Loading device and loading method for seabed corridor under soft geology
By using loading chambers and collecting ditchs in the seabed corridor combined with electromagnetic springs and pumping pipes, the automatic control of sinking and drainage consolidation of mud and water mixtures is used to solve the complexity of installation and environmental impact of the seabed corridor. The problem has improved construction efficiency and structural stability.
Patent Information
- Application Number
- CN202411257847.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-09
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2044-09-09
AI Technical Summary
The prior art is complex, time-consuming and labor-intensive during the installation and fixing of submarine corridors, and causes interference to the marine environment. Traditional methods require water tanks and gravel backfill, which is inefficient and increases construction cycle and cost.
Design a loading device for submarine corridors under weak geology, including loading chambers, water collection ditches and control units, using electromagnetic springs and pumping pipes combined with mud and water mixture for temporary and permanent loading, and automatic control is achieved through force sensors and attitude sensors and precise sinking, using drainage and consolidation method to form permanent loading.
It reduces the impact on the marine environment, improves construction efficiency and safety, simplifies the construction process, ensures the stability of the corridor and the long-term reliability of the structure, and reduces the risk of structural stress concentration and potential damage.
Smart Images

Figure CN118911200A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of corridors, and in particular to a loading device and a loading method for a submarine corridor under soft geology. Background Art
[0002] With the rapid advancement of information technology, the demand for data storage has exploded, prompting people to explore innovative solutions to meet this challenge. Submarine data centers have emerged as cutting-edge technology. They cleverly use the low temperature environment of the seabed as a natural heat dissipation system, significantly improving the energy efficiency and safety of data storage. These data centers are usually composed of two core parts: data cabins and submarine corridors. The cabins are closely attached to the side of the corridor, together building a stable and efficient data storage system.
[0003] However, current technology faces multiple challenges in the installation and fixation of submarine corridors. Traditional methods rely on heavy equipment such as tugboats, crane ships or large semi-submersible barges to transport the huge corridor structure from land to the designated sea area. This is not only complicated, time-consuming and labor-intensive, but also accompanied by high transportation and installation costs. More importantly, in order to ensure that the corridor can sink firmly to the seabed and maintain its stability for a long time, existing technologies often require the installation of water tanks inside the corridor for temporary loading, followed by permanent fixation through gravel backfilling. This process is not only inefficient and increases the construction period, but may also cause unnecessary interference and impact on the marine environment. Summary of the invention
[0004] In view of the deficiencies mentioned in the above technical background, the object of the present invention is to provide a submarine corridor loading device and loading method under soft geology.
[0005] The purpose of the present invention can be achieved through the following technical solutions:
[0006] The present invention discloses a submarine corridor loading device under weak geology, which is arranged in a corridor body and comprises a loading chamber, a water collecting ditch and a control unit. The middle part of the corridor body is provided with an adapted water collecting ditch along the length direction. Both sides of the water collecting ditch are loading areas. Both sides of each loading area are provided with drainage side pipes communicating with the water collecting ditch. The loading area is divided into a plurality of loading chambers by a partition along the length direction of the corridor body. The bottom of each loading chamber is provided with a load receiving plate installed on the inner bottom surface of the corridor body.
[0007] Each of the loading chambers is layered with a plurality of unit cells from bottom to top through a grid frame, and each of the unit cells is provided with a plurality of electromagnetic springs. A loading plate is provided on the top of the loading chamber, and the loading plate is fixed on the grid frame of the top unit cell;
[0008] Each of the loading chambers is provided with a pumping pipe that penetrates the plurality of unit cells, and a valve is provided at the connection between the pumping pipe and the unit cells; the water collecting channel discharges water to the periphery of the corridor body through the pumping pipe through the pumping pump;
[0009] A plurality of attitude sensors are arranged on the top of the corridor body, and the attitude sensors are electrically connected to the control unit, and the control unit is used for automatic control of loading construction.
[0010] As a preferred technical solution of the present invention, a filter cloth is provided under each of the grille frames.
[0011] As a preferred technical solution of the present invention, the load-bearing plate is supported in the corridor body by piers, and a force sensor for detecting the weight of the loading chamber is provided on the top of the pier, and the force sensor is electrically connected to the control unit.
