Prefabricated and assembled railway pier structure based on concrete-filled steel tube framework

By setting up positioning parts and cast steel pipes in the bridge pier structure, combining leveling frames and strengthening connecting ribs, the rapid positioning and efficient connection of prefabricated assembled bridge piers are achieved, and the problems of node processing complexity and seismic resistance of prefabricated assembled bridge structures are solved. Improve construction efficiency and structural stability.

CN118911002APending Publication Date: 2024-11-08BEIJING UNIV OF TECH +3
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411329313.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-24
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

The prefabricated assembled bridge structure is complex in node and seam processing, affecting seismic resistance and overall stiffness, and the construction efficiency and quality are difficult to guarantee.

Method used

The prefabricated assembled railway piers structure based on the steel pipe concrete skeleton is adopted. By setting up positioning parts and connected casting pipelines, the prefabricated parts can be quickly positioned and joint spliced, and components such as plugs, plugs, cast steel pipes and leveling frames are simplified. The pouring process improves the connection tightness.

Benefits of technology

It realizes rapid positioning and efficient connection of the bridge pier structure, improves construction efficiency and structural stability, reduces the use position of grouting materials, ensures the tightness and integration of the connection, and improves the safety and quality of construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911002A_ABST
    Figure CN118911002A_ABST
Patent Text Reader

Abstract

The invention discloses a prefabricated assembly railway pier structure based on a concrete filled steel tube framework, and belongs to the technical field of pier constructions.The assembly structure is simple in structure, a bearing platform, a pier section and a cover beam which are prefabricated are sequentially hoisted, positioning parts pre-buried in a prefabricated part are in up-down butt joint, and a direct pressurizing pump pressurizing mode is adopted, so that the prefabricated assembly railway pier structure is obtained. The grouting material is driven into the input hole, moves downwards along the interior of the pouring steel pipe, bypasses the sinking hole, moves upwards along the inner hole and finally flows out of the output hole, the inner hole and the pouring steel pipe are filled with the grouting material at the moment, and after the grouting material is solidified, integration of the bearing platform, the pier column section and the bent cap is achieved; according to the structure, positioning is convenient and fast, prefabricated parts are connected through grouting materials, the number of input positions of the grouting materials is small, the grouting materials are all arranged at the position of the bent cap, pouring at each connecting point is not needed, pouring of the grouting materials of all pier column structures can be completed, the pouring mode is simple, filling of the grouting materials is guaranteed, and the structure is high in construction efficiency and tight and stable in connection.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of bridge pier construction, and in particular relates to a prefabricated assembled railway bridge pier structure based on a steel tube concrete skeleton. Background Art

[0002] With the development of road traffic and industrialized construction in my country, the requirements for construction efficiency, construction quality, environmental impact, construction cost, etc. in the process of bridge construction are becoming increasingly stringent. The factory prefabrication and on-site assembly of prefabricated assembly technology has the advantages of shortening the construction period, ensuring project quality and construction safety, reducing environmental pollution at the construction site, reducing labor and material costs, and flexible on-site assembly construction. It is of great significance for the rapid construction of bridges. However, compared with traditional cast-in-place concrete construction, the treatment of structural nodes and joints using prefabricated assembly construction technology is more complicated, and the structural integrity and stiffness will be affected to a certain extent, thereby affecting the seismic performance of prefabricated assembly structures. Summary of the invention

[0003] In view of this, an object of the present invention is to provide a prefabricated assembled railway pier structure based on a steel tube concrete skeleton, which can realize rapid positioning and joint splicing of prefabricated parts by providing a positioning portion and a connecting casting pipeline.

[0004] In order to achieve the above object, the present invention provides the following technical solutions:

