A preparation and pouring system for fiber concrete
By introducing adjustment mechanisms into the fiber concrete pouring system, the extrusion and release of the pouring pipes are solved, and the construction efficiency and concrete quality are improved.
Patent Information
- Application Number
- CN202411337169.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-25
- Publication Date
- 2024-12-13
- Estimated Expiration
- 2044-09-25
AI Technical Summary
In the existing fiber concrete pouring system, the pouring pipe lacks the function of adjusting the flow, which can easily lead to concrete spillage and blockage, affecting construction efficiency and quality.
A fiber concrete preparation casting system including an adjustment mechanism is designed to achieve extrusion and release of the casting pipe through a bracket, a control part and a drive part, adjust the casting flow rate, and prevent blockage through vibration.
Flexible adjustment of pouring flow is achieved, concrete blockage is prevented, construction efficiency and uniform pouring quality of concrete are improved.
Smart Images

Figure CN118854803B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of concrete pouring, and more particularly to a preparation and pouring system for fiber concrete. Background Art
[0002] In bridge construction, two precast panels need to be connected into a whole using cast-in-place wet joints at the gap between them to form a bridge deck. Fiber concrete is usually used for casting, which can resist cracking of the bridge deck.
[0003] When pouring wet joints in situ, extendable pouring pipes are usually used for pouring. This eliminates the need to hoist the equipment used to prepare concrete onto the bridge deck. Casting pipes generally do not have the function of regulating the pouring flow rate. When additional concrete needs to be poured in some locations, the concrete is prone to overflow and needs to be manually leveled in a timely manner. In addition, the ends of the casting pipes are prone to blockage after long-term use.
[0004] Therefore, it is necessary to propose a preparation and casting system for fiber concrete to at least partially solve the problems existing in the prior art. Summary of the invention
[0005] A series of simplified concepts are introduced in the Summary of the Invention, which will be further described in detail in the Detailed Description of the Invention. The Summary of the Invention does not mean to attempt to define the key features and essential technical features of the claimed technical solution, nor does it mean to attempt to determine the scope of protection of the claimed technical solution.
[0006] In order to at least partially solve the above problems, the present invention provides a fiber concrete preparation and pouring system, comprising: a preparation body, used to prepare concrete; a conveying body connected to the discharge port of the preparation body, on which a pouring pipe is provided, the conveying body is used to convey the prepared concrete to a position to be poured through the pouring pipe; the pouring pipe is provided with an adjustment mechanism, the adjustment mechanism is used to squeeze or release the pouring pipe;
[0007] The adjustment mechanism comprises: a bracket, which is used to be connected with the casting pipe; an adjustment part, which is movably arranged on the bracket; and a driving part, which is used to drive two movable ends of the adjustment part to squeeze or release the casting pipe.
[0008] Preferably, the preparation body comprises: a mixing tank and an adding mechanism for adding steel fibers into the mixing tank; a fluidity detector is provided in the mixing tank, and when the fluidity detector detects that the fluidity of concrete without adding steel fibers is within a preset range, steel fibers are added into the mixing tank through the adding mechanism;
[0009] The condition satisfied by the preset range is that after the steel fiber is mixed with the concrete, the steel fiber will not settle in the concrete.
[0010] Preferably, the adjustment part includes: at least two limit plates, which are arranged on the bracket, and the limit plates are slidably connected with a movable part; the driving part is connected to the movable part and is used to drive the movable part to move back and forth in a straight line; two extrusion parts, which are provided with a first hinge point, a second hinge point and a movable end, the first hinge point is hinged to the movable part, the second hinge point is hinged to the bracket, and the movable end is used to contact the casting pipe.
[0011] Preferably, the extrusion member includes: two rod bodies, each of which is provided with a first hinge point and a second hinge point, the first hinge points on the two rod bodies are respectively hinged to the two movable parts, and the second hinge points on the two rod bodies are respectively hinged to the two sides of the bracket; the two rod bodies are connected by a contact round rod to form a movable end, and the contact round rod is rotatably connected to the rod body.
[0012] Preferably, the movable part includes: a support block, on which two support rods are hinged, and the two support rods are respectively hinged to the first hinge points of the two extrusion parts; the output end of the driving part is connected to the support block, which is used to drive the support block to move linearly back and forth on the limit plate.
[0013] Preferably, a limiting block is provided on the supporting block, and a limiting groove for sliding of the limiting block is provided on the limiting plate.
