Power monitoring system network security risk identification method
Through delay curve analysis and associated link identification of power system links, the problem of unrecognized link transmission correlation changes in the power monitoring system is solved, and more accurate network security risk identification and data transmission security assurance are achieved. .
Patent Information
- Application Number
- CN202410892657.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-04
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2044-07-04
AI Technical Summary
In power monitoring systems, existing technologies mainly focus on data transmission anomalies on a single link, but fail to effectively identify changes in transmission correlation between links, resulting in incomplete network security risk identification.
Through monitoring and data collection of each link in the power system, the delay curve of each link is analyzed, the delay-related links are obtained, and the normal or alienated abnormality identification is generated based on the abnormality of the delay-related links, and then marked Abnormal links ensure the stability and security of data transmission.
It improves the identification accuracy of network security risks in the power monitoring system, promptly identifies network congestion, equipment failures or malicious attacks, and ensures the security of data transmission and system stability.
Smart Images

Figure CN118869280A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of electric power monitoring systems, and in particular to a method for identifying network security risks of electric power monitoring systems. Background Art
[0002] The power system is one of the important national infrastructures. The demand for power resources in various industries is increasing year by year, requiring the entire power system to be safe, stable and reliable. With the widespread application of computer and network communication technology in power monitoring systems, the network security issues of power monitoring systems are becoming increasingly prominent. In order to strengthen the security management of power monitoring systems, prevent hackers and malicious codes from attacking and infringing on power monitoring systems, and ensure the safe and stable operation of power systems;
[0003] The power monitoring system monitors and adjusts and controls the operating status of each production unit equipment in the power system, ensuring the safe operation and reliable power supply of the power system. With the continuous development of intelligent and information technology, more and more emerging technologies are being applied in the power system, which has greatly increased the technology, workload and difficulty involved in the power monitoring system. In addition, the modern power monitoring system uses computer network technology to replace the traditional distributed plant automation equipment technology, which brings portability while also exposing the power monitoring system to multiple network threats.
[0004] During the transmission process, data passes through all nodes and links of the power monitoring system. Encryption and authentication mechanisms are used in each node and link to prevent data from being intercepted or tampered with during transmission;
[0005] The patent publication number CN115333770A discloses a network security risk monitoring system and method for an electric power system, which relates to the technical field of network security. In the present invention, data access request information is subjected to access anomaly analysis processing to obtain a corresponding data access anomaly degree; for each electric power data storage server, based on the data access anomaly degree corresponding to the data access request information obtained by the electric power data storage server, the data security degree corresponding to the electric power data storage server is determined; for each electric power data storage server, based on the data security degree corresponding to the electric power data storage server, a security protection processing method for performing data security protection processing on the electric power data storage server is determined, and data stored in the electric power data storage server is subjected to data security protection processing based on the security protection processing method. Based on the above method, the problem of poor data security protection effect in the prior art can be improved;
[0006] However, in the power monitoring system, the transmission normality between each link is generally maintained in a stable range, that is, the transmission correlation between each link. When identifying the network security risks of the power monitoring system, the abnormality of data transmission is generally identified, and the changes in the transmission correlation between each link are not identified;
[0007] Therefore, when identifying the network security risks of the power monitoring system, we should not only pay attention to the performance of a single link, but also the transmission correlation between links. By identifying highly correlated links, we can better understand the stability and reliability of the entire system. Based on this, a network security risk identification method for the power monitoring system is proposed. Summary of the invention
[0008] The purpose of the present invention is to provide a method for identifying network security risks of an electric power monitoring system, which solves the technical problem that when identifying network security risks of an electric power monitoring system, the anomalies of data transmission are generally identified, but the changes in transmission correlation between each link are not identified.
[0009] The purpose of the present invention can be achieved by the following technical solutions:
[0010] A method for identifying network security risks of an electric power monitoring system comprises the following steps:
[0011] Step 1: Monitor and collect data from each link of the power system;
[0012] Step 2: Randomly calibrate n calibration moments within a preset time length T, analyze the delays corresponding to each link at the n calibration moments, and obtain the delay curves corresponding to each link;
[0013] Step 3: Analyze the delay values corresponding to the n calibration moments on each delay curve, obtain the correlation between the delay curves, and obtain the delay associated links corresponding to each link according to the correlation between the delay curves;
[0014] Step 4: Compare the real-time delay value of each link with the preset value threshold, and mark the link whose real-time delay value is greater than the preset value as an abnormal link;
[0015] Step 5: Obtain the delay-associated link corresponding to the abnormal link, and determine whether to generate a regular abnormal flag or an alienated abnormal flag based on whether the delay-associated link is also an abnormal link.
