Construction method for concrete asphalt core wall panel rock-fill dam built on deep covering layer and dam body structure
By forming a construction base in water conservancy and hydropower projects and simultaneously constructing anti-seepage walls in corridors and setting up a concrete asphalt core wall structure, the problems of low bearing capacity and high permeability caused by the deep covering layer are solved, and the construction period is shortened and the dam body is shortened. Improved stability.
Patent Information
- Application Number
- CN202410964619.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-18
- Publication Date
- 2024-10-25
AI Technical Summary
In water conservancy and hydropower projects, deep covering layers lead to low foundation bearing capacity and strong permeability, making it difficult to effectively shorten the dam construction period with existing technology.
By forming a construction base surface on the original river bed, constructing a grouting gallery, and simultaneously constructing an anti-seepage wall within the gallery, setting up a concrete asphalt core wall structure and transition layer, the foundation hardening treatment process is optimized.
It has shortened the construction period, improved the stability and anti-seepage performance of the dam body, and ensured construction efficiency and safety.
Smart Images

Figure CN118835569A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of water conservancy and hydropower engineering, and in particular to a construction method and a dam body structure for a concrete asphalt core wall panel rockfill dam built on a thick covering layer. Background Art
[0002] In the actual design of water conservancy and hydropower projects, the original riverbed will have more or less weak covering layers. If the thickness of the covering layer is shallow, the covering layer can be removed before selecting a hard dam type or a lightweight dam type. If the covering layer is deep, it generally has the characteristics of low bearing capacity and strong permeability. The existing technology usually hardens the surface of the foundation to strengthen the integrity of the foundation to improve the bearing capacity of the foundation. However, due to the numerous procedures and long construction period of the dam construction, the construction period of the dam often becomes a key issue for the construction project. Therefore, how to optimize the foundation hardening treatment process and the dam construction process to shorten the construction period has become an urgent problem to be solved in this field. Summary of the invention
[0003] The present invention aims to solve at least one of the technical problems existing in the prior art. To this end, one object of the present invention is to provide a construction method for a concrete asphalt core wall panel rockfill dam built on a thick overburden. The construction method for the dam body of the present invention can effectively shorten the construction period.
[0004] The invention also provides a dam structure.
[0005] The construction method for building a concrete asphalt core wall panel rockfill dam on a thick covering layer according to the present invention comprises: basic cleaning and leveling of the original riverbed to form a construction base surface on the original riverbed; constructing a grouting gallery on the construction base surface, and then carrying out dam body construction on the construction base surface; and carrying out anti-seepage wall construction in the gallery while constructing the dam body.
[0006] According to the construction method of the concrete asphalt core wall panel rockfill dam built on a thick covering layer of the present invention, after completing the cleaning and leveling of the original riverbed, a grouting corridor is constructed on the construction base surface, and then the dam body construction is carried out on the construction base surface. At the same time as the dam body construction, the anti-seepage wall construction is carried out in the corridor, so that the anti-seepage wall construction and the dam body construction can be carried out simultaneously, so as to shorten the construction period.
[0007] According to some embodiments of the present invention, cleaning and leveling the original riverbed to form a construction base on the original riverbed includes: leveling and excavating the surface of the thick covering layer on the original riverbed, and performing replacement operations on the original riverbed that does not meet the construction requirements.
[0008] According to some embodiments of the present invention, carrying out construction of an anti-seepage wall in the corridor while constructing the dam body includes: setting an anti-seepage wall in the thick covering layer inside the corridor, and performing curtain grouting at the bottom of the anti-seepage wall.
[0009] According to some embodiments of the present invention, the dam body construction includes: setting a rockfill dam on the original riverbed and setting a transition layer in the middle of the rockfill dam; and setting a concrete asphalt core wall structure in the transition layer.
[0010] According to some embodiments of the present invention, the dam body construction also includes: determining the cross-sectional dimensions of the corridor at the bottom of the rockfill dam, and analyzing the dam body deformation and seepage influencing parameters based on the cross-sectional dimensions; and calculating and verifying the corridor cross-sectional dimensions based on the influencing parameters.
