Tower drum operation platform and wind power tower drum
The tower operating platform made of concrete uses the combined design of splicing modules and post-casting tapes to solve the problem of many and easy-to-lost steel operating platforms in wind power towers, achieving rapid production and low-cost installation, ensuring the safety of wind power Tower installation time and cycle.
Patent Information
- Application Number
- CN202411043242.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-31
- Publication Date
- 2024-10-15
AI Technical Summary
The steel operating platform of the existing wind power tower has many parts and is easy to be lost. The processing cycle is long, resulting in delayed installation and high production costs.
The tower operating platform made of concrete simplifies the production process, reduces the number of parts, ensures the stability of transportation and stacking, and reduces production costs through the combined design of spliced modules and post-cast belts.
It achieves rapid production and simplified installation of the tower operating platform, reduces production costs, avoids the problem of missing parts, and ensures the installation time and installation cycle of the wind power tower.
Smart Images

Figure CN118775188A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of wind power, and in particular to a tower operating platform and a wind power tower. Background Art
[0002] In the related art, a steel operating platform is provided inside the wind turbine tower for operators to install and maintain equipment, such as wind turbine equipment. However, the steel operating platform has many parts, which are easily lost during transportation and stacking. In addition, the processing cycle of the parts of the steel operating platform is long, which is prone to installation delays due to delivery reasons. At the same time, the production cost of the steel operating platform is high. Summary of the invention
[0003] The present invention aims to solve one of the technical problems in the related art to at least some extent. To this end, an embodiment of the present invention provides a tower operation platform, which is made of concrete, is easy to produce, transport and stack, and has low cost.
[0004] An embodiment of the present invention further provides a wind power tower.
[0005] The tower operating platform of the embodiment of the present invention comprises:
[0006] A splicing module, wherein the splicing module is made of concrete pouring, and there are at least two splicing modules, and at least two of the splicing modules are spliced and connected;
[0007] The post-cast strip is made of concrete and is cast and connected between two adjacent splicing modules.
[0008] The tower operating platform of the embodiment of the present invention has multiple splicing modules made of cast concrete, and the post-cast strips made of cast concrete are cast and connected between two adjacent splicing modules to make the multiple splicing modules spliced and connected. The production is simple and fast, with a short processing cycle to ensure delivery time and low production cost. At the same time, the tower operating platform has a simple structure and parts will not be lost during transportation and stacking.
[0009] In some embodiments, the end face of the splicing module used to connect the post-cast strip has a plurality of protruding connecting ribs. In two adjacent splicing modules, the plurality of connecting ribs of one splicing module are overlapped and connected with the plurality of connecting ribs of the other splicing module in a one-to-one correspondence and cast in the post-cast strip.
[0010] In some embodiments, the splicing module includes a platform plate and a platform beam, the platform beam is arranged at the bottom of the platform plate, and the post-cast strip casts and connects the platform plates of two adjacent splicing modules and the platform beams of two adjacent splicing modules.
[0011] In some embodiments, the platform beam includes a main beam and a secondary beam, at least one end of the secondary beam is connected to the main beam, and the secondary beam is arranged at an angle to the main beam, a number of the main beams and at least two secondary beams are staggered and connected, wherein the free ends of at least some of the secondary beams form a connecting portion, and in two adjacent splicing modules, the connecting portion of one of the splicing modules is arranged one-to-one with the connecting portion of the other splicing module, and are cast and connected by the post-casting strip.
[0012] In some embodiments, the tower operating platform also includes a fence, which is arranged on several of the platform plates and around the elevator hole. The elevator hole passes through several of the platform plates and is staggered with the main beam and the secondary beam. The elevator hole and the cable hole are arranged at intervals. The cable hole passes through several of the platform plates and is staggered with the main beam and the secondary beam.
[0013] In some embodiments, the tower operating platform also includes a leveling device, which is disposed on the platform plate and / or the platform beam. There are multiple leveling devices, and the multiple leveling devices are disposed at the outer peripheral ends of the spliced whole of at least two of the splicing modules and are arranged at intervals along the circumference of the spliced whole.
[0014] In some embodiments, at least one end of the main beam forms a mounting portion, or at least one end of the main beam and free ends of some secondary beams form mounting portions;
[0015] The mounting portion is located at the outer peripheral end of the spliced whole and is provided with the corresponding leveling device.
[0016] In some embodiments, the leveling device comprises:
[0017] A guide sleeve assembly, wherein the guide sleeve assembly is cast in the mounting portion along a vertical direction, or the guide sleeve assembly is cast in the mounting portion and the platform plate along a vertical direction;
[0018] An adjusting member, at least a portion of which is disposed in the guide sleeve assembly, and the adjusting member can move in a vertical direction relative to the guide sleeve assembly and can extend from the bottom of the mounting portion.
[0019] In some embodiments, the guide sleeve assembly includes a sleeve and a nut, and the nut is arranged at the bottom of the sleeve;
[0020] The adjusting member comprises a bolt, which is sequentially inserted into the sleeve and the nut and is threadedly connected with the nut.
[0021] In some embodiments, the guide sleeve assembly further comprises an anchor plate, the anchor plate is connected to the sleeve and is located at the bottom of the sleeve, and the nut is disposed at the bottom of the anchor plate.
