Experimental device and method for simulating invasion of drilling fluid into hydrate reservoir
By combining the pressure chamber, hydraulic expansion and contraction components and automatic proportioning device in the experimental device, the observation and mechanical properties measurement of the three-dimensional morphology and internal structural changes of the drilling fluid invading the hydrate reservoir are realized, solving the problem that the existing technology cannot observe the three-dimensional Changes and issues of continuity experiments are provided to provide technical support for well wall stability assessment.
Patent Information
- Application Number
- CN202410988562.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-23
- Publication Date
- 2024-10-29
AI Technical Summary
Existing experimental devices that simulate the invasion of drilling fluid into hydrate reservoirs cannot observe three-dimensional morphological changes and internal structural changes, cannot conduct continuity experiments of drilling fluids with different densities, and cannot effectively evaluate wellbore stability.
An experimental device including a pressure chamber, hydraulic telescopic components, visual window, drilling fluid injection pipe and gas-water separator was designed. The three-dimensional morphological changes were recorded through a camera, the mechanical properties were measured, and the automatic proportioning device was used to realize the mixing of drilling fluids with different densities. Continuity experiment.
It can comprehensively and accurately observe the three-dimensional morphology and internal structural changes of the hydrate reservoir invaded by drilling fluid, establish a connection with the changes in mechanical properties, and provide technical support for well wall stability assessment.
Smart Images

Figure CN118858591A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of geotechnical engineering basic physical property measurement, and in particular to an experimental device and method for simulating drilling fluid intrusion into a hydrate reservoir. Background Art
[0002] Hydrates will decompose if they are out of the temperature and pressure conditions under which they exist stably. To prevent the decomposition of hydrates in large quantities from causing wellbore instability, pressure-controlled overbalanced or near-balanced drilling methods and lower mechanical drilling rates are often used. The permeability of hydrate-containing formations is relatively good, so the drilling fluid will inevitably invade the formation and transfer heat and mass under the pressure and temperature differences. Under the action of the pressure difference, the drilling fluid will drive away the native fluid in the pores of the formation around the wellbore and invade the formation. The invasion of the drilling fluid changes the mechanical properties and structure of the hydrate reservoir around the wellbore, causing wellbore instability.
[0003] Therefore, it is necessary to study the laws of mechanical properties and structural changes after drilling fluid invades hydrate reservoirs, explore the impact of drilling fluid invasion on hydrate reservoirs, and establish an evaluation model for wellbore stability.
[0004] The existing experimental devices and methods for simulating drilling fluid invasion into hydrate reservoirs focus on measuring the changes in mechanical properties after the drilling fluid invades the reservoir. They are unable to observe the three-dimensional morphological changes of hydrate sediment samples and the changes in the internal structure of hydrates, and are unable to conduct continuous experiments on drilling fluids of different densities. Summary of the invention
[0005] In view of the above problems, the purpose of the present invention is to provide an experimental device and method for simulating the invasion of drilling fluid into a hydrate reservoir, which can explore the changes in the three-dimensional morphology and internal structure during the invasion of drilling fluid into a hydrate reservoir, and establish a connection with the changes in mechanical properties, thereby providing technical support for establishing a wellbore stability assessment model.
[0006] To achieve the above object, the present invention adopts the following technical solutions: The experimental device for simulating drilling fluid intrusion into a hydrate reservoir of the present invention comprises: a base; a loading frame, comprising a horizontal loading plate and vertical loading legs, wherein the upper portion of the vertical loading legs is fixedly connected to the horizontal loading plate, and the lower end of the vertical loading legs is connected to the base, so as to fix the horizontal loading plate at a position of a set height; a pressure chamber, which is a chamber structure with an opening at the lower end, and the pressure chamber is arranged at the top of the base and the lower end opening of the pressure chamber is closed by the base; a sediment sample assembly is arranged in the pressure chamber and fixed to the base; a hydraulic telescopic assembly is arranged on the loading frame, and the telescopic end of the hydraulic telescopic assembly is connected to the top of the sediment sample assembly, so as to apply axial pressure to the sediment sample assembly; and a visual window is arranged on the outer wall of the pressure chamber to observe changes in the sediment sample assembly.
