Large-scale distributed energy distribution network sensor optimization configuration method and system
By constructing the PMU optimal configuration model and the FTU optimal configuration model, and using the N-k criterion and electrical distance, the problems of high distribution network monitoring cost and low fault location accuracy are solved, and efficient monitoring and accurate fault location of the distribution network are achieved.
Patent Information
- Application Number
- CN202410728893.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-06
- Publication Date
- 2024-10-15
AI Technical Summary
Existing PMU and FTU configuration methods have unreasonable settings in terms of cost, measurable redundancy and distribution uniformity, resulting in high distribution network monitoring costs and low fault location accuracy, especially when faults are measurable after distributed energy is connected. Sexuality is affected.
Construct an optimal PMU configuration model and introduce the N-k criterion and electrical distance to achieve measurable redundancy of important loads and uniform distribution of PMUs; based on the constraint of maximizing the sum of fault current state distances, optimize the FTU configuration model to improve distribution network fault location Accuracy.
By optimizing the configuration of PMU and FTU, the number of information collection devices is reduced, comprehensive monitoring and efficient fault location of the distribution network are achieved, and the system operating efficiency and fault location accuracy are improved.
Smart Images

Figure CN118783399A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of power system monitoring and control, and in particular to a method and system for optimizing the configuration of sensors in a large-scale distributed energy distribution network. Background Art
[0002] With the access of a large number of distributed generation (DG) to the distribution network, real-time and accurate monitoring of active distribution network information, as well as dynamic analysis and control of the system's operating status, have become important requirements for active distribution networks. Reasonable configuration of information acquisition devices can directly and effectively obtain real-time operating information of active distribution networks, thereby better analyzing and managing their status. However, due to the large scale and large number of nodes in the distribution network, configuring information acquisition devices at all nodes will result in excessively high investment costs, which is neither reasonable nor necessary. Therefore, it is of great significance to study how to use the least information acquisition devices to achieve comprehensive monitoring of active distribution networks.
[0003] There are some shortcomings in the current technology. First, the existing PMU (synchronous phasor measurement unit) configuration method is unreasonable in the setting of objective functions and constraints, and fails to effectively balance factors such as cost, measurable redundancy and PMU distribution uniformity. Secondly, with the access of a large number of distributed power sources to the distribution network, the power flow characteristics after the fault have changed significantly. Most of the existing FTU (feeder terminal unit) configuration methods fail to consider the impact of distributed energy access on the measurability of distribution network faults, which may reduce the accuracy of fault location and prolong the power supply restoration time. Summary of the invention
[0004] In view of the problems existing in the existing PMU configuration method and FTU configuration method, the present invention is proposed.
[0005] Therefore, the problem to be solved by the present invention is how to reasonably configure the information collection device under the condition of controllable cost to achieve comprehensive monitoring and observability of the active distribution network, thereby improving the operating efficiency of the system and the accuracy of fault location.
[0006] In order to solve the above technical problems, the present invention provides the following technical solutions:
[0007] In the first aspect, an embodiment of the present invention provides a method for optimizing the configuration of sensors in a large-scale distributed energy distribution network, which includes constructing a PMU optimization configuration model, introducing the Nk criterion and electrical distance, and realizing measurable redundancy of important loads and uniform distribution of PMUs; based on the constraint condition of the observable rate of distribution network faults, with the goal of maximizing the sum of fault current state distances, establishing a distribution network FTU optimization configuration model taking into account distributed energy access, and improving the accuracy of distribution network fault location.
[0008] As a preferred solution of the large-scale distributed energy distribution network sensor optimization configuration method of the present invention, the construction of the PMU optimization configuration model includes the following steps: according to a plurality of topological structures that are measurable as constraint conditions, with the goal of minimizing the number of PMU configurations in the network, a PMU optimization configuration model is established; the Nk criterion and electrical distance are introduced to improve the PMU optimization configuration model; by setting the measurement redundancy threshold b of the corresponding node i ,i∈Ω 重要负荷 Change to k+1 to ensure that several important load nodes meet the Nk criterion of PMU; distribute PMU evenly in the distribution network through electrical distance, and when the When , the electrical distance between PMUs is maximized, that is, the specific formula of the improved PMU optimization configuration model is as follows:
[0009]
[0010] Where M is a sufficiently large number, N is the total number of switches, and d t (i,j) is the electrical distance between nodes i and j in topology t, is the updated measurement redundancy threshold, T is the number of selected topologies, t is the topology number, S t is the measurement redundancy vector, A t is the node association matrix, and the specific formula is as follows:
[0011]
[0012] The specific formula of the electrical distance is as follows:
[0013] d ij =Z ii +Z jj -2Z ij ;
[0014] Among them, d ij is the electrical distance from node i to node j, Z ij is the mutual impedance from node i to node j, Z ii is the self-impedance of node i, Z jj is the self-impedance of node j.
[0015] The improved PMU optimization configuration model is solved by the improved particle swarm algorithm. The specific formula of the adaptation function in the improved PMU optimization configuration model is as follows:
[0016]
[0017] Among them, fitness(x) is the fitness function, W is the multiplication coefficient, S t is the measurement redundancy vector, gti is the measurable flag. When node i in topology t is measurable, g ti =1; when node i is unmeasurable in topology t, then g ti =0.
