Root canal preparation machine and root canal treatment system
By introducing the positioning part and the driving part into the root canal preparation machine, the connection process between the root canal preparation machine and the root canal file is simplified, the problem of complicated and easy-to-damage connections in the existing technology is solved, and the assembly efficiency and safety are improved. .
Patent Information
- Application Number
- CN202411014854.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-26
- Publication Date
- 2024-10-29
AI Technical Summary
The connection process between the movement of the existing root canal preparation machine and the root canal file is complicated, which can easily cause damage to the root canal file.
A root canal preparation machine including a main body of the preparation machine, a movement, a first clamping part and a positioning part is designed. The relative position between the first clamping part and the main body of the preparation machine is indicated by the positioning part, which simplifies root canal preparation. The assembly process of the machine and the root canal file is carried out, and automatic positioning is realized through the driving part and position sensor to avoid repeated angle adjustment.
The rapid assembly of the root canal preparation machine and the root canal file is realized, which improves the assembly efficiency and reduces the risk of damage to the root canal file.
Smart Images

Figure CN118845259A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of dental medical auxiliary equipment, and in particular to a root canal preparation machine and a root canal treatment system. Background Art
[0002] The root canal preparation machine is a very important device in root canal treatment surgery. It can efficiently assist dentists in preparing the root canals of patients' teeth. During the root canal preparation process, the root canal preparation machine drives the root canal file to expand and clean the root canal in a continuous rotation or reciprocating motion to prepare a root canal shape that is conducive to gutta-percha filling and facilitate subsequent operations.
[0003] However, currently, when operators connect the core of the root canal preparation machine to the root canal file needle, the operators often need to repeatedly adjust the angle of the root canal preparation machine, which makes the process of connecting the core of the root canal preparation machine to the root canal file needle more complicated. In addition, during the process of repeatedly adjusting the angle of the root canal preparation machine, the root canal file needle may be damaged due to multiple contacts with the root canal preparation machine. Summary of the invention
[0004] The present application provides a root canal preparation machine and a root canal treatment system. The problem that the connection process between the core and the root canal file of the root canal preparation machine in the prior art is relatively complicated can be solved. The technical solution is as follows:
[0005] In one aspect, a root canal preparation machine is provided, comprising: a preparation machine body, a machine core, a first clamping member and a positioning member;
[0006] The movement is installed in the head of the preparatory machine body;
[0007] The movement has a mounting cavity and a first opening communicating with the mounting cavity;
[0008] The first clamping member is fixedly connected to the inner wall of the installation cavity;
[0009] The positioning member is fixedly connected to the movement, and the positioning member is used to indicate the relative position between the first clamping member and the preparatory machine body;
[0010] Wherein, the first opening is used for the end of the root canal file needle to extend into the installation cavity so as to be clamped with the first clamping piece.
[0011] Optionally, the positioning member is fixed on an end surface of the movement where the first opening is provided.
[0012] Optionally, the first clamping member has a connecting surface and a first clamping surface that are arranged opposite to each other;
[0013] The first clamping member is fixedly connected to the inner wall of the installation cavity through the connecting surface;
[0014] The orthographic projection of the connecting surface on the reference plane is located between the orthographic projections of the positioning member and the first clamping surface on the reference plane; and the reference plane is a plane parallel to the first opening.
[0015] Optionally, the symmetry axis of the orthographic projection of the positioning member on the reference plane coincides with the symmetry axis of the orthographic projection of the connecting surface on the reference plane, and coincides with the symmetry axis of the orthographic projection of the first clamping surface on the reference plane.
[0016] Optionally, the positioning member includes: a protruding portion protruding outward relative to the end surface of the movement, and / or a recessed portion recessed inward relative to the end surface of the movement, and / or a different color portion having a color different from the color of the end surface of the movement.
[0017] Optionally, the positioning member is fixedly connected to the outer side surface of the movement;
[0018] Wherein, the preparatory machine body is configured to: drive the movement, the positioning member and the first clamping member to rotate synchronously until the positioning member determines that the first clamping member has rotated to a specified position, and the specified position is a fixed position of the first clamping member relative to the preparatory machine body.
[0019] Optionally, the movement has a transmission part; the preparatory machine body includes: a control element, a driving part and a position sensor, the control element is electrically connected to the driving part and the position sensor respectively, and the driving part is in transmission connection with the transmission part;
[0020] Wherein, the control element is configured as follows: after receiving a reset instruction, the driving unit and the transmission unit drive the movement, the positioning member and the first clamping member to rotate synchronously; after the positioning member is detected by the position sensor, the driving unit controls the movement to stop rotating so that the first clamping member is located at the specified position.
[0021] Optionally, the positioning member includes a magnet; and the position sensor is a magnetic induction sensor.
[0022] Optionally, after the first clamping member is located at the designated position, the position sensor, the positioning member and the orthographic projection of the first clamping member on the reference plane are arranged in sequence along the axial direction of the preparation machine body, and the positioning member is closer to the position sensor than the first clamping member;
[0023] Alternatively, after the first clamping member is located at the designated position, the position sensor, the positioning member and the orthographic projection of the first clamping member on the reference plane are arranged in sequence along the axial direction of the preparation machine body, and the first clamping member is closer to the position sensor than the positioning member;
[0024] Alternatively, after the first clamping member is located at the designated position, the orthographic projections of the positioning member and the first clamping member on the reference plane are arranged in sequence along an axial direction perpendicular to the preparation machine body, and the positioning member and the first clamping member are both distributed on one side of the axis of the preparation machine body;
[0025] Alternatively, after the first clamping member is located at the designated position, the orthographic projections of the positioning member and the first clamping member on the reference plane are arranged in sequence along an axial direction perpendicular to the preparation machine body, and the positioning member and the first clamping member are both distributed on the other side of the axis of the preparation machine body;
[0026] Wherein, the reference plane is a plane parallel to the first opening.
