Lining trolley capable of being quickly modified and suitable for multi-section construction and construction method
By designing a lining trolley that can be quickly modified and utilizing the flexible splicing and adjustment of formwork units, the problem of material and labor waste in multi-section construction was solved, efficient tunnel lining construction was achieved, and the cost and construction period were reduced.
Patent Information
- Application Number
- CN202411063438.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-05
- Publication Date
- 2024-10-15
Smart Images

Figure CN118774886A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of tunnel construction, and more specifically to a lining trolley and a construction method thereof which can be quickly modified and is suitable for multi-section construction. Background Art
[0002] In the process of underground cavern excavation, it is inevitable that there will be excavation and support of various cross-sections. In order to ensure the quality of tunnel lining and avoid safety accidents of vehicles and personnel during construction, the lining construction of long tunnels has been considered from the aspects of economy, safety, and efficiency. The use of tunnel lining trolleys has become the norm. Due to the diversification of tunnel sections, its lining structure has also changed, resulting in the need to redesign and process the overall structure and size of the lining trolley, which not only wastes materials, but also consumes a lot of manpower and time. The lining construction of various sections causes the design and processing problems of new lining trolleys. The tunnel lining trolley consists of a template assembly, a bracket assembly, a gantry assembly, a transverse mechanism, a jacking mechanism, a traveling mechanism, a strut assembly, a ladder platform, a hydraulic and electrical system, etc. Therefore, the present invention focuses on improving the template assembly and the support rod assembly for different tunnel section structures, so as to provide a lining trolley that can be quickly modified and suitable for multi-section construction, so that a lining trolley can be reused for multiple sections with a slight modification, thereby not only effectively reducing a large amount of waste of manpower and material resources, but also saving time and cost for processing new trolleys. Summary of the invention
[0003] An object of the present invention is to solve at least the above problems and to provide at least the advantages which will be described hereinafter.
[0004] In order to achieve these purposes and other advantages according to the present invention, a lining trolley that can be quickly modified and is suitable for multi-section construction is provided, wherein the template assembly of the lining trolley includes a plurality of pairs of left-right symmetrically arranged foundation side template units, left-right symmetrically arranged foundation side top template units, a top adjustment template unit connecting a pair of foundation side top template units, and a side adjustment template unit connecting two adjacent foundation side template units, or adjacent foundation side template units and foundation side top template units; wherein the top adjustment template unit includes a top reference template, and a plurality of top splicing templates that are sequentially symmetrically detachably spliced on both sides of the top reference template; the side adjustment template unit includes a side reference template, and a plurality of side splicing templates that are sequentially detachably spliced on both sides of the side reference template;
[0005] Wherein, the supporting rods of the top adjustment template unit and the side adjustment template unit include: a top extension drive device, which is arranged on the bracket assembly of the lining trolley, and the top extension end of the top extension drive device is fixed to the bottom of the top reference template or to the inner side of the side reference template;
[0006] The supporting rods of the base side formwork unit and the base top formwork unit include:
[0007] A linear drive device, which is arranged on the bracket assembly of the lining trolley;
[0008] A pair of damping telescopic rods, one end of the pair of damping telescopic rods is damping hinged on the moving end of the linear drive device, and the other end is provided with a running wheel, and the pair of running wheels are arranged at intervals along the arc of the support surface of the tunnel;
[0009] An angle control rod, whose structure is the same as that of the damping telescopic rod, the two ends of the angle control rod are respectively hinged to a pair of damping telescopic rods and are located at one end close to the walking wheel;
[0010] A limiting slide rail is arranged on the corresponding foundation side formwork unit and foundation top formwork unit, and the travel wheel limiting movement is arranged in the limiting slide rail;
[0011] A pair of limit abutment components, the pair of limit abutment components are respectively arranged at both ends of the limit slide rail, the limit abutment components include a linear drive mechanism and an abutment plate arranged on the moving end of the linear drive mechanism, wherein:
[0012] The linear drive mechanism drives the abutment plate to abut against the outer side of the traveling wheel.
