Sludge spray drying device and sludge vaporization drying method
By using thermal oil and high-pressure air technology in the sludge spray drying device, high-temperature and high-pressure atomization spraying of the sludge is solved, the problem of low sludge drying efficiency is improved, the calorific value and incineration effect of the sludge are reduced, and the Processing costs.
Patent Information
- Application Number
- CN202411050334.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-01
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2044-08-01
AI Technical Summary
The existing sludge drying technology has low drying efficiency, resulting in insufficient calorific value of the sludge after drying, affecting the incineration effect.
Using sludge spray drying device, heat the sludge pump pipe and spray drying furnace using thermal oil, combined with high-pressure air jet technology, the sludge is atomized and sprayed and quickly dried under high temperature and high pressure conditions to increase the heat of the sludge Value and drying efficiency.
It significantly improves the drying efficiency and incineration effect of the sludge, reduces the energy consumption of the subsequent incineration process, and reduces maintenance costs.
Smart Images

Figure CN118908528A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of sludge treatment, and in particular to a sludge spray drying device and a sludge vaporization drying method. Background Art
[0002] Sludge, represented by municipal sewage sludge, has a high moisture content (generally around 72% after mechanical dehydration), low calorific value, low calorific value (200-400kCal / kg), takes up space in landfills, is difficult to maintain in the later stages, is prone to clogging drainage systems, and has high maintenance costs. Currently, the more thorough treatment method is incineration.
[0003] The calorific value of sludge after mechanical dehydration is too low to reach the lower limit of calorific value required for normal combustion of solid fuel (generally 800-1200kCal / kg), so it needs to be dried and dehydrated to increase the calorific value. The existing sludge drying technology has low drying efficiency, and the moisture content in the sludge after drying cannot be fully reduced, which affects the subsequent incineration effect.
[0004] Therefore, in order to improve the efficiency of sludge drying and the effect of drying and dehydration, the present invention provides a sludge spray drying device and a vaporization drying method. Summary of the invention
[0005] In view of the above analysis, the present invention aims to provide a sludge spray drying device and a sludge vaporization drying method to solve the problem of insufficient sludge drying leading to low calorific value of the dried sludge.
[0006] The purpose of the present invention is mainly achieved through the following technical solutions:
[0007] A sludge spray drying device comprises: a sludge pump pipe, a spray drying furnace, a sprayer and a heating device arranged on the sludge pump pipe and the spray drying furnace; the sludge pump pipe is arranged above the spray drying furnace and passes through the spray drying furnace, and the end of the sludge pump pipe is connected to the sprayer; the sprayer is used to atomize the sludge and spray it into the inner cavity of the spray drying furnace; the heating device is used to heat the sludge pump pipe and the spray drying furnace.
[0008] The heating device includes: a first heat-conducting oil pipe and a second heat-conducting oil pipe; the first heat-conducting oil pipe is arranged outside the sludge pump pipe; the second heat-conducting oil pipe is arranged on the inner wall of the cavity of the spray drying furnace; the first heat-conducting oil pipe and the second heat-conducting oil pipe are both filled with heat-conducting oil.
[0009] Furthermore, the first heat transfer oil pipe and the second heat transfer oil pipe are both arranged on the sludge pump pipe or the spray drying furnace in a spirally coiled manner; the heat transfer oil flows through the gasification incinerator, thereby being able to transfer the heat generated by the sludge gasification and incineration to the sludge pump pipe and the spray drying furnace.
[0010] Furthermore, the sprayer has a conical structure; the upper end of the sprayer is connected to the sludge pump pipe, and the lower end has a conical bell mouth; a plurality of third high-pressure air inlets are arranged on the outside of the bell mouth; the third high-pressure air inlets are used to blow high-pressure gas into the inner cavity of the bell mouth so that the sludge can be sprayed into the spray drying furnace in a spray state.
[0011] Furthermore, the plurality of third high-pressure air inlets are distributed in an array at equal intervals in the circumferential direction outside the bell mouth of the sprayer, and the plurality of third high-pressure air inlets are located at the same height.
[0012] Furthermore, the angle between the blowing direction of the third high-pressure air inlet and the radial direction of the sprayer is α; 5°≤α≤30°.
[0013] Furthermore, the first heat-conducting oil pipe is connected to a first solenoid valve and a first oil pump, the first solenoid valve is used to adjust the flow rate of the heat-conducting oil in the first heat-conducting oil pipe, and the first oil pump is used to control the flow rate of the heat-conducting oil in the first heat-conducting oil pipe.
[0014] Furthermore, the second heat-conducting oil pipe is connected to a second solenoid valve and a second oil pump; the second solenoid valve is used to adjust the flow rate of the heat-conducting oil in the second heat-conducting oil pipe, and the second oil pump is used to control the flow rate of the heat-conducting oil in the second heat-conducting oil pipe.
[0015] Furthermore, a first air inlet pipe is provided at the lower end of the spray drying furnace, and an air outlet pipe is provided at the upper end; the first air inlet pipe is used for bottom blowing hot air; and the air outlet pipe is used for discharging the gas after the sludge is vaporized and dried.
[0016] A sludge vaporization and drying method adopts the above-mentioned sludge spray drying device to vaporize and dry the sludge to be treated.
[0017] A sludge gasification, drying and incineration integrated treatment system comprises the above-mentioned sludge spray drying device.
[0018] The technical solution of the present invention can achieve at least one of the following effects:
[0019] 1. The sludge spray drying device of the present invention uses heat-conducting oil to absorb the heat generated by incineration to heat the sludge in the sludge pump pipe, so that the sludge has a higher temperature before spray drying, and the sludge is heated in the sludge pump pipe, and the sludge is pressurized and preheated; after pressurized preheating, part of the moisture in the sludge is vaporized to loosen its internal structure, thereby improving the atomization injection effect of the sprayer, and then improving the vaporization drying effect, which is beneficial to significantly improve the calorific value of the sludge before entering the gasification incinerator, making the subsequent incineration more sufficient and thorough, and improving the efficiency of sludge treatment.