[0011] According to some embodiments of the present invention, the corridor has a width of D and a height of L, and satisfies: D ≥ 5.5 m, L ≥ 6 m.
[0012] The dam structure according to the present invention is briefly described below.
[0013] The dam structure according to the present invention includes: a thick covering layer, a construction base surface is formed on the thick covering layer; a first dam body and a second dam body, the first dam body and the second dam body are respectively arranged on the construction base surface and a core wall structure is formed between the first dam body and the second dam body; a corridor, the corridor is arranged on the top of the construction base surface and is located at the bottom of the core wall structure.
[0014] The thick covering layer is the basic part of the dam structure. By processing and improving the thick covering layer to form a stable construction base surface, the first dam body and the second dam body are respectively arranged on the construction base surface, and a core wall structure is arranged between the first dam body and the second dam body. The core wall structure mainly adopts concrete, asphalt and other material components, has good anti-seepage function, can effectively prevent water infiltration, and ensure the stability and safety of the first dam body and the second dam body; a corridor is arranged at the bottom of the core wall structure, and the dam body construction and the core wall structure construction can be carried out at the same time as the anti-seepage wall construction is carried out in the corridor, which is conducive to shortening the construction period.
[0015] According to some embodiments of the present invention, an anti-seepage layer is formed in the thick covering layer and the anti-seepage layer is located directly below the corridor.
[0016] According to some embodiments of the present invention, a curtain grouting layer is formed at the bottom of the anti-seepage layer.
[0017] According to some embodiments of the present invention, the core wall includes: a first transition layer and a second transition layer, and a concrete asphalt layer is formed between the first transition layer and the second transition layer.
[0018] Additional aspects and advantages of the present invention will be given in part in the following description and in part will be obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] The above and / or additional aspects and advantages of the present invention will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:
[0020] Figure 1 is a flow chart of a construction method for a concrete asphalt core wall panel rockfill dam constructed on a thick overburden layer according to one embodiment of the present invention;
[0021] Figure 2 It is a schematic structural diagram of a dam structure according to an embodiment of the present invention.
[0022] Reference numerals:
[0023] Dam structure 1;
[0024] Thick covering layer 11, construction base surface 111;
[0025] A first dam body 121, a second dam body 122, a core wall structure 123, a first transition layer 124, and a second transition layer 125;
[0026] Corridor 13;
[0027] Anti-seepage layer 14; Curtain grouting layer 15. DETAILED DESCRIPTION
[0028] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.
[0029] In the actual design of water conservancy and hydropower projects, the original riverbed will have more or less weak covering layers. If the thickness of the covering layer is shallow, the covering layer can be removed before selecting a hard dam type or a lightweight dam type. If the covering layer is deep, it generally has the characteristics of low bearing capacity and strong permeability. The existing technology usually hardens the surface of the foundation to strengthen the integrity of the foundation to improve the bearing capacity of the foundation. However, due to the numerous procedures and long construction period of the dam construction, the construction period of the dam often becomes a key issue for the construction project. Therefore, how to optimize the foundation hardening treatment process and the dam construction process to shorten the construction period has become an urgent problem to be solved in this field.
[0030] Reference below Figure 1-Figure 2A construction method for a concrete asphalt core-slab rockfill dam constructed on a thick overburden layer according to an embodiment of the present invention is described.
[0031] The construction method for a concrete asphalt core wall panel rockfill dam built on a thick covering layer according to the present invention comprises: basic cleaning and leveling of the original riverbed to form a construction base surface on the original riverbed; constructing a grouting gallery on the construction base surface, and then carrying out dam body construction on the construction base surface; and carrying out anti-seepage wall construction in the gallery while constructing the dam body.
[0032] Specifically, before the construction begins, preparations should be made for the construction, and a detailed survey of the construction site should be conducted to understand the geological conditions, groundwater conditions, and climatic conditions, etc., to provide basic data for subsequent construction plans. Clear the debris and water on the surface to ensure that the construction surface is dry and clean, and reinforce the original riverbed and clean and level the foundation to form a construction base on the original riverbed. The construction base will serve as the basis for subsequent dam construction and corridor setting. After the original riverbed is set firmly, the corridor and dam construction will be carried out on the construction base. The corridor is a grouting corridor, which is arranged along the axis of the dam. When the original riverbed is processed, the corridor can be poured. After the corridor is poured, the dam construction can be carried out on the construction base, and the construction of the anti-seepage wall in the corridor is carried out simultaneously with the dam construction, thereby shortening the construction period.