[0013] Preferably, the splicing structure of the top splicing template and the top reference template, the splicing structure of two adjacent top splicing templates, the splicing structure of the side reference template and the side splicing template, and the splicing structure of two adjacent side splicing templates are all the same, the top splicing template, the top reference template, the side reference template and the side splicing template are all uniformly named as unit templates, a plurality of splicing structures are arranged at intervals on the unit template, the vertical section of the unit template is in a "[" shape, and each splicing structure includes:
[0014] A vertical strip, which is arranged on one side where two unit templates are spliced together and fixed on the side wall of one of the unit templates;
[0015] An L-shaped plate is arranged on the side wall of another unit template, the transverse part of the L-shaped plate covers the vertical strip, and at least one group of through holes are correspondingly provided on the transverse part, the side walls of the two unit templates and the vertical strip, and a first tensioning screw is provided on each group of through holes for tensioning and locking.
[0016] Preferably, the top splicing formwork and the side splicing formwork are formed by splicing multiple section formworks along the longitudinal direction of the tunnel, and ear seats are provided on the transverse parts of the L-shaped plates on two adjacent section formworks, and second tension screws are provided on the ear holes on the ear seats at one end of the spliced two adjacent section formworks for tensioning and locking.
[0017] Preferably, a rubber layer is provided on the outer wall of the unit template.
[0018] Preferably, a jacking pressure detection structure is provided on the jacking end of the jacking drive device, and the jacking pressure detection structure is used to detect the supporting stress of the top reference template and the side reference template.
[0019] Preferably, a support pressure detection structure is provided on the telescopic end of the damping telescopic rod, and the support pressure detection structure is used to detect the support stress of the foundation side formwork unit and the foundation side top formwork unit;
[0020] The damping telescopic rod is provided with an angle detection structure, and the angle detection structure is used to detect the adjustment angle of the damping telescopic rod;
[0021] An abutment pressure detection structure is provided on the abutment plate, and the abutment pressure detection structure is used to detect the limit pressure of the running wheel.
[0022] Preferably, the damping telescopic rod includes a sleeve, a main rod slidably inserted into the sleeve, a spring clamped and limited on the outside of the sleeve and the main rod, and a pair of connecting ends are provided on the ends of the sleeve and the main rod opposite to each other, wherein the connecting end on the sleeve is hinged to the moving end of the linear drive device, the connecting end on the main rod is provided with the walking wheel, a pair of annular protrusions are protruding from the outer side walls of the sleeve and the main rod, and the two ends of the spring are respectively fixed to the pair of protrusions.
[0023] Preferably, the abutment plate is in an arc shape and matches the arc shape of the running wheel.
[0024] A construction method for a lining trolley that can be quickly modified and is suitable for multi-section construction is provided, comprising the following steps:
[0025] S1. Before the installation and removal of the lining trolley, the invert and backfill construction have been completed;
[0026] S2, according to the size and arch shape of the current tunnel construction section, the top adjustment template unit and the side adjustment template unit are hoisted and spliced in sequence, wherein the top splicing template, the top reference template, the side reference template and the side splicing template are prefabricated and ready for use according to the size and arch shape of the tunnel construction section;
[0027] S3, driving the left-right symmetrically arranged basic side template units and side adjustment template units to move to the designed positions on both sides of the tunnel section, wherein the moving end of the linear drive device is adjusted to adjust its radial position, and the distance between the moving ends of a pair of linear drive mechanisms is adjusted to adjust the angle between a pair of damping telescopic rods, so that the basic side template units are moved to the sides of the tunnel section to the designed positions, and then the top extension end of the top extension drive device is adjusted to adjust its radial position, so that the side adjustment template is moved to the sides of the tunnel section to the designed positions;
[0028] S4, driving the left-right symmetrically arranged foundation side top template unit to move to the top side of the tunnel section to the designed position, and then driving the top adjustment template unit to move to the top side of the tunnel section to the designed position, after forming an arch, sealing and installing the end templates at both ends to complete the template installation; wherein, the adjustment method of the foundation side top template unit is the same as the adjustment method of the foundation side template unit, and the adjustment method of the top adjustment template unit is the same as the adjustment method of the side adjustment template unit;
[0029] S5. pouring concrete into the installed formwork to form a lining layer;
[0030] S6, after the concrete reaches a specified strength, driving and adjusting the foundation side formwork unit, the side adjustment formwork unit, the foundation side top formwork unit and the top adjustment formwork unit to be demoulded away from the lining layer;
[0031] S7, moving the lining trolley to the next lining position, and repeating steps S3 to S6 until the lining of the continuous tunnel section with the same construction section size and arch shape is completed;
[0032] S8. Repeat S2 to S7 to complete the lining construction of tunnel sections with different section sizes and different or same arch shapes.
