Forming device and machining method of special-shaped shell discharging channel

By designing the special-shaped shell channel forming device and processing method, using CNC flame cutting machine and press for curved processing, combined with tire and auxiliary tool samples, the accuracy control problem of special-shaped cavity parts in assembly and welding is solved, significantly improving the Manufacturing quality and pass rate.

CN118905564AActive Publication Date: 2024-11-08CHINA FIRST HEAVY IND
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202410972852.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-19
Publication Date
2024-11-08
Estimated Expiration
2044-07-19

AI Technical Summary

Technical Problem

When manufacturing complex special-shaped cavity parts, especially the shell-mounted channel part of the material conveying slide, since it is a special-shaped cavity, it is difficult to accurately measure and control during assembly and welding, resulting in differences in channel sizes, which seriously affects production efficiency and Product quality.

Method used

A forming device and processing method for special-shaped shell passageways is designed, including guide plate, upper guard plate and right guard plate. The curved processing is carried out through CNC flame cutting machine and press, and combined with special tire tools and auxiliary tools samples to ensure that Parts’ profile accuracy and welding accuracy. The device is divided into three steps: material preparation, welding and mechanical processing. It uses steel brackets and insert plates for positioning and measurement to ensure that the shape and size of the channel meet the design requirements.

Benefits of technology

It effectively improves the manufacturing quality and pass rate of special-shaped cavity parts, from the original 25% to 100%, solves the problems of manufacturing and inspection, and provides popular process design ideas for the production of complex special-shaped cavity parts.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118905564A_ABST
    Figure CN118905564A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of manufacturing and inspection of special-shaped cavities, and discloses a forming device and a machining method of a special-shaped shell discharging channel. The forming device comprises a mould, a guide plate tool, an auxiliary tool sample plate and an auxiliary tool. By means of the process improvement measures, the special-shaped shell discharging channel of the material conveying sliding plate is effectively controlled in the material preparing, assembling and welding and machining processes, the manufacturing quality of the material conveying sliding plate is greatly improved, and the percent of pass is increased to 100% from original 25%. The manufacturing and inspection problems of the special-shaped cavity are solved, and a process design thought is provided for subsequent production of similar products.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of manufacturing and testing a special-shaped cavity, and in particular to a forming device and a processing method for a special-shaped shell channel. Background Art

[0002] The feed slide of a special product is welded from multiple 35# carbon structural steel parts. It has a compact structure, complex shape, high form and position tolerance requirements, large deformation during welding, and easy deformation during processing. In the manufacturing process of the feed slide, the shell discharge channel is very important and is one of the important factors that determine whether the shell is unobstructed. Since the shell discharge channel is a special-shaped cavity with all spatial dimensions, it is difficult to manufacture during the production process. It is impossible to measure the specific value at a fixed point during the assembly and welding process to ensure the correctness of its size. Therefore, during the test, the shell discharge is often not smooth due to the difference in channel size, which seriously restricts production and increases the cost and difficulty of the test. Summary of the invention

[0003] The purpose of the present invention is to propose a forming device and processing method for a special-shaped shell channel. The manufacturing process is used in various links of production and manufacturing by newly designing 4 sets of parts forming auxiliary tools, 2 sets of auxiliary tools for channel control during welding and 1 set of auxiliary tools for channel detection. The tooling used in the present invention can solve the problems of manufacturing accuracy and inspection difficulties in the manufacturing process of special-shaped cavity parts, so as to improve the accuracy of part shape, improve welding accuracy, and facilitate inspection. The technical solution is scalable and can be applied to the manufacture of parts of complex special-shaped cavities.

[0004] The technical solution of the present invention is as follows: a forming device for a special-shaped shell discharge channel, wherein the special-shaped shell discharge channel comprises a guide plate 1, an upper guard plate 2 and a right guard plate 3;

[0005] The guide plate 1 is a special-shaped curved surface; the upper guard plate 2 is formed by splicing two arc segments;

[0006] The upper guard plate 2 and the right guard plate 3 are respectively processed by a CNC flame cutting machine according to the size of the unfolded diagram, and then cut, press, bend, process and finish the product.