[0027] In another aspect, a root canal treatment system is provided, the root canal treatment system comprising:
[0028] A root canal file and a root canal preparation machine, wherein the end of the root canal file is used to extend into the installation cavity through the first opening to be clamped with the first clamping piece, and the root canal preparation machine is any one of the root canal preparation machines given above.
[0029] The beneficial effects of the technical solution provided by this application include at least:
[0030] A root canal preparation machine may include: a preparation machine body, a movement, a first clamping piece and a positioning piece. Since the positioning piece fixedly connected to the movement can be used to indicate the relative position between the first clamping piece and the preparation machine body. Therefore, the position of the first clamping piece relative to the preparation machine body can be quickly determined by the positioning piece. Afterwards, when the operator knows the position of the second clamping piece provided on the end of the root canal file needle, the operator operates the root canal preparation machine so that the first clamping piece is aligned and clamped with the second clamping piece provided on the end of the root canal file needle, and the root canal preparation machine and the root canal file needle can be quickly assembled, which simplifies the assembly process of the two and effectively improves the assembly efficiency. In addition, by adopting this installation method, there is no need to repeatedly adjust the angle of the root canal preparation machine, which can effectively avoid damage to the root canal file needle caused by multiple contacts. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0032] Figure 1 It is a structural schematic diagram of a root canal preparation machine provided in an embodiment of the present application;
[0033] Figure 2 yes Figure 1 A front view of a root canal preparation machine is shown;
[0034] Figure 3 is a schematic diagram of the relative positions of a positioning member and a first clamping member provided in an embodiment of the present application;
[0035] Figure 4 is a cross-sectional view of a partial structure of a root canal preparation machine provided in an embodiment of the present application;
[0036] Figure 5 It is a partial structural schematic diagram of a root canal preparation machine provided in an embodiment of the present application;
[0037] Figure 6 is a partial structural cross-sectional view of another root canal preparation machine provided in an embodiment of the present application;
[0038] Figure 7 It is a partial structural cross-sectional view of another root canal preparation machine provided in an embodiment of the present application;
[0039] Figure 8 is a schematic diagram of the relative positions of a first clamping member, a positioning member and a position sensor provided in an embodiment of the present application;
[0040] Fig. 9 is another schematic diagram of the relative positions of a first clamping member, a positioning member and a position sensor provided in an embodiment of the present application;
[0041] Fig.10 This is another schematic diagram of the relative positions of a first clamping member, a positioning member and a position sensor provided in an embodiment of the present application;
[0042] Fig.11 This is a schematic diagram of the relative positions of another first clamping member, a positioning member and a position sensor provided in an embodiment of the present application;
[0043] Fig.12 It is a partial structural schematic diagram of another root canal preparation machine provided in an embodiment of the present application;
[0044] Fig.13is a cross-sectional view of a root canal treatment system provided in an embodiment of the present application;
[0045] Fig.14 yes Fig.13 Schematic diagram of the connection between the root canal file needle and the movement.
[0046] The above drawings have shown clear embodiments of the present application, which will be described in more detail later. These drawings and text descriptions are not intended to limit the scope of the present application in any way, but to illustrate the concept of the present application to those skilled in the art by referring to specific embodiments. DETAILED DESCRIPTION
[0047] In order to make the objectives, technical solutions and advantages of the present application clearer, the implementation methods of the present application will be further described in detail below with reference to the accompanying drawings.
[0048] Please refer to Figure 1 and Figure 2 , Figure 1 is a structural schematic diagram of a root canal preparation machine provided in an embodiment of the present application, Figure 2 yes Figure 1 The front view of the root canal preparation machine is shown. The root canal preparation machine may include: a preparation machine body 100 , a core 200 , a first clamping member 300 and a positioning member 400 .
[0049] The root canal preparation machine has a main body 100 of the preparation machine installed in the head of the machine. Here, the movement 200 can be rotated in the head of the preparation machine main body 100.
[0050] The core 200 of the root canal preparation machine may have a mounting cavity a1 and a first opening a2 connected to the mounting cavity a1 , wherein the first opening a2 may be used for the end of a root canal file needle (not shown) to extend into the mounting cavity a1 in the core 200 .
[0051] The first clamping member 300 in the root canal preparation machine can be fixedly connected to the inner wall of the mounting cavity a1 in the movement 200. After the end of the root canal file needle extends into the mounting cavity a1 in the movement 200, the end of the root canal file needle can be clamped with the first clamping member 300 in the mounting cavity a1. For example, the end of the root canal file needle can have a second clamping member that cooperates with the first clamping member 300. In the actual assembly process of the root canal preparation machine and the root canal file needle, after the second clamping member provided on the end of the root canal file needle is aligned and clamped with the first clamping member 300 located in the mounting cavity a1 in the movement 200, the root canal preparation machine and the root canal file needle can be effectively assembled. However, before the end of the root canal file needle extends into the mounting cavity a1 in the movement 200, the operator needs to accurately know the position of the first clamping member 300 in order to efficiently connect the root canal preparation machine with the root canal file needle.
[0052] The positioning member 400 in the root canal preparation machine can be fixedly connected to the machine core 200 , and the positioning member 400 is used to indicate the relative position between the first clamping member 300 and the preset machine body 100 .
