Active power distribution network multi-risk pre-control auxiliary decision-making method and system

By coordinating the analysis and classification of multiple risks in the active distribution network and adopting optimized combination control strategies, the challenge of traditional methods being difficult to cope with multiple risks is solved, and effective risk elimination and safe and stable operation of the power grid is achieved.

CN118899827APending Publication Date: 2024-11-05STATE GRID CORPORATION OF CHINA +4
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410922542.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-10
Publication Date
2024-11-05

AI Technical Summary

Technical Problem

Traditional risk isolation analysis and decision-making methods are difficult to effectively deal with the challenges brought by multiple risks in active distribution networks, and cannot consider multiple risk events related to time and space for classification and differentiation, resulting in the inability to eliminate risks or excessive ineffective disposal operations. , worsen the risk trend of the power grid.

Method used

Adopting multiple risk pre-control and auxiliary decision-making methods, by taking into account the future risk information and weak links of the power grid, sorting them according to the risk urgency, it provides optimized combination control strategies for functional connection, including the main and supporting coordinated load transfer strategy and source network load storage Collaborative optimization strategy and equipment overload transfer strategy to generate optimal auxiliary decision-making information.

Benefits of technology

The comprehensive disposal of multiple risks has been achieved, the reduction of invalid adjustments has been achieved, the power grid's ability to deal with multiple risks has been improved, the risk defense ability has been improved, and the safe and economic operation of the power grid has been ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118899827A_ABST
    Figure CN118899827A_ABST
Patent Text Reader

Abstract

The invention discloses a multi-risk pre-control auxiliary decision-making method and system for an active power distribution network, and the method comprises the steps: scanning the future risk of a power grid to obtain the initial future risk information of the power grid and the future weak link of the power grid, and sorting the emergency degree of the future risk information of the power grid; for the future weak link of the power grid, executing a main and distribution cooperative load transfer strategy, and scanning the future risk of the power grid again to obtain updated future risk information of the power grid; aiming at the updated future risk information of the power grid, executing a source grid load storage collaborative optimization strategy, and updating the future risk information of the power grid again; executing an equipment out-of-limit load transfer strategy for the re-updated future risk information of the power grid; and generating optimal auxiliary decision information based on the main and distribution cooperative load transfer strategy, the source network load storage cooperative optimization strategy and the equipment out-of-limit load transfer strategy. According to the method, combined regulation and control are optimized, multiple risks are eliminated, invalid adjustment is reduced, and an optimal disposal strategy oriented to the multiple risks is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of power systems, and more specifically, to an active distribution network multiple risk pre-control auxiliary decision-making method and system. Background Art

[0002] With the construction of new power systems, distributed new energy has shown a development pattern of "rapid development of installed capacity and increased proportion of low-voltage grid-connected power". Distributed new energy has experienced explosive growth in distribution networks, and the form and operation mode of distribution networks have undergone major changes.

[0003] At present, the active and networked characteristics of distribution networks are becoming increasingly obvious, and the interaction between sources, grids, loads and storage is becoming more frequent, which brings new challenges to dispatching and operation. After a high proportion of distributed wind, solar and other volatile new energy sources are connected to the grid, the distribution system becomes an active distribution network, whose power has high volatility and strong randomness, and the safe and economic operation of the system faces serious challenges and threats. The uncertainty of new energy output increases the difficulty of predicting and preventing multiple risks and cascading failures in the power grid. Active distribution networks have many types of risks, diverse risk events, and different forms of failures. There is a possibility that one risk will develop and evolve into other risks or weak links, making it very difficult to defend against risks in active distribution networks.

[0004] The purpose of the traditional risk isolation analysis and decision-making method is to defend against isolated risks. The existing technology uses the traditional risk isolation analysis and decision-making method to defend against isolated risks, such as transferring an isolated risk to other locations by load shedding, and does not consider whether this will cause potential risk interference in other locations. Therefore, the traditional method does not consider the correlation between multiple risks. Even for multiple risks, it is isolated and analyzed in sequence and auxiliary decisions are given. It does not consider the spatiotemporal coupling and transmission relationship between multiple risks, and does not classify and differentiate the multiple risk events associated with multiple spatiotemporal associations. Due to the lack of overall consideration of risk disposal strategies, risks cannot be eliminated or too many invalid disposal operations will be performed, aggravating the risk situation of the distribution network. Therefore, in the complex scenario of the active distribution network, when there are multiple risks coupled in time and space, the traditional risk and grid weak link isolated analysis and disposal methods will cause other related new risks or grid weak links after handling one risk. Not only can the risk not be effectively eliminated, but it will also lead to excessive adjustment operations on the grid, worsening the risk situation of the active distribution network. The traditional decision-making method that only considers a single risk is difficult to effectively cope with the challenges brought by a single or multiple risks of the active distribution network, and cannot provide pre-control auxiliary strategy support based on multi-risk coordinated analysis. How to effectively prevent multiple risks in the future operation of active distribution networks has become a difficult problem.

[0005] In view of the above problems, a new active distribution network multi-risk pre-control decision-making auxiliary method and system is urgently needed. Summary of the invention

[0006] In order to solve the deficiencies in the prior art, the present invention provides an active distribution network multiple risk pre-control decision-making auxiliary method and system. The method comprehensively considers the future risk information of multiple power grids and the weak links of the power grid, and on the basis of classifying and analyzing the multiple risks or weak links, sorts them according to the urgency of the risks, and provides an optimized combined control strategy with functional connection to make comprehensive disposal decisions for the multiple risks or weak links.

[0007] The present invention adopts the following technical solution.

[0008] The first aspect of the present invention relates to an active distribution network multiple risk pre-control auxiliary decision-making method, the method comprising the following steps: scanning the future risks of the power grid to obtain initial future risk information of the power grid and future weak links of the power grid, and sorting the urgency of the future risk information of the power grid; for the future weak links of the power grid, executing the main distribution coordinated load transfer strategy, and re-scanning the future risks of the power grid to obtain updated future risk information of the power grid; for the updated future risk information of the power grid, executing the source-grid-load-storage coordinated optimization strategy, and updating the future risk information of the power grid again; for the updated future risk information of the power grid, executing the equipment over-limit load transfer strategy; based on the main distribution coordinated load transfer strategy, the source-grid-load-storage coordinated optimization strategy and the equipment over-limit load transfer strategy, generate and output the optimal auxiliary decision information.

[0009] Preferably, the future risks of the power grid are scanned to obtain initial future risk information of the power grid and future weak links of the power grid, including: predicting transformer over-limit, line over-limit, and bus over-limit during the future operation of the power grid, and generating future risk information of the power grid based on the over-limit situation; the future risk information of the power grid includes risk ID, risk type, risk area, substation corresponding to the risk, equipment corresponding to the risk, and risk content; predicting series supply, single power substation, single-transformer single-line substation, loss of dual power supply for important users, and power loss of equipment during the future operation of the power grid, and generating the future weak links of the power grid; the future weak links of the power grid include weak link ID, weak type, weak area, substation corresponding to the weak link, equipment corresponding to the weak link, and weak link content.

[0010] Preferably, for the future weak links of the power grid, a main-distribution coordinated load transfer strategy is implemented, including: performing load transfer calculations on the main grid side with the goal of all main grid-side equipment being energized, and simulating the status of distribution network equipment after the transfer; querying the status of distribution network equipment, and if there is a 10kV bus or 10kV feeder that has lost power, performing a reverse load simulation on the distribution network side with the goal of all 10kV bus loads being energized; recording the main grid-side load transfer results, the distribution network-side reverse load results, and the bus load that cannot be transferred as a main-distribution coordinated load transfer plan.

[0011] Preferably, the load transfer calculation is performed on the main grid side with the goal of all main grid-side equipment being powered, and the state of the distribution grid-side equipment after the transfer is simulated, including: extracting all power-losing equipment on the main grid side, and dividing the voltage levels of the power-losing equipment, and transferring the load of the power-losing equipment from the power-losing equipment of the highest voltage level to the power-losing equipment of the lower voltage level one by one; for the current voltage level, finding the transfer path for each power-losing equipment from the power grid topology, and solving the optimal transfer path with the goal of minimizing the average load rate of the equipment; under the optimal transfer path, simulating the power-losing equipment in the next voltage level, and continuing to solve the optimal transfer path for the power-losing equipment in the next voltage level until the load transfer to the power-losing equipment in the lowest voltage level is completed.