[0007] The forming device includes a mold, a guide plate tooling, an auxiliary tool template and an auxiliary tool;

[0008] The guide plate 1 is made by cooperating with a mold and a guide plate tooling;

[0009] The mold comprises an upper mold and a lower mold, the upper mold is assembled on the press, and the lower mold is placed on the press platform. After the upper mold and the lower mold cooperate, an initial guide plate is formed; the guide plate tooling comprises a flat plate and an arc shell, the arc shell is located on the flat plate, and the outer surface of the arc shell is matched with the inner arc surface of the guide plate 1; the inner arc surface of the initial guide plate is abutted against the arc shell, and the accuracy of its peripheral contour relative to the central arc position is judged. After meeting the requirements, it is spot welded on the guide plate tooling to process and control its external dimensions;

[0010] After the processed upper guard plate 2 and the right side guard plate 3 are spot welded, the correctness of the welding of the upper guard plate 2 is checked by an auxiliary tool template; the inner arc surface of the auxiliary tool template matches the outer arc surface of the welded upper guard plate 2 and the right side guard plate 3; the guide plate 1 is positioned at the corresponding position on the upper guard plate 2 and the right side guard plate 3 by the auxiliary tool;

[0011] The auxiliary tool includes a steel support 5, a reference plate 8 and a plug plate 7; the entire special-shaped shell channel is divided into 13 units, and each unit uses a plug plate 7 to check the position of the guide plate 1; the shape of the plug plate 7 is designed according to the inner arc surface of the guide plate 1 after accurate welding and the corresponding position;

[0012] The steel bracket 5 is formed by welding angle steels of the same size, and a measuring reference block 4 is welded at the bottom and around the steel bracket 5 for reference measurement; a handle hole is processed on the steel bracket 5, and a handle reference plate 8 is installed on the top of the steel bracket 5 through the handle hole; the reference block is processed based on the handle reference plate 8; a plurality of sockets are provided on the handle reference plate 8, and the plug plate 7 is inserted into the steel bracket 5 through the sockets to guide the position of the guide plate 1;

[0013] The steel support 5 is arranged around the special-shaped shell channel.

[0014] A processing method for a forming device of a special-shaped shell channel comprises the following steps:

[0015] Step 1: Prepare the ingredients;

[0016] Manufacturing process of guide plate 1: according to the size of the development drawing, a CNC flame cutting machine is used for cutting - press bending - processing - finished product; first, a plane development drawing of the part is drawn according to the guide plate drawing, and a 20mm processing allowance is left around the development drawing, and cutting is performed. After cutting, the burrs around the steel plate are cleaned, and the press is used for leveling before bending; an 800T press is used for bending, and the upper die is closed on the upper tire of the press, and the lower die is placed on the lower platform of the press. After adjusting the position of the upper die and the lower die by the up and down movement of the press, it is fixed and then bent;

[0017] The curved rear guide plate 1 is processed around to ensure the correctness of the arc and the surrounding position. The machining is carried out by a vertical processing machine. First, the guide plate 1 is placed on the guide plate fixture. The guide plate arc is consistent with the arc shell arc. Each part is adjusted to ensure that the gap is less than 2mm. Spot welding is carried out. The center position of the two short sides is spot welded with a length of 15-20mm, and one long side is spot welded with 3 sections of 15mm long. The spot welding material is H08Mn2Siφ2, and the spot welding current is 100-150A.

[0018] After the spot welding is completed, the guide plate fixture is assembled on the machine bed, and the auxiliary tool is used to align and position it, and the shape is processed. During the processing, the welding is ground with a grinding wheel and then knocked off with a copper rod to prepare for welding;

[0019] Manufacturing process of upper guard plate 2: according to the size of the unfolded drawing, use CNC flame cutting machine to cut materials - press to bend - process - finished product; draw the plane unfolded drawing of the parts according to the design drawing, leave 10mm processing allowance around the unfolded drawing, cut and cut materials, clean the burrs around the steel plate after cutting, use press to level it and then bend it, the bend is pressed by 800T press, the pressing point is controlled within the range of 10-15mm, and the whole sample is used for inspection many times during the pressing process; after bending, process, ensure the correctness of the intersection position of the two arcs when marking, and prepare for welding after processing;