[0033] The present invention includes at least the following beneficial effects: avoiding the one-time use of traditional lining trolleys, the lining trolley that can be quickly modified increases the reuse rate of the trolley, improves the process connection of multi-section lining construction, saves the design and processing time of the new trolley, labor, materials and processing machinery losses, significantly reduces the construction cost, and maximizes the economic benefits of the trolley.
[0034] Other advantages, objectives and features of the present invention will be embodied in part through the following description, and in part will be understood by those skilled in the art through study and practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] Figure 1 A schematic plan view of a dark excavation section in one embodiment of the present invention;
[0036] Figure 2 A support schematic diagram of the template assembly according to one of the technical solutions of the present invention;
[0037] Figure 3 A schematic diagram of the support of the top reference template according to one of the technical solutions of the present invention;
[0038] Figure 4 A schematic diagram of the side structure of the splicing structure according to one of the technical solutions of the present invention;
[0039] Figure 5 It is a front structural schematic diagram of the splicing structure of one of the technical solutions of the present invention;
[0040] Figure 6 It is a schematic diagram of the side structure of the supporting rod of the foundation side formwork unit according to one of the technical solutions of the present invention.
[0041] The meanings of the figures in the specification are as follows: foundation side formwork unit 100, foundation side top formwork unit 200, top adjustment formwork unit 300, side adjustment formwork unit 400, top reference formwork 31, top splicing formwork 32, top extension drive device 33, section formwork 1, linear drive device 21, damping telescopic rod 22, walking wheel 23, angle control rod 24, limiting slide rail 25, limiting abutment assembly 26, splicing structure 500, vertical slat 51, L-shaped plate 52, first tension screw 53, ear seat 54, second tension screw 55, sleeve 201, main rod 202, spring 203, protrusion 204. DETAILED DESCRIPTION
[0042] The present invention is further described in detail below in conjunction with the accompanying drawings so that those skilled in the art can implement the invention with reference to the description.
[0043] It should be noted that the experimental methods described in the following embodiments are conventional methods unless otherwise specified, and the reagents and materials are commercially available unless otherwise specified; in the description of the present invention, the orientation or positional relationship indicated by the terms is based on the orientation or positional relationship shown in the accompanying drawings, which is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0044] like Figures 1 to 6As shown, the present invention provides a lining trolley that can be quickly modified and is suitable for multi-section construction. The template assembly of the lining trolley includes a plurality of pairs of left-right symmetrically arranged foundation side template units 100, left-right symmetrically arranged foundation side top template units 200, a top adjustment template unit 300 connecting a pair of foundation side top template units 200, and a side adjustment template unit 400 connecting two adjacent foundation side template units 100, or adjacent foundation side template units 100 and foundation side top template units 200; wherein, the top adjustment template unit 300 includes a top reference template 31, and a plurality of top splicing templates 32 that are sequentially symmetrically detachable and spliced on both sides of the top reference template 31; the side adjustment template unit 400 includes a side reference template, a plurality of top splicing templates 32 that are sequentially detachable and spliced on the side reference template Multiple side splicing templates on both sides of the plate; the shape and size of the foundation side template unit 100 and the foundation side top template unit 200 are designed as a fixed mode, which can adapt to multiple sections of tunnel linings with similar cross-sectional shapes in the tunnel to be constructed. Based on the following support rods, the arc combination of the foundation side template unit 100 and the foundation side top template unit 200 can be adjusted, so that more tunnel cross-sectional shapes and sizes can be adapted; the top adjustment template unit 300 and the side adjustment template unit 400 are designed in a one-to-one correspondence with the tunnel linings with similar cross-sectional shapes in the tunnel to be constructed. Due to the similar shapes, the top reference template 31 and the side reference template remain unchanged. It is only necessary to adapt the number of spliced top splicing templates 32 and side splicing templates according to the cross-sectional size, so as to adapt to different sections. That is, a trolley only needs to dismantle or install the number of top splicing templates 32 and side splicing templates, and drive and adjust the angles of the foundation side template unit 100 and the foundation side top template unit 200 to adapt to the lining construction of different tunnel sections.
[0045] The supporting rods of the top adjustment template unit 300 and the side adjustment template unit 400 include: a top extension drive device 33, which is arranged on the bracket assembly of the lining trolley, and the top extension end of the top extension drive device 33 is fixed to the bottom of the top reference template 31 or to the inner side of the side reference template; through the top extension and retraction of the top extension end of the top extension drive device 33, tunnel sections of different sizes can be adapted. Specifically, the top extension drive device 33 can be a jack or a hydraulic cylinder.
