1.30, water-swelling ratio (bentonite / water) 0.07-0.30, ash-powder ratio (cement / fly ash) 0.18-0.83;

[0046] ②A1B2C1, A1B2C2: water-cement ratio (water / ((cement + fly ash) 0.56-0.96, mortar-sand ratio (cement + fly ash) / sand aggregate) 0.39-0.82, water-swelling ratio (bentonite / water) 0.13-0.36, ash-powder ratio (cement / fly ash) 0.49-0.81;

[0047] ③A1B1C1, A1B1C2: water-cement ratio (water / ((cement + fly ash)) 0.31-1.28, mortar-sand ratio (cement + fly ash) / sand aggregate) 0.29-0.92, water-swelling ratio (bentonite / water) 0.11-0.70, ash-powder ratio (cement / fly ash) 0.11-0.62.

[0048] (2) A2B2C1: 2-level water-rich Ⅱ-level water pressure soft rock formation, A2B2C2: 2-level water-rich Ⅱ-level water pressure hard rock formation are both grouted with dual liquid slurry, and the slurry ratio is as follows:

[0049] ① The water-cement ratio of liquid A (water / cement) is 2.4-2.8, and the volume ratio (liquid A / liquid B) is 1-2.

[0050] S6. After the slurry ratio is determined according to S5, synchronous grouting is performed. During the synchronous grouting process, the grouting pressure is controlled, and the slurry pressure in the formation is required to be greater than the sum of the static water pressure and the soil pressure at that point. The characteristic is that the grouting pressure is the sum of the static water and soil pressure and the additional pressure, and the additional pressure is 0.2-0.35MPa. In addition, the secondary grouting pressure should be greater than the static water and soil pressure at the grouting outlet by 0.1MPa-0.2MPa, and controlled at 0.3-0.5MPa.

[0051] S7. During the synchronous grouting process, the grouting volume is controlled according to the excavation speed, characterized in that the grouting volume Q is equal to the product of the theoretical shield tail gap volume and the slurry injection rate, the theoretical shield tail gap volume is the difference between the cutter head area and the area of ​​the circle where the outer diameter of the segment is located multiplied by the segment ring width, and the rock formation injection rate is not less than 1.1. In addition, during the secondary grouting, pressure control is mainly used, grouting volume control is auxiliary, and dynamic adjustment is performed according to the leakage situation.

[0052] S8. When the shield machine's posture begins to deviate and the trend of deviation to one side gradually increases during the excavation process, the control system gradually increases the thrust on the deviation side and reduces the thrust on the other side to adjust the shield's posture. The upper gap of the shield tail is monitored to ensure that the shield's posture returns to normal. The distance of the shield tail gap is controlled to be:

[0053] ①A1B1C1, A1B1C2: 40-45mm;

[0054] ②A1B2C1, A1B2C2: 45-50mm;

[0055] ③A2B1C1, A2B1C2: 50-55mm;

[0056] ④A2B2C1, A2B2C2: 55-60mm.

[0057] S9. The shield tail intelligent monitoring system is used to monitor the shield attitude, excavation speed, formation characteristics, shield tail gap, cylinder stroke difference and other parameters. The monitored data and segment design parameters are used in the intelligent segment optimization system to select the best segment type.

[0058] S10. During the tunneling process of the shield machine, the gap between the shield machine shell and the soil layer is filled to prevent the circulating mud from leaking back, so that the synchronous grouting is fully filled, and the pipe segments are fixed in combination with the secondary grouting, so as to control the floating and horizontal deviation.

[0059] In S2, after the end reinforcement is completed, the shield machine is installed at the starting position for digging and debugged, and construction begins after debugging is completed and construction preparations are ready.

[0060] In S5, the grouting pump used for synchronous grouting is a fully hydraulic double-cylinder double-outlet piston grouting pump, the number of which is 2, and the grouting pipeline adopts a high-pressure rubber hose with an inner diameter of 50 mm and an ordinary steel pipe with an outer diameter of 50 mm.

[0061] In the S5, the components of liquid A are cement, bentonite dosage, stabilizer dosage, and water, and the components of liquid B are water glass.

[0062] In S5, the single-liquid grouting method: the shield machine excavation speed is adjusted according to the geological conditions of the formation, the slurry is transported to the grouting pipe through the grouting pump, and sprayed into the formation through the ejector. The double-liquid grouting method: the shield machine excavation speed is adjusted first, and then the mixture of liquid A and liquid B is transported to the grouting pipe through the grouting pump and sprayed into the formation through the ejector.

