Grouting device and grouting method for internal-staggered-type staggered-layer coal mining method
Through the shaft tube and support structure of the internal staggered staggered position coal mining grouting device, the problem of dealing with gas associated with multiple coal seam fissures is solved, gas drainage and coal seam reinforcement are realized, and the stability and safety of the coal seam are improved.
Patent Information
- Application Number
- CN202411005252.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-25
- Publication Date
- 2024-10-15
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In the internal staggered-layer coal mining method, there are many cracks in the coal seam and the associated gas is difficult to effectively handle. Simple grouting reinforcement can easily lead to gas accumulation and leakage risks.
Design an internal staggered staggered layer coal mining method grouting device, including a shaft tube and a support frame. A hole is drilled through the shaft tube and the support frame is inserted into the opening position. The through-channel of the support frame is used for gas extraction and grouting reinforcement. , ensuring effective gas treatment and coal seam stability.
It improves the drilling efficiency and the support strength of coal seam reinforcement, prevents gas escape and accumulation, achieves effective use of gas and stable reinforcement of coal seams, and reduces the risk of gas leakage.
Smart Images

Figure CN118774882A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of coal mining equipment, and in particular relates to a grouting device for inner staggered layer coal mining and a grouting method thereof. Background Art
[0002] In the internal staggered layer mining method, the coal seam is deep underground and is affected by the ground stress, which may cause problems such as breakage and loosening. By drilling holes and grouting at the vertical side walls of the tunnel, the slurry solidifies to form anchor rods, thereby improving the overall stability of the vertical side walls of the tunnel.
[0003] In the Chinese patent with publication number CN113107544B, it is mentioned that multi-angle and all-round grouting reinforcement is realized inside the coal seam underground, so that the grouting effect inside the coal seam is more significant. However, for coal seams with many cracks that need to be reinforced, there is often associated gas in the cracks of the coal seams. During and after the grouting reinforcement, the associated gas needs to be processed. Simple grouting can only block the gas and cause it to accumulate. Excessive gas accumulation can easily cause hidden dangers such as gas leakage. Summary of the invention
[0004] The technical problem to be solved by the present invention is to overcome the disadvantages of the above-mentioned prior art and provide a grouting device and a grouting method for internal staggered layer coal mining.
[0005] The technical solution adopted to solve the above technical problems is:
[0006] An internal staggered staggered layer coal mining method grouting device, comprising a frame, a power source, a pumping assembly and a driving structure, wherein the pumping assembly and the driving structure are conductively connected, the frame can lift one end of the driving structure, an axle tube is rotatably mounted on the end of the driving structure, and a mounting bracket can be inserted in the axle tube;
[0007] The shaft tube comprises a tube body, a drill bit is installed at an opening at one end of the tube body away from the driving structure, a notch communicating with the opening is provided on a circumferential side wall of the tube body, and a support seat is provided on the side of the frame away from the driving structure;
[0008] The support frame includes a middle tube, and the circumferential side wall of the middle tube is installed with support blocks arranged in a ring array. Two side plates are connected between the support blocks on the same side along the axial direction of the middle tube, and a through channel connected to the middle tube is formed between the two side plates.
[0009] Furthermore, there are three notches, which are arranged in a circular array on the circumferential side wall of the tube body, the support blocks are arranged equidistantly along the notches, and the side plates are fixedly connected to the support blocks and the circumferential side wall of the middle tube to form a three-pointed star structure.
[0010] Furthermore, the end of the side plate is fixedly connected to the circumferential side wall of the middle tube, the width of the side plate is greater than the radius of the drill bit, and the end of the side plate away from the middle tube is sharpened to form a wedge head.
[0011] Furthermore, a material passing gap is formed between the outer wall of the side plate and the inner wall of the notch, a detachable liner is built into the through channel, the outer diameter of the middle tube is smaller than the inner diameter of the tube body, a plugging cap is provided at the port of the middle tube facing the pumping component, the length of the middle tube is greater than the length of the side plate, and the middle tube and the side plate are flush with each other at one end away from the pumping component.