[0020] Manufacturing process of right side guard plate 3: Cutting by CNC flame cutting machine according to the size of the unfolded drawing - bending by press - processing - finished product; Draw the plane unfolded drawing of the part according to the design drawing, leave 10mm machining allowance around the unfolded drawing, cut and cut, clean the burrs around the steel plate after cutting, use press to level before bending, use 800T press to press and form the bending, use the whole sample to check during the pressing process; Processing after bending, measure and mark according to the sample during processing and marking, process according to the line, and prepare for assembly and welding after processing;

[0021] Step 2: welding;

[0022] First, assemble the upper guard plate 2 and the right guard plate 3 according to the dimensions of the drawing. After the assembly is completed, check the correctness of the assembly, and then assemble the guide plate 1; first, put the guide plate 1 into the cavity to be assembled, place the steel bracket 5 around the special-shaped shell channel, and measure the placement size of the steel bracket 5 based on the bottom plate. Place the plug plate 7 in the marked order, and adjust the position of the guide plate 1 at any time during the placement process to make it meet the size of the sample; after all the plug plates 7 are inspected, the guide plate 1 is fixed and spot welded, and welding is performed after the spot welding is completed. The auxiliary tool is used for measurement before and after welding;

[0023] Step 3: machining and polishing;

[0024] The parts where the special-shaped shell channel is located are machined according to the machining process, and the special-shaped shell channel is polished and its shape conformity is checked after semi-finishing according to the process requirements; in the semi-finishing process, the positioning size of the component after welding in step 2 is processed, and the processing is carried out according to the center of the part that has been processed. After the positioning reference is processed, the positioning pin hole 6 is processed. The positioning pin hole 6 is also positioned according to the processed center and processed on the machine pressure block; the machine pressure block is a positioning reference block used for clamping during the machining process, and is removed after the machining is completed; after the component after welding in step 2 is placed according to the processed reference block, the shell channel is polished and inspected;

[0025] Complete the above steps to obtain qualified parts.

[0026] Beneficial effects of the present invention: Through the above process improvement measures, the special-shaped shell discharge channel of the feed slide is effectively controlled during the material preparation, welding and machining processes, which greatly improves the manufacturing quality of the feed slide, and the qualified rate is increased from the original 25% to 100%. The manufacturing and inspection problems of special-shaped cavities are solved, providing a process design idea for the subsequent production of similar products. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 The following is a typical parts outline drawing;

[0028] Figure 2 It is the combination diagram of the guide plate curved auxiliary tool;

[0029] Figure 3 Provide a mold for the guide plate curved auxiliary tool;

[0030] Figure 4 It is the lower die of the curved auxiliary tool for the guide plate;

[0031] Figure 5(a)-Figure 5(b) Schematic diagram of the guide plate processing tooling from different perspectives;

[0032] FIG5( c ) is a three-dimensional schematic diagram of the guide plate processing tooling;

[0033] Figure 6 For the upper guard plate sample;

[0034] Figure 7 This is the right side guard plate sample;

[0035] Figure 8 Welding inspection samples for shell channel;

[0036] Fig. 9 Install welding auxiliary equipment bracket for shell discharge channel;

[0037] Figure 10(a)-Figure 10(b) Schematic diagram of the reference plate for the shell channel welding auxiliary tool;

[0038] Fig.11 This is the drawing of the auxiliary tools for welding the shell channel;

[0039] Figure 12(a)-Figure 12(b) This is a schematic diagram of the positioning benchmark processing of the shell discharge channel inspection sample;

[0040] Fig.13 This is the machining drawing of the positioning hole of the shell discharge channel inspection sample;

[0041] Fig.14 This is the drawing for the shell discharge channel inspection sample.

[0042] In the figure: 1-guide plate; 2-upper guard plate; 3-right side guard plate; 4-measurement reference block; 5-steel bracket; 6-locating pin hole; 7-insert plate; 8-handle reference plate. DETAILED DESCRIPTION

[0043] Part 1: Manufacturing accuracy assurance of special-shaped cavity parts

[0044] The special-shaped cavity is mainly composed of three parts, see Figure 1 , respectively, guide plate 1, upper guard plate 2 and right guard plate 3. The guide plate 1 is an important part and also a difficult part to manufacture. The manufacturing process of the three parts is described below.