[0020] 2. In the sludge spray drying device of the present invention, the sprayer adopts multi-channel high-pressure air to rotate and squeeze the internal air to realize atomized spraying, and the sludge can be sprayed into the spray drying furnace in an umbrella-shaped effect, thereby promoting heat exchange between the sludge and the bottom-blown hot air of the spray drying furnace; the present invention sprays the sludge into the atomized vaporization drying furnace in the manner of atomized explosion, so that the atomized sludge sprayed into the furnace can be quickly dried and dried, thereby improving the sludge drying efficiency, achieving good drying effect, and removing more water after drying, thereby helping to reduce the energy consumption of the subsequent incineration process.
[0021] 3. The sludge spray drying device of the present invention uses heat-conducting oil to heat the spray drying furnace, maintain the temperature inside the spray drying furnace, and keep the space inside the cavity at a high temperature at all times, so as to achieve rapid flash evaporation of the sprayed sludge, improve the subsequent incineration gasification effect, make up for the low calorific value of the sludge (even after drying), further improve the calorific value (temperature) of the dried sludge, promote its combustion effect, and improve the sludge treatment efficiency while saving costs.
[0022] In the present invention, the above-mentioned technical solutions can also be combined with each other to achieve more preferred combination solutions. Other features and advantages of the present invention will be described in the subsequent description, and some advantages can become obvious from the description, or can be understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained through the contents particularly pointed out in the description and the drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] The drawings are only for the purpose of illustrating particular embodiments and are not to be considered limiting of the present invention. Like reference symbols denote like components throughout the drawings.
[0024] Figure 1 This is a schematic structural diagram of a sludge spray drying device according to Example 1 of the present invention;
[0025] Figure 2 This is a schematic diagram of the structure of a sludge pump pipe and an atomizer of a sludge spray drying device according to Example 1 of the present invention;
[0026] Figure 3 This is a cross-sectional effect diagram of an atomizer of a sludge spray drying device according to Example 1 of the present invention;
[0027] Figure 4 This is a schematic structural diagram of a condenser of a sludge spray drying device according to Example 1 of the present invention;
[0028] Figure 5 This is a flow chart of the sludge gasification and drying method according to Example 2 of the present invention.
[0029] Figure 6A schematic diagram of the structural composition of a gasification incinerator and a waste heat boiler of a sludge gasification, drying and incineration integrated treatment system according to Example 3 of the present invention;
[0030] Figure 7 This is a schematic diagram of the arrangement of preheating tubes of the air preheater of Example 3;
[0031] Figure 8 This is a schematic diagram of the structure of the preheating tube of Example 3.
[0032] Reference numerals:
[0033] 1-feeding trough; 2-feeder; 3-sludge pump pipe; 4-first heat transfer oil pipe; 5-spray drying furnace; 6-sprayer; 601-first high-pressure air inlet; 602-second high-pressure air inlet; 603-third high-pressure air inlet; 7-second heat transfer oil pipe; 8-air outlet pipe; 9-first oil inlet interface; 10-first oil outlet interface; 11-feeding pipe; 12-first air inlet pipe; 13-cage conveyor; 14-driving motor; 15-first solenoid valve; 16-first oil pump; 17-bellows box; 18-condenser; 1 9- condenser air inlet interface; 20- condenser air outlet interface; 21- drainage interface; 22- heat exchange air duct; 23- air distribution plate; 24- air distribution plate; 25- first flue gas chamber; 26- second flue gas chamber; 27- connecting chamber; 28- second oil inlet interface; 29- second oil outlet interface; 30- gasification incinerator; 31- second air inlet duct; 32- water inlet interface; 33- water outlet interface; 34- waste heat boiler; 35- first gas preheater; 36- second gas preheater; 37- dust outlet; 38- flue gas outlet. DETAILED DESCRIPTION
[0034] The preferred embodiments of the present invention will be described in detail below in conjunction with the accompanying drawings, wherein the accompanying drawings constitute a part of the present invention and are used together with the embodiments of the present invention to illustrate the principles of the present invention, but are not used to limit the scope of the present invention.
[0035] Example 1
[0036] A specific embodiment of the present invention discloses a sludge spray drying device, such as Figure 1 , Figure 2As shown, it includes: a sludge pump pipe 3, a spray drying furnace 5, a sprayer 6 and a heating device arranged on the sludge pump pipe 3 and the spray drying furnace 5; the sludge pump pipe 3 is arranged above the spray drying furnace 5 and passes through the spray drying furnace 5, and the end of the sludge pump pipe 3 is connected to the sprayer 6; the sprayer 6 is used to atomize the sludge and spray it into the inner cavity of the spray drying furnace 5; the heating device includes: a first heat transfer oil pipe 4 and a second heat transfer oil pipe 7; the first heat transfer oil pipe 4 is arranged on the outside of the sludge pump pipe 3; the second heat transfer oil pipe 7 is arranged on the inner wall of the cavity of the spray drying furnace 5; the first heat transfer oil pipe 4 and the second heat transfer oil pipe 7 are both filled with heat transfer oil.
[0037] Specifically, the first heat transfer oil pipe 4 and the second heat transfer oil pipe 7 are both arranged on the sludge pump pipe 3 or the spray drying furnace 5 in a spirally coiled manner; the heat transfer oil flows through the gasification incinerator, and then can transfer the heat generated by the sludge gasification and incineration to the sludge pump pipe 3 and the spray drying furnace 5.
[0038] Specifically, Figure 1 , Figure 2 As shown, the first heat transfer oil pipe 4 is provided outside the sludge pump pipe 3, and multiple groups of the first heat transfer oil pipe 4 are provided on the sludge pump pipe 3; multiple groups of the first heat transfer oil pipe 4 are coiled outside the sludge pump channel 3 to preheat the sludge in the sludge pump channel 3. The first heat transfer oil pipe 4 is connected to the heat transfer oil pipe outside the gasification incinerator 30; and then the first heat transfer oil pipe 4 preheats the sludge pump pipe 3 and the sludge inside it through the heat transfer oil circulating inside. The sludge is heated in the sludge pump pipe 3 by the heat transfer oil (300-380℃) in the first heat transfer oil pipe 4; after heating, the sludge temperature reaches above 110℃.
