Small offshore platform for offshore piling operation
By setting up a balance control device and cable connecting pile hammer on the offshore platform, the tension force and the negative pressure of seawater suction are used to solve the instability problem of offshore pile driving platform during offshore operations, and the efficiency of small platforms is achieved , low-cost pile driving operations.
Patent Information
- Application Number
- CN202411222182.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-02
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2044-09-02
AI Technical Summary
The existing offshore pile driving platforms are difficult to maintain stability due to limited equipment arm length and insufficient water depth during offshore operations, resulting in unstable platform, and the displacement of large platforms is cumbersome and costly.
The platform is equipped with a balance control device and cable to connect the pile hammer. The tension force formed by the hammer and the negative pressure generated by the sea water suction are used to maintain the smoothness of the platform through the pulley and impeller structure, reduce the platform size and improve the displacement flexibility .
It realizes efficient and stable pile driving operations on small platforms, reduces costs and improves the platform's anti-vibration and skewing ability, and is suitable for offshore coastal embankment pile driving construction.
Smart Images

Figure CN118911100A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of marine engineering and relates to a small offshore platform for offshore piling operations. Background Art
[0002] Sometimes offshore piling construction is required for coastal embankment reinforcement, reclamation and other operations (when coastal operating space is limited or geological conditions do not allow the movement of operating equipment). Currently, most of these operations are done using ship-borne engineering machinery. However, the length of the engineering machinery's operating arm is limited, and when the offshore water depth is insufficient or there are reef disturbances, the ships carrying engineering machinery are unable to perform the task. In this case, it is necessary to rely on an offshore operating platform with a long-arm crane. The offshore operating platform is divided into moored, fixed pile lifting and floating types. Due to the high switching frequency of the piling position, moored and floating types meet the operating conditions.
[0003] Due to the long crane arm and the pile hammer being far away from the center of the platform, coupled with the longitudinal reciprocating motion of the pile hammer, it is difficult to maintain stability during piling of non-fixed pile offshore platforms. At present, the platform's anti-rolling ability is generally improved by increasing the draft, that is, increasing the draft by increasing the platform area and the platform's submerged depth (increasing the deadweight or adding additional weight). The water depth of offshore operations is shallow and unstable. In addition, the relocation of large platforms is cumbersome and the costs are high. For this reason, the applicant proposed a small offshore platform based on coastal embankment piling construction, aiming to effectively enhance its anti-vibration and anti-rolling ability based on a smaller platform area, reflecting the characteristics of small platforms such as low construction cost and low maintenance cost. Summary of the invention
[0004] The purpose of the present invention is to provide a small offshore platform for offshore piling operations in view of the above-mentioned problems existing in the prior art. The technical problem to be solved by the present invention is how to make the offshore platform for offshore operations smaller and the piling operations more stable.
[0005] The purpose of the present invention can be achieved through the following technical solutions: a platform balance control device is arranged on the side away from the platform working end, and a balance hammer generates downward pressure on the platform working end on the side away from the platform working end to ensure that the platform will not tilt due to the hammer. In addition, a cable is used to connect the pile hammer so that the drop hammer has less impact on the stability of the platform.
[0006] Specifically, it includes a platform, a boom arranged on the platform, a pile hammer connected to the top of the boom and extending forward to one side of the working end of the platform, a telescopic cylinder located in the middle of the platform, and a stabilizing structure located at the platform away from the working end. The cylinder body of the telescopic cylinder is fixed on the platform, and a first fixed pulley is rotatably connected to the push rod of the telescopic cylinder. The stabilizing structure includes a water pipe fixed on the platform, a mounting plate fixed at the lower opening of the water pipe, an impeller rotatably connected to the mounting plate, and a driving shaft fixed at the axis of the impeller. The opening of the water pipe is rotatably connected to a second fixed pulley. A fixed pulley, a worm gear is provided at the upper end of the driving shaft, the top of the boom is rotatably connected to a third fixed pulley, and also includes a cable, the cable passes through the second fixed pulley, the first fixed pulley and the third fixed pulley in sequence, a tension spring is connected between the end of the cable close to the water pipe and the platform, the second fixed pulley has a worm wheel matched with the worm gear, the telescopic cylinder pulls down the middle part of the cable to drive the pile hammer to start the hammer and the driving shaft to rotate at the same time, and when the telescopic cylinder pulls down the middle part of the cable until the impeller rotates, the seawater under the platform can be transported to the platform through the water pipe.