[0012] Preferably, the status of the equipment on the distribution network side is queried, and if there is a 10kV bus or 10kV feeder that has lost power, a load reversal simulation is performed on the distribution network side with the goal of energizing all 10kV bus loads, including: extracting the set of power-losing equipment on the main network side according to the load dedicated supply situation on the main network side; for each power-losing equipment in the power-losing equipment set, extracting the transfer capacity of the associated loads corresponding to the power-losing equipment; sorting the transfer capacities of the associated loads, and searching for the reversing strategy of the power-losing equipment from the highest to the lowest transfer capacity until the transfer of power to the power-losing equipment is completed.

[0013] Preferably, completing the power transfer to the power-losing device includes: generating a power transfer plan for each power-losing device, the power transfer plan at least including transfer-in feeder information, transfer-in bus information, tie switch control strategy and disconnection point information.

[0014] Preferably, a source-grid-load-storage collaborative optimization strategy is executed for the updated future risk information of the power grid, including: sorting the updated future risk information of the power grid by urgency; taking the optimal economic efficiency of the regulated object and the maximization of the new energy consumption as the objective function, and using a linear programming algorithm to dispatch the source-grid-load-storage, so as to realize load transfer in sequence according to the future risk information of the power grid according to the urgency sorting.

[0015] Preferably, the objective function is to optimize the economic efficiency of the regulated object and maximize the consumption of new energy, and a linear programming algorithm is used to schedule the source, grid, load and storage, including: using multiple regulated object constraints, grid section safety constraints, and system power balance constraints as constraints of the linear programming algorithm.

[0016] Preferably, for the updated future risk information of the power grid, an equipment over-limit load transfer strategy is executed, including: extracting the equipment over-limit information from the updated future risk information of the power grid, and dividing the voltage level of the over-limit equipment based on the equipment over-limit information, and performing voltage reduction on the over-limit equipment from the over-limit equipment of the highest voltage level to the over-limit equipment of the lower voltage level; for the current voltage level, extracting the transferable path of the over-limit equipment from the constrained power grid topology; assigning priority to the transferable path of the over-limit equipment according to the dual power supply of important users, the equipment load rate and the equipment status, and selecting the path with the largest voltage drop as the over-limit load transfer strategy for the over-limit equipment under the current priority until the voltage drop target under the current voltage level is achieved.

[0017] Preferably, for the future risk information of the power grid that has been updated again, an equipment over-limit load transfer strategy is executed, including: updating the equipment over-limit information after executing the equipment over-limit load transfer strategy; based on the updated equipment over-limit information, counting the equipment over-limit situation to evaluate the auxiliary decision effect.

[0018] The second aspect of the present invention relates to an active distribution network multiple risk pre-control strategy decision system using the method in the first aspect of the present invention, the system comprising a future risk scanning module, a main distribution coordinated load transfer strategy generation module, a source grid load storage coordinated optimization strategy generation module, an active control strategy generation module and a human-machine interface module; wherein the future risk scanning module is used to scan the future risks of the power grid to obtain initial future risk information of the power grid and future weak links of the power grid, and to sort the urgency of the future risk information of the power grid; the main distribution coordinated load transfer strategy generation module is used to execute the main distribution coordinated load transfer strategy for the future weak links of the power grid, and to scan the future risks of the power grid again to obtain updated future risk information of the power grid; the source grid load storage coordinated optimization strategy generation module is used to execute the source grid load storage coordinated optimization strategy for the updated future risk information of the power grid, and to update the future risk information of the power grid again; the active control strategy generation module is used to execute the equipment over-limit load transfer strategy for the updated future risk information of the power grid; the human-machine interface module is used to generate and output the optimal auxiliary decision information based on the main distribution coordinated load transfer strategy, the source grid load storage coordinated optimization strategy and the equipment over-limit load transfer strategy.

[0019] Preferably, the future risk information of the power grid includes the risk ID, risk type, risk area, substation corresponding to the risk, equipment corresponding to the risk, and risk content; the future weak links of the power grid include the weak link ID, weak type, weak area, substation corresponding to the weak link, equipment corresponding to the weak link, and weak link content.

[0020] Preferably, a future risk scanning module is used to scan the future risks of the power grid to obtain multiple initial future risk information of the power grid and future weak links of the power grid, including: predicting the over-limit conditions during the future operation of the power grid; wherein the over-limit conditions include transformer over-limit, line over-limit, and bus over-limit, and generating future risk information of the power grid based on the over-limit conditions; predicting the equipment conditions during the future operation of the power grid, the equipment conditions include series supply, single power substation, single-transformer single-line substation, important users losing dual power supplies, equipment power failure, and generating the future weak links of the power grid based on the equipment conditions.

[0021] Preferably, the main and distribution coordinated load transfer strategy generation module is used to execute the main and distribution coordinated load transfer strategy for future weak links in the power grid, including: performing load transfer calculation on the main grid side with the goal of energizing all main grid-side equipment corresponding to the future weak links in the power grid, and simulating the status of the distribution network side equipment after the transfer; querying the status of the distribution network side equipment, if there is a 10kV bus or 10kV feeder that has lost power, then performing load reversal simulation on the distribution network side with the goal of energizing all 10kV bus loads; recording the load transfer results on the main grid side, the load reversal results on the distribution network side, and the bus load that cannot be transferred, and using the load transfer results on the main grid side, the load reversal results on the distribution network side, and the bus load that cannot be transferred as the main and distribution coordinated load transfer plan.

[0022] Preferably, in the main-distribution coordinated load transfer strategy generation module, the load transfer calculation is performed on the main grid side with the goal of powering all the main grid-side equipment corresponding to the future weak links of the power grid, and the state of the distribution network side equipment after the transfer is simulated, including: extracting all the power-losing equipment on the main grid side corresponding to the future weak links of the power grid, and dividing the voltage levels of the power-losing equipment, starting from the power-losing equipment with the highest voltage level to the power-losing equipment with lower voltage levels, and performing load transfer of the power-losing equipment in each voltage level until the load transfer to the power-losing equipment in the lowest voltage level is completed.

[0023] Preferably, in the main distribution coordinated load transfer strategy generation module, the load of the power-lost equipment is transferred from the power-lost equipment at the highest voltage level to the power-lost equipment at the lower voltage level, including: for the current voltage level calculated for the load transfer, the transfer path for each power-lost equipment is found from the power grid topology, and the optimal transfer path is solved with the lowest average load rate of the equipment as the goal; under the optimal transfer path, the power-lost equipment in the next voltage level is simulated, and used to continue to solve the optimal transfer path in the next voltage level.

[0024] Preferably, in the main distribution coordinated load transfer strategy generation module, the status of the distribution network side equipment is queried, and if there is a 10kV bus or 10kV feeder that has lost power, a load reversal simulation is performed on the distribution network side with the goal of energizing all 10kV bus loads, including: extracting the set of power-losing equipment on the main network side according to the load transfer situation on the main network side; for each power-losing equipment in the power-losing equipment set, extracting the transfer capacity of the associated loads corresponding to the power-losing equipment; sorting the transfer capacity of the associated loads, searching for the reversing strategy of each associated load in the power-losing equipment in order from the highest to the lowest transfer capacity, and using the reversing strategy to transfer the power to the power-losing equipment until the transfer to the power-losing equipment is completed.

[0025] Preferably, in the main distribution coordinated load transfer strategy generation module, the transfer of power to the power-off equipment is completed, including: generating a transfer plan for each power-off equipment, the transfer plan including the transfer-in feeder information, the transfer-in bus information, the interconnection switch control strategy and the disconnection point information.

[0026] Preferably, the source-grid-load-storage collaborative optimization strategy generation module is used to execute the source-grid-load-storage collaborative optimization strategy for the updated future risk information of the power grid, including: sorting the urgency of the updated multiple future risk information of the power grid; taking the optimal economic efficiency of the control object and the maximization of new energy consumption as the objective function, and using a linear programming algorithm to dispatch the source-grid-load-storage, so as to realize load transfer in sequence according to the urgency sorting for the updated multiple future risk information of the power grid.

[0027] Preferably, in the source-grid-load-storage collaborative optimization strategy generation module, the source-grid-load-storage is scheduled using a linear programming algorithm with the optimal economic efficiency of the control object and the maximum consumption of new energy as the objective function, including: using multiple control object constraints, grid section safety constraints, and system power balance constraints as constraints of the linear programming algorithm.