[0053] In the embodiment of the present application, the positioning member 400 fixedly connected to the movement 200 can be used to indicate the relative position between the first clamping member 300 and the preparation machine body 100. Therefore, the operator can quickly determine the position of the first clamping member 300 relative to the preparation machine body 100 through the positioning member 400. Afterwards, when the operator knows the position of the second clamping member provided on the end of the root canal file needle, the operator operates the root canal preparation machine so that the first clamping member 300 is aligned and clamped with the second clamping member provided on the end of the root canal file needle, and the root canal preparation machine and the root canal file needle can be quickly assembled, which simplifies the assembly process of the two and effectively improves the assembly efficiency. In addition, by adopting this installation method, there is no need to repeatedly adjust the angle of the root canal preparation machine, which can effectively avoid damage to the root canal file needle caused by multiple contacts.
[0054] It should be noted that, in the process of treating a patient's teeth using a root canal preparation machine and a root canal file, the operator can first clamp the root canal file needle and pre-place the root canal file needle in the root canal of the tooth, and then assemble the root canal preparation machine and the root canal file needle.
[0055] In summary, the embodiment of the present application provides a root canal preparation machine, which may include: a preparation machine body, a movement, a first clamping piece and a positioning piece. Since the positioning piece fixedly connected to the movement can be used to indicate the relative position between the first clamping piece and the preparation machine body. Therefore, the position of the first clamping piece relative to the preparation machine body can be quickly determined by the positioning piece. Afterwards, when the operator knows the position of the second clamping piece provided on the end of the root canal file needle, the operator operates the root canal preparation machine so that the first clamping piece is aligned and clamped with the second clamping piece provided on the end of the root canal file needle, and the root canal preparation machine and the root canal file needle can be quickly assembled, which simplifies the assembly process of the two and effectively improves the assembly efficiency. And by adopting this installation method, there is no need to repeatedly adjust the angle of the root canal preparation machine, which can effectively avoid damage to the root canal file needle caused by multiple contacts.
[0056] In the embodiment of the present application, there are various structures of the positioning member 400 in the root canal preparation machine, and the positioning members 400 of different structures are arranged at different positions on the core 200. The embodiment of the present application will be schematically described by taking the following two possible implementation methods as examples:
[0057] The first possible implementation is Figure 1 and Figure 2As shown, the positioning member 400 in the root canal preparation machine can be fixed on the end face of the movement 200 where the first opening a2 is set. In this case, the positioning member 400 can be used as a marking member, that is, the positioning member 400 can be used to mark the relative position between the first clamping member 300 and the preparation machine body 100.
[0058] In this case, a first opening a2 and a positioning piece 400 connected to the installation cavity a1 are provided on the end face of the movement 200. The operator can quickly know the position of the first clamping piece 300 relative to the preparation machine body 100 by observing the positioning piece 400 provided on the end face of the movement 200.
[0059] Optional, please refer to Figure 3 and Figure 4 , Figure 3 is a schematic diagram of the relative positions of a positioning member and a first clamping member provided in an embodiment of the present application, Figure 4 The first clamping member 300 in the root canal preparation machine may have a connecting surface b1 and a first clamping surface b2 that are arranged opposite to each other, and the first clamping member 300 may be fixedly connected to the inner wall of the installation cavity a1 in the movement 200 through the connecting surface b1.
[0060] The orthographic projection of the connection surface b1 in the first clamping member 300 on the reference plane C may be located between the orthographic projection of the positioning member 400 on the reference plane C and the orthographic projection of the first clamping surface b2 in the first clamping member 300 on the reference plane C. Here, the reference plane C may be a plane parallel to the first opening a2 in the movement 200.
[0061] In this case, by fixing the connection surface b1 of the first clamping member 300 to the inner wall of the installation cavity a1 in the movement 200, the fixed connection between the first clamping member 300 and the movement 200 can be achieved. In a possible case, the movement 200 and the first clamping member 300 can also be integrally formed. The first clamping surface b2 in the first clamping member 300, which is arranged opposite to the connection surface b1, can be used to cooperate with the second clamping member at the end of the root canal file needle. In addition, the orthographic projection of the connection surface b1 in the first clamping member 300 on the reference plane C is arranged between the orthographic projection of the positioning member 400 on the reference plane C and the orthographic projection of the first clamping surface b2 in the first clamping member 300 on the reference plane C. That is, the orthographic projection of the positioning member 400 on the reference plane can be arranged adjacent to the orthographic projection of the first clamping member 300 on the reference plane. In this way, the operator can know the position of the first clamping member 300 more efficiently and accurately through the positioning member 400, thereby further improving the efficiency of assembling the root canal preparation machine and the root canal file.
[0062] In the embodiments of the present application, Figure 3 As shown, the symmetry axis L1 of the orthographic projection of the positioning member 400 in the root canal preparation machine on the reference plane C can coincide with the symmetry axis L2 of the orthographic projection of the connecting surface b1 in the first clamping member 300 on the reference plane C, and can coincide with the symmetry axis L3 of the orthographic projection of the first clamping surface b2 in the first clamping member 300 on the reference plane C.
[0063] In this case, by setting the symmetry axis L1 of the orthographic projection of the positioning member 400 on the reference plane C, the symmetry axis L2 of the orthographic projection of the connecting surface b1 in the first clamping member 300 on the reference plane C, and the symmetry axis L3 of the orthographic projection of the first clamping surface b2 in the first clamping member 300 on the reference plane C to coincide, the positioning member 400 can be centrally arranged relative to the first clamping member 300, so that the operator can pre-align the positioning member 400 with the central position of the connecting position of the end of the root canal file needle during the process of assembling the root canal preparation machine and the root canal file needle, and then simply move the root canal preparation machine to realize the assembly of the root canal preparation machine and the root canal file needle.