[0007] The logic of this plan is to use the tensioning force formed on the cable by the hammer to drive the second fixed pulley to rotate, and then to rotate the drive shaft, that is, the impeller, to form negative pressure at the lower end of the aqueduct, and the seawater is sucked into the aqueduct and discharged from the top of the aqueduct. In the process of seawater being drawn out from bottom to top, there is downward pressure on the side of the platform close to the aqueduct. This downward pressure and the downward pressure on the side of the platform close to the pile hammer when the hammer is lifted are respectively located on both sides of the vertical line where the center of gravity of the platform is located, and can partially offset each other to maintain the stability of the platform, or reduce the forward tilt and shaking of the platform caused by the hammer.
[0008] When the hammer is dropped, since the pile hammer is flexibly connected with a cable, the impact force of the pile driving formed by the hammer will not have a significant impact on the stability of the platform, and the reverse rotation of the impeller will not have a significant impact on the platform because there is air above the water pipe. Therefore, this solution can maintain good stability during piling and can greatly reduce the size of the platform, which can reduce costs on the one hand and improve the flexibility of platform shifting on the other.
[0009] Furthermore, an extension arm is provided on the platform, on which a guide hammer cylinder is fixedly provided, and the pile hammer is longitudinally slidably connected in the guide hammer cylinder. The guide hammer cylinder can ensure the trajectory of the pile hammer, and at the same time, the guide hammer cylinder is also used to cooperate with the pile head to ensure that the striking action is at the center of the pile head.
[0010] Furthermore, the pile hammer is connected to a movable pulley, and the end of the cable close to the pile hammer is connected to the middle of the boom. The existence of the movable pulley can reduce the power of the telescopic cylinder, increase the push-pull displacement of the telescopic rod, make the rotation continuity of the impeller better, and also save effort in lifting the hammer.
[0011] Further, the cylinder body of the telescopic cylinder is located under the platform, and the push rod of the telescopic cylinder is located above the platform. The telescopic cylinder can be a hydraulic cylinder, and most of the telescopic cylinder and the water conduit are located under the platform, which can effectively lower the center of gravity of the platform.
[0012] Furthermore, the water guide pipe includes a cylinder and a cone, the cylinder is located above the cone, and the large diameter end of the cone faces downward. The conical structure at the bottom of the water guide pipe increases the dehydration resistance of the platform. In addition, the downward pressure generated when the impeller rotates has a larger force bearing surface and a more uniform pressure.
[0013] Furthermore, a partition net is arranged at the large diameter end of the cone, which can prevent underwater organisms from interfering with the impeller, and can also prevent non-biological objects of certain size from entering and affecting the operation of the impeller.
[0014] Furthermore, a pressure regulating hole is provided on the side wall of the cone, and a valve is arranged in the pressure regulating hole.
[0015] Furthermore, the preload force of the tension spring is adjustable.
[0016] As the telescopic cylinder controls the increase of the cable tension, the stretching amplitude of the tension spring is limited, and the stretching rate gradually decreases as the pile hammer moves upward. Correspondingly, the rotational torque of the impeller also gradually decreases, which corresponds to the forward tilting pressure of the platform formed by the lifting of the hammer. The impact of the pile hammer on the stability of the platform is the greatest at the moment of lifting the hammer, and then decreases. Therefore, the rotation of the impeller is basically synchronized with it, and the anti-roll balance force of the platform is also adapted to it.
[0017] The adjustment of the preload force of the tension spring can regulate the rotation speed of the impeller. In addition, the opening of the pressure regulating hole can regulate the water pressure in the water pipe, and together with the tension spring, the platform balancing force generated by the water pipe can be adjusted.
[0018] It is not difficult to see that, in comparison, this solution can realize long-arm piling operations on smaller platforms. The interference of the piling process on the stability of the platform can be adaptively reduced. The balancing force does not require external force drive and complex control, and is automatically applied according to the piling rhythm. The balancing force is separated from the hammer force of piling and has no effect on the drop hammer. It is suitable for coastal dam piling operations implemented offshore, and the platform cost is low. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a schematic structural diagram of a small offshore platform for offshore piling operations provided by the present invention; Figure 2 It is a cross-sectional view of the aqueduct; Figure 3 It is a schematic diagram of a small offshore platform used for offshore piling operations.
[0020] In the figure, 1. platform; 2. boom; 3. pile hammer; 4. telescopic cylinder; 5. first fixed pulley; 6. water guide pipe; 61. cylinder; 62. cone cylinder; 63. valve; 7. mounting plate; 8. impeller; 9. worm gear; 10. worm; 11. tension spring; 12. second fixed pulley; 13. third fixed pulley; 14. drive shaft; 15. cable; 16. extension arm; 17. guide hammer cylinder; 18. movable pulley; 19. active stabilization structure. DETAILED DESCRIPTION
[0021] The following are specific embodiments of the present invention and combined with the accompanying drawings to further describe the technical solution of the present invention, but the present invention is not limited to these embodiments.