[0063] In S6, the slurry ratio used in the secondary grouting is the same as that of the synchronous grouting.

[0064] In S9, the intelligent segment optimization system consists of a parameter import module, a calculation module, and a selection decision module. The parameter import module automatically imports the shield posture, excavation speed, formation characteristics, shield tail gap, cylinder stroke difference, and other parameters through the shield tail intelligent monitoring system, and performs exhaustive calculations on all the selected points through the calculation module with the existing segment design parameters in the module. Finally, the selection decision module automatically performs weight evaluation based on the calculation results, and selects the optimal segment type with reference to the evaluation results.

[0065] In S10, the filling material is a fast-setting mud, and its material composition is: liquid A: bentonite, hydroxypropyl methylcellulose (HPMC), thickener, stabilizer, water, liquid B: water glass; the mixing ratio is: bentonite: HPMC: stabilizer: thickener: water

[0066] =1.8:0.005:1.2:0.01:4.75, water glass is 35-50L / m 3 .

[0067] In the above S4, the average excavation speed in the second type of strata may be greater than that in the first type of strata.

[0068] In S8, the posture of the shield machine is adjusted, and the deviation correction amount each time shall not exceed 5 mm.

[0069] Beneficial effects of the present invention:

[0070] 1. The present invention fully considers the problems of complex strata and complex construction environment during shield tunnel construction, so that in the face of different strata and different working conditions during the construction process, the construction method can be flexibly converted, avoiding the trouble of construction delays caused by mismatched construction methods and parameter combinations in complex strata and complex construction environments, greatly improving construction efficiency and reducing costs. The stratum level is divided in combination with the water-rich level, water pressure level, and sand-shale interlayer type, which has more advantages in distinguishing the construction method and parameter matching.

[0071] 2. The present invention classifies the strata and clearly points out the types of synchronous grouting slurries, slurry ratios, and methods for determining grouting parameters such as grouting pressure and grouting volume required for strata of different grades. Different grades of strata are matched with corresponding slurry types and ratios, which reduces some unnecessary troubles in slurry selection and makes the present invention more applicable to different strata. At the same time, it saves construction costs and improves construction efficiency and safety quality levels.

[0072] 3. The present invention monitors the construction parameters through the shield tail intelligent monitoring system, and uses the monitored data and segment design parameters to select the best segment type using the intelligent segment optimization system. This makes the selected segment more in line with the requirements of the construction site, avoids the shortcomings caused by the construction personnel's selection based on experience, and plays a certain role in ensuring the quality of the formed tunnel and the shield tunneling posture.

[0073] 4. The present invention optimizes the construction parameters of different strata by dividing the grades of water-rich and high-water-pressure sandstone and mudstone interlayers and combining them with construction parameters such as shield tunneling speed, shield tunneling posture, and shield tail gap, thereby greatly improving the construction efficiency, reducing unnecessary losses during the construction process, and improving the quality level of the formed tunnel, which has a certain reference role in actual engineering.

[0074] 5. The present invention has carried out coordinated matching and optimization of construction parameters such as shield end reinforcement combination method, synchronous grouting slurry, shield thrust, excavation speed and shield posture for strata with extremely strong water-richness, extremely high water pressure and other harsh construction environments, forming a shield rapid excavation construction method that can coordinate the various steps of this type of construction stratum, reducing the risk of construction in harsh environments. BRIEF DESCRIPTION OF THE DRAWINGS

[0075] Figure 1 This is a diagram of the construction steps for rapid shield tunneling;

[0076] Figure 2 This is a combination diagram of the end reinforcement methods;

[0077] Figure 3 This is the adaptation diagram for synchronous grouting slurry. DETAILED DESCRIPTION

[0078] The following implementation cases will clearly and completely demonstrate the concept, purpose, technical solution and effects of the present invention. Obviously, the implementation cases described are only some examples of the present invention, which are representative and can serve as a certain illustration of the present application.

[0079] Example

[0080] This embodiment provides a shield rapid tunneling construction method for interlayered sand and mudstone with large longitudinal slope, rich in water and high water pressure, which is characterized by comprising the following steps:

[0081] S1. First, based on the results of geological exploration, the water-rich and water-pressure of the aquifers are divided according to the unit water inflow (q) and groundwater pressure (p) of the boreholes. Secondly, the rock samples obtained by coring during geological exploration are tested experimentally to analyze the percentage of each type of rock, and the sand-mudstone interlayer formations are classified according to the relative content of sandstone and mudstone in the sand-mudstone interlayer. Finally, the water-rich level of the aquifer and the sand-mudstone interlayer are combined to determine that the starting section of the engineering construction stratum is A1B1C1, the middle section is A1B1C2, and the final section is A2B2C1.

