Dustless chemical floor assembled temporary PC pavement slab and paving method

Through the dust-free construction site assembly temporary PC road panel and paving method, the problems of long construction cycle, low work efficiency, high cost and difficult maintenance in the existing technology are solved, and rapid disassembly and efficient construction are achieved, which is suitable for all constructions. Site and road.

CN118910970AActive Publication Date: 2024-11-08AIRPORT CONSTR ENG CO LTD +3
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411159753.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-22
Publication Date
2024-11-08
Estimated Expiration
2044-08-22

AI Technical Summary

Technical Problem

In the prior art, cast-in-place concrete or reinforced concrete, as temporary construction sites or temporary construction walkways, has problems such as long construction cycle, low work efficiency, high cost and difficult maintenance.

Method used

The dust-free construction site assembled temporary PC channel panel includes base mechanism, cover mechanism and small cover mechanism. The adjacent plates are connected through plate connections and small cover mechanisms to achieve rapid disassembly and assembly and fixation, combining digital equipment and The equipment is accurately positioned and installed.

Benefits of technology

It realizes a temporary road panel with fast construction speed, high efficiency, low cost, convenient maintenance and recyclable, suitable for all construction sites and roads, truly realizing dust-free construction sites.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118910970A_ABST
    Figure CN118910970A_ABST
Patent Text Reader

Abstract

The invention discloses a dust-free chemical floor assembly type temporary PC pavement slab and a paving method, and relates to the technical field of assembly type pavement slabs, the dust-free chemical floor assembly type temporary PC pavement slab comprises a pavement slab plate, the pavement slab plate comprises a base mechanism, a cover plate mechanism and a small cover plate mechanism, the cover plate mechanism is arranged at the top end of the base mechanism, and the small cover plate mechanism is arranged at the top of the cover plate mechanism; adjacent pavement slab plates are connected through plate connecting pieces and small cover plate mechanisms, and the base mechanism, the cover plate mechanisms and the small cover plate mechanisms are sequentially installed during pavement. The problems that in the prior art, cast-in-place concrete (or reinforced concrete) is adopted as a temporary construction site or a temporary construction road, and the cast-in-place site is long in construction period, low in work efficiency, high in cost and difficult to maintain are solved, the pavement slab is high in overall disassembly and assembly speed, high in efficiency, low in cost, convenient to maintain, capable of being recycled and put into use after construction is completed, and the construction efficiency is greatly improved. The method is suitable for all construction sites and roads, and the aim of dust-free chemical engineering site construction is really achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of assembled road panels, and in particular to a dust-free assembled temporary PC road panel and a paving method. Background Art

[0002] At present, there are few studies on prefabricated temporary sites and construction access roads at home and abroad. Some researchers still focus on prefabricated concrete pavements in this area, and most of them are in the research stage. This is mainly due to the problems of prefabricated road panels, transportation, high cost, inconvenient disassembly and transportation, and low reuse rate. Therefore, most domestic construction sites currently still use cast-in-place concrete (or reinforced concrete) as temporary construction sites or temporary construction access roads. Cast-in-place sites have the disadvantages of long construction period, low efficiency, high cost, and difficult maintenance. Only a small part of the existing sites and temporary access roads can be used as permanent sites in a "permanent and temporary" manner. Most of them still need to be broken up and transported in the later stage, and the permanent site needs to be re-paved, which seriously affects the progress of the project and is not conducive to cost control. The site is often damaged during use, and the reinforced concrete form is difficult to repair. Summary of the invention

[0003] The invention discloses a dust-free construction site assembled temporary PC road panel and a paving method, aiming to solve the problem in the prior art that "cast-in-place concrete (or reinforced concrete) is used as a temporary construction site or a temporary construction access road, and the cast-in-place site has a long construction period, low efficiency, high cost and difficult maintenance".