[0064] In the present application, the connection surface b1 in the first clamping member 300 may be a connection arc surface, the first clamping surface b2 in the first clamping member 300 may be a clamping plane, and both ends of the first clamping surface b2 may be connected to both ends of the connection surface b1.
[0065] For example, the shape of the figure enclosed by the orthographic projection of the connection surface b1 in the first clamping member 300 on the reference plane C and the orthographic projection of the first clamping surface b2 in the first clamping member 300 on the reference plane C can be in the shape of a "D". After the second clamping member provided on the end of the root canal file needle is clamped with the first clamping member, the second clamping surface in the second clamping member can contact the first clamping surface in the first clamping member. For example, the second clamping member at the end of the root canal file needle can be a D-type step joint, which is clamped with the first clamping member 300 fixed in the movement 200, and finally realizes the assembly connection of the root canal preparation machine and the root canal file needle.
[0066] Optional, please refer to Figure 4 and Figure 5 , Figure 5 It is a partial structural diagram of a root canal preparation machine provided in an embodiment of the present application. The movement 200 in the root canal preparation machine may have a transmission part 201, and the preparation machine body 100 may include: a driving part 101, and the driving part 101 may be connected to the transmission part 201 in a transmission manner. Among them, the driving part 101 in the preparation machine body 100 may be configured to: drive the movement 200, the first clamping part 300 and the positioning part 400 to rotate synchronously through the transmission part 201.
[0067] In this case, by setting a driving part 101 in the root canal preparation machine, the driving part 101 can be connected to the transmission part 201 set on the outer surface of the movement 200. In this way, when the driving part 101 is in a working state, the transmission part 201 can be driven to drive the movement 200 to rotate around its own axis, and then the first clamping part 300 fixed in the movement 200 and the positioning part 400 fixed on the end face of the movement 200 can rotate together with the random core 200.
[0068] In this way, after the operator sends an opening command to the driving unit 101 in the preparation machine body 100 through the root canal preparation machine, the driving unit 101 can rotate the movement 200 and adjust the position of the positioning member 400; after the positioning member 400 rotates to the position required by the operator, the operator sends a closing command to the driving unit 101 through the root canal preparation machine, and the movement 200 can stop rotating.
[0069] It should be noted that by using the cooperation of the driving part 101 and the transmission part 201 to drive the movement 200 to rotate to adjust the use of the positioning member 400, there is no need to repeatedly find the connection angle between the root canal preparation machine and the root canal file needle, and the automation level of the root canal preparation machine 00 and the root canal file needle assembly is improved. It should also be noted that in other possible implementations, the operator can manually rotate the movement 200 using a fixture that matches the shape of the first clamping member 300 to adjust the position of the positioning member 400 set on the end face of the movement 200.
[0070] For example, Figure 4 As shown, the preparation machine body 100 may also include: a shell K, and other components in the preparation machine body 100 may be arranged in the shell K. For example, the driving part 101 in the preparation machine body 100 may be installed in the shell K. Here, the transmission part fixed on the movement 200 may have a plurality of first bevel teeth, and the driving part 101 may include: a driving motor and a transmission shaft (not shown in the figure), the output shaft of the driving motor may be connected to one end of the transmission shaft, and the other end of the transmission shaft may have a plurality of second bevel teeth meshing with the plurality of first bevel teeth on the transmission part. In this way, the output shaft of the driving motor can drive the transmission shaft to rotate, and then drive the transmission part to rotate through the cooperation of the plurality of second bevel teeth and the plurality of first bevel teeth.
[0071] In the present application, after the root canal preparation machine and the root canal file are assembled, the operator can send a start command to the driving unit 101 through the root canal preparation machine, so that the driving unit 101 can drive the movement 200 and the root canal file to rotate synchronously through the transmission unit 201, so as to realize the treatment of the root canal through the root canal file.
[0072] In an embodiment of the present application, the positioning member 400 in the root canal preparation machine may include: a protruding portion (not shown in the figure) protruding outward relative to the end surface of the movement 200, and / or a recessed portion recessed inward relative to the end surface of the movement 200, and / or a different color portion whose color is different from the color of the end surface of the movement.
[0073] In this case, by providing positioning members 400 of different shapes, the operator can more clearly observe the positioning member 400 and the position of the positioning member 400, thereby facilitating the operator to adjust the position of the positioning member 400, thereby more conveniently adjusting the position of the first clamping member 300 provided in the movement 200. In addition, the color of the positioning member 400 can also be set to be different from the color of the end surface of the movement 200, so that the operator can more clearly observe the positioning member 400 and the position of the positioning member 400, thereby facilitating the operator to adjust the position of the positioning member 400, thereby more conveniently adjusting the position of the first clamping member 300 provided in the movement 200.
[0074] For example, the shape of the positioning member 400 may be circular, square, or oval, etc. It should be noted that the shape and color of the positioning member 400 are not specifically limited in the embodiment of the present application, as long as the operator can easily observe the positioning member 400 and the position of the positioning member 400.
[0075] For the second possible implementation, please refer to Figure 6 , Figure 6 It is a partial structural cross-sectional view of another root canal preparation machine provided in an embodiment of the present application. The positioning member 400 in the root canal preparation machine can be fixed on the outer surface of the movement 200. Here, after the positioning member 400 is fixed to the outer surface of the movement 200, the relative position of the positioning member 400 and the first clamping member 300 in the movement 200 is fixed.