[0016] As a further solution of the present invention: the specific method of obtaining the delay curves corresponding to each link is:
[0017] A1: Randomly select a link from each link of the power system as the analysis link, calibrate n calibration moments within the preset time length T, record the delay R1n of the analysis link at these moments, use the n calibration moments as the horizontal coordinates and the corresponding delay values R1n as the vertical coordinates to draw the delay curve L1 of the analysis link;
[0018] A2: Repeat step A1 to obtain the delay curve Lb corresponding to each link, where n is the number of calibration moments, b is the number of links, b≥1, n≥1.
[0019] As a further solution of the present invention: the specific method of calibrating n calibration moments within a preset time period is:
[0020] The specific method of calibrating n moments at a fixed time interval t and calibrating n calibration moments within a preset time length, where t=30 seconds.
[0021] As a further solution of the present invention: the specific method of obtaining the delay associated links corresponding to each link is:
[0022] A01: From each link of the power system, select the same link as in step A1 as the analysis link, mark the delay values of the delay curve of the analysis link at n calibration moments as R1n, and mark the delay values of the delay curves of other links at n calibration moments as Wen, where e represents the number of other links after removing the analysis link, e=b-1, e≥1, calculate the similarity value Xe between the analysis link and each other link through the similarity analysis calculation formula, and determine the delay curve with a similarity value Xe greater than a preset value Y1 as the delay associated link of the analysis link;
[0023] A02: Repeat step A01 to obtain the delay-associated links corresponding to each link.
[0024] As a further solution of the present invention: the similarity analysis calculation formula is specifically:
[0025]
[0026] Among them, they are the means of links R1 p and R1 n, and Wfp is the average value of the delay values of other links after excluding the analyzed link, n≥c≥1, e≥f≥1.
[0027] As a further solution of the present invention: the specific method of marking as an abnormal link is:
[0028] During the data transmission process, the real-time delay value Gb of each link is obtained at a certain time interval J1, and the real-time delay value Gb is compared with the preset value threshold Y2. When Gb>Y2, the corresponding link is marked as an abnormal link. When Gb≤Y2, no processing is performed. Here, the time interval J1 is greater than 5 minutes.
[0029] As a further solution of the present invention: determining whether to generate a conventional abnormality mark or an alienated abnormality mark, the specific method is as follows:
[0030] The number of delay-associated links corresponding to the abnormal link is marked as h, and the number of delay-associated links marked as abnormal links at the same time is obtained. When the ratio between g and h is greater than the preset limit Y3, a regular abnormal flag is generated; when the ratio between g and h is less than or equal to the preset limit Y3, an alienated abnormal flag is generated.
[0031] As a further solution of the present invention: when the ratio between g and h is greater than a preset limit value Y3 and less than a preset limit value Y4, only the abnormal link is output, Y4>Y3.
[0032] As a further solution of the present invention: when the ratio between g and h is greater than the preset limit value Y3 and greater than or equal to the preset limit value Y4, a stop transmission signal is generated to interrupt the data transmission, and the transmission data is packaged into an abnormal data packet, and the abnormal data packet is output simultaneously with the abnormal link.
[0033] Beneficial effects of the present invention:
[0034] (1) The present invention generates a conventional abnormal mark or an alienated abnormal mark by judging. The abnormal mark indicates that the abnormal delay value of the abnormal link is caused by the conventional original image, and the alienated abnormal mark indicates that the abnormal delay value of the abnormal link is not caused by the conventional original image, which is conducive to the relevant staff to further monitor the abnormal link and help to timely identify abnormal situations in the network, such as network congestion, equipment failure or malicious attack, so as to provide a basis for system optimization and security protection, and further improve the accuracy of identifying network security risks of the power monitoring system;
[0035] (2) The present invention generates a stop transmission signal to interrupt data transmission, and packages the transmitted data into an abnormal data packet. The abnormal data packet is output simultaneously with the abnormal link to avoid continued transmission of the abnormal data, and the transmission of the abnormal data is terminated in time, thereby further ensuring network security in the power monitoring system. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] The present invention will be further described below in conjunction with the accompanying drawings.