[0045] 1. Manufacturing process of guide plate

[0046] The difficulty in manufacturing the guide plate lies in how to ensure the correctness of the arc relative to the external dimensions during the bending and post-forming processing. Therefore, a special mold is designed for manufacturing during the bending and processing process.

[0047] The mold is mainly composed of an upper mold and a lower mold. Figure 2 , the upper die is closed on the press, the lower die is placed on the press platform, and the upper die is Figure 3 、See the lower die Figure 4 .

[0048] After the guide plate 1 is curved, the peripheral processing is carried out. The processing difficulty lies in the accuracy of the peripheral contour relative to the central arc position. In order to solve the above problem, a guide plate tooling is made, see Figure 5, which is used to inspect and process the guide plate to ensure that the shape and size of the guide plate meet the requirements of the drawing. The guide plate tooling is made of thick steel plates or forgings. The carcass and the inner side of the guide plate have the same arc. The bottom is left with a machine tool clamp for easy clamping. The upper part is the guide plate installation area. The guide plate 1 is spot welded on the carcass, and then processed according to the program to control the external dimensions of the guide plate.

[0049] 2. Manufacturing process of upper guard plate

[0050] The manufacturing process of the upper guard plate is as follows: according to the size of the unfolded drawing, the CNC flame cutting machine is used for cutting - the press is used for bending - processing - the finished product. During the bending and processing marking process, a sample (such as Figure 7 ) to ensure the correctness of the arc position.

[0051] 3. Manufacturing process of right side guard

[0052] The manufacturing process of the right side guard plate is as follows: according to the size of the unfolded drawing, the CNC flame cutting machine is used for cutting - the press is used for bending - processing - the finished product. During the bending and processing and marking process, a sample (such as Figure 7 ) to ensure the correctness of the arc position.

[0053] Part 2: Control of welding process

[0054] The manufacturing process of the guide plate 1, the upper guard plate 2, and the right guard plate 3 has been strictly controlled, and the manufacturing quality of the products has been greatly improved. Relying solely on the conformity of the parts manufacturing cannot fully meet the shape and size requirements after welding. In the welding drawings, there are no clear welding dimensions for the positioning drawings of the guide plates. The markings are all spatial dimensions and cannot be measured. Therefore, slight differences in the assembly position will affect the size of the channel. Therefore, how to ensure that the shape and size of the entire channel meet the design requirements during welding is a problem that needs to be solved. Based on the above reasons, welding aids and templates are made to ensure the correctness of the channel welding position and shape and size.

[0055] According to the product structure, first use the auxiliary sample to check the correctness of the upper guard plate welding. Figure 8 Then the guide plate is assembled, and the auxiliary tool adopts a steel bracket ( Fig. 9 ), a handle reference plate (Figure 10(a) and Figure 10(b)) and an insert plate. The entire shell channel is divided into 13 units, and each unit is inspected with an insert plate. Auxiliary tool manufacturing process: The steel bracket is welded with 50*50*5 angle steels, and measurement reference blocks are welded on the bottom and around the steel bracket for reference measurement. When processing the steel bracket, the handle holes are processed first. After the reference plate is manufactured, it is fixed on the pre-welded angle steel frame. The reference blocks are installed at the bottom of the frame and in two directions. The reference blocks are processed based on the handle reference plate to ensure the correct position of the reference block and the reference plate. When in use, place the inspection template in sequence according to the sockets of the reference plate, and place the above-mentioned auxiliary tools according to the reference dimensions of the drawing, see Fig.11 , ensure that the assembly dimensions meet the drawing requirements.

[0056] Part 3: Inspection of the machined rear exhaust channel

[0057] The product requires semi-finishing before the shell discharge channel is inspected, and inspection tools are made for inspection. Similarly, the entire shell discharge channel is divided into 13 units along the shell discharge direction, and a plug-in plate is inserted into each unit to inspect the conformity of the shape of the shell discharge channel of the feed slide. The reference plate is fixed on the shell discharge channel by machine positioning (Figure 12 (a) and Figure 12 (b)) and screws, see Figure (13), and the plug-in plate is used for measurement, see Figure (14).