[0022] In some embodiments, a countersunk hole is provided on the top surface of the platform plate, the countersunk hole is communicated with the sleeve, and the head of the bolt is located in the countersunk hole.
[0023] The wind turbine tower of the embodiment of the present invention comprises:
[0024] Tower body;
[0025] A bearing seat, the bearing seat is arranged on the inner circumferential surface of the tower body, there are a plurality of bearing seats, and the plurality of bearing seats are arranged at intervals along the circumferential direction of the tower body;
[0026] A tower operating platform, wherein the tower operating platform is the tower operating platform described in any one of the above embodiments, and the tower operating platform is located in the tower body and is arranged on a plurality of the bearing seats.
[0027] The wind turbine tower of the embodiment of the present invention has the tower operation platform of the embodiment of the present invention, so that the installation time and installation cycle of the wind turbine tower can be ensured, and the production cost is low. The tower operation platform is arranged on a plurality of bearing seats on the inner circumference of the tower body to ensure the stable installation of the tower operation platform and facilitate the installation of the tower operation platform.
[0028] In some embodiments, the tower operating platform has a plurality of leveling devices, and the plurality of leveling devices are arranged on the plurality of bearing seats in a one-to-one correspondence.
[0029] In some embodiments, the bearing seat includes a corbel and a limit plate, the corbel is arranged on the inner circumferential surface of the tower body, at least two limit plates are arranged on the top of the corbel, and at least two limit plates are arranged at intervals along the circumference of the tower body;
[0030] The tower operating platform has a main beam and a secondary beam, at least one end of the main beam forms a mounting portion, or at least one end of the main beam and the free ends of some secondary beams form mounting portions, the mounting portion is provided with a corresponding leveling device, the mounting portion and the leveling device are arranged on the corresponding corbel piece and are located between two adjacent limit plates.
[0031] In some embodiments, the tower body is made of cast concrete, and the bearing seat also includes a connecting component, one end of which is cast or anchored in the wall of the tower body, and the other end of the connecting component is connected to the corbel.
[0032] In some embodiments, the wind turbine tower further includes an extension plate, which is disposed at the outer peripheral end of the tower operating platform and extends along the circumference of the tower operating platform, and at least a portion of the extension plate is located between the tower operating platform and the tower body. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 is an exploded view of a tower operating platform according to an embodiment of the present invention;
[0034] Figure 2 is a structural schematic diagram of a tower operating platform according to an embodiment of the present invention;
[0035] Figure 3 is a top perspective view of a tower operating platform according to an embodiment of the present invention;
[0036] Figure 4 The installation structure of the leveling device and the bearing seat in the embodiment of the present invention is shown in FIG. Figure 1 ;
[0037] Figure 5 The installation structure of the leveling device and the bearing seat in the embodiment of the present invention is shown in FIG. Figure 2 ;
[0038] Figure 6 is a schematic structural diagram of a leveling device in an embodiment of the present invention;
[0039] Figure 7 It is a partial cross-sectional schematic diagram of a wind turbine tower according to an embodiment of the present invention.
[0040] Reference numerals:
[0041] 10. Tower operating platform; 1. Splicing module; 11. Connecting ribs; 12. Platform plate; 13. Platform beam; 131. Main beam; 132. Secondary beam; 133. Connecting part; 134. Mounting part; 14. Countersunk hole; 2. Post-casting strip; 3. Fence; 4. Elevator hole; 5. Cable hole; 6. Leveling device; 61. Guide sleeve assembly; 611. Casing; 612. Nut; 613. Anchor plate; 62. Adjustment piece; 7. Orifice plate;
[0042] 20. Tower body; 30. Bearing seat; 301. Corbel; 302. Limiting plate; 303. Connecting assembly; 40. Extension plate. DETAILED DESCRIPTION
[0043] Embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings. The embodiments described below with reference to the accompanying drawings are exemplary and intended to be used to explain the present invention, but should not be understood as limiting the present invention.
[0044] Reference below Figure 1-Figure 7A tower operating platform and a wind turbine tower according to an embodiment of the present invention are described.
[0045] like Figure 1-Figure 7 As shown, the tower operating platform of the embodiment of the present invention includes a splicing module 1 and a post-cast strip 2.
[0046] The splicing module 1 is made of concrete pouring, and there are at least two splicing modules 1, which are spliced and connected. The post-cast strip 2 is made of concrete pouring, and the post-cast strip 2 is poured and connected between two adjacent splicing modules 1.
[0047] like Figure 1-Figure 7 As shown, the tower operating platform 10 is horizontally arranged in the tower body 20 and is used by operators to install and maintain equipment.
[0048] The tower operation platform 10 preferably includes two splicing modules 1, which are made of concrete casting. The splicing module 1 is preferably a semicircular plate and has an arc end and a plane end in the horizontal direction. The plane ends of the two splicing modules 1 are arranged in a relative direction. The post-casting strip 2 is cast and connected between the plane ends of the two splicing modules 1, so that the two splicing modules 1 are spliced and connected, and the two splicing modules 1 and the post-casting strip 2 form a circular platform body. In other words, the platform body includes two splicing modules 1 and the post-casting strip 2. The post-casting strip 2 is also made of concrete casting to enable the two splicing modules 1 to be cast and connected.
