Method, system and equipment for enabling super capacitor to participate in off-grid standby power regulation of wind turbine generator and medium

Supercapacitors participate in the off-grid backup power regulation of wind turbines, which solves the instability problem of the energy storage system when wind turbines are off-grid and supports frequency and voltage stabilization of wind turbines, reducing costs and improving system stability. and economic benefits.

CN118783554APending Publication Date: 2024-10-15HUANENG YANGJIANG WIND POWER CO LTD +3
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411153368.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-21
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

The existing energy storage system is unstable when the wind turbine is off-grid and cannot effectively cope with the fluctuation, frequency and voltage problems of the wind turbine, resulting in poor system stability and high cost.

Method used

The supercapacitor is used to participate in the off-grid backup adjustment method of wind turbines. By calculating the active and reactive power requirements of the target wind farm, the active and reactive power target values ​​of each wind turbine are adjusted, and the adjustment flexibility of the supercapacitor is used to improve the system. frequency and voltage stability.

Benefits of technology

It realizes the off-grid operation of wind turbines with stable frequency and voltage, reduces the frequency and voltage fluctuations of the wind farm, improves the stability and economic benefits of the system, and saves 20% of the cost by reducing the cost of high-voltage equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure HDA0005004225760000011
    Figure HDA0005004225760000011
  • Figure HDA0005004225760000021
    Figure HDA0005004225760000021
  • Figure HDA0005004225760000031
    Figure HDA0005004225760000031
Patent Text Reader

Abstract

The invention provides a method, a system and equipment for a super capacitor to participate in off-grid standby power regulation of a wind turbine generator and a medium. The method comprises the following steps: step 1, respectively calculating an active power distribution demand and a reactive power distribution demand of a target wind power plant; step 2, according to the obtained active power distribution demand and reactive power distribution demand of the target wind power plant, respectively confirming active distribution power and reactive distribution power of a super capacitor and a fan in each unit; step 3, adjusting an active power target value and a reactive power target value of each wind turbine generator set according to the obtained active distribution power and the reactive distribution power; according to the invention, through the line connected to the low-voltage side of the box transformer of the wind turbine generator set, the cost of a high-voltage transformer, a high-voltage line, high-voltage switch equipment, secondary equipment, containers, capital construction and the like is saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of new energy and electric power, and specifically relates to a method, system, equipment and medium for supercapacitors to participate in off-grid backup power regulation of wind turbines. Background Art

[0002] The integration of large-scale distributed wind and solar energy into the power grid can replace some traditional power plants and increase the proportion of renewable energy generation, thereby alleviating environmental pollution problems such as greenhouse gas emissions. However, compared with traditional power stations, the inherent uncertainty, intermittency and volatility of distributed renewable energy will affect the stability of the power grid and cause power quality problems. In addition, in extreme weather conditions, if a wind farm has an off-grid accident such as disconnection of the unit and the booster station line, the yaw, pitch, personnel lifting system and other equipment of each wind turbine will lose power, resulting in the wind turbine being unable to yaw, the pitch system being unable to work, and no lighting inside the wind turbine, and even the inability to save key data, communication being lost and the background being unable to control the wind turbine. This will easily turn into a safety accident, causing blade breakage and wind turbine collapse, seriously threatening the safe operation of the equipment at the station.

[0003] When a wind farm loses connection with the external power grid under extreme weather conditions, the backup power supply can supply power to the necessary loads of the wind turbines and substations, ensuring the safety of the turbines and substations. The energy storage system has the characteristics of dynamically absorbing energy and releasing it in a timely manner, which can make up for the intermittent and volatile nature of wind power, improve the controllability of the wind farm's output power, and enhance the stability level. The energy storage system can be used as a backup power system for wind turbines to ensure the safety of the system when off-grid.

[0004] Equipping each wind turbine with a distributed energy storage backup power supply will become an important technical requirement for wind turbines in areas with extreme wind conditions in the future. While reducing the corresponding design margin and equipment costs, it will effectively improve the reliability of the unit equipment and the safety of production activities, and effectively avoid the huge and incalculable economic losses caused by wind farm accidents.