[0076] In the present application, the preparation machine body 100 in the root canal preparation machine can be configured to: drive the movement 200, the positioning member 400 and the first clamping member 300 to rotate synchronously until it is determined through the positioning member 400 that the first clamping member 300 has rotated to a specified position, and the specified position can be a fixed position of the first clamping member 300 relative to the preparation machine body 100.
[0077] Here, the preparation machine body 100 in the root canal preparation machine can drive the movement 200, the positioning member 400 and the first clamping member 300 to rotate synchronously after receiving the reset instruction. The preparation machine body 100 can also determine whether the first clamping member 300 has rotated to the specified position by detecting the positioning member 400. For example, after the preparation machine body 100 detects the positioning member 400, it can be determined that the first clamping member 300 has rotated to the specified position. At this time, the preparation machine body 100 can control the movement 200, the positioning member 400 and the first clamping member 300 to stop rotating.
[0078] In one possible implementation, a reset button (not shown in the figure) can be set on the preparation machine body 100. After the operator presses the reset button, the preparation machine body 100 can receive the reset command, and then can drive the movement 200, the positioning member 400 and the first clamping member 300 to rotate synchronously until the first clamping member 300 has rotated to the specified position.
[0079] In the embodiment of the present application, the preparatory machine body 100 can drive the movement 200, the positioning member 400 and the first clamping member 300 to rotate synchronously, and the preparatory machine body 100 can determine whether the first clamping member 300 has rotated to the specified position by detecting the positioning member 400. In this way, after the first clamping member 300 rotates to the specified position, the operator can know the position of the first clamping member 300.
[0080] Optional, please refer to Figure 7 , Figure 7 It is a partial structural cross-sectional view of another root canal preparation machine provided by an embodiment of the present application. The movement 200 may have a transmission part 201. The preparation machine body 100 may include: a control element (not shown in the figure), a driving part 101 and a position sensor 102. The control element may be electrically connected to the driving part 101 and the position sensor 102 respectively, and the driving part 101 may be in transmission connection with the transmission part 201.
[0081] The control element may be configured to: after receiving a reset instruction, drive the movement 200, the positioning member 400 and the first clamping member 300 to rotate synchronously through the driving unit 101 and the transmission unit 201. After the positioning member 400 is detected by the position sensor 102, the movement 200 is controlled to stop rotating through the driving unit 101, so that the first clamping member 300 is located at a specified position.
[0082] In this case, after the positioning member 400 is detected by the position sensor 102, the position sensor 102 can transmit the detection signal to the control element, and the control element can control the drive unit 101 to switch to the stop working state after receiving the detection signal, thereby controlling the movement 200 to stop rotating. It should be noted that the preset signal value detected by the position sensor 102 after the first clamping member 300 rotates to the specified position can be pre-stored in the memory of the control element. The control element can compare the received real-time detection signal value sent by the position sensor 102 with the stored preset signal value to determine whether the real-time detection signal value is equal to the preset signal value. For example, the control element can be a control motherboard. It should also be noted that in actual use, the position information of the position sensor 102 is known to the operator, and the relative position of the positioning member 400 and the first clamping member 300 is fixed. Then, after the position sensor 102 detects that the positioning member 400 is rotated by the movement 200, the drive unit 101 controls the movement 200 to stop rotating, and the operator can determine the position of the first clamping member 300.
[0083] In this application, if Figure 7 As shown, the positioning member 400 in the root canal preparation machine may include: a magnet fixed on the outer side of the core 200, and the position sensor 102 may be a magnetic induction sensor. In this case, during the rotation of the magnet with the core 200, the magnetic induction sensor converts the change of the magnetic field intensity into an angle change according to the change of the magnetic field intensity of the magnet, and then detects the rotation angle position of the first clamping member 300 rotating with the core.
[0084] For example, when the magnetic induction sensor detects that the magnetic field strength value of the magnet is the maximum, the magnetic induction sensor sends a detection signal to the control element, and the control element controls the drive unit 101 to switch to a stop working state based on the received detection signal, and the first clamping member 300 can be in a specified position. Alternatively, when the magnetic induction sensor detects that the magnetic field strength value of the magnet is the minimum, the magnetic induction sensor sends a detection signal to the control element, and the control element controls the drive unit 101 to switch to a stop working state based on the received detection signal, and the first clamping member 300 can be in a specified position. Alternatively, when the magnetic induction sensor detects that the magnetic field strength value of the magnet is at any set value, the magnetic induction sensor sends a detection signal to the control element, and the control element controls the drive unit 101 to switch to a stop working state based on the received detection signal, and the first clamping member 300 can be in a specified position. For example, the magnetic induction sensor can be a Hall sensor.
[0085] It should be noted that the distribution relationship between the positioning member 400 and the first clamping member 300 in the second optional implementation is similar to the distribution relationship between the positioning member 400 and the first clamping member 300 in the first optional implementation. Figure 8 , Figure 8 It is a schematic diagram of the relative positions of a first clamping member, a positioning member and a position sensor provided in an embodiment of the present application. The first clamping member 300 in the root canal preparation machine may have a connection surface b1 and a first clamping surface b2 arranged relatively to each other. The orthographic projection of the connection surface b1 in the first clamping member 300 on the reference plane C may be located between the orthographic projection of the positioning member 400 on the reference plane C and the orthographic projection of the first clamping surface b2 in the first clamping member 300 on the reference plane C. Here, this reference plane C may be a plane parallel to the first opening a2 in the movement 200. Similarly, the symmetry axis of the orthographic projection of the positioning member 400 on the reference plane C may also coincide with the symmetry axis of the orthographic projection of the connection surface b1 in the first clamping member 300 on the reference plane C, and may also coincide with the symmetry axis of the orthographic projection of the first clamping surface b2 in the first clamping member 300 on the reference plane C. Here, the advantages of the sampling of the positioning member 400 and the first clamping member 300 in this way can be referred to the corresponding content above, and will not be repeated here.