[0028] Preferably, the active control strategy generation module is used to execute the equipment over-limit load transfer strategy based on the updated future risk information of the power grid, including: extracting the equipment over-limit information from the updated future risk information of the power grid, and dividing the voltage level of the over-limit equipment based on the equipment over-limit information, starting from the over-limit equipment with the highest voltage level to the over-limit equipment with the lower voltage level, and performing voltage reduction on the over-limit equipment one voltage level at a time until the voltage reduction target at the current voltage level is reached.

[0029] Preferably, in the active control strategy generation module, the voltage of the over-limit equipment is reduced step by step from the over-limit equipment with the highest voltage level to the over-limit equipment with the lower voltage level, including: extracting the transferable path of the over-limit equipment from the constrained power grid topology based on the current voltage level calculated for load transfer; assigning priorities to the transferable paths of the over-limit equipment according to the dual power sources of important users, equipment load rate and equipment status, and selecting the path with the largest voltage drop as the over-limit load transfer strategy for the over-limit equipment under the current priority.

[0030] Preferably, the active control strategy generation module is used to execute the equipment over-limit load transfer strategy based on the future risk information of the power grid that has been updated again, including: updating the equipment over-limit information after executing the equipment over-limit load transfer strategy; based on the updated equipment over-limit information, counting the equipment over-limit situation to evaluate the auxiliary decision-making effect.

[0031] A third aspect of the present invention relates to a terminal, comprising a processor and a storage medium; the storage medium is used to store instructions; the processor is used to operate according to the instructions to execute the steps of the method according to the first aspect of the present invention.

[0032] A fourth aspect of the present invention relates to a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the steps of the method in the first aspect of the present invention.

[0033] The beneficial effect of the present invention is that, compared with the prior art, the active distribution network multiple risk pre-control auxiliary decision-making method and system in the present invention comprehensively considers multiple future risk information of power grids and weak links of power grids, and on the basis of classifying and analyzing multiple risks or weak links, sorts them by risk urgency, and provides an optimized combination control strategy with functional connection to make comprehensive disposal decisions for multiple risks or weak links. While completely eliminating multiple risks, the present invention reduces ineffective adjustments to the power grid and realizes the optimal disposal strategy for the power grid facing multiple risks.

[0034] The beneficial effects of the present invention also include:

[0035] 1. The present invention comprehensively analyzes and classifies multiple future risks, conducts overall disposal considerations based on the nature of risks and coupling relationships, and provides an optimized step-by-step risk disposal strategy, thereby eliminating associated risk points and reducing ineffective control operations on the power grid, thereby improving the dispatching personnel's ability to deal with future risks of the active distribution network.

[0036] 2. The present invention provides intelligent generation of pre-control auxiliary decision-making for multiple future risks of active distribution networks. The pre-control auxiliary decision-making generation algorithm targets the future operating risk points and weak links of the active distribution network, and can generate pre-control auxiliary decisions that take into account the coordinated optimization of source-grid-load-storage and the coordinated load transfer of main distribution. This decision comprehensively considers the various risk types and urgency levels with spatiotemporal coupling relationships in the future, and can provide optimized regulation and disposal strategies for multiple risks in the future, reduce the impact of adjustments on the power grid, and effectively enhance the risk defense capabilities of the active distribution network. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] Figure 1 It is a flow chart of a method for assisting decision-making in pre-controlling multiple risks of an active power distribution network according to the present invention;

[0038] Figure 2 It is a flow chart of a main distribution network coordinated load transfer strategy in a multiple risk pre-control auxiliary decision-making method for active distribution network of the present invention;

[0039] Figure 3 A schematic diagram of a flow chart of generating a load transfer strategy for equipment overload in an active power distribution network multiple risk pre-control auxiliary decision-making method according to the present invention;

[0040] Figure 4 The present invention is a schematic diagram of the architecture of an active distribution network multiple risk pre-control decision-making auxiliary system. DETAILED DESCRIPTION

[0041] In order to make the purpose, technical scheme and advantages of the present invention clearer, the technical scheme of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. The embodiments described in the present invention are only embodiments of a part of the present invention, not all embodiments. Based on the spirit of the present invention, all other embodiments not recorded in the present invention obtained by ordinary technicians in this field according to the embodiments recorded in the present invention without making creative work should belong to the protection scope of the present invention.

[0042] The idea of ​​the present invention is to generate pre-control auxiliary decision-making information by receiving important information such as "future risk information of the power grid" and "future weak links of the power grid". The pre-control auxiliary decision-making generation algorithm includes three functions: main distribution coordinated load transfer strategy, source network load storage coordinated optimization strategy, and equipment over-limit load transfer strategy. First, receive external distribution network future risk information and future weak link information, sort them by time, and deal with them in sequence. Subsequently, for important information such as "future risk information of the power grid" and "future weak links of the power grid", first call the main distribution coordinated load transfer strategy to process the weak links of the main distribution network and generate load transfer, then call the source network load storage coordinated optimization strategy generation module to give a risk resistance strategy, and finally, call the equipment over-limit load transfer strategy to overcome the equipment over-limit problem. By integrating multiple strategies and retrieving scenario data, the control process of the power grid is simulated to generate the optimal pre-control auxiliary decision-making information.

[0043] Figure 1 FIG. 1 is a flow chart of a method for assisting decision-making in pre-controlling multiple risks of an active distribution network according to the present invention. Figure 1 As shown, the first aspect of the present invention relates to an active distribution network multiple risk pre-control decision-making auxiliary method, and the method includes steps 1 to 5.

[0044] Step 1: Scan the future risks of the power grid to obtain initial future risk information of the power grid and future weak links of the power grid, and sort the urgency of the future risk information of the power grid.

[0045] Preferably, the future risks of the power grid are scanned to obtain initial future risk information of the power grid and future weak links of the power grid, including: predicting transformer over-limit, line over-limit, and bus over-limit during the future operation of the power grid, and generating future risk information of the power grid based on the over-limit situation; the future risk information of the power grid includes risk ID, risk type, risk area, substation corresponding to the risk, equipment corresponding to the risk, and risk content; predicting chain supply, single power substation, single-transformer single-line substation, loss of dual power supply for important users, and power loss of equipment during the future operation of the power grid, and generating the future weak links of the power grid; the future weak links of the power grid include weak link ID, weak type, weak area, substation corresponding to the weak link, equipment corresponding to the weak link, and weak link content.

[0046] On the one hand, the grid operation data is collected and analyzed to make reasonable predictions on the future operation status of the grid. The prediction adopts the grid equipment over-limit prediction method commonly used in the prior art. If there are three or more types of equipment over-limit problems in the grid, such as transformer over-limit, line over-limit, and bus over-limit, it is considered that there are risk points in the future operation of the grid. Each equipment over-limit situation is recorded as a risk information.

[0047] In the risk information, the risk type can be divided according to the equipment type or the actual risk situation, such as the degree of risk. The risk area is the area where the equipment is located, such as the geographical location or the logical location of the equipment in the power grid topology. The substation corresponding to the risk is the substation where the risk equipment is located. If the risk equipment is a bus or line, it can be the substation at both ends of the risk equipment. The equipment corresponding to the risk can be the actual physical equipment name, ID, type, etc. in the power system. The risk content includes textual descriptions such as the reasons that may lead to future risks.

[0048] On the other hand, there are many ways to calculate the future weak links of the power grid, which can be applied to the present invention according to actual conditions. For example, based on the off-grid load capacity identification method of the power grid weak links, Wang Xue et al., in the article "Journal of Electric Power Science and Technology", mentioned the load off-grid situation caused by the failure of sensitive equipment, calculated the total off-grid load capacity caused by the line failure, and found the weak links of the power grid. In addition, it is also possible to predict the weak links based on one or more risk information. For example, within the same area of ​​the power grid topology, the number of risk information that exists can be used to characterize the location and degree of future weak links in the power grid.

[0049] In one embodiment of the present invention, if there are multiple nodes that are simply connected in series on a certain line, a certain substation is in the form of a single power supply without power backup, or the substation participates in power supply in the form of a single power supply and no backup line, then it is considered that this power supply method has weak links, and it is easy to cause large-scale problems due to the failure of a line or a device. In addition, for loads with large power consumption, they are called important loads in the present invention. If there should be more than two effective transmission lines on the load node, and one or two lines are out of power at the current moment, it is considered that there is a weak problem of important users losing dual power supplies. If all the power supply lines on a certain device cannot supply power to the current device, there is a power outage of the device, and it is judged that there are also such weak links in the future operation of the power grid.