[0082] S2. Before the shield machine starts excavation, the construction site is cleaned and the construction platform and support structure are built to reinforce the end using the combination of freezing method and grouting reinforcement method.

[0083] S3. When the longitudinal slope is between 1% and 3%, the thrust of A1B1C2 and A1B1C1 is controlled at 11000-13000KN, and the thrust of A2B2C1 is controlled at 6600-9000KN; when the longitudinal slope is greater than 3%, the thrust of A1B1C2 and A1B1C1 is controlled at 10000-12000KN, and the thrust of A2B2C1 is controlled at 6000-8800KN.

[0084] S4. When the longitudinal slope is 1%-3%, A1B1C2: the average speed is controlled at 30-35mm / min, A1B1C1: the average speed is controlled at 35-40mm / min, A2B2C1: the average speed is controlled at 12-15mm / min.

[0085] S5, A1B1C1 and A1B1C2 use single-liquid slurry for simultaneous grouting with the following proportions: water-cement ratio (water / ((cement + fly ash)) 0.31-1.28, mortar-sand ratio (cement + fly ash) / sand aggregate) 0.29-0.92, water swelling ratio (bentonite / water) 0.11-0.70, ash-powder ratio (cement / fly ash) 0.11-0.62; A2B2C1 uses double-liquid slurry for simultaneous grouting with the following proportions: A liquid water-cement ratio (water / cement) 2.4-2.8, volume ratio (A liquid / B liquid) 1-2.

[0086] S6. After the slurry ratio is determined according to S5, synchronous grouting is carried out. During the synchronous grouting process, the grouting pressure is controlled to ensure that the slurry pressure in the formation is greater than the sum of the static water pressure and soil pressure at that point. The grouting pressure is the sum of the static water and soil pressure and the additional pressure, and the additional pressure is 0.2-0.35MPa. The secondary grouting pressure is controlled at 0.3-0.5MPa.

[0087] S7. During the synchronous grouting process, the grouting volume should also be controlled. The grouting volume Q is equal to the product of the theoretical shield tail gap volume and the slurry injection rate. The theoretical shield tail gap volume is the difference between the cutter head area and the area of ​​the circle where the outer diameter of the segment is located multiplied by the segment ring width. The rock formation injection rate is not less than 110%.

[0088] S8. During the tunneling process of the shield machine, when the posture begins to deviate and the trend of shifting to one side gradually increases, the control system gradually increases the thrust on the offset side and reduces the thrust on the other side to adjust the shield posture. The upper gap of the shield tail is monitored to ensure that the shield posture returns to the normal state. A1B1C1, A1B1C2: control the shield tail gap to be maintained at 40-45mm, and A2B2C1 controls the shield tail gap to be maintained at 55-60mm.

[0089] S9. The shield tail intelligent monitoring system is used to monitor the shield attitude, excavation speed, formation characteristics, shield tail gap, cylinder stroke difference and other parameters. The monitored data and segment design parameters are used in the intelligent segment optimization system to select the best segment type.

[0090] S10. During the tunneling process of the shield machine, the gap between the shield machine shell and the soil layer is filled to prevent the circulating mud from leaking back, so that the synchronous grouting is fully filled, and the pipe segments are fixed in combination with the secondary grouting, so as to control the floating and horizontal deviation.

[0091] In addition to the above embodiments, the present invention may also have other implementation modes. Any technical solution formed by equivalent replacement or equivalent transformation falls within the protection scope required by the present invention.