[0049] It is understandable that the tower operating platform is not limited to including two semicircular splicing modules. In other embodiments, the tower operating platform includes a plurality of fan-shaped splicing modules, and the plurality of fan-shaped splicing modules are sequentially connected along the circumference of the tower operating platform.
[0050] It can be understood that the splicing module is not limited to including arc ends and planar ends. In other embodiments, the tower operating platform includes a plurality of triangular splicing modules, and the plurality of triangular splicing modules are connected in sequence along the circumference of the tower operating platform to form a polygonal platform body. In other words, the triangular splicing module has three planar ends, two of which are arranged along the circumference of the tower operating platform and are used to connect to other splicing modules on the corresponding side, and the remaining planar end is connected between two of the planar ends to form the outer peripheral surface of the polygonal platform body.
[0051] The tower operating platform of the embodiment of the present invention has multiple splicing modules made of cast concrete, and the post-cast strips made of cast concrete are cast and connected between two adjacent splicing modules to make the multiple splicing modules spliced and connected. The production is simple and fast, with a short processing cycle to ensure delivery time and low production cost. At the same time, the tower operating platform has a simple structure and parts will not be lost during transportation and stacking.
[0052] like Figure 1 and Figure 2 As shown, the end face of the splicing module 1 used to connect the post-cast strip 2 has a plurality of protruding connecting ribs 11. In two adjacent splicing modules 1, the plurality of connecting ribs 11 of one splicing module 1 are overlapped and connected with the plurality of connecting ribs 11 of the other splicing module 1 in a one-to-one correspondence and cast in the post-cast strip 2.
[0053] Specifically, the concrete of the splicing module 1 has a steel mesh inside, and the steel mesh has a plurality of connecting bars 11, and the plurality of connecting bars 11 extend from the plane end of the splicing module 1, and the plurality of connecting bars 11 are arranged at intervals along the length direction of the plane end, and the plurality of connecting bars 11 of one splicing module 1 are overlapped and connected with the plurality of connecting bars 11 of another splicing module 1 one by one, and the two overlapping connecting bars 11 can be further connected by binding wires, and concrete is poured on the plurality of overlapping connecting bars 11 one by one to form a post-casting strip 2, in other words, the concrete of the splicing module 1 has a plurality of overlapping connecting bars 11 one by one, thereby ensuring the strength of the tower operation platform 10.
[0054] like Figure 1-Figure 3 As shown, the splicing module 1 includes a platform plate 12 and a platform beam 13. The platform plate 12 is arranged horizontally, and the platform beam 13 is arranged at the bottom of the platform plate 12. The platform plate 12 and the platform beam 13 are both made of concrete and are integrally connected.
[0055] Both the platform plate 12 and the platform beam 13 have steel meshes therein, and the steel meshes have multiple connecting ribs 11. The portion of the platform plate 12 located at the plane end has a portion of the connecting ribs 11 extending out, and the portion of the platform beam 13 located at the plane end has another portion of the connecting ribs 11 extending out. In two adjacent splicing modules 1, the connecting ribs 11 of the platform plate 12 of one splicing module 1 are connected to the connecting ribs 11 of the platform plate 12 of the other splicing module 1 in a one-to-one correspondence, and the connecting ribs 11 of the platform beam 13 of one splicing module 1 are connected to the connecting ribs 11 of the platform beam 13 of the other splicing module 1 in a one-to-one correspondence.
[0056] The post-cast strip 2 casts and connects the platform plates 12 of two adjacent splicing modules 1, and casts and connects the platform beams 13 of two adjacent splicing modules 1. Specifically, the post-cast strip 2 includes a strip portion and a protruding portion that are integrally connected, the strip portion extends in the horizontal direction and is cast and connected between the two platform plates 12, the connecting ribs 11 extending from the two platform plates 12 are located in the strip portion, a protruding portion is provided at the bottom of the strip portion, the protruding portion is cast and connected between the two platform beams 13, and the connecting ribs 11 extending from the two platform beams 13 are located in the protruding portion.
[0057] The platform beam 13 supports the platform plate 12 to ensure the strength of the platform plate 12, while reducing the thickness and weight of the splicing module 1 and the amount of concrete used. The post-cast strip 2 casts and connects the platform plate 12 and the platform beam 13 to ensure the connection stability between the splicing modules 1 and ensure the strength of the tower operating platform 10.
[0058] like Figure 1-Figure 3 The platform beam 13 includes a main beam 131 and a secondary beam 132, at least one end of the secondary beam 132 is connected to the main beam 131, and the secondary beam 132 is arranged at an angle to the main beam 131, and a plurality of main beams 131 and at least two secondary beams 132 are staggered and connected, wherein the free ends of at least some of the secondary beams 132 form a connecting portion 133, and in two adjacent splicing modules 1, the connecting portion 133 of one splicing module 1 is arranged one-to-one with the connecting portion 133 of the other splicing module 1, and are cast and connected by a post-casting strip 2.
[0059] Specifically, the length direction of the main beam 131 is orthogonal to the length direction of the secondary beam 132, the length direction of the main beam 131 is parallel to the length direction of the plane end, at least two secondary beams 132 are respectively provided on both sides of the width direction of the main beam 131, and at least two secondary beams 132 on the same side are arranged at intervals along the length direction of the main beam 131. Preferably, three secondary beams 132 are provided on the side of the main beam 131 facing the plane end, and two secondary beams 132 are provided on the side of the main beam 131 away from the plane end. Along the length direction of the main beam 131, the secondary beam 132 on the side away from the plane end is located between two adjacent secondary beams 132 facing the plane end.
