Geological mineral exploration sampling device
By combining borehole collection and real-time detection technology in the geological and mineral survey sampling device, the problems of inaccurate deep-seated collection and cumbersome sampling process in the existing technology are solved, and efficient and accurate mineral sample collection and detection are achieved.
Patent Information
- Application Number
- CN202410985431.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-23
- Publication Date
- 2024-10-15
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
It is difficult for existing geological survey sampling devices to accurately collect mineral samples from different deep layers, resulting in inaccurate geological inspection results. The sampling process is cumbersome, consumes a lot of manpower and material resources, and is inefficient.
A geological and mineral survey sampling device is designed, including a body, a holder, a drill, a collector and a detector. Samples are collected through drilling and detected in real time. The drilling posture and collection method are adjusted according to the detection results to ensure that the samples meet the standards. Using Different power bits and leg adjustments for improved stability.
It improves the accuracy and efficiency of the collection device in complex environments, reduces labor and time costs, and ensures the accuracy and representativeness of samples.
Smart Images

Figure CN118776964A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of exploration and sampling, and in particular to a geological and mineral exploration and sampling device. Background Art
[0002] Geological survey is a survey and research activity that uses various means and methods to survey and detect geology, determine the appropriate bearing layer, determine the foundation type based on the bearing capacity of the bearing layer, and calculate the foundation parameters. In the process of geological survey, it is necessary to sample and study mineral resources.
[0003] Accurate resource estimates depend on the collection of reliable samples during exploration. Therefore, the sampling procedure must be carefully designed to minimize sample bias, reduce sample contamination, and improve sample representativeness. Whether it is hand grab sampling, trench sampling or core sampling, the sampling procedure must be adjusted according to the target area mineralization, ground conditions and interpretation requirements, and take into account the actual situation of implementation.
[0004] Most of the sampling devices used in existing geological surveys can only sample the surface and cannot sample different depths, resulting in inaccurate geological inspection results. In addition, impurities are easily introduced during the sampling process, resulting in low sample accuracy and inconvenience in use.
[0005] Chinese patent application number: 201810434396.9, discloses a geological exploration rock sampling device, including two fixed blocks parallel to each other, a placement plate is commonly fixed on the opposite side of the two fixed blocks, a second drive motor is fixed on one side of the upper end of the placement plate, a second opening is provided on the placement plate, a fourth notch is provided on the upper ends of the two fixed blocks, a moving device is commonly provided on the two fourth notches, a sampling device is provided on the moving device, a lighting device is provided on the sampling device, a fixing device is provided on the moving device, a concave groove is provided on one side of the fixed block, and the concave groove is located at the lower end of the fourth notch, and a third opening is provided on the side wall at one end of the concave groove. The present invention realizes the function of convenient movement and can cross the ditch, and will not cause the staff to take a detour or disassemble for transportation due to the ditch, thereby ensuring work efficiency, reducing the labor intensity of the staff, and facilitating smooth and rapid sampling work.
[0006] However, the above method has the following problems: in the sampling of mineral exploration, different tests need to be conducted on different geological samples. The existing technology often uses manual methods to distinguish the type, quality, and appearance of the sampled exploration samples, and also needs to be brought to the testing agency to check whether the geological mineral content meets the requirements. If it is found that it does not meet the requirements, it needs to be re-explored and sampled. However, this method consumes a lot of manpower and material resources and the operation process is cumbersome and complicated, which greatly drags down the efficiency of exploration and sampling work and hinders its progress. Summary of the invention
[0007] To this end, the present invention provides a geological and mineral exploration sampling device to overcome the problem in the prior art that the environment of the sampling location is complex, resulting in the exploration and sampling device being time-consuming, labor-intensive, inefficient, and difficult to collect accurate objects to be tested, thereby reducing the accuracy of the sampling device.
[0008] To achieve the above object, the present invention provides a geological and mineral exploration sampling device, comprising:
[0009] The vehicle body is provided with a number of expansion sockets for fixing various moving parts;
[0010] A fixer connected to the vehicle body and used to fix the vehicle body in a drilling posture;
[0011] A collector, used to collect samples in a filling manner in the sampling area and collect the collected survey samples;
[0012] A drilling machine, which is fixedly mounted on one side of the vehicle body, includes a drill bit for drilling holes in the area to be sampled, and enters a collection state when the sampling depth is reached;
[0013] A detector is arranged on the adjacent side of the vehicle body corresponding to the drilling machine, and is used to detect the sample and record the initial inspection result of the sample, and adjust the drilling posture and the filling method according to the initial inspection result of the sample to obtain a new survey sample, and use the new survey sample as the survey sample for detection to obtain the survey result of the area to be sampled;
[0014] A transport pipe, which is connected to the collector and the detector respectively, and is used to transport the collected survey sample to the detector;
[0015] Wherein, the action components include the drilling rig, the collector, the detector and the conveying pipe;
[0016] The initial sample inspection results are the basis for determining whether the survey samples meet the sampling sample standards.