[0022] A platform 1 balance control device is provided on the side away from the working end of the platform 1, and a balance hammer generates downward pressure on the working end of the platform 1 on the side away from the working end of the platform 1, ensuring that the platform 1 will not tilt due to the hammer. In addition, the pile hammer 3 is connected with a cable 15, so that the drop hammer has less influence on the stability of the platform 1.
[0023] like Figure 1 and Figure 2 As shown, it includes a platform 1, a boom 2 arranged on the platform 1, a pile hammer 3 connected to the top of the boom 2 and extending forward to one side of the working end of the platform 1, a telescopic cylinder 4 located in the middle of the platform 1, and a stabilizing structure located at the platform 1 away from the working end. The cylinder body of the telescopic cylinder 4 is fixed on the platform 1, and a first fixed pulley 5 is rotatably connected to the push rod of the telescopic cylinder 4. The stabilizing structure includes a water pipe 6 fixed on the platform 1, a mounting plate 7 fixed at the lower opening of the water pipe 6, and an impeller 8 rotatably connected to the mounting plate 7. A driving shaft 14 is fixedly arranged at the axis of the impeller 8, and a worm 10 is provided at the upper end of the driving shaft. The opening of the water pipe 6 is rotatably connected to the impeller 8. A second fixed pulley 12 is connected, and a worm wheel 9 is provided on the second fixed pulley 12 for cooperating with the worm 10. The cable 15 passes through the second fixed pulley 12, the first fixed pulley 5 and the third fixed pulley 13 in sequence. The end of the cable 15 close to the water pipe 6 passes around the second fixed pulley 12 and is connected to the platform 1 through a tension spring. The telescopic cylinder 4 pulls down the middle of the cable 15 to drive the pile hammer 3 to start the hammer and the impeller 8 to rotate at the same time. The impeller 8 rotates due to the rotation of the second fixed pulley 12, so that the worm wheel 9 drives the worm 10 to rotate, and then the impeller 8 rotates. When the impeller 8 rotates, the seawater under the platform 1 can be transported to the platform 1 through the water pipe 6.
[0024] The logic of this scheme is: utilize the tension force formed on the cable 15 by the hammer to drive the impeller 8 to rotate, form negative pressure at the lower end of the water pipe 6, and the seawater is sucked into the water pipe 6 and discharged from the top of the water pipe 6. In the process of the seawater being drawn out from bottom to top, there is a downward pressure on the side of the platform 1 close to the water pipe 6. This downward pressure and the downward pressure on the side of the platform 1 close to the pile hammer 3 when the hammer is lifted are respectively located on both sides of the platform 1, which can partially offset each other to maintain the stability of the platform 1, and the platform 1 will not tilt forward due to the hammer.
[0025] When the hammer is dropped, since the pile hammer 3 is flexibly connected with the cable 15, the stability of the platform 1 will not be greatly affected during the process of the pile driving impact force generated by the hammer, and the reverse rotation of the impeller 8 will not have a great impact on the platform 1 because there is air above the water pipe 6. Therefore, this solution can maintain good stability during pile driving and can greatly reduce the size of the platform 1, which can reduce costs on the one hand and improve the flexibility of the platform 1 on the other.
[0026] The platform 1 can be a floating type, a moored type, or a fixed pile type. When used in a fixed pile type, this solution can reduce the pulling force on the fixed pile during the piling process.
[0027] An extension arm 16 is provided on the platform 1, and a guide hammer cylinder 17 is fixedly provided on the extension arm 16. The pile hammer 3 is longitudinally slidably connected in the guide hammer cylinder 17. The guide hammer cylinder 17 can ensure the trajectory of the pile hammer 3. At the same time, the guide hammer cylinder 17 is also used to cooperate with the pile head to ensure that the striking effect is at the center of the pile head. The extension arm 16 is retractable and is used to adjust the forward position of the guide hammer cylinder 17. Figure 3 As shown, when piling, the pull-out position of the extension arm 16 is adjusted according to the distance between the force application position and the platform 1, that is, the position of the guide hammer cylinder 17 is adjusted within a certain range by utilizing the flexibility of the cable 15; the platform 1 is rectangular, and the water pipe 6 and the guide hammer cylinder 17 are respectively located at the two ends of the length direction of the platform 1, so that the balancing force offset control method provided in this scheme has a more obvious effect on maintaining the stability of the platform 1.
[0028] The pile hammer 3 is connected to a movable pulley 18, and one end of the cable 15 close to the pile hammer 3 is connected to the middle of the boom 2. The cylinder body of the telescopic cylinder 4 is located under the platform 1, and the push rod of the telescopic cylinder 4 is located above the platform 1. The telescopic cylinder 4 can be a hydraulic cylinder, and most of it and the water conduit 6 are located under the platform 1, which can effectively lower the center of gravity of the platform 1.
