Offshore wind turbine installation auxiliary device and method
By designing offshore fan installation auxiliary devices with hydraulic support components and position sensors, the fan clamping, lifting and compensation operations are realized, and the problem of insufficient climate and lifting height of the existing installation methods is solved, and the installation efficiency and safety are improved , suitable for the installation of large offshore fans.
Patent Information
- Application Number
- CN202411274129.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-12
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2044-09-12
AI Technical Summary
Existing offshore fan installation methods such as split lifting and overall lifting have problems such as climate constraints and insufficient lifting height, which leads to high installation difficulty and high cost. Floating support installation is also greatly affected by the weather, making it difficult to meet the installation needs of high-large fan.
An offshore fan installation auxiliary device is designed, including a support frame and a pile holder. The hydraulic support assembly and position sensor are used to realize the clamping, lifting and compensation operation of the fan, which can realize the movement of six degrees of freedom, combined with collaborative control. Improves load-bearing capacity and safety.
The window period for floating support installation operations has been expanded, construction risks have been reduced, operation efficiency and safety have been improved, and it is suitable for the installation of large offshore fans.
Smart Images

Figure CN118793568B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of offshore wind turbine installation, and in particular relates to an offshore wind turbine installation auxiliary device and method. Background Art
[0002] Wind energy is a clean, pollution-free renewable energy source with the advantage of sustainable development, and is also the direction of future energy development. Compared with land-based wind power, offshore wind turbines have the advantages of not occupying land, high offshore wind speed, large wind turbine power generation, and negligible noise; however, due to the complexity and variability of the marine environment, the difficulty of structural design, installation, and subsequent operation and maintenance of offshore wind turbines has been greatly increased.
[0003] Usually, the foundation structures of offshore wind turbines include gravity foundation, single pile foundation, high pile foundation, tripod pile foundation, pipe frame foundation, floating structure support, etc., among which single pile foundation is currently widely used in the built offshore wind farms. The installation methods of single pile offshore wind power include split hoisting method and integral hoisting method. Both methods have certain shortcomings. Split hoisting needs to be assembled at sea, which is greatly restricted by the climate, and problems in the initial commissioning will greatly increase the cost; integral hoisting requires a certain lifting capacity, and the draft during hoisting is not suitable for offshore installation; with the large-scale development of offshore wind turbines, the height of wind turbines is getting higher and higher, and the lifting height of the lifting ship is often not enough to complete the installation.
[0004] As a new installation method, floating installation has been widely used in the installation of topside modules on oil platforms. Combined with the characteristics of the wind turbine itself, floating installation of the wind turbine will be an effective solution. However, the current floating installation is also restricted by factors such as harsh operating conditions and being greatly affected by the weather. Summary of the invention
[0005] In view of the above-mentioned deficiencies in the prior art, the present invention provides an offshore wind turbine installation auxiliary device and method to solve the above-mentioned technical problems.
[0006] In a first aspect, the present invention provides an offshore wind turbine installation auxiliary device, comprising:
[0007] A support frame body, the support frame body comprising a first L-shaped support frame and a second L-shaped support frame; the first L-shaped support frame is fixedly mounted on the first hull of the catamaran, and the second L-shaped support frame is mounted on the second hull of the catamaran; the openings of the first L-shaped support frame and the second L-shaped support frame are opposite to each other;
[0008] The bottom end of the first L-shaped support frame is rotatably connected to the first longitudinal hydraulic support assembly, and the top end of the first L-shaped support frame is rotatably connected to the first transverse hydraulic support assembly; the bottom end of the second L-shaped support frame is rotatably connected to the second longitudinal hydraulic support assembly, and the top end of the second L-shaped support frame is rotatably connected to the second transverse hydraulic support assembly;
[0009] The first longitudinal hydraulic support assembly and the second longitudinal hydraulic support assembly are both rotatably connected to the bottom of the pile gripper; the first transverse hydraulic support assembly and the second transverse hydraulic support assembly are respectively rotatably connected to two opposite sides of the pile gripper;
[0010] The pile gripper comprises a pile body clamping mechanism, and the pile body clamping mechanism is used to fix the wind turbine pile body.