[0086] The position sensor 102 in the preparation machine body 100 can be arranged at a position closer to the driving part 101, so that the position sensor 102 can be more conveniently connected to the control element. And the symmetry axis of the positive projection of the position sensor 102 on the target plane C can coincide with the symmetry axis of the positive projection of the preparation machine body 100 on the target plane. In this way, it can be ensured that the position sensor 102 is arranged in the center, so that after the subsequent position sensor 102 detects the positioning member 400, the operator can more conveniently know the actual position of the first clamping member 300.
[0087] In the present application, when the position sensor 102 is a magnetic induction sensor and the positioning member 400 is a magnet, it can be determined that the first clamping member 300 is in the specified position when the magnetic induction sensor detects that the magnetic field strength of the magnet is at the maximum value; it can also be determined that the first clamping member 300 is in the specified position when the magnetic induction sensor detects that the magnetic field strength of the magnet is at the minimum value; it can also be determined that the first clamping member 300 is in the specified position when the magnetic induction sensor detects that the magnetic field strength value of the magnet is at any set value. Therefore, the embodiments of the present application will be schematically described using the following four cases as examples:
[0088] In the first case, when the position sensor 102 determines that the first clamping member 300 is at the specified position by detecting that the magnetic field strength of the positioning member 400 is at the maximum value, as shown in FIG. Figure 8 As shown, after the first clamping member 300 is located at the specified position, the position sensor 102, the positioning member 400 and the orthographic projection of the first clamping member 300 on the reference plane C can be arranged in sequence along the axial direction of the preparation machine body 100, and the positioning member 400 can be closer to the position sensor 102 relative to the first clamping member 300.
[0089] Exemplarily, in the process of driving the movement 200, the positioning member 400 and the first clip 300 to rotate synchronously through the driving part 101 and the transmission part 201, the position sensor 102 can monitor the magnetic field strength of the positioning member 400 in real time. After the position sensor 102 detects that the magnetic field strength of the positioning member 400 is the maximum value (usually a positive value), it can be determined that the first clip 300 is located at the specified position. In this case, the positioning member 400 can be located at the position closest to the position sensor 102, and the position of the positioning member 400 here can be positioned as the 0° position. Correspondingly, the first clip 300 can also be located at the position closest to the position sensor 102 to ensure that the operator can more accurately determine the actual position of the first clip 300.
[0090] In the second case, when the position sensor 102 determines that the first clamping member 300 is at the specified position by detecting that the magnetic field strength of the positioning member 400 is the minimum value, as shown in FIG. Fig. 9 As shown, Fig. 9 This is another schematic diagram of the relative positions of a first clamping member, a positioning member and a position sensor provided in an embodiment of the present application. After the first clamping member 300 is located at a specified position, the position sensor 102, the positioning member 400 and the orthographic projection of the first clamping member 300 on the reference plane C can be arranged in sequence along the axial direction of the preparation machine body 100, and the first clamping member 300 can be closer to the position sensor 102 relative to the positioning member 400.
[0091] Exemplarily, in the process of driving the movement 200, the positioning member 400 and the first clip 300 to rotate synchronously through the driving part 101 and the transmission part 201, the position sensor 102 can monitor the magnetic field strength of the positioning member 400 in real time. After the position sensor 102 detects that the magnetic field strength of the positioning member 400 is the minimum value (usually a negative value), it can be determined that the first clip 300 is located at the specified position. In this case, the positioning member 400 can be located at the position farthest from the position sensor 102, and the position of the positioning member 400 here can be positioned at a 180° position. Correspondingly, the first clip 300 can also be located at the position farthest from the position sensor 102 to ensure that the operator can more accurately determine the actual position of the first clip 300.
[0092] In the third case, when the position sensor 102 determines that the first clamping member 300 is at the specified position by detecting that the magnetic field strength of the positioning member 400 is the first preset value, as shown in FIG. Fig.10 As shown, Fig.10 Schematic diagram of the relative positions of another first clamping member, a positioning member and a position sensor provided in an embodiment of the present application. After the first clamping member 300 is located at a specified position, the orthographic projections of the positioning member 400 and the first clamping member 300 on the reference plane C can be arranged in sequence along the axis perpendicular to the preparation machine body 100, and the positioning member 400 and the first clamping member 300 can be distributed on one side of the axis of the preparation machine body 100. For example, Fig.10 In the embodiment, the positioning member 400 and the first clamping member 300 can both be distributed on the left side of the axis of the preparation machine body 100 .
[0093] Exemplarily, in the process of driving the movement 200, the positioning member 400 and the first clamping member 300 to rotate synchronously through the driving part 101 and the transmission part 201, the position sensor 102 can monitor the magnetic field strength of the positioning member 400 in real time. After the position sensor 102 detects that the magnetic field strength of the positioning member 400 is a first preset value (usually a positive value, and less than the maximum value of the magnetic field strength of the positioning member 400), it can be determined that the first clamping member 300 is located at the specified position. In this case, the positioning member 400 can be located on one side (for example, the left side) of the axis of the preparation machine body 100, and the position of the positioning member 400 here can be positioned at a 90° position. Correspondingly, the first clamping member 300 can also be located on one side (for example, the left side) of the axis of the preparation machine body 100 to ensure that the operator can more accurately determine the actual position of the first clamping member 300.