[0005] However, the off-grid backup power system also faces some challenges in the application process. First, the energy storage technology and control technology of the off-grid backup power system need to be further improved and optimized to improve the performance and reliability of the system. Secondly, the cost of the off-grid backup power system is also high. It is necessary to further expand the key technology of the joint operation of distributed energy storage and wind turbine units under the premise of ensuring the reliability and safety of the system to reduce the overall operation cost. In addition, the existing power storage systems mostly adopt a centralized compensation method, which cannot well meet the needs of the power grid to flexibly and reliably adapt to the fluctuations in wind turbines. The reason is that: as wind power generation equipment, the wind turbine units are relatively scattered. When the wind speed is unevenly distributed, the power factor of individual wind turbines is reduced or too high, the voltage is too low, and the line is short-circuited, the existing power storage system often cannot respond in time to flexibly respond to the fluctuations in the power grid, making the stability of the existing power storage system relatively poor.

[0006] From the perspective of existing technologies, the regulation potential of wind farm energy storage backup power supply is far from being explored. Most wind power energy storage systems that have been put into operation have relatively simple regulation strategies, which are generally used to reduce wind abandonment, that is, to store electricity under high wind conditions and discharge it through energy storage during low wind speed periods. Other energy storage control technologies such as wind power primary frequency regulation generally only perform rapid charging and discharging power regulation in a short period of time.

[0007] The energy storage backup power supply is matched with the wind turbine to provide independent, long-term, high-power backup power support for a single wind turbine in a timely manner. It can provide rapid backup support for the unit under extreme and emergency conditions such as power transmission line disconnection, and can enable some units to form a small microgrid to enhance the safety margin of the unit. The centralized energy storage will lose this ability when the corresponding transmission line is disconnected. On this basis, the energy storage backup power supply can be combined with the wind turbine's own control strategy, and the wind turbine master control can be used to complete the relevant functions. The adjustment flexibility of the energy storage system can be used to expand the active adjustable range of the wind turbine, improve the wind power's support capacity for the system frequency, or provide reactive power support for the wind turbine to achieve the support of the grid connection point voltage.

[0008] At present, there is a lack of supporting technical products for off-grid backup power regulation in wind power backup power supply. With the popularization of wind turbine energy storage backup power supply system, it will become more and more valuable to use the adjustment flexibility of energy storage to achieve complementary integration of energy storage and wind turbine characteristics. Summary of the invention

[0009] The purpose of the present invention is to provide a method, system, equipment and medium for supercapacitors to participate in off-grid backup power regulation of wind turbines, which solves the defect of instability in the current energy storage system when participating in off-grid backup power of wind turbines; the present invention can improve the frequency and voltage regulation characteristics of the system. First, based on the real-time output power of the wind farm, combined with the grid connection point frequency and voltage during the period, the output power of the energy storage is calculated to achieve real-time adjustment of the active power and reactive power of the wind turbine, so that the frequency and voltage of the main power supply are more stable, and finally the system stability of the wind farm is supported.

[0010] In order to achieve the above object, the technical solution adopted by the present invention is:

[0011] The present invention provides a method for supercapacitors to participate in off-grid backup power regulation of wind turbines, comprising the following steps:

[0012] Step 1, respectively calculating the active power allocation demand and reactive power allocation demand of the target wind farm;

[0013] Step 2: confirm the active power distribution and reactive power distribution of the supercapacitor and wind turbine in each unit according to the obtained active power distribution demand and reactive power distribution demand of the target wind farm;

[0014] Step 3: adjusting the active power target value and reactive power target value of each wind turbine generator set according to the obtained active distributed power and reactive distributed power.

[0015] Preferably, in step 1, the active power distribution demand of the target wind farm is calculated, and the specific method is:

[0016] S11, calculating a first active power deviation target value according to the bus frequency deviation at the current moment;

[0017] Calculate the bus frequency deviation change rate at the current moment according to the bus frequency deviation at the current moment;

[0018] The second active power deviation target value is calculated according to the obtained bus frequency deviation change rate at the current moment;

[0019] S12, summing the first active power deviation target value and the second active power deviation target value to obtain a sum value;

[0020] The obtained sum value is subtracted from the real-time active power of the current target wind farm to obtain an active power correction value.

[0021] Preferably, in step 1, the reactive power allocation demand of the target wind farm is calculated, and the specific method is:

[0022] Get the power factor of the grid-connected point at the current moment;

[0023] The reactive power compensation value is calculated based on the obtained power factor;

[0024] Calculate the reactive power deviation target value of the target wind farm according to the obtained reactive power compensation value;

[0025] The reactive power correction value is obtained by subtracting the obtained reactive power deviation target value from the current real-time reactive power of the target wind farm.