[0012] As a preferred technical solution of the present invention, the loading chambers on both sides of the ditch are symmetrically arranged, and the pumping pipes on the two symmetrical loading chambers are collected into a pumping main pipe, and the pumping main pipe is connected to the suction device on the seabed.
[0013] As a preferred technical solution of the present invention, a telescopic joint is provided under the valve to adapt to the change in height of the unit compartment.
[0014] The present invention provides a method for loading a submarine corridor under weak geology, characterized in that the method adopts the submarine loading device under weak geology, and comprises the following steps:
[0015] S1. Determine the loading scheme: design the negative buoyancy scheme at different sinking stages according to the geometric dimensions, structural type and weight spatial distribution of the corridor to be installed, and determine the location of the loading object;
[0016] S2. Adjusting the electromagnetic spring: adjusting the height of the electromagnetic spring according to the loading scheme until the unit compartment reaches the required volume of the loaded object;
[0017] S3, pumping mud-water mixture to form temporary loading: starting the suction device to suck the mud-water mixture as a load into the unit compartment, and the control system adjusts the opening and closing amount of the valve according to the negative buoyancy scheme of different sinking stages;
[0018] S4, monitoring the sinking process: During the whole sinking process, the weight of each loading chamber is monitored in real time by the force sensor, and the posture of the corridor to be installed is monitored in real time by the posture sensor. Once an abnormality occurs, the control system adjusts the opening and closing amount of the valve and the power of the winch suction device in real time;
[0019] S5, draining and consolidating to form permanent loading: after the corridor to be installed is completely sunk into the seabed, each unit compartment is drained and consolidated, and the mud-water mixture forms a permanent loading;
[0020] S6. Pavement: After the drainage and consolidation are completed, concrete is poured on the concrete loading plate to form the pavement, and a grid net is installed on the drainage ditch.
[0021] Furthermore, the negative buoyancy scheme for different sinking stages in step S1 is to configure 1 to 1.1 times of negative buoyancy in the initial stage, gradually increase it to 1.2 times of negative buoyancy after the sinking posture of the corridor to be installed is stable, and adjust it to more than 1.5 times of negative buoyancy after continuing to sink to the seabed.
[0022] Furthermore, the positions where the loads are filled in step S1 are arranged in a skip-bin or full-house manner.
[0023] Furthermore, in step S2, the mud-water mixture is sucked by the suction device and sent to the first-layer unit cells, which are the bottom layer of the layered unit cells, followed from bottom to top by the second-layer unit cells, the third-layer unit cells and the fourth-layer unit cells.
[0024] Further, step S4 of draining and consolidating to form permanent loading includes the following steps;
[0025] 1) Filling the second unit compartment: After the first unit compartment is filled with the mud-water mixture, the electromagnetic spring in the second unit compartment is adjusted to a set height, and its valve is opened to fill the mud-water mixture;
[0026] 2) Draining and consolidating the first unit compartment: loosening the electromagnetic spring of the first unit compartment, the mud-water mixture is drained and consolidated under the weight of the second unit compartment, and compressed to the minimum volume;
[0027] 3) Filling the first unit compartment: after the water in the first unit compartment is discharged to the water collecting ditch through the drainage side pipe, the electromagnetic spring of the first unit compartment is adjusted to a set height, and its valve is opened to continue filling the mud-water mixture;
[0028] 4) Repeat the above operation to make the space of the first unit cell completely filled with solid particles in the mud-water mixture, and repeat the above operation for the remaining unit cells according to the requirements of permanent loading.
[0029] In summary, the beneficial effects of the present invention are:
[0030] 1. During the construction of the submarine corridor, a suction device is used to handle the soft seabed to obtain a mud-water mixture, which is then injected into the corridor's loading chamber as a counterweight, reducing the need for other materials and the impact of construction on the marine environment. The pier equipped with a force sensor below the loading chamber is responsible for supporting the weight and monitoring the force in real time through the sensor, helping the construction team understand the corridor's sinking potential and moment balance state, so that the valve opening and closing amount and the power of the suction device can be adjusted in time, and the sinking speed and depth of the corridor can be controlled to ensure that it reaches the predetermined position accurately, ensuring the stability of the corridor during construction and preventing the corridor from overturning or displacement during construction.