[0094] In the fourth case, when the position sensor 102 determines that the first clamping member 300 is at the specified position by detecting that the magnetic field strength of the positioning member 400 is the second preset value, as shown in FIG. Fig.11 As shown, Fig.11 : is another relative position diagram of the first clamping member, the positioning member and the position sensor provided in the embodiment of the present application. After the first clamping member 300 is located at the specified position, the orthographic projections of the positioning member 400 and the first clamping member 300 on the reference plane C can be arranged in sequence along the axis perpendicular to the preparation machine body 100, and the positioning member 400 and the first clamping member 300 can be distributed on the other side of the axis of the preparation machine body 100. For example, Fig.11 In the embodiment, the positioning member 400 and the first clamping member 300 can both be distributed on the right side of the axis of the preparation machine body 100 .
[0095] Exemplarily, in the process of driving the movement 200, the positioning member 400 and the first clamping member 300 to rotate synchronously through the driving part 101 and the transmission part 201, the position sensor 102 can monitor the magnetic field strength of the positioning member 400 in real time. After the position sensor 102 detects that the magnetic field strength of the positioning member 400 is a second preset value (usually a negative value, and greater than the minimum value of the magnetic field strength of the positioning member 400), it can be determined that the first clamping member 300 is located at the specified position. In this case, the positioning member 400 can be located on the other side of the axis of the preparation machine body 100 (for example, the right side), and the position of the positioning member 400 here can be positioned at the 270° position. Correspondingly, the first clamping member 300 can also be located on the other side of the axis of the preparation machine body 100 (for example, the right side) to ensure that the operator can more accurately determine the actual position of the first clamping member 300.
[0096] Optionally, there are multiple optional implementations for the arrangement positions of the magnet and the magnetic induction sensor in the embodiment of the present application. The following is a schematic description using two optional implementations as examples:
[0097] The first optional implementation method is Figure 7 As shown, a first slot k1 may be provided on the side of the edge portion of the movement 200 near the first opening a2, and a magnet may be fixed in the first slot k1. The magnetic induction sensor may be installed at the end surface of the housing K in the preparatory machine body 100 near the first opening a2 of the movement 200.
[0098] For the second optional implementation, please refer to Fig.12 , Fig.12 It is a partial structural schematic diagram of another root canal preparation machine provided in an embodiment of the present application. A second slot k2 can be provided in the central portion of the outer side surface of the movement 200, and the magnet can be fixed in the second slot k2. The root canal preparation machine may also include: a movement housing (not shown in the figure) rotatably connected to the movement 200, and the movement housing can be used to wrap the movement 200. The magnetic induction sensor can be fixed on the inner wall of the movement housing. Here, the structure and working principle of the magnet and the magnetic induction sensor can refer to the structure and working principle of the magnet and the magnetic induction sensor in the above-mentioned optional implementation method, which will not be repeated here.
[0099] It should be noted that, when the positioning member 400 includes a magnet fixed on the outer surface of the movement 200 and the position sensor 102 can be a magnetic induction sensor, the magnetic induction sensor can also be externally mounted, that is, the magnetic induction sensor can be fixed outside the movement housing by using a tooling fixture to ensure that the magnetic induction sensor can detect changes in the magnetic field strength of the magnet.
[0100] In other possible implementations, the positioning member 400 may also be a reflection pattern (not shown in the figure) with a different reflectivity from the outer side surface of the movement 200, and the position sensor 102 may also be a light sensor for emitting light and receiving light. Because after the light sensor emits light, the light intensity of the detection light reflected by the reflection pattern is different from the light intensity of the detection light reflected by the area on the outer side surface of the movement 200 where the positioning member 400 is not provided. After receiving the detection signal, the light sensor feeds back the detection signal to the control element, so as to control the drive unit 101 to switch to a stop working state after the first clamping member 300 rotates to a specified position through the control element. For example, the intensity of the detection light reflected by the reflection pattern may be greater than the intensity of the detection light reflected by the area on the outer side surface of the movement 200 where the positioning member is not provided.
[0101] In summary, the embodiment of the present application provides a root canal preparation machine, which may include: a preparation machine body, a movement, a first clamping piece and a positioning piece. Since the positioning piece fixedly connected to the movement can be used to indicate the relative position between the first clamping piece and the preparation machine body. Therefore, the position of the first clamping piece relative to the preparation machine body can be quickly determined by the positioning piece. Afterwards, when the operator knows the position of the second clamping piece provided on the end of the root canal file needle, the operator operates the root canal preparation machine so that the first clamping piece is aligned and clamped with the second clamping piece provided on the end of the root canal file needle, and the root canal preparation machine and the root canal file needle can be quickly assembled, which simplifies the assembly process of the two and effectively improves the assembly efficiency. And by adopting this installation method, there is no need to repeatedly adjust the angle of the root canal preparation machine, which can effectively avoid damage to the root canal file needle caused by multiple contacts.
[0102] The present application also provides a root canal treatment system. Fig.13 and Fig.14 , Fig.13 is a cross-sectional view of a root canal treatment system provided in an embodiment of the present application, Fig.14 yes Fig.13 The root canal treatment system may include: a root canal file 001 and a root canal preparation machine.
[0103] The end of the root canal file needle 001 can be used to extend into the installation cavity a1 through the first opening a2 of the core 200 in the root canal preparation machine to be clamped with the first clamping member 300 .
[0104] In the present application, the end of the root canal file needle 001 may have a second clamping piece 0011. After the end of the root canal file needle 001 extends from the first opening a2 into the installation cavity a1 of the movement 200, the second clamping piece 0011 can be clamped with the first clamping piece 300 fixed in the installation cavity a1 of the movement 200 to achieve the connection between the root canal file needle 001 and the root canal preparation machine.