[0058] The present invention is applicable, and the size and shape of special-shaped welded parts are well controlled, meeting the welding tolerance requirements, and can meet the drawing requirements without additional processing, thus saving the machining cost; at the same time, the inspection method is simple and easy to operate, and compared with laser scanning, the cost is low, and it is easy to operate and grind.

[0059] The specific scheme for the control and research of the special-shaped shell channel is as follows:

[0060] The manufacturing process of welded parts is: blanking and forming - single part processing - welding - heat treatment - machining - grinding of the middle clamp. Therefore, each manufacturing process of welded parts is effectively controlled, so that the manufactured products are qualified products. First of all, the preparation process of a single part. From Figure (1), it can be seen that the three important parts that make up the shell channel are all curved parts, especially the guide plate, which is a spatially shaped part. It cannot be formed by ordinary presses, and a separate mold needs to be made for the curvature.

[0061] The first process: material preparation

[0062] Guide plate manufacturing process: according to the size of the expansion drawing, use a CNC flame cutting machine for cutting - press bending - processing - finished product. First, draw the plane expansion drawing of the part according to the guide plate drawing, leave a 20mm processing allowance around the expansion drawing, nest the material through the programming software, and transfer the nesting program to the cutting machine for cutting and cutting. After cutting, clean the burrs around the steel plate, use a press to level it, and then bend it. When bending, use an 800T press, put the upper die handle on the upper tire of the press, and put the lower die on the lower platform of the press. Adjust the position of the upper and lower dies by moving the press up and down, fix them, and then bend them.

[0063] After the curve, the guide plate is processed around to ensure the correctness of the arc and the surrounding position. The machining is carried out on a vertical processing machine. First, the guide plate is placed on the processing tooling. The arc of the guide plate matches the arc of the mold. Adjust each part to ensure that the gap at each location is less than 2mm. Spot welding is carried out. The center position of the two short sides is spot welded with a length of 15-20mm, and one long side is spot welded with 3 sections of 15mm long. The spot welding material: H08Mn2Siφ2, current: 100-150A.

[0064] After spot welding is completed, the auxiliary tool is assembled on the machine bed, and the auxiliary tool is aligned and positioned. The shape is processed according to the procedure. After processing, the grinding wheel and cutting disc are used to take it out. When taking it out, pay attention to protect the parts and the mold, and try to damage the mold as little as possible. During the grinding process, use a copper rod to knock it for easy removal. After all processes are completed, it is ready to participate in assembly and welding.

[0065] The manufacturing process of the upper guard plate: according to the size of the unfolded drawing, use a CNC flame cutting machine to cut the material - press to bend it - process it - finished product. Draw the part plane unfolded drawing according to the design drawing, leave a 10mm processing allowance around the unfolded drawing, nest the material through the programming software, and transfer the nesting program to the cutting machine for cutting and cutting. After cutting, clean the burrs around the steel plate, use a press to level it, and then bend it. The bend is pressed by an 800T press, and the pressing point is controlled within the range of 10-15mm. The overall sample is used for inspection many times during the pressing process. Processing is carried out after bending, and the sample ( Figure 6 ) to ensure the correctness of the intersection position of the two arcs, and after processing is completed, it is ready for assembly and welding.

[0066] The manufacturing process of the right guard plate: according to the size of the unfolded view, use a CNC flame cutting machine to cut the material - press to bend it - process it - finished product. Draw the part plane unfolded view according to the design drawing, leave a 10mm processing allowance around the unfolded view, nest the material through the programming software, and transfer the nesting program to the cutting machine for cutting and cutting. After cutting, clean the burrs around the steel plate, use a press to level it, and then bend it. The bend is pressed and formed by an 800T press. When drawing the bend, measure the outer dimensions of the part to ensure the correctness of the position of the bend line. Use an integral template for inspection during the pressing process. Processing is carried out after bending, and a template ( Figure 7 ) to measure and mark, and then process according to the lines. After processing is completed, it is ready for assembly and welding.