[0031] During the construction process, the water in the mud-water mixture is gradually discharged through the drainage consolidation method, while solid particles such as mud and sand are left in the unit cells. Once the construction is completed, the weight of these solid particles provides the required permanent load for the corridor. It can not only accurately evaluate the stress and stability of the corridor, but also reduce backfill work compared to traditional processes, improve the reliability of the structure in underwater service, simplify the construction process, and improve the efficiency and safety of submarine corridor construction.
[0032] 2. The strategy of using electromagnetic springs with staged control and filling mud-water mixtures one by one in cells is used to achieve a precise drainage and consolidation process. This method ensures uniform compression of the mud-water mixture, effectively avoids structural deformation problems, and eliminates hidden dangers caused by uneven consolidation. It optimizes the use efficiency of the mud-water mixture, reduces unnecessary consumption of materials, and thus improves the efficiency of resource utilization. In addition, this technology gives the construction team stronger monitoring capabilities and real-time control of the status of each unit cell, so that the sinking rate and load distribution of the corridor can be accurately controlled, thereby significantly reducing the risk of structural stress concentration and potential damage. This innovative solution significantly enhances the safety, operating efficiency and engineering quality of the submarine corridor construction. At the same time, the stability of the structure is also effectively guaranteed from a long-term perspective. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 is a schematic diagram of a corridor loading device of the present invention;
[0034] Figure 2 yes Figure 1 AA section view;
[0035] Figure 3 This is a flow chart of a method for loading a submarine corridor under weak geology according to the present invention;
[0036] Figure 4 It is a schematic diagram of the load of the present invention arranged in a full room;
[0037] Figure 5It is a schematic diagram of the load arrangement according to the jump bin of the present invention;
[0038] Figure 6 This is a schematic diagram of the pavement of the corridor to be installed according to the present invention;
[0039] Figure 7 Schematic diagram of the initial state of drainage consolidation of the first layer of unit cells in this embodiment;
[0040] Figure 8 This is a schematic diagram of the first layer unit compartment being filled with mud-water mixture in this embodiment;
[0041] Fig. 9 This is a schematic diagram of drainage consolidation of the first unit cell under the load of the second layer of unit cells in this embodiment;
[0042] Fig.10 This is a schematic diagram of the first layer unit compartment repeatedly filled with mud-water mixture in this embodiment;
[0043] Fig.11 This is a flow chart of the drainage and consolidation of the four-layer unit cells in this embodiment;
[0044] Wherein: (a) is a schematic diagram of drainage consolidation of the first layer of unit cells; (b) is a schematic diagram of drainage consolidation of the second layer of unit cells; (c) is a schematic diagram of drainage consolidation of the third layer of unit cells; (d) is a schematic diagram of drainage consolidation of the fourth layer of unit cells;
[0045] Among them: 1-loading chamber, 11-loading plate, 12-grid frame, 13-unit compartment, 131-electromagnetic spring, 132-valve, 133-expansion joint, 134-filter cloth, 14-pier, 2-ditch, 21-water pump, 22-water pipe, 3-drainage side pipe, 4-partition, 5-loading plate, 6-pumping pipe, 61-pumping main pipe, 7-attitude sensor, 8-road pavement, 9-grid net, Ⅰ-mud-water mixture, Ⅱ-solid particles. DETAILED DESCRIPTION
[0046] The specific embodiments of the present invention are described in detail below in conjunction with the accompanying drawings. It should be understood that the specific embodiments given here are only used to illustrate and explain the present invention, and cannot be used to limit the present invention.
[0047] It should be noted that many specific details are set forth in the following description to facilitate a full understanding of the present invention. However, the present invention may also have other implementations and variations thereof. Therefore, the protection scope of the present invention is not limited to the specific embodiments disclosed below.
[0048] like Figure 1 and Figure 2As shown, a submarine corridor loading device under soft geology is arranged in the corridor body, including a loading chamber 1, a water collecting ditch 2 and a control unit. An adapted water collecting ditch 2 is arranged in the middle of the corridor body along the length direction. Both sides of the water collecting ditch 2 are loading areas. Both sides of each loading area are provided with drainage side pipes 3 communicating with the water collecting ditch 2. The loading area is divided into a plurality of loading chambers 1 by a partition 4 along the length direction of the corridor body. The bottom of each loading chamber 1 is provided with a load receiving plate 11 installed on the bottom surface of the corridor body.