[0017] Furthermore, the detector detects the survey sample to obtain the actual content of the geological minerals in the survey sample, and the detector is provided with the standard content of the geological minerals in the sampled sample. When the detector obtains the preliminary inspection sample transported by the transport pipe, the detector detects the preliminary inspection sample to obtain the preliminary inspection result of the preliminary inspection sample, and controls the fixer to adjust the corresponding moving position and fixing mode according to the preliminary inspection result, so as to change the drilling posture of the vehicle body;
[0018] The initial inspection samples are inspection samples that are transported to the detector through the transport pipe after the collector is first filled.
[0019] Further, the detector determines whether to change the drilling posture according to the initial inspection result, wherein:
[0020] If the actual content of the geological mineral is less than the standard content, the initial inspection result of the sample is unqualified, the detector determines to reselect the area to be sampled, the fixture adjusts the drilling posture at a preset angle, and after the drill reaches the new area to be sampled, the sampler collects new exploration samples, and the new exploration samples are tested to obtain the initial inspection results of the samples in the area to be sampled;
[0021] The preset angle is a rotation angle determined by the fixture according to the area to be sampled reselected by the detector.
[0022] Furthermore, the fixing device includes a bracket and a leg. When the vehicle body is located on a slope with a slope angle not less than a preset angle with respect to the horizontal ground, the leg drills into the ground perpendicular to the slope direction and adjusts the vehicle body to a drilling posture to fix the vehicle body; the drilling posture is an optimal posture to ensure that the geological and mineral exploration sampling device remains stable through azimuth, inclination and height;
[0023] The preset inclination angle is the minimum angle that affects the operational deformation of the drilling rig due to the inclination of the vehicle body.
[0024] Furthermore, the fixture determines the stability performance through the azimuth angle α, the inclination angle β and the height h of the vehicle body, a standard stability parameter K0 is preset in the fixture, the stability performance K and the standard stability parameter K0 are compared, and the drilling posture of the fixture is adjusted according to the comparison result;
[0025] The drilling posture ensures that the geological and mineral exploration sampling device maintains a stable optimal posture through azimuth, inclination and height.
[0026] Further,
[0027] The standard stability parameter is the minimum stability performance parameter of the drilling posture to ensure that the geological and mineral exploration sampling device can sample normally;
[0028] If the performance parameter is less than the standard stability parameter, the fixture readjusts the azimuth, inclination and height of the vehicle body and redetermines the drilling posture to improve the stability performance.
[0029] Furthermore, the drill bit has different drilling powers, the drill bit is a hollow drill bit and is mounted on the collector; the drill bit drills holes in the area to be sampled to discharge geological minerals, and the discharged geological minerals accumulate around the collector, and the collection state is the state when the exploration minerals accumulate around the collector; the filling method is that when the drilling rig is in the collection state, the collector fills the exploration minerals into the collector.
[0030] Furthermore, the extension length L of the hole drilled by the drilling rig into the area to be sampled is compared with the set sampling depth h, and the drilling feed power of the drilling rig is adjusted at the same time;
[0031] In the implementation, the sampling range is set to the corresponding area with a radius of 1m;
[0032] If L≤h+1m, the drill rig drills at high power into the area to be sampled;
[0033] If h-1m<L<h+1m, the drill rig drills at low power or stops drilling and enters the collection state, waiting for the collector to collect exploration samples;
[0034] If h+1m≤L, the drilling rig stops drilling, redefines the area to be sampled, and the geological and mineral exploration sampling device resamples to obtain new sample preliminary inspection results.
[0035] Furthermore, after the collector collects the survey sample in a filling manner, it performs a preliminary inspection on the survey sample and reads the shape and type of the survey sample. If the shape and type of the survey sample are consistent with the required sampling sample, the survey sample is transported to the detector through a delivery pipe; if the shape and type of the survey sample are inconsistent with the required sampling sample, the drilling rig is controlled to adjust the sampling depth and re-sample.
[0036] Furthermore, the delivery pipe records the type, shape, quantity and quality of the transported exploration samples. If the type, shape, quantity and quality do not meet the sampling requirements, the delivery pipe controls the drilling rig to take samples continuously for multiple times; if the type, shape, quantity and quality meet the sampling requirements, the delivery pipe controls the drilling rig and the collector to stop working until the next command.