[0046] The supporting rods of the base side formwork unit 100 and the base top formwork unit 200 include:
[0047] A linear drive device 21, which is arranged on the bracket assembly of the lining trolley; specifically, the linear drive device 21 can be a jack or a hydraulic cylinder, etc.;
[0048] A pair of damping telescopic rods 22, one end of the pair of damping telescopic rods 22 is damping hinged on the moving end of the linear drive device 21, and the other end is provided with a running wheel 23, and the pair of running wheels 23 are arranged at intervals along the arc of the support surface of the tunnel; the back and forth movement of the moving end of the linear drive device 21 can compress the pair of damping telescopic rods 22 to extend or compress;
[0049] The angle control rod 24 has the same structure as the damping telescopic rod 22. Both ends of the angle control rod 24 are respectively hinged to a pair of damping telescopic rods 22 and are located at one end close to the walking wheel 23.
[0050] A certain distance can be maintained between the pair of running wheels 23, so that the damping telescopic rod 22 has a certain supporting contact surface with the foundation side formwork unit 100 and the foundation side top formwork unit 200;
[0051] The limiting slide rail 25 is arranged on the corresponding foundation side formwork unit 100 and foundation top formwork unit 200.
[0052] The travel wheel 23 is limitedly movable in the limit rail 25; the limit rail 25 can prevent the travel wheel 23 from being separated from the foundation side formwork unit 100 and the foundation side top formwork unit 200;
[0053] A pair of limit abutment components 26, a pair of limit abutment components 26 are respectively arranged at both ends of the limit slide rail 25, and the limit abutment components 26 include a linear drive mechanism and an abutment plate arranged on the moving end of the linear drive mechanism, wherein the linear drive mechanism drives the abutment plate to abut against the outside of the walking wheel 23. The limit abutment component 26 is a key control component, which can adjust a pair of damping telescopic rods 22 to different telescopic lengths and angles, so that the foundation side formwork unit 100 and the foundation side top formwork unit 200 rotate relative to the moving direction of the moving end of the linear drive device 21 to adapt to tunnel sections of different sizes.
[0054] In the above technical solution, firstly, according to the design size and shape of the entire tunnel section to be constructed, and the length of the tunnel with the same section size and shape, multiple sections with similar shapes and different sizes are selected as the design basis, and the multiple sections can share the same trolley. When switching the lining construction of the multiple sections, it is only necessary to dismantle or splice and install the top splicing template 32 and the number of side splicing templates, and drive and adjust the angle of the foundation side template unit 100 and the foundation side top template unit 200, which can significantly improve the trolley switching operation efficiency and save the trolley construction cost.
[0055] In another technical solution, the splicing structure 500 of the top splicing template 32 and the top reference template 31, the splicing structure 500 of two adjacent top splicing templates 32, the splicing structure 500 of the side reference template and the side splicing template, and the splicing structure 500 of two adjacent side splicing templates are all the same, the top splicing template 32, the top reference template 31, the side reference template and the side splicing template are all uniformly named as unit templates, a rubber layer is applied on the outer wall of the unit template, a plurality of splicing structures 500 are arranged at intervals on the unit template, the vertical section of the unit template is in the shape of "[", and each splicing structure 500 includes:
[0056] A vertical strip 51 is provided on one side where two unit templates are joined and fixed to a side wall of one of the unit templates; specifically, the vertical strip 51 and the unit template are welded or integrally formed;
[0057] The L-shaped plate 52 is arranged on the side wall of another unit template, and the transverse part of the L-shaped plate 52 covers the vertical strip 51. The transverse part, the side walls of the two unit templates and the vertical strip 51 are provided with at least one group of through holes, and each group of through holes is provided with a first tension screw 53 for tensioning and locking. Specifically, two groups of through holes are provided, and the L-shaped plate 52 and the unit template are welded; the first tension screw 53 can be used to conveniently, quickly and firmly splice the two unit templates together, and it is also convenient to disassemble, thereby improving the working efficiency.
[0058] In the above technical solution, a convenient, fast and strong splicing and disassembly method is provided, and when switching the construction of different tunnel sections, quick disassembly or splicing can be carried out, thereby improving the overall construction efficiency.