[0049] Each loading chamber 1 is provided with a plurality of unit cells 13 in layers from bottom to top through a grid frame 12, and a plurality of electromagnetic springs 131 are provided in each unit cell 13. A loading plate 5 is provided on the top of the loading chamber 1, and the loading plate 5 is fixed on the grid frame 12 of the top unit cell 13;
[0050] Each loading chamber 1 is provided with a pumping pipe 6 penetrating a plurality of unit cells 13, and a valve 132 is provided at the connection between the pumping pipe 6 and the unit cells 13; the water collecting ditch 2 discharges water to the periphery of the corridor body through the pumping pipe 22 by means of a pumping pump 21;
[0051] A plurality of attitude sensors 7 are provided at the top of the corridor body. The attitude sensors 7 are electrically connected to a control unit, and the control unit is used for automatic control of loading construction.
[0052] The loading chambers 1 on both sides of the water collecting ditch 2 of this embodiment are symmetrically arranged along the length direction of the corridor body, and the pumping pipes 6 on the two symmetrical loading chambers 1 are collected into a pumping main pipe 61, which is connected to the suction device on the seabed to suck the mud-water mixture I on the seabed as the load and distribute it to the corresponding loading chambers 1; each loading chamber 1 is provided with 4 unit compartments 13 from bottom to top, and each unit compartment 13 is provided with 4 electromagnetic springs 131, and the electromagnetic springs 131 adjust the height of the unit compartment 13 by electromagnetic force, thereby adjusting the volume filled with the mud-water mixture I; a concrete loading plate 5 is provided on the top of the loading chamber 1 to provide drainage loading, and after the construction is completed, it serves as the road surface inside the submarine corridor, which not only completes the loading requirements of the structure, but also meets the use function, avoiding additional construction procedures; two attitude sensors 7 are symmetrically arranged on the top of the corridor body, which can monitor the attitude of the corridor in real time and guide fine adjustments during the sinking process, such as adjusting the pumping volume and pumping position of the mud-water mixture I, to ensure that the corridor sinks evenly and is accurately positioned at a predetermined position.
[0053] As a preferred embodiment of the present invention, a filter cloth 134 is provided under each grid frame 12 .
[0054] As a preferred embodiment of the present invention, the loading plate 11 is supported in the corridor body by piers 14. A force sensor for detecting the weight of the loading chamber 1 is provided on the top of the pier 14. The force sensor is electrically connected to the control unit.
[0055] The load-bearing plate 11 bears all the loading weight of the loading chamber 1 above, and evenly distributes the weight in the loading chamber 1 to the pier 14, avoiding structural damage due to load concentration and improving the stability and safety of the corridor. The force sensor on the top of the pier 14 can monitor the weight of the loading chamber 1 in real time, ensuring accurate load control during construction, which helps to timely discover and adjust the pumping volume of the mud-water mixture I.
[0056] As a preferred embodiment of the present invention, a telescopic joint 133 is provided below the valve 132 to adapt to the height change of the unit compartment 13 .
[0057] The telescopic joint 133 ensures that the pumping pipe 6 can still work normally after the height of each unit compartment 13 is lowered.