[0039] Furthermore, the upper end of the sludge pump pipe 3 is connected to the feeding tank 1, and the sludge enters the sludge pump pipe 3 through the feeding tank 1; and a feeder 2 is provided between the sludge pump pipe 3 and the feeding tank 1, and the feeder 2 is used to introduce the sludge into the sludge pump pipe 3. Preferably, the feeder 2 is a double screw feeder.
[0040] Furthermore, a plurality of temperature sensors are arranged on the first heat transfer oil pipe 4, and the preheating state of the sludge inside the sludge pump channel 3 is determined by taking an average of a plurality of temperature values measured by the temperature sensors.
[0041] Furthermore, a first solenoid valve 15 and a first oil pump 16 are arranged between the first heat transfer oil pipe 4 and the heat transfer oil pipe outside the gasification incinerator 30. The first solenoid valve 15 is used to adjust the flow rate of the heat transfer oil in the first heat transfer oil pipe 4, and the first oil pump 16 is used to control the flow rate of the heat transfer oil, thereby achieving temperature control of the heat transfer oil.
[0042] Furthermore, a sludge pump is provided on the sludge pump channel 3 for controlling the speed at which the sludge is introduced into the spray drying furnace 5 .
[0043] In a specific embodiment of the present invention, a sprayer 6 is used to spray the wet sludge in the sludge pump pipe 3 into the spray drying furnace 5. Figure 2 , Figure 3 As shown, the sprayer 6 in the present invention is a cone-shaped structure.
[0044] Specifically, the upper end of the sprayer 6 is connected to the lower end of the sludge pump pipe 3. The lower end of the sprayer 6 has a conical bell mouth, and the bell mouth and the sludge pump pipe 3 are connected through a connecting pipe at the upper end of the sprayer 6.
[0045] like Figure 2 , Figure 3 As shown, the upper end of the sprayer 6 is connected to a first high-pressure air inlet 601 and a second high-pressure air inlet 602; specifically, the first high-pressure air inlet 601 and the second high-pressure air inlet 602 are both connected to the connecting pipe at the upper end of the sprayer 6, and are symmetrically arranged on both sides of the connecting pipe.
[0046] Furthermore, if Figure 2 , Figure 3 As shown, a plurality of third high-pressure air inlets 603 are arranged outside the conical bell mouth at the lower end of the sprayer 6.
[0047] Specifically, the plurality of third high-pressure air inlets 603 are arranged in an array with equal spacing in the circumferential direction outside the bell mouth of the sprayer 6, and the plurality of third high-pressure air inlets 603 are located at the same height, such as Figure 3 shown.
[0048] Preferably, the number of the third high-pressure air inlets is 6.
[0049] like Figure 3 As shown, the angle between the blowing direction of the plurality of third high-pressure air inlets 603 and the radial direction of the sprayer 6 is α; 10°≤α≤30°. The diameter of the inscribed circle in the blowing direction of the plurality of third high-pressure air inlets 603 is d in Preferably, the angle α is in the range of 20° to 25°.
[0050] Specifically, the blowing direction of the third high-pressure air inlet 603 is set to be inclined downward; Figure 2 As shown, the third high-pressure air inlet 603 is arranged at an angle with the horizontal direction; the angle between the blowing direction of the third high-pressure air inlet 603 and the horizontal direction is 20° to 30°.
[0051] Preferably, the cone angle of the inner cavity of the bell mouth of the sprayer 6 is 60°.
[0052] Specifically, the internal flow channel diameter of the connecting pipe at the upper end of the sprayer 6 is D0; the pipe mouth diameters of the first high-pressure air inlet 601 and the second high-pressure air inlet 602 are the same, both 2D0; the height H of the bell mouth of the sprayer 6 is (5~7)D0; the outer diameter D of the position of the third high-pressure air inlet 603 of the bell mouth is (4~6)D0, the diameter of the internal cavity D1 is (3~4)D0, and D1 is smaller than D.
[0053] Specifically, the cross section of the sprayer 6 at the height of the third high-pressure air inlet 603 is a circular ring, and the inner diameter of the circular ring is D1; the diameter of the inscribed circle in the blowing direction of the third high-pressure air inlet 603 is d in Moreover, the inner diameter of the sprayer 6 is larger than the diameter of the inscribed circle of the air inlet axis of the third high-pressure air inlet 631, that is, D1>d in Preferably, d in =1 / 4D=(1~1.5)D0.
[0054] In the present invention, high-pressure air is introduced into the first high-pressure air inlet 601 and the second high-pressure air inlet 602, and high-pressure air is introduced into the upper end of the atomizer 6 to create a high-pressure environment inside the internal conical space of the atomizer 6 to promote the atomization and injection of sludge.
[0055] In the present invention, multiple third high-pressure air inlet interfaces 603 are provided to spray high-pressure air into the bell mouth of the sprayer 6, and the high-pressure air is distributed circumferentially, so that the sludge inside the bell mouth can be circumferentially pressurized and vortex-crushed.
[0056] Furthermore, a second heat-conducting oil pipe 7 connected to the third heat-conducting oil pipe is provided on the inner wall of the spray-drying furnace 5; the second heat-conducting oil pipe 7 heats or keeps warm the furnace cavity of the spray-drying furnace 5 through the heat-conducting oil flowing inside.
[0057] In a specific embodiment of the present invention, Figure 1 As shown, a plurality of groups of second heat-conducting oil pipes 7 are arranged on the furnace body of the spray drying furnace 5 .
[0058] Preferably, if Figure 1 As shown, the furnace body of the spray drying furnace 5 is a circular or rectangular structure.
[0059] Further, a plurality of groups of second heat-conducting oil pipes 7 are arranged on the inner wall surface of the spray-drying furnace 5; each group of second heat-conducting oil pipes 7 is connected to the first oil inlet interface 9 and the second oil inlet interface 10 installed on the outer wall surface of the spray-drying furnace 5. Preferably, the second heat-conducting oil pipes 7 are arranged spirally on the inner wall of the spray-drying furnace 5.