[0060] The secondary beam 132 has a connecting end and a free end that are relatively arranged along the length direction. The connecting end is connected to the main beam 131. Among the three secondary beams 132 located on the side of the main beam 131 facing the plane end, the free end of the secondary beam 132 is located at the plane end of the splicing module 1 to form a connecting portion 133. Therefore, the plane end of the splicing module 1 has three spaced-apart connecting portions 133. The connecting portion 133 has a plurality of extending connecting ribs 11. The three connecting portions 133 of one splicing module 1 are arranged one by one with the three connecting portions 133 of another splicing module 1, and are cast and connected by a post-casting strip 2.
[0061] It is understandable that the arrangement of the main beam and the secondary beam is not limited to the following: Figure 3As shown, in other embodiments, the tower operating platform includes a plurality of fan-shaped splicing modules, which are connected in sequence along the circumference of the tower operating platform, the platform beam of the splicing module is in a fishbone shape, the main beam extends radially along the tower operating platform, a plurality of secondary beams are provided on both sides of the width of the main beam, the plurality of secondary beams on the same side are arranged at intervals along the length direction of the main beam, the secondary beams and the main beams are arranged at an acute angle, and in two circumferentially adjacent splicing modules, the plurality of secondary beams on one side of the main beam of one splicing module and the plurality of secondary beams on the other side of the main beam of the other splicing module are relatively close and arranged one by one, and are cast and connected by post-casting strips.
[0062] like Figure 1-Figure 3 As shown, the platform body is provided with elevator holes 4 and cable holes 5 arranged at intervals. The elevator hole 4 penetrates the platform plates 12 of the two splicing modules 1 in the vertical direction. Specifically, the elevator hole 4 includes two connected sub-holes, and the two sub-holes are arranged one by one on the platform plates 12 of the two splicing modules 1 and are located at the plane end of the splicing module 1. The post-cast strip 2 is divided into two interval sections by the elevator hole 4.
[0063] The cable hole 5 is provided on the platform plate 12 of one of the splicing modules 1 and penetrates the platform plate 12 in the vertical direction.
[0064] Both the elevator hole 4 and the cable hole 5 are arranged in a staggered manner with respect to the main beam 131 and the secondary beam 132 .
[0065] The tower operating platform 10 further includes a fence 3 , which is arranged on the platform body, specifically, on the platform plates 12 of the two splicing modules 1 , and the fence 3 is arranged around the elevator hole 4 in the vertical direction.
[0066] The elevator hole 4 and the fence 3 are used for the elevator and the elevator track to pass in the vertical direction. At the same time, the fence 3 also separates the space surrounded by it from the working space on the platform plate 12 to protect the operator on the platform plate 12 and prevent the operator on the platform plate 12 from accidentally colliding with the running elevator or accidentally falling from the elevator hole 4. Preferably, the fence 3 is provided with a closable railing door for the operator to pass through.
[0067] The cable hole 5 is used for the cable to pass through in the vertical direction. Preferably, the tower operation platform 10 also includes a perforated plate 7, which covers the cable hole 5 and is provided with a through hole for the cable to pass through, so as to prevent the operator on the platform plate 12 from accidentally falling from the cable hole 5 through the perforated plate 7. During the operation, the perforated plate 7 is prohibited from being stepped on, and a slogan is provided to avoid potential safety hazards.
[0068] The fence 3 and the perforated plate 7 are preferably made of steel and are mounted on the platform plate 12 by means of connecting members such as bolts.
[0069] It should be noted that the elevator hole is not limited to being provided on two platform plates at the same time. In other embodiments, the elevator hole can be provided on the platform plate of a splicing module, or on the platform plates of multiple splicing modules. For example, the tower operating platform includes multiple fan-shaped splicing modules, and the multiple fan-shaped splicing modules are connected in sequence along the circumference of the tower operating platform. The elevator hole is provided at the splicing center of the multiple fan-shaped splicing modules. In other words, the elevator hole is provided at the center of the platform body.
[0070] It should be noted that the cable holes are not limited to being provided on the platform plate of one splicing module. In other embodiments, the cable holes are also provided on the platform plates of two splicing modules. The cable holes and the elevator holes are arranged at intervals along the length direction of the post-cast strip, and the post-cast strip is divided into three sections.
[0071] Furthermore, a mounting frame or mounting bar is also provided on the splicing module 1 for installing and accommodating tools and equipment, such as accommodating a fire extinguisher. The mounting frame and the mounting bar are preferably made of steel material and are mounted on the platform plate 12 by connecting members such as bolts.
[0072] like Figure 2-Figure 5 As shown, the tower operating platform 10 also includes a leveling device 6, which is arranged on the platform plate 12 and / or the platform beam 13. There are multiple leveling devices 6, and the multiple leveling devices 6 are arranged at the outer peripheral end of the splicing whole of at least two splicing modules 1 and are arranged at intervals along the circumference of the splicing whole.
[0073] Specifically, there are at least three leveling devices 6, which are arranged at the outer peripheral end of the platform body and spaced apart along the circumference of the platform body. The leveling devices 6 are arranged at the arc-shaped ends of the corresponding splicing modules 1, and the leveling devices 6 can be arranged on the platform plate 12, on the platform beam 13, or on both the platform plate 12 and the platform beam 13.