[0011] In an optional embodiment, a posture sensor is installed at the center of the side wall of the pile gripper.
[0012] In an optional embodiment, the pile gripper includes a fixed frame, which includes an upper frame and a lower frame, and the upper frame and the lower frame have the same size; a plurality of connecting rods are welded between the upper frame and the lower frame, and the upper frame is parallel to the lower frame; and a pile clamping mechanism is installed inside the fixed frame.
[0013] In an optional embodiment, the pile clamping mechanism includes a first clamping group and a second clamping group, the first clamping group includes two clamps, and the second clamping group includes two clamps; the first clamping group is above the second clamping group, and the first clamping group and the second clamping group are in two parallel planes and remain perpendicular.
[0014] In an optional embodiment, the clamp includes a hydraulic telescopic structure and a U-shaped fixing portion, the bottom of the U-shaped fixing portion is fixedly connected to the hydraulic telescopic structure; the bases of the hydraulic telescopic structures of the two clamps of the first clamping group are fixedly mounted on the upper frame, and the openings of the U-shaped fixing portions of the two clamps of the first clamping group are opposite to each other; the bases of the hydraulic telescopic structures of the two clamps of the second clamping group are fixedly mounted on the lower frame, and the openings of the U-shaped fixing portions of the two clamps of the second clamping group are opposite to each other.
[0015] In an optional embodiment, the first transverse hydraulic support assembly and the second transverse hydraulic support assembly each include three hydraulic telescopic rods, and the three hydraulic telescopic rods are parallel and not in the same plane.
[0016] In an optional embodiment, the first longitudinal hydraulic support assembly and the second longitudinal hydraulic support assembly each include three hydraulic telescopic rods; the three hydraulic telescopic rods of the same longitudinal hydraulic support assembly form a Z-shaped support structure, and the bottoms of the three hydraulic telescopic rods are connected to the support frame through ball hinges.
[0017] In an optional embodiment, the hydraulic telescopic parts of the first longitudinal hydraulic support assembly, the second longitudinal hydraulic support assembly, the first transverse hydraulic support assembly and the second transverse hydraulic support assembly are all provided with displacement sensors; and the U-shaped fixing parts of all clamps are provided with displacement sensors.
[0018] In a second aspect, the present invention provides an offshore wind turbine installation auxiliary method, comprising:
[0019] Obtain posture data collected by the posture sensor;
[0020] Calculate posture compensation data based on the preset desired posture and the posture data;
[0021] The telescopic amounts of the first longitudinal hydraulic support assembly, the second longitudinal hydraulic support assembly, the first transverse hydraulic support assembly, the second transverse hydraulic support assembly, and the telescopic amounts of the hydraulic telescopic structure of the pile clamping mechanism are controlled based on the posture compensation data.
[0022] In an optional embodiment, calculating the posture compensation data based on the preset desired posture and the posture data includes:
[0023] Construct a global coordinate system O-XYZ fixed to the earth;
[0024] Taking the position of the posture sensor as the origin, construct the hull coordinate system o-xyz;
[0025] Construct the wind turbine coordinate system o'-x'y'z' with the center of the pile gripper as the origin;
[0026] After measuring the attitude change data of the hull, the attitude sensor converts it to the wind turbine coordinate system o'-x'y'z' through the attitude transfer matrix to obtain the attitude change data of the wind turbine;
[0027] The obtained posture change data of the fan are converted to a fixed coordinate system O-XYZ, and a kinematic solution is performed on the posture change data of the fan in the fixed coordinate system O-XYZ to obtain posture compensation data.
[0028] The beneficial effects of the present invention are that the offshore wind turbine installation auxiliary device and method provided by the present invention can realize the clamping, lifting and compensation operations of the entire wind turbine, can realize the movement of the entire wind turbine with six degrees of freedom, has a larger working space, expands the window period of floating installation operations, reduces construction risks, and improves operating efficiency. Through collaborative operations, the wind turbine is jointly controlled, its carrying capacity is increased, and operational safety is improved.