[0060] Specifically, the first oil inlet interface 9 is connected to the third heat transfer oil pipe of the gasification incinerator 30, and the heat transfer oil flows between the third heat transfer oil pipe and the second heat transfer oil pipe 7, thereby transferring heat between the spray drying furnace 5 and the gasification incinerator 30, thereby heating the internal cavity of the spray drying furnace 5. In the present invention, by providing the second heat transfer oil pipe 7 and the heat transfer oil therein, the temperature of the air inside the spray drying furnace 5 is increased, and after the sludge is sprayed into the spray drying furnace 5 through the sprayer 6, it can be quickly dried, and most of the water vapor in the sludge can be separated, so that the sludge is quickly dried.
[0061] In a specific embodiment of the present invention, multiple groups of second heat transfer oil pipes 7 are arranged in an annular shape on the spray drying furnace 5, and the multiple groups of second heat transfer oil pipes 7 are parallel to each other. Preferably, the temperature of the heat transfer oil in the second heat transfer oil pipes 7 is 300°C to 380°C.
[0062] Furthermore, in order to achieve the regulation of the internal temperature of the spray drying furnace 5, a second solenoid valve and a second oil pump are provided between the second heat conducting oil pipe 7 and the third heat conducting oil pipe, so as to control the flow rate of the heat conducting oil in the second heat conducting oil pipe 7. The greater the flow rate of the heat conducting oil, the higher the internal temperature of the spray drying furnace 5; when the flow rate of the second heat conducting oil pipe 7 is adjusted to the maximum, the flow rate of the heat conducting oil is adjusted by controlling the rotation speed of the oil pump, thereby achieving the regulation of the internal temperature of the spray drying furnace 5.
[0063] In the present invention, a PID controller is provided to adjust the oil pump speed and valve opening in the heat transfer oil circuit, so as to control the flow rate of the heat transfer oil and the amount of oil entering the first heat transfer oil pipe 4 and the second heat transfer oil pipe 7, thereby realizing the regulation of the heat transfer oil temperature, the sludge pump channel 3 temperature, and the furnace chamber temperature of the spray drying furnace 5.
[0064] Furthermore, in order to achieve rapid vaporization and drying of the sludge in the spray drying furnace 5, in the present invention, a first air inlet pipe 12 is connected to the bottom of the spray drying furnace 5, and the first air inlet pipe 12 can blow high-temperature air heated by the waste heat boiler 34 and the second gas heating preheater from the bottom of the spray drying furnace 5, thereby quickly drying the sludge by the high-temperature air.
[0065] In the present invention, the first air inlet pipe 12 uses a bottom blowing air supply method to blow high-temperature air; preferably, the temperature of the high-temperature air in the first air inlet pipe 12 is not less than 400°C. The present invention dries the sludge after spraying by bottom blowing high-temperature air, which can prevent the atomized and dried sludge debris from being deposited at the bottom of the spray drying furnace 5, and can promote the sludge debris after spraying to circulate up and down in the spray drying furnace 5, prolong the retention time of the sludge debris in the spray drying furnace 5, and then promote its drying effect, and can dry and take away more water vapor in the sludge to the maximum extent, improve the sludge calorific value, and make the sludge have a higher temperature before entering the gasification incinerator 30.
[0066] Furthermore, in order to monitor the internal temperature of the spray drying furnace 5, a plurality of temperature sensors are installed on the furnace wall of the spray drying furnace 5 to monitor the temperature inside the cavity of the spray drying furnace 5; specifically, the plurality of temperature sensors are arranged at intervals along the height direction of the spray drying furnace 5.
[0067] like Figure 1 As shown, a temperature sensor is respectively arranged on the first air inlet pipe 12 and the air outlet pipe 8; and four temperature sensors are arranged on the furnace body of the spray drying furnace 5.
[0068] In a specific embodiment of the present invention, a material guide pipe 11 is provided at the bottom of the spray drying furnace 5; the upper end of the material guide pipe 11 is connected to the inner cavity of the spray drying furnace 5, and the lower end is connected to the cage conveyor 13, and then the dried sludge is sent to the gasification incinerator 30 for incineration through the cage conveyor 13.
[0069] Specifically, the lower end of the spray drying furnace 5 is connected to the guide pipe 11, the upper end of the guide pipe 11 is connected to the inner cavity of the spray drying furnace 5, and the lower end is connected to the cage conveyor 13. The guide pipe 11 is used to guide the gasified and dried sludge into the cage conveyor 13; then the cage conveyor is driven to rotate by the driving motor 14 to transport the dried sludge to the gasification incinerator 30 for incineration.
[0070] Specifically, the gas generated by sludge drying is discharged through the air outlet pipe 8 arranged at the upper end of the spray drying furnace 5; by controlling the flow of the second heat transfer oil pipe 7 on the spray drying furnace 5, the temperature of the gas discharged from the air outlet pipe 8 is controlled to be greater than 100°C; preferably, the temperature of the gas discharged from the air outlet pipe 8 is 120°C.
[0071] Furthermore, a second solenoid valve and a second oil pump are provided between the second heat-conducting oil pipe 7 and the third heat-conducting oil pipe. In the present invention, the oil quantity control in the first heat-conducting oil pipe 4 and the second heat-conducting oil pipe 7 is controlled by a PID controller. Specifically, the PID controller controls the flow of the first solenoid valve and the second solenoid valve and the rotation speed of the first oil pump 16 and the second oil pump to achieve the oil quantity and temperature control of the first heat-conducting oil pipe 4 and the second heat-conducting oil pipe 7.
[0072] In a specific embodiment of the present invention, a condenser is used to post-treat the gas generated after the sludge is vaporized and dried in the spray drying furnace 5. The structure of the condenser is as follows: Figure 4 Specifically, the gas generated by baking the sludge in the spray drying furnace 5 is passed into the condenser for condensation; after condensation, liquid sewage and gaseous non-condensable gas are generated; wherein, the sewage is discharged and purified by biochemical treatment; the non-condensable gas is passed into the gasification incinerator 30 for incineration.
[0073] like Figure 4As shown, the condenser includes: a wind box 17, a condenser tube 18, a condenser tube air inlet interface 19, a condenser tube air outlet interface 20, a drain interface 21 and a heat exchange air duct 22.
[0074] Specifically, the condenser pipe 18 is a tapered pipe or a trapezoidal pipe with a gradually expanding size.