[0005] The present invention comprises a cap, a plurality of pier segments and a cap beam which are built upward in sequence; positioning parts are embedded in the cap, the pier and the cap beam, and the positioning parts comprise plug columns, connecting columns and plug tubes which are fixedly connected in sequence from top to bottom, the plug columns extend from the top surfaces of the pier segments and the cap beam, the plug tubes are pre-buried in the bottom surfaces of the pier segments and the cap beam, and the inner holes of the plug tubes leak out from the bottom surfaces of the pier segments and the cap beam, and the cap, the pier, the pier segments and the cap beam which are built in sequence are positioned and connected in sequence by inserting the plug columns into the plug tubes, and the pier segments are provided with a plurality of plug columns which are fixedly connected from top to bottom. A through hole that penetrates downward, the top surface of the pedestal is provided with a plurality of sink holes, and the bottom surface of the pier segment is provided with a plurality of upper sink holes; the upper sink holes, through holes and sink holes are respectively coaxially arranged, and an inner hole connected up and down is formed by the splicing of the pedestal, the pier segment and the cap beam, a casting steel pipe is provided in the inner hole, an input pipe is provided on the side surface of the top end of the casting steel pipe, the input pipe extends from the side surface of the cap beam, the casting steel pipe extends downward from the upper end of the inner hole to the lower end, the outer diameter of the casting steel pipe is smaller than the inner diameter of the inner hole, and the side surface of the cap beam is connected to the output pipe of the upper sink hole.

[0006] Furthermore, it also includes a leveling frame, which is respectively arranged on the upper and lower edges of the pier segment, and is also arranged on the top surface of the pedestal and the bottom surface of the cap beam. When the pedestal, pier segment and cap beam are spliced ​​in sequence, adjacent leveling frames are in contact with each other.

[0007] Furthermore, in the adjacent contacting leveling frame, a card platform is provided on the inner bottom edge of the upper leveling frame frame, and a card member is provided on the inner side of the lower leveling frame frame for transverse sliding. The card member includes a sliding rod transversely slidably arranged on the inner side of the lower leveling frame frame, and a baffle panel is provided at the end of the sliding rod. When pouring grouting material, the grouting material flows along the gap reserved by the leveling frame frame and pushes the baffle panel to move, so that the sliding rod moves toward the leveling frame. A baffle rod is also fixedly connected above the sliding rod, and as the sliding rod moves, the baffle rod slides into the plane of the card platform.

[0008] Furthermore, the leveling frame is fixedly connected with a plurality of reinforcing bars, and the reinforcing bars are respectively pre-embedded in the fixed abutments, pier segments and cap beams.

[0009] Furthermore, the bottom surface of the blocking rod is an inclined surface facing the card table.

[0010] Furthermore, two positioning parts are respectively buried in the abutment, the pier and the cap beam.

[0011] Furthermore, the casting steel pipe is formed by connecting a plurality of connected steel pipe segments.

[0012] The beneficial effects of the present invention are:

[0013] The present invention has a simple structure. The prefabricated abutments, pier segments and cap beams are hoisted in sequence, and the positioning parts embedded in the prefabricated parts are connected up and down. The connection method is to insert the plug column into the plug tube. In this way, the prefabricated abutments, pier segments and cap beams can be quickly positioned to implement the next step of casting and connection. The positioning part does not serve as a casting structure. The upper sink hole, through hole and sink hole connected in sequence are the inner hole. This inner hole serves as a casting structure for connecting the superimposed prefabricated parts. After the superposition is completed, a casting steel pipe is also arranged in the combined inner hole. The input pipe of the casting steel pipe passes through the cap beam and serves as the upper support structure of the casting steel pipe. The lower end of the casting steel pipe is connected to the sink hole. A gap is left at the lower end, and the outer diameter of the casting steel pipe is smaller than the inner diameter of the inner hole. The grouting material is pumped into the input hole by directly pressurizing with a pressure pump. The grouting material moves down along the casting steel pipe, bypasses the sinking hole, and moves up along the inner hole, and finally flows out from the output hole. At this time, the grouting material fills the inner hole and the casting steel pipe. After the grouting material solidifies, the abutment and pier column segments are integrated with the cap beam. This structure is easy and quick to position, and the prefabricated parts are connected by the grouting material. There are few grouting material input positions, all of which are opened at the cap beam position. It is not necessary to pour at each connection point to complete the grouting of all pier column structures. The pouring method is simple and ensures that the grouting material is full. This structure has high construction efficiency and tight and stable connections.