[0004] To achieve the above object, the technical solution of the present invention is:

[0005] A dust-free temporary PC road panel assembled at a construction site comprises panels, wherein the panels comprise a base mechanism, a cover mechanism and a small cover mechanism, wherein a cover mechanism is disposed on the top of the base mechanism, and a small cover mechanism is disposed on the top of the cover mechanism, and adjacent panels are connected via panel connectors and the small cover mechanism.

[0006] Preferably, the base mechanism comprises a main rib frame and an edge reinforcement frame, the edge reinforcement frame is a rectangular frame structure formed by connecting a plurality of first plates, the main rib frame is a tic-tac-toe structure array formed by connecting a plurality of second plates that cross each other in the horizontal and vertical directions, the main rib frame is arranged on the inner side of the edge reinforcement frame, and the outer end of the main rib frame is integrally connected to the inner surface of the edge reinforcement frame; a plurality of connection boxes consisting of tic-tac-toe structures are provided at a position adjacent to the edge reinforcement frame of the tic-tac-toe structure array, two reinforced main ribs are arranged side by side in the connection box body, and the edge reinforcement frame between the outer ends of the two reinforced main ribs is provided with a through plate connection hole, and the height of the plate connection hole is less than the width; a plurality of cover plate connection holes of rectangular structures are evenly distributed on the first plate on the outer side of the edge reinforcement frame.

[0007] Preferably, the cover mechanism includes a third plate body, a plurality of cover main ribs are evenly distributed on the bottom end of the third plate body, a card slot is provided on the upper end of the second plate body opposite to the cover main rib, the cover main rib is snap-connected with the card slot, a plurality of first elastic plates are provided at the bottom edge of the third plate body, a first hook structure is provided at the bottom of the first elastic plate facing outward, the first elastic plate is tightly fitted to the inner surface of the first plate body outside the edge reinforcement frame, and is connected to the cover connecting hole through the first hook structure, a rectangular opening is provided at the position of the third plate body opposite to the upper port of the connecting box body, and a small cover mechanism is arranged at the rectangular opening.

[0008] Preferably, small cover connecting holes of a rectangular structure are respectively provided at both ends of the front and rear opposite side walls of the connecting box body, and the small cover mechanism includes a fourth plate body matching the shape and size of the rectangular opening, second elastic plates are respectively provided on the front and rear ends of the lower surface of the fourth plate body, and a second hook structure inclined outward is provided at the bottom of the second elastic plate, the second elastic plate is tightly fitted with the front and rear inner walls of the connecting box body, and the second hook structure is clamped with the corresponding small cover connecting holes, fifth plates are respectively provided at the left and right ends of the lower surface of the fourth plate body, and sixth plates are respectively provided at the front and rear ends between the two fifth plates, the top of the sixth plate body is fixedly connected to the bottom of the fourth plate body, and an inverted V-shaped groove is provided at the bottom of the sixth plate body.

[0009] Preferably, the plate connecting member includes a rod body, one end of the rod body is provided with a conical structure, the outer surface of the rod body behind the conical structure is symmetrically provided with a first clamping block, the rear end of the rod body is symmetrically provided with a second clamping block, the two first clamping blocks and the two second clamping blocks are cross-arranged, and the top ends of the third plate body and the fourth plate body are provided with anti-slip grooves.

[0010] A method for paving a dust-free, assembled temporary PC road panel comprises the following steps:

[0011] Step A1, using digital equipment to accurately locate the newly built temporary site and road;

[0012] Step A2, marking the construction area with colored paint;

[0013] Step A3: Use loaders, excavators and small machines to roll and level the surface, with a compaction degree of ≥ 98%;

[0014] Step A4, after the base layer has completed the three-plate working surface, the road panel is installed;

[0015] Step A5, testing the installed panels.