[0018] As a preferred solution of the large-scale distributed energy distribution network sensor optimization configuration method of the present invention, the improved particle swarm algorithm includes the following steps: updating the particle swarm position in each generation of population to obtain the population historical optimal position P g1 and the historical suboptimal position P g2 ; At the same time, use the historical optimal position P g1 and the historical suboptimal position P g2 The difference between the two guides P g1 Perform local search and enhance P g1 The search capability within the neighborhood; the specific formula for the local search is as follows:
[0019] P g '1=P g1 +r·d t ·(P g1 -P g2 );
[0020] Among them, P g '1 is the position of the particle after differential, P g1 is the historical optimal position, P g2 is the historical suboptimal position, r is a random number between -1 and 1, d t is the local scaling factor at the tth generation.
[0021] The specific formula for using the greedy retention strategy for the results of local search is as follows:
[0022]
[0023] When it is detected that the historical optimal position of the entire population has not been updated within a certain number of iterations, the improved particle swarm algorithm falls into the local optimal area, and performs reverse learning for s generations on the n particles in the current population, keeping the learning mechanism of the other Nn particles unchanged.
[0024] As a preferred solution of the large-scale distributed energy distribution network sensor optimization configuration method of the present invention, the reverse learning includes the following steps: setting the learning object of the i-th particle to the historical worst position W of particle i i =(w i1 ,w i2 ,...,w iD ); At the same time, from the m worst position sets of the initial population Randomly select particles from The specific formula for updating the velocity of the i-th particle during the reverse learning process is as follows:
[0025]
[0026] in, is the j-th dimension value of the velocity of the ith particle in the t+1th generation, ω is the inertia coefficient, is the j-th dimension value of the velocity of the ith particle of the t-th generation, c3 and c4 represent learning factors, is the j-th dimension value of the position of the ith particle in the t-th generation, is the j-th dimension value of the ith worst position in the t-th generation, is the j-th dimension value of the randomly selected initial worst position.
[0027] By selecting the worst particle, n particles are selected out of the current local optimal area and distributed in the search area.
[0028] As a preferred solution of the method for optimizing the configuration of sensors in a large-scale distributed energy distribution network of the present invention, the worst particle algorithm comprises the following steps: inputting the initial population randomly generated by the particle swarm algorithm and preset radius R; assuming The fitness values are arranged in ascending order. Select the particles whose Euclidean distance is greater than the preset distance from the N-1 particles in the initial population Let count = count + 1, Determine the number of selected particles; when the number of selected particles is less than m initial worst particles, randomly generate new particles, and determine whether the randomly generated new particles meet the Euclidean distance; if the randomly generated new particles meet the Euclidean distance, add the randomly generated new particles to the selected particle set; if the randomly generated new particles do not meet the Euclidean distance, re-determine the number of selected particles; when the number of selected particles is greater than m initial worst particles, output the worst case particle set; the specific formula of the preset radius R is as follows:
[0029]
[0030] in, for The maximum distance in .
[0031] As a preferred solution of the large-scale distributed energy distribution network sensor optimization configuration method of the present invention, the construction process of the distribution network FTU optimization configuration model includes the following steps: using FTU to collect fault information to process the distribution network short-circuit fault; the specific formula for the FTU to collect fault information is as follows:
[0032] FTUs=(s1,s2,...,s k ...,s n );
[0033] Among them, FTUs is the fault information, s k is the fault current direction information detected by the kth FTU; if the fault current direction is positive, then s k =1; if the fault current direction is negative, then s k =-1; if no fault current is detected, s k =0.
[0034] When there is distributed energy in the feeder section of the feeder terminal unit, the direction from the system power supply to the distributed energy is regarded as the positive direction; when there is no distributed energy in the feeder section of the feeder terminal unit, the direction from the system power supply to the distributed energy is regarded as the negative direction; based on the contribution rate of a single FTU to the observability of distribution network faults, the constraint condition of the observability rate of distribution network faults is obtained; the specific formula of the contribution rate is as follows:
[0035]
[0036] Among them, μ i The contribution rate of FTU configuration to the observability of distribution network faults when the i-th switch is configured, a i is the total number of switches downstream of the ith switch, a j +1 is the frequency at which each switch needs to be configured with an FTU when a fault occurs in each area, and N is the total number of switches.
[0037] The specific formula of the observable rate constraint is as follows:
[0038]
[0039] Among them, μ i The contribution rate of configuring FTU for the i-th switch to the observability of distribution network faults is, N is the total number of switches, x i is a variable, and α is the threshold of the observable failure rate of the distribution network.
[0040] As a preferred solution of the method for optimizing the configuration of sensors in a large-scale distributed energy distribution network according to the present invention, it also includes, based on the observable rate constraint condition, minimizing the number of FTU configurations As the goal, the initial solution of FTU optimal configuration is solved; based on the initial solution, with the goal of maximizing the sum of the distances between the two fault current states, a distribution network FTU optimal configuration model considering the access of distributed energy is established; the specific formula of the distribution network FTU optimal configuration model is as follows:
[0041]
[0042]
[0043]
[0044]
[0045] Among them, x i It is a 0-1 variable, indicating whether FTU is installed on the i-node. is the fault current state when line i fails, is the fault current state of line j when it fails, [] c To correct using Dijkstra algorithm, is the maximum number of installed FTUs, Initial solution for FTU configuration.