[0014] Preferably, it further comprises: a control module which is in communication connection with the driving part and is used for controlling the operation of the driving part to adjust the working state of the regulating part.
[0015] Preferably, the control module controls the driving unit including:
[0016] The first control strategy is to make the driving part control the two movable ends of the regulating part to move back and forth between the initial position and the clearing position, thereby vibrating the casting pipe;
[0017] The initial position is the position where the two movable ends are not in contact with the pouring pipe; the clearing position is the position where the two movable ends are in contact with the pouring pipe and are at a first distance from each other;
[0018] The second control strategy is to make the driving part control the two movable ends of the regulating part to be a set distance apart when the pouring flow rate needs to be adjusted, and the set distance corresponds to the pouring flow rate;
[0019] The third control strategy is to make the driving part control the two movable ends of the regulating part to be a second distance apart so that the casting pipe is closed; wherein the second distance is smaller than the first distance.
[0020] Preferably, it also includes: a cleaning body, on which is provided a water pipe connected to the pouring pipe; after the concrete pouring is completed, a cleaning water flow is provided into the pouring pipe through the cleaning body, and at the same time, the control module adopts the first control strategy to vibrate the pouring pipe.
[0021] Compared with the prior art, the present invention has at least the following beneficial effects:
[0022] The fiber concrete preparation and pouring system described in the present invention has an adjusting mechanism that can squeeze and release the pouring pipe according to the needs when pouring concrete. When the pouring pipe is squeezed, the inner diameter of the pouring pipe changes with the squeezing depth, thereby realizing the regulation of the pouring flow rate; the intermittent squeezing and releasing of the pouring pipe by the adjusting mechanism can cause the pouring pipe to vibrate, thereby preventing a large amount of concrete from adhering to the end of the pouring pipe and avoiding blockage.
[0023] The fiber concrete preparation and pouring system of the present invention, other advantages, objectives and features of the present invention will be reflected in part through the following description, and in part will be understood by those skilled in the art through research and practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0025] Figure 1 It is a schematic diagram of the overall structure of the preparation and pouring system of the fiber concrete according to the present invention;
[0026] Figure 2 It is a structural schematic diagram of the fiber concrete preparation and pouring system of the present invention when the movable end of the adjustment mechanism is not in contact with the pouring pipe;
[0027] Figure 3 It is a structural schematic diagram of the movable end of the adjustment mechanism in the fiber concrete preparation and pouring system of the present invention when it contacts the pouring pipe;
[0028] Figure 4 It is a structural schematic diagram of the case where the movable end of the adjustment mechanism in the fiber concrete preparation and pouring system of the present invention squeezes the pouring pipe but does not close the pouring pipe;
[0029] Figure 5 It is a structural schematic diagram of the active end of the adjustment mechanism in the fiber concrete preparation and pouring system of the present invention when the pouring pipe is closed;
[0030] Figure 6 It is a schematic diagram of the structure of the support in the fiber concrete preparation and pouring system of the present invention;
[0031] Figure 7 It is a schematic structural diagram of the connection between the extrusion part and the movable part in the fiber concrete preparation and pouring system of the present invention;
[0032] Figure 8 It is a top view three-dimensional structural schematic diagram of the connection between the extrusion part and the movable part in the preparation and pouring system of the fiber concrete of the present invention;
[0033] Fig. 9 It is a structural schematic diagram of the connection between the support block and the limit plate in the fiber concrete preparation and pouring system of the present invention;
[0034] Fig.10 It is a schematic structural diagram of a cleaning body in the fiber concrete preparation and pouring system of the present invention. DETAILED DESCRIPTION
[0035] The present invention is further described in detail below in conjunction with the accompanying drawings and embodiments so that those skilled in the art can implement the invention with reference to the description.
[0036] It should be understood that the terms such as “having”, “including” and “comprising” used herein do not exclude the existence or addition of one or more other elements or combinations thereof.
[0037] like Figure 1 As shown, the present invention provides a fiber concrete preparation and pouring system, comprising: a preparation body 1, used for preparing concrete; a conveying body 2 connected to a discharge port of the preparation body 1, on which a pouring pipe 3 is provided, the conveying body 2 is used to convey the prepared concrete to a position to be poured through the pouring pipe 3; the pouring pipe 3 is provided with an adjustment mechanism 4, the adjustment mechanism 4 is used to squeeze or release the pouring pipe 3;
[0038] like Figure 2 As shown, the adjustment mechanism 4 includes: a bracket 7 for connecting with the casting pipe 3; an adjustment part 8 movably arranged on the bracket 7; and a driving part 9 for driving two movable ends 86 of the adjustment part 8 to squeeze or release the casting pipe 3.