[0016] Preferably, in step A4, the method for installing the road panel comprises the following steps:

[0017] Step B1: Before installation, check whether the panels are intact and free of serious defects, including broken panels, through cracks, and broken corners; general defects, including localized small-area peeling, marks, and cracks, should be avoided; check whether the panel connectors are damaged;

[0018] Step B2: After the panels are installed in place, aligned with the edge line, corrected for verticality, and temporarily fixed firmly, the hook can be released;

[0019] Step B3, after all the connection points of a single plate are connected with the plate connectors, the cover plate mechanism is installed;

[0020] Step B4, the cover plate mechanism is fastened and connected with the card slot through the main ribs of the cover plate, and then the first hook-shaped structures around the periphery are fastened with the connecting holes of the cover plate;

[0021] Step B5, after the cover mechanism is installed, the adjacent panels are connected through the panel connectors, and then the small cover mechanisms are fastened one by one. When the small cover mechanism is put in, it is fastened with the connecting holes of the small cover through the second hook structure, and the panel connectors are fixed at the same time.

[0022] Preferably, in step B5, the method for fixing the plate connecting member comprises the following steps:

[0023] Step C1, the rod body of the plate connecting member passes through the relative plate connecting holes of the adjacent plates and then rotates 90 degrees to be engaged with the preset limit grooves at the upper and lower ends of the ports in the plate connecting holes through the two first clamping blocks. At this time, the two second clamping blocks are in a horizontal position;

[0024] Step C2, insert the small cover mechanism. At this time, the sixth plate body located on the outside is clamped on the position of the rod body adjacent to the second clamping block through a V-shaped groove, and the outer surface of the second clamping block is tightly fitted with the inner surface of the sixth plate body; after the fourth plate body is covered on the top of the connecting box body, the inner surface of the fifth plate body is tightly fitted with the corresponding reinforced main rib.

[0025] Preferably, in step A5, the plate detection method comprises the following steps:

[0026] Step D1, using a 3m ruler to detect the flatness of the plate surface, taking the maximum value of the distance between the ruler and the plate surface in the vertical, horizontal and oblique directions of each plate;

[0027] Step D2, using a feeler gauge to measure the height difference between adjacent boards;

[0028] Step D3, use 20m pulling wire to check the linearity of longitudinal and transverse seams.

[0029] The dust-free industrial site assembled temporary PC road panel and paving method of the present invention have the following beneficial effects:

[0030] The present invention overcomes the problem in the prior art that "cast-in-place concrete (or reinforced concrete) is used as a temporary construction site or temporary construction access road, and the cast-in-place site has a long construction period, low work efficiency, high cost, and difficult maintenance". The road panel has fast overall disassembly and assembly speed, high efficiency, low cost, convenient maintenance and can be recycled. It can be put into use after the construction is completed without waiting for the age. It is suitable for all construction sites and roads, and truly realizes the goal of dust-free construction site. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 , a schematic diagram of the top view of the base mechanism of the present invention;

[0032] Figure 2 , a front view structural diagram of the base mechanism of the present invention;

[0033] Figure 3 , a schematic diagram of the top view of the cover mechanism of the present invention;

[0034] Figure 4 , a side structural schematic diagram of the cover plate mechanism of the present invention;

[0035] Figure 5 , a schematic diagram of the top view of the small cover mechanism of the present invention;

[0036] Figure 6 , a front view structural schematic diagram of the small cover plate mechanism of the present invention;

[0037] Figure 7 , a side structural schematic diagram of the small cover plate mechanism of the present invention;

[0038] Figure 8 , a schematic diagram of the top view of the plate connector of the present invention;

[0039] Fig. 9 , a front view structural schematic diagram of the plate connecting member of the present invention;

[0040] Fig.10, a schematic diagram of the structure of the road panel of the present invention after assembly.

[0041] 1: main rib frame, 2: connecting box body, 3: strengthening main rib, 4: plate connecting hole; 5: card slot, 6: edge reinforcement frame, 7: anti-slip pattern, 8: rectangular opening, 9: rectangular opening edge, 10: cover plate main rib, 11: first elastic plate, 12: third elastic plate, 13: second hook structure, 14: fifth plate body, 15: sixth plate body, 16: plate connecting piece, 17: cover plate connecting hole, 161: first card block, 162: second card block. DETAILED DESCRIPTION

[0042] The following describes in detail the implementation mode of the present invention in a step-by-step manner. The description is only a preferred embodiment of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.