[0075] Specifically, one end of the condenser 18 is provided with a condenser air inlet interface 19, and the other end is provided with a condenser air outlet interface 20. The gas discharged from the spray drying furnace 5 enters the condenser 18 through the condenser air inlet interface 19 and is discharged through the condenser air outlet interface 20. Preferably, the condenser air outlet interface 20 opens upward.
[0076] Specifically, the liquid discharge port 21 is disposed below the condenser 18 and is located at one end close to the condenser air outlet port 20 .
[0077] Specifically, a wind box 17 is arranged on the side of the condenser 18, and the wind box 17 is fixedly connected to the condenser 18 but not connected. A plurality of heat exchange air ducts 22 are embedded inside the condenser 18, and the heat exchange air ducts 22 are arranged perpendicular to the condenser 18 and penetrate the condenser 18; one end of the heat exchange air duct 22 is connected to the wind box 17, and the other end is connected to the external space; preferably, the plurality of heat exchange air ducts 22 are arranged at equal intervals along the axial direction of the condenser 18.
[0078] Furthermore, an air pump is installed at the air inlet of the bellows 17 , and cold air can be introduced into the bellows 17 through the air pump.
[0079] During implementation, cold air is introduced into the bellows 17 through the air pump, enters the heat exchange air duct 22 through the bellows 17, and then exchanges heat with the gas flowing in the condenser 18 through the heat exchange air duct 22 to condense the gas discharged from the spray drying furnace 5. The liquid produced after condensation is discharged from the drain interface 21; the non-condensable gas (combustible gas in the sludge) that does not change its state after condensation is introduced into the gasification incinerator 30 for incineration.
[0080] Furthermore, in order to improve the condensation effect of the condenser, in the present invention, an air distribution plate 23 is provided in the condensation tube 18 , and an air distribution plate 24 is provided in the wind box 17 .
[0081] Specifically, the air distribution plate 24 is arranged parallel to the condensing tube 18 and is located below the multiple heat exchange air ducts 22; the surface of the air distribution plate 24 is provided with uneven air holes, so that the air volume in the heat exchange air duct 22 can be adjusted through the air distribution plate 24, thereby realizing the stepped distribution of cold air and improving the condensation effect.
[0082] Preferably, the size of the air holes on the air distribution plate 24 gradually decreases from the condenser air inlet interface 19 to the condenser air outlet interface 20. As a result, the air volume flowing into the multiple heat exchange air ducts 22 is reduced in a step-by-step manner. The air volume on the side close to the condenser air inlet interface 19 is large, which can quickly exchange heat with the gas discharged from the spray drying furnace 5, and then quickly cool the gas. After the gas exchanges heat with the multiple heat exchange air ducts 22 in turn, the temperature decreases step by step, and the air volume in the heat exchange air duct 22 is gradually reduced in coordination with the gas temperature in the condenser 18; the present invention can reduce the amount of cold air on the premise of achieving rapid condensation of the gas through reasonable air distribution, thereby reducing equipment power and saving sludge treatment costs.
[0083] Specifically, Figure 4 As shown, the air equalizing plate 23 is arranged inside the condenser tube 18 and has evenly distributed pores on its surface. After the gas in the condenser tube 18 is condensed through the heat exchange air pipe 22, it is evenly distributed through the air equalizing plate 23 and then discharged from the condenser tube air outlet interface 20.
[0084] During implementation, the high-temperature gas discharged from the outlet pipe 8 of the spray drying furnace 5 is condensed by the condenser, the gas temperature is reduced, and part of the vapor is liquefied into liquid and discharged as sewage, and the chemical substances dissolved in the sewage are purified by biochemical treatment. After condensation, the non-condensable gas is passed into the gasification incinerator 30 for incineration.
[0085] In this embodiment, a plurality of heat exchange air pipes 22 are provided to exchange heat with high-temperature gas, and the flow rate of cold air in the plurality of heat exchange air pipes 22 is adjusted by an air distribution plate 24, thereby realizing step heat exchange. As the temperature of the gas decreases step by step, the amount of cold air introduced is reduced to avoid excessive consumption of cold air, reduce the power of the fan and / or refrigeration equipment, reduce energy consumption, and reduce processing costs.
[0086] Example 2
[0087] A specific embodiment of the present invention provides a sludge gasification and drying method, such as Figure 5 As shown, the following steps are included:
[0088] Step S1: preheating the sludge in the sludge pump pipe 3;
[0089] Step S2: The sprayer sprays the sludge under pressure;
[0090] Step S3: the spray drying furnace 5 bakes the atomized sludge to achieve vaporization and drying;
[0091] Step S4: The spray drying furnace 5 blows hot air from the bottom to take away the gas generated by the sludge vaporization and drying.
[0092] In the step S1 , the sludge in the sludge pump pipe 3 is heated by the heat transfer oil of the first heat transfer oil pipe 4 , so that the sludge is heated once before entering the spray drying furnace 5 .
[0093] In step S1 , multiple temperature sensors outside the sludge pump pipe 3 measure the temperatures of multiple positions of the first heat transfer oil pipe 4 as t1 , t2 , t3 . . . , respectively, and then average the multiple temperature values to determine the heating temperature of the sludge pump pipe 3 .
[0094] In step S2, the multiple streams of high-pressure air blown in by the third high-pressure air inlet port 603 can form a highly vortex airflow in the circumferential direction of the sludge, thereby promoting the decomposition and atomization of the sludge. The decomposed and atomized sludge particles have a certain speed and are sprayed into the inner cavity of the spray drying furnace 5 to achieve atomized injection of the sludge.
[0095] In step S2, the sludge in the atomizer 6 is pressurized through the first high-pressure air inlet interface 601 and the second high-pressure air inlet interface 602, so that when it is atomized through multiple third high-pressure air inlet interfaces 603, the atomization pressure can be maintained to avoid affecting the atomization effect due to the reduction of internal pressure in the atomizer 6 cavity.
[0096] In the step S2, when the sludge is atomized and sprayed by the sprayer 6, the pressure of the high-temperature air in the first air inlet pipe 12 is Po, the gas pressure of the spray drying furnace 5 is lower than that of the first air inlet pipe 12, and the pressure value in the cavity of the spray drying furnace 5 is Ped; the difference △P between Po and Ped is used as a variable for controlling the conveying volume of the bottom cage conveyor 13, △P=Po-Ped, and in actual application, the upper and lower limits △Pmax and △Pmin of △P are given.