[0007] In the experimental device, preferably, the sediment sample assembly includes an upper pressure head, an upper permeable stone, a sediment sample, a lower permeable stone, a lower pressure head and a rubber membrane; the upper pressure head, the upper permeable stone, the sediment sample, the lower permeable stone and the lower pressure head are stacked in sequence from top to bottom to compact the sediment sample; the rubber membrane is wrapped around the exterior of the whole formed by the upper pressure head, the upper permeable stone, the sediment sample, the lower permeable stone and the lower pressure head to prevent the sediment sample from loosening; the rubber membrane is arranged in a grid shape.
[0008] The experimental device preferably further comprises a drilling fluid injection pipe; a vertical drilling fluid intrusion channel is provided in the sediment sample; one end of the drilling fluid injection pipe is extended from the upper pressure head into the interior of the sediment sample and communicated with the drilling fluid intrusion channel, and the other end is used to be connected to the drilling fluid automatic configuration device through a drilling fluid proportioning pipeline; a fourth valve is provided on the drilling fluid proportioning pipeline.
[0009] The experimental device described above, preferably, the hydraulic telescopic assembly includes a hydraulic cylinder, an axial pressure channel and a loading piston; the hydraulic cylinder is a cavity structure opening downward, and its open end is fixed to the horizontal loading plate of the loading frame; the piston end of the loading piston is arranged in the cavity of the hydraulic cylinder, and both sides of the piston end are in contact with the inner wall of the hydraulic cylinder; the telescopic end of the loading piston passes through the horizontal loading plate and the top of the pressure chamber in sequence and is connected to the upper pressure head; the axial pressure channel is arranged on the side wall of the cavity of the hydraulic cylinder and is located above the top of the loading piston; the axial pressure channel is used to be connected to the first high-precision pressure volume controller through the first pressure volume controller pipeline to form pressure in the cavity of the hydraulic cylinder; the first pressure volume controller pipeline is provided with a first valve.
[0010] The experimental device preferably further includes a pore pressure pipeline; a through hole is provided at the center of the lower permeable stone; one end of the pore pressure pipeline is extended into the through hole by the lower pressure head, and the other end is respectively connected to the xenon gas source and the first nitrogen gas source; the pore pressure pipeline is also connected in parallel with a second pressure volume controller pipeline, and the free end of the second pressure volume controller pipeline is connected to a second high-precision pressure volume controller; a second valve is provided on the second pressure volume controller pipeline; and a third valve is provided on the pore pressure pipeline.
[0011] The experimental device preferably further includes a confining pressure pipeline; one end of the confining pressure pipeline is connected to the bottom of the pressure chamber outside the sediment sample assembly, and the other end is divided into two paths, one path is connected to the third high-precision pressure volume controller through the third pressure volume controller pipeline, and the other path is connected to the second nitrogen gas source through the nitrogen pipeline; the third pressure volume controller pipeline is provided with a fifth valve, the nitrogen pipeline is provided with a sixth valve, and the confining pressure pipeline is provided with a seventh valve.
[0012] The experimental device preferably also includes a back pressure pipe; one end of the back pressure pipe is connected to the upper permeable stone after passing through the upper pressure head, and the other end is connected to the gas-water separator and the gas flow meter in sequence; the gas-water separator is used to separate the water-gas mixture generated during the experiment, and the gas flow meter is used to measure the gas production of the separated gas; the back pressure pipe is provided with a back pressure valve and an eighth valve.
[0013] The experimental device preferably further comprises a thermocouple and a thermocouple pipe; the thermocouple pipe extends from the base into the interior of the pressure chamber; and the thermocouple is connected to the end of the thermocouple pipe extending therein.
[0014] The experimental device preferably further comprises a water bath jacket; the water bath jacket is mounted on the upper part of the pressure chamber; the water bath jacket is provided with two cooling liquid channels; the two cooling liquid channels are respectively connected to the water bath device through cooling liquid pipes.