[0074] Preferably, the leveling device 6 is disposed in the arc-shaped end of the corresponding splicing module 1 and can extend from the bottom of the arc-shaped end of the splicing module 1. In other words, the leveling device 6 is disposed in the outer peripheral end of the platform body and can extend from the bottom of the outer peripheral end of the platform body.
[0075] Preferably, a plurality of leveling devices 6 are provided at the arc-shaped end of each splicing module 1 .
[0076] The leveling device 6 is used to level the platform body to prevent the tower operating platform 10 from shaking in the tower body 20 along the vertical direction.
[0077] In order to ensure the stability of the tower operating platform 10 and prevent it from shaking due to, for example, the walking of operators, at least three leveling devices 6 are provided to form a stable support.
[0078] It can be understood that the leveling device is not limited to being disposed in the arc-shaped end of the splicing module. In other embodiments, the leveling device is disposed on the arc surface of the arc-shaped end of the splicing module. In other words, the leveling device is disposed on the outer peripheral surface of the outer peripheral end of the platform body. In other words, the leveling device is disposed on the side wall surface of the platform body along the horizontal direction.
[0079] It is understandable that the leveling device is not limited to each splicing module. In other embodiments, the tower operating platform includes more than three fan-shaped splicing modules, and the more than three fan-shaped splicing modules are connected in sequence along the circumference of the tower operating platform. In this case, there are splicing modules without a leveling device.
[0080] like Figure 1-Figure 5 As shown, at least one end of the main beam 131 forms a mounting portion 134, or at least one end of the main beam 131 and the free ends of some secondary beams 132 form mounting portions 134. The mounting portion 134 is located at the outer peripheral end of the spliced whole and is provided with a corresponding leveling device 6.
[0081] Specifically, the length direction of the main beam 131 is parallel to the length direction of the plane end, and both ends of the main beam 131 in the length direction are free ends and are both located at the arc-shaped ends of the splicing module 1 to form the mounting portion 134 .
[0082] In the two secondary beams 132 located at the side of the main beam 131 away from the plane end, the free ends of the secondary beams 132 are located at the arc-shaped end of the splicing module 1 to form a mounting portion 134 .
[0083] Therefore, each splicing module 1 has four mounting portions 134 at the bottom of the arc-shaped end, and the four mounting portions 134 are arranged at intervals along the circumference of the splicing module 1, so that the platform body has eight mounting portions 134 arranged at intervals along the circumference of the platform body, and the eight mounting portions 134 are all located at the bottom of the outer peripheral end of the platform body.
[0084] Each mounting portion 134 is provided with a corresponding leveling device 6 , so that the outer peripheral end of the platform body is provided with eight leveling devices 6 arranged at intervals along the circumferential direction.
[0085] Since the main beam 131 and the secondary beam 132 support the platform plate 12, and the leveling device 6 also supports it during leveling, the leveling device 6 is arranged on the mounting portion 134 formed by the main beam 131 and the secondary beam 132, so that the supporting force of the leveling device 6 acts on the main beam 131 and the secondary beam 132, thereby preventing the leveling device 6 from being arranged on the platform plate 12, which would cause stress concentration and deformation and damage to the platform plate 12.
[0086] At the same time, since the main beam 131 and the secondary beam 132 are located at the bottom of the platform plate 12, the leveling device 6 is arranged on the mounting portion 134 formed by the main beam 131 and the secondary beam 132, which can also avoid interference problems caused by the main beam 131 and the secondary beam 132 being lower than the leveling device 6 when the leveling device 6 is arranged on the platform plate 12.
[0087] It can be understood that the mounting portion is not limited to being formed on the main beam and the secondary beam at the same time. In other embodiments, the tower operating platform includes a plurality of fan-shaped splicing modules, which are connected in sequence along the circumference of the tower operating platform. The platform beam of the splicing module is fishbone-shaped, and the main beam extends radially along the tower operating platform. One end of the main beam in the length direction is located at the arc end of the splicing module to form a mounting portion. A plurality of secondary beams are provided on both sides of the width of the main beam, and the plurality of secondary beams on the same side are arranged at intervals along the length direction of the main beam. The secondary beams and the main beams are arranged at an acute angle. In two circumferentially adjacent splicing modules, the plurality of secondary beams on one side of the main beam of one splicing module and the plurality of secondary beams on the other side of the main beam of the other splicing module are relatively close and arranged one by one, and are cast and connected by a post-casting strip, so only the main beam forms the mounting portion.
[0088] like Figure 4-Figure 6 As shown, the leveling device 6 includes a guide sleeve assembly 61 and an adjusting member 62. The guide sleeve assembly 61 is cylindrical around the vertical direction, and the guide sleeve assembly 61 is cast in the mounting portion 134 along the vertical direction, or the guide sleeve assembly 61 is cast in the mounting portion 134 and the platform plate 12 along the vertical direction. Preferably, the guide sleeve assembly 61 is cast in the mounting portion 134 along the vertical direction.