[0037] Figure 1It is a schematic diagram of the framework structure of a method for identifying network security risks of a power monitoring system according to the present invention;
[0038] Figure 2 It is a schematic diagram of the delay curve structure of an analysis link in a method for identifying network security risks of an electric power monitoring system according to the present invention. DETAILED DESCRIPTION
[0039] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0040] Embodiment 1
[0041] See also Figure 1-Figure 2 As shown, the present invention is a method for identifying network security risks of a power monitoring system, comprising the following steps:
[0042] Step 1: Before identifying network security risks, monitor and collect the delay of each link in the power system:
[0043] Step 2: Obtain n randomly calibrated calibration moments of each link within a preset time length T, obtain the delays corresponding to each link at the n calibration moments, and analyze them to obtain the delay curves corresponding to each link. The specific method is as follows:
[0044] It should be noted that the time interval between the n calibration moments can be a fixed time interval or a random time interval, which is a preset fixed time interval t here;
[0045] It should be noted that latency refers to the time required from one end of a network to the other end, which usually includes sending latency, propagation latency, processing latency and queuing latency. The specific values of the preset duration T and the fixed time interval t are formulated by relevant staff according to actual needs. Here, t = 30 seconds;
[0046] A1: Randomly select one link from each link of the power system as the analysis link;
[0047] A2: The delay corresponding to the n calibration moments of the analysis link within the preset time length T is marked as R1 n;
[0048] Take n calibration moments as the horizontal coordinates and the delay R1n corresponding to each calibration moment as the vertical coordinates, obtain the coordinates of each calibration point, and import them into the two-dimensional coordinate system to obtain the delay curve L1 of the analysis link;
[0049] A3: Repeat steps A1-A2 to obtain the delay curve Lb corresponding to each link, where n is the number corresponding to the calibration time, b refers to the number corresponding to the link, b≥1, n≥1;
[0050] Step 3: Analyze the delay values corresponding to the n calibration moments on each delay curve, obtain the correlation between the delay curves, and obtain the delay associated links corresponding to each link according to the correlation between the delay curves. The specific method is as follows:
[0051] A01: From the various links of the power system, select the same link as in step A1 as the analysis link;
[0052] A02: The delay values R1n corresponding to the n calibration moments on the delay curve of the analysis link are marked as Wen, and e refers to the number of other links after the analysis link is removed, e = b-1, e ≥ 1;
[0053] A03: Obtain the similarity value Xe between the analysis curve and other delay curves through the similarity analysis calculation formula;
[0054] The similarity analysis calculation formula is as follows:
[0055]
[0056] Where, they are the mean values of link R1 p and R1 n, and Wfp is the mean value of the delay values of other links after excluding the analyzed link, n≥c≥1, e≥f≥1;
[0057] The delay curve with similarity value Xe greater than preset value Y1 is determined as the delay associated link related to the analysis link. The specific value of preset value Y1 is formulated by relevant personnel according to actual needs;
[0058] The larger the similarity value Xe is, the higher the similarity between the delay curve of the corresponding link and the delay curve of the analysis link is, that is, the higher the degree of synchronization between the two delay curves, which means that there is some common influencing factor between the two links, for example, they both pass through the same network bottleneck or share the same physical transmission medium. In this case, if the delay of link 1 increases due to some reason, such as network congestion, equipment failure, etc., then the delay of link 1 associated with link 2 will also increase synchronously;
[0059] A04: Repeat steps A01-A03 to obtain the delay associated links corresponding to each link;
[0060] By analyzing the correlation between each delay curve, the delay associated link corresponding to each link is obtained, which facilitates targeted analysis of abnormal links in the later stage.