[0015] The experimental device preferably further comprises a camera and a data collector; the camera is arranged outside the pressure chamber and facing the visual window; the data collector is used to collect data in the experiment.
[0016] The experimental method for simulating drilling fluid intrusion into a hydrate reservoir according to the present invention comprises the following steps: (1) Make a cylindrical sediment sample of transparent sand and place it in a pressure chamber; (2) Injecting water and gas to control the high-pressure and low-temperature environment in the pressure chamber and generate hydrates; (3) Drilling fluid is injected into the sediment sample through a drilling fluid proportioning device to simulate drilling fluid invasion; (4) Record the internal structural changes of the soil layer under the influence of drilling fluid invasion through a camera; (5) Determine the three-dimensional structural changes of the sediment sample through the grid changes on the rubber membrane; (6) Conduct triaxial tests on sediment samples from hydrate reservoirs under the influence of drilling fluid invasion to measure the mechanical properties of the soil layer; (7) Collect data through the gas-water separation device and invert the mechanical properties; (8) Change the drilling fluid density and repeat the experiment.
[0017] The present invention adopts the above technical solution, which has the following advantages: (1) The present invention provides a visual window made of sapphire mirror material in the middle of the pressure chamber, the sediment sample is made of transparent sand, the rubber membrane is transparent as a whole, and a standard grid is drawn on the surface. The three-dimensional model of the sediment sample and the changes in the internal structure can be determined by a camera; (2) The present invention can realize automatic density proportioning and injection of drilling fluid through the automatic proportioning device of drilling fluid, and can carry out continuous experiments on the invasion of drilling fluids of different densities to evaluate the influence of drilling fluid density factors on wellbore stability; (3) The present invention can measure the gas production of the sample during the process of drilling fluid invading the sediment sample through the gas-water separator, thereby inverting the mechanical properties of the sediment sample after the drilling fluid invades, thereby establishing a connection with the three-dimensional model and internal structure changes of the sediment sample, and establishing a more comprehensive and accurate evaluation model of the wellbore stability during hydrate extraction. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present invention. Throughout the accompanying drawings, the same reference numerals are used to represent the same components. In the accompanying drawings: Figure 1 It is a schematic structural diagram of an experimental device for simulating drilling fluid intrusion into a hydrate reservoir according to the present invention; Figure 2 It is an implementation system diagram of the experimental device for simulating drilling fluid intrusion into a hydrate reservoir according to the present invention.
[0019] The reference numerals in the figures are as follows: 1-Hydraulic cylinder; 2-axial pressure channel; 3-loading frame; 4-loading piston; 5-water bath jacket; 6-coolant channel; 7-pressure chamber; 8-visible window; 9-drilling fluid intrusion channel; 10-rubber membrane; 11-upper permeable stone; 12-sediment sample; 13-lower permeable stone; 14-upper pressure head; 15-lower pressure head; 16-thermocouple; 17-pore pressure pipeline; 18-thermocouple pipeline; 19-drilling fluid injection pipe; 20-confining pressure pipeline; 21-back pressure pipeline; 22-base; 23-first high-precision pressure volume controller; 24-second high Precision pressure volume controller; 25-third high precision pressure volume controller; 26-xenon gas source; 27-first nitrogen gas source; 28-second nitrogen gas source; 29a-first valve; 29b-second valve; 29c-third valve; 29d-fourth valve; 29e-fifth valve; 29f-sixth valve; 29g-seventh valve; 29h-eighth valve; 30-back pressure valve; 31-gas-water separator; 32-gas flow meter; 33-water bath device; 34-camera; 35-drilling fluid automatic configuration device; 36-data acquisition device. DETAILED DESCRIPTION
[0020] The exemplary embodiments of the present invention will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present invention are shown in the accompanying drawings, it should be understood that the present invention can be implemented in various forms and should not be limited by the embodiments described herein. On the contrary, these embodiments are provided in order to enable a more thorough understanding of the present invention and to fully convey the scope of the present invention to those skilled in the art.