[0043] In the description of the present invention, it should be noted that the directions or positional relationships indicated by terms such as “upper”, “lower”, “left”, “right”, “top”, “bottom”, “inside” and “outside” are based on the directions or positional relationships shown in the accompanying drawings, and are only for the purpose of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, and a specific direction structure and operation, and therefore cannot be understood as a limitation on the present invention.

[0044] In the initial embodiment, the present invention is a dust-free chemically assembled temporary PC road panel, including panels (such as Fig.10 As shown), the plate includes a base mechanism (as Figure 1 , 2 As shown), cover mechanism (as Figure 3 , 4 As shown), small cover mechanism (as Figure 5 , 6 , 7), the top of the base mechanism is provided with a cover mechanism, the top of the cover mechanism is provided with a small cover mechanism, and adjacent plates are connected by plate connectors (such as Figure 8 , 9 As shown) and connected with a small cover mechanism.

[0045] In a further embodiment, Figure 1 , 2As shown, the base mechanism includes a main rib frame 1 and an edge reinforcement frame 6. The edge reinforcement frame 6 is a rectangular frame structure formed by connecting a plurality of first plates. The main rib frame 1 is a tic-tac-toe structure array formed by connecting a plurality of second plates that cross each other horizontally and vertically. The main rib frame 1 is arranged on the inner side of the edge reinforcement frame 6, and the outer end of the main rib frame 1 is integrally connected to the inner surface of the edge reinforcement frame 6.

[0046] In a further embodiment, Figure 1 , 2 As shown, the part of the tic-tac-toe structure array adjacent to the edge reinforcement frame 6 is provided with a plurality of connection boxes 2 consisting of tic-tac-toe structures, two reinforcement main ribs 3 are arranged side by side in the connection box 2, and the edge reinforcement frame 6 between the outer ends of the two reinforcement main ribs 3 is provided with a through plate connection hole 4, and the height of the plate connection hole 4 is less than the width, as shown in FIG. Figure 2 As shown, it is convenient to limit the first block when rotating the plate connector; a plurality of rectangular cover plate connecting holes 17 are evenly distributed on the first plate body outside the edge reinforcement frame 6.

[0047] In a further embodiment, Figure 3 , 4 As shown, the cover mechanism comprises a third plate body, a plurality of cover plate main ribs 10 are evenly distributed at the bottom end of the third plate body, and a card slot 5 (such as Figure 1 As shown), the main rib 10 of the cover plate is snap-fitted with the card slot 5, a plurality of first elastic plates 11 are provided at the bottom edge of the third plate body, a first hook-shaped structure is provided at the bottom of the first elastic plate 11 toward the outside, the first elastic plate 11 is tightly fitted with the inner surface of the first plate body outside the edge reinforcement frame 6, and is connected to the cover plate connecting hole 17 through the first hook-shaped structure, a rectangular opening 8 is provided at the position of the third plate body opposite to the upper port of the connecting box body 2, and a small cover plate mechanism is arranged at the rectangular opening 8.

[0048] In a further embodiment, Figure 3 , 4As shown in , 5, 6, and 7, small cover connecting holes of rectangular structure are respectively provided at both ends of the front and rear opposite side walls of the connecting box body (not shown in the figure, refer to the plate connecting holes), and the small cover mechanism includes a fourth plate body whose shape and size match the rectangular opening 8, and second elastic plates are respectively provided on the front and rear ends of the lower surface of the fourth plate body, and a second hook structure 13 inclined outward is provided at the bottom of the second elastic plate. The second elastic plate is tightly fitted with the front and rear inner walls of the connecting box body 2, and the second hook structure 13 is clamped with the corresponding small cover connecting hole 17, and fifth plate bodies 14 are respectively provided at the left and right ends of the lower surface of the fourth plate body, and sixth plate bodies 15 are respectively provided at the front and rear ends between the two fifth plate bodies 14, and the top of the sixth plate body 15 is fixedly connected to the bottom of the fourth plate body, and the bottom of the sixth plate body is provided with an inverted V-shaped groove (as shown in Figure 6 shown).