[0061] Step 4: The real-time delay value of each link in the power monitoring system is obtained and compared with the preset value threshold. The link with a real-time delay value greater than the preset value is marked as an abnormal link. The specific method is as follows:
[0062] When each link is transmitting data, the real-time delay value of each link is obtained at every time interval J1 and marked as Gb. The real-time delay value Gb is compared with the preset value threshold Y2. When Gb>Y2, the corresponding link is marked as an abnormal link. When Gb≤Y2, no processing is performed. The specific value of the preset value threshold Y2 is formulated by relevant personnel according to actual needs, J1>5 minutes;
[0063] Step 5: Obtain the delay-associated link corresponding to the abnormal link, and determine whether to generate a conventional abnormal flag or an alienated abnormal flag according to whether the delay-associated link is also an abnormal link. The specific method is as follows:
[0064] Mark the number of delay-associated links corresponding to the abnormal link with h, and obtain the number of links marked as abnormal links in the delay-associated links at the same time with g. When g / h is greater than the preset limit value Y3, it means that the delay value of the delay-associated link corresponding to the abnormal link accounts for a large proportion of the number of abnormal links that occur abnormally at the same time, and a conventional abnormal mark is generated. When g / h is less than or equal to the preset limit value Y3, it means that the delay value of the delay-associated link corresponding to the abnormal link accounts for a small proportion of the number of abnormal links that occur abnormally at the same time, and an alienated abnormal mark is generated. The specific value of the preset limit value Y3 is formulated by relevant personnel according to actual needs.
[0065] By analyzing the delays corresponding to each link at n calibration moments, the delay curves corresponding to each link are obtained, and the correlation between each delay curve is obtained according to the delay values corresponding to the n calibration moments on each delay curve. The delay-associated links corresponding to each link are obtained according to the correlation between each delay curve. The real-time delay values of each link in the power monitoring system are obtained and compared with the preset value threshold. The links with real-time delay values greater than the preset value are marked as abnormal links. The delay-associated links corresponding to the abnormal links are obtained. According to whether the delay-associated links are abnormal links at the same time, it is determined whether a conventional abnormal mark or an alienated abnormal mark is generated. The abnormal mark indicates that the abnormal delay value of the abnormal link is caused by the conventional original image, and the alienated abnormal mark indicates that the abnormal delay value of the abnormal link is not caused by the conventional original image, which is conducive to the relevant staff to further monitor the abnormal links and help to timely identify abnormal situations in the network, such as network congestion, equipment failure or malicious attacks, so as to provide a basis for system optimization and security protection, and further improve the accuracy of identifying network security risks of the power monitoring system.
[0066] Embodiment 2
[0067] As the second embodiment of the present invention, when the present application is implemented, compared with the first embodiment, the technical solution of the present embodiment is different from that of the first embodiment only in that,
[0068] When the ratio between g and h is greater than the preset limit Y3 and less than the preset limit Y4, only the abnormal link is output, which is conducive to the relevant staff to monitor and analyze the risks of the abnormal link in time, and helps to identify the abnormal situation in the network in time. The specific values of Y3 and Y4 are formulated by the relevant personnel according to actual needs to meet Y4>Y3;
[0069] When the ratio between g and h is greater than the preset limit value Y3 and greater than or equal to the preset limit value Y4, a stop transmission signal is generated to interrupt the data transmission, and the transmitted data is packaged into an abnormal data packet, and the abnormal data packet is output simultaneously with the abnormal link to avoid the abnormal data from continuing to be transmitted, and the abnormal data transmission is terminated in time, so as to further ensure the network security in the power monitoring system;
[0070] Embodiment 3
[0071] As the third embodiment of the present invention, when the present application is specifically implemented, compared with the first and second embodiments, the technical solution of this embodiment is to combine the solutions of the first and second embodiments mentioned above for implementation.
[0072] The above formulas are all dimensionless and numerical calculations. The formula is a formula for the most recent real situation obtained by collecting a large amount of data and performing software simulation. The preset parameters and thresholds in the formula are set by technicians in this field according to actual conditions.
[0073] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.
Claims
1. A method for identifying network security risks in a power monitoring system, characterized in that: The following steps are involved: Step 1: Monitor and collect data from each link of the power system; Step 2: Randomly calibrate n calibration moments within a preset time length T, analyze the delays corresponding to each link at the n calibration moments, and obtain the delay curves corresponding to each link; Step 3: Analyze the delay values corresponding to the n calibration moments on each delay curve, obtain the correlation between the delay curves, and obtain the delay associated links corresponding to each link according to the correlation between the delay curves; Step 4: Compare the real-time delay value of each link with the preset value threshold, and mark the link whose real-time delay value is greater than the preset value as an abnormal link; Step 5: Obtain the delay-associated link corresponding to the abnormal link, and determine whether to generate a regular abnormal flag or an alienated abnormal flag based on whether the delay-associated link is also an abnormal link.