[0067] The second process: welding

[0068] After the parts are prepared, they are assembled. All assemblies are completed on the assembly platform. The upper guard plate and the right guard plate are assembled first, according to the dimensions of the drawing. After the assembly is completed, use ( Figure 8 ) Check the correctness of the assembly, and then assemble the guide plate. First, place the guide plate in the cavity to be assembled, place the steel bracket, and measure the placement size of the steel bracket based on the bottom plate. After drawing the line, place it according to the line. Place the plug plate in the order of the mark. During the placement process, adjust the position of the guide plate at any time to make it meet the size of the sample. After all the plug plates are inspected, the guide plate position is fixed and spot welding is performed. After spot welding is completed, welding is performed. This auxiliary tool can be used for measurement before and after welding.

[0069] The third process: machining and polishing

[0070] The feed slide plate is machined according to the machining process. After semi-finishing according to the process requirements, the shell discharge channel is polished and its shape conformity is checked. During the semi-finishing process, the positioning size of the inspection sample is processed according to (Figure 12). During processing, the center of the part that has been processed is used as the reference. After the positioning reference is processed, the positioning pin hole is processed. See ( Fig.13 ), the pin hole is also positioned according to the center of the processing in the drawing and processed on the machine pressure block (the machine pressure block is a positioning reference block used for clamping during the machining process and is removed after the machining is completed). After placing the inspection sample drawing (14) according to the processed reference, polish and inspect the shell discharge channel.

[0071] Complete the above steps to obtain qualified parts.

Claims

1. A forming device for a special-shaped shell channel, characterized in that: The special-shaped shell discharge channel comprises a guide plate (1), an upper guard plate (2) and a right side guard plate (3); The guide plate (1) is a special-shaped curved surface; the upper guard plate (2) is formed by splicing two circular arc segments; The upper guard plate (2) and the right guard plate (3) are respectively processed by a CNC flame cutting machine through cutting, pressing, bending, processing and finished product according to the size of the unfolded drawing; The forming device includes a mold, a guide plate tooling, an auxiliary tool template and an auxiliary tool; The guide plate (1) is manufactured by cooperating with a mold and a guide plate tooling; The mold comprises an upper mold and a lower mold, the upper mold is assembled on the press, and the lower mold is placed on the press platform. After the upper mold and the lower mold are matched, an initial guide plate is formed; the guide plate tooling comprises a flat plate and an arc shell, the arc shell is located on the flat plate, and the outer surface of the arc shell is matched with the inner arc surface of the guide plate (1); the inner arc surface of the initial guide plate is abutted against the arc shell, and the accuracy of its peripheral contour relative to the central arc position is judged. After meeting the requirements, it is spot welded on the guide plate tooling to control its external dimensions; After the processed upper guard plate (2) and the right side guard plate (3) are spot welded, the correctness of the welding of the upper guard plate (2) is checked by using an auxiliary tool template; the inner arc surface of the auxiliary tool template matches the outer arc surface of the welded upper guard plate (2) and the right side guard plate (3); the guide plate (1) is positioned at the corresponding position on the upper guard plate (2) and the right side guard plate (3) by using the auxiliary tool; The auxiliary tool comprises a steel support (5), a reference plate (8) and an insert plate (7); the entire special-shaped shell channel is divided into 13 units, and each unit uses an insert plate (7) to check the position of the guide plate (1); the shape of the insert plate (7) is designed according to the inner arc surface of the guide plate (1) after accurate welding and the corresponding position; The steel support (5) is formed by welding angle steels of the same size. The bottom and surrounding of the steel support (5) are welded with a measuring reference block (4) for reference measurement. A handle hole is processed on the steel support (5), and a handle reference plate (8) is installed on the top of the steel support (5) through the handle hole. The reference block is processed based on the handle reference plate (8). A plurality of sockets are provided on the handle reference plate (8), and the plug plate (7) is inserted into the steel support (5) through the sockets to guide the position of the guide plate (1). The steel support (5) is arranged around the special-shaped shell channel.