[0037] Compared with the prior art, the beneficial effects of the present invention lie in that the fixing device adjusts the drilling posture of the vehicle body, the drilling rig controls the drilling sampling depth, the collector collects the collected survey samples and transports them to the detector through the delivery pipe, the detector detects the samples and resamples the samples with unqualified test results, and the samples to be tested are accurately collected under complex environmental conditions in the sampling area, thereby improving the accuracy of the collection device in various complex situations.
[0038] Furthermore, the detector detects the geological mineral content of the exploration samples taken and compares it with the geological mineral content of the required samples. According to the content comparison results, it is determined whether it is necessary to redetermine the exploration and sampling of the sampling area, so as to quickly confirm whether the collected exploration samples meet the sampling standards, and further improve the accuracy of the collection device in a variety of complex situations.
[0039] Furthermore, the legs of the fixer are used to drill into the slope in a direction perpendicular to the slope to improve the stability of the survey and sampling device. The stability is determined according to the azimuth, inclination and height and the azimuth, inclination and height are readjusted to achieve the function of improving the stability of the survey and sampling device, further improving the accuracy of the collection device in a variety of complex situations.
[0040] Furthermore, by setting drill bits of different powers on the collector and filling the collector with geological minerals discharged by the drill bit into the ground by gravity extrusion to complete the collection work, the structure of the exploration and sampling device is simplified, and the accuracy of the collection device in various complex situations is further improved.
[0041] Furthermore, the sampling depth of the collector is controlled by the extended length of the drill rig, so that exploration samples that meet the requirements can be collected, the sampling precision and accuracy of the exploration sampling device are improved, and the accuracy of the collection device in various complex situations is further improved.
[0042] Furthermore, the survey samples are preliminarily tested through the collector, and the drilling rig is controlled to adjust the sampling depth and re-sample, and the survey samples are recorded and further tested through the delivery pipe. At the same time, the drilling rig is controlled to take samples multiple times, and remedial measures are added for unqualified survey samples, saving manpower and time costs, making the test results more comprehensive, and further improving the accuracy of the collection device in the face of various complex situations. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] Figure 1 It is a structural schematic diagram of the geological and mineral exploration sampling device of the present invention;
[0044] Figure 2 This is a structural diagram of a geological and mineral exploration sampling device according to an embodiment of the present invention;
[0045] Figure 3 This is an operation flow chart of the geological and mineral exploration device according to an embodiment of the present invention;
[0046] Figure 4 This is a flow chart of geological and mineral exploration sampling in an embodiment of the present invention;
[0047] Among them, there are vehicle body 1, fixer 2, drilling rig 3, collector 4, conveying pipe 5 and detector 6. DETAILED DESCRIPTION
[0048] In order to make the objects and advantages of the present invention more clearly understood, the present invention is further described below in conjunction with embodiments; it should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0049] The preferred embodiments of the present invention are described below with reference to the accompanying drawings. It should be understood by those skilled in the art that these embodiments are only used to explain the technical principles of the present invention and are not intended to limit the protection scope of the present invention.
[0050] It should be noted that, in the description of the present invention, terms such as "up", "down", "left", "right", "inside" and "outside" indicating directions or positional relationships are based on the directions or positional relationships shown in the drawings. This is merely for the convenience of description and does not indicate or imply that the device or element must have a specific orientation, be constructed and operated in a specific orientation. Therefore, it cannot be understood as a limitation on the present invention.
[0051] In addition, it should be noted that in the description of the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0052] See also Figure 1 As shown, it is a schematic diagram of the structure of the geological and mineral exploration sampling device of the present invention, and combined with Figure 1 See also Figure 2 As shown, it is a structural diagram of a geological and mineral exploration sampling device according to an embodiment of the present invention, which is used to perform exploration and sampling of a desired geological and mineral area in the face of complex and diverse environments, and includes:
[0053] The vehicle body 1 is provided with a plurality of expansion sockets for fixing various moving parts;
[0054] A fixer 2 is connected to the vehicle body 1 and is used to fix the vehicle body 1 in a drilling posture;
[0055] The collector 4 is used to collect samples in a filling manner in the sampling area and collect the collected survey samples;
[0056] The drilling machine 3 is fixed on one side of the vehicle body 1, and includes a drill bit for drilling holes in the area to be sampled, and enters a collection state when the sampling depth is reached;
[0057] The detector 6 is arranged on the adjacent side of the vehicle body 1 corresponding to the drilling machine 3, and is used to detect the sample and record the initial inspection result of the sample, and adjust the drilling posture and filling method according to the initial inspection result of the sample to obtain a new survey sample, and detect the new survey sample as the survey sample to obtain the survey result of the area to be sampled;
[0058] A conveying pipe 5, which is connected to the collector 4 and the detector 6 respectively, and is used to transport the collected survey samples to the detector 6;
[0059] The action parts include a drilling machine 3, a collector 4, a conveying pipe 5 and a detector 6;
[0060] The initial sample inspection results are the basis for determining whether the survey samples meet the sampling sample standards.