[0012] Furthermore, the support seat includes a vertical rod, a support block in the shape of a third of a circular ring is arranged on the top of the vertical rod, the support block is arranged coaxially with the tube body, two pressure blocks in the shape of a third of a circular ring are hingedly installed at both ends of the support block, and a pin rod is arranged at one end of the two pressure blocks close to each other.
[0013] Furthermore, an end ring is installed at one end of the side plate close to the pumping assembly, and the end ring is installed at the side plate farthest from the middle pipe. Side frames are installed between adjacent side plates. The distance between the side frame and the middle pipe is greater than the outer diameter of the pipe body, and a clamping nut is installed through the middle of the side frame.
[0014] Furthermore, a clamping groove is provided on the end surface of the opening of the tube body, and the drill bit is clamped with the tube body through the clamping groove. The drill bit and the tube body are plug-fitted and assembled, and the drill bit and the tube body are connected by bolts.
[0015] Furthermore, the pumping assembly includes a conversion valve, which is a three-way reversing valve. Two inlet ends of the conversion valve are connected to a water tank and a slurry tank respectively, and the outlet end of the conversion valve is connected to a delivery pipe.
[0016] Furthermore, the driving structure includes a linear module, a rotating driving member is installed at the end of the linear module, a driving tube is installed at the rotating driving member on the tube body, a relay tube is connected between the driving tube and the tube body, and the driving tube is conductively connected to the pumping assembly.
[0017] Furthermore, a grouting method for internal staggered layer mining method, using a concrete reinforced grouting device, comprises the following steps:
[0018] S1. Use the frame to align the shaft tube vertically with the coal seam where a hole needs to be drilled. The driving structure drives the shaft tube and the drill bit to rotate and translate to perform drilling operations. During the process, the generated debris will be pushed outward by the notch of the shaft tube;
[0019] S2. After the hole reaches the predetermined depth, the driving structure pulls the shaft tube out from the hole position, removes the drill bit from the opening of the shaft tube, and installs the support frame coaxially along the notch in the middle of the shaft tube. The driving structure drives the shaft tube to insert the support frame into the hole position, and the side plate end of the support frame is interference-embedded in the inner wall of the hole to reinforce the hole position;
[0020] S3. The driving structure extracts the shaft tube from the opening position, and uses an external negative pressure pump to penetrate into the overhead space of the support frame, and extracts the gas contained in the coal seam through the opening. During the extraction process, drilling operations can be carried out at subsequent positions;
[0021] S4. After all the hole opening work, support frame retention work and gas extraction work are completed, the driving structure inserts the shaft pipe from the hole opening position, and provides slurry to the shaft pipe through the pumping assembly. The slurry fills the gap between the inner wall of the hole and the support frame. After the slurry solidifies, the reinforcement work is completed;
[0022] S5. The support frame is left at the opening, and the middle pipe of the support frame can be connected through an external negative pressure pump to regularly extract the gas contained in the coal seam through the through channel.
[0023] Through the above technical solution, the beneficial effects of the present invention are as follows:
[0024] (1) The present invention provides a shaft tube and a support frame. The shaft tube connects the drill bit and the driving structure, so that the drilling operation can be carried out. The broken coal is guided away from the drill bit through the notch on the circumferential side wall of the shaft tube, thereby improving the drilling efficiency. After drilling, the star-shaped support frame is left at the drilling position to strengthen the support of the tunnel. The space formed by the support frame is used to extract gas from the coal seam, thereby preventing a large amount of gas between the coal seams from escaping into the tunnel in the early stage of drilling. At the same time, the gas is effectively utilized.
[0025] (2) The present invention optimizes the support frame, and provides a wedge head on the circumferential side wall of the support frame. When the support frame is retained, the support frame is placed in the notch of the shaft tube, and the support frame with interference design is wedged into the opening through the shaft tube to provide stable support for the opening position, and the gap between the outer wall of the support frame and the inner wall of the opening is grouted to improve the support strength and seal the opening position. The support frame is wedged into the through channel at the coal seam to regularly extract deep gas and prevent gas from accumulating between coal seams in the later stage. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a first perspective structural diagram of the present invention;
[0027] Figure 2 It is a second viewing angle structural diagram of the present invention;
[0028] Figure 3 It is a third perspective structural diagram of the present invention;
[0029] Figure 4 It is a schematic diagram of the position of the shaft tube and its connected structure of the present invention;
[0030] Figure 5 It is a schematic diagram of the position between the shaft tube and the support frame of the present invention;
[0031] Figure 6 is a schematic cross-sectional view between the shaft tube and the support frame of the present invention;
[0032] Figure 7 is a schematic cross-sectional view between the shaft tube and the support frame of the present invention;
[0033] Figure 8 It is a schematic diagram of the state of the present invention during the hole opening process;
[0034] Fig. 9 It is a schematic diagram of the state of the present invention during the process of stent placement;
[0035] Fig.10 It is a schematic diagram of the state of the present invention after the stent is placed.