[0033] According to the construction method of the concrete asphalt core wall panel rockfill dam built on a thick covering layer of the present invention, after completing the cleaning and leveling of the original riverbed, a grouting corridor is constructed on the construction base surface, and then the dam body construction is carried out on the construction base surface. At the same time as the dam body construction, the anti-seepage wall is constructed in the corridor, so that the construction of the anti-seepage wall and the construction of the dam body can be carried out simultaneously, so as to shorten the construction period.
[0034] According to some embodiments of the present invention, basic cleaning and leveling of the original riverbed to form a construction base on the original riverbed includes: leveling and excavating the surface of the thick covering layer on the original riverbed, and performing replacement operations on the original riverbed that does not meet the construction requirements.
[0035] Specifically, the surface of the thick covering layer on the original riverbed is leveled and excavated to remove large stones, tree roots and other debris to ensure a flat construction base. According to the design requirements and geological survey results, the soil or rock layer on the surface of the original riverbed is removed. For the original riverbed part that does not meet the construction requirements after excavation, it is necessary to carry out filling and replacement operations, which can be carried out by vibratory crushed stone pile construction to ensure the quality and stability of the construction base, laying a solid foundation for the subsequent dam construction.
[0036] According to some embodiments of the present invention, carrying out construction of an anti-seepage wall in the corridor while constructing the dam body includes: setting an anti-seepage wall in the thick covering layer inside the corridor, and performing curtain grouting at the bottom of the anti-seepage wall.
[0037] Specifically, an anti-seepage wall is set up inside the treated corridor according to the design requirements. The material and structure of the anti-seepage wall should be selected and designed according to the specific conditions of the dam body, seepage pressure and other factors. The construction of the anti-seepage wall should ensure that it fits tightly with the corridor wall without gaps or voids to ensure its anti-seepage effect. Curtain grouting is carried out at the bottom of the anti-seepage wall. Curtain grouting is a commonly used anti-seepage measure. Slurry is injected into the cracks and pores of rocks or soil to form a continuous and dense curtain to cut off or reduce the seepage channel. Parameters such as slurry material, grouting pressure, and grouting method of curtain grouting should be selected and designed according to specific conditions to ensure its effectiveness and reliability.
[0038] According to some embodiments of the present invention, the dam construction includes: setting a rockfill dam on the original riverbed and setting a transition layer in the middle of the rockfill dam; and setting a concrete asphalt core wall structure in the transition layer.
[0039] Specifically, a rockfill dam is set up on the construction base to form a stable dam body, and a transition layer is set up in the middle part of the rockfill dam according to the design requirements. The main function of the transition layer is to reduce the stress difference between the rockfill dam and the concrete asphalt core wall, and to improve the stability and durability of the overall structure. The material of the transition layer should have good water permeability, shear strength and stability, and materials with moderate particle size such as gravel and crushed stone are usually selected. A concrete asphalt core wall structure is set up on the transition layer. The concrete asphalt core wall is a commonly used anti-seepage structure with good anti-seepage performance and durability. By setting up a transition layer and a concrete asphalt core wall structure, it is ensured that the core wall can effectively play an anti-seepage role.
[0040] According to some embodiments of the present invention, the dam construction further includes: determining the cross-sectional dimensions of the gallery at the bottom of the rockfill dam, and analyzing the dam deformation and seepage influencing parameters according to the cross-sectional dimensions; and calculating and verifying the gallery cross-sectional dimensions according to the influencing parameters.
[0041] Specifically, before or during the construction of the rockfill dam, the end dimensions of the corridor set on the original riverbed are judged, and the possible impact on the deformation and seepage of the dam body is analyzed based on the end dimensions of the corridor. Through corresponding scientific calculations, the obtained influencing parameters are compared with the preset design standards to verify whether the cross-sectional dimensions meet the requirements, ensure that the functions and effects of the corridor in the dam body are effectively exerted, and avoid adverse effects on the stability and safety of the dam body.