[0061] The fixing device 2 adjusts the drilling posture of the vehicle body 1, the drilling machine 3 controls the drilling sampling depth, the collector 4 collects the collected survey samples and transports them to the detector 6 through the conveying pipe 5, the detector 6 detects the samples and resamples the samples with unqualified test results, so that the samples to be tested can be accurately collected under complex environmental conditions in the sampling area, thereby improving the accuracy of the collection device in various complex situations.
[0062] Specifically, the drilling device includes a luffing mechanism, a jib, a winch mechanism, a power head, a follower frame, a drill rod and drilling tools; the luffing mechanism is connected to the jib to adjust the working amplitude of the jib and the height of the whole machine in the transport state; the jib is the installation and support component of the drill rod and the power head and the guide component of the working footage; a pressurized oil cylinder is installed on the jib, and the power head is supported on the jib through the pressurized oil cylinder; there are rectangular guide rails on the left and right sides of the jib, and the rectangular guide rails guide the working footage of the power head and the follower frame; the follower frame is an auxiliary device for the work of the drill rod.
[0063] Specifically, the power head includes a hydraulic motor, a reducer, a power box, a buffer device, a sliding frame, a connecting plate, and a pressure plate. There is a group of gear rings fixed to the slewing bearing in the power box, and the gear rings are fixed to the wheel hub. There are three groups of driving keys on the inner wall of the wheel hub. After the high-speed rotation of the hydraulic motor is decelerated by the reducer, the power of the reducer is input to the gear shaft in the power box. The pinion of the gear shaft meshes with the gear ring to form the last stage of deceleration. The gear ring fixed to the wheel hub is driven to rotate under the support of the slewing bearing. The key on the wheel hub drives the drill rod to rotate, realizing the rotary motion of the drilling rig 3.
[0064] Specifically, the winch device includes a hydraulic deceleration mechanism, a drum, a winch support, a wire rope, and a rope loop. The winch device is used to lift or lower the drill rod. The drill rod transmits the power of the power head to the drilling tool. The drilling tool includes a sand bucket, a soil drill bucket, a spiral bucket, a simple drill, a bottom cleaning drill bucket, and a hole expansion drill bit. Different drilling tools are configured according to different geological conditions.
[0065] Specifically, the sample testing device includes soil testing, water sample testing, and rock sample testing. Soil testing includes density, water content, and particle size distribution. Water sample testing includes temperature, pH value, dissolved oxygen content, and major ion content. Rock sample testing includes density, hardness, elemental composition, and mineral composition.
[0066] See also Figure 3 As shown, it is an operation flow chart of the geological and mineral exploration device according to an embodiment of the present invention, including:
[0067] Step S1, the vehicle body moves to the vicinity of the area to be sampled;
[0068] Step S2, the fixing device fixes the vehicle body in a drilling posture;
[0069] Step S3, the drilling machine drills a hole into the area to be sampled and enters a collection state when the sampling depth is reached;
[0070] Step S4, the collector collects samples in a filling manner, and delivers the collected survey samples to the detector through a delivery pipe;
[0071] Step S5, the detector detects the sample and records the initial detection result of the sample;
[0072] Step S6, adjusting the drilling posture according to the initial sample inspection result to obtain new exploration samples, and inspecting the new exploration samples to obtain the exploration results of the area to be sampled.
[0073] Please cooperate Figure 2 See also Figure 4 As shown, it is a flow chart of geological and mineral exploration sampling in an embodiment of the present invention.
[0074] The detector 6 detects the survey sample to obtain the actual content of geological minerals in the survey sample. The detector 6 is provided with the standard content of geological minerals in the sampled sample. When the detector 6 obtains the preliminary inspection sample transported by the transport pipe 5, the detector 6 detects the preliminary inspection sample to obtain the preliminary inspection result of the preliminary inspection sample, and controls the fixer 2 to adjust the corresponding moving position and fixing mode according to the preliminary inspection result to change the drilling posture of the vehicle body 1;
[0075] The initial inspection samples are the survey samples that are transported to the detector 6 through the transport pipe 5 after the collector 4 is first filled.