[0014] Other advantages, objectives and features of the present invention will be described in the following description and will be apparent to those skilled in the art to some extent, or those skilled in the art may be taught from the practice of the present invention. The objectives and other advantages of the present invention may be realized and obtained through the following description. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] In order to make the purpose, technical solution and beneficial effects of the present invention clearer, the present invention provides the following drawings for illustration:

[0016] Figure 1 This is an overall schematic diagram of a bridge pier structure according to an embodiment of the present invention;

[0017] Figure 2 This is a schematic diagram of the first structure of a pier segment according to an embodiment of the present invention;

[0018] Figure 3 This is a schematic diagram of the second structure of a pier segment according to an embodiment of the present invention;

[0019] Figure 4 It is a cross-sectional view of a positioning portion of an embodiment of the present invention;

[0020] Figure 5 for Figure 4 Detailed schematic diagram of point A;

[0021] Figure 6 This is a cross-sectional view of a steel pipe casting according to an embodiment of the present invention;

[0022] Figure 7 for Figure 6 Detailed diagram of point B;

[0023] Figure 8 This is a schematic diagram of pre-embedded reinforcement bars according to an embodiment of the present invention;

[0024] The markings in the attached drawings are as follows: 1. Abutment; 2. Pier segment; 3. Cap beam; 31. Output pipe; 4. Positioning part; 41. Insert column; 42. Connecting column; 43. Insert tube; 5. Inner hole; 51. Upper countersunk hole; 52. Through hole; 53. Lower countersunk hole; 6. Casting steel pipe; 61. Input pipe; 7. Leveling frame; 71. Card platform; 72. Card part; 721. Sliding rod; 722. Baffle plate; 723. Baffle rod; 73. Strengthening connecting bars. DETAILED DESCRIPTION

[0025] like Figures 1 to 8 As shown, the present invention discloses a prefabricated assembled railway pier structure based on a steel tube concrete skeleton, such as Figure 1 , including a cap 1, a number of bridge pier segments 2 and a cap beam 3 which are sequentially built upward; wherein the cap 1, the bridge pier segments 2 and the cap beam 3 are all prefabricated in a factory and then transported to the site for splicing and construction, such as Figure 4As shown, two positioning parts 4 are embedded in the abutment 1, the pier and the cap beam 3. Figure 4 The positioning portion 4 includes a plug post 41, a connecting post 42 and a plug sleeve 43 which are fixedly connected in sequence from top to bottom. Figure 2 , Figure 3 and Figure 4 As shown, the inserted column 41 extends from the top surface of the pier segment 2 and the cap beam 3, the inserted tube 43 is pre-buried in the bottom surface of the pier segment 2 and the cap beam 3, and the inner hole 5 of the inserted tube 43 leaks out from the bottom surface of the pier segment 2 and the cap beam 3. The cap 1, pier segment 2 and cap beam 3 built in sequence are positioned and connected in sequence by inserting the inserted column 41 into the inserted tube 43, as shown in FIG. Figure 6 and Figure 7 As shown, the pier segment 2 is provided with a plurality of through holes 52 penetrating from top to bottom, the top surface of the cap 1 is provided with a plurality of sinking holes 53, and the bottom surface of the pier segment 2 is provided with a plurality of upper sinking holes 51; after splicing, the upper sinking holes 51, the through holes 52 and the sinking holes 53 at the same position are coaxially arranged, and an inner hole 5 connected up and down is formed with the splicing of the cap 1, the pier segment 2 and the cap beam 3, and a casting steel pipe 6 is provided in the inner hole 5, and an input pipe 61 is provided on the top side of the casting steel pipe 6, and the The input pipe 61 extends out from the side of the cap beam 3, and the casting steel pipe 6 is fixed in the upper countersunk hole 51 through the input pipe 61. The casting steel pipe 6 extends downward from the upper end of the inner hole 5 to the lower end. There is a gap between the bottom end of the casting steel pipe 6 and the bottom end of the countersunk hole 53. The outer diameter of the casting steel pipe 6 is smaller than the inner diameter of the inner hole 5. The side of the cap beam 3 is connected to the output pipe 31 of the upper countersunk hole 51. Preferably, the casting steel pipe 6 is composed of several connected steel pipe segments to facilitate the transportation of prefabricated components.