[0036] Figure numerals: 1. frame; 11. main body; 12. swing frame; 13. lifting mechanism; 2. pumping assembly; 21. conversion valve; 22. water tank; 23. slurry tank; 24. delivery pipe; 3. driving structure; 31. linear module; 32. rotary drive member; 4. shaft tube; 41. tube body; 42. notch; 43. support seat; 44. drill bit; 45. relay tube; 46. driving tube; 5. support frame; 51. middle tube; 52. side plate; 53. through channel; 54. support block; 55. wedge head; 56. end ring; 57. side frame; 58. plugging cap; 59. liner; 6. power source. DETAILED DESCRIPTION
[0037] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0038] like Figure 1-Figure 10 As shown, this embodiment provides an internal staggered staggered layer coal mining method grouting device, including a frame 1, a power source 6, a pumping assembly 2 and a driving structure 3. The frame 1 provides an installation space, the power source 6 is a generator, and can provide electrical energy for the pumping assembly 2 and the driving structure 3. The pumping assembly 2 and the driving structure 3 are connected, and the pumping assembly 2 is used to provide slurry. When it is necessary to drill holes on the side walls of the tunnels at different heights, the frame 1 can lift one end of the driving structure 3. For details, refer to Figure 2The bottom of the main body 11 has a deer hole, which can be flexibly adjusted in angle and position. A swing frame 12 is hingedly installed in the middle of the main body 11. The left end of the swing frame 12 is rotatably connected to the main body 11. A lifting mechanism 13 is installed between the right end of the swing frame 12 and the main body 11. The lifting mechanism 13 can be extended to lift the right end of the swing frame 12, so as to perform flexible multi-angle drilling;
[0039] The practical problem solved by this scheme is how to achieve gas extraction while drilling and reinforcement. Figure 3 The end of the driving structure 3 is rotatably mounted with a shaft tube 4, which is arranged horizontally and can transmit a rotational driving force. The shaft tube 4 can be inserted into the bracket 5 for installation. After drilling, the shaft tube 4 can be used to complete the auxiliary installation of the bracket 5;
[0040] For the shaft tube 4, refer to Figure 4 The shaft tube 4 includes a tube body 41, which is designed to be through-through on the left and right. When drilling, a drill bit 44 is installed at the opening of the tube body 41 away from the driving structure 3. The driving structure 3 drives the drill bit 44 to rotate and translate through the tube body 41 to complete the drilling operation. During the drilling process, a notch 42 connected to the opening is provided on the circumferential side wall of the tube body 41. The drill bit 44 will produce debris during operation. When the tube body 41 rotates, the debris can be pushed and thrown through the notch 42 and discharged outward. The debris can temporarily enter the internal space of the tube body 41 to avoid the debris gathering around the drill bit 44 and causing the debris to affect the rotation of the drill bit 44, thereby ensuring the drilling efficiency. The frame 1 is located on the side away from the driving structure 3 and is provided with a support seat 43. The support seat 43 can support the right end of the shaft tube 4 in the early stage of drilling to ensure that the shaft tube 4 can drive the drill bit 44 to rotate stably, thereby avoiding the weight of the drill bit 44 causing the right end of the shaft tube 4 to sag and cause drilling to get stuck.