[0026] Preferably, in step 2, the active power distribution of the supercapacitor and the wind turbine in each unit is determined according to the obtained active power distribution demand of the target wind farm, and the specific method is:

[0027] S21, counting the remaining active power of the wind turbine in each wind turbine unit and the remaining power of the supercapacitor;

[0028] S22, calculating the change in available active power of each wind turbine generator set;

[0029] S23, calculating the weight of the change in available active power of each wind turbine generator set;

[0030] S24, calculating the active distribution power of each wind turbine generator set.

[0031] Preferably, in step 2, the reactive power distribution of the supercapacitor and the wind turbine in each unit is determined according to the reactive power distribution demand of the target wind farm, and the specific method is:

[0032] Count the available capacity of supercapacitors in each wind turbine;

[0033] Calculate the weight of supercapacitors in each wind turbine;

[0034] The reactive distribution power of the supercapacitor in each wind turbine is calculated according to the obtained weight.

[0035] Preferably, in step 3, the active power target value of each wind turbine is adjusted according to the obtained active power distribution, and the specific method is:

[0036] The wind condition information of each wind turbine is obtained, the active output ratio is calculated according to the wind speed at each wind turbine location and the remaining power of its corresponding supercapacitor, and the active power target value corresponding to the wind turbine and supercapacitor in each wind turbine is calculated according to the active output ratio.

[0037] A system for supercapacitors to participate in off-grid backup power regulation of wind turbines, comprising:

[0038] A power allocation demand calculation unit, used to calculate the active power allocation demand and reactive power allocation demand of the target wind farm respectively;

[0039] The unit distribution power confirmation unit is used to confirm the active distribution power and reactive distribution power of the supercapacitor and wind turbine in each unit according to the obtained active power distribution demand and reactive power distribution demand of the target wind farm;

[0040] The unit power target value adjustment unit is used to adjust the active power target value and reactive power target value of each wind turbine unit according to the obtained active power distribution power and reactive power distribution power.

[0041] A computer device comprising:

[0042] a processor suitable for executing a computer program;

[0043] A computer-readable storage medium stores a computer program, and when the computer program is executed by the processor, the method described is performed.

[0044] A computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the method described above is implemented.

[0045] A computer program product comprises a computer program, wherein the computer program implements the method when executed by a processor.

[0046] Compared with the prior art, the present invention has the following beneficial effects:

[0047] The present invention provides a method for supercapacitors to participate in off-grid backup power regulation of wind turbines, which can provide an off-grid frequency and voltage regulation method for the energy storage backup power supply of wind turbines, expand the application of supercapacitors in wind turbines, effectively reduce the frequency and voltage fluctuations of off-grid operation of wind farms, and thus improve the overall economic benefits of wind farm operation; and the method is relatively simple to implement, and can save costs such as high-voltage transformers, high-voltage lines, high-voltage switchgear and secondary equipment, containers and infrastructure costs by connecting to the low-voltage side of the wind turbine box transformer, and the cost savings can be as high as 20%; in the context of increasingly stringent assessments on new energy grid connection, the method will have increasingly important significance, and its market value will become increasingly greater. BRIEF DESCRIPTION OF THE DRAWINGS

[0048] Figure 1 It is the overall process framework of the present invention.

[0049] Figure 2 This is a schematic diagram of active power target value distribution.

[0050] Figure 3 This is a working diagram of the wind energy storage management system. DETAILED DESCRIPTION

[0051] In the following description, specific details such as specific system structures, technologies, etc. are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present application. However, it should be clear to those skilled in the art that the present application may also be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to prevent unnecessary details from obstructing the description of the present application.

[0052] Example 1

[0053] like Figures 1 to 3 As shown, this embodiment provides a method for supercapacitors to participate in off-grid backup power regulation of wind turbines. In order to reduce the impact of the randomness of wind turbine output power on the power grid, according to the different emphasis on the power system requirements, there are different priority relationships between the frequency modulation calls of wind turbines and energy storage devices. It is necessary to formulate corresponding frequency modulation control strategies according to actual conditions to coordinate and adjust the output conditions of various aspects; at the same time, in order to realize the reactive regulation of distributed energy storage, the energy storage energy management system needs to obtain reactive scheduling instructions, power factor instructions or voltage control instructions from AVC, and convert them into the required reactive power output value through internal calculation of the algorithm. Then the energy management system distributes the specific reactive power instructions to each energy storage unit.