[0076] Specifically, the detector 6 determines whether to change the drilling posture according to the initial inspection result; if the actual content of the geological mineral is less than the standard content, the initial inspection result of the sample is unqualified, and the detector 6 determines to reselect the area to be sampled, and the fixture 2 adjusts the drilling posture at a preset angle, and after the drill rig 3 reaches the new area to be sampled, the sampler collects new exploration samples, and the new exploration samples are tested to obtain the initial inspection results of the samples in the area to be sampled;
[0077] The preset angle is a rotation angle determined by the holder 2 according to the area to be sampled reselected by the detector 6 .
[0078] Embodiment 1: This embodiment is applied to a case where the standard content of geological minerals contained in the preset sampling sample is 10%-20%. If the initial inspection sample transported by the conveying pipe 5 to the detector 6 is detected by the detector 6 and the actual content of the geological mineral is 9%, and the actual content is less than the standard content range, the detector 6 displays that the initial inspection result of the sample is unqualified, and the geological mineral exploration sampling device re-samples to obtain a new initial inspection result of the sample;
[0079] Embodiment 2: This embodiment is applied to a case where the standard content of geological minerals in the preset sampling sample is 10%-20%. If the initial inspection sample transported by the conveying pipe 5 to the detector 6 is detected by the detector 6 and the actual content of the geological mineral is 21%, and the actual content is less than the standard content range, the detector 6 displays that the initial inspection result of the sample is unqualified, and the geological and mineral exploration sampling device re-samples to obtain a new initial inspection result of the sample;
[0080] Embodiment 3: This embodiment is applied to the case where the standard content of geological minerals contained in the preset sampling sample is 10%-20%. If the initial inspection sample transported by the conveying pipe 5 to the detector 6 is detected by the detector 6 and the actual content of the geological mineral is 15%, and the actual content is within the standard content range, the detector 6 will display that the initial inspection result of the sample is qualified, and the exploration sample is retained as a backup;
[0081] The detector 6 detects the geological mineral content of the exploration sample taken and compares it with the geological mineral content of the required sample. According to the content comparison result, it is determined whether it is necessary to re-determine the exploration sampling of the sampling area, so as to quickly confirm whether the collected exploration sample meets the sampling standard, and further improve the accuracy of the collection device in a variety of complex situations.
[0082] Specifically, the fixture 2 includes a bracket and a leg, and the leg includes a hydraulic structure. When the vehicle body 1 is located on a slope with a slope angle not less than a preset angle with the horizontal ground, the leg drills into the ground perpendicular to the slope direction and adjusts the vehicle body 1 to a drilling posture to be fixed; the drilling posture is to ensure that the geological and mineral exploration sampling device maintains an optimal posture of stability through azimuth, inclination, and height;
[0083] The preset inclination angle is the minimum angle that affects the operation deformation of the drilling rig 3 caused by the inclination of the vehicle body 1 .
[0084] It is understandable that the preset inclination angle is related to the device itself. As for the preset inclination angle of different devices, those skilled in the art can select it according to the device conditions, which will not be elaborated here.
[0085] Specifically, the fixture 2 determines the stability performance through the azimuth angle α, the inclination angle β and the height h of the vehicle body 1. The standard stability parameter K0 is preset in the fixture 2. The stability performance K and the standard stability parameter K0 are compared, and the drilling posture of the fixture 2 is adjusted according to the comparison result;
[0086] Among them, the drilling posture ensures that the geological and mineral exploration sampling device maintains a stable and optimal posture through azimuth, inclination and height.
[0087] Embodiment 4: The preset standard stability parameters in the fixture 2 are 0.8, including an azimuth angle of 15°, an inclination angle of 7°, and a height of 10m for the drilling rig 3. The drilling posture initially fixed by the fixture 2 is an azimuth angle of 28°, an inclination angle of 15°, and a height of 15m for the drilling rig 3. It can be concluded that the stability performance of this drilling posture is 0.65, which is less than the preset standard stability parameters. Therefore, the fixture 2 readjusts the azimuth angle, inclination angle, and height of the vehicle body 1, and redetermines the drilling posture to improve the stability performance.
[0088] Embodiment 5: The preset standard stability parameters in the fixture 2 are 0.8, including an azimuth angle of 13°, an inclination angle of 5°, and a height of 13m for the drilling rig 3. The drilling posture initially fixed by the fixture 2 is an azimuth angle of 31°, an inclination angle of 17°, and a height of 14m for the drilling rig 3. It can be concluded that the stability performance of this drilling posture is 0.53, which is less than the preset standard stability parameters. Therefore, the fixture 2 readjusts the azimuth angle, inclination angle, and height of the vehicle body 1, and redetermines the drilling posture to improve the stability performance.