[0046] The specific formula for the target is as follows:
[0047]
[0048] Where L is the line status, is the fault current state corresponding to the fault line state under the current FTU configuration; if the kth line fails, then L k =1; if the kth line is not faulty, then L k =0.
[0049] Based on the access of distributed energy, the relevant formulas for misjudgment of short-circuit current direction are as follows:
[0050]
[0051] Among them, S i (L) is the fault current state corresponding to the fault line i state under the current FTU configuration, Kj is the switch corresponding to the jth distributed energy source, L j is the fault current state of line j, SET down is the downstream line set of line i, SET up is the upstream line set of line i, SET DG It is the collection of nodes where distributed energy sources are located.
[0052] The problem of misjudgment of short-circuit current direction caused by the access of distributed energy in the FTU optimization configuration model of the distribution network is corrected by a correction strategy; the correction strategy includes the following steps: i(L) The distribution network structure and fault point are input into the distribution network FTU optimization configuration model; all distributed energy and FTU are numbered; according to the Dijkstra algorithm, for any distributed energy i and FTUj, the path between the ith distributed energy and the jth FTU is found; at the same time, it is determined whether there is a path between the ith distributed energy and the jth fault point; if there is a path between the ith distributed energy and the jth fault point, the fault current state of the modified distributed energy feeder should be -1; if there is no path between the distributed energy and the fault point, the fault current state of the feeder with distributed energy remains unchanged, and the correct current state is output.
[0053] In the second aspect, an embodiment of the present invention provides a large-scale distributed energy distribution network sensor optimization configuration system, which includes: a PMU optimization configuration module, which is used to construct a PMU optimization configuration model, introduce the Nk criterion and electrical distance, and achieve measurable redundancy of important loads and uniform distribution of PMUs; an FTU optimization configuration module, based on the constraint conditions of the observable rate of distribution network faults, with the goal of maximizing the sum of fault current state distances, to establish a distribution network FTU optimization configuration model taking into account distributed energy access, thereby improving the accuracy of distribution network fault location.
[0054] In a third aspect, an embodiment of the present invention provides a computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: when the computer program instructions are executed by the processor, the steps of the method for optimizing the configuration of sensors in a large-scale distributed energy distribution network as described in the first aspect of the present invention are implemented.
[0055] In a fourth aspect, an embodiment of the present invention provides a computer-readable storage medium having a computer program stored thereon, wherein: when the computer program instructions are executed by a processor, the steps of the method for optimizing the configuration of sensors in a large-scale distributed energy distribution network as described in the first aspect of the present invention are implemented.
[0056] The beneficial effects of the present invention are as follows: the present invention realizes measurable redundancy of important loads and uniform distribution of PMUs by constructing a PMU optimization configuration model, introducing the Nk criterion and electrical distance; based on the constraint condition of the observable rate of distribution network faults, with the goal of maximizing the sum of fault current state distances, a distribution network FTU optimization configuration model taking into account distributed energy access is established, thereby improving the accuracy of distribution network fault location. BRIEF DESCRIPTION OF THE DRAWINGS
[0057] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. Among them:
[0058] Figure 1 This is a flow chart of the method for optimizing the configuration of sensors in a large-scale distributed energy distribution network according to Example 1.
[0059] Figure 2 This is a typical distribution network of the large-scale distributed energy distribution network sensor optimization configuration method of Example 1.
[0060] Figure 3 This is the misjudgment of the short-circuit current direction in the large-scale distributed energy distribution network sensor optimization configuration method in Example 1.
[0061] Figure 4 This is the IEEE 33 distribution network of Example 2, which is the method for optimizing the configuration of sensors in a large-scale distributed energy distribution network.
[0062] Figure 5 Example 2 is the PMU configuration result of the large-scale distributed energy distribution network sensor optimization configuration method.
[0063] Figure 6 Example 2 is the FTU configuration result of the large-scale distributed energy distribution network sensor optimization configuration method. DETAILED DESCRIPTION
[0064] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the accompanying drawings.
[0065] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.
[0066] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor does it refer to a separate or selective embodiment that is mutually exclusive with other embodiments.
[0067] Example 1
[0068] Reference Figure 1 to Figure 3 , which is the first embodiment of the present invention, and provides a method for optimizing the configuration of sensors in a large-scale distributed energy distribution network, comprising:
[0069] Specifically, common information collection devices include synchronized phasor measurement units (PMUs) and feeder terminal units (FTUs). Synchronized phasor measurement units (PMUs) are usually installed at key locations of the power system, such as the end of the line and the exit of the substation, in order to obtain comprehensive system information and help operators respond quickly. Synchronized phasor measurement units (PMUs) are used to measure the voltage, current and phase angle information of each node or device in the power system in real time. Through high-precision timestamps, synchronized phasor measurement units (PMUs) can provide accurate phasor data for monitoring the status of the power grid, detecting and locating faults, and analyzing the stability of the power system.
[0070] Furthermore, the feeder terminal unit (FTU) is generally installed on the main line or important branch of the distribution network to monitor the operating status of the line and quickly take protective measures when a fault occurs to ensure the safe and stable operation of the power grid. The feeder terminal unit (FTU) can monitor parameters such as current and voltage in real time and has a protection function. Operators can use the feeder terminal unit (FTU) to quickly detect and locate line faults to ensure the reliable operation of the power system.