[0039] The prepared concrete of the preparation body 1 is discharged from the discharge port into the conveying body 2. The conveying body 2 pressurizes the concrete to convey it to the position to be poured through the pouring pipe 3. The conveying body 2 conveys the concrete by pressurization. It can adopt any pressurization conveying method in the prior art, and the purpose is to be able to convey the concrete to a higher position for pouring.
[0040] The adjusting mechanism 4 can squeeze and release the pouring pipe 3 according to the needs during concrete pouring. The position where the adjusting mechanism 4 is installed on the pouring pipe 3 is made of hard material, and the position on the pouring pipe 3 squeezed by the adjusting mechanism 4 is made of flexible material. When the pouring pipe 3 is squeezed, the inner diameter of the pouring pipe 3 changes with the squeezing depth, thereby realizing the adjustment of the pouring flow rate; the intermittent squeezing and releasing of the pouring pipe 3 by the adjusting mechanism 4 can generate vibrations on the pouring pipe 3, thereby preventing a large amount of concrete from adhering to the end of the pouring pipe 3 and avoiding blockage.
[0041] Specifically, the portion where the pouring pipe 3 is connected to the bracket 7 is made of a hard material, that is, this portion will not deform, while the portion where the pouring pipe 3 contacts the two movable ends 86 is made of a flexible material, that is, it is easy to deform, thereby achieving an extrusion effect on the pouring pipe 3 through the two movable ends 86. By adjusting the distance between the two movable ends 86, the pouring flow of the pouring pipe 3 can be changed. By controlling the intermittent contact and non-contact between the two movable ends 86 of the adjusting part 8 and the pouring pipe 3 through the driving part 9, a certain vibration effect can be generated on the pouring pipe 3, thereby preventing blockage.
[0042] like Figure 1 As shown, further, the preparation body 1 comprises: a mixing tank 5 and an adding mechanism 6 for adding steel fibers into the mixing tank 5; a fluidity detector is provided in the mixing tank 5, and when the fluidity detector detects that the fluidity of concrete without adding steel fibers is within a preset range, steel fibers are added into the mixing tank 5 through the adding mechanism 6;
[0043] The conditions satisfied by the preset range are: after the steel fiber is mixed with the concrete, the steel fiber will not settle in the concrete, and the fluidity of the concrete after adding the steel fiber can enable the concrete to be poured smoothly.
[0044] The adding mechanism 6 for adding steel fibers can be any device in the prior art, and no limitation is made here.
[0045] When preparing fiber concrete, this embodiment adopts the method of adding steel fibers to make fiber concrete. Since steel fibers are easy to settle in concrete with a large fluidity, that is, when the concrete is poured, the concrete needs time to solidify, and the steel fibers will settle, resulting in uneven distribution in the concrete, affecting the performance of the formed wet joints; steel fibers are not easy to settle in concrete with a small fluidity, but concrete with a small fluidity will cause pouring difficulties. Therefore, before adding steel fibers, it is necessary to detect the fluidity of the concrete through a flow detector. When the fluidity reaches the preset range, steel fibers are added. The fiber concrete formed in this way can prevent the steel fibers from settling and maintain a certain fluidity to ensure smooth pouring.
[0046] like Figure 2 , Figure 6 and Figure 7 As shown, further, the adjusting part 8 includes: at least two limit plates 81, which are arranged on the bracket 7, and a movable part 82 is slidably connected to the limit plate 81; the driving part 9 is connected to the movable part 82, and is used to drive the movable part 82 to move back and forth in a straight line; two extrusion parts 83, which are provided with a first hinge point 84, a second hinge point 85 and a movable end 86, the first hinge point 84 is hinged to the movable part 82, the second hinge point 85 is hinged to the bracket 7, and the movable end 86 is used to contact the casting pipe 3.
[0047] The driving part 9 drives the movable part 82 to move up and down, thereby driving the extrusion part 83 hinged to the movable part 82 to move, so that the movable end 86 moves in the direction close to or away from the casting pipe 3, thereby realizing the extrusion and release of the casting pipe 3; the limit plate 81 is used to limit the distance of the movable part 82 moving up and down, and the second hinge point 85 hinged to the bracket 7 is the force point of the extrusion part 83. When the extrusion part 83 moves, it rotates with the second hinge point 85 as the rotation center.