[0049] In a further embodiment, Figure 8 , 9 As shown, the plate connector 16 includes a rod body, one end of which is provided with a conical structure, the outer surface of the rod body behind the conical structure is symmetrically provided with a first clamping block 161, and the rear end of the rod body is symmetrically provided with a second clamping block 162, and the two first clamping blocks 161 and the two second clamping blocks 162 are cross-arranged.

[0050] In a further embodiment, Figure 2 , 8 As shown in FIG. 9 , the rod body passes through the relative plate connecting hole 4 of the adjacent plate and then rotates 90 degrees to be engaged with the preset limiting grooves (not shown in the figure) at the upper and lower ends of the inner port of the plate connecting hole 4 through the two first clamping blocks 161. At this time, the two second clamping blocks 162 are located in a horizontal position, and the sixth plate body 15 located on the outside is engaged with the position of the rod body adjacent to the second clamping block 162 through a V-shaped groove. The outer surface of the second clamping block 162 is tightly fitted with the inner surface of the sixth plate body 15, thereby achieving the fixation of the plate connecting piece.

[0051] In a further embodiment, Fig.10 As shown, the top of the third plate body and the fourth plate body are provided with anti-slip grooves 7. After the fourth plate body is covered on the top of the connecting box body 2, the inner surface of the fifth plate body is tightly fitted with the corresponding reinforced main ribs 3. The reinforced main ribs 3 are used to assist in fixing the plate connecting holes 4 and strengthen the structural strength of the connecting box body 2 by tightly fitting with the fifth plate body.

[0052] In a further embodiment, Figure 1-10 As shown, the present invention discloses a method for paving a dust-free, assembled temporary PC road panel, comprising the following steps:

[0053] Step A1, using digital equipment to accurately locate the newly built temporary site and road;

[0054] Step A2, marking the construction area with colored paint;

[0055] Step A3: Use loaders, excavators and small machines to roll and level the surface, with a compaction degree of ≥ 98%;

[0056] Step A4, after the base layer has completed the three-plate working surface, the road panel is installed;

[0057] Step A5, testing the installed panels.

[0058] In a further embodiment, Figure 1-10 As shown, in step A4, the method for installing the road panel includes the following steps:

[0059] Step B1: Before installation, check whether the panels are intact and free of serious defects, including broken panels, through cracks, and broken corners; general defects, including localized small-area peeling, marks, and cracks, should be avoided; check whether the panel connectors are damaged;

[0060] Step B2: After the panels are installed in place, aligned with the edge line, corrected for verticality, and temporarily fixed firmly, the hook can be released;

[0061] Step B3, after all the connection points of a single plate are connected with the plate connectors, the cover plate mechanism is installed;

[0062] Step B4, the cover plate mechanism is fastened and connected with the card slot through the main ribs of the cover plate, and then the first hook-shaped structures around the periphery are fastened with the connecting holes of the cover plate;

[0063] Step B5, after the cover mechanism is installed, the adjacent panels are connected through the panel connectors, and then the small cover mechanisms are fastened one by one. When the small cover mechanism is put in, it is fastened with the connecting holes of the small cover through the second hook structure, and the panel connectors are fixed at the same time.