[0058] like Figures 3 to 6 As shown, a method for loading a submarine corridor under weak geology of the present invention adopts a submarine loading device under weak geology, and comprises the following steps:
[0059] S1. Determine the loading scheme: design the negative buoyancy scheme for different sinking stages according to the geometric size, structural type, and weight spatial distribution of the corridor to be installed. Specifically, configure 1.05 times the negative buoyancy in the initial stage, and gradually increase it to 1.2 times the negative buoyancy after the sinking posture of the corridor is stable. After it continues to sink to the seabed, adjust it to 1.5 times the negative buoyancy to ensure that it is always on the bottom; at the same time, the position of the loading object is arranged in a full-chamber manner, that is, all loading chambers 12 on the plane are filled and loaded. For some areas with large undercurrents, in order to resist local scouring loads, it is necessary to apply a larger side load to the local position of the corridor body according to the flow field calculation results;
[0060] S2. Adjusting the electromagnetic spring 131: adjusting the height of the electromagnetic spring 131 according to the loading plan until the unit compartment 13 reaches the required volume of the loaded object;
[0061] S3, pumping mud-water mixture I to form temporary loading: start the suction device to suck the mud-water mixture I as the loading object into the unit compartment 13, and the control system adjusts the opening and closing amount of the valve 132 according to the negative buoyancy scheme in different sinking stages;
[0062] S4, monitoring of the sinking process: During the whole sinking process, the weight of each loading chamber 1 is monitored in real time by the force sensor, and the posture of the corridor to be installed is monitored in real time by the posture sensor 7. Once an abnormality occurs, the control system adjusts the opening and closing amount of the valve 132 and the power of the winch suction device in real time;
[0063] The sinking force of each loading point is identified through the force sensor, the opening and closing amount of the valve 132 is controlled, and the load of the loading point is adjusted to ensure that the forces on each part of the corridor are balanced during the sinking process, maintain the overall stability of the structure, and reduce additional stress concentration. At the same time, the automated monitoring and adjustment system can reduce manual operations, improve construction efficiency, shorten construction period, and can adapt to different marine environmental conditions to ensure safe sinking in various environments.
[0064] S5. Drainage and consolidation to form permanent loading: After the corridor to be installed is completely sunk to the seabed, drainage and consolidation treatment is performed on each unit compartment 13, and the mud-water mixture I forms a permanent loading;
[0065] S6, road pavement 8: After the drainage and consolidation are completed, concrete is poured on the concrete loading plate 5 to form the road pavement 8, and a grid net 9 is installed on the drainage ditch 2 at the same time.
[0066] Furthermore, in step S2, the mud-water mixture I is sucked by the suction device and sent to the first-layer unit cell 13. The first-layer unit cell 13 is the bottom layer of the layered unit cells 13, and from bottom to top are the second-layer unit cell 13, the third-layer unit cell 13 and the fourth-layer unit cell 13.
[0067] Furthermore, if Figures 7 to 11 As shown, Figures 7 to 10 This is a flow chart of drainage and consolidation of the first layer unit cell 13 of this embodiment. Fig.11 This is a flow chart of the four-layer unit cells 13 of this embodiment being drained and consolidated respectively. Step S4 of draining and consolidating to form permanent loading includes the following steps:
[0068] 1) Filling the second unit compartment 13: After the first unit compartment 13 is filled with the mud-water mixture I, the electromagnetic spring 131 in the second unit compartment 13 is adjusted to a set height, and its valve 132 is opened to fill the mud-water mixture I;
[0069] In order to ensure that the first unit compartment 13 can still maintain sufficient negative buoyancy after drainage and consolidation, and the negative buoyancy coefficient that the entire loading system can always provide is not lower than that before drainage and consolidation, it is necessary to perform accurate calculations in advance to determine the volume of the mixture that needs to be filled in the second layer, and adjust the height of the second layer spring accordingly.
[0070] 2) Draining and consolidating the first unit compartment 13: loosening the electromagnetic spring 131 of the first unit compartment 13, the mud-water mixture I is drained and consolidated under the weight of the second unit compartment 13, and compressed to the minimum volume;
[0071] 3) Filling the first unit compartment 13: After the water in the first unit compartment 13 is discharged to the water collecting ditch 2 through the drainage side pipe 3, the electromagnetic spring 131 of the first unit compartment 13 is adjusted to a set height, and its valve 132 is opened to continue filling the mud-water mixture I;
[0072] 4) Repeat the above operation to make the space of the first unit cell 13 completely filled with solid particles II in the mud-water mixture I, and repeat the above operation for the remaining unit cells 13 according to the requirements of permanent loading.