[0071] S1: Construct a PMU optimization configuration model, introduce the Nk criterion and electrical distance, and achieve measurable redundancy of important loads and uniform distribution of PMUs.
[0072] Specifically, based on the constraints that several topological structures can be realized and measured, and with the goal of minimizing the number of PMU configurations in the network, a PMU optimization configuration model is established. The specific formula of the PMU optimization configuration model is as follows:
[0073]
[0074] Where N is the total number of switches, x i is a 0-1 variable indicating whether PMU is configured on node i. i =1, then configure PMU on node i, if x i = 0, then PMU is not configured on node i, x = (x1, x2, ..., x N ) T , T is the number of selected topologies, t is the topology number, S t is the measurement redundancy vector, b is an all-one matrix, which is used to ensure that each node is measurable, A t is the node association matrix, and the specific formula is as follows:
[0075]
[0076] Furthermore, the PMU optimization configuration model is improved by setting the measurement redundancy threshold b of the corresponding node i ,i∈Ω 重要负荷 Change to k+1 to ensure that several important load nodes can meet the Nk criterion of PMU, that is, the failure of k PMUs related to this node does not affect the monitoring of this node; PMUs are evenly distributed in the distribution network through electrical distance, and when the When , the electrical distance between PMUs is maximized, that is, the specific formula of the improved PMU optimization configuration model is as follows:
[0077]
[0078] Where M is a sufficiently large number, here we take 1×10 3 , x j is a 0-1 variable indicating whether PMU is configured on node j. j =1, then configure PMU on node j, if x j = 0, then no PMU is configured on node j, is the updated measurement redundancy threshold, T is the number of selected topologies, t is the topology number, S t is the measurement redundancy vector.
[0079] It should be noted that electrical distance refers to the electrical connection between nodes, indicating the degree of electrical coupling between nodes. Generally speaking, the shorter the electrical distance between the fault point and the main power point, the greater the scope and extent of the fault. The input impedance of a two-port network is usually used to represent the electrical distance between nodes. The specific formula for electrical distance is as follows:
[0080] d ij =Z ii +Z jj -2Z ij ;
[0081] Among them, d ij is the electrical distance from node i to node j, Z ij is the mutual impedance from node i to node j, Z ii is the self-impedance of node i, Z jj is the self-impedance of node j.
[0082] Furthermore, the fitness function is used to guide the evolution of the particle swarm. The particles will move closer to the particles with higher fitness function values and gradually optimize. The improved PMU optimization configuration model is solved by the improved particle swarm algorithm. The specific formula of the fitness function in the improved PMU optimization configuration model is as follows:
[0083]
[0084] Among them, fitness(x) is the fitness function, which is used to guide the evolution of the particle swarm. The particles will move closer to the particles with higher fitness function values and gradually optimize. M is a sufficiently large number, which is 1×10 3 , W is the multiplication coefficient, W>>M, S t is the measurement redundancy vector, g ti is the measurable flag. When node i in topology t is measurable, g ti =1; when node i is unmeasurable in topology t, then g ti =0.
[0085] It should be noted that the Particle Swarm Optimization (PSO) algorithm is a heuristic algorithm that originates from the study of the flocking behavior of birds during foraging. Its main idea is to use information sharing between individuals in the population to generate an evolutionary process from disorder to order in the search space, thereby obtaining the optimal / local optimal position / solution to the problem.
[0086] Specifically, the improved particle swarm algorithm includes the following steps: updating the particle swarm position in each generation to obtain the historical optimal position P of the population g1 and the historical suboptimal position P g2 ; At the same time, use the historical optimal position P g1 and the historical suboptimal position P g2 The difference between the two guides P g1 Perform local search and enhance P g1 The search capability within the neighborhood, the specific formula for local search is as follows:
[0087] P g '1=P g1 +r·d t ·(P g1 -P g2 );
[0088] Among them, P g '1 is the position of the particle after differential, P g1 is the historical optimal position, P g2 is the historical suboptimal position, r is a random number between -1 and 1, used to control the direction of local search, d t is the local scaling factor at generation t, d t The specific formula for linear decrease with the increase of population iteration number is as follows:
[0089]
[0090] Among them, d t+1 is the local scaling factor at generation t+1, d tis the local scaling factor at the tth generation, T is the number of selected topologies, and t is the topology number.
[0091] It should be noted that in the early stages of evolution, P g1 The optimal solution of the distance function is generally far away, so the larger d t It enables particles to conduct local search with a larger radius, accelerating the convergence speed. In the late stage of evolution, the distance to the optimal solution is generally closer, and the smaller d t Can search for higher precision solutions, so d t It decreases linearly with the number of population iterations.
[0092] Furthermore, a greedy retention strategy is adopted for the results of local search. The specific formula is as follows:
[0093]
[0094] Furthermore, when it is detected that the historical optimal position of the entire population has not been updated within a certain number of iterations, the improved particle swarm algorithm falls into the local optimal area, and performs reverse learning for s generations on the n particles in the current population, keeping the learning mechanism of the other Nn particles unchanged.