Claims

1. A shield tunneling construction method for rapid excavation of interlayered sand and mudstone with large longitudinal slope, rich in water and high water pressure, characterized in that: The following steps are involved: S1. Classification of interbedded sandstone and mudstone with high water pressure and rich water: ① According to the unit water yield of the borehole (q), the water-richness of the aquifer is divided into: Weak water-rich: q≤0.1L / (s·m); Medium water content: 0.1L / (s·m)<q≤1.0L / (s·m); Strong water-richness: 1.0L / (s·m)<q≤5.0L / (s·m); Extremely water-rich: q>5.0L / (s·m); Furthermore, weak water-richness and moderate water-richness are level 1 water-richness, and strong water-richness and extremely strong water-richness are level 2 water-richness. ② According to the groundwater pressure (p), the aquifer water pressure is divided into: Low water pressure: p<0.4MPa; Medium water pressure: 0.4MPa <p≤0.6MPa; High water pressure: 0.6MPa <p≤1.0MPa; Extremely high water pressure: p>1.0MPa; Furthermore, low water pressure and medium water pressure are Level I water pressure, and high water pressure and extremely high water pressure are Level II water pressure. ③ Classify sandstone and mudstone interbedded strata according to the relative content of sandstone and mudstone in the strata: Type I sandstone-mudstone interbeds (soft rock layers dominated by sandstone): sandstone content > 50%, mudstone content < 50%; Type II sandstone-mudstone interlayers (hard rock layers dominated by mudstone): sandstone content <50%, mudstone content >50%. ④ Combine ①, ②, and ③: 1st level water-rich level I water pressure soft rock formation (A1B1C1), 2nd level water-rich level II water pressure hard rock formation (A2B2C2), 1st level water-rich level II water pressure hard rock formation (A1B2C2), 1st level water-rich level II water pressure soft rock formation (A1B2C1), 1st level water-rich level I water pressure hard rock formation (A1B1C2), 2nd level water-rich level I water pressure soft rock formation (A2B1C1), 2nd level water-rich level II water pressure soft rock formation (A2B2C1), 2nd level water-rich level I water pressure hard rock formation (A2B1C2). S2. Before the shield machine starts excavation, the construction site is cleaned and the construction platform and support structure are built. Then, according to the classification of the strata in S1, the corresponding combination method is used to reinforce the starting end of the shield machine, which is characterized by: ①A1B1C1: The end of the 1st level water-rich and Ⅰth level water pressure soft rock layer is reinforced by a combination of freezing and grouting reinforcement. ②A1B1C2: The end of the water-rich and hydraulically hard rock formation of level 1 is reinforced by the combination of jet grouting piles and tunnel portal plain wall; ③A1B2C2: The end of the water-rich and water-pressure hard rock formation of level 1 is reinforced by a combination of high-pressure jet grouting piles and grouting reinforcement; ④A1B2C1: The first-level water-rich and second-level water-pressure soft rock formations are reinforced by a combination of high-pressure jet grouting piles, grouting reinforcement, and freezing method. ⑤A2B1C1: The end of the 2nd level water-rich and Ⅰ-level water pressure soft rock formation is reinforced by a combination of double-tube high-pressure jetting piles and grouting reinforcement; ⑥A2B1C2: The end of the 2nd level water-rich and Ⅰth level water pressure hard rock formation is reinforced by the combined method of tunnel portal plain wall, pipe bite piles and backward grouting; ⑦A2B2C1: The end of the water-rich and water-pressure soft rock layer of level 2 is reinforced by a combination of triple-tube high-pressure jet grouting piles and vertical freezing method; ⑧A2B2C2: The end of the 2nd level water-rich and 2nd level water pressure hard rock formation is reinforced by using triple-tube high-pressure rotary jet piles and vertical freezing combination method. S3. Before the shield machine excavates, the thrust of the shield machine is set according to its geological and hydrological characteristics, longitudinal slope angle, soil arch effect of the reinforcement body at the starting end, and the bearing capacity of the reaction frame. Its characteristics are as follows: ① When the longitudinal slope is between 1% and 3%, the shield thrust is set to: A1B1C2, A1B1C1: 11000-13000 kN, A2B1C1, A2B1C2: 8800-11000 kN, A1B2C1, A1B2C2: 8000-10000 kN, A2B2C1, A2B2C2: 6600-9000 kN. ②When the longitudinal slope is greater than 3%, the shield thrust is set to: A1B1C2, A1B1C1: 10000-12000kN, A2B1C1, A2B1C2: 8000-10000kN, A1B2C1, A1B2C2: 7500-9000kN, A2B2C1, A2B2C2: 6000-8800kN. S4. According to the setting of the thrust of the shield machine in S3, the tunneling speed of the shield machine is further set, and its characteristics are as follows: ①When the longitudinal slope is 1%-3%, the average speed is set as: A1B1C2: 30-35mm / min, A1B1C1: 35-40mm / min, A2B1C2: 20-25mm / min, A2B1C1: 25-30mm / min, A1B2C2: 15-20mm / min, A1B2C1: 20-25mm / min, A2B2C2: 10-15mm / min, A2B2C1: 15-20mm / min; ②When the longitudinal slope is greater than 3%, the average speed is set to: A1B1C2: 25-30mm / min, A1B1C1: 30-35mm / min, A2B1C2: 15-20mm / min, A2B1C1: 20-25mm / min, A1B2C2: 10-15mm / min, A1B2C1: 15-20mm / min, A2B2C2: 10-12mm / min, A2B2C1: 12-15mm / min. S5. After completing the preliminary preparations and setting the parameters, the shield machine starts to excavate. During the excavation process, the gap between the segment lining and the soil layer needs to be grouted synchronously. In terms of the selection of slurry for synchronous grouting, different levels of strata are matched with different types of slurry according to the classification results in S1. The characteristics are: (1) A1B1C1: 1st grade water-rich Ⅰ-water pressure soft rock formation, A1B1C2: 1st grade water-rich Ⅰ-water pressure hard rock formation, A1B2C2: 1st grade water-rich Ⅱ-water pressure hard rock formation, A1B2C1: 1st grade water-rich Ⅱ-water pressure soft rock formation, A2B1C1: 2nd grade water-rich Ⅰ-water pressure soft rock formation, A2B1C2: 2nd grade water-rich Ⅰ-water pressure hard rock formation all adopt single liquid slurry for synchronous grouting, and the slurry proportion is as follows: ①A2B1C1, A2B1C2: water-cement ratio (water / ((cement + fly ash) 0.45-1.51, mortar-sand ratio (cement + fly ash) / sand aggregate) 0.22-1.30, water-swelling ratio (bentonite / water) 0.07-0.30, ash-powder ratio (cement / fly ash) 0.18-0.83; ②A1B2C1, A1B2C2: water-cement ratio (water / ((cement + fly ash) 0.56-0.96, mortar-sand ratio (cement + fly ash) / sand aggregate) 0.39-0.82, water-swelling ratio (bentonite / water) 0.13-0.36, ash-powder ratio (cement / fly ash) 0.49-0.81; ③A1B1C1, A1B1C2: water-cement ratio (water / ((cement + fly ash)) 0.31-1.28, mortar-sand ratio (cement + fly ash) / sand aggregate) 0.29-0.92, water-swelling ratio (bentonite / water) 0.11-0.70, ash-powder ratio (cement / fly ash) 0.11-0.