[0097] During implementation, the material guide flow rate of the material guide pipe 11 is controlled by calibrating △Pmax and △Pmin on site, and △P is controlled to be between △Pmax and △Pmin. When the pressure difference is too large, the speed of the cage conveyor 13 is reduced; when the pressure difference is too low, the conveying efficiency of the cage conveyor 13 is increased.
[0098] In step S3, the temperatures monitored from bottom to top by multiple temperature sensors on the spray drying furnace 5 are T0, T1, T2, T3, T4, and T5 respectively; the five temperature values are weighted and averaged to obtain the parameter T representing the temperature of the spray drying furnace 5.
[0099] In step S3, according to the correlation between the temperature at different positions and the temperature inside the furnace chamber, the weighted value adopts a value between 0.8 and 1.2. Specifically, the amount of sludge sprayed in the spray drying furnace 5 (sludge pump speed) is related to the entire temperature distribution of T1-T5. T1, T2, T3, T4, and T5 are weighted (average value) and then used to adjust the air volume of the first air inlet pipe 12 at the bottom. When the air volume is the largest, the speed of the sludge pump is adjusted in turn.
[0100] Furthermore, in step S3 and step S4, the process of baking and flashing the sludge in the furnace cavity by the spray drying furnace 5 and the process of vaporizing and drying the sludge by bottom blowing hot air are continuously carried out during the falling process of the sludge; at the same time, the first air inlet pipe 12 blows hot air into the bottom of the spray drying furnace 5 to promote the turbulence of the sludge inside the furnace cavity.
[0101] Example 3
[0102] A specific embodiment of the present invention provides a sludge gasification, drying and incineration integrated treatment system, including the sludge drying device of Example 1, and the sludge is gasified and dried by the sludge drying device of Example 1. Furthermore, the sludge gasification, drying and incineration integrated system of this embodiment also includes: a cage conveyor 13, a gasification incinerator 30, a waste heat boiler 34 and a gas preheater.
[0103] like Figure 1 As shown, the cage conveyor 13 is used to pass the gasified and dried sludge discharged from the bottom of the spray drying furnace 5 into the gasification incinerator 30 for incineration.
[0104] like Figure 6 As shown, the gasification incinerator 30 includes: a gasification incineration chamber and a flue gas furnace; the gasification incineration chamber is used to incinerate combustible dried sludge and non-condensable gas; the flue gas furnace is connected to the waste heat boiler 34 to introduce the high-temperature flue gas generated by combustion into the waste heat boiler 34.
[0105] Specifically, the gasification incineration chamber is used to incinerate the dried sludge, and its internal incineration temperature reaches 900°C.
[0106] like Figure 6 As shown, the flue gas furnace is an inverted U-shaped structure, which is used to guide the flue gas after sludge incineration. A dust outlet is provided at the lower end of the flue gas furnace to guide the medium ash after sludge incineration. A separator is provided on the side of the flue gas furnace, the separator is connected to the side of the flue gas furnace, and a dust outlet is provided at the bottom of the separator to guide the medium ash.
[0107] Specifically, the flue gas duct includes: a first flue gas duct 25, a second flue gas duct 26 and a connecting duct 27; wherein the lower end of the first flue gas duct 25 is connected to the gasification and incineration chamber and is arranged parallel to the second flue gas duct 26; the upper end of the first flue gas duct 25 is connected to the upper end of the second flue gas duct 26 through the connecting duct 27.
[0108] In the present invention, the sludge is gasified in the gasification chamber of the gasification incineration furnace 30 to generate gasification gas, and the gasification gas is burned in the gasification chamber; the gasification gas is also burned in the first flue gas furnace 25.
[0109] Furthermore, a third heat transfer oil pipe is arranged on the wall of the first flue gas furnace 25, and the third heat transfer oil pipe recovers the heat generated by the gasification incinerator 30 through the heat transfer oil, and then passes the heat transfer oil into the first heat transfer oil pipe 4 and the second heat transfer oil pipe 7 to preheat and dry the sludge.
[0110] The third heat-conducting oil pipe is provided with a second oil inlet interface 28 and a second oil outlet interface 29, wherein the second oil inlet interface 28 is used to introduce the heat-conducting oil refluxed from the first heat-conducting oil pipe 4 and the second heat-conducting oil pipe 7 into the third heat-conducting oil pipe; the second oil outlet interface 29 is used to provide the first heat-conducting oil pipe 4 and the second heat-conducting oil pipe 7 with the heat-conducting oil heated by the gasification incinerator 30.
[0111] Furthermore, the heat transfer oil in the third heat transfer oil pipe is heated by the gasification incinerator 30 and divided into three paths: one path is supplied to the first heat transfer oil pipe 4 for preheating the sludge; one path is supplied to the second heat transfer oil pipe 7 for gasifying and drying the sprayed sludge; and one path is supplied to the air cooler for cooling, and the flow rate of the heat transfer oil supplied to the air cooler is adjusted by a valve, thereby regulating the temperature of the heat transfer oil.
[0112] Preferably, the temperature of the heat transfer oil in the first heat transfer oil pipe 4 and the second heat transfer oil pipe 7 is controlled to be 300° C.-380° C.
[0113] Furthermore, a cooling liquid circulation loop is provided at the end of the second flue gas duct 26; the cooling liquid circulation loop includes: a liquid cooling pipeline, a water inlet interface 32 and a water outlet interface 33; the liquid cooling pipeline is wound around the outer wall of the end of the second flue gas duct 26, and the two ends are respectively connected to the water inlet interface 32 and the water outlet interface 33; a water tank and a water pump are connected between the water inlet interface 32 and the water outlet interface 33, which are used to introduce cooling liquid into the liquid cooling pipeline, thereby cooling the second flue gas duct 26, and the flue gas inside the second flue gas duct 26 is discharged in the form of medium ash after cooling.
[0114] Furthermore, the upper end of the flue gas furnace or the upper end of the separator is connected to the waste heat boiler 34, and the high-temperature flue gas generated by the incineration enters the waste heat boiler 34. Preferably, the temperature of the high-temperature flue gas in the waste heat boiler 34 is 550°C±50°.