[0026] This assembly structure is simple in structure. The prefabricated pedestal 1, pier segment 2 and cap beam 3 are hoisted in sequence, and the positioning part 4 embedded in the prefabricated parts is connected up and down. The connection method is to insert the column 41 into the insert tube 43. In this way, the prefabricated pedestal 1, pier segment 2 and cap beam 3 can be quickly positioned to implement the next step of casting connection. The positioning part 4 is not used as a casting structure, but only as a positioning structure. The upper countersunk hole 51, through hole 52 and lower countersunk hole 53 connected in sequence are the inner hole 5. This inner hole 5 is used as a casting structure for connecting the superimposed prefabricated parts. After the superposition is completed, a casting steel pipe 6 is also arranged in the combined inner hole 5. The input pipe 61 of the casting steel pipe 6 passes through the cap beam 3 and serves as the upper support structure of the casting steel pipe 6. , there is a gap between the lower end of the casting steel pipe 6 and the lower end of the sinking hole 53, and the outer diameter of the casting steel pipe 6 is smaller than the inner diameter of the inner hole 5. The grouting material is pumped into the input hole by direct pressure pump pressure, and the grouting material moves down along the casting steel pipe 6, bypasses the sinking hole 53, and moves up along the inner hole 5, and finally flows out from the output hole. At this time, the grouting material fills the inner hole 5 and the casting steel pipe 6. After the grouting material solidifies, the base 1 and the pier segment are integrated with the cap beam 3; this structure is convenient and quick to position, and the prefabricated parts are connected by the grouting material. There are few grouting material input positions, all of which are opened at the cap beam 3. It is not necessary to pour at each connection point to complete the grouting of all pier structures. The pouring method is simple and ensures that the grouting material is full. This structure has high construction efficiency and tight and stable connections.

[0027] In a further solution, Figure 2 As shown, it also includes a leveling frame 7, which is respectively arranged on the upper and lower edges of the pier segment 2, and is also arranged on the top surface of the cap 1 and the bottom surface of the cap beam 3. When the cap 1, the pier segment 2 and the cap beam 3 are spliced ​​in sequence, the adjacent leveling frames 7 are in contact with each other. Figure 8 As shown, the leveling frame 7 is fixedly connected with a plurality of reinforcing bars 73, and the reinforcing bars 73 are respectively pre-buried in the fixed abutment 1, the pier segment 2, and the cap beam 3.

[0028] By setting a steel leveling frame 7 on the contact surface of the prefabricated structure, a gap is left between the contact surfaces of the prefabricated structure, so that after the roughening treatment between the contact surfaces, each prefabricated structure can still be directly spliced ​​through the contact of the leveling frame 7, avoiding uneven splicing of the splicing surface after the roughening treatment, which makes the entire pier structure skewed; and by leaving a gap by the leveling frame 7, when pouring grouting material, the grouting material flows into the splicing surface through the gap between the upper countersunk hole 51, the through hole 52 and the lower countersunk hole 53, further improving the connection force between the contact surfaces and ensuring the integration and stability of the prefabricated structure. By setting the reinforcing ribs 73, the connectivity and integrity between the leveling frame 7 and the prefabricated parts are ensured, and the stability of the formed pier structure is ensured through the coordinated support of the leveling frame 7 and the reinforcing ribs 73.

[0029] In a further solution, Figure 5 As shown, in the adjacent contacting leveling frame 7, a card platform 71 is provided at the inner bottom edge of the upper leveling frame 7, and a card member 72 is provided on the inner side of the lower leveling frame 7 for transverse sliding. The card member 72 includes a sliding rod 721 which is transversely slidably arranged on the inner side of the lower leveling frame 7, and a baffle panel 722 is provided at the end of the sliding rod 721. When pouring grouting material, the grouting material flows along the gap left by the leveling frame 7 and pushes the baffle panel 722 to move, so that the sliding rod 721 moves toward the leveling frame 7. A baffle rod 723 is also fixedly connected above the sliding rod 721. As the sliding rod 721 moves, the baffle rod 723 slides into the upper plane of the card platform 71.

[0030] In this structure, due to the slow flow characteristic of the grouting material, during the grouting material filling process, the grouting material flows along the inner hole 5 and flows into the gap between the abutment 1, the pier segment 2 and the cap beam 3. This gap is supported by the leveling frame 7. The grouting material expands and flows along the gap and pushes the baffle plate 722, so that the sliding rod 721 drives the baffle rod 723 to move and slide into the card platform 71 of the upper leveling frame 7. Finally, the grouting material fills all the gaps. After the grouting material solidifies, the two contacting leveling frames 7 can be connected. In addition to the connection of the grouting material, the two leveling frames 7 are also fixed internally by the clamp 72, which realizes a rigid connection and ensures the aesthetics of the outer side of the pier structure.

[0031] In a further solution, Figure 5 As shown, the bottom surface of the blocking rod 723 is an inclined surface facing the card platform 71, and when the blocking rod 723 moves laterally, it provides downward pressure on the card platform 71.

[0032] Finally, it should be noted that the above preferred embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail through the above preferred embodiments, those skilled in the art should understand that various changes can be made in form and details without departing from the scope defined by the claims of the present invention.