[0095] Specifically, reverse learning includes the following steps: setting the learning object of the i-th particle to the historical worst position W of particle i i =(w i1 ,w i2 ,...,w iD ); At the same time, from the m worst position sets of the initial population Randomly select particles from The specific formula for updating the velocity of the i-th particle during the reverse learning process is as follows:
[0096]
[0097] in, is the j-th dimension value of the velocity of the ith particle in the t+1th generation, ω is the inertia coefficient, is the j-th dimension value of the velocity of the ith particle of the t-th generation, c3 and c4 are learning factors, usually 1.5-2.0, r3 and r4 are random numbers in [0,1], is the j-th dimension value of the position of the ith particle in the t-th generation, is the j-th dimension value of the ith worst position in the t-th generation, is the j-th dimension value of the randomly selected initial worst position.
[0098] Furthermore, to ensure that the m initial worst particles can pull the n particles out of the current local optimal area and widely distribute them in the search area, there should be a large Euclidean distance between the m initial worst particles. Therefore, when selecting the worst particles, it is necessary to ensure that the distance between them is greater than the preset repulsion radius R.
[0099] Furthermore, selecting the worst particle includes the following steps: input the initial population and the preset exclusion radius R; assuming The fitness values are arranged in ascending order. Select the particles whose Euclidean distance is greater than the preset distance from the N-1 particles in the initial population Let count = count + 1, Determine the number of selected particles; when the number of selected particles is less than m, randomly generate new particles; determine whether the randomly generated new particles meet the Euclidean distance conditions, add them to the selected particle set, re-determine the number of selected particles, and output the worst-case particle set; when the number of selected particles is greater than m, output the worst-case particle set; the specific formula for the preset radius R is as follows:
[0100]
[0101] in, for The maximum distance in .
[0102] It should be noted that in the reverse learning process, the maximum update speed v of the particle is dynamically adjusted. max The purpose of particle reverse learning is to use the pulling effect of the population's initial worst position and the individual's historical worst position to quickly escape from the local optimal area. max The larger the value, the greater the escape velocity. In addition, since the algorithm is prone to fall into the local optimal area before reverse learning, it is also necessary to increase the particle's v max , enabling the search to be carried out in a larger area. After the reverse learning is completed, v max Set to the original value.
[0103] S2: Based on the constraint of the observable rate of distribution network faults and taking the maximization of the sum of fault current state distances as the goal, a distribution network FTU optimization configuration model considering the access of distributed energy is established to improve the accuracy of distribution network fault location.
[0104] Specifically, the FTU is used to collect fault information to handle the short-circuit fault of the distribution network. The specific formula for FTU to collect fault information is as follows:
[0105] FTUs=(s1,s2,...,s k ...,s n );
[0106] Among them, FTUs is the fault information, s k is the fault current direction information detected by the kth FTU. If the fault current direction is positive, then s k =1; if the fault current direction is negative, then s k =-1; if no fault current is detected, s k =0; when there is distributed energy in the feeder section of the feeder terminal unit, the direction from the system power supply to the distributed energy is regarded as the positive direction; when there is no distributed energy in the feeder section of the feeder terminal unit, the direction from the system power supply to the distributed energy is regarded as the negative direction.
[0107] Furthermore, most distribution networks adopt closed-loop design and open-loop operation, such as Figure 2 As shown in Table 1, the FTU configuration required when a single fault occurs in the four areas A1 to A4 is shown in Table 1. Figure 2 In the system, if a fault occurs in any area, the fault location can be accurately located in this area by the measurement information provided by the FTU. In this case, all switches in the system need to be configured with FTU. This condition can be called the full FTU configuration condition.
[0108] Table 1 FTU configuration table
[0109] Fault area Fault current flow switch Need to configure the FTU switch A1 1 1 A2 1,2 1,2 A3 1,2,3 1,2,3 A4 1,2,4 1,2,4
[0110] Furthermore, in Figure 2 In the table, the frequency of each switch needing to configure FTU when a fault occurs in each area, the total number of downstream switches of each switch, and the contribution rate of each switch to observability when FTU is configured are shown in Table 2. When the distribution network fault is completely observable, the frequency of each switch needing to configure FTU is equal to the total number of downstream switches plus 1; when the switch is at a leaf node, the number of downstream switches is 0; the total frequency of all switches needing to configure FTU is equal to the total number of downstream switches of all nodes plus the total number of switches (here the total frequency is 9); the smaller the number of layers, the greater the contribution of FTU configuration to fault observability, and its contribution can be measured by the contribution rate. The specific formula of the contribution rate is as follows:
[0111]
[0112] Among them, μ i The contribution rate of FTU configuration to the observability of distribution network faults when the i-th switch is configured, a i is the total number of switches downstream of the ith switch, a i +1 is the frequency at which each switch needs to be configured with an FTU when a fault occurs in each area, and N is the total number of switches.
[0113] Table 2 FTU fault observability contribution rate
[0114] switch Frequency Total number of downstream switches required Contribution rate 1 4 3 4 / 9 2 3 2 3 / 9 3 1 0 1 / 9 4 1 0 1 / 9
[0115] Specifically, based on the contribution rate of a single FTU to the observability of distribution network faults, the observability rate constraint of the distribution network faults is obtained. The specific formula of the observability rate constraint is as follows:
[0116]
[0117] Among them, μ i The contribution rate of configuring FTU for the i-th switch to the observability of distribution network faults is, N is the total number of switches, x i is a 0-1 variable, indicating whether FTU is configured on switch i, and α is the threshold of the observable rate of distribution network faults.
[0118] Furthermore, based on the observable rate constraint, the number of FTU configurations is minimized. As the goal, find the initial solution of the FTU optimization configuration.