[0050] The information of the weak link includes the weak link ID, weak type, weak area, substation corresponding to the weak link, equipment corresponding to the weak link, weak link and other contents. The weak area represents the geographical information or grid topology location of the weak link. The substation corresponding to the weak link can be the substation where the equipment with the weak problem is located, or the weak link cannot get power from a certain substation. The equipment corresponding to the weak link is a transformer, line, busbar or actual electrical physical equipment. The weak link content may include information about the cause of the weak link and other information without a standard format.

[0051] In the present invention, when there is information about future risks of the power grid, the urgency of multiple power grid risks can be ranked. In the subsequent calculation process, according to the ranking of the urgency of the power grid risks, various strategies are called to first deal with the risks with the highest urgency, and then deal with other risk issues in turn. In one embodiment, the ranking of the urgency of the risks is achieved according to the degree of exceeding the limit of the equipment, that is, the more serious the degree of exceeding the limit, the more urgent the risk. According to different strategies, the ranking method of the urgency of the risks is also different.

[0052] In the subsequent steps of the present invention, multiple strategies with different priorities are formulated for different risks and weak links of the power grid. According to the prediction of the future operation of the power grid, some strategies are selectively adopted, or multiple strategies are executed in sequence according to the priority order of the strategies.

[0053] Step 2: Execute the main distribution coordinated load transfer strategy for the future weak links of the power grid, and scan the future risks of the power grid again to obtain updated future risk information of the power grid.

[0054] First, the main and distribution coordinated control strategy generation module sorts out the future risk information and future weak link information of the power grid in the same time section, and provides active control for the power grid.

[0055] In the case of only risks in power grid operation and no weak links, the risks are sorted by urgency, and the most urgent risks are dealt with first. If there is equipment exceeding the limit and cannot be eliminated, the equipment exceeding the limit load transfer strategy support is implemented, and the collaborative optimization strategy and load transfer strategy are integrated and output to the interface module. In other words, in this case, there is no need to deal with the weak links of the power grid, so there is no need to adopt the main distribution collaborative load transfer strategy.

[0056] However, if risk points and weak links appear at the same time, the main distribution coordinated load transfer strategy generation module is first called to provide a load transfer strategy, and then the future risks of the power grid are further scanned, and a coordinated control strategy is given for the existing risks. If there is a device that exceeds the limit and cannot be eliminated, the load transfer strategy support for the device exceeding the limit is further executed, and the coordinated optimization strategy and load transfer strategy are integrated and output to the interface module.

[0057] Preferably, for the future weak links of the power grid, a main-distribution coordinated load transfer strategy is implemented, including: performing load transfer calculations on the main grid side with the goal of all main grid-side equipment being energized, and simulating the status of distribution network equipment after the transfer; querying the status of distribution network equipment, and if there is a 10kV bus or 10kV feeder that has lost power, performing a reverse load simulation on the distribution network side with the goal of all 10kV bus loads being energized; recording the main grid-side load transfer results, the distribution network-side reverse load results, and the bus load that cannot be transferred as a main-distribution coordinated load transfer plan.

[0058] In the present invention, the main distribution coordinated load transfer strategy generation module generates the main distribution coordinated load transfer strategy online based on the analysis results of the weak links of the future operation of the power grid, taking into account factors such as dual power supplies of important users, equipment load rate, and equipment status. The main distribution coordinated load transfer strategy generation module can provide a load transfer strategy for equipment power failure.

[0059] Preferably, the load transfer calculation is performed on the main grid side with the goal of all main grid-side equipment being powered, and the state of the distribution grid-side equipment after the transfer is simulated, including: extracting all power-losing equipment on the main grid side, and dividing the voltage levels of the power-losing equipment, and transferring the load of the power-losing equipment from the power-losing equipment of the highest voltage level to the power-losing equipment of the lower voltage level one by one; for the current voltage level, finding the transfer path for each power-losing equipment from the power grid topology, and solving the optimal transfer path with the goal of minimizing the average load rate of the equipment; under the optimal transfer path, simulating the power-losing equipment in the next voltage level, and continuing to solve the optimal transfer path for the power-losing equipment in the next voltage level until the load transfer to the power-losing equipment in the lowest voltage level is completed.

[0060] First, the main grid side equipment is generally equipment with a voltage level of 110kV or above. When implementing the main distribution coordinated load transfer strategy, first analyze the power outage range affected by the power failure of the equipment, and obtain the power failure equipment set by statistics. Perform load transfer analysis on the main grid side equipment in this set until all the main grid power failure equipment is powered on or the transfer analysis ends even if the transfer path for all power failure equipment is not found.

[0061] Figure 2 The figure is a flow chart of the main distribution and coordinated load transfer strategy in the active distribution network multi-risk pre-control auxiliary decision-making method of the present invention. Figure 2 As shown in the figure, according to the bus voltage level where the power-off equipment is located and the plant voltage level to which the power-off equipment belongs, the power-off equipment is restored in order from high to low. In the process of restoring the power-off equipment, firstly, all the transfer paths of the power-off equipment that can energize itself are topologically searched to obtain the transfer path set. Then, taking into account the factors such as the dual power supply of important users, the load rate of equipment, the status of equipment, the number of transfer equipment, etc., the strategy priority is sorted through simulation calculation, and the transfer path with the lowest average equipment load rate is selected without equipment exceeding the limit. In the above calculation process, the lowest average equipment load rate is the objective function, which is used to find the optimal transfer path. Other contents such as the dual power supply of important users, the status of equipment and the number of transfer equipment can be used as constraints to limit the optimal transfer method to ensure that the calculation results can actually run.

[0062] Finally, each time a voltage level power supply device and the corresponding lines and buses are restored, the power-off area is recalculated and the power-off device set is counted until the power-off devices on the main network are switched on or the power-off analysis is completed. In one case, all power-off devices on the main network side can be switched on. In another case, the power is switched on to the emergency devices based on the priority of the strategy, such as the urgency of future risk information. The analysis of subsequent devices ends when there is no power-off condition.

[0063] Preferably, the status of the equipment on the distribution network side is queried, and if there is a 10kV bus or 10kV feeder that has lost power, a load reversal simulation is performed on the distribution network side with the goal of energizing all 10kV bus loads, including: extracting the set of power-losing equipment on the main network side according to the load transfer situation on the main network side; for each power-losing equipment in the power-losing equipment set, extracting the transfer capacity of the associated loads corresponding to the power-losing equipment; sorting the transfer capacities of the associated loads, and searching for the reversing strategy of the power-losing equipment from the highest to the lowest transfer capacity until the transfer of power to the power-losing equipment is completed.

[0064] After completing the load transfer analysis on the main grid side, it is also necessary to implement the load transfer analysis on the distribution grid side. First, for the unrestored power-off equipment set on the main grid side, including busbars, feeders, feeder segments, etc., the distribution grid load transfer scheme is analyzed. According to the power-off equipment set, the associated loads are analyzed by topology to search for transfer paths. The higher the transfer capacity of the associated loads, the fewer transfer paths there are for the power-off equipment.

[0065] In one embodiment, a single-path reverse strategy search is first performed, that is, the reverse of the power outage load is achieved through one path. When the load surplus of the 10kV outgoing line switches of all the backup line substations searched cannot transfer all the loads that need to be transferred, a multi-path combination reverse strategy search is performed, that is, the power outage load is shared through multiple paths, thereby realizing the transfer of the power outage load. The present invention supports simulating the execution process of the load transfer strategy by simulation, so as to obtain the simulated power grid operation state as a calculation result. The transfer strategy is executed in the above manner until the transfer of the 10kV bus load is completed, and the execution of the strategy is terminated.

[0066] Preferably, completing the power transfer to the power-losing device includes: generating a power transfer plan for each power-losing device, the power transfer plan at least including transfer-in feeder information, transfer-in bus information, tie switch control strategy and disconnection point information.

[0067] In the present invention, the transfer plan obtained after the transfer strategy can integrate the contents of other strategies mentioned later to obtain the optimal strategy result of the final active distribution network multi-risk pre-control auxiliary decision, which is used to actually regulate the power grid. Therefore, the transfer plan in the transfer strategy can be a collection of multiple different transfer plans, and each transfer plan includes accurate main network and distribution network scheduling information. This scheduling method can be specific to the connection method of the line, the state of the switch, the operating power gear of the equipment, etc.