[0041] For support frame 5, refer to Figure 5-Figure 7 After the drilling is completed, the tube body 41 is pulled out from the opening position, the drill bit 44 is removed, and the inside of the tube body 41 is cleaned. Then, the support frame 5 can be installed in the tube body 41, and the tube body 41 is driven by the driving structure 3 to translate the support frame 5 into the opening to support the opening position. For details, refer to Figure 6 The support frame 5 includes a middle tube 51, the left end of the middle tube 51 is open and the right end is sealed, and the circumferential side wall of the middle tube 51 is installed with support blocks 54 arranged in a ring array, and the support blocks 54 protrude from the circumferential side wall of the middle tube 51, and two side plates 52 are connected axially between the support blocks 54 on the same side of the middle tube 51, and the two side plates 52 are squeezed at the inner wall of the opening away from one end of the middle tube 51, so as to realize overhead support. At the same time, a through channel 53 interconnected with the middle tube 51 is formed between the two side plates 52. By connecting a negative pressure pump to the left end of the middle tube 51, the inside of the opening can be evacuated through the through channel 53, so that the gas in the coal seam at the opening position can be extracted, and the support frame 5 is used to realize gas extraction and utilization;
[0042] After the support frame 5 is retained, the pumping component 2 can be used to provide slurry to the pipe body 41. The slurry enters the inside of the pipe body 41 and can fill the overhead space between the outer wall of the support frame 5 and the inner wall of the opening to seal and reinforce the opening position. The coal seam gap can also be grouting reinforced, and then the pipe body 41 is pulled out to end the grouting operation. It should be noted that after the slurry solidifies, the through channel 53 is still in a conductive state. During the coal mining process, the middle pipe 51 can still be connected to a negative pressure pump for regular gas extraction. For coal mine environments with high gas concentrations, efficient gas extraction and utilization can be carried out, and the gas concentration in the tunnel can be effectively controlled.
[0043] In a further embodiment, in order to ensure the conduction of the through channel 53 after grouting, refer to Figure 6 A material passing gap is formed between the outer wall of the side plate 52 and the inner wall of the notch 42. Because the outer diameter of the tube body 41 is smaller than the outer diameter of the drill bit 44, and the inner diameter of the opening is also larger than the inner diameter of the tube body 41, during grouting, the slurry inside the tube body 41 can enter the gap between the outer wall of the tube body 41 and the inner wall of the opening through the material passing gap. For multiple unconnected coal seam gaps along the radial direction of the opening, synchronous grouting can be performed, so that the slurry is not blocked by the tube body 41 and can quickly enter multiple independent gaps between the coal seams, thereby improving the grouting efficiency. A detachable liner 59 is built into the through channel 53. The liner 59 blocks the through channel 53 during grouting to prevent the slurry from entering the through channel 53 and solidifying to cause blockage. In addition, the liner 59 is made of flexible rubber material and is connected in series with each other. As a whole, it can be deformed and pulled out from the port of the middle pipe 51 to open the through channel 53 and facilitate the subsequent gas extraction. It should be noted that the outer diameter of the middle pipe 51 is smaller than the inner diameter of the tube body 41, and a larger gap can be left to facilitate the flow of slurry in the tube body 41. A plugging cap 58 is provided at the port of the middle pipe 51 opposite to the pumping component 2. The plugging cap 58 prevents the slurry from entering from the port of the middle pipe 51 and prevents the through channel 53 from being blocked by the slurry. Specifically, the length of the middle pipe 51 is greater than the length of the side plate 52. At the same time, the middle pipe 51 and the side plate 52 are flush with each other at one end away from the pumping component 2. After the support frame 5 is retained, the middle pipe 51 has a protruding opening design and will not be completely sealed in the opening by the slurry, which can facilitate the subsequent connection with an external negative pressure pump.
[0044] In a further embodiment, a specific configuration of the shaft tube 4 and the support frame 5 is provided, referring to Figure 6There are three notches 42, and the three notches 42 are opened in a circular array on the circumferential side wall of the tube body 41, so as to form three through openings with equal distances. When installing the support frame 5, the support blocks 54 are arranged equidistantly along the notches 42. At the same time, the side plates 52 are fixedly connected with the support blocks 54 and the circumferential side walls of the middle tube 51 to form a three-pointed star structure. One of the three notches 42 is located directly above the tube body 41, and the other two are symmetrically arranged front and back at the oblique lower position of the tube body 41. When the side plates 52 and the support blocks 54 are inserted into the notches 42, the support frame 5 is erected in the two notches 42 at the lower part of the shaft tube 4 by using the side plates 52, and the support frame 5 is suspended and limited to ensure that the shaft tube 4 and the support frame 5 can be coaxial, and then can be smoothly inserted into the opening along the original path without secondary alignment, thereby improving the installation efficiency of the support frame 5.