[0048] like Figure 7 and Figure 8 As shown, further, the extrusion member 83 includes: two rod bodies 831, each rod body 831 is provided with a first hinge point 84 and a second hinge point 85, the first hinge points 84 on the two rod bodies 831 are respectively hinged to the two movable parts 82, and the second hinge points 85 on the two rod bodies 831 are respectively hinged to the two sides of the bracket 7; the two rod bodies 831 are connected by a contact round rod 832 to form a movable end 86, and the contact round rod 832 is rotatably connected to the rod body 831.
[0049] The rod body 831 includes: a first rod segment, a second rod segment and a third rod segment connected in sequence, a first angle is formed between the first rod segment and the second rod segment, and a second angle is formed between the second rod segment and the third rod segment; a second hinge point 85 is arranged at the connection between the first rod segment and the second rod segment, a first hinge point 84 is arranged at one end of the first rod segment away from the second rod segment, and a contact round rod 832 is arranged on the third rod segment; the first hinge point 84 and the second hinge point 85 are holes arranged on the rod body 831.
[0050] The contact round rod 832 is used to contact the casting pipe 3 . In order to reduce the contact friction between the contact round rod 832 and the casting pipe 3 , the contact round rod 832 can rotate relative to the rod body 831 .
[0051] like Figure 7As shown, further, the movable part 82 includes: a support block 821, on which two support rods 822 are hinged, and the two support rods 822 are respectively hinged to the first hinge points 84 of the two extrusion parts 83; the output end of the driving part 9 is connected to the support block 821, and is used to drive the support block 821 to move linearly back and forth on the limiting plate 81.
[0052] A mounting groove is provided on the support block 821, and a hinge rod is provided in the mounting groove. One end of the support rod 822 is rotatably connected to the hinge rod, and the other end is rotatably connected to the first hinge point 84 of the rod body 831; after the driving unit 9 causes the support block 821 to move, it drives the two support rods 822 to move upward. Since the support rod 822 is hinged to the rod body 831, and the rod body 831 is rotatably connected to the bracket 7, the movable end 86 can be driven to rotate with the second hinge point 85 as the rotation center, so that the two movable ends 86 are close to or away from each other.
[0053] like Figure 8 and Fig. 9 As shown, further, a limiting block 823 is provided on the supporting block 821 , and a limiting groove 811 for the limiting block 823 to slide is provided on the limiting plate 81 .
[0054] The limiting groove 811 and the limiting block 823 are used to limit the up and down reciprocating movement of the supporting block 821 .
[0055] The working principle of the adjustment mechanism 4 is as follows: when it is necessary to adjust the distance between the two movable ends 86, taking the reduction of the distance as an example, after the driving unit 9 works, its output end drives the support block 821 to move upward along the limit groove 811, and at the same time drives the two support rods 822 hinged to the support block 821 to move upward. Since the support rod 822 is hinged to the rod body 831, and the rod body 831 is hinged to the bracket 7, when the support block 821 moves upward, it will drive the rod body 831 to rotate along the second hinge point 85, so that the movable end 86 rotates toward the side close to the casting pipe 3, then the distance between the two movable ends 86 is reduced, which can squeeze the casting pipe 3; when the distance between the two movable ends 86 needs to be increased, the support block 821 is driven downward by the driving unit 9, then the corresponding movable end 86 will rotate toward the side away from the casting pipe 3, and the distance between the two movable ends 86 is increased.
[0056] When the casting pipe 3 needs to be vibrated, the driving unit 9 drives the support block 821 to move back and forth within a preset distance, so that the two movable ends 6 intermittently squeeze and release the casting pipe 3.
[0057] In one embodiment, it further includes: a control module that is communicatively connected to the driving part 9 and is used to control the operation of the driving part 9 to adjust the working state of the regulating part 8 .
[0058] The control module is used to control the driving part 9 according to the needs of the casting process, thereby realizing the control of the regulating part 8.