[0059] In another technical solution, the top splicing formwork 32 and the side splicing formwork are both formed by splicing multiple section formworks 1 along the longitudinal direction of the tunnel, and an ear seat 54 is provided on the transverse portion of the L-shaped plate 52 on two adjacent section formworks 1, and a second tensioning screw 55 is provided on the ear hole on the ear seat 54 at one end of the spliced two adjacent section formworks 1 for tensioning and locking.
[0060] In the above technical solution, when constructing a lining, the length is long, and the length of the standard steel plate is fixed. Therefore, the section template 1 is formed by using a steel plate, and then the ear seat 54 is arranged, so that the section template 1 is spliced along the length direction of the tunnel to form a unit template. Since the ear seat 54 is arranged on the L-shaped plate 52, it can form an integral body with the splicing structure 500, forming a force mode of horizontal and vertical tension, which significantly improves the support stability of the unit template.
[0061] In another technical solution, a jacking pressure detection structure is provided on the jacking end of the jacking drive device 33, and the jacking pressure detection structure is used to detect the support stress of the top reference template 31 and the side reference template. When pouring concrete, the support stress of the top reference template 31 and the side reference template can be known in real time, thereby providing a data basis for judging the support safety.
[0062] In another technical solution, a support pressure detection structure is provided on the telescopic end of the damping telescopic rod 22, and the support pressure detection structure is used to detect the support stress of the foundation side formwork unit 100 and the foundation side top formwork unit 200; when pouring concrete, the support stress of the foundation side formwork unit 100 and the foundation side top formwork unit 200 can be known in real time, thereby providing a data basis for judging the support safety;
[0063] The damping telescopic rod 22 is provided with an angle detection structure, which is used to detect the adjustment angle of the damping telescopic rod 22; the angle detection structure can know the current angle state of the damping telescopic rod 22 in real time, thereby providing a data basis for whether the support is deformed and whether the deformation is within a safe range;
[0064] The abutment plate is provided with an abutment pressure detection structure, which is used to detect the limit pressure of the running wheel 23. Since the damping telescopic rod 22 is at a certain angle, the running wheel 23 is subjected to lateral and vertical pressures at the same time. The abutment pressure detection structure is provided on the abutment plate to more intuitively and accurately know the support stress in the direction of the combined force currently applied to the running wheel 23, and the lateral and vertical pressures can also be calculated according to the angle detected by the angle detection structure, thereby controlling safety.
[0065] In the above technical scheme, a supporting pressure detection structure, an angle detection structure, and an abutting pressure detection structure are set to perform real-time detection to indirectly reflect the stress conditions of the foundation side formwork unit 100 and the foundation side top formwork unit 200, and through the mutual verification and calculation of the detection data of the supporting pressure detection structure, the angle detection structure, and the abutting pressure detection structure, it can be known whether there is an unnecessary internal stress state in the support angle of the foundation side formwork unit 100 and the foundation side top formwork unit 200, and then the telescopic length of the damping telescopic rod 22 and the abutment position of the limit abutment assembly 26 are adjusted in reverse to make the support of the foundation side formwork unit 100 and the foundation side top formwork unit 200 more stable and safe.
[0066] In another technical solution, the damping telescopic rod 22 includes a sleeve 201, a main rod 202 slidably inserted into the sleeve 201, a spring 203 that is pressed and limited and sleeved outside the sleeve 201 and the main rod 202, and a pair of connecting ends are provided on the ends of the sleeve 201 and the main rod 202 that are away from each other, wherein the connecting end on the sleeve 201 is hinged to the moving end of the linear drive device 21, the connecting end on the main rod 202 is provided with the walking wheel 23, a pair of annular protrusions 204 are convexly provided on the outer side walls of the sleeve 201 and the main rod 202, and the two ends of the spring 203 are respectively fixed on the pair of protrusions 204. A specific structure of a damping telescopic rod 22 is provided, wherein the relative sliding of the main rod 202 and the sleeve 201 is completed under the damping action of the spring 203, so that the sliding of the main rod 202 and the sleeve 201 is more stable.
[0067] In another technical solution, the abutment plate is in an arc shape and matches the arc shape of the running wheel 23. The contact area between the running wheel 23 is increased, making the limiting abutment more reliable.