[0045] In a further embodiment, in order to stably retain the support frame 5, refer to Figure 6 and Figure 7 When the shaft tube 4 and the support frame 5 are inserted into the opening, the end of the side plate 52 is fixedly connected to the circumferential side wall of the middle tube 51, which can ensure the stability of the position of the support frame 5 and avoid deviation. At the same time, the width of the side plate 52 is greater than the radius of the drill bit 44, which can ensure that during the insertion of the support frame 5 into the opening, the side plate 52 is interference-embedded in the inner wall of the opening to a certain depth, which can improve the support stability. In addition, the side plate 52 is sharpened at one end away from the middle tube 51 to form a wedge head 55. The contact area between the wedge head 55 and the inner wall of the opening is small, which reduces the resistance of the interference embedding, increases the embedding depth of the support frame 5, and ensures smooth insertion.
[0046] In a further embodiment, in order to adapt to the stable retention of the support frame 5 of different lengths, refer to Figure 7 When the depth of the hole changes, different lengths of supports 5 can be used, but the length of the notch 42 on the side wall of the tube body 41 will not change. Therefore, side frames 57 are installed between adjacent side plates 52. The distance between the side frames 57 and the middle tube 51 is greater than the outer diameter of the tube body 41. A clamping nut is installed through the middle of the side frame 57. In this way, after the support frame 5 is coaxially inserted into the tube body 41, the clamping nut is rotated to squeeze and fix the circumferential side wall of the tube body 41, so that the left end of the support frame 5 can be fixed. After that, the tube body 41 can be moved to the right to drive the support frame 5 to be inserted into the hole synchronously. After the insertion is in place, the clamping nut can be loosened to complete the separation, and the tube body 41 can be pulled out separately. At the same time, an end ring 56 is installed at one end of the side plate 52 close to the pumping component 2. The end ring 56 is installed at the farthest point from the middle tube 51 of the side plate 52. A blind hole can be opened in the side wall of the tunnel corresponding to the middle hole position of the end ring 56, and an expansion bolt can be installed in the end ring 56 to assist in fixing the support frame 5 before the slurry solidifies.
[0047] In a further embodiment, in order to adapt to the adaptive support of the shaft tube 4 and the support frame 5, refer to Figure 4 and Figure 5The support seat 43 includes a vertical rod, which is fixedly connected to the frame 1. A support block with a third of a circular ring shape is arranged on the top of the vertical rod. The support block can avoid the notch 42 position of the shaft tube 4. When drilling, refer to Figure 4 The support block is coaxially arranged with the tube body 41, and two pressure blocks of a third of a circular ring shape are hingedly installed at both ends of the support block. A pin is arranged at one end of the two pressure blocks close to each other. The two pressure blocks swing upward and are connected by the pin. The tube body 41 can be fully wrapped and the rotating tube body 41 can be stably limited. When the support frame 5 is retained, refer to Figure 5 The tube body 41 does not rotate but only translates, driving the support frame 5 to translate. The support block frame supports the lower part of the tube body 41, and the two pressing blocks swing downward and away from each other to avoid the forward path of the support frame 5, thereby realizing smooth translation and pushing of the support frame 5.
[0048] In a further embodiment, referring to Figure 4 and Figure 5 A clamping groove is provided on the end face of the opening of the tube body 41, and a corresponding convex key is also provided on the left end of the drill bit 44, so that the drill bit 44 is clamped with the tube body 41 through the clamping groove, and a plug is provided on the left end of the drill bit 44, and the outer diameter of the plug is smaller than the inner diameter of the tube body 41, so that plug-in assembly can be performed. After plug-in, the drill bit 44 and the tube body 41 are connected by bolts, which can be stably pressed and prevented from falling off, and the drill bit 44 can be removed by reversing the bolts, so that it is convenient to use the tube body 41 to retain the support frame 5 later.