[0021] The present invention provides an experimental device for simulating the invasion of drilling fluid into a hydrate reservoir, which can study the changes in sample morphology and internal structure during the invasion of drilling fluid, establish a three-dimensional model, and establish a connection between the changes in sample morphology and structure and changes in mechanical properties; and can conduct continuous tests on drilling fluids of different densities to find out the influence of drilling fluid density during the invasion process; and provide powerful hardware support for establishing a wellbore stability assessment model.
[0022] Embodiment 1: like Figure 1 and Figure 2As shown, the experimental device for simulating drilling fluid intrusion into a hydrate reservoir provided by the present invention comprises: a base 22; a loading frame 3, comprising a horizontal loading plate and vertical loading legs, the upper part of the vertical loading legs being fixedly connected to the horizontal loading plate, and the lower end of the vertical loading legs being connected to the base 22, so as to fix the horizontal loading plate at a position of a set height; a pressure chamber 7, which is a chamber structure with an opening at the lower end, the pressure chamber 7 being arranged at the top of the base and the lower end opening of the pressure chamber 7 being closed by the base 22; a sediment sample assembly being arranged in the pressure chamber 7 and fixed to the base 22; a hydraulic telescopic assembly being arranged on the loading frame 3, the telescopic end of which is connected to the top of the sediment sample assembly, so as to apply axial pressure to the sediment sample assembly; and a visual window 8 being arranged on the outer wall of the pressure chamber 7, so as to observe changes in the sediment sample assembly.
[0023] In the above embodiment, preferably, the sediment sample assembly includes an upper pressure head 14, an upper permeable stone 11, a sediment sample 12, a lower permeable stone 13, a lower pressure head 15 and a rubber membrane 10; the upper pressure head 14, the upper permeable stone 11, the sediment sample 12, the lower permeable stone 13 and the lower pressure head 15 are stacked in sequence from top to bottom to compact the sediment sample 12; the rubber membrane 10 is wrapped around the outer part of the whole formed by the upper pressure head 14, the upper permeable stone 11, the sediment sample 12, the lower permeable stone 13 and the lower pressure head 15 to prevent the sediment sample 12 from loosening; wherein the rubber membrane 10 is arranged in a grid shape.
[0024] In the above embodiment, preferably, the present invention also includes a drilling fluid injection pipe 19; a vertical drilling fluid intrusion channel 9 is provided in the sediment sample 12; one end of the drilling fluid injection pipe 19 extends from the upper pressure head 14 into the interior of the sediment sample 12 and communicates with the drilling fluid intrusion channel 9, and the other end is used to be connected to the drilling fluid automatic configuration device 35 through a drilling fluid proportioning pipeline; a fourth valve 29d is provided on the drilling fluid proportioning pipeline.
[0025] In the above embodiment, preferably, the hydraulic telescopic assembly includes a hydraulic cylinder 1, an axial pressure channel 2 and a loading piston 4; the hydraulic cylinder 1 is a cavity structure with an opening facing downward, and its open end is fixed to the horizontal loading plate of the loading frame 3; the piston end of the loading piston 4 is arranged in the cavity of the hydraulic cylinder 1, and both sides of the piston end are in contact with the inner wall of the hydraulic cylinder 1; the telescopic end of the loading piston 4 passes through the horizontal loading plate and the top of the pressure chamber 7 in sequence and is connected to the upper pressure head 14; the axial pressure channel 2 is arranged on the side wall of the cavity of the hydraulic cylinder 1, and is located above the top of the loading piston 4; the axial pressure channel 2 is used to be connected to the first high-precision pressure volume controller 23 through the first pressure volume controller pipeline to form pressure in the cavity of the hydraulic cylinder 1; a first valve 29a is arranged on the first pressure volume controller pipeline.