[0089] Embodiment 6: The preset standard stability parameters in the fixture 2 are 0.8, including an azimuth angle of 9°, an inclination angle of 4°, and a height of 12 m for the drilling rig 3. The drilling posture initially fixed by the fixture 2 is an azimuth angle of 16°, an inclination angle of 11°, and a height of 12 m for the drilling rig 3. It can be concluded that the stability performance of this drilling posture is 0.73, which is less than the preset standard stability parameters. Therefore, the fixture 2 readjusts the azimuth angle, inclination angle, and height of the vehicle body 1, and redetermines the drilling posture to improve the stability performance.
[0090] The legs of the fixer 2 are used to drill into the slope in a direction perpendicular to the slope to improve the stability of the survey and sampling device. The stability is determined according to the azimuth, inclination and height and the azimuth, inclination and height are readjusted to achieve the function of improving the stability of the survey and sampling device, further improving the accuracy of the collection device in a variety of complex situations.
[0091] Specifically,
[0092] The standard stability parameters are the minimum stability performance parameters of the drilling posture to ensure that the geological and mineral exploration sampling device can sample normally;
[0093] If the performance parameter is less than the standard stability parameter, the fixture 2 readjusts the azimuth, inclination and height of the vehicle body 1 and redefines the drilling posture to improve the stability performance.
[0094] Specifically, the drill bit has different drilling powers, the drill bit is a hollow drill bit and is mounted on the collector 4; the drill bit drills a hole in the area to be sampled to discharge geological minerals, and the discharged geological minerals accumulate around the collector 4. The collection state is the state when the exploration minerals accumulate around the collector 4; the filling method is that when the drilling rig 3 is in the collection state, the collector 4 fills the exploration minerals into the collector 4.
[0095] The structure of the survey and sampling device is simplified by setting drill bits of different powers on the collector 4 so that the geological minerals discharged from the ground by the drill bits are filled into the collector 4 by gravity extrusion to complete the collection work, thereby further improving the accuracy of the collection device in various complex situations.
[0096] Specifically, the extension length L of the hole drilled by the drill rig 3 into the area to be sampled is compared with the set sampling depth h, and the drilling feed power of the drill rig 3 is adjusted at the same time;
[0097] In the implementation, the sampling range is set to the corresponding area with a radius of 1m. At this time,
[0098] If L≤h+1m, the drilling rig 3 drills at high power into the area to be sampled;
[0099] If h-1m<L<h+1m, the drilling machine 3 drills at low power or stops drilling and enters the collection state, waiting for the collector 4 to collect the survey samples;
[0100] If h+1m≤L, the drilling rig 3 stops drilling, redefines the area to be sampled, and the geological and mineral exploration sampling device resamples to obtain new sample preliminary inspection results.
[0101] Example 7: For the corresponding sampling points with a sampling depth of 200m and a sampling range of 1m, the drill motor has two drilling modes of 120W and 10W. The area to be sampled is 200m away from the ground. After the geological and mineral exploration sampling device fixes the drilling posture, when the drill rig 3 is telescoped to the area to be sampled by no more than 199m, the drill rig 3 continues to drill to the area to be sampled in a high-power form of 120W; when the drill bit is greater than 199m and less than 201m, the drill bit drills or stops drilling in a low-power form of 10W, and during this period the collector 4 collects the exploration samples and transports them to the detector 6; when the drill rig 3 is telescoped to no less than 201m, the drill bit stops drilling, the area to be sampled is redetermined, and the geological and mineral exploration sampling device resamples to obtain new sample preliminary inspection results.
[0102] Example 8: For the corresponding sampling points with a sampling depth of 300m and a sampling range of 3m, the drill motor has two drilling modes of 160W and 18W. The area to be sampled is 300m away from the ground. After the geological and mineral exploration sampling device fixes the drilling posture, when the drill rig 3 is telescoped to the area to be sampled by no more than 297m, the drill rig 3 continues to drill to the area to be sampled in a high-power form of 160W; when the drill bit is greater than 297m and less than 303m, the drill bit drills or stops drilling in a low-power form of 18W, and during this period the collector 4 collects the exploration samples and transports them to the detector 6; when the drill rig 3 is telescoped to no less than 303m, the drill bit stops drilling, the area to be sampled is redetermined, and the geological and mineral exploration sampling device resamples to obtain new sample preliminary inspection results.