[0059] Furthermore, the control module controls the driving unit 9 including:
[0060] The first control strategy is to make the driving part 9 control the two movable ends 86 of the regulating part 8 to move back and forth between the initial position and the clearing position, thereby vibrating the pouring pipe 3;
[0061] The initial position is the position where the two movable ends 86 are not in contact with the pouring pipe 3; the clearing position is the position where the two movable ends 86 are in contact with the pouring pipe 3 and the two movable ends 86 are at a first distance from each other;
[0062] The first control strategy is generally executed after each pouring stage is completed;
[0063] like Figure 2 The initial position is shown. Figure 3 The figure shows the positions of the two movable ends 86 when the movable ends 86 are in contact with the casting pipe 3 and no extrusion occurs. When the two movable ends 86 are at a first distance from each other, a small extrusion effect is formed on the casting pipe 3, that is, Figure 4 Thus, under the action of squeezing the casting tube 3 and the elastic recovery of the casting tube 3, a vibration is generated, which can remove the concrete attached to the inside;
[0064] The second control strategy is to make the driving part 9 control the two movable ends 86 of the regulating part 8 to be a set distance apart when the pouring flow rate needs to be adjusted, and the set distance corresponds to the pouring flow rate;
[0065] There is a corresponding relationship between the distance between the two movable ends 86 and the distance that the driving part 9 drives the movable member 82 to move, and there is a corresponding relationship between the distance between the two movable ends 86 and the pouring flow rate. Therefore, when the pouring flow rate needs to be adjusted, it is sufficient to adjust the distance that the movable member 82 moves up and down;
[0066] The third control strategy is to make the driving part 9 control the two movable ends 86 of the regulating part 8 to be a second distance apart, so that the casting pipe 3 is closed; wherein the second distance is smaller than the first distance;
[0067] The third control strategy is generally executed after the first control strategy is executed; or it is executed when the pouring pipe 3 needs to be temporarily closed;
[0068] like Figure 5As shown, when the two movable ends 86 are at a second distance from each other, the squeezing effect on the pouring pipe 3 can close the pouring pipe 3, that is, prevent the concrete from flowing out of the pouring pipe 3; this also makes it possible for the pouring pipe 3 to be in a closed state when moving after completing a pouring stage, so as to prevent the concrete remaining in the pouring pipe 3 from falling to a non-pouring position; and, during the pouring process, if the position of the pouring pipe 3 is not moved in time, resulting in a large amount of concrete poured at a certain position being accumulated, the pouring pipe 3 can be closed in time through the third control strategy, and the conveying body 2 will detect the increase in pressure in the pouring pipe 3 and stop conveying in time, so as to prevent a large amount of concrete from overflowing and affecting the construction.
[0069] Through the different control strategies of the driving part 9 by the above control module, the adjustment mechanism 4 can be adapted to multiple usage requirements during the concrete pouring process, thereby improving the efficiency and quality of the concrete pouring construction.
[0070] like Fig.10 As shown, in one embodiment, it also includes: a cleaning body 10, on which a water pipe 11 connected to the pouring pipe 3 is provided; after the concrete pouring is completed, a cleaning water flow is provided to the pouring pipe 3 through the cleaning body 10, and at the same time, the control module adopts a first control strategy to vibrate the pouring pipe 3.
[0071] In order to further prevent the concrete from clogging the casting pipe 3, after the concrete pouring is completed, a high-pressure cleaning water flow can be provided by the cleaning body 10 to flush the casting pipe 3. At the same time, the control module executes the first control strategy to promote the removal of residual concrete in the casting pipe 3 to prevent clogging and facilitate the next use.
[0072] In the description of the present invention, it is to be understood that the terms “center”, “longitudinal”, “lateral”, “length”, “width”, “thickness”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “horizontal”, “top”, “bottom”, “inside”, “outside”, “clockwise”, “counterclockwise”, “axial”, “radial”, “circumferential”, etc., indicating orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.
[0073] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection, an electrical connection, or communication with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0074] Although the embodiments of the present invention have been disclosed as above, they are not limited to the applications listed in the specification and implementation modes. They can be fully applied to various fields suitable for the present invention. For those familiar with the art, additional modifications can be easily implemented. Therefore, without departing from the general concept defined by the present invention, the present invention is not limited to the specific details and the illustrations shown and described herein.