[0105] In this case, after the position of the first clamping piece 300 in the root canal preparation machine is determined, the first clamping piece 300 in the root canal preparation machine and the second clamping piece 0011 at the end of the root canal file needle 001 can be quickly aligned, and there is no need to repeatedly rotate the angle of the root canal preparation machine to dock with the root canal file needle 001, which effectively simplifies the installation process of the root canal preparation machine and the root canal file needle 001.
[0106] In the present application, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance. The term "plurality" refers to two or more than two, unless otherwise clearly defined.
[0107] The above description is only an optional embodiment of the present application and is not intended to limit the present application. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application shall be included in the protection scope of the present application.
Claims
1. A root canal preparation machine, characterized in that: include: A preparatory machine body (100), a machine core (200), a first clamping member (300) and a positioning member (400); The movement (200) is installed in the head of the preparation machine body (100); The movement (200) has a mounting cavity (a1) and a first opening (a2) communicating with the mounting cavity (a1); The first clamping member (300) is fixedly connected to the inner wall of the installation cavity (a1); The positioning member (400) is fixedly connected to the movement (200), and the positioning member (400) is used to indicate the relative position between the first clamping member (300) and the preparatory machine body (100); The first opening (a2) is used for allowing the end of the root canal file needle to extend into the installation cavity (a1) so as to be clamped with the first clamping member (300).
2. The root canal preparation machine according to claim 1, characterized in that: The positioning member (400) is fixed on the end surface of the movement (200) where the first opening (a2) is provided.
3. The root canal preparation machine according to claim 2, characterized in that: The first clamping member (300) has a connecting surface (b1) and a first clamping surface (b2) which are arranged opposite to each other; The first clamping member (300) is fixedly connected to the inner wall of the installation cavity (a1) via the connecting surface (b1); Wherein, the orthographic projection of the connecting surface (b1) on the reference plane (C) is located between the orthographic projections of the positioning member (400) and the first clamping surface (b2) on the reference plane (C); and the reference plane (C) is a plane parallel to the first opening (a2).
4. The root canal preparation machine according to claim 3, characterized in that: The symmetry axis (L1) of the orthographic projection of the positioning member (400) on the reference plane (C) coincides with the symmetry axis (L2) of the orthographic projection of the connecting surface (b1) on the reference plane (C), and coincides with the symmetry axis (L3) of the orthographic projection of the first clamping surface (b2) on the reference plane (C).
5. The root canal preparation machine according to any one of claims 2 to 4, characterized in that: The positioning member (400) comprises: a protruding portion protruding outwardly relative to the end surface of the movement (200), and / or a recessed portion recessed inwardly relative to the end surface of the movement (200), and / or a portion of a different color having a color different from that of the end surface of the movement (200).
6. The root canal preparation machine according to claim 1, characterized in that: The positioning member (400) is fixedly connected to the outer side surface of the movement (200); Wherein, the preparation machine body (100) is configured to: drive the movement (200), the positioning member (400) and the first clamping member (300) to rotate synchronously until it is determined through the positioning member (400) that the first clamping member (300) has rotated to a specified position, and the specified position is a fixed position of the first clamping member (300) relative to the preparation machine body (100).
7. The root canal preparation machine according to claim 6, characterized in that: The movement (200) has a transmission part (201); the preparatory machine body (100) comprises: a control element, a driving part (101) and a position sensor (102); the control element is electrically connected to the driving part (101) and the position sensor (102) respectively, and the driving part (101) is transmission-connected to the transmission part (201); The control element is configured to: after receiving a reset instruction, drive the movement (200), the positioning member (400) and the first clamping member (300) to rotate synchronously through the driving unit (101) and the transmission unit (201); after detecting the positioning member (400) through the position sensor (102), control the movement (200) to stop rotating through the driving unit (101), so that the first clamping member (300) is located at the specified position.
8. The root canal preparation machine according to claim 7, characterized in that: The positioning member (400) comprises a magnet; and the position sensor (102) is a magnetic induction sensor.
9. The root canal preparation machine according to claim 7, characterized in that: After the first clamping member (300) is located at the designated position, the position sensor (102), the positioning member (400) and the orthographic projection of the first clamping member (300) on the reference plane (C) are arranged in sequence along the axial direction of the preparation machine body (100), and the positioning member (400) is closer to the position sensor (102) than the first clamping member (300); Alternatively, after the first clamping member (300) is located at the designated position, the position sensor (102), the positioning member (400) and the orthographic projection of the first clamping member (300) on the reference plane (C) are arranged in sequence along the axial direction of the preparation machine body (100), and the first clamping member (300) is closer to the position sensor (102) than the positioning member (400); Alternatively, after the first clamping member (300) is located at the designated position, the positioning member (400) and the orthographic projection of the first clamping member (300) on the reference plane (C) are arranged in sequence along an axial direction perpendicular to the preparation machine body (100), and the positioning member (400) and the first clamping member (300) are both distributed on one side of the axis of the preparation machine body (100); Alternatively, after the first clamping member (300) is located at the designated position, the orthographic projections of the positioning member (400) and the first clamping member (300) on the reference plane (C) are arranged in sequence along an axial direction perpendicular to the preparation machine body (100), and the positioning member (400) and the first clamping member (300) are both distributed on the other side of the axis of the preparation machine body (100); Wherein, the reference plane (C) is a plane parallel to the first opening (a2).
10. A root canal treatment system, characterized in that: include: A root canal file needle (001) and a root canal preparation machine as described in any one of claims 1 to 9, wherein the end of the root canal file needle (001) is used to extend into the installation cavity (a1) through the first opening (a2) to be clamped with the first clamping member (300).