[0073] By adjusting the electromagnetic spring 131 and filling the mud-water mixture I in stages, draining and consolidating each unit compartment 13 one by one, it is helpful to evenly compress the mud-water mixture I, reduce structural deformation caused by uneven consolidation, allow more efficient use of the mud-water mixture I, reduce material waste, and optimize resource utilization. At the same time, this drainage and consolidation method allows the construction team to better monitor the status of each unit compartment 13, more accurately control the sinking speed and load distribution of the corridor, reduce stress concentration and potential damage to the structure, and help improve the safety, efficiency and quality of the submarine corridor construction, while ensuring the long-term stability of the structure.
[0074] It should be understood that the above-mentioned embodiments are one or more embodiments of the present invention, and there are many other embodiments and variations thereof based on the present invention; the variations and modifications made by ordinary technicians in this industry through the present invention without making pioneering innovations all fall within the scope of protection of the present invention.
Claims
1. A loading device for a submarine corridor under soft geology, arranged in the corridor body, characterized in that: It includes a loading chamber, a water collecting ditch and a control unit. The middle part of the corridor body is provided with an adapted water collecting ditch along the length direction. Both sides of the water collecting ditch are loading areas. Both sides of each loading area are provided with drainage side pipes communicating with the water collecting ditch. The loading area is divided into a plurality of loading chambers by a partition along the length direction of the corridor body. The bottom of each loading chamber is provided with a load-bearing plate installed on the inner bottom surface of the corridor body. Each of the loading chambers is layered with a plurality of unit cells from bottom to top through a grid frame, and each of the unit cells is provided with a plurality of electromagnetic springs. A loading plate is provided on the top of the loading chamber, and the loading plate is fixed on the grid frame of the top unit cell; Each of the loading chambers is provided with a pumping pipe that penetrates the plurality of unit cells, and a valve is provided at the connection between the pumping pipe and the unit cells; the water collecting channel discharges water to the periphery of the corridor body through the pumping pipe through the pumping pump; A plurality of attitude sensors are arranged on the top of the corridor body, and the attitude sensors are electrically connected to the control unit, and the control unit is used for automatic control of loading construction.
2. The submarine corridor loading device under weak geology according to claim 1 is characterized by: A filter cloth is arranged under each grid frame.
3. The submarine corridor loading device under weak geology according to claim 1 is characterized by: The load-bearing plate is supported in the corridor body through piers, and a force sensor for detecting the weight of the loading chamber is provided on the top of the pier, and the force sensor is electrically connected to the control unit.
4. The submarine corridor loading device under weak geology according to claim 1 is characterized by: The loading chambers on both sides of the water collecting ditch are symmetrically arranged, and the pumping pipes on the two symmetrical loading chambers are collected into a main pumping pipe, and the main pumping pipe is connected to the suction device on the seabed.
5. The submarine corridor loading device in soft geology according to claim 1 is characterized by: A telescopic joint is provided below the valve to adapt to the change in height of the unit compartment.
6. A loading method for a submarine corridor under weak geology, characterized in that: The seabed loading device for soft geology according to claims 1 to 5 is used, comprising the following steps: S1. Determine the loading scheme: design the negative buoyancy scheme at different sinking stages according to the geometric dimensions, structural type and weight spatial distribution of the corridor to be installed, and determine the location of the loading object; S2. Adjusting the electromagnetic spring: adjusting the height of the electromagnetic spring according to the loading scheme until the unit compartment reaches the required volume of the loaded object; S3, pumping mud-water mixture to form temporary loading: starting the suction device to suck the mud-water mixture as a load into the unit compartment, and the control system adjusts the opening and closing amount of the valve according to the negative buoyancy scheme of different sinking stages; S4, monitoring the sinking process: During the whole sinking process, the weight of each loading chamber is monitored in real time by the force sensor, and the posture of the corridor to be installed is monitored in real time by the posture sensor. Once an abnormality occurs, the control system adjusts the opening and closing amount of the valve and the power of the winch suction device in real time; S5, draining and consolidating to form permanent loading: after the corridor to be installed is completely sunk into the seabed, each unit compartment is drained and consolidated, and the mud-water mixture forms a permanent loading; S6. Pavement: After the drainage and consolidation are completed, concrete is poured on the concrete loading plate to form the pavement, and a grid net is installed on the drainage ditch.
7. The method for loading a submarine corridor in soft geology according to claim 1, characterized in that: The negative buoyancy scheme for different sinking stages in step S1 is