[0026] In the above embodiment, preferably, the present invention also includes a pore pressure pipeline 17; a through hole is provided at the center of the lower permeable stone 13; one end of the pore pressure pipeline 17 is extended into by the lower pressure head 15 and is connected to the through hole, and the other end thereof is respectively connected to the xenon gas source 26 and the first nitrogen gas source 27; the pore pressure pipeline 17 is also connected in parallel with a second pressure volume controller pipeline, and the free end of the second pressure volume controller pipeline is connected to a second high-precision pressure volume controller 24; a second valve 29b is provided on the second pressure volume controller pipeline; and a third valve 29c is provided on the pore pressure pipeline 17.
[0027] In the above embodiment, preferably, the present invention also includes a confining pressure pipeline 20; one end of the confining pressure pipeline 20 is connected to the bottom of the pressure chamber 7 outside the sediment sample assembly, and the other end thereof is divided into two paths, one path is connected to the third high-precision pressure volume controller 25 through the third pressure volume controller pipeline, and the other path is connected to the second nitrogen gas source 28 through the nitrogen pipeline; a fifth valve 29e is provided on the third pressure volume controller pipeline, a sixth valve 29f is provided on the nitrogen pipeline, and a seventh valve 29g is provided on the confining pressure pipeline 20.
[0028] In the above embodiment, preferably, it also includes a back pressure pipe 21; one end of the back pressure pipe 21 passes through the upper pressure head 14 and is connected to the upper permeable stone 113, and the other end thereof is connected to the gas-water separator 31 and the gas flow meter 32 in sequence; the gas-water separator 31 is used to separate the water-gas mixture generated during the experiment, and the gas flow meter 32 is used to measure the gas production of the separated gas; the back pressure pipe 21 is provided with a back pressure valve 30 and an eighth valve 29h.
[0029] In the above embodiment, preferably, the present invention further includes a thermocouple 16 and a thermocouple pipe 18; the thermocouple pipe 18 extends from the base 22 into the interior of the pressure chamber 7; and the thermocouple 16 is connected to the end of the thermocouple pipe 18 extending therein.
[0030] In the above embodiment, preferably, the present invention further comprises a water bath jacket 5; the water bath jacket 5 is sleeved on the upper part of the pressure chamber 7; two cooling liquid channels 6 are arranged on the water bath jacket 5; the two cooling liquid channels 6 are respectively connected to the water bath device 33 through cooling liquid pipelines.
[0031] In the above embodiment, preferably, the present invention also includes a camera 34 and a data collector 36; the camera 34 is arranged outside the pressure chamber 7 and facing the visual window 8, for observing the changing state of the sediment sample; the data collector 36 is used to collect data in the experiment; wherein the data collector is respectively connected to the thermocouple 16, the first high-precision pressure-volume controller 23, the second high-precision pressure-volume controller 24, the third high-precision pressure-volume controller 25 and the water bath device 33.
[0032] The working process of the experimental device for simulating drilling fluid intrusion into a hydrate reservoir according to the present invention is as follows: (1) Connecting pipeline: according to Figure 2 , a coolant channel 6 of an experimental device for simulating drilling fluid invading a hydrate reservoir is connected to a water bath device 33 using a flexible pipeline to control the temperature of a pressure chamber 7, and a confining pressure pipeline 20 of the experimental device is connected to a third high-precision pressure volume controller 25 and a second nitrogen gas source 28 through a fifth valve 29e, a sixth valve 29f, and a seventh valve 29g respectively using a flexible pressure-resistant pipeline to control the confining pressure of a sediment sample 12; a pore pressure pipeline 17 of the experimental device is connected to a second high-precision pressure volume controller 24, a xenon gas source 26, and a first nitrogen gas source 27 through a second valve 29b and a third valve 29c respectively using a flexible pressure-resistant pipeline to control the pore pressure of the sediment sample 12, the xenon gas source 26 provides gas for in-situ generation of hydrates, and the first nitrogen gas source 27 is used for pipeline leak detection; drilling The well fluid injection pipe 19 is connected to the automatic drilling fluid proportioning device 35 through the fourth valve 29d to provide the drilling fluid required for invasion; the back pressure pipeline 21 of the experimental device is connected to the back pressure valve 30, the gas-water separator 31 and the gas flow meter 32 through the eighth valve 29h using a flexible pressure-resistant pipeline to achieve back pressure control of the sediment sample 12; the axial pressure channel 2 of the experimental device is connected to the first high-precision pressure-volume controller 23 through the first valve 29a using a flexible pressure-resistant pipeline to achieve axial pressure loading; the thermocouple 16 in the thermocouple pipeline 18 of the experimental device, the first high-precision pressure-volume controller 23, the second high-precision pressure-volume controller 24, the third high-precision pressure-volume controller 25, and the water bath device 33 are connected to the data acquisition device 36 to achieve data acquisition during the experiment.