[0029] The water pipe 6 includes a cylinder 61 and a cone 62. The cylinder 61 is located above the cone 62, and the large diameter end of the cone 62 faces downward. The conical structure at the bottom of the water pipe 6 increases the dehydration resistance of the platform 1. In addition, when the impeller 8 rotates, the downward pressure bearing surface is larger and the pressure is more uniform. In addition, in order to improve the controllability and adaptability of stabilization, an active stabilization structure 19 similar to the water pipe 6 is arranged on the platform inside the water pipe 6. The difference between the two is that an electric paddle is arranged in the active stabilization structure, and the electric paddle can rotate to generate downward pressure in the rear direction of the platform 1. The principle is the same as that of the water pipe 6, except that the water pipe 6 is passively stabilized and adapted to the pile driving rhythm, while the active stabilization structure 19 is an actively controlled boosting structure, which is opened when needed to increase the downward pressure in the rear direction of the platform 1.
[0030] The specific embodiments described herein are merely examples of the spirit of the present invention. Those skilled in the art may make various modifications or additions to the specific embodiments described or replace them in similar ways, but they will not deviate from the spirit of the present invention or exceed the scope defined by the appended claims.
Claims
1. A small offshore platform (1) for offshore piling operations, characterized in that: The invention comprises a platform (1), a boom (2) arranged on the platform (1), a pile hammer (3) connected to the top of the boom (2) and extending forward from the working end of the platform (1), a telescopic cylinder (4) located in the middle of the platform (1), and a stabilizing structure located at the working end of the platform (1), wherein the cylinder body of the telescopic cylinder (4) is fixed on the platform (1), a first fixed pulley (5) is rotatably connected to the push rod of the telescopic cylinder (4), the stabilizing structure comprises a water pipe (6) fixed on the platform (1), a mounting plate (7) fixed at the lower opening of the water pipe (6), an impeller (8) rotatably connected to the mounting plate (7), and a drive shaft (14) fixed at the axis of the impeller (8), a second fixed pulley (12) is rotatably connected to the opening of the water pipe (6), and the upper end of the drive shaft (14) is connected to the second fixed pulley (12). The invention comprises a worm gear (10), the top of the boom (2) is rotatably connected to a third fixed pulley (13), and a cable (15), the cable (15) passes through a second fixed pulley (12), a first fixed pulley (5) and a third fixed pulley (13) in sequence, a tension spring (11) is connected between an end of the cable (15) close to the water pipe (6) and the platform (1), the second fixed pulley (12) has a worm wheel (9) matched with the worm gear (10), the telescopic cylinder (4) pulls down the middle of the cable (15) to drive the pile hammer (3) to start the hammer and the drive shaft (14) to rotate at the same time, and the telescopic cylinder (4) pulls down the middle of the cable (15) to rotate the impeller (8), so that the seawater under the platform (1) can be transported to the platform (1) through the water pipe (6).
2. The small offshore platform (1) for offshore piling operations according to claim 1, characterized in that: An extension arm (16) is arranged on the platform (1), a guide hammer cylinder (17) is fixedly arranged on the extension arm (16), and the pile hammer (3) is longitudinally slidably connected in the guide hammer cylinder (17).
3. The small offshore platform (1) for offshore piling operations according to claim 1 or 2, characterized in that: The pile hammer (3) is connected to a movable pulley (18), and one end of the cable (15) close to the pile hammer (3) is connected to the middle part of the boom (2).
4. The small offshore platform (1) for offshore piling operations according to claim 1 or 2, characterized in that: The cylinder body of the telescopic cylinder (4) is located below the platform (1), and the push rod of the telescopic cylinder (4) is located above the platform (1).
5. The small offshore platform (1) for offshore piling operations according to claim 1 or 2, characterized in that: The water guide pipe (6) comprises a cylinder (61) and a conical cylinder (62), wherein the cylinder (61) is located above the conical cylinder (62), and the large-diameter end of the conical cylinder (62) faces downward.
6. The small offshore platform (1) for offshore piling operations according to claim 5, characterized in that: The large diameter end of the cone (62) is provided with a partition.
7. The small offshore platform (1) for offshore piling operations according to claim 5, characterized in that: A pressure regulating hole is provided on the side wall of the cone cylinder (62), and a valve (63) is provided in the pressure regulating hole.
8. The small offshore platform (1) for offshore piling operations according to claim 1 or 2, characterized in that: The preload force of the tension spring (11) is adjustable.
Citation Information
Patent Citations
Apparatus for installing piles and sheet piles
CA2388388A1
Pile driver provided with quality control system and used for in-hole deep-layer dynamic compaction method
CN219033204U
Underwater piling construction platform
CN219280693U
Vehicle-mounted pile driver structure
CN219343176U
Pile driving hammer with wide operating height adjustment - can have hammer shaft variably clamped on sliding frame
DE2708186A1