[0115] In a specific embodiment of the present invention, Figure 6 As shown, the waste heat boiler 34 is an inverted U-shaped structure, one end of which is connected to the flue gas furnace, and the other end is provided with a dust outlet 37 and a flue gas outlet 38. The waste heat boiler 34 is nested with a first gas preheater 35 and a second gas preheater 36, which can heat the gas flowing through the waste heat boiler 34 by absorbing the waste heat of the flue gas.
[0116] Furthermore, the first gas preheater 35 is used to preheat the non-condensable gas discharged from the condenser; and the second gas preheater 36 is used to preheat the air.
[0117] Considering that the non-condensable gas discharged from the condenser has a low temperature (low enthalpy value), directly passing it into the gasification incinerator 30 will reduce the furnace temperature of the gasification incinerator 30 and increase the combustion energy consumption of the gasification incinerator 30. Therefore, in the present invention, the non-condensable gas is heat exchanged through the waste heat boiler 34, absorbs the heat of the combustion flue gas to increase the enthalpy value, and then is passed into the gasification incinerator 30 for combustion.
[0118] Specifically, the non-condensable gas condensed by the condenser 18 is firstly introduced into the first gas preheater 35 for preheating, and then introduced into the gasification incinerator 30 for combustion. Preferably, the temperature of the non-condensable gas after preheating by the first gas preheater 35 is not less than 200°C.
[0119] like Figure 1 , Figure 6 As shown, air is introduced into the second gas preheater 36, and high-temperature air is obtained by heating the low-temperature air with the high-temperature flue gas in the waste heat boiler 34. Further, the obtained high-temperature air is introduced into the spray drying furnace 5 and the gasification incinerator 30 respectively, thereby realizing the gasification, drying and incineration of the sludge.
[0120] Specifically, the second gas preheater 36 preheats the air to 400°C; the high-temperature air of 400°C is divided into two paths, one path is passed into the furnace cavity through the first air inlet pipe 12 at the bottom of the spray drying furnace 5 to dry the sludge, and the other path is passed into the gasification incineration chamber through the second air inlet pipe 31 at the bottom of the gasification incineration furnace 30 to incinerate the dried sludge.
[0121] In the present invention, the gas outlet of the second gas preheater 36 is arranged upstream of the first gas preheater 35 , so that the temperature of the gas preheated by the second gas preheater 36 is higher than that of the first gas preheater 35 .
[0122] Specifically, the principles of the first gas preheater 35 and the second gas preheater 36 are the same.
[0123] Exemplarily, the second gas preheater 36 includes: a box body 361 and a connecting air duct 362; wherein a plurality of box bodies 361 are provided, and the box bodies 361 are covered on the outside of the waste heat boiler 34; the connecting air duct 362 is used to connect the plurality of box bodies 361, and when the air flows through the plurality of box bodies 361 in sequence, it can exchange heat with the waste heat boiler 34 and the high-temperature flue gas therein.
[0124] Exemplarily, the second gas preheater 36 includes: a preheating pipe 363 and a connecting air duct 362; specifically, the preheating pipe 363 is arranged throughout the interior of the waste heat boiler 34, and its two ends are connected to the connecting air duct 362 / inlet air duct / outlet air duct. When in use, the preheating pipe 363 is in direct contact with the high-temperature flue gas inside the waste heat boiler 34, thereby heating the gas circulating inside the preheating pipe 363. Specifically, multiple groups of preheating pipes 363 are arranged, and two groups of preheating pipes 363 are connected by the connecting air duct 362. Preferably, multiple preheating pipes 363 of the same group are arranged in multiple rows and columns inside the waste heat boiler 34, and two adjacent rows of preheating pipes 363 are staggered in the direction of flue gas circulation, such as Figure 7 shown.
[0125] Preferably, in this embodiment, the preheating tube 363 is configured as a gradually shrinking and expanding tube; Figure 8 As shown, the preheating tube 363 is a rectangular tube with at least one spherical expansion chamber arranged in the middle. The gas circulates in the preheating tube 363. When the gas flows through the spherical expansion chamber of the preheating tube 363, a vortex phenomenon is generated, which promotes heat exchange between the gas and the wall of the preheating tube 363, thereby improving the heat exchange efficiency and achieving the expected temperature of the gas after passing through the gas preheater.
[0126] In the present invention, a built-in preheating pipe 363 is provided to exchange heat with the high-temperature flue gas (550°C) to improve the preheating effect and preheating efficiency of the air, so that the low-temperature air can reach the expected temperature (400°C) in a short time, so as to supply the gasification incineration chamber with sufficient oxygen for combustion, and supply the spray drying furnace 5 with sufficient high-temperature air to dry the sludge, thereby improving the treatment efficiency and treatment quality of the sludge.
[0127] In a specific embodiment of the present invention, Figure 6 As shown, the second gas preheater 36 is provided with four boxes 361, and the four boxes 361 are connected through the connecting air duct 362. Among them, three groups are provided from bottom to top at the tail section (low temperature section) of the U-shaped waste heat boiler 34, and the bottommost box 361 is connected to the air inlet duct, and at the same time, a box 361 is provided at the front section (high temperature section) of the waste heat boiler 34, and the box 361 at the front section of the waste heat boiler 34 is connected to the air outlet duct. Specifically, the front section and the tail section of the preheating boiler 34 are divided according to the flow order of the high temperature flue gas inside them.
[0128] Or, if Figure 6As shown, the second gas preheater 36 is provided with four groups of preheating pipes 363, and the four groups of preheating pipes 363 are connected through the connecting air duct 362. Among them, three groups of preheating pipes 363 are arranged from bottom to top in the tail section (low temperature section) of the U-shaped waste heat boiler 34, and one group of preheating pipes 363 is arranged in the head section (high temperature section) of the heat boiler 34. In addition, the group of preheating pipes 363 at the bottom of the tail section is connected to the air inlet duct, and the preheating pipes 363 at the head section are connected to the air outlet duct.