[0119] Furthermore, based on the initial solution, with the goal of maximizing the sum of the distances between the two fault current states, a distribution network FTU optimization configuration model considering the access of distributed energy sources is established; the specific formula for maximizing the sum of the distances between the two fault current states is as follows:
[0120]
[0121] Where L is the line status, is the fault current state corresponding to the fault line state under the current FTU configuration; if the kth line fails, then L k =1; if the kth line is not faulty, then L k =0.
[0122] Specifically, based on the access of distributed energy, the relevant formula for misjudgment of short-circuit current direction is as follows:
[0123]
[0124] Among them, S i (L) is the fault current state corresponding to the fault line i state under the current FTU configuration, K j is the switch corresponding to the jth distributed energy source, L j is the fault current state of line j, SET down is the downstream line set of line i, SET up is the upstream line set of line i, SET DG It is the collection of nodes where distributed energy sources are located.
[0125] Furthermore, the correction strategy is used to correct the misjudgment problem of short-circuit current direction caused by the access of distributed energy in the distribution network FTU optimization configuration model. The correction strategy includes the following steps: i (L) The distribution network structure and fault point are input into the distribution network FTU optimization configuration model; all distributed energy and FTU are numbered; based on the Dijkstra algorithm, for any i and j, the path between the ith distributed energy and the ith FTU is found; it is determined whether there is a path between the ith distributed energy and the jth fault point; if there is a path between the ith distributed energy and the jth fault point, the fault current state of the modified distributed energy feeder should be -1; if there is no path between the distributed energy and the fault point, the fault current state of the distributed energy feeder remains unchanged; the correct current state is output.
[0126] Furthermore, the specific formula of the distribution network FTU optimization configuration model is as follows:
[0127]
[0128] Among them, x i is a variable, is the fault current state when line i fails, is the fault current state of line j when it fails, [] c To correct using Dijkstra algorithm, is the maximum number of installed FTUs, Initial solution for FTU configuration.
[0129] Specifically, the specific formula of the fitness function in the distribution network FTU optimization configuration model is as follows:
[0130]
[0131] Among them, fitness (L) is the fitness function, which is used to guide the evolution of the particle swarm. The particles will move closer to the particles with higher fitness function values and gradually optimize. is the fault current state when line i fails, is the fault current state when line j fails.
[0132] Furthermore, this embodiment also provides a large-scale distributed energy distribution network sensor optimization configuration system, including: a PMU optimization configuration module, which is used to construct a PMU optimization configuration model, introduce the Nk criterion and electrical distance, and achieve measurable redundancy of important loads and uniform distribution of PMUs; an FTU optimization configuration module, based on the constraint conditions of the observable rate of distribution network faults, with the goal of maximizing the sum of fault current state distances, to establish a distribution network FTU optimization configuration model taking into account distributed energy access, thereby improving the accuracy of distribution network fault location.
[0133] This embodiment also provides a computer device, which is suitable for the case of a large-scale distributed energy distribution network sensor optimization configuration method, including a memory and a processor; the memory is used to store computer-executable instructions, and the processor is used to execute computer-executable instructions to implement the large-scale distributed energy distribution network sensor optimization configuration method proposed in the above embodiment.
[0134] The computer device may be a terminal, and the computer device includes a processor, a memory, a communication interface, a display screen and an input device connected via a system bus. The processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The communication interface of the computer device is used to communicate with an external terminal in a wired or wireless manner, and the wireless manner can be achieved through WIFI, an operator network, NFC (near field communication) or other technologies. The display screen of the computer device may be a liquid crystal display screen or an electronic ink display screen, and the input device of the computer device may be a touch layer covering the display screen, or a key, trackball or touchpad provided on the housing of the computer device, or an external keyboard, touchpad or mouse, etc.
[0135] This embodiment also provides a storage medium on which a computer program is stored. When the program is executed by a processor, the following steps are implemented: constructing a PMU optimization configuration model, introducing the Nk criterion and electrical distance, and realizing measurable redundancy of important loads and uniform distribution of PMUs; based on the constraint condition of the observable rate of distribution network faults, with the goal of maximizing the sum of fault current state distances, establishing a distribution network FTU optimization configuration model taking into account distributed energy access, and improving the accuracy of distribution network fault location.
[0136] In summary, the present invention constructs a PMU optimization configuration model, introduces the Nk criterion and electrical distance, and realizes the measurable redundancy of important loads and uniform distribution of PMUs; based on the constraint condition of the observable rate of distribution network faults, with the goal of maximizing the sum of fault current state distances, a distribution network FTU optimization configuration model taking into account distributed energy access is established to improve the accuracy of distribution network fault location.
[0137] Example 2
[0138] Reference Figures 4 to 6 , which is the second embodiment of the present invention, and this embodiment provides a method for optimizing the configuration of sensors in a large-scale distributed energy distribution network. In order to verify the beneficial effects of the present invention, scientific demonstration is carried out through economic benefit calculation and simulation experiments.
[0139] Specifically, the present invention is tested on the IEEE 33 power distribution network. Figure 4 Assuming that nodes 9, 19 and 25 are important loads, the present invention considers the N-1 criterion of PMU, and the PMU configuration scheme is as follows: Figure 5 As shown, the present invention configures a total of 12 PMUs, which are relatively evenly distributed in the distribution network. The electrical information of the remaining nodes that are not configured with PMUs can be obtained through Kirchhoff's law, that is, the configuration scheme can achieve full measurability of the IEEE 33 distribution network and can meet the N-1 criterion of PMU for important loads.