[0054] The energy storage scheduling core model of the present invention adopts a method of calculating and allocating active power demand and reactive power demand in combination with the frequency deviation and voltage deviation of the power grid. The actual wind farm output power at any time point is scheduled and allocated according to the corresponding frequency deviation and active power demand at that time point, and according to the output margin of the wind speed and the supercapacitor charge state. At high wind speeds, the energy storage power supply is mainly involved in frequency modulation, and the wind turbine sets operate under the MPPT control mode. At medium and low wind speeds, the wind turbine sets mainly provide frequency modulation support, and the energy storage power supply supports the rotor speed recovery process. Then, the reactive loss is calculated through the power factor of the wind turbine set, and the remaining capacity margin of the supercapacitor is used for on-site reactive compensation.

[0055] The following steps are involved:

[0056] Step 1, respectively calculating the active power allocation demand and reactive power allocation demand of the target wind farm;

[0057] Step 2: confirm the active power distribution and reactive power distribution of the supercapacitor and wind turbine in each unit according to the obtained active power distribution demand and reactive power distribution demand of the target wind farm;

[0058] Step 3: adjusting the active power target value and reactive power target value of each wind turbine generator set according to the obtained active distributed power and reactive distributed power.

[0059] Example 2

[0060] On the basis of Example 1, this embodiment provides a method for supercapacitors to participate in off-grid backup power regulation of wind turbines. In step 1, the active power distribution demand of the target wind farm is calculated. The specific method is:

[0061] S11, calculating a first active power deviation target value according to the bus frequency deviation at the current moment;

[0062] Calculate the bus frequency deviation change rate at the current moment according to the bus frequency deviation at the current moment;

[0063] The second active power deviation target value is calculated according to the obtained bus frequency deviation change rate at the current moment;

[0064] S12, summing the first active power deviation target value and the second active power deviation target value to obtain a sum value;

[0065] The obtained sum value is subtracted from the real-time active power of the current target wind farm to obtain an active power correction value.

[0066] Example 3

[0067] Based on Example 1, this embodiment provides a method for supercapacitors to participate in off-grid backup power regulation of wind turbines. In step 1, the reactive power distribution demand of the target wind farm is calculated. The specific method is:

[0068] Get the power factor of the grid-connected point at the current moment;

[0069] The reactive power compensation value is calculated based on the obtained power factor;

[0070] Calculate the reactive power deviation target value of the target wind farm according to the obtained reactive power compensation value;

[0071] The reactive power correction value is obtained by subtracting the obtained reactive power deviation target value from the current real-time reactive power of the target wind farm.

[0072] Example 4

[0073] On the basis of Example 1, this embodiment provides a method for supercapacitors to participate in off-grid backup power regulation of wind turbines. In step 2, the active power distribution of the supercapacitors and wind turbines in each unit is confirmed according to the obtained active power distribution demand of the target wind farm. The specific method is:

[0074] S21, counting the remaining active power of the wind turbine in each wind turbine unit and the remaining power of the supercapacitor;

[0075] S22, calculating the change in available active power of each wind turbine generator set;

[0076] S23, calculating the weight of the change in available active power of each wind turbine generator set;

[0077] S24, calculating the active distribution power of each wind turbine generator set.

[0078] Example 5

[0079] On the basis of Example 1, this embodiment provides a method for supercapacitors to participate in off-grid backup power regulation of wind turbines. In step 2, the reactive power distribution power of the supercapacitors and wind turbines in each unit is confirmed according to the reactive power distribution demand of the target wind farm. The specific method is:

[0080] Count the available capacity of supercapacitors in each wind turbine;

[0081] Calculate the weight of supercapacitors in each wind turbine;

[0082] The reactive distribution power of the supercapacitor in each wind turbine is calculated according to the obtained weight.

[0083] Example 6

[0084] On the basis of Example 1, this embodiment provides a method for supercapacitors to participate in off-grid backup power regulation of wind turbines. In step 3, the active power target value of each wind turbine is adjusted according to the obtained active power distribution. The specific method is:

[0085] The wind condition information of each wind turbine is obtained, the active output ratio is calculated according to the wind speed at each wind turbine location and the remaining power of its corresponding supercapacitor, and the active power target value corresponding to the wind turbine and supercapacitor in each wind turbine is calculated according to the active output ratio.