62. (2) A2B2C1: 2-level water-rich Ⅱ-level water pressure soft rock formation, A2B2C2: 2-level water-rich Ⅱ-level water pressure hard rock formation are both grouted with dual liquid slurry, and the slurry ratio is as follows: ① The water-cement ratio of liquid A (water / cement) is 2.4-2.8, and the volume ratio (liquid A / liquid B) is 1-2. S6. After the slurry ratio is determined according to S5, synchronous grouting is performed. During the synchronous grouting process, the grouting pressure is controlled, and the slurry pressure in the formation is required to be greater than the sum of the static water pressure and the soil pressure at that point. The characteristic is that the grouting pressure is the sum of the static water and soil pressure and the additional pressure, and the additional pressure is 0.2-0.35MPa. In addition, the secondary grouting pressure should be greater than the static water and soil pressure at the grouting outlet by 0.1MPa-0.2MPa, and controlled at 0.3-0.5MPa. S7. During the synchronous grouting process, the grouting volume is controlled according to the excavation speed, characterized in that the grouting volume Q is equal to the product of the theoretical shield tail gap volume and the slurry injection rate, the theoretical shield tail gap volume is the difference between the cutter head area and the area of ​​the circle where the outer diameter of the segment is located multiplied by the segment ring width, and the rock formation injection rate is not less than 1.

1. In addition, during the secondary grouting, pressure control is mainly used, grouting volume control is auxiliary, and dynamic adjustment is performed according to the leakage situation. S8. When the shield machine's posture begins to deviate and the trend of deviation to one side gradually increases during the excavation process, the control system gradually increases the thrust on the deviation side and reduces the thrust on the other side to adjust the shield's posture. The upper gap of the shield tail is monitored to ensure that the shield's posture returns to normal. The distance of the shield tail gap is controlled to be: ①A1B1C1, A1B1C2: 40-45mm; ②A1B2C1, A1B2C2: 45-50mm; ③A2B1C1, A2B1C2: 50-55mm; ④A2B2C1, A2B2C2: 55-60mm. S9. The shield tail intelligent monitoring system is used to monitor the shield attitude, excavation speed, formation characteristics, shield tail gap, cylinder stroke difference and other parameters. The monitored data and segment design parameters are used in the intelligent segment optimization system to select the best segment type. S10. During the tunneling process of the shield machine, the gap between the shield machine shell and the soil layer is filled to prevent the circulating mud from leaking back, so that the synchronous grouting is fully filled, and the pipe segments are fixed in combination with the secondary grouting, so as to control the floating and horizontal deviation.