[0068] For example, if any method of transferring power on a certain line can ensure the effectiveness of the transfer strategy, a variety of line operation and power supply methods can be generated based on the interconnection switch status, load access status, etc. of the line to ensure that alternative solutions are provided in the further scheduling of subsequent steps 3 and 4.

[0069] Step 3: Execute the source-grid-load-storage collaborative optimization strategy for the updated future risk information of the power grid, and update the future risk information of the power grid again.

[0070] Preferably, for the updated future risk information of the power grid, a source-grid-load-storage collaborative optimization strategy is implemented, including: sorting the updated future risk information of the power grid by urgency; taking the optimal economic efficiency of the control object and the maximum consumption of new energy as the objective function, a linear programming algorithm is used to dispatch the source-grid-load-storage, so as to sequentially realize load transfer according to the future risk information of the power grid according to the urgency sorting. Multiple control object constraints, power grid section safety constraints, and system power balance constraints are used as constraints of the linear programming algorithm.

[0071] The source-grid-load-storage collaborative optimization strategy generation module comprehensively considers the control characteristics of multiple control objects such as new energy, energy storage, controllable load, and adjustable resources, as well as the source-grid-load-storage collaborative operation potential, and generates a source-grid-load-storage collaborative optimization control strategy online.

[0072] Based on the generation of source-grid-load-storage coordinated optimization strategy based on linear programming, a safety correction control model is constructed that includes constraints on multiple source control objects such as new energy, energy storage, controllable load, and adjustable resources, section safety constraints, and system power balance. With the optimal economic efficiency of the control object and the maximization of new energy consumption as the objective function, the linear programming method is used for iterative solution to accurately obtain the source-load coordinated optimization control strategy.

[0073] In different embodiments, the optimal economic target of the control object can be expressed by formulas based on the cost of equipment operation, the transmission efficiency of the transmission line, etc. The maximum consumption of new energy can be analyzed based on the load conditions of the power grid and the output proportion of new energy. The multi-regulatory objects are different types of equipment such as source, grid, load and storage, so corresponding constraints are imposed according to the rated power and operation mode of the equipment. Section safety constraints can be implemented based on the section set composed of multiple main transmission lines of the power grid in a certain area. Constraints on parameters such as the maximum and minimum transmission capacity of the section, the degree of change in transmission capacity, etc. In addition, constraints such as system power balance are used to implement balance operations between load demand and source, grid, load and storage power supply.

[0074] By adopting a linear programming algorithm, it is possible to iteratively solve the equipment transfer strategy when achieving the optimal goal under the premise of implementing various constraints. It should be clear that the alternative equipment transfer strategies in the present invention are limited, for example, they are limited by the calculation results of the aforementioned main distribution collaborative load transfer strategy. If the aforementioned main distribution collaborative load transfer strategy can completely determine a certain optimal main grid side transfer method, then the source-grid-load-storage collaborative optimization strategy in this step can only be fine-tuned under this optimal main grid side transfer method.

[0075] Of course, if some low-voltage lines or equipment in the present invention are transferred, it may affect the key decision of the main distribution coordinated load transfer strategy. The present invention also supports the iterative improvement of the main distribution coordinated load transfer strategy on the basis of incorporating the source-grid-load-storage coordinated optimization strategy, such as selecting the best one from the multiple transfer schemes obtained by traversing step 2.

[0076] In one embodiment, the above two strategies are only constrained to various types of power grid sections, that is, as long as there is no risk or weak link in the section layer. The multiple transmission lines in the section can be adjusted arbitrarily. Therefore, there are many different actual transfer strategies under the above two strategies. This actual transfer strategy needs to be selected from the equipment overload transfer strategy mentioned in step 4.

[0077] Step 4: Based on the updated future risk information of the power grid, execute the equipment overload transfer strategy.

[0078] Preferably, for the updated future risk information of the power grid, an equipment over-limit load transfer strategy is executed, including: extracting the equipment over-limit information from the updated future risk information of the power grid, and dividing the voltage level of the over-limit equipment based on the equipment over-limit information, and performing voltage reduction on the over-limit equipment from the over-limit equipment of the highest voltage level to the over-limit equipment of the lower voltage level; for the current voltage level, extracting the transferable path of the over-limit equipment from the constrained power grid topology; assigning priority to the transferable path of the over-limit equipment according to the dual power supply of important users, the equipment load rate and the equipment status, and selecting the path with the largest voltage drop as the over-limit load transfer strategy for the over-limit equipment under the current priority until the voltage drop target under the current voltage level is achieved.

[0079] In view of the future risk information of the power grid that has been updated again, the present invention supports the execution of the equipment over-limit transfer strategy. In this strategy, the number of over-limit equipment is first counted, and the load transfer strategy analysis on the main network side is performed, and the remaining over-limit equipment and the over-limit situation are counted until the voltage drop target is reached or the transfer analysis is completed. When the strategy does not achieve the voltage drop target, the reverse supply strategy analysis of load transfer or power outage on the distribution network side is continuously performed until the voltage drop target is reached or the transfer analysis is completed. At this point, the strategy improvements in step 2 and step 3 are integrated to form an integrated main and distribution coordinated load transfer scheme.

[0080] Figure 3 The figure is a flow chart of generating a load transfer strategy for equipment exceeding the load limit in a multi-risk pre-control decision-making auxiliary method for active distribution network of the present invention. Figure 3 As shown in the figure, this strategy first analyzes the main grid transfer and then analyzes the distribution network transfer, but in essence it analyzes different voltage levels to obtain the final transfer strategy.

[0081] First, according to the voltage level of the over-limit equipment and the voltage level of the plant to which the equipment belongs, the voltage drop analysis is carried out from high to low. The topology searches all the transferable paths of the over-limit equipment to obtain the transfer path set. Considering the dual power supply of important users, equipment load rate, equipment status and other factors, the transfer path priority is sorted through simulation calculation, and the path with the largest voltage drop is selected. For each voltage level power supply equipment with a voltage drop, recalculate whether the voltage drop target is achieved, and iterate the calculation in sequence.

[0082] It should be clear that the grid topology here is a constrained grid topology. For example, in this iterative process, there is no need to consider the transfers that have been implemented in steps 2 and 3. In the constrained grid topology, some trunk lines have restricted some lines and some switches to a state that cannot be modified according to the transfer operations implemented in steps 2 and 3. Under the above constraints, further adjustments to the transfer mode are implemented according to the constrained grid topology. For example, in steps 2 and 3, the way a longer transmission line is connected to the substation has been adjusted. When the transmission line is connected between two transformers, the adjustment of this step can be to provide a transfer plan by adjusting the position of the associated switch that implements the cut-off on the line.

[0083] After the transfer is completed on the main grid side, the load transfer strategy analysis is performed on the distribution grid side. All transfer paths for 10kV over-limit equipment are found through topological search, and load transfer schemes are screened according to the simulation calculation results. All feasible load transfer schemes screened out are prioritized. Finally, the transfer strategy with the best voltage drop effect is selected.

[0084] Preferably, for the future risk information of the power grid that has been updated again, an equipment over-limit load transfer strategy is executed, including: updating the equipment over-limit information after executing the equipment over-limit load transfer strategy; based on the updated equipment over-limit information, counting the equipment over-limit situation to evaluate the auxiliary decision effect.

[0085] Step 5: Based on the main distribution coordinated load transfer strategy, the source-grid-load-storage coordinated optimization strategy, and the equipment over-limit load transfer strategy, generate and output the optimal auxiliary decision information.

[0086] The present invention adjusts the grid connection mode of the equipment, the connection mode of the transformer, and the connection mode of the line switch in different orders by sequentially implementing the above three power transfer strategies. The method integrates the final schemes determined after the implementation of the three strategies in turn to obtain the optimal auxiliary decision information. Similar to the contents of the three schemes, the optimal auxiliary decision information may also include the input feeder information, input busbar information, contact switch control status, and disconnection point location corresponding to the equipment, so as to ensure that an accurate power transfer mode can be provided for each risk and weak link.

[0087] Since the traditional strategy mode of single handling of multiple risks in the future cannot cope with the handling of multiple risks with time-space coupling relationships in active distribution networks, the present invention comprehensively considers the future risk information and future weak links of multiple power grids, and sorts them according to the urgency of the risks on the basis of analyzing and classifying the multiple risks and weak links in the future, with the goal of minimizing the adjustment amount, a combined control strategy with functional connection is provided to make comprehensive processing decisions on multiple risks or weak links, while completely eliminating multiple risks, reducing ineffective adjustments to the power grid, and realizing the optimal handling of the power grid for multiple risks. Under the background of the rapid development of the current active distribution network, the invention has high practical value.