[0140] Furthermore, considering the first-order line fault, in the first stage, the present invention sets the distribution network fault observable rate threshold to 50%, and then solves the FTU optimization configuration model of the second stage taking into account the access of distributed energy resources based on the improved particle swarm algorithm, and obtains the FTU configuration scheme, such as Figure 6 shown.
[0141] Furthermore, the performance comparison of the FTU configuration scheme is shown in Table 3. The threshold of the observable rate of distribution network faults in the comparison example is still set to 50%, and random points are selected in the second stage. It can be seen from Table 3 that after using the proposed method, the accuracy of fault location is improved by 31.6% when the number of FTU configurations is the same, which shows the effectiveness of the proposed method. Based on the fault current information obtained by sampling the configured FTU, the operator can accurately locate the line where the fault occurs, which is of great significance for power supply restoration after the distribution network fault.
[0142] Table 3 Performance comparison
[0143]
[0144] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.
Claims
1. A method for optimizing the configuration of sensors in a large-scale distributed energy distribution network, characterized in that: include, Construct a PMU optimization configuration model, introduce the Nk criterion and electrical distance, and achieve measurable redundancy of important loads and uniform distribution of PMUs; Based on the constraint of the observable rate of distribution network faults and taking the maximization of the sum of fault current state distances as the goal, an FTU optimization configuration model for distribution network considering the access of distributed energy sources is established to improve the accuracy of distribution network fault location.
2. The large-scale distributed energy distribution network sensor optimization configuration method according to claim 1, characterized in that: The construction of the PMU optimization configuration model comprises the following steps: Based on the constraints that several topological structures are all measurable, and with the goal of minimizing the number of PMU configurations in the network, a PMU optimization configuration model is established; The Nk criterion and electrical distance are introduced to improve the PMU optimization configuration model; By setting the measurement redundancy threshold b of the corresponding node i ,i∈Ω 重要负荷 Change to k+1 to ensure that several important load nodes meet the Nk criterion of PMU; The PMUs are evenly distributed in the distribution network by electrical distance. When , the electrical distance between PMUs is maximized, that is, the specific formula of the improved PMU optimization configuration model is as follows: Where M is a sufficiently large number, N is the total number of switches, and d t (i,j) is the electrical distance between nodes i and j in topology t, is the updated measurement redundancy threshold, T is the number of selected topologies, t is the topology number, S t is the measurement redundancy vector, A t is the node association matrix, and the specific formula is as follows: The specific formula of the electrical distance is as follows: d ij =Z ii +Z jj -2Z ij ; Among them, d ij is the electrical distance from node i to node j, Z ij is the mutual impedance from node i to node j, Z ii is the self-impedance of node i, Z jj is the self-impedance of node j; The improved PMU optimization configuration model is solved by the improved particle swarm algorithm. The specific formula of the adaptation function in the improved PMU optimization configuration model is as follows: Among them, fitness(x) is the fitness function, W is the multiplication coefficient, S t is the measurement redundancy vector, g ti is the measurable flag. When node i in topology t is measurable, g ti =1; when node i is unmeasurable in topology t, then g ti =0.
3. The large-scale distributed energy distribution network sensor optimization configuration method according to claim 2, characterized in that: The improved particle swarm algorithm comprises the following steps: Update the particle swarm position in each generation to obtain the historical optimal position P of the population g1 and the historical suboptimal position P g2 ; At the same time, using the historical optimal position P g1 and the historical suboptimal position P g2 The difference between the two guides P g1 Perform local search and enhance P g1 Search capabilities within the neighborhood; The specific formula of the local search is as follows: P g '1=P g1 +r·d t ·(P g1 -P g2 ); Among them, P g '1 is the position of the particle after differential, P g1 is the historical optimal position, P g2 is the historical suboptimal position, r is a random number between -1 and 1, d t is the local scaling factor at the tth generation; The specific formula for using the greedy retention strategy for the results of local search is as follows: When it is detected that the historical optimal position of the entire population has not been updated within a certain number of iterations, the improved particle swarm algorithm falls into the local optimal area, and performs reverse learning for s generations on the n particles in the current population, keeping the learning mechanism of the other Nn particles unchanged.
4. The method for optimizing the configuration of sensors in a large-scale distributed energy distribution network according to claim 3, characterized in that: The reverse learning includes the following steps: Set the learning object of the i-th particle to the historical worst position W of particle i i =(w i1 ,w i2 ,...,w iD ); At the same time, from the m worst position sets of the initial population Randomly select particles from The specific formula for updating the velocity of the i-th particle during the reverse learning process is as follows: in, is the j-th dimension value of the velocity of the ith particle in the t+1th generation, ω is the inertia coefficient, is the j-th dimension value of the velocity of the ith particle of the t-th generation, c3 and c4 represent learning factors, is the j-th dimension value of the position of the ith particle in the t-th generation, is the j-th dimension value of the ith worst position in the t-th generation, is the j-th dimension value of the randomly selected initial worst position; By selecting the worst particle, n particles are selected out of the current local optimal area and distributed in the search area.