[0086] Example 7

[0087] The working process of this method is explained by taking the wind farm F in a certain off-grid operation period as an example. Figure 1 According to the bus frequency deviation Δf at the current moment, the active deviation target value ΔP is calculated. set1 , and then calculate the bus frequency deviation change rate Δf / Δt to calculate the active deviation target value Δp set2 The active power deviation target value is superimposed to obtain the total active power demand value, and then the active power change ΔP actually performed by the wind farm is obtained through the background of the wind power monitoring system. real , and then perform the deviation Δp by detecting set1 +Δp set2 -ΔP real And use PI controller to adjust the active power command in real time.

[0088] Subsequently, the wind storage management system allocates active power to each wind turbine unit based on the collected operating conditions of each wind turbine unit:

[0089] First, the remaining active power P of each wind turbine is counted. rem_i =P t h eory_i -P actual_i . Among them, P theory Represents theoretical active power, P actual Indicates the actual active power.

[0090] Then, the remaining power SOC of the wind turbine supercapacitor backup energy storage is calculated. i , select the backup energy storage device whose SOC is in the working range, and calculate the active power P corresponding to each supercapacitor backup energy storage c_i For backup energy storage devices whose SOC is not in the working range, the active power P of each supercapacitor backup energy storage c_i is zero.

[0091] Calculate the change in available active power P of each unit ava_i =P rem_i +P c_i , and then calculate the weight of the available active power change of each unit Use the weight to get the allocated power P i .

[0092] Finally, the wind condition information of each wind turbine is obtained, and the active output ratio of the wind turbine and supercapacitor in the wind turbine is calculated according to the wind speed at the machine site and the backup power of the supercapacitor energy storage, combined with the allocated power, and the active power target value is issued according to the active output ratio.

[0093] At the same time, the wind energy storage management system measures the current power factor of the grid connection point, calculates the reactive power value that needs to be compensated, calculates the reactive power compensation value of the entire field, and then superimposes the reactive power adjustment command of the entire field ΔQ=ΔQ set -ΔQ real When distributing reactive power, first calculate the available capacity Q of each supercapacitor energy storage backup. i , allocate and issue reactive power compensation instructions according to their weight relative to the total available capacity.

[0094] The allocation link will first consider preventing the supercapacitor from overcharging or over-discharging, and determine whether the current state of charge of the supercapacitor energy storage system meets the discharge and charging constraints respectively. After the state of charge constraint is met, the active power deviation value is evenly distributed to each wind turbine unit, and then the active power deviation target value is allocated to the wind turbine main power supply and the supercapacitor backup power system according to the real-time wind speed of the unit. When facing a drop in frequency, the kinetic energy of the wind turbine rotor is small at low wind speeds. If the wind turbine continues to participate in the system frequency modulation, the system frequency will be at risk of a secondary drop. At this time, the supercapacitor will give priority to outputting active power; at high wind speeds, the wind turbine rotor speed is high, and the speed is difficult to increase further. Considering the characteristics of fast charging and discharging of supercapacitors, supercapacitors will give priority to outputting active power. The execution process of active and reactive output can be found in the attached. Figure 2 , where P rem_i Represents the remaining active power of wind turbine i; SOC i Indicates the remaining capacity of supercapacitor i; W i Represents the residual active power weight of wind turbine i; ΔP i Indicates active deviation command; V i Indicates the measured wind speed of the wind turbine; V0 indicates the reference wind speed setting value; ΔP w Indicates the active output of the unit; ΔP soc It represents the active output of the supercapacitor; KH1 represents the output adjustment coefficient of the wind turbine under high wind speed conditions; KH2 represents the output adjustment coefficient of the supercapacitor under high wind speed conditions; KL1 represents the output adjustment coefficient of the wind turbine under low wind speed conditions; KL2 represents the output adjustment coefficient of the supercapacitor under low wind speed conditions.

[0095] This section will take a wind farm F with a wind turbine configured with supercapacitor backup energy storage as an example to describe the application scheme and effect of the method proposed in the present invention. Wind farm F is a wind farm in the coastal area with an installed capacity of 100MW. During off-grid operation, the wind farm needs to ensure that the frequency and voltage of the bus meet the requirements of the internal load. After being temporarily disconnected from the power grid, the bus frequency is often abnormal due to changes in wind speed. The units of wind farm F use supercapacitor energy storage backup power supplies to power the units when operating off-grid, and are equipped with a wind energy storage management system for controlling the wind farm backup energy storage system. The off-grid backup power regulation strategy program corresponding to the method of the present invention is deployed on a distributed wind energy storage management system. The wind energy storage management system and the wind power monitoring system cooperate with each other to achieve the operating effect of off-grid backup power regulation.