[0049] In a further embodiment, in order to carry out a smooth grouting operation, refer to Figure 3The pumping assembly 2 includes a conversion valve 21, which is a three-way reversing valve, and the two inlet ends of the conversion valve 21 are connected to a water tank 22 and a slurry tank 23 through a hose, respectively. The water tank 22 and the slurry tank 23 are fixedly arranged on the main body 11, and the conversion valve 21 is fixed to the left end of the swing frame 12, and tilts synchronously with the swing frame 12. At the same time, the outlet end of the conversion valve 21 is connected to a delivery pipe 24. When not in use, the delivery pipe 24 is bundled and coiled in the storage box to avoid being scattered. When the driving structure 3 moves to the right, the rolled delivery pipe 24 will be drawn out of the storage box to adapt to the translational movement of the driving structure 3. It should be noted that when punching, the water tank 22 is connected to the pipe through the conversion valve 21. The pipe body 41 is connected, and a water pump is arranged in the water tank 22, which can provide water flow to the inside of the pipe body 41, dissipate heat to the drill bit 44, and flush out the debris from the notch 42, further improving the waste discharge efficiency. During grouting, the slurry tank 23 is connected to the pipe body 41 through the conversion valve 21, and a mortar pump is built in the slurry tank 23, which can provide continuous slurry to the inside of the pipe body 41. The slurry tank 23 is built with a stirring frame, which can continuously perform anti-solidification stirring. After the grouting is completed, the water tank 22 is connected to the pipe body 41 again through the conversion valve 21, which can flush out the slurry inside the conversion valve 21 and the delivery pipe 24, avoiding the slurry solidifying in the conversion valve 21 and the delivery pipe 24 and causing blockage, thereby ensuring the stability of continuous use.
[0050] In a further embodiment, in order to ensure the rotation and translation drive of the tube body 41, refer to Figure 3 The driving structure 3 includes a linear module 31 and a rotary drive member 32. The rotary drive member 32 is connected to the left end of the tube body 41 to provide installation space. The linear module 31 is a screw slide driven by a motor. The linear module 31 is fixed in the middle of the swing frame 12 and can drive the rotary drive member 32 and the tube body 41 to move horizontally. The tube body 41 is located at the rotary drive member 32 and a drive tube 46 is installed. The drive tube 46 is connected to the rotary drive member 32 through a bearing. A gear ring is installed on the circumferential side wall of the drive tube 46. The rotary drive member 32 is internally mounted with a drive tube 46. A stepper motor is installed at the corresponding gear ring position, which can be driven to rotate. The drive tube 46 is connected to the pumping component 2 to supply water and slurry. A rotating joint is provided at the connection position. The rotation of the drive tube 46 will not cause the delivery tube 24 to twist. At the same time, a relay tube 45 is connected between the drive tube 46 and the tube body 41. When the drive tube 46 and the tube body 41 are blocked or damaged, the relay tube 45 can be removed to clean the inside of the pipeline, or the drive tube 46 and the tube body 41 can be replaced separately, which is convenient for maintenance.
[0051] In a further embodiment, a grouting method for internal staggered layer mining method, using a concrete reinforced grouting device, refers to Figure 8-Figure 10 , including the following steps:
[0052] S1. The bottom of the frame 1 is provided with a driving crawler. The frame 1 is used to move the shaft tube 4 to vertically align with the coal seam to be drilled. The right end of the shaft tube 4 can also be lifted by the lifting mechanism 13 to perform inclined drilling of the upper tunnel. At the same time, the driving structure 3 drives the shaft tube 4 and the drill bit 44 to rotate and translate to perform drilling operations. During the process, the generated debris will enter the tube body 41 through the notch 42 for temporary storage, and the debris can be pushed and thrown by the rotation of the shaft tube 4 and the inner wall of the notch 42. As the debris at the right end is continuously generated, the debris that is continuously thrown and moved is subjected to less friction resistance, and it is easier for the newly generated debris to be squeezed outward to avoid accumulation in the hole affecting the normal rotation of the shaft tube 4 and the drill bit 44;
[0053] S2. After the hole reaches the predetermined depth, the driving structure 3 pulls the shaft tube 4 out from the hole position. At this time, the drill bit 44 is removed from the opening of the shaft tube 4, and the support frame 5 is coaxially installed in the middle of the shaft tube 4 along the notch 42. The driving structure 3 moves horizontally again to drive the shaft tube 4 to insert the support frame 5 into the hole position. The end of the side plate 52 of the support frame 5 is interference-embedded in the inner wall of the hole to reinforce the hole position. This support is an overhead support, which can leave space for gas to escape. For the veins with less gas between coal seams, ventilation can be used to discharge the gas;
[0054] S3. For veins with sufficient gas content, after the support frame 5 is left in place, the drive structure 3 can be used to extract the shaft tube 4 from the opening position. At this time, the external negative pressure pump is connected to the pipeline and inserted into the overhead space formed by the support frame 5 to continuously extract the gas in the gaps between different coal seams. At this time, the extraction time is relatively long, and drilling operations can be carried out at subsequent positions during the extraction process.