5. The method for optimizing the configuration of sensors in a large-scale distributed energy distribution network according to claim 4, characterized in that: The worst particle algorithm comprises the following steps: Input the initial population randomly generated by the particle swarm algorithm and a preset radius R; Assumptions The fitness values are arranged in ascending order. Select the particles whose Euclidean distance is greater than the preset distance from the N-1 particles in the initial population Let count = count + 1, Determine the number of selected particles; When the number of selected particles is less than m initial worst particles, new particles are randomly generated, and it is determined whether the randomly generated new particles meet the Euclidean distance; If the randomly generated new particle satisfies the Euclidean distance, the randomly generated new particle is added to the selected particle set; If the randomly generated new particles do not satisfy the Euclidean distance, the number of selected particles is re-determined; When the number of selected particles is greater than m initial worst particles, the worst case particle set is output; The specific formula of the preset radius R is as follows: in, for The maximum distance in .
6. The method for optimizing the configuration of sensors in a large-scale distributed energy distribution network according to claim 5, characterized in that: The construction process of the distribution network FTU optimization configuration model includes the following steps: Use FTU to collect fault information and handle short-circuit faults in the distribution network; The specific formula for FTU to collect fault information is as follows: FTUs=(s1,s2,...,s k ...,s n ); Among them, FTUs is the fault information, s k is the fault current direction information detected by the kth FTU; if the fault current direction is positive, then s k =1; if the fault current direction is negative, then s k =-1; if no fault current is detected, s k =0; When there is distributed energy in the feeder section of the feeder terminal unit, the direction from the system power supply to the distributed energy is regarded as the positive direction; When there is no distributed energy in the feeder section of the feeder terminal unit, the direction from the system power supply to the distributed energy is regarded as a negative direction; Based on the contribution rate of a single FTU to the observability of distribution network faults, the constraint condition of the observability rate of distribution network faults is obtained; The specific formula of the contribution rate is as follows: Among them, μ i The contribution rate of FTU configuration to the observability of distribution network faults when the i-th switch is configured, a i is the total number of switches downstream of the ith switch, a j +1 is the frequency of each switch needing to configure FTU when a fault occurs in each area, and N is the total number of switches; The specific formula of the observable rate constraint is as follows: Among them, μ i The contribution rate of configuring FTU for the i-th switch to the observability of distribution network faults is, N is the total number of switches, x i is a variable, and α is the threshold of the observable failure rate of the distribution network.
7. The method for optimizing the configuration of sensors in a large-scale distributed energy distribution network according to claim 6, characterized in that: Also includes, Based on the observable rate constraint, the number of FTU configurations is minimized As the goal, find the initial solution of the FTU optimal configuration; Based on the initial solution, the FTU optimization configuration model of the distribution network considering the access of distributed energy is established with the goal of maximizing the sum of the distances between the two fault current states. The specific formula of the distribution network FTU optimization configuration model is as follows: Among them, x i It is a 0-1 variable, indicating whether FTU is installed on the i-node. is the fault current state when line i fails, is the fault current state when line j fails, [] c To correct using Dijkstra algorithm, is the maximum number of installed FTUs, Initial solution for FTU configuration; The specific formula for the target is as follows: Where L is the line status, is the fault current state corresponding to the fault line state under the current FTU configuration; if the kth line fails, then L k =1; if the kth line is not faulty, then L k =0; Based on the access of distributed energy, the relevant formulas for misjudgment of short-circuit current direction are as follows: Among them, S i (L) is the fault current state corresponding to the fault line i state under the current FTU configuration, Kj is the switch corresponding to the jth distributed energy source, L j is the fault current state of line j, SET down is the downstream line set of line i, SET up is the upstream line set of line i, SET DG is the collection of nodes where distributed energy sources are located; The misjudgment problem of short-circuit current direction caused by the access of distributed energy in the FTU optimization configuration model of the distribution network is corrected through the correction strategy; The correction strategy includes the following steps: The initial current state S i (L), the distribution network structure and fault points are input into the distribution network FTU optimization configuration model; Number all distributed energy resources and FTUs; According to the Dijkstra algorithm, for any distributed energy source i and FTUj, find the path between the i-th distributed energy source and the j-th FTU; At the same time, determine whether there is a path between the i-th distributed energy source and the j-th fault point; If there is a path between the i-th distributed energy source and the j-th fault point, the fault current state of the modified distributed energy source feeder should be -1; If there is no path between the distributed energy and the fault point, the fault current state of the feeder with distributed energy remains unchanged and the correct current state is output.
8. A large-scale distributed energy distribution network sensor optimization configuration system, based on the large-scale distributed energy distribution network sensor optimization configuration method according to any one of claims 1 to 7, characterized in that: Including, PMU optimization configuration module, used to build PMU optimization configuration model, introduce Nk criterion and electrical distance, realize measurable redundancy of important loads and uniform distribution of PMU; The FTU optimization configuration module, based on the constraint condition of the observable rate of distribution network faults and with the goal of maximizing the sum of fault current state distances, establishes a distribution network FTU optimization configuration model taking into account the access of distributed energy sources to improve the accuracy of distribution network fault location.
9. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the method for optimizing the configuration of sensors in a large-scale distributed energy distribution network according to any one of claims 1 to 7 are implemented.
10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method for optimizing the configuration of sensors in a large-scale distributed energy distribution network according to any one of claims 1 to 7 are implemented.