[0064] In a further embodiment, Figure 1-10 As shown, in step B5, the method for fixing the plate connecting member includes the following steps:

[0065] Step C1, the rod body of the plate connecting member passes through the relative plate connecting holes of the adjacent plates and then rotates 90 degrees to be engaged with the preset limit grooves at the upper and lower ends of the ports in the plate connecting holes through the two first clamping blocks. At this time, the two second clamping blocks are in a horizontal position;

[0066] Step C2, insert the small cover mechanism. At this time, the sixth plate body located on the outside is clamped on the position of the rod body adjacent to the second clamping block through a V-shaped groove, and the outer surface of the second clamping block is tightly fitted with the inner surface of the sixth plate body; after the fourth plate body is covered on the top of the connecting box body, the inner surface of the fifth plate body is tightly fitted with the corresponding reinforced main rib.

[0067] In a further embodiment, Figure 1-10 As shown, in step A5, the plate detection method includes the following steps:

[0068] Step D1, using a 3m ruler to detect the flatness of the plate surface, taking the maximum value of the distance between the ruler and the plate surface in the vertical, horizontal and oblique directions of each plate;

[0069] Step D2, using a feeler gauge to measure the height difference between adjacent boards;

[0070] Step D3, use 20m pulling wire to check the linearity of longitudinal and transverse seams.

Claims

1. A dust-free chemically assembled temporary PC road panel, characterized by: It comprises a plate, wherein the plate comprises a base mechanism, a cover mechanism and a small cover mechanism. The top of the base mechanism is provided with a cover mechanism, the top of the cover mechanism is provided with a small cover mechanism, and adjacent plates are connected by plate connectors and the small cover mechanism.

2. A dust-free, temporary PC road panel assembled in a chemical process as claimed in claim 1, characterized in that: The base mechanism includes a main rib frame and an edge reinforcement frame. The edge reinforcement frame is a rectangular frame structure formed by connecting a plurality of first plates. The main rib frame is a tic-tac-toe structure array formed by connecting a plurality of second plates that cross each other in a horizontal and vertical direction. The main rib frame is arranged on the inner side of the edge reinforcement frame, and the outer end of the main rib frame is integrally connected to the inner surface of the edge reinforcement frame; a plurality of connection boxes formed by tic-tac-toe structures are provided at a position adjacent to the edge reinforcement frame of the tic-tac-toe structure array, and two reinforced main ribs are arranged side by side in the connection box body, and the edge reinforcement frame between the outer ends of the two reinforced main ribs is provided with a through plate connection hole, and the height of the plate connection hole is less than the width; a plurality of rectangular cover plate connection holes are evenly distributed on the first plate on the outer side of the edge reinforcement frame.

3. A dust-free, temporary PC road panel assembled in a construction site as claimed in claim 2, characterized in that: The cover mechanism includes a third plate body, and a plurality of cover main ribs are evenly distributed on the bottom end of the third plate body. A card slot is provided on the upper end of the second plate body opposite to the cover main rib, and the cover main rib is engaged with the card slot. A plurality of first elastic plates are provided at the bottom edge of the third plate body, and a first hook structure is provided at the bottom of the first elastic plate toward the outside. The first elastic plate is tightly fitted to the inner surface of the first plate body outside the edge reinforcement frame, and is connected to the cover connecting hole through the first hook structure. A rectangular opening is provided at the position of the third plate body opposite to the upper port of the connecting box body, and a small cover mechanism is arranged at the rectangular opening.

4. A dust-free, temporary PC road panel assembled in a chemical process as claimed in claim 3, characterized in that: Small cover connecting holes of rectangular structure are respectively provided at both ends of the front and rear opposite side walls of the connecting box body, and the small cover mechanism includes a fourth plate body whose shape and size match the rectangular opening, and second elastic plates are respectively provided on the front and rear ends of the lower surface of the fourth plate body, and a second hook structure inclined outward is provided at the bottom of the second elastic plate, and the second elastic plate is tightly fitted with the front and rear inner walls of the connecting box body, and the second hook structure is clamped with the corresponding small cover connecting holes, and fifth plates are respectively provided at the left and right ends of the lower surface of the fourth plate body, and sixth plates are respectively provided at the front and rear ends between the two fifth plates, the top of the sixth plate body is fixedly connected to the bottom of the fourth plate body, and the bottom of the sixth plate body is provided with an inverted V-shaped groove.