[0089] The adjusting member 62 extends in the vertical direction, and at least a part of the adjusting member 62 is inserted into the guide sleeve assembly 61. The adjusting member 62 can move in the vertical direction relative to the guide sleeve assembly 61, and can extend from the bottom of the mounting portion 134. Thus, the stability of the tower operating platform 10 can be adjusted by adjusting the positions of the multiple adjusting members 62 in the vertical direction. The guide sleeve assembly 61 guides and installs the adjusting member 62, and can prevent the adjusting member 62 from causing damage to the concrete of the splicing module 1 when it moves.
[0090] It should be noted that the leveling device 6 or the mounting portion 134 provided with the leveling device 6 is used to be provided on a supporting component, preferably provided on the bearing seat 30 in the tower body 20, and the position of the corresponding position of the platform plate 12 along the vertical direction is adjusted by adjusting the extension length of the adjusting member 62 from the bottom of the mounting portion 134, so as to adjust the stability of the tower operation platform 10 by adjusting the positions of the multiple adjusting members 62 along the vertical direction. Since the stability of the tower operation platform 10 is adjusted by the cooperation of the multiple leveling devices 6, during the leveling process, the leveling device 6 is not limited to being extended from the bottom of the mounting portion 134. In other words, the bottom of the leveling device 6 can be located in the mounting portion 134, and at this time, the mounting portion 134 provided with the leveling device 6 plays a supporting role.
[0091] Specifically, when the tower operating platform 10 is in a stable state, the bottoms of all the adjusting parts 62 can be located in the corresponding mounting parts 134. At this time, the mounting part 134 provided with the leveling device 6 itself ensures the stability of the tower operating platform 10. Several adjusting parts 62 may also be extended. The stability of the tower operating platform 10 is ensured by the cooperation of several extended adjusting parts 62, or by the cooperation of several extended adjusting parts 62 and several mounting parts 134 where the adjusting parts 62 are not extended.
[0092] like Figure 4 and Figure 6 As shown, the guide sleeve assembly 61 includes a sleeve 611 and a nut 612. The sleeve 611 is cylindrical in the vertical direction, and the inner circumference of the sleeve 611 is smooth. The nut 612 is arranged at the bottom of the sleeve 611 and is coaxially arranged with the sleeve 611. Preferably, the bottom surface of the nut 612 is flush with the bottom surface of the mounting portion 134.
[0093] The adjusting member 62 is preferably a bolt, which is sequentially inserted into the sleeve 611 and the nut 612 and threadedly connected to the nut 612. The length of the bolt extending from the bottom of the nut 612 can be adjusted by rotating the bolt, thereby adjusting the length of the bolt extending from the bottom of the mounting portion 134. The sleeve 611 guides and installs the bolt, and can prevent the concrete of the splicing module 1 from being damaged when the bolt moves.
[0094] Furthermore, the guide sleeve assembly 61 further includes an anchor plate 613, which is horizontally arranged and connected to the bottom of the sleeve 611, and a nut 612 is arranged at the bottom of the anchor plate 613. The anchor plate 613 is provided with a through hole penetrating the anchor plate 613 in the vertical direction, and the through hole of the anchor plate 613 is connected to both the sleeve 611 and the nut 612 for passing a bolt serving as the adjusting member 62. The sleeve 611, the nut 612 and the anchor plate 613 are all cast in the splicing module 1, and the anchor plate 613 serves to enhance the stability of the guide sleeve assembly 61.
[0095] Furthermore, a countersunk hole 14 is provided on the top surface of the platform plate 12, and the countersunk hole 14 is connected to the top of the sleeve 611. The head of the bolt serving as the adjusting member 62 is located in the countersunk hole 14, so as to facilitate the rotation of the bolt serving as the adjusting member 62 by a tool, while preventing the head of the bolt serving as the adjusting member 62 from being higher than the top surface of the platform plate 12, thereby posing a safety hazard to the operator.
[0096] like Figure 1-Figure 7 As shown, the wind power tower of the embodiment of the present invention comprises a tower body 20, a bearing seat 30 and a tower operation platform 10. The bearing seat 30 is arranged on the inner circumferential surface of the tower body 20, and there are multiple bearing seats 30, and the multiple bearing seats 30 are arranged at intervals along the circumference of the tower body 20. The tower operation platform 10 is the tower operation platform 10 of the embodiment of the present invention, which is located in the tower body 20 and is arranged on multiple bearing seats 30.
[0097] like Figure 4 and Figure 7 As shown, the tower body 20 is cylindrical in the vertical direction, and the inner circumferential surface of the tower body 20 is provided with a plurality of bearing seats 30 arranged at intervals along the circumference of the tower body 20. The tower operating platform 10 is located in the tower body 20 and is provided on the plurality of bearing seats 30 for operators to install and maintain equipment.
[0098] The wind turbine tower of the embodiment of the present invention has the tower operation platform of the embodiment of the present invention, so that the installation time and installation cycle of the wind turbine tower can be ensured, and the production cost is low. The tower operation platform is arranged on a plurality of bearing seats on the inner circumference of the tower body to ensure the stable installation of the tower operation platform and facilitate the installation of the tower operation platform.
[0099] Furthermore, the multiple leveling devices 6 of the tower operating platform 10 are arranged on the multiple bearing seats 30 in a one-to-one correspondence, so as to ensure the stability of the tower operating platform 10 by adjusting the multiple leveling devices 6 .