[0033] (2) Preparation of sediment samples: A certain amount of ice powder and transparent sand were mixed evenly in a cold storage at -15°C, and compacted in fifteen layers using a compacting hammer in a sample-stripping cylinder to form a cylindrical sample of ice-sand mixture. After freezing for 6 hours, the sample-stripping cylinder was removed and the sediment sample was taken out.
[0034] (3) Installation of sediment sample: Remove the bolts between the base 22 and the pressure chamber 7, open the pressure chamber 7, place the lower permeable stone 13, the sediment sample 12, the upper permeable stone 11, and the upper pressure head 14 on the lower pressure head 15 in sequence, and wrap them with the rubber membrane 10, then cover the pressure chamber 7 and tighten the bolts between the base 22 and the pressure chamber 7.
[0035] (4) Sample saturation: Open the fifth valve 29e, the sixth valve 29f and the seventh valve 29g, open the second nitrogen gas source 28, and inject nitrogen into the pressure chamber 7 and the third high-precision pressure volume controller 25 through the fifth valve 29e, the sixth valve 29f and the seventh valve 29g respectively. When the pressure in the third high-precision pressure volume controller 25 rises to 0.2 MPa, close the sixth valve 29f and the gas cylinder of the second nitrogen gas source 28; open the second valve 29b and the needle valve 29c, adjust the back pressure valve 30 to the highest setting, and open the xenon gas source 26. , xenon gas is injected into the second high-precision pressure volume controller 24 and the sediment sample 12 through the second valve 29b and the third valve 29c, respectively. When the pressure of the second high-precision pressure volume controller 24 rises to 0.1MPa, the xenon gas source 26 is turned off; the third high-precision pressure volume controller 25 and the second high-precision pressure volume controller 24 are adjusted to control the rate of increase of the confining pressure to be the same as the rate of increase of the pore pressure, and the confining pressure is always kept 0.1MPa higher than the pore pressure until the confining pressure and the pore pressure reach 0.7MPa and 0.6MPa respectively. The third high-precision pressure volume controller 25 and the second high-precision pressure volume controller 24 are adjusted to enter the constant pressure mode. The water bath device 33 is turned on, and the nitrogen temperature in the pressure chamber 7 is adjusted to rise to 18°C to melt the ice in the sediment sample 12. The nitrogen temperature in the pressure chamber 7 is obtained by the thermocouple 16. When the volume of xenon gas in the second high-precision pressure volume controller 24 is no longer consumed, it is considered that the sediment sample 12 has reached complete gas saturation.
[0036] (5) In-situ hydrate generation: adjust the water bath device 33 and the nitrogen temperature in the pressure chamber 7 to 7°C so that the temperature of the sediment sample 12 is lower than the hydrate phase equilibrium temperature; when the gas volume in the second high-precision pressure-volume controller 24 does not change significantly, it indicates that the water in the pores of the sediment sample 12 has completely reacted with the xenon gas to form xenon hydrate. The hydrate saturation is calculated based on the change in the xenon gas volume in the second high-precision pressure-volume controller 24.