[0088] Figure 4 FIG. 1 is a schematic diagram of the architecture of an active distribution network multi-risk pre-control decision-making auxiliary system of the present invention. Figure 4 As shown, the second aspect of the present invention relates to an active distribution network multiple risk pre-control strategy decision system using the method in the first aspect of the present invention, the system includes a future risk scanning module, a main distribution coordinated load transfer strategy generation module, a source grid load storage coordinated optimization strategy generation module, an active regulation strategy generation module and a human-machine interface module; wherein the future risk scanning module is used to scan the future risks of the power grid to obtain initial future risk information of the power grid and future weak links of the power grid, and to sort the urgency of the future risk information of the power grid; the main distribution coordinated load transfer strategy generation module is used to target the future weak links of the power grid , execute the main distribution coordinated load transfer strategy, and re-scan the future risks of the power grid to obtain updated future risk information of the power grid; the source-grid-load-storage coordinated optimization strategy generation module is used to execute the source-grid-load-storage coordinated optimization strategy for the updated future risk information of the power grid, and update the future risk information of the power grid again; the active control strategy generation module is used to execute the equipment over-limit load transfer strategy for the updated future risk information of the power grid; the human-machine interface module is used to generate and output the optimal auxiliary decision-making information based on the main distribution coordinated load transfer strategy, the source-grid-load-storage coordinated optimization strategy and the equipment over-limit load transfer strategy.

[0089] like Figure 4 As shown in the figure, the main and distribution coordinated control strategy generation module also sorts out the future risk information and future weak link information of the power grid at the same time section to provide active control strategies.

[0090] The active control strategy generation implementation includes obtaining risk and weak link information at future time points. Thus, it is determined whether there are weak links in the power grid. If there is only risk information, only the risk information is analyzed. Otherwise, the load transfer strategy generation module of the main distribution coordinated load transfer strategy generation module is called to generate the load transfer strategy for the weak links of the power grid. This strategy adjusts the operation mode of the power grid section at future time points according to the transfer control strategy and simulates the execution of the load transfer control strategy. After performing risk scanning and risk content correction on the section at future time points after the load transfer is executed, the operation status of the power grid is simulated to determine whether there are still future risks of the power grid. If not, the optimal auxiliary decision information is generated.

[0091] If there are still grid risks, the risks are sorted by urgency, the most urgent risks are dealt with first, and the source-grid-load-storage collaborative optimization strategy generation module is called to generate the strategy. The source-grid-load-storage collaborative optimization strategy is simulated, that is, the grid section at a future time point is adjusted according to the collaborative optimization control strategy. The adjusted grid section at a future time point is scanned for risks and the risk set is corrected. Determine whether there is still a risk of equipment over-limit. If so, the equipment over-limit load transfer strategy is generated. If not, the optimal auxiliary decision information is generated.

[0092] If there is a risk of equipment exceeding the limit, the equipment exceeding the limit load transfer strategy generation is executed, and the equipment exceeding the limit main distribution coordinated load transfer strategy generation module is called to obtain the transfer strategy. At the same time, the simulation method is used to simulate the execution of the equipment exceeding the limit load transfer strategy, count the exceeding limit equipment situation, evaluate the execution effect of the equipment exceeding the limit load transfer strategy, and output the decision information to the interface module.

[0093] Preferably, the future risk information of the power grid includes the risk ID, risk type, risk area, substation corresponding to the risk, equipment corresponding to the risk, and risk content; the future weak links of the power grid include the weak link ID, weak type, weak area, substation corresponding to the weak link, equipment corresponding to the weak link, and weak link content.

[0094] Preferably, a future risk scanning module is used to scan the future risks of the power grid to obtain multiple initial future risk information of the power grid and future weak links of the power grid, including: predicting the over-limit conditions during the future operation of the power grid; wherein the over-limit conditions include transformer over-limit, line over-limit, and bus over-limit, and generating future risk information of the power grid based on the over-limit conditions; predicting the equipment conditions during the future operation of the power grid, the equipment conditions include series supply, single power substation, single-transformer single-line substation, important users losing dual power supplies, equipment power failure, and generating the future weak links of the power grid based on the equipment conditions.

[0095] Preferably, the main and distribution coordinated load transfer strategy generation module is used to execute the main and distribution coordinated load transfer strategy for future weak links in the power grid, including: performing load transfer calculation on the main grid side with the goal of energizing all main grid-side equipment corresponding to the future weak links in the power grid, and simulating the status of the distribution network side equipment after the transfer; querying the status of the distribution network side equipment, if there is a 10kV bus or 10kV feeder that has lost power, then performing load reversal simulation on the distribution network side with the goal of energizing all 10kV bus loads; recording the load transfer results on the main grid side, the load reversal results on the distribution network side, and the bus load that cannot be transferred, and using the load transfer results on the main grid side, the load reversal results on the distribution network side, and the bus load that cannot be transferred as the main and distribution coordinated load transfer plan.

[0096] Preferably, in the main-distribution coordinated load transfer strategy generation module, the load transfer calculation is performed on the main grid side with the goal of powering all the main grid-side equipment corresponding to the future weak links of the power grid, and the state of the distribution network side equipment after the transfer is simulated, including: extracting all the power-losing equipment on the main grid side corresponding to the future weak links of the power grid, and dividing the voltage levels of the power-losing equipment, starting from the power-losing equipment with the highest voltage level to the power-losing equipment with lower voltage levels, and performing load transfer of the power-losing equipment in each voltage level until the load transfer to the power-losing equipment in the lowest voltage level is completed.

[0097] Preferably, in the main distribution coordinated load transfer strategy generation module, the load of the power-lost equipment is transferred from the power-lost equipment at the highest voltage level to the power-lost equipment at the lower voltage level, including: for the current voltage level calculated for the load transfer, the transfer path for each power-lost equipment is found from the power grid topology, and the optimal transfer path is solved with the lowest average load rate of the equipment as the goal; under the optimal transfer path, the power-lost equipment in the next voltage level is simulated, and used to continue to solve the optimal transfer path in the next voltage level.

[0098] Preferably, in the main distribution coordinated load transfer strategy generation module, the status of the distribution network side equipment is queried, and if there is a 10kV bus or 10kV feeder that has lost power, a load reversal simulation is performed on the distribution network side with the goal of energizing all 10kV bus loads, including: extracting the set of power-losing equipment on the main network side according to the load transfer situation on the main network side; for each power-losing equipment in the power-losing equipment set, extracting the transfer capacity of the associated loads corresponding to the power-losing equipment; sorting the transfer capacity of the associated loads, searching for the reversing strategy of each associated load in the power-losing equipment in order from the highest to the lowest transfer capacity, and using the reversing strategy to transfer the power to the power-losing equipment until the transfer to the power-losing equipment is completed.

[0099] Preferably, in the main distribution coordinated load transfer strategy generation module, the transfer of power to the power-off equipment is completed, including: generating a transfer plan for each power-off equipment, the transfer plan including the transfer-in feeder information, the transfer-in bus information, the interconnection switch control strategy and the disconnection point information.

[0100] Preferably, the source-grid-load-storage collaborative optimization strategy generation module is used to execute the source-grid-load-storage collaborative optimization strategy for the updated future risk information of the power grid, including: sorting the urgency of the updated multiple future risk information of the power grid; taking the optimal economic efficiency of the control object and the maximization of new energy consumption as the objective function, and using a linear programming algorithm to dispatch the source-grid-load-storage, so as to realize load transfer in sequence according to the urgency sorting for the updated multiple future risk information of the power grid.

[0101] Preferably, in the source-grid-load-storage collaborative optimization strategy generation module, the source-grid-load-storage is scheduled using a linear programming algorithm with the optimal economic efficiency of the control object and the maximum consumption of new energy as the objective function, including: using multiple control object constraints, grid section safety constraints, and system power balance constraints as constraints of the linear programming algorithm.

[0102] Preferably, the active control strategy generation module is used to execute the equipment over-limit load transfer strategy based on the updated future risk information of the power grid, including: extracting the equipment over-limit information from the updated future risk information of the power grid, and dividing the voltage level of the over-limit equipment based on the equipment over-limit information, starting from the over-limit equipment with the highest voltage level to the over-limit equipment with the lower voltage level, and performing voltage reduction on the over-limit equipment one voltage level at a time until the voltage reduction target at the current voltage level is reached.