[0100] Specifically, Figure 4 and Figure 5 As shown, there are multiple bearing seats 30 corresponding to the mounting parts 134 , preferably eight, and eight mounting parts 134 and the leveling devices 6 are correspondingly arranged on the eight bearing seats 30 to ensure the stability of the tower operating platform 10 .
[0101] The bearing seat 30 includes a corbel 301 and a limiting plate 302. The corbel 301 is arranged on the inner circumference of the tower body 20. At least two limiting plates 302 are arranged on the top of the corbel 301, preferably two limiting plates 302. The two limiting plates 302 are arranged at intervals along the circumference of the tower body 20. The corresponding mounting portion 134 and the leveling device 6 are located between the two limiting plates 302, so that the positions of the mounting portion 134 and the leveling device 6 are limited by the two limiting plates 302 to prevent the mounting portion 134 and the leveling device 6 from being separated from the bearing seat 30.
[0102] Furthermore, the tower body 20 is made of concrete. The bearing seat 30 further includes a connection assembly 303, preferably four connection assemblies 303, the connection assembly 303 extending along the radial direction of the tower body 20, one end of the connection assembly 303 is arranged in the wall surface of the tower body 20, and the other end of the connection assembly 303 is connected to the corbel 301, so that the corbel 301 is fixed to the inner circumference of the tower body 20 through the connection assembly 303.
[0103] The connecting assembly 303 preferably includes a sleeve and a bolt, both of which extend radially along the tower body 20. The sleeve is sleeved on the outer periphery of the screw rod of the bolt, and the head of the bolt is located outside the sleeve. The ends of the sleeve and the bolt with heads are cast in the wall surface of the tower body 20, and the tail of the bolt is also located outside the sleeve and extends out from the inner circumference of the tower body 20. The tail of the bolt can be threadedly connected to the corbel 301. The tail of the bolt can also be passed through the corbel 301 and threadedly connected to a nut, and the corbel 301 is fixed by the nut. Preferably, the corbel 301 is fixed by a nut.
[0104] It is understandable that the connection assembly is not limited to including a sleeve and a bolt. In other embodiments, the connection assembly includes an anchor rod, one end of which is anchored in the wall of the tower body, and the other end of the anchor rod is connected to the corbel.
[0105] like Figure 1 , Figure 2 and Figure 7 As shown, the wind turbine tower of the embodiment of the present invention further includes an extension plate 40, which is arranged at the outer peripheral end of the tower operating platform 10 and extends along the circumference of the tower operating platform 10, and at least a portion of the extension plate 40 is located between the tower operating platform 10 and the tower body 20.
[0106] Specifically, the extension plate 40 is annular in the vertical direction and surrounds the outer periphery of the tower operating platform 10. The inner peripheral end of the extension plate 40 is connected to the outer peripheral end of the tower operating platform 10, and the outer peripheral end of the extension plate 40 is against the inner peripheral surface of the tower body 20, so that the extension plate 40 blocks the interval space between the outer peripheral surface of the tower operating platform 10 and the inner peripheral surface of the tower body 20 to avoid safety hazards.
[0107] The extension plate 40 may be a whole, or may include a plurality of arc-shaped plates, and the plurality of arc-shaped plates are sequentially arranged along the circumference of the tower operating platform 10 .
[0108] Preferably, the extension plate 40 is made of steel, and the inner peripheral end of the extension plate 40 is supported on the top surface of the arc-shaped end of the platform plate 12 and connected by a connecting member such as a bolt. It is understandable that in other embodiments, a step may be provided on the arc surface of the arc-shaped end of the platform plate 12, and the inner peripheral end of the extension plate 40 is provided on the step.
[0109] Preferably, an elastic layer, such as a rubber layer, is provided at the outer peripheral end of the extension plate 40 .
[0110] The manufacturing process of the wind power tower of the embodiment of the present invention includes manufacturing the tower operation platform 10. Hoisting the tower operation platform 10 in the tower body 20. Leveling the tower operation platform 10. Installing the extension plate 40.
[0111] The steps of manufacturing the tower operating platform 10 specifically include casting and manufacturing the splicing modules 1. Concrete is poured between two adjacent splicing modules 1, and a post-casting strip 2 is formed, so that at least two splicing modules 1 are spliced and connected to form a platform body. Accessories are installed on the platform body, and the accessories include at least one of a fence 3, a perforated plate 7, a mounting frame, and a mounting fence.
[0112] Preferably, the splicing module 1 is prefabricated in a factory, and then the post-cast strip 2 is cast at the hoisting site.
[0113] It should be noted that, in the step of casting and manufacturing the splicing module 1 , the leveling device 6 has been cast in the corresponding splicing module 1 .
[0114] In the description of the present invention, it is necessary to understand that the terms "length", "width", "thickness", "up", "down", "vertical", "horizontal", "top", "bottom", "inside", "outside", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0115] In addition, the terms "first" and "second" are only used for distinction, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0116] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection, an electrical connection, or communication with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0117] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0118] In the present invention, the terms "one embodiment", "some embodiments", "examples", "specific examples", or "some examples" etc. mean that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the described specific features, structures, materials or characteristics may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.
[0119] Although the above embodiments have been shown and described, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations on the present invention. Changes, modifications, substitutions and variations of the above embodiments by those of ordinary skill in the art are all within the scope of protection of the present invention.