[0037] (6) Mechanical properties experiment: Set the required parameters. The three stresses (σ1, σ2, a, n, σ3) applied to the cylindrical specimen are perpendicular to each other, and the two stresses are equal, that is, the intermediate principal stress is equal to the secondary principal stress (σ2=σ3). △σ represents the deviatoric stress, which is equal to the difference between the axial stress and the radial stress (△σ=σ1-σ2). During the test, the operator increases the axial stress and radial confining pressure of the water-containing transparent sand sample to the specified confining pressure (effective confining pressure is 3MPa), and then keeps the confining pressure unchanged and continues to increase the axial stress of the sample. The loading speed of the axial load is 0.2 mm / min. The displacement caused by the radial and axial deformation of the specimen is collected and recorded in the data acquisition and control system.
[0038] (7) Drilling fluid invasion: Open the fourth valve 29d, and inject the drilling fluid into the drilling fluid invasion channel 9 through the drilling fluid automatic proportioning device 35 and the drilling fluid injection pipe 19 to complete the drilling fluid invasion.
[0039] (8) Sample structure changes: The camera 34 records the changes in the morphology and internal structure of the sediment sample through the visual window 8.
[0040] Embodiment 2: The present invention also provides an experimental method for simulating drilling fluid intrusion into a hydrate reservoir, comprising the following steps: (1) Make a cylindrical sediment sample of transparent sand and place it in a pressure chamber; (2) Injecting water and gas to control the high-pressure and low-temperature environment in the pressure chamber and generate hydrates; (3) Drilling fluid is injected into the sediment sample through a drilling fluid proportioning device to simulate drilling fluid invasion; (4) Record the internal structural changes of the soil layer under the influence of drilling fluid invasion through a camera; (5) Determine the three-dimensional structural changes of the sediment sample through the grid changes on the rubber membrane; (6) Conduct triaxial tests on sediment samples from hydrate reservoirs under the influence of drilling fluid invasion to measure the mechanical properties of the soil layer; (7) Collect data through the gas-water separation device and invert the mechanical properties; (8) Change the drilling fluid density and repeat the experiment.
[0041] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. An experimental device for simulating drilling fluid intrusion into a hydrate reservoir, characterized in that: include: Base; A loading frame, comprising a horizontal loading plate and vertical loading legs, wherein the upper portion of the vertical loading legs is fixedly connected to the horizontal loading plate, and the lower end of the vertical loading legs is connected to the base, so as to fix the horizontal loading plate at a position of a set height; The pressure chamber is a chamber structure with an opening at the lower end, the pressure chamber is arranged on the top of the base and the opening at the lower end is closed by the base; A sediment sample assembly is disposed in the pressure chamber and fixed to the base; A hydraulic telescopic assembly, arranged on the loading frame, with a telescopic end connected to the top of the sediment sample assembly, for applying axial pressure to the sediment sample assembly; The outer wall of the pressure chamber is provided with a viewing window to observe changes in the sediment sample assembly.
2. The experimental device according to claim 1, characterized in that: The sediment sample assembly comprises an upper pressure head, an upper permeable stone, a sediment sample, a lower permeable stone, a lower pressure head and a rubber membrane; The upper pressure head, the upper permeable stone, the sediment sample, the lower permeable stone and the lower pressure head are stacked in sequence from top to bottom to compact the sediment sample; The rubber film is wrapped around the exterior of the whole formed by the upper pressure head, the upper permeable stone, the sediment sample, the lower permeable stone and the lower pressure head to prevent the sediment sample from loosening; The rubber film is arranged in a grid shape.
3. The experimental device according to claim 2, characterized in that: Also included is a drilling fluid injection pipe; A vertical drilling fluid invasion channel is provided in the sediment sample; One end of the drilling fluid injection pipe is extended from the upper pressure head into the interior of the sediment sample and communicated with the drilling fluid invasion channel, and the other end is used to be connected to the drilling fluid automatic configuration device through the drilling fluid proportioning pipeline; The drilling fluid proportioning pipeline is provided with a fourth valve.