5. A dust-free, temporary PC road panel assembled in a construction site as claimed in claim 4, characterized in that: The plate connecting piece includes a rod body, one end of which is provided with a conical structure, the outer surface of the rod body behind the conical structure is symmetrically provided with a first clamping block, the rear end of the rod body is symmetrically provided with a second clamping block, the two first clamping blocks and the two second clamping blocks are cross-arranged, and the top ends of the third plate body and the fourth plate body are provided with anti-slip grooves.

6. A method for paving a dust-free, assembled temporary PC road panel in a construction site as claimed in claim 5, characterized in that: The steps include: Step A1, using digital equipment to accurately locate the newly built temporary site and road; Step A2, marking the construction area with colored paint; Step A3: Use loaders, excavators and small machines to roll and level the surface, with a compaction degree of ≥ 98%; Step A4, after the base layer has completed the three-plate working surface, the road panel is installed; Step A5, testing the installed panels.

7. A method for paving a dust-free, assembled temporary PC road panel as claimed in claim 6, characterized in that: In step A4, the method for installing the road panel comprises the following steps: Step B1: Before installation, check whether the panels are intact and free of serious defects, including broken panels, through cracks, and broken corners; general defects, including localized small-area peeling, marks, and cracks, should be avoided; check whether the panel connectors are damaged; Step B2: After the panels are installed in place, aligned with the edge line, corrected for verticality, and temporarily fixed firmly, the hook can be released; Step B3, after all the connection points of a single plate are connected with the plate connectors, the cover plate mechanism is installed; Step B4, the cover plate mechanism is fastened and connected with the card slot through the main ribs of the cover plate, and then the first hook-shaped structures around the periphery are fastened with the connecting holes of the cover plate; Step B5, after the cover mechanism is installed, the adjacent panels are connected through the panel connectors, and then the small cover mechanisms are fastened one by one. When the small cover mechanism is put in, it is fastened with the connecting holes of the small cover through the second hook structure, and the panel connectors are fixed at the same time.

8. A method for paving a dust-free, assembled temporary PC road panel as claimed in claim 7, characterized in that: In step B5, the method for fixing the plate connecting member comprises the following steps: Step C1, the rod body of the plate connecting member passes through the relative plate connecting holes of the adjacent plates and then rotates 90 degrees to be engaged with the preset limit grooves at the upper and lower ends of the ports in the plate connecting holes through the two first clamping blocks. At this time, the two second clamping blocks are in a horizontal position; Step C2, insert the small cover mechanism. At this time, the sixth plate body located on the outside is clamped on the position of the rod body adjacent to the second clamping block through a V-shaped groove, and the outer surface of the second clamping block is tightly fitted with the inner surface of the sixth plate body; after the fourth plate body is covered on the top of the connecting box body, the inner surface of the fifth plate body is tightly fitted with the corresponding reinforced main rib.

9. A method for paving a dust-free, assembled temporary PC road panel as claimed in claim 8, characterized in that: In step A5, the plate detection method includes the following steps: Step D1, using a 3m ruler to detect the flatness of the plate surface, taking the maximum value of the distance between the ruler and the plate surface in the vertical, horizontal and oblique directions of each plate; Step D2, using a feeler gauge to measure the height difference between adjacent boards; Step D3, use 20m pulling wire to check the linearity of longitudinal and transverse seams.

Citation Information

Patent Citations

  • Novel assembly type temporary road structure and paving and connecting construction method thereof

    CN112030664A

  • Environment-friendly ultra-light fabricated construction road and construction method thereof

    CN113308959A

  • Fabricated PC prefabricated road plate

    CN219972840U

  • Spliced temporary PC pavement slab for dust-free chemical field

    CN223003250U

  • Precast concrete panel, manufacturing method of the precast concrete panel and slab construction method using the precast concrete panel

    KR101921715B1