[0103] Example 9: For the corresponding sampling points with a sampling depth of 300m and a sampling range of 1m, the drill motor has two drilling modes of 200W and 26W. The area to be sampled is 300m away from the ground. After the geological and mineral exploration sampling device fixes the drilling posture, when the drill rig 3 is telescoped to the area to be sampled by no more than 299m, the drill rig 3 continues to drill to the area to be sampled in a high-power form of 200W; when the drill bit is greater than 299m and less than 301m, the drill bit drills or stops drilling in a low-power form of 26W, and during this period the collector 4 collects the exploration samples and transports them to the detector 6; when the drill rig 3 is telescoped to no less than 301m, the drill bit stops drilling, the area to be sampled is redetermined, and the geological and mineral exploration sampling device resamples to obtain new sample preliminary inspection results.
[0104] The sampling depth of the collector 4 is controlled by the extended length of the drill rig 3, so that exploration samples that meet the requirements can be collected, the sampling precision and accuracy of the exploration sampling device are improved, and the accuracy of the collection device in various complex situations is further improved.
[0105] Specifically, after the collector 4 collects the survey sample in a filling manner, it performs a preliminary inspection on the survey sample and reads the shape and type of the survey sample. If the shape and type of the survey sample are consistent with the required sampling sample, the survey sample is transported to the detector 6 through the conveying pipe 5; if the shape and type of the survey sample are inconsistent with the required sampling sample, the drilling rig 3 is controlled to adjust the sampling depth and re-sample.
[0106] In practice, if the sampling target is block granite, the minimum sampling target is 40% granite blocks. At this time, if a single sample is 30% granite, 20% granite powder, and 50% mud, the detector determines that the sample is unqualified and resamples;
[0107] If the sample taken out at a single time is 41% granite gravel, 19% granite powder, and 40% mud, the detector determines that the sample is qualified and continuously samples several times;
[0108] It is understandable that if there is an unqualified sample during several consecutive samplings, the detector will detect several samples before the sample as the sample set of the collection point and stop sampling.
[0109] Specifically, the delivery pipe 5 records the type, shape, quantity and quality of the transported exploration samples. If the type, shape, quantity and quality do not meet the sampling requirements, the delivery pipe 5 controls the drilling rig 3 to take samples continuously for multiple times; if the type, shape, quantity and quality meet the sampling requirements, the delivery pipe 5 controls the drilling rig 3 and the collector 4 to stop working until the next command.
[0110] The survey samples are preliminarily tested through the collector 4, and the drilling rig 3 is controlled to adjust the sampling depth and re-sample. The survey samples are recorded and further tested through the conveying pipe 5. The drilling rig 3 is controlled to take samples multiple times, which increases the remedial measures for unqualified survey samples, saves manpower and time costs, makes the test results more comprehensive, and further improves the accuracy of the collection device in various complex situations.
[0111] So far, the technical solutions of the present invention have been described in conjunction with the preferred embodiments shown in the accompanying drawings. However, it is easy for those skilled in the art to understand that the protection scope of the present invention is obviously not limited to these specific embodiments. Without departing from the principle of the present invention, those skilled in the art can make equivalent changes or substitutions to the relevant technical features, and the technical solutions after these changes or substitutions will fall within the protection scope of the present invention.
[0112] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A geological and mineral exploration sampling device, characterized in that: include: The vehicle body is provided with a number of expansion sockets for fixing various moving parts; A fixer connected to the vehicle body and used to fix the vehicle body in a drilling posture; A collector, used to collect samples in a filling manner in the sampling area and collect the collected survey samples; A drilling machine, which is fixedly mounted on one side of the vehicle body, includes a drill bit for drilling holes in the area to be sampled, and enters a collection state when the sampling depth is reached; A detector is arranged on the adjacent side of the vehicle body corresponding to the drilling machine, and is used to detect the sample and record the initial inspection result of the sample, and adjust the drilling posture and the filling method according to the initial inspection result of the sample to obtain a new survey sample, and use the new survey sample as the survey sample for detection to obtain the survey result of the area to be sampled; A transport pipe, which is connected to the collector and the detector respectively, and is used to transport the collected survey sample to the detector; Wherein, the action components include the drilling rig, the collector, the detector and the conveying pipe; The initial sample inspection results are the basis for determining whether the survey samples meet the sampling sample standards.
2. The geological and mineral exploration sampling device according to claim 1, characterized in that: The detector detects the survey sample to obtain the actual content of the geological minerals in the survey sample. The detector is provided with the standard content of the geological minerals in the sampled sample. When the detector obtains the preliminary inspection sample transported by the transport pipe, the detector detects the preliminary inspection sample to obtain the preliminary inspection result of the preliminary inspection sample, and controls the fixer to adjust the corresponding moving position and fixing mode according to the preliminary inspection result to change the drilling posture of the vehicle body; The initial inspection samples are inspection samples that are transported to the detector through the transport pipe after the collector is first filled.