2. A processing method using the forming device of the special-shaped shell channel according to claim 1, characterized in that: The steps include: Step 1: Prepare the ingredients; The manufacturing process of the guide plate (1) is as follows: according to the size of the unfolded drawing, a CNC flame cutting machine is used for cutting - a press is used for bending - processing - finished product; first, a plane unfolded drawing of the part is drawn according to the guide plate drawing, and a 20 mm machining allowance is left around the unfolded drawing, and the cutting is performed. After cutting, the burrs around the steel plate are cleaned, and the bending is performed after the press is used for leveling; when bending, an 800T press is used, the upper die is attached to the upper tire of the press, and the lower die is placed on the lower platform of the press. After the upper and lower dies are adjusted in position by the up and down movement of the press, they are fixed, and then the bending is performed; The curved rear guide plate (1) is processed around to ensure the correctness of the arc and the surrounding position. The machining is carried out using a vertical processing machine. First, the guide plate (1) is placed on the guide plate fixture. The guide plate arc is matched with the arc shell arc. Each part is adjusted to ensure that the gap at each location is less than 2mm. Spot welding is carried out. The center position of the two short sides is spot welded with a length of 15-20mm. One long side is spot welded with 3 sections of 15mm in length. The spot welding material is H08Mn2Si Spot welding current: 100-150A; After the spot welding is completed, the guide plate fixture is assembled on the machine bed, and the auxiliary tool is used to align and position it, and the shape is processed. During the processing, the welding is ground with a grinding wheel and then knocked off with a copper rod to prepare for welding; The manufacturing process of the upper guard plate (2) is as follows: according to the size of the unfolded drawing, a CNC flame cutting machine is used for cutting - a press is used for bending - processing - finished product; a plane unfolded drawing of the part is drawn according to the design drawing, a 10mm machining allowance is left around the unfolded drawing, and cutting is performed. After cutting, the burrs around the steel plate are cleaned, and the bending is performed after leveling with a press. The bending is formed by pressing with an 800T press, and the pressing point is controlled within the range of 10-15mm. During the pressing process, the integral sample is used for multiple inspections; after bending, processing is performed, and the correctness of the intersection position of the two arcs is ensured during the processing and marking. After the processing is completed, it is ready for assembly and welding; The manufacturing process of the right side guard plate (3) is as follows: according to the size of the unfolded drawing, a CNC flame cutting machine is used to cut the material - a press is used to bend the material - processing - finished product; according to the design drawing, a plane unfolded drawing of the part is drawn, and a 10mm machining allowance is left around the unfolded drawing, and the material is cut and cut. After cutting, the burrs around the steel plate are cleaned, and the material is bent after being leveled by a press. The bent material is pressed and formed by an 800T press, and an integral sample is used for inspection during the pressing process; after bending, the material is processed, and the marking is measured and marked according to the sample, and the material is processed according to the line. After the processing is completed, it is ready for assembly and welding; Step 2: welding; First, assemble the upper guard plate (2) and the right guard plate (3) according to the dimensions of the drawing. After the assembly is completed, check the correctness of the assembly, and then assemble the guide plate (1); first, place the guide plate (1) in the cavity to be assembled, place the steel bracket (5) around the special-shaped shell channel, and measure the placement size of the steel bracket (5) based on the bottom plate. Place the plug plates (7) in the order of the marks, and adjust the position of the guide plate (1) at any time during the placement process to make it meet the size of the sample; after all the plug plates (7) are inspected, the guide plate (1) is fixed in position and spot welded. After the spot welding is completed, welding is performed. The auxiliary tool is used for measurement before and after assembly and welding; Step 3: machining and polishing; The parts where the special-shaped shell channel is located are machined according to the machining process, and the special-shaped shell channel is polished and its shape conformity is checked after semi-finishing according to the process requirements; during the semi-finishing process, the positioning size of the component after welding in step 2 is processed, and the processing is carried out according to the center of the part that has been processed. After the positioning reference is processed, the positioning pin hole (6) is processed. The positioning pin hole (6) is also positioned according to the processed center and processed on the machine pressure block; the machine pressure block is a positioning reference block used for clamping during the machining process and is removed after the machining is completed; after the component after welding in step 2 is placed according to the processed reference block, the shell channel is polished and inspected; Complete the above steps to obtain qualified parts.

Citation Information

Patent Citations

  • Annular special-shaped cambered surface section welded mold and manufacturing method thereof

    CN102974687A

  • Forming method of special-shaped curved surface structural member

    CN112846647A

  • Special-shaped curved surface medium-thickness plate machining method based on multi-point flexible bending

    CN114798902A

  • Sintering fan three -dimensional flow blade die mould frock

    CN208680336U

  • Machine forming for a connecting end of a deformed bar

    KR101857218B1