[0029] In addition, the invention has a reliable design principle, a simple structure and a very broad application prospect. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0031] Figure 1 It is a schematic diagram of an offshore wind turbine installation auxiliary device in an installation scenario according to an embodiment of the present invention.
[0032] Figure 2 It is a schematic diagram of an offshore wind turbine installation auxiliary device according to an embodiment of the present invention.
[0033] Figure 3 It is a partial schematic diagram of an offshore wind turbine installation auxiliary device according to an embodiment of the present invention.
[0034] Figure 4 It is a schematic diagram of a coordinate system of an offshore wind turbine installation auxiliary device according to an embodiment of the present invention.
[0035] Figure 5 It is a schematic diagram of the kinematic inverse solution of an offshore wind turbine installation auxiliary device according to an embodiment of the present invention.
[0036] Among them, 1- auxiliary device, 2- catamaran, 3- wind turbine, 4- hydraulic system, 5- electronic control system; 101- support frame, 102- hydraulic telescopic rod, 103- servo valve, 104- pile gripper, 105- clamp, 106- ball hinge, 107- wedge; 201- posture sensor. DETAILED DESCRIPTION
[0037] In order to enable those skilled in the art to better understand the technical solutions in the present invention, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0038] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art of the present invention. The terms used in the specification of the present invention herein are only for the purpose of describing specific embodiments and are not intended to limit the present invention.
[0039] For details, please refer to Figure 1 and Figure 2 , offshore wind turbine installation auxiliary devices include:
[0040] The support frame 101 includes a first L-shaped support frame and a second L-shaped support frame; the first L-shaped support frame is fixedly mounted on the first hull of the catamaran 2, and the second L-shaped support frame is mounted on the second hull of the catamaran 2; the openings of the first L-shaped support frame and the second L-shaped support frame are opposite to each other;
[0041] The bottom end of the first L-shaped support frame is rotatably connected to the first longitudinal hydraulic support assembly, and the top end of the first L-shaped support frame is rotatably connected to the first transverse hydraulic support assembly; the bottom end of the second L-shaped support frame is rotatably connected to the second longitudinal hydraulic support assembly, and the top end of the second L-shaped support frame is rotatably connected to the second transverse hydraulic support assembly;
[0042] The first longitudinal hydraulic support assembly and the second longitudinal hydraulic support assembly are both rotatably connected to the bottom of the pile gripper 104; the first transverse hydraulic support assembly and the second transverse hydraulic support assembly are respectively rotatably connected to two opposite sides of the pile gripper 104;
[0043] The pile gripper 104 includes a pile clamping mechanism, which is used to fix the pile of the wind turbine.
[0044] Among them, a posture sensor 201 is installed at the center of the side wall of the pile gripper 104. The pile gripper 104 includes a fixed frame, and the fixed frame includes an upper frame and a lower frame, and the upper frame and the lower frame have the same size; a plurality of connecting rods are welded between the upper frame and the lower frame, and the upper frame is parallel to the lower frame; a pile clamping mechanism is installed inside the fixed frame. The pile clamping mechanism includes a first clamping group and a second clamping group, the first clamping group includes two clamps 105, and the second clamping group includes two clamps 105; the first clamping group is above the second clamping group, and the first clamping group and the second clamping group are in two parallel planes and remain vertical. The clamp 105 includes a hydraulic telescopic structure and a U-shaped fixing portion, the bottom of the U-shaped fixing portion is fixedly connected to the hydraulic telescopic structure; the bases of the hydraulic telescopic structures of the two clamps 105 of the first clamping group are fixedly installed on the upper frame, and the openings of the U-shaped fixing portions of the two clamps 105 of the first clamping group are opposite to each other; the bases of the hydraulic telescopic structures of the two clamps 105 of the second clamping group are fixedly installed on the lower frame, and the openings of the U-shaped fixing portions of the two clamps 105 of the second clamping group are opposite to each other.