[0129] When in use, the air flows through the three boxes 631 / three groups of preheating pipes 363 at the tail section of the waste heat boiler 34 in sequence, and then enters the box 361 / preheating pipe 363 at the head section, realizing step-by-step preheating of the air, gradually increasing the air temperature, and achieving the optimal preheating effect.
[0130] Correspondingly, the first gas preheater 35 for preheating the non-condensable gas is arranged in the middle section of the waste heat boiler 34, such as Figure 6 As shown. Further, by controlling the length and flow rate of the flow path of the non-condensable gas / air in the first gas preheater 35 / the second gas preheater 36, the temperature of the non-condensable gas / air after being preheated by the first gas preheater 35 / the second gas preheater 36 is controlled. In the present invention, the non-condensable gas is controlled to be 200°C±5° after preheating, and the temperature of the air is not less than 400°C after preheating.
[0131] It is worth noting that the "high temperature" and "low temperature" in the present invention refer to the temperature change before and after the gas / heat transfer oil is heated, or before and after heat exchange, and are used to distinguish the endothermic or exothermic state of the substance, and do not indicate a specific temperature range.
[0132] Compared with the prior art, the technical solution provided by this embodiment has at least one of the following beneficial effects:
[0133] 1. In this embodiment, the preheated sludge is sprayed and flashed in the cavity formed by the second heat transfer oil pipe 7 (300°C) inside the spray drying furnace 5, and hot air (400°C) is introduced through the bottom of the spray drying furnace 5 for ventilation and drying. After drying, the moisture content of the sludge is reduced from 72% to 60% or even lower. After entering the gasification incinerator, it is first gasified and then incinerated.
[0134] 2. The sludge incineration equipment of the present invention realizes a solution with high energy efficiency and low operating cost; the current direct operating cost can be as low as 150 yuan / t, while the operating cost of the prior art is generally 350-400 yuan / t, and the present invention is 200-250 yuan / t lower than the existing method.
[0135] 3. The relevant equipment of the present invention has a simple structure and is easy to manufacture, and the initial investment can be significantly reduced. The practice of the processing method of the present invention shows that the initial investment in the technical equipment of the present invention is about 200,000 yuan / t / d, while the existing technology is generally 350,000-400,000 yuan / t / d.
[0136] 4. In the present invention, according to the principle of cascade utilization of heat and the principle of minimization of auxiliary fuel, the drying and incineration integrated system is arranged, the heat utilization rate is high, the energy consumption of sludge treatment is greatly reduced, and the comprehensive treatment cost is reduced.
[0137] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily conceived by any technician familiar with the technical field within the technical scope disclosed by the present invention should be covered within the protection scope of the present invention.
Claims
1. A sludge spray drying device, characterized in that: include: A sludge pump pipe (3), a spray drying furnace (5), a sprayer (6) and a heating device arranged on the sludge pump pipe (3) and the spray drying furnace (5); the sludge pump pipe (3) is arranged above the spray drying furnace (5) and passes through the spray drying furnace (5), and the end of the sludge pump pipe (3) is connected to the sprayer (6); the sprayer (6) is used to spray the sludge into the inner cavity of the spray drying furnace (5); the heating device is used to heat the sludge pump pipe (3) and the spray drying furnace (5).
2. The sludge spray drying device according to claim 1, characterized in that: The sprayer (6) is of a conical structure; the upper end of the sprayer (6) is connected to the sludge pump pipe (3), and the lower end has a conical bell mouth; a plurality of third high-pressure air inlets (603) are arranged on the outside of the bell mouth; the third high-pressure air inlets (603) are used to blow high-pressure gas into the inner cavity of the bell mouth so that the sludge can be sprayed into the spray drying furnace (5) in a spray state.
3. The sludge spray drying device according to claim 2, characterized in that: The plurality of third high-pressure air inlets (603) are distributed in an array at equal intervals in the circumferential direction outside the bell mouth of the sprayer (6), and the plurality of third high-pressure air inlets (603) are located at the same height.
4. The sludge spray drying device according to claim 3, characterized in that: The angle between the blowing direction of the third high-pressure air inlet (603) and the radial direction of the sprayer (6) is α; 5°≤α≤30°.
5. The sludge spray drying device according to claim 4, characterized in that: The first heat transfer oil pipe (4) and the second heat transfer oil pipe (7) are both arranged on the sludge pump pipe (3) or the spray drying furnace (5) in a spirally coiled manner; the heat transfer oil flows through the gasification incinerator, thereby being able to transfer the heat generated by the gasification and incineration of the sludge to the sludge pump pipe (3) and the spray drying furnace (5).
6. The sludge spray drying device according to any one of claims 1 to 5, characterized in that: The first heat-conducting oil pipe (4) is connected to a first solenoid valve (15) and a first oil pump (16); the first solenoid valve (15) is used to adjust the flow rate of the heat-conducting oil in the first heat-conducting oil pipe (4); and the first oil pump (16) is used to control the flow rate of the heat-conducting oil in the first heat-conducting oil pipe (4).
7. The sludge spray drying device according to any one of claims 1 to 5, characterized in that: The second heat-conducting oil pipe (7) is connected to a second solenoid valve and a second oil pump; the second solenoid valve is used to adjust the flow rate of the heat-conducting oil in the second heat-conducting oil pipe (7), and the second oil pump is used to control the flow rate of the heat-conducting oil in the second heat-conducting oil pipe (7).
8. The sludge spray drying device according to claim 1, characterized in that: The spray drying furnace (5) is provided with a first air inlet pipe (12) at the lower end and an air outlet pipe (8) at the upper end; the first air inlet pipe (12) is used for bottom blowing hot air; the air outlet pipe (8) is used for discharging gas after sludge vaporization and drying.
9. A sludge gasification and drying method, characterized in that: The sludge to be treated is vaporized and dried by using the sludge spray drying device according to any one of claims 1 to 8.
10. A sludge gasification, drying and incineration integrated treatment system, characterized in that: A sludge spray drying device comprising any one of claims 1-8.
Citation Information
Patent Citations
Anhydration and incineration processing method for wet sludge
CN101386464A
Integral treatment method for drying and incinerating sludge
CN103244957A
Sludge drying incineration system and method
CN104891769A
Papermaking mud high temperature innocent treatment device
CN204588966U