[0096] The wind energy storage management system needs to obtain the real-time active power output value of the wind farm and the wind speed and wind conditions at the current position from the background of the wind power monitoring system. The adjustment algorithm of the wind energy storage management system calculates the available power and output power of the supercapacitor backup energy storage at the current moment based on the relevant data obtained, and sends it to the backup energy storage device for execution.

[0097] Example 8

[0098] This embodiment provides a system for supercapacitors to participate in off-grid backup power regulation of wind turbines, including:

[0099] A power allocation demand calculation unit, used to calculate the active power allocation demand and reactive power allocation demand of the target wind farm respectively;

[0100] The unit distribution power confirmation unit is used to confirm the active distribution power and reactive distribution power of the supercapacitor and wind turbine in each unit according to the obtained active power distribution demand and reactive power distribution demand of the target wind farm;

[0101] The unit power target value adjustment unit is used to adjust the active power target value and reactive power target value of each wind turbine unit according to the obtained active power distribution power and reactive power distribution power.

[0102] Example 9

[0103] This embodiment 9 provides a computer device, including: a memory for storing a computer program; and a processor for implementing the steps of a computer method when executing the computer program.

[0104] When the processor executes the computer program, the steps of the above computer method are implemented.

[0105] Alternatively, when the processor executes the computer program, the functions of each module in the above system are realized.

[0106] The computer device may be a computing device such as a desktop computer, a notebook, a PDA, and a cloud server. The computer device may include, but is not limited to, a processor and a memory. Those skilled in the art will appreciate that the above are examples of computer devices and do not constitute a limitation on computer devices. The computer device may include more components than the above, or a combination of certain components, or different components. For example, the computer device may also include input and output devices, network access devices, buses, etc.

[0107] The processor may be a central processing unit (CPU), other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc. The processor is the control center of the computer device, and uses various interfaces and lines to connect various parts of the entire computer device.

[0108] The memory may be used to store the computer programs and / or modules, and the processor implements various functions of the computer device by running or executing the computer programs and / or modules stored in the memory and calling the data stored in the memory.

[0109] The memory may mainly include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required for at least one function (such as a sound playback function, an image playback function, etc.), etc.; the data storage area may store data created according to the use of the mobile phone (such as audio data, a phone book, etc.), etc. In addition, the memory may include a high-speed random access memory, and may also include a non-volatile memory, such as a hard disk, a memory, a plug-in hard disk, a smart memory card (SmartMediaCard, SMC), a secure digital (SecureDigital, SD) card, a flash card (FlashCard), at least one disk storage device, a flash memory device, or other volatile solid-state storage devices.

[0110] Example 10

[0111] This embodiment 10 also provides a computer-readable storage medium, which stores a computer program. When the computer program is executed by a processor, the steps of the method described are implemented.

[0112] If the module / unit integrated in the computer system is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium.

[0113] Based on such understanding, the present invention implements all or part of the processes in the above method, and can also be completed by instructing related hardware through a computer program, and the computer program can be stored in a computer-readable storage medium, and when the computer program is executed by a processor, the steps of the above computer method can be implemented. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or preset intermediate form, etc.

[0114] The computer-readable storage medium may include: any entity or device capable of carrying the computer program code, recording medium, USB flash drive, mobile hard disk, magnetic disk, optical disk, computer memory, read-only memory (ROM), random access memory (RAM), electrical carrier signal, telecommunication signal and software distribution medium, etc.

[0115] It should be noted that the content contained in the computer-readable storage medium can be appropriately increased or decreased according to the requirements of legislation and patent practice in the jurisdiction. For example, in some jurisdictions, according to legislation and patent practice, computer-readable storage media do not include electrical carrier signals and telecommunication signals.

[0116] Embodiment 11

[0117] This embodiment 11 provides a computer product, which includes a computer program, and the computer program is stored in a computer-readable storage medium; the processor of the computer device reads the computer program from the computer-readable storage medium, and the processor executes the computer program, so that the computer device can execute the method in embodiment 1, which will not be repeated here.