4. The experimental device according to claim 2, characterized in that: The hydraulic expansion and contraction assembly comprises a hydraulic cylinder, an axial pressure channel and a loading piston; The hydraulic cylinder is a cavity structure with an opening downward, and its opening end is fixed to the horizontal loading plate of the loading frame; The piston end of the loading piston is disposed in the cavity of the hydraulic cylinder, and both sides of the piston end are in contact with the inner wall of the hydraulic cylinder; The telescopic end of the loading piston passes through the horizontal loading plate and the top of the pressure chamber in sequence and then is connected to the upper pressure head; The axial pressure channel is arranged on the side wall of the cavity of the hydraulic oil cylinder and is located above the top of the loading piston; The axial pressure channel is used to connect to the first high-precision pressure volume controller through the first pressure volume controller pipeline, so that pressure is formed in the cavity of the hydraulic cylinder; A first valve is arranged on the first pressure-volume controller pipeline.
5. The experimental device according to claim 2, characterized in that: Also included are bore pressure pipes; A through hole is provided at the center of the lower permeable stone; One end of the hole pressure pipe is inserted into the pressure head and communicated with the through hole, and the other end is connected to the xenon gas source and the first nitrogen gas source respectively; The pore pressure pipeline is also connected in parallel with a second pressure volume controller pipeline, and the free end of the second pressure volume controller pipeline is connected with a second high-precision pressure volume controller; A second valve is provided on the second pressure-volume controller pipeline; The pore pressure pipeline is provided with a third valve.
6. The experimental device according to claim 2, characterized in that: It also includes confining pressure piping; One end of the confining pressure pipeline is connected to the bottom of the pressure chamber outside the sediment sample assembly, and the other end thereof is divided into two paths, one path is connected to the third high-precision pressure volume controller through the third pressure volume controller pipeline, and the other path is connected to the second nitrogen gas source through the nitrogen pipeline; The third pressure-volume controller pipeline is provided with a fifth valve, the nitrogen pipeline is provided with a sixth valve, and the confining pressure pipeline is provided with a seventh valve.
7. The experimental device according to claim 2, characterized in that: It also includes back pressure piping; One end of the back pressure pipe passes through the upper pressure head and is connected to the upper permeable stone, and the other end is connected to the gas-water separator and the gas flow meter in sequence; The gas-water separator is used to separate the water-gas mixture produced during the experiment, and the gas flow meter is used to measure the gas production of the separated gas; The back pressure pipeline is provided with a back pressure valve and an eighth valve.
8. The experimental device according to claim 1, characterized in that: Also included are thermocouples and thermocouple tubing; The thermocouple pipe extends from the base into the pressure chamber; the thermocouple is connected to the end of the thermocouple pipe extending therein.
9. The experimental device according to claim 1, characterized in that: Also included is a water bath jacket; The water bath jacket is arranged on the upper part of the pressure chamber; The water bath jacket is provided with two cooling liquid channels; The two cooling liquid channels are connected to the water bath device through cooling liquid pipelines respectively.
10. The experimental device according to claim 1, characterized in that: It also includes cameras and data loggers; The camera is arranged outside the pressure chamber and directly facing the visual window; The data collector is used to collect data in the experiment.
11. An experimental method based on the experimental device for simulating drilling fluid invading hydrate reservoirs according to any one of claims 1 to 10, characterized in that: The following steps are involved: (1) Make a cylindrical sediment sample of transparent sand and place it in a pressure chamber; (2) Injecting water and gas to control the high-pressure and low-temperature environment in the pressure chamber and generate hydrates; (3) Drilling fluid is injected into the sediment sample through a drilling fluid proportioning device to simulate drilling fluid invasion; (4) Record the internal structural changes of the soil layer under the influence of drilling fluid invasion through a camera; (5) Determine the three-dimensional structural changes of the sediment sample through the grid changes on the rubber membrane; (6) Conduct triaxial tests on sediment samples from hydrate reservoirs under the influence of drilling fluid invasion to measure the mechanical properties of the soil layer; (7) Collect data through the gas-water separation device and invert the mechanical properties; (8) Change the drilling fluid density and repeat the experiment.
Citation Information
Cited By
Pulsation visualization conventional triaxial fracturing rock sample testing system
CN120102606A
Comprehensive testing device and method for invasion of drilling fluid into hydrate reservoir under influence of mud cake
CN121613052A