[0068] A construction method for a lining trolley that can be quickly modified and is suitable for multi-section construction is provided, comprising the following steps:
[0069] S1. Before the installation and removal of the lining trolley, the invert and backfill construction have been completed;
[0070] S2, according to the size and arch shape of the current tunnel construction section, the top adjustment template unit 300 and the side adjustment template unit 400 are hoisted and spliced in sequence, wherein the top splicing template 32, the top reference template 31, the side reference template and the side splicing template are prefabricated and ready for use according to the size and arch shape of the tunnel construction section;
[0071] S3, driving the left-right symmetrically arranged basic side template units 100 and side adjustment template units 400 to move to the designed positions on both sides of the tunnel section, wherein the moving end of the linear drive device 21 is adjusted to adjust its radial position, and the distance between the moving ends of a pair of linear drive mechanisms is adjusted to adjust the angle between a pair of damping telescopic rods 22, so that the basic side template unit 100 moves to the side of the tunnel section to the designed position, and then the top extension end of the top extension drive device 33 is adjusted to adjust its radial position, so that the side adjustment template moves to the side of the tunnel section to the designed position;
[0072] S4, drive the left-right symmetrically arranged base side top template unit 200 to move to the top side of the tunnel section to the designed position, and then drive the top adjustment template unit 300 to move to the top side of the tunnel section to the designed position, after forming an arch, seal and install the end templates at both ends to complete the template installation; wherein, the adjustment method of the base side top template unit is the same as the adjustment method of the base side template unit 100, and the adjustment method of the top adjustment template unit 300 is the same as the adjustment method of the side adjustment template unit 400;
[0073] S5. pouring concrete into the installed formwork to form a lining layer;
[0074] S6. After the concrete reaches a specified strength, the foundation side formwork unit 100, the side adjustment formwork unit 400, the foundation side top formwork unit 200 and the top adjustment formwork unit 300 are driven to be demoulded away from the lining layer;
[0075] S7, moving the lining trolley to the next lining position, and repeating steps S3 to S6 until the lining of the continuous tunnel section with the same construction section size and arch shape is completed;
[0076] S8. Repeat S2 to S7 to complete the lining construction of tunnel sections with different section sizes and different or same arch shapes.
[0077] In the above technical solution, firstly, according to the design size and shape of the entire tunnel section to be constructed, and the length of the tunnel with the same section size and shape, multiple sections with similar shapes and different sizes are selected as the design basis, and the multiple sections can share the same trolley. When switching the lining construction of the multiple sections, it is only necessary to dismantle or splice and install the top splicing template 32 and the number of side splicing templates, and drive and adjust the angle of the foundation side template unit 100 and the foundation side top template unit 200, which can significantly improve the trolley switching operation efficiency and save the trolley construction cost.
[0078] <Application Examples>
[0079] Project Overview:
[0080] like Figure 1 As shown, the single-tunnel three-line section of the Dashiba-Daqingcun Station underground excavation section has a total length of 389.509m, of which the mileage YK7+072.538~YK7+268.564 is the 2-2 section, with a total length of 196.026m, a section width of 21.44m, and a height of 14.496m; the mileage YK7+268.564~YK7+462.047 is the 3-3 section, with a total length of 193.483m, a section width of 23.32m, and a height of 15.826m.
[0081] Before the installation and removal of the lining trolley, the invert and backfill construction have been completed. The backfill is cast with C25 concrete. According to the specifications, pedestrians are allowed only when the filling concrete strength exceeds 2.5Mpa, and traffic and other operating loads are allowed only when the filling concrete strength reaches 100%.
[0082] Since the cross-sectional size and overall curvature of the single-tunnel three-track section are basically the same, and the overall organization is constructed from the 3-3 section to the 2-2 section, the size of the 2-2 section was taken into overall consideration for in-depth design when the entire set of 3-3 section lining trolleys were initially designed. The trolley structure and detailed drawings are basically similar, the installation and use of the trolleys are the same, and unified personnel are used for installation. The installation process, process and requirements are basically the same.
[0083] The overall length of the lining trolley for section 3-3 and section 2-2 is 9.1m. According to the construction arrangement, section 3-3 and section 2-2 share a trolley. Section 3-3 is constructed first, and then section 2-2. When designing the trolley, the number of top splicing templates 32 and top reference templates 31, the number of side splicing templates and side reference templates are designed according to the shape and size from section 3-3 to section 2-2. When switching from section 3-3 to section 2-2, it is only necessary to remove the top part splicing template and side splicing template, and adjust the angle of the foundation side template unit 100 and the foundation side top template unit 200, which significantly improves the construction efficiency.