[0055] S4. After all the hole opening work, support frame 5 retention work and gas extraction work are completed, the drive structure 3 is used again to insert the shaft tube 4 from the hole opening position, and the pumping component 2 can be used to provide slurry for the shaft tube 4. The slurry enters the tube body 41 and passes through the gap formed between the outer wall of the side plate 52 and the inner wall of the notch 42 to enter the outside of the tube body 41, completely filling the entire hole opening space. For the independent coal seam gaps, grouting and filling can be carried out simultaneously. In this process, the slurry will fill the gap between the inner wall of the hole and the support frame 5, and the tube body 41 will be extracted. After the slurry solidifies, the reinforcement work of the coal seam gap is completed. For the slurry outflow caused by the extraction of the tube body 41, an external hose can be used to connect the pumping component 2 and insert it into the hole for supplementary filling of the slurry, or the slurry can be filled back manually to ensure that the hole is sealed tightly;
[0056] S5, the support frame 5 is left at the opening for long-term support to avoid insufficient support caused by slurry deformation and rupture. At the same time, the plugging cap 58 can be unscrewed and the internal flexible liner 59 can be pulled out. At this time, the through channel 53 is released, and the middle pipe 51 can be directly connected to the coal seam gap. In the subsequent mining process, the gas contained in the coal seam can be regularly extracted through the through channel 53. For veins with sufficient gas content, the gas can be fully extracted from the inner layer for use, and the danger of tunnel gas leakage caused by gas accumulation can be avoided, thereby improving the safety of tunnel use.
[0057] The above are only preferred embodiments of the present invention and are not intended to limit the protection scope of the present invention.
Claims
1. A grouting device for internal staggered layer coal mining method, comprising a frame (1), a power source (6), a pumping assembly (2) and a driving structure (3), wherein the pumping assembly (2) and the driving structure (3) are conductively connected, and the frame (1) can lift one end of the driving structure (3), characterized in that: The end of the driving structure (3) is rotatably mounted with a shaft tube (4), and a support bracket (5) can be inserted and mounted in the shaft tube (4); The shaft tube (4) comprises a tube body (41), a drill bit (44) is installed at an opening at one end of the tube body (41) away from the driving structure (3), a notch (42) communicating with the opening is provided on a circumferential side wall of the tube body (41), and a support seat (43) is provided on the side of the frame (1) away from the driving structure (3); The support frame (5) comprises a middle tube (51), and support blocks (54) arranged in an annular array are installed on the circumferential side wall of the middle tube (51). Two side plates (52) are connected axially along the middle tube (51) between the support blocks (54) located on the same side, and a through channel (53) communicating with the middle tube (51) is formed between the two side plates (52).
2. The internal staggered layer coal mining method grouting device according to claim 1 is characterized in that: The end of the side plate (52) is fixedly connected to the circumferential side wall of the middle tube (51), the width of the side plate (52) is greater than the radius of the drill bit (44), and one end of the side plate (52) away from the middle tube (51) is sharpened to form a wedge head (55).
3. The internal staggered layer coal mining method grouting device according to claim 1 is characterized in that: A material passing gap is formed between the outer wall of the side plate (52) and the inner wall of the notch (42); a detachable liner (59) is built into the through channel (53); the outer diameter of the middle tube (51) is smaller than the inner diameter of the tube body (41); a plugging cap (58) is provided at the port of the middle tube (51) facing the pumping component (2); the length of the middle tube (51) is greater than that of the side plate (52); and the middle tube (51) and the side plate (52) are flush with each other at one end away from the pumping component (2).