2. According to claim 1, a shield tunneling construction method for rapid excavation of interlayered sand and mudstone with large longitudinal slope, rich in water and high water pressure, characterized in that: In S2, after the end reinforcement is completed, the shield machine is installed at the starting position for digging and debugged, and construction begins after the debugging is completed and the construction is ready.

3. According to claim 1, a shield tunneling method for rapid excavation of interlayered sand and mudstone with large longitudinal slope, rich in water and high water pressure, characterized in that: In S5, the grouting pump used for synchronous grouting is a fully hydraulic double-cylinder double-outlet piston grouting pump, the number of which is 2, and the grouting pipeline adopts a high-pressure rubber hose with an inner diameter of 50 mm and an ordinary steel pipe with an outer diameter of 50 mm.

4. According to claim 1, a shield tunneling construction method for rapid excavation of interlayered sand and mudstone with large longitudinal slope, rich water and high water pressure, characterized in that: In the S5, the components of liquid A are cement, bentonite dosage, stabilizer dosage, and water, and the components of liquid B are water glass.

5. According to claim 1, a shield tunneling construction method for rapid excavation of interlayered sand and mudstone with large longitudinal slope, rich in water and high water pressure, characterized in that: In S5, the single-liquid grouting method: the shield machine excavation speed is adjusted according to the geological conditions of the formation, the slurry is transported to the grouting pipe through the grouting pump, and sprayed into the formation through the ejector. The double-liquid grouting method: the shield machine excavation speed is adjusted first, and then the mixture of liquid A and liquid B is transported to the grouting pipe through the grouting pump and sprayed into the formation through the ejector.

6. According to claim 1, a shield tunneling construction method for rapid excavation of interlayered sand and mudstone with large longitudinal slope, rich in water and high water pressure, characterized in that: In S6, the slurry ratio used in the secondary grouting is the same as that of the synchronous grouting.

7. According to claim 1, a shield tunneling construction method for rapid excavation of interlayered sand and mudstone with large longitudinal slope, rich water and high water pressure, characterized in that: In S9, the intelligent segment optimization system consists of a parameter import module, a calculation module, and a selection decision module. The parameter import module automatically imports the shield posture, excavation speed, formation characteristics, shield tail gap, cylinder stroke difference, and other parameters through the shield tail intelligent monitoring system, and performs exhaustive calculations on all the selected points through the calculation module with the existing segment design parameters in the module. Finally, the selection decision module automatically performs weight evaluation based on the calculation results, and selects the optimal segment type with reference to the evaluation results.

8. According to claim 1, a shield tunneling construction method for rapid excavation of interlayered sand and mudstone with large longitudinal slope, rich water and high water pressure, characterized in that: In S10, the filling material is a fast-setting mud, and its material composition is: liquid A: bentonite, hydroxypropyl methylcellulose (HPMC), thickener, stabilizer, water, liquid B: water glass; the mixing ratio is bentonite: HPMC: stabilizer: thickener: water = 1.8: 0.005: 1.2: 0.01: 4.75, and the water glass is 35-50 L / m 3 .

9. According to claim 1, a shield tunneling construction method for rapid excavation of interlayered sand and mudstone with large longitudinal slope, rich water and high water pressure, characterized in that: In S4, the average excavation speed in the second type of strata may be greater than that in the first type of strata.

10. According to claim 1, a shield tunneling method for rapid excavation of interbedded sand and mudstone with large longitudinal slope, rich in water and high water pressure, characterized in that: In S8, the posture of the shield machine is adjusted, and the deviation correction amount each time shall not exceed 5 mm.

Citation Information

Patent Citations

  • Shield tunnel-entering construction method at stratum rich in water powder and soil powder sand

    CN102913250A

  • Method of earth pressure shield machine tunnelling in high efficiency in water-rich round gravel stratum

    CN104653191A

  • Shield novel inert slurry used for upper-soft and lower-hard water-rich stratum and combination grouting technology

    CN107842374A

  • Receiving construction method of near-river-section water-rich silt layer shield machine

    CN110344834A

  • Water-rich sand layer shield method construction subway station end reinforcing construction method