[0118] It should be noted that a person of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be implemented by instructing related hardware through a computer program. The program can be stored in a computer-readable storage medium. When the program is executed, it can include the processes of the embodiments of the above-mentioned methods.

[0119] The embodiments described above are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.

Claims

1. A method for supercapacitors to participate in off-grid backup power regulation of wind turbines, characterized in that: The following steps are involved: Step 1, respectively calculating the active power allocation demand and reactive power allocation demand of the target wind farm; Step 2: confirm the active power distribution and reactive power distribution of the supercapacitor and wind turbine in each unit according to the obtained active power distribution demand and reactive power distribution demand of the target wind farm; Step 3: adjusting the active power target value and reactive power target value of each wind turbine generator set according to the obtained active distributed power and reactive distributed power.

2. The method for supercapacitors to participate in off-grid backup power regulation of wind turbines according to claim 1, characterized in that: In step 1, the active power distribution demand of the target wind farm is calculated. The specific method is: S11, calculating a first active power deviation target value according to the bus frequency deviation at the current moment; Calculate the bus frequency deviation change rate at the current moment according to the bus frequency deviation at the current moment; The second active power deviation target value is calculated according to the obtained bus frequency deviation change rate at the current moment; S12, summing the first active power deviation target value and the second active power deviation target value to obtain a sum value; The obtained sum value is subtracted from the real-time active power of the current target wind farm to obtain an active power correction value.

3. The method for supercapacitors to participate in off-grid backup power regulation of wind turbines according to claim 1, characterized in that: In step 1, the reactive power allocation demand of the target wind farm is calculated. The specific method is: Get the power factor of the grid-connected point at the current moment; The reactive power compensation value is calculated based on the obtained power factor; Calculate the reactive power deviation target value of the target wind farm according to the obtained reactive power compensation value; The reactive power correction value is obtained by subtracting the obtained reactive power deviation target value from the current real-time reactive power of the target wind farm.

4. The method for supercapacitors to participate in off-grid backup power regulation of wind turbines according to claim 1, characterized in that: In step 2, the active power distribution of the supercapacitor and wind turbine in each unit is determined according to the active power distribution demand of the target wind farm. The specific method is: S21, counting the remaining active power of the wind turbine in each wind turbine unit and the remaining power of the supercapacitor; S22, calculating the change in available active power of each wind turbine generator set; S23, calculating the weight of the change in available active power of each wind turbine generator set; S24, calculating the active distribution power of each wind turbine generator set.

5. The method for supercapacitors to participate in off-grid backup power regulation of wind turbines according to claim 1, characterized in that: In step 2, the reactive power distribution of the supercapacitor and wind turbine in each unit is determined according to the reactive power distribution demand of the target wind farm. The specific method is: Count the available capacity of supercapacitors in each wind turbine; Calculate the weight of supercapacitors in each wind turbine; The reactive distribution power of the supercapacitor in each wind turbine is calculated according to the obtained weight.

6. The method for supercapacitors to participate in off-grid backup power regulation of wind turbines according to claim 1, characterized in that: In step 3, the active power target value of each wind turbine is adjusted according to the obtained active distribution power. The specific method is: The wind condition information of each wind turbine is obtained, the active output ratio is calculated according to the wind speed at each wind turbine location and the remaining power of its corresponding supercapacitor, and the active power target value corresponding to the wind turbine and supercapacitor in each wind turbine is calculated according to the active output ratio.

7. A system for supercapacitors to participate in off-grid backup power regulation of wind turbines, characterized in that: include: A power allocation demand calculation unit, used to calculate the active power allocation demand and reactive power allocation demand of the target wind farm respectively; The unit distribution power confirmation unit is used to confirm the active distribution power and reactive distribution power of the supercapacitor and wind turbine in each unit according to the obtained active power distribution demand and reactive power distribution demand of the target wind farm; The unit power target value adjustment unit is used to adjust the active power target value and reactive power target value of each wind turbine unit according to the obtained active power distribution power and reactive power distribution power.

8. A computer device, characterized in that: include: a processor suitable for executing a computer program; A computer-readable storage medium, wherein a computer program is stored in the computer-readable storage medium, and when the computer program is executed by the processor, the method according to any one of claims 1 to 6 is performed.

9. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the method according to any one of claims 1 to 6 is implemented.

10. A computer program product, characterized in that The computer program product comprises a computer program, and when the computer program is executed by a processor, the method according to any one of claims 1 to 6 is implemented.