[0045] like Figure 3As shown, the first transverse hydraulic support assembly and the second transverse hydraulic support assembly each include three hydraulic telescopic rods 102, the three hydraulic telescopic rods 102 are parallel and not in the same plane, two of which are connected to the lower frame of the fixed frame of the pile gripper 104, and one is connected to the upper frame of the fixed frame of the pile gripper 104. A servo valve 103 is provided at one end of the hydraulic telescopic rod 102 connected to the support frame 101, and both ends of the hydraulic telescopic rod 102 are connected to the support frame 101 and the fixed frame of the pile gripper 104 through ball hinges 106, respectively.
[0046] The first longitudinal hydraulic support assembly and the second longitudinal hydraulic support assembly each include three hydraulic telescopic rods 102; the three hydraulic telescopic rods 102 of the same longitudinal hydraulic support assembly form a Z-shaped support structure, and the bottoms of the three hydraulic telescopic rods 102 are connected to the support frame 101 through ball hinges 106. The three hydraulic telescopic rods 102 are connected to wedges 107 through ball hinges 106, and the wedges 107 are fixedly installed at the bottom of the fixed frame of the pile gripper 104.
[0047] The hydraulic telescopic parts of the first longitudinal hydraulic support assembly, the second longitudinal hydraulic support assembly, the first transverse hydraulic support assembly, and the second transverse hydraulic support assembly are all provided with displacement sensors.
[0048] All displacement sensors and posture sensors 201 are electrically connected to an electronic control system, which may be a PLC. The electronic control system is communicatively connected to a hydraulic system, which controls the servo valves 103 of the hydraulic telescopic structures of all hydraulic telescopic rods 102 and pile grippers 104 to control the telescopic amount.
[0049] Specifically, when installing the fan, perform the following steps:
[0050] S1: First, use the auxiliary device to clamp the fan.
[0051] S2: The posture sensor installed on the pile holder of the motion compensation device is used to measure the posture of the wind turbine in real time.
[0052] S3: Perform kinematic inverse analysis on the auxiliary device based on the measured wind turbine posture data.
[0053] S4: Control the motion of the drive branch of the motion compensation device through the control algorithm and the electronic control system to lift the fan and adjust its position.
[0054] S5: Install the wind turbine after posture compensation on the offshore pile foundation.
[0055] In the above technical scheme, the offshore wind turbine floating installation method using the new motion simulation device includes: a hull, an auxiliary device (two special-shaped 6-SPS parallel mechanisms), a control system and a hydraulic system, and is characterized in that: the two special-shaped 6-SPS parallel mechanisms are respectively installed on both sides of the front end of the hull deck, and jointly control the pile gripper, which clamps the wind turbine, and the two special-shaped 6-SPS parallel mechanisms control the drive branches through the control system and the hydraulic system to perform wave compensation motion and wind turbine installation operation motion.
[0056] Displacement sensors are installed on all telescopic components to detect displacement data in real time and feed back to the control system; posture sensors are installed on the pile gripper to obtain the spatial posture data of the wind turbine through the spatial posture transfer matrix solution. The control system is designed in a hydraulic drive mode and fully digital control, which can realize a step servo multi-axis controller with programmable speed regulation.
[0057] The electronic control system mainly accepts the instructions input into the control system and transmits them to the servo valve. The servo valve controls the movement of the hydraulic cylinder to complete various posture changes.
[0058] The control method of the offshore wind turbine installation auxiliary device provided by the present invention is executed by an electric control system and specifically includes the following steps:
[0059] S1. Obtain posture data collected by the posture sensor.
[0060] S2. Calculate posture compensation data based on the preset desired posture and the posture data.