[0103] Preferably, in the active control strategy generation module, the voltage of the over-limit equipment is reduced step by step from the over-limit equipment with the highest voltage level to the over-limit equipment with the lower voltage level, including: extracting the transferable path of the over-limit equipment from the constrained power grid topology based on the current voltage level calculated for load transfer; assigning priorities to the transferable paths of the over-limit equipment according to the dual power sources of important users, equipment load rate and equipment status, and selecting the path with the largest voltage drop as the over-limit load transfer strategy for the over-limit equipment under the current priority.

[0104] Preferably, the active control strategy generation module is used to execute the equipment over-limit load transfer strategy based on the future risk information of the power grid that has been updated again, including: updating the equipment over-limit information after executing the equipment over-limit load transfer strategy; based on the updated equipment over-limit information, counting the equipment over-limit situation to evaluate the auxiliary decision-making effect.

[0105] A third aspect of the present invention relates to a terminal, comprising a processor and a storage medium; the storage medium is used to store instructions; the processor is used to operate according to the instructions to execute the steps of the method in the first aspect of the present invention.

[0106] A fourth aspect of the present invention relates to a computer-readable storage medium having a computer program stored thereon, wherein the program, when executed by a processor, implements the steps of the method in the first aspect of the present invention.

[0107] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents, and any modifications or equivalent replacements that do not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.

Claims

1. A multi-risk pre-control decision-making auxiliary method for active distribution network, characterized in that: The method comprises the following steps: Scan the future risks of the power grid to obtain multiple initial future risk information and future weak links of the power grid; Execute the main distribution coordinated load transfer strategy for the future weak links of the power grid, and scan the future risks of the power grid again to obtain the future risk information of the power grid updated for the multiple initial future risk information of the power grid; Execute the source-grid-load-storage collaborative optimization strategy for the updated future risk information of the power grid, and update the future risk information of the power grid again; Based on the updated future risk information of the power grid, a strategy for transferring equipment load beyond the limit is executed; Based on the main distribution coordinated load transfer strategy, the source-grid-load-storage coordinated optimization strategy and the equipment over-limit load transfer strategy, the optimal auxiliary decision information is generated and output.

2. The active distribution network multiple risk pre-control decision-making auxiliary method according to claim 1 is characterized by: The future risk information of the power grid includes risk ID, risk type, risk area, substation corresponding to the risk, equipment corresponding to the risk, and risk content; The future weak links of the power grid include weak link ID, weak type, weak area, substation corresponding to the weak link, equipment corresponding to the weak link, and weak link content.

3. The active distribution network multiple risk pre-control decision-making auxiliary method according to claim 2 is characterized by: The scanning of future risks of the power grid is performed to obtain a plurality of initial future risk information of the power grid and future weak links of the power grid, including: Predicting the over-limit situation during the future operation of the power grid; wherein the over-limit situation includes transformer over-limit, line over-limit, and bus over-limit, and generating the future risk information of the power grid according to the over-limit situation; Predict the equipment conditions during the future operation of the power grid, including series supply, single power substation, single-transformer single-line substation, loss of dual power supply for important users, and power failure of equipment, and generate the future weak links of the power grid based on the equipment conditions.

4. The active distribution network multiple risk pre-control decision-making auxiliary method according to claim 3 is characterized by: The above-mentioned strategy of implementing the main distribution and coordinated load transfer strategy for the future weak links of the power grid includes: The load transfer calculation is performed on the main grid side with the goal of powering all the main grid side devices corresponding to the future weak links of the power grid, and the state of the distribution grid side devices after the transfer is simulated; Query the equipment status on the distribution network side. If there is a 10kV bus or 10kV feeder that is de-energized, perform load reversal simulation on the distribution network side with the goal of energizing all 10kV bus loads. The load transfer results on the main grid side, the load reversal results on the distribution network side and the bus load that cannot be transferred are recorded, and the load transfer results on the main grid side, the load reversal results on the distribution network side and the bus load that cannot be transferred are used as the main and distribution coordinated load transfer plan.

5. The active distribution network multiple risk pre-control decision-making auxiliary method according to claim 4 is characterized by: The load transfer calculation is performed on the main grid side with the goal of powering all the main grid side devices corresponding to the future weak links of the power grid, and the state of the distribution grid side devices after the transfer is simulated, including: Extract all the power-losing devices on the main grid side corresponding to the future weak links of the power grid, and divide the voltage levels of the power-losing devices, starting from the power-losing devices with the highest voltage level to the power-losing devices with lower voltage levels, and transfer the load of the power-losing devices to the power-losing devices in each voltage level until the load transfer to the power-losing devices in the lowest voltage level is completed.

6. The active distribution network multiple risk pre-control decision-making auxiliary method according to claim 5 is characterized by: The method of transferring the load of the power-lost equipment from the power-lost equipment of the highest voltage level to the power-lost equipment of the lower voltage level in order of voltage level comprises: According to the current voltage level calculated by the load transfer, the transfer path of each power-off device is found from the power grid topology, and the optimal transfer path is solved with the lowest average load rate of the device as the goal; Under the optimal power transfer path, the power-off equipment in the next voltage level is simulated, and used to continue to solve the optimal power transfer path in the next voltage level.

7. The active distribution network multiple risk pre-control decision-making auxiliary method according to claim 4 is characterized by: The query of the equipment status on the distribution network side, if there is a 10kV bus or 10kV feeder that is de-energized, then a load reversal simulation is performed on the distribution network side with the goal of energizing all 10kV bus loads, including: Extracting a power-off device set on the main grid side according to the load transfer situation on the main grid side; For each power-off device in the power-off device set, extracting the transfer capacity of the associated load corresponding to the power-off device; The transfer capabilities of the associated loads are sorted, and the reverse flow strategy of each associated load in the power-losing device is searched in order from the highest to the lowest transfer capability, and the power is transferred to the power-losing device using the reverse flow strategy until the transfer to the power-losing device is completed.

8. The active distribution network multiple risk pre-control decision-making auxiliary method according to claim 7 is characterized by: The completing the transfer of power to the power-lost equipment includes: A power transfer plan is generated for each power-off device, wherein the power transfer plan includes transfer-in feeder information, transfer-in bus information, tie switch control strategy and disconnection point information.

9. The active distribution network multiple risk pre-control decision-making auxiliary method according to claim 3 is characterized by: The executing of the source-grid-load-storage collaborative optimization strategy for the updated future risk information of the power grid includes: sorting the updated plurality of future risk information of the power grid by urgency; Taking the optimal economy of the regulated object and the maximization of the consumption of new energy as the objective function, a linear programming algorithm is used to dispatch the source, grid, load and storage, so as to realize load transfer in sequence according to the urgency sorting and the updated future risk information of the multiple power grids.

10. The active distribution network multiple risk pre-control decision-making auxiliary method according to claim 9, characterized in that: The objective function is to optimize the economic efficiency of the control object and maximize the consumption of new energy, and use a linear programming algorithm to dispatch the source, grid, load and storage, including: The constraints of the linear programming algorithm are multiple control object constraints, power grid section safety constraints, and system power balance constraints.

11. The active distribution network multiple risk pre-control decision-making auxiliary method according to claim 3, characterized in that: The executing of the equipment overload transfer strategy for the future risk information of the power grid after the further update includes: The equipment over-limit information is extracted from the future risk information of the power grid that is updated again, and the voltage level of the over-limit equipment is divided based on the equipment over-limit information. The voltage of the over-limit equipment is reduced step by voltage level from the over-limit equipment of the highest voltage level to the over-limit equipment of the lower voltage level until the voltage drop target at the current voltage level is reached.

12. The active distribution network multiple risk pre-control decision-making auxiliary method according to claim 11, characterized in that: The step of reducing the voltage of the over-limit devices from the over-limit devices of the highest voltage level to the over-limit devices of the lower voltage levels by voltage level includes: According to the current voltage level calculated by the load transfer, extracting a transferable path of the over-limit device from the constrained power grid topology; Priorities are assigned to the transferable paths for the over-limit equipment based on dual power supplies for important users, equipment load rate and equipment status. Under the current priority, the path with the largest voltage drop is selected as the over-limit load transfer strategy for the over-limit equipment.

13. The active distribution network multiple risk pre-control decision-making auxiliary method according to claim 3 is characterized by: The executing of the equipment overload transfer strategy for the future risk information of the power grid after the further update includes: Update the equipment over-limit information after executing the equipment over-limit load transfer strategy; Based on the updated device over-limit information, statistics on device over-limit situations are collected to evaluate the effectiveness of auxiliary decision-making.