Claims

1. A prefabricated assembled railway bridge pier structure based on a steel tube concrete skeleton, characterized by: The invention comprises a cap (1), a plurality of pier segments (2) and a cap beam (3) which are built upward in sequence; a positioning part (4) is embedded in the cap (1), the pier and the cap beam (3); the positioning part (4) comprises an insertion column (41), a connecting column (42) and an insertion tube (43) which are fixedly connected in sequence from top to bottom; the insertion column (41) extends from the top surface of the pier segment (2) and the cap beam (3); the insertion tube (43) is pre-buried in the bottom surface of the pier segment (2) and the cap beam (3); the inner hole (5) of the insertion tube (43) leaks out from the bottom surface of the pier segment (2) and the cap beam (3); the cap (1), the pier segment (2) and the cap beam (3) which are built in sequence are positioned and connected in sequence by inserting the insertion column (41) into the insertion tube (43); the pier segment (2) is provided with a plurality of insertion columns (41) which are fixedly connected in sequence from top to bottom; A through hole (52) passes through the bottom of the pier (1); a plurality of sinking holes (53) are provided on the top surface of the pier (1); and a plurality of upper sinking holes (51) are provided on the bottom surface of the pier segment (2); the upper sinking holes (51), the through hole (52) and the sinking holes (53) are respectively coaxially arranged, and an inner hole (5) connected up and down is formed by splicing the pier (1), the pier segment (2) and the cap beam (3); a casting steel pipe (6) is provided in the inner hole (5); an input pipe (61) is provided on the top side of the casting steel pipe (6); the input pipe (61) extends from the side of the cap beam (3); the casting steel pipe (6) extends downward from the upper end of the inner hole (5) to the lower end; the outer diameter of the casting steel pipe (6) is smaller than the inner diameter of the inner hole (5); and the side of the cap beam (3) is connected to the output pipe (31) of the upper sinking hole (51).

2. The prefabricated assembled railway bridge pier structure based on a steel tube concrete skeleton according to claim 1 is characterized in that: It also includes a leveling frame (7), which is respectively arranged on the upper and lower edges of the pier segment (2), and is also arranged on the top surface of the pedestal (1) and the bottom surface of the cap beam (3). When the pedestal (1), the pier segment (2) and the cap beam (3) are spliced ​​in sequence, adjacent leveling frames (7) are in contact with each other.

3. The prefabricated assembled railway bridge pier structure based on a steel tube concrete skeleton according to claim 2 is characterized in that: In the adjacent contacting leveling frames (7), a clamping platform (71) is provided at the inner bottom edge of the upper leveling frame (7), and a clamping member (72) is provided on the inner side of the lower leveling frame (7) for transverse sliding. The clamping member (72) comprises a sliding rod (721) which is transversely slidably arranged on the inner side of the lower leveling frame (7). A baffle plate (722) is provided at the end of the sliding rod (721). When pouring grouting material, the grouting material flows along the gap left by the leveling frame (7) and pushes the baffle plate (722) to move, so that the sliding rod (721) moves toward the leveling frame (7). A baffle rod (723) is also fixedly connected above the sliding rod (721). As the sliding rod (721) moves, the baffle rod (723) slides into the upper plane of the clamping platform (71).

4. The prefabricated assembled railway bridge pier structure based on a steel tube concrete skeleton according to claim 2 is characterized in that: The leveling frame (7) is fixedly connected with a plurality of reinforcing connecting bars (73), and the reinforcing connecting bars (73) are respectively pre-buried in the fixed capping platform (1), the pier segment (2), and the cap beam (3).

5. The prefabricated assembled railway bridge pier structure based on a steel tube concrete skeleton according to claim 3 is characterized by: The bottom surface of the blocking rod (723) is an inclined surface facing the card platform (71).

6. The prefabricated assembled railway bridge pier structure based on a steel tube concrete skeleton according to claim 1 is characterized by: Two positioning parts (4) are respectively embedded in the cap platform (1), the pier and the cap beam (3).

7. The prefabricated assembled railway bridge pier structure based on a steel tube concrete skeleton according to claim 1 is characterized in that: The casting steel pipe (6) is formed by connecting a plurality of connected steel pipe segments.

Citation Information

Cited By

  • Bearing platform structure and construction method thereof

    CN119466021A

  • A foundation structure and its construction method

    CN119466021B