[0061] Please refer to Figure 4 , construct a global coordinate system O-XYZ fixed to the earth; construct the hull coordinate system o-xyz with the position of the posture sensor as the origin; construct the wind turbine coordinate system o'-x'y'z' with the center of the pile gripper as the origin; after measuring the posture change data of the hull, the posture sensor converts the posture change data to the wind turbine coordinate system o'-x'y'z' through the posture transfer matrix to obtain the posture change data of the wind turbine; convert the obtained posture change data of the wind turbine to the fixed coordinate system O-XYZ, perform kinematics solution on the posture change data of the wind turbine in the fixed coordinate system O-XYZ, and obtain posture compensation data.
[0062] The kinematic inverse solution process includes:
[0063] Establish the mathematical model of the special-shaped 6-SPS parallel mechanism and establish the local coordinate system of the upper and lower platforms of the mechanism, among which the upper platform coordinate system O d -x d y d zd , the upper platform hinge point is D i (i=1,2...,6) , lower platform coordinate system O b -x b y b z b The hinge point of the lower platform is B i (i=1,2...,6) ,in D i 、B i Location Figure 5 As shown:
[0064] Using the matrix D Indicates the hinge point on the connecting rod D i In the coordinate system O b -x b y b z b The coordinate vector under can be:
[0065] ;
[0066] Similarly, we can have a matrix B Indicates the lower hinge point of the connecting rod in the coordinate system O b -x b y b z b The coordinate vector is:
[0067] ;
[0068] At this time, the pose vector of the upper platform relative to the lower platform can be expressed as:
[0069] ;
[0070] in for O d -x d y d z d Towards O b-x b y b z b The rotational transformation relationship between the two coordinate systems can also be expressed using the rotation matrix. Therefore, the upper platform coordinate system O d -x d y d z d From the middle hinge point to the lower platform coordinate system O b -x b y b z b The conversion relationship can be expressed by the following formula:
[0071] ;
[0072] in For each hinge point O d -x d y d z d The driving branch vector matrix can be expressed as:
[0073] ;
[0074] For each branch, we have:
[0075] ;
[0076] In the formula, is the i-th driving branch chain vector. The driving branch chain length of the special-shaped 6-SPS parallel mechanism can be inversely solved through the position and posture of the upper platform.
[0077] In the formula, the direction vector can be expressed as:
[0078] ;
[0079] The length of each branch chain can be expressed as:
[0080] .
[0081] Among them, the driving branch chain refers to the hydraulic cylinder, and the length of the driving branch chain - the initial length of the hydraulic cylinder = the extension and retraction amount of the hydraulic rod.
[0082] S3. Control the telescopic amounts of the first longitudinal hydraulic support assembly, the second longitudinal hydraulic support assembly, the first transverse hydraulic support assembly, the second transverse hydraulic support assembly, and the telescopic amount of the hydraulic telescopic structure of the pile clamping mechanism based on the posture compensation data.
[0083] The detection data of the displacement sensor is obtained, and based on the detection data, it is verified whether the actual extension and contraction amount of each hydraulic component is consistent with the extension and contraction amount in the control instruction.
[0084] Although the present invention has been described in detail with reference to the accompanying drawings and in combination with the preferred embodiments, the present invention is not limited thereto. Without departing from the spirit and essence of the present invention, a person of ordinary skill in the art may make various equivalent modifications or substitutions to the embodiments of the present invention, and these modifications or substitutions shall be within the scope of the present invention. Any person of ordinary skill in the art may easily think of changes or substitutions within the technical scope disclosed by the present invention, and these shall be within the scope of protection of the present invention.