14. An active distribution network multiple risk pre-control strategy decision system, characterized by: The system is implemented by using an active distribution network multiple risk pre-control strategy decision method in any one of claims 1 to 3; The system includes a future risk scanning module, a main distribution coordinated load transfer strategy generation module, a source grid load storage coordinated optimization strategy generation module, an active control strategy generation module and a human-machine interface module; wherein, The future risk scanning module is used to scan the future risks of the power grid to obtain initial future risk information of the power grid and future weak links of the power grid; The main distribution and coordinated load transfer strategy generation module is used to execute the main distribution and coordinated load transfer strategy for the future weak links of the power grid, and re-scan the future risks of the power grid to obtain updated future risk information of the power grid; The source-grid-load-storage collaborative optimization strategy generation module is used to execute the source-grid-load-storage collaborative optimization strategy for the updated future risk information of the power grid, and update the future risk information of the power grid again; The active control strategy generation module is used to execute the equipment overload transfer strategy according to the future risk information of the power grid that has been updated again; The human-machine interface module is used to generate and output optimal auxiliary decision-making information based on the main distribution coordinated load transfer strategy, the source-grid-load-storage coordinated optimization strategy and the equipment over-limit load transfer strategy.

15. The active distribution network multiple risk pre-control decision-making auxiliary method according to claim 14, characterized in that: The future risk information of the power grid includes risk ID, risk type, risk area, substation corresponding to the risk, equipment corresponding to the risk, and risk content; The future weak links of the power grid include weak link ID, weak type, weak area, substation corresponding to the weak link, equipment corresponding to the weak link, and weak link content.

16. The active distribution network multiple risk pre-control decision-making auxiliary method according to claim 15, characterized in that: The future risk scanning module is used to scan the future risks of the power grid to obtain a plurality of initial future risk information of the power grid and future weak links of the power grid, including: Predicting the over-limit situation during the future operation of the power grid; wherein the over-limit situation includes transformer over-limit, line over-limit, and bus over-limit, and generating the future risk information of the power grid according to the over-limit situation; Predict the equipment conditions during the future operation of the power grid, including series supply, single power substation, single-transformer single-line substation, loss of dual power supply for important users, and power failure of equipment, and generate the future weak links of the power grid based on the equipment conditions.

17. The active distribution network multiple risk pre-control decision-making auxiliary method according to claim 16, characterized in that: The main distribution and coordinated load transfer strategy generation module is used to execute the main distribution and coordinated load transfer strategy for the future weak links of the power grid, including: The load transfer calculation is performed on the main grid side with the goal of powering all the main grid side devices corresponding to the future weak links of the power grid, and the state of the distribution grid side devices after the transfer is simulated; Query the equipment status on the distribution network side. If there is a 10kV bus or 10kV feeder that is de-energized, perform load reversal simulation on the distribution network side with the goal of energizing all 10kV bus loads. The load transfer results on the main grid side, the load reversal results on the distribution network side and the bus load that cannot be transferred are recorded, and the load transfer results on the main grid side, the load reversal results on the distribution network side and the bus load that cannot be transferred are used as the main and distribution coordinated load transfer plan.

18. The active distribution network multiple risk pre-control decision-making auxiliary method according to claim 17, characterized in that: In the main distribution coordinated load transfer strategy generation module, The load transfer calculation is performed on the main grid side with the goal of powering all the main grid side devices corresponding to the future weak links of the power grid, and the state of the distribution grid side devices after the transfer is simulated, including: Extract all the power-losing devices on the main grid side corresponding to the future weak links of the power grid, and divide the voltage levels of the power-losing devices, starting from the power-losing devices with the highest voltage level to the power-losing devices with lower voltage levels, and transfer the load of the power-losing devices to the power-losing devices in each voltage level until the load transfer to the power-losing devices in the lowest voltage level is completed.

19. The active distribution network multiple risk pre-control decision-making auxiliary method according to claim 18, characterized in that: In the main distribution coordinated load transfer strategy generation module, The method of transferring the load of the power-lost equipment from the power-lost equipment of the highest voltage level to the power-lost equipment of the lower voltage level in order of voltage level comprises: According to the current voltage level calculated by the load transfer, the transfer path of each power-off device is found from the power grid topology, and the optimal transfer path is solved with the lowest average load rate of the device as the goal; Under the optimal power transfer path, the power-off equipment in the next voltage level is simulated, and used to continue to solve the optimal power transfer path in the next voltage level.

20. The active distribution network multiple risk pre-control decision-making auxiliary method according to claim 17, characterized in that: In the main distribution coordinated load transfer strategy generation module, The query of the equipment status on the distribution network side, if there is a 10kV bus or 10kV feeder that is de-energized, then a load reversal simulation is performed on the distribution network side with the goal of energizing all 10kV bus loads, including: Extracting a power-off device set on the main grid side according to the load transfer situation on the main grid side; For each power-off device in the power-off device set, extracting the transfer capacity of the associated load corresponding to the power-off device; The transfer capabilities of the associated loads are sorted, and the reverse flow strategy of each associated load in the power-losing device is searched in order from the highest to the lowest transfer capability, and the power is transferred to the power-losing device using the reverse flow strategy until the transfer to the power-losing device is completed.

21. The active distribution network multiple risk pre-control decision-making auxiliary method according to claim 20, characterized in that: In the main distribution coordinated load transfer strategy generation module, completing the transfer of power to the power-off equipment includes: A power transfer plan is generated for each power-off device, wherein the power transfer plan includes transfer-in feeder information, transfer-in bus information, tie switch control strategy and disconnection point information.

22. The active distribution network multiple risk pre-control decision-making auxiliary method according to claim 16, characterized in that: The source-grid-load-storage collaborative optimization strategy generation module is used to execute the source-grid-load-storage collaborative optimization strategy according to the updated future risk information of the power grid, including: sorting the updated plurality of future risk information of the power grid by urgency; Taking the optimal economy of the regulated object and the maximization of the consumption of new energy as the objective function, a linear programming algorithm is used to dispatch the source, grid, load and storage, so as to realize load transfer in sequence according to the urgency sorting and the updated future risk information of the multiple power grids.

23. The active distribution network multiple risk pre-control decision-making auxiliary method according to claim 22, characterized in that: In the source-grid-load-storage collaborative optimization strategy generation module, The objective function is to optimize the economic efficiency of the control object and maximize the consumption of new energy, and use a linear programming algorithm to dispatch the source, grid, load and storage, including: The constraints of the linear programming algorithm are multiple control object constraints, power grid section safety constraints, and system power balance constraints.

24. The active distribution network multiple risk pre-control decision-making auxiliary method according to claim 16, characterized in that: The active control strategy generation module is used to execute the equipment overload transfer strategy according to the future risk information of the power grid that has been updated again, including: The equipment over-limit information is extracted from the future risk information of the power grid that is updated again, and the voltage level of the over-limit equipment is divided based on the equipment over-limit information. The voltage of the over-limit equipment is reduced step by voltage level from the over-limit equipment of the highest voltage level to the over-limit equipment of the lower voltage level until the voltage drop target at the current voltage level is reached.

25. The active distribution network multiple risk pre-control decision-making auxiliary method according to claim 24, characterized in that: In the active control strategy generation module, The step of reducing the voltage of the over-limit devices from the over-limit devices of the highest voltage level to the over-limit devices of the lower voltage levels by voltage level includes: According to the current voltage level calculated by the load transfer, extracting a transferable path of the over-limit device from the constrained power grid topology; Priorities are assigned to the transferable paths for the over-limit equipment based on dual power supplies for important users, equipment load rate and equipment status. Under the current priority, the path with the largest voltage drop is selected as the over-limit load transfer strategy for the over-limit equipment.

26. The active distribution network multiple risk pre-control decision-making auxiliary method according to claim 16, characterized in that: The active control strategy generation module is used to execute the equipment overload transfer strategy according to the future risk information of the power grid that has been updated again, including: Update the equipment over-limit information after executing the equipment over-limit load transfer strategy; Based on the updated device over-limit information, statistics on device over-limit situations are collected to evaluate the effectiveness of auxiliary decision-making.

27. A terminal comprising a processor and a storage medium; characterized in that: The storage medium is used to store instructions; The processor is configured to operate according to the instructions to execute the steps of the method according to any one of claims 1-13.

28. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the steps of the method according to any one of claims 1 to 13 are implemented.