[0084] Practical benefits:
[0085] The cost of a single-hole three-line section lining trolley is about 1.4 million yuan, and the cost of one modification is about 80,000 yuan. If the whole set of 3-3 section lining trolleys is modified into 2-2 section lining trolleys, the direct economic benefits saved are: 1.40-8=1.32 million yuan; the modified trolley scheme will directly reduce the cost of new trolleys entering and leaving the site and the cost of installing and removing new trolleys, and can ensure that the trolleys do not need to be replaced during the construction of linings of different sections, making the transition between processes smoother and ensuring the continuity of construction.
[0086] If a brand new trolley is used for the 2-2 lining trolley, not only will there be an additional waste of manpower, materials and machines, but it will also increase the processing and arrival time of the new trolley. Since the trolley is installed inside the tunnel and the excavation and support of the guide tunnel are also being carried out inside the tunnel, the arrival of the new trolley will seriously affect the overall construction organization of the site and increase the safety hazards of on-site mechanical transportation.
[0087] If a newly purchased trolley is used, the 3-3 section lining trolley and the steel bar trolley need to be dismantled, and the overall construction period is about 35 days, and the installation of a new lining trolley takes about 30 days. If the modified trolley solution is adopted, it takes about 30 days to modify a set of lining trolleys, saving about 35+30-30=35 days of trolley installation and removal time, indirectly advancing the construction period by 35 days, thereby improving the overall construction efficiency, ensuring the overall construction period, and reducing costs in disguise.
[0088] Although the embodiments of the present invention have been disclosed as above, they are not limited to the applications listed in the specification and the implementation modes, and they can be fully applied to various fields suitable for the present invention. For those familiar with the art, additional modifications can be easily implemented. Therefore, without departing from the general concept defined by the claims and the scope of equivalents, the present invention is not limited to the specific details and the illustrations shown and described herein.
Claims
1. The lining trolley can be quickly modified to be suitable for multi-section construction, characterized by: The template assembly of the lining trolley includes a plurality of pairs of left-right symmetrically arranged base side template units, left-right symmetrically arranged base side top template units, a top adjustment template unit connecting a pair of base side top template units, and a side adjustment template unit connecting two adjacent base side template units, or adjacent base side template units and base side top template units; wherein the top adjustment template unit includes a top reference template, and a plurality of top splicing templates that are sequentially symmetrically detachably spliced on both sides of the top reference template; the side adjustment template unit includes a side reference template, and a plurality of side splicing templates that are sequentially detachably spliced on both sides of the side reference template; Wherein, the supporting rods of the top adjustment template unit and the side adjustment template unit include: a top extension drive device, which is arranged on the bracket assembly of the lining trolley, and the top extension end of the top extension drive device is fixed to the bottom of the top reference template or to the inner side of the side reference template; The supporting rods of the base side formwork unit and the base top formwork unit include: A linear drive device, which is arranged on the bracket assembly of the lining trolley; A pair of damping telescopic rods, one end of the pair of damping telescopic rods is damping hinged on the moving end of the linear drive device, and the other end is provided with a running wheel, and the pair of running wheels are arranged at intervals along the arc of the support surface of the tunnel; An angle control rod, whose structure is the same as that of the damping telescopic rod, the two ends of the angle control rod are respectively hinged to a pair of damping telescopic rods and are located at one end close to the walking wheel; A limiting slide rail is arranged on the corresponding foundation side formwork unit and foundation top formwork unit, and the travel wheel limiting movement is arranged in the limiting slide rail; A pair of limit abutment components are respectively arranged at both ends of the limit slide rail, and the limit abutment components include a linear drive mechanism and an abutment plate arranged on the moving end of the linear drive mechanism, wherein the linear drive mechanism drives the abutment plate to abut against the outer side of the walking wheel.
2. The lining trolley that can be quickly modified and applied to multi-section construction as claimed in claim 1 is characterized in that: The splicing structure of the top splicing template and the top reference template, the splicing structure of two adjacent top splicing templates, the splicing structure of the side reference template and the side splicing template, and the splicing structure of two adjacent side splicing templates are all the same. The top splicing template, the top reference template, the side reference template and the side splicing template are all uniformly named as unit templates. A plurality of splicing structures are arranged at intervals on the unit template. The vertical section of the unit template is in the shape of "[", and each splicing structure includes: A vertical strip, which is arranged on one side where two unit templates are spliced together and fixed on the side wall of one of the unit templates; An L-shaped plate is arranged on the side wall of another unit template, the transverse part of the L-shaped plate covers the vertical strip, and at least one group of through holes are correspondingly provided on the transverse part, the side walls of the two unit templates and the vertical strip, and a first tensioning screw is provided on each group of through holes for tensioning and locking.