Claims
1. A fiber concrete preparation and casting system, characterized in that: include: A preparation body (1) is used to prepare concrete; a conveying body (2) connected to a discharge port of the preparation body (1) and provided with a pouring pipe (3), the conveying body (2) being used to convey the prepared concrete to a position to be poured through the pouring pipe (3); an adjustment mechanism (4) is provided on the pouring pipe (3), the adjustment mechanism (4) being used to squeeze or release the pouring pipe (3); The adjustment mechanism (4) comprises: a bracket (7) for connecting to the casting pipe (3); an adjustment part (8) movably arranged on the bracket (7); and a driving part (9) for driving two movable ends (86) of the adjustment part (8) to squeeze or release the casting pipe (3); It also includes: a control module connected to the drive unit (9) for controlling the operation of the drive unit (9) to adjust the working state of the regulating unit (8); The control module controls the driving unit (9) including: A first control strategy causes the driving part (9) to control the two movable ends (86) of the regulating part (8) to move back and forth between an initial position and a clearing position, thereby vibrating the casting pipe (3); The initial position is the position where the two movable ends (86) are not in contact with the pouring pipe (3); the clearing position is the position where the two movable ends (86) are in contact with the pouring pipe (3) and the two movable ends (86) are at a first distance from each other; A second control strategy, when the pouring flow rate needs to be adjusted, causes the driving unit (9) to control the two movable ends (86) of the regulating unit (8) to be spaced apart by a set distance, wherein the set distance corresponds to the pouring flow rate; The third control strategy enables the driving part (9) to control the two movable ends (86) of the regulating part (8) to be spaced apart by a second distance, so that the casting pipe (3) is closed; wherein the second distance is smaller than the first distance.
2. The fiber concrete preparation and pouring system according to claim 1, characterized in that: The preparation body (1) comprises: a mixing tank (5) and an adding mechanism (6) for adding steel fibers into the mixing tank (5); a fluidity detector is provided in the mixing tank (5); when the fluidity detector detects that the fluidity of concrete without adding steel fibers is within a preset range, steel fibers are added into the mixing tank (5) through the adding mechanism (6); The condition satisfied by the preset range is that after the steel fiber is mixed with the concrete, the steel fiber will not settle in the concrete.
3. The fiber concrete preparation and pouring system according to claim 1, characterized in that: The adjusting part (8) comprises: at least two limit plates (81) arranged on the bracket (7), and a movable part (82) is slidably connected to the limit plates (81); the driving part (9) is connected to the movable part (82) and is used to drive the movable part (82) to move linearly back and forth; and two extrusion parts (83) are provided with a first hinge point (84), a second hinge point (85) and a movable end (86), the first hinge point (84) is hinged to the movable part (82), the second hinge point (85) is hinged to the bracket (7), and the movable end (86) is used to contact the casting pipe (3).
4. The fiber concrete preparation and pouring system according to claim 3, characterized in that: The extrusion member (83) comprises: two rod bodies (831), each rod body (831) being provided with a first hinge point (84) and a second hinge point (85), the first hinge points (84) on the two rod bodies (831) being respectively hinged to the two movable members (82), and the second hinge points (85) on the two rod bodies (831) being respectively hinged to the two sides of the bracket (7); the two rod bodies (831) are connected via a contact round rod (832) to form a movable end (86), and the contact round rod (832) is rotatably connected to the rod body (831).
5. The fiber concrete preparation and pouring system according to claim 4, characterized in that: The movable member (82) comprises: a support block (821) on which two support rods (822) are hingedly connected, and the two support rods (822) are respectively hingedly connected to the first hinge points (84) of the two extrusion members (83); the output end of the driving unit (9) is connected to the support block (821) and is used to drive the support block (821) to move linearly back and forth on the limiting plate (81).
6. The fiber concrete preparation and pouring system according to claim 5, characterized in that: The support block (821) is provided with a limit block (823), and the limit plate (81) is provided with a limit groove (811) for the limit block (823) to slide.
7. The fiber concrete preparation and pouring system according to claim 1, characterized in that: Also includes: A cleaning body (10) is provided with a water pipe (11) connected to the pouring pipe (3); after concrete pouring is completed, a cleaning water flow is provided into the pouring pipe (3) through the cleaning body (10), and at the same time, the control module uses a first control strategy to vibrate the pouring pipe (3).
Citation Information
Patent Citations
Layered casting technology controlling steel fiber distribution direction in steel fiber concrete
CN110341025A
Concrete prefabricated part pouring equipment
CN112757467A
Bridge cylindrical pier maintenance device and method
CN115262406A
Concrete pouring equipment for hydraulic engineering construction
CN213926269U