Claims
1. A tower operating platform, characterized in that: include: A splicing module, wherein the splicing module is made of concrete pouring, and there are at least two splicing modules, and at least two of the splicing modules are spliced and connected; The post-cast strip is made of concrete and is cast and connected between two adjacent splicing modules.
2. The tower operating platform according to claim 1, characterized in that: The end face of the splicing module used to connect the post-cast strip has a plurality of protruding connecting ribs. In two adjacent splicing modules, the plurality of connecting ribs of one splicing module are overlapped and connected with the plurality of connecting ribs of the other splicing module in a one-to-one correspondence and cast in the post-cast strip.
3. The tower operating platform according to claim 1, characterized in that: The splicing module comprises a platform plate and a platform beam, wherein the platform beam is arranged at the bottom of the platform plate, and the post-casting strip casts and connects the platform plates of two adjacent splicing modules and the platform beams of two adjacent splicing modules.
4. The tower operating platform according to claim 3, characterized in that: The platform beam includes a main beam and a secondary beam, at least one end of the secondary beam is connected to the main beam, and the secondary beam is arranged at an angle to the main beam, a number of the main beams and at least two secondary beams are staggered and connected, wherein the free ends of at least some of the secondary beams form a connecting portion, and in two adjacent splicing modules, the connecting portion of one of the splicing modules is arranged one-to-one with the connecting portion of the other splicing module, and are cast and connected by the post-casting strip.
5. The tower operating platform according to claim 4, characterized in that: It also includes a fence, which is arranged on several of the platform plates and around the elevator hole. The elevator hole penetrates several of the platform plates and is staggered with the main beam and the secondary beam. The elevator hole and the cable hole are arranged at intervals. The cable hole penetrates several of the platform plates and is staggered with the main beam and the secondary beam.
6. The tower operating platform according to claim 4, characterized in that: It also includes a leveling device, which is arranged on the platform plate and / or the platform beam. There are multiple leveling devices, and the multiple leveling devices are arranged at the outer peripheral ends of the splicing whole of at least two splicing modules and are arranged at intervals along the circumference of the splicing whole.
7. The tower operating platform according to claim 6, characterized in that: At least one end of the main beam forms a mounting portion, or at least one end of the main beam and free ends of some secondary beams form mounting portions; The mounting portion is located at the outer peripheral end of the spliced whole and is provided with the corresponding leveling device.
8. The tower operating platform according to claim 7, characterized in that: The leveling device comprises: A guide sleeve assembly, wherein the guide sleeve assembly is cast in the mounting portion along a vertical direction, or the guide sleeve assembly is cast in the mounting portion and the platform plate along a vertical direction; An adjusting member, at least a portion of which is disposed in the guide sleeve assembly, and the adjusting member can move in a vertical direction relative to the guide sleeve assembly and can extend from the bottom of the mounting portion.
9. The tower operating platform according to claim 8, characterized in that: The guide sleeve assembly comprises a sleeve and a nut, wherein the nut is arranged at the bottom of the sleeve; The adjusting member comprises a bolt, which is sequentially passed through the sleeve and the nut and is threadedly connected with the nut.
10. The tower operating platform according to claim 9, characterized in that: The guide sleeve assembly also includes an anchor plate, which is connected to the sleeve and located at the bottom of the sleeve, and the nut is arranged at the bottom of the anchor plate.
11. The tower operating platform according to claim 9, characterized in that: A countersunk hole is provided on the top surface of the platform plate, the countersunk hole is communicated with the sleeve, and the head of the bolt is located in the countersunk hole.
12. A wind power tower, characterized in that: include: Tower body; A bearing seat, the bearing seat is arranged on the inner circumferential surface of the tower body, there are a plurality of bearing seats, and the plurality of bearing seats are arranged at intervals along the circumferential direction of the tower body; A tower operating platform, wherein the tower operating platform is the tower operating platform described in any one of claims 1 to 11, and the tower operating platform is located in the tower body and is arranged on a plurality of the bearing seats.
13. The wind turbine tower according to claim 12, characterized in that: The tower operating platform has a plurality of leveling devices, and the plurality of leveling devices are arranged on the plurality of bearing seats in a one-to-one correspondence.
14. The wind turbine tower according to claim 13, characterized in that: The bearing seat includes a corbel and a limit plate, wherein the corbel is arranged on the inner circumference of the tower body, and at least two limit plates are arranged at intervals along the circumference of the tower body on the top of the corbel; The tower operating platform has a main beam and a secondary beam, at least one end of the main beam forms a mounting portion, or at least one end of the main beam and the free ends of some secondary beams form mounting portions, the mounting portion is provided with a corresponding leveling device, the mounting portion and the leveling device are arranged on the corresponding corbel piece and are located between two adjacent limit plates.
15. The wind turbine tower according to claim 14, characterized in that: The tower body is made of cast concrete, and the bearing seat also includes a connecting component, one end of which is cast or anchored in the wall surface of the tower body, and the other end of which is connected to the corbel.
16. The wind turbine tower according to claim 12, characterized in that: It also includes an extension plate, which is arranged at the outer peripheral end of the tower operating platform and extends along the circumference of the tower operating platform. At least part of the extension plate is located between the tower operating platform and the tower body.
Citation Information
Cited By
Tower operating platform and wind turbine tower
WO2026026452A1