3. The lining trolley capable of being quickly modified and applied to multi-section construction as claimed in claim 2, characterized in that: The top splicing formwork and the side splicing formwork are both formed by splicing multiple section formworks along the longitudinal direction of the tunnel. Ear seats are provided on the transverse parts of the L-shaped plates on two adjacent section formworks, and second tension screws are provided on the ear holes on the ear seats at one end of the spliced two adjacent section formworks for tensioning and locking.
4. The lining trolley capable of being quickly modified and applied to multi-section construction as claimed in claim 2, characterized in that: A rubber layer is provided on the outer wall of the unit template.
5. The lining trolley capable of being quickly modified and applied to multi-section construction as claimed in claim 1, characterized in that: A jacking pressure detection structure is provided on the jacking end of the jacking drive device, and the jacking pressure detection structure is used to detect the supporting stress of the top reference template and the side reference template.
6. The lining trolley capable of being quickly modified and applied to multi-section construction as claimed in claim 1, characterized in that: A support pressure detection structure is provided on the telescopic end of the damping telescopic rod, and the support pressure detection structure is used to detect the support stress of the foundation side formwork unit and the foundation side top formwork unit; The damping telescopic rod is provided with an angle detection structure, and the angle detection structure is used to detect the adjustment angle of the damping telescopic rod; An abutment pressure detection structure is provided on the abutment plate, and the abutment pressure detection structure is used to detect the limit pressure of the running wheel.
7. The lining trolley capable of being quickly modified and applied to multi-section construction as claimed in claim 1, characterized in that: The damping telescopic rod includes a sleeve, a main rod slidably inserted into the sleeve, a spring clamped and limited on the outside of the sleeve and the main rod, and a pair of connecting ends are provided on the ends of the sleeve and the main rod facing away from each other, wherein the connecting end on the sleeve is hinged to the moving end of the linear drive device, the connecting end on the main rod is provided with the walking wheel, a pair of annular protrusions are protruding from the outer side walls of the sleeve and the main rod, and the two ends of the spring are respectively fixed to the pair of protrusions.
8. The lining trolley capable of being quickly modified and applied to multi-section construction as claimed in claim 1, characterized in that: The abutment plate is in an arc shape and matches the arc shape of the travel wheel.
9. The construction method of a lining trolley capable of being quickly modified and applied to multi-section construction as claimed in any one of claims 1 to 8, characterized in that: The following steps are involved: S1. Before the installation and removal of the lining trolley, the invert and backfill construction have been completed; S2, according to the size and arch shape of the current tunnel construction section, the top adjustment template unit and the side adjustment template unit are hoisted and spliced in sequence, wherein the top splicing template, the top reference template, the side reference template and the side splicing template are prefabricated and ready for use according to the size and arch shape of the tunnel construction section; S3, driving the left-right symmetrically arranged basic side template units and side adjustment template units to move to the designed positions on both sides of the tunnel section, wherein the moving end of the linear drive device is adjusted to adjust its radial position, and the distance between the moving ends of a pair of linear drive mechanisms is adjusted to adjust the angle between a pair of damping telescopic rods, so that the basic side template units are moved to the sides of the tunnel section to the designed positions, and then the top extension end of the top extension drive device is adjusted to adjust its radial position, so that the side adjustment template is moved to the sides of the tunnel section to the designed positions; S4, driving the left-right symmetrically arranged foundation side top template unit to move to the top side of the tunnel section to the designed position, and then driving the top adjustment template unit to move to the top side of the tunnel section to the designed position, after forming an arch, sealing and installing the end templates at both ends to complete the template installation; wherein, the adjustment method of the foundation side top template unit is the same as the adjustment method of the foundation side template unit, and the adjustment method of the top adjustment template unit is the same as the adjustment method of the side adjustment template unit; S5. pouring concrete into the installed formwork to form a lining layer; S6, after the concrete reaches a specified strength, driving and adjusting the foundation side formwork unit, the side adjustment formwork unit, the foundation side top formwork unit and the top adjustment formwork unit to be demoulded away from the lining layer; S7, moving the lining trolley to the next lining position, and repeating steps S3 to S6 until the lining of the continuous tunnel section with the same construction section size and arch shape is completed; S8. Repeat S2 to S7 to complete the lining construction of tunnel sections with different section sizes and different or same arch shapes.