[0042] According to some embodiments of the present invention, the corridor has a width of D and a height of L, and satisfies: D ≥ 5.5 m, L ≥ 6 m.
[0043] Specifically, the corridor needs to accommodate construction equipment, materials and construction personnel. Sufficient width and height can ensure the smooth progress of the construction process and avoid low construction efficiency or safety hazards due to small space. The width D and height L of the corridor are set to meet D≥5.5m and L≥6m to ensure the smooth progress of the dam construction, the safety and stability of the dam body, and possible future renovation and expansion needs. At the same time, by expanding the size of the corridor, the construction of the anti-seepage wall can be carried out in the corridor, and the dam body construction can be carried out simultaneously, thereby shortening the dam body construction period.
[0044] As the size of the corridor increases, the construction tools of the anti-seepage wall should also be adjusted accordingly to ensure that the construction tools can be stably constructed in the corridor.
[0045] The dam structure 1 according to the present invention is briefly described below.
[0046] The dam structure 1 according to the present invention includes: a thick covering layer 11, on which a construction base 111 is formed; a first dam body 121 and a second dam body 122, which are respectively arranged on the construction base 111 and a core wall structure 123 is formed between the first dam body 121 and the second dam body 122; and a corridor 13, which is arranged on the top of the construction base 111 and located at the bottom of the core wall structure 123.
[0047] Specifically, the thick covering layer 11 serves as the basic part of the dam body structure 1. The thick covering layer 11 is processed and improved to form a stable construction base surface 111. The first dam body 121 and the second dam body 122 are respectively arranged on the construction base surface 111, and a core wall structure 123 is arranged between the first dam body 121 and the second dam body 122. The core wall structure 123 mainly adopts concrete, asphalt and other material components, has good anti-seepage function, can effectively prevent water infiltration, and ensure the stability and safety of the first dam body 121 and the second dam body 122; a corridor 13 is arranged at the bottom of the core wall structure 123, and the dam body construction and the core wall structure 123 can be carried out while the anti-seepage wall construction is carried out in the corridor 13, which is conducive to shortening the construction period.
[0048] According to some embodiments of the present invention, an anti-seepage layer 14 is formed in the thick cover layer 11 and the anti-seepage layer 14 is located directly below the gallery 13 .
[0049] Specifically, the anti-seepage layer 14 is located at the bottom of the dam structure 1 and in the thick covering layer 11 below the construction base 111, and the anti-seepage layer 14 is located directly below the corridor 13. By setting the anti-seepage layer 14, the water below the dam body can be effectively prevented from penetrating into the dam body, ensuring the stability and safety of the dam body. By setting the anti-seepage layer 14 below the corridor 13, the potential seepage path can be effectively cut off, and the anti-seepage performance of the dam body can be improved.
[0050] According to some embodiments of the present invention, a curtain grouting layer 15 is formed at the bottom of the anti-seepage layer 14 .
[0051] Specifically, the curtain grouting layer 15 is located at the bottom of the impermeable layer 14 and directly contacts the geological layer below the dam body. It covers the potential seepage path below the impermeable layer 14, forming a barrier to further prevent the infiltration of water. By arranging the curtain grouting layer 15 at the bottom of the impermeable layer 14, the impermeability of the dam body can be further improved, ensuring the long-term stability and safety of the dam body.
[0052] According to some embodiments of the present invention, the core wall includes: a first transition layer 124 and a second transition layer 125 , and a concrete asphalt layer is formed between the first transition layer 124 and the second transition layer 125 .