4. The internal staggered layer coal mining method grouting device according to claim 1 is characterized in that: The notches (42) are provided with three notches, which are arranged in a ring array on the circumferential side wall of the tube body (41), the support blocks (54) are arranged equidistantly along the notches (42), and the side plates (52) are fixedly connected to the support blocks (54) and the circumferential side wall of the middle tube (51) to form a three-pointed star structure.
5. The internal staggered layer coal mining method grouting device according to claim 1 is characterized in that: The support seat (43) comprises a vertical rod, a support block in the shape of a third of a circular ring is arranged on the top of the vertical rod, the support block is coaxially arranged with the tube body (41), two pressure blocks in the shape of a third of a circular ring are hingedly mounted at both ends of the support block, and a pin is arranged at one end of the two pressure blocks close to each other.
6. The internal staggered layer coal mining method grouting device according to claim 1 is characterized in that: An end ring (56) is installed at one end of the side plate (52) close to the pumping assembly (2). The end ring (56) is installed at the side plate (52) farthest from the middle pipe (51). Side frames (57) are installed between adjacent side plates (52). The distance between the side frames (57) and the middle pipe (51) is greater than the outer diameter of the pipe body (41). A locking nut is installed through the middle of the side frame (57).
7. The internal staggered layer coal mining method grouting device according to claim 1 is characterized in that: The end surface of the opening of the tube body (41) is provided with a clamping groove, the drill bit (44) is clamped with the tube body (41) through the clamping groove, the drill bit (44) and the tube body (41) are plug-fitted and assembled, and the drill bit (44) and the tube body (41) are connected by bolts.
8. The internal staggered layer coal mining method grouting device according to claim 1, characterized in that: The pumping assembly (2) comprises a conversion valve (21), which is a three-way reversing valve. The two inlet ends of the conversion valve (21) are connected to a water tank (22) and a slurry tank (23) respectively, and the outlet end of the conversion valve (21) is connected to a delivery pipe (24).
9. The internal staggered layer coal mining method grouting device according to claim 1, characterized in that: The driving structure (3) comprises a linear module (31), a rotary driving member (32) is installed at the end of the linear module (31), a driving tube (46) is installed at the rotary driving member (32) of the tube body (41), a relay tube (45) is connected between the driving tube (46) and the tube body (41), and the driving tube (46) is conductively connected to the pumping assembly (2).
10. A grouting method for a concrete reinforcement grouting device according to any one of claims 1 to 9, characterized in that: The steps include: S1. Using the frame (1), the shaft tube (4) is vertically aligned with the coal seam where a hole is to be drilled. The driving structure (3) drives the shaft tube (4) and the drill bit (44) to rotate and translate to perform a drilling operation. During the process, the generated debris is pushed outward by the notch (42) of the shaft tube (4); S2. After the hole reaches a predetermined depth, the driving structure (3) pulls the shaft tube (4) out of the hole opening position, removes the drill bit (44) from the opening of the shaft tube (4), and installs the support frame (5) coaxially along the notch (42) in the middle of the shaft tube (4). The driving structure (3) drives the shaft tube (4) to insert the support frame (5) into the hole opening position, and the end of the side plate (52) of the support frame (5) is interference-embedded in the inner wall of the hole to reinforce and support the hole opening position; S3, the driving structure (3) extracts the shaft tube (4) from the opening position, and uses an external negative pressure pump to penetrate into the overhead space of the support frame (5), and extracts the gas contained in the coal seam through the opening. During the extraction process, drilling operations are performed at subsequent positions; S4, after all the hole opening work, support frame (5) retention work and gas extraction work are completed, the driving structure (3) inserts the shaft tube (4) from the hole opening position, and provides slurry to the shaft tube (4) through the pumping component (2), and the slurry fills the gap between the inner wall of the hole and the support frame (5). After the slurry solidifies, the reinforcement work is completed; S5. The support frame (5) is left at the opening, and the middle pipe (51) of the support frame (5) is connected through an external negative pressure pump to regularly extract the gas contained in the coal seam through the through channel (53).