3. The geological and mineral exploration sampling device according to claim 2, characterized in that: The detector determines whether to change the drilling posture according to the initial detection result, wherein: If the actual content of the geological mineral is less than the standard content, the initial inspection result of the sample is unqualified, the detector determines to reselect the area to be sampled, the fixture adjusts the drilling posture at a preset angle, and after the drill reaches the new area to be sampled, the sampler collects new exploration samples, and the new exploration samples are tested to obtain the initial inspection results of the samples in the area to be sampled; The preset angle is a rotation angle determined by the fixture according to the area to be sampled reselected by the detector.
4. The geological and mineral exploration sampling device according to claim 1, characterized in that: The fixing device includes a bracket and a leg. When the vehicle body is located on a slope with a predetermined inclination angle not less than the horizontal ground, the leg drills into the ground perpendicular to the slope direction and adjusts the vehicle body to a drilling posture to fix the vehicle body; the drilling posture is an optimal posture to ensure that the geological and mineral exploration sampling device remains stable through azimuth, inclination and height; The preset inclination angle is the minimum angle that affects the operational deformation of the drilling rig due to the inclination of the vehicle body.
5. The geological and mineral exploration sampling device according to claim 4, characterized in that: The fixture determines the stability performance through the azimuth, inclination and height of the vehicle body, and the standard stability parameters are preset in the fixture, and the stability performance and standard stability parameters are compared, and the drilling posture of the fixture is adjusted according to the comparison result; The drilling posture ensures that the geological and mineral exploration sampling device maintains a stable optimal posture through azimuth, inclination and height.
6. The geological and mineral exploration sampling device according to claim 5, characterized in that: The standard stability parameter is the minimum stability performance parameter of the drilling posture to ensure that the geological and mineral exploration sampling device can sample normally; If the performance parameter is less than the standard stability parameter, the fixture readjusts the azimuth, inclination and height of the vehicle body and redetermines the drilling posture to improve the stability performance.
7. The geological and mineral exploration sampling device according to claim 1, characterized in that: The drill bit has different drilling powers, the drill bit is a hollow drill bit and is mounted on the collector; the drill bit drills holes in the area to be sampled to discharge geological minerals, and the discharged geological minerals accumulate around the collector. The collection state is the state when the exploration minerals accumulate around the collector; the filling method is that when the drilling rig is in the collection state, the collector fills the exploration minerals into the collector.
8. The geological and mineral exploration sampling device according to claim 7, characterized in that: The extension length of the hole drilled by the drilling rig into the area to be sampled is compared with the set sampling depth, and the drilling feed power of the drilling rig is adjusted at the same time; If the drilling rig does not reach the sampling depth range, the drilling rig drills toward the area to be sampled at high power; If the drilling rig is within the sampling depth range, the drilling rig drills at low power or stops drilling and enters a collection state, waiting for the collector to collect survey samples; If the drilling rig exceeds the sampling depth range, the drilling rig stops drilling and redefines the area to be sampled, and the geological and mineral exploration sampling device resamples to obtain new sample preliminary inspection results.
9. The geological and mineral exploration sampling device according to claim 7, characterized in that: After the collector collects the survey sample in a filling manner, it performs a preliminary test on the survey sample and reads the shape and type of the survey sample. If the shape and type of the survey sample are consistent with the required sampling sample, the survey sample is transported to the detector through the transport pipe; if the shape and type of the survey sample are inconsistent with the required sampling sample, the drilling rig is controlled to adjust the sampling depth and re-sample.
10. The geological and mineral exploration sampling device according to any one of claims 1 to 9, characterized in that: The delivery pipe records the type, shape, quantity and quality of the transported exploration samples. If the type, shape, quantity and quality do not meet the sampling requirements, the delivery pipe controls the drilling rig to take samples continuously for multiple times; if the type, shape, quantity and quality meet the sampling requirements, the delivery pipe controls the drilling rig and the collector to stop working until the next command.
Citation Information
Patent Citations
Downhole mechanized continuous mining method for hard mineral aggregates
CN109403978A
Gold ore prospecting method below quaternary covering layer in Qinglongbeach area
CN112001007A
Drilling automatic positioning device and method
CN112253083A
Sampling and drilling device for detecting the quality of wall concrete and drilling method
CN113959772A
Tin ore stoping method based on sublevel open-stope sublevel filling
CN115370400A
Cited By
Rotary-cut sampling device and method for geological mineral resource exploration
CN121026660A