[0053] Specifically, the core wall structure 123 is a key component of the dam body, located between the first dam body 121 and the second dam body 122, and plays an anti-seepage role. The first transition layer 124 and the second transition layer 125 are respectively located on both sides of the concrete asphalt layer, regulating and transitioning the material properties and stress distribution between the concrete asphalt layer and other parts of the dam body, ensuring the stability and integrity of the core wall structure 123. The concrete asphalt layer is made of a mixture of concrete and asphalt, and has good anti-seepage performance and durability. It forms a complete core wall structure 123 by tightly combining the transition layers on both sides, effectively preventing the infiltration of water bodies. The core wall structure 123 of this design enables the concrete asphalt layer to be better combined with other parts of the dam body through the transition and adjustment of the transition layer, thereby improving the stability and durability of the core wall structure 123. At the same time, the concrete asphalt layer, as the anti-seepage main body, effectively guarantees the anti-seepage performance of the dam body.
[0054] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.
[0055] In the description of the present invention, "first feature" or "second feature" may include one or more of the features.
[0056] In the description of the present invention, "plurality" means two or more.
[0057] In the description of the present invention, a first feature being “on” or “under” a second feature may include that the first and second features are directly in contact with each other, or may include that the first and second features are not in direct contact with each other but are in contact with each other via another feature therebetween.
[0058] In the description of the present invention, “on”, “over” and “above” a first feature from a second feature includes the first feature being directly above and obliquely above the second feature, or simply means that the first feature is horizontally higher than the second feature.
[0059] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "illustrative embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.
[0060] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the claims and their equivalents.
Claims
1. A construction method for a concrete asphalt core wall panel rockfill dam built on a thick overburden, characterized in that: include: Cleaning and leveling the original riverbed to form a construction base surface on the original riverbed; constructing a grouting gallery on the construction base surface, and then carrying out dam body construction on the construction base surface; While the dam body is being constructed, the construction of the anti-seepage wall in the corridor is being carried out.
2. The construction method for a concrete asphalt core wall panel rockfill dam built on a thick overburden layer according to claim 1, characterized in that: The basic cleaning and leveling of the original riverbed to form a construction base surface on the original riverbed includes: The surface of the thick covering layer on the original riverbed is leveled and excavated, and the original riverbed that does not meet the construction requirements is replaced.
3. The construction method for a concrete asphalt core wall panel rockfill dam built on a thick overburden layer according to claim 1, characterized in that: The construction of the anti-seepage wall in the corridor during the construction of the dam body includes: An anti-seepage wall is set in the thick covering layer inside the corridor, and curtain grouting is carried out at the lower part of the anti-seepage wall.
4. The construction method for a concrete asphalt core wall panel rockfill dam built on a thick overburden layer according to claim 1, characterized in that: The dam construction includes: A rockfill dam is set on the original riverbed, and a transition layer is set in the middle of the rockfill dam; A concrete asphalt core wall structure is arranged in the transition layer.
5. The construction method for a concrete asphalt core wall panel rockfill dam built on a thick overburden layer as claimed in claim 4, characterized in that: The dam construction also includes: determining the cross-sectional dimensions of the corridor at the bottom of the rockfill dam, and analyzing the dam deformation and seepage influencing parameters according to the cross-sectional dimensions; The corridor cross-sectional dimensions are calculated and verified based on the influencing parameters.
6. The construction method for a concrete asphalt core wall panel rockfill dam built on a thick overburden layer according to claim 1, characterized in that: The corridor has a width of D and a height of L, and satisfies: D≥5.5m, L≥6m.
7. A dam structure, characterized in that: include: A thick covering layer (11), wherein a construction base surface (111) is formed on the thick covering layer (11); A first dam body (121) and a second dam body (122), wherein the first dam body (121) and the second dam body (122) are respectively arranged on the construction base surface (111) and a core wall structure (123) is formed between the first dam body (121) and the second dam body (122); A corridor (13), wherein the corridor (13) is arranged on the top of the construction base surface (111) and located at the bottom of the core wall structure (123).
8. The dam structure according to claim 7, characterized in that: An anti-seepage layer (14) is formed in the thick covering layer (11), and the anti-seepage layer (14) is located directly below the corridor (13).
9. The dam structure according to claim 8, characterized in that: A curtain grouting layer (15) is formed at the bottom of the anti-seepage layer (14).
10. The dam structure according to claim 7, characterized in that: The core wall comprises: A first transition layer (124) and a second transition layer (125), wherein a concrete asphalt layer is formed between the first transition layer (124) and the second transition layer (125).