Claims
1. An offshore wind turbine installation auxiliary device, characterized in that: include: A support frame body, the support frame body comprising a first L-shaped support frame and a second L-shaped support frame; the first L-shaped support frame is fixedly mounted on the first hull of the catamaran, and the second L-shaped support frame is mounted on the second hull of the catamaran; the openings of the first L-shaped support frame and the second L-shaped support frame are opposite to each other; The bottom end of the first L-shaped support frame is rotatably connected to the first longitudinal hydraulic support assembly, and the top end of the first L-shaped support frame is rotatably connected to the first transverse hydraulic support assembly; the bottom end of the second L-shaped support frame is rotatably connected to the second longitudinal hydraulic support assembly, and the top end of the second L-shaped support frame is rotatably connected to the second transverse hydraulic support assembly; The first longitudinal hydraulic support assembly and the second longitudinal hydraulic support assembly are both rotatably connected to the bottom of the pile gripper; the first transverse hydraulic support assembly and the second transverse hydraulic support assembly are respectively rotatably connected to two opposite side surfaces of the pile gripper; The pile gripper includes a pile clamping mechanism, which is used to fix the wind turbine pile; The pile gripper comprises a fixed frame, which comprises an upper frame and a lower frame. The upper frame and the lower frame have the same size. A plurality of connecting rods are welded between the upper frame and the lower frame. The upper frame and the lower frame are parallel. A pile clamping mechanism is installed inside the fixed frame. The pile clamping mechanism includes a first clamping group and a second clamping group, the first clamping group includes two clamps, and the second clamping group includes two clamps; the first clamping group is above the second clamping group, and the first clamping group and the second clamping group are in two parallel planes and are kept perpendicular; The clamp includes a hydraulic telescopic structure and a U-shaped fixing portion, the bottom of the U-shaped fixing portion is fixedly connected to the hydraulic telescopic structure; the bases of the hydraulic telescopic structures of the two clamps of the first clamping group are fixedly mounted on the upper frame, and the openings of the U-shaped fixing portions of the two clamps of the first clamping group are opposite to each other; the bases of the hydraulic telescopic structures of the two clamps of the second clamping group are fixedly mounted on the lower frame, and the openings of the U-shaped fixing portions of the two clamps of the second clamping group are opposite to each other; The first lateral hydraulic support assembly and the second lateral hydraulic support assembly each include three hydraulic telescopic rods, and the three hydraulic telescopic rods are parallel and not in the same plane; The first longitudinal hydraulic support assembly and the second longitudinal hydraulic support assembly each include three hydraulic telescopic rods; the three hydraulic telescopic rods of the same longitudinal hydraulic support assembly form a Z-shaped support structure, and the bottoms of the three hydraulic telescopic rods are connected to the support frame through ball hinges; A posture sensor is installed at the center of the side wall of the pile gripper.
2. The offshore wind turbine installation auxiliary device according to claim 1, characterized in that: The hydraulic telescopic parts of the first longitudinal hydraulic support assembly, the second longitudinal hydraulic support assembly, the first transverse hydraulic support assembly and the second transverse hydraulic support assembly are all provided with displacement sensors; the displacement sensors are electrically connected to the controller, and the controller controls the movement state of the first longitudinal hydraulic support assembly, the second longitudinal hydraulic support assembly and the pile clamping mechanism.
3. A control method for an offshore wind turbine installation auxiliary device, used to control the offshore wind turbine installation auxiliary device according to any one of claims 1-2, characterized in that: include: Obtain posture data collected by the posture sensor; Calculating posture compensation data based on a preset desired posture and the posture data; The telescopic amounts of the first longitudinal hydraulic support assembly, the second longitudinal hydraulic support assembly, the first transverse hydraulic support assembly, the second transverse hydraulic support assembly, and the hydraulic telescopic structure of the pile clamping mechanism are controlled based on the posture compensation data.
4. The method according to claim 3, characterized in that Calculating posture compensation data based on a preset desired posture and the posture data, including: Construct a global coordinate system O-XYZ fixed to the earth; With the position of the posture sensor as the origin, construct the hull coordinate system o-xyz; Construct the wind turbine coordinate system o'-x'y'z' with the center of the pile gripper as the origin; After measuring the attitude change data of the hull, the attitude sensor converts it into the wind turbine coordinate system o'-x'y'z' through the attitude transfer matrix to obtain the attitude change data of the wind turbine; The obtained posture change data of the fan is converted to a fixed coordinate system O-XYZ, and a kinematic solution is performed on the posture change data of the fan in the fixed coordinate system O-XYZ to obtain posture compensation data.