2. A method for identifying network security risks of a power monitoring system according to claim 1, characterized in that: The specific method of obtaining the delay curve corresponding to each link is: A1: Randomly select a link from each link of the power system as the analysis link, calibrate n calibration moments within the preset time length T, record the delay R1n of the analysis link at these moments, use the n calibration moments as the horizontal coordinates and the corresponding delay values R1n as the vertical coordinates to draw the delay curve L1 of the analysis link; A2: Repeat step A1 to obtain the delay curve Lb corresponding to each link, where n is the number of calibration moments, b is the number of links, b≥1, n≥1.
3. A method for identifying network security risks of a power monitoring system according to claim 2, characterized in that: The specific method of calibrating n calibration moments within a preset time period is: The specific method of calibrating n moments at a fixed time interval t and calibrating n calibration moments within a preset time length, where t=30 seconds.
4. A method for identifying network security risks of a power monitoring system according to claim 3, characterized in that: The specific method of obtaining the delay associated links corresponding to each link is: A01: From each link of the power system, select the same link as in step A1 as the analysis link, mark the delay values of the delay curve of the analysis link at n calibration moments as R1n, and mark the delay values of the delay curves of other links at n calibration moments as Wen, where e represents the number of other links after removing the analysis link, e=b-1, e≥1, calculate the similarity value Xe between the analysis link and each other link through the similarity analysis calculation formula, and determine the delay curve with a similarity value Xe greater than a preset value Y1 as the delay associated link of the analysis link; A02: Repeat step A01 to obtain the delay-associated links corresponding to each link.
5. A method for identifying network security risks of a power monitoring system according to claim 4, characterized in that: The similarity analysis calculation formula is as follows: Among them, they are the means of links R1 p and R1 n, and Wfp is the average value of the delay values of other links after excluding the analyzed link, n≥c≥1, e≥f≥1.
6. A method for identifying network security risks in a power monitoring system according to claim 5, characterized in that: The specific method of marking an abnormal link is as follows: During the data transmission process, the real-time delay value Gb of each link is obtained at a certain time interval J1, and the real-time delay value Gb is compared with the preset value threshold Y2. When Gb>Y2, the corresponding link is marked as an abnormal link. When Gb≤Y2, no processing is performed. Here, the time interval J1 is greater than 5 minutes.
7. A method for identifying network security risks in a power monitoring system according to claim 6, characterized in that: Determine whether to generate a regular exception flag or an alienated exception flag. The specific method is as follows: The number of delay-associated links corresponding to the abnormal link is marked as h, and the number of delay-associated links marked as abnormal links at the same time is obtained. When the ratio between g and h is greater than the preset limit Y3, a regular abnormal flag is generated; when the ratio between g and h is less than or equal to the preset limit Y3, an alienated abnormal flag is generated.
8. A method for identifying network security risks of a power monitoring system according to claim 7, characterized in that: When the ratio between g and h is greater than a preset limit value Y3 and less than a preset limit value Y4, only the abnormal link is output, Y4>Y3.
9. A method for identifying network security risks of a power monitoring system according to claim 8, characterized in that: When the ratio between g and h is greater than the preset limit value Y3 and greater than or equal to the preset limit value Y4, a stop transmission signal is generated to interrupt the data transmission. At the same time, the transmission data is packaged into an abnormal data packet, and the abnormal data packet is output simultaneously with the abnormal link.
Citation Information
Patent Citations
Interconnected power grid cascading fault risk assessment and alarming method considering communication vulnerability degrees
CN107679716A
Network abnormity detection method based on situation awareness prediction method
CN110460622A
Link fault monitoring method and device
CN111786804A
Network anomaly detection method based on round-trip time delay time sequence and related device
CN114039889A
Application and cloud platform cross-layer fault analysis method and system based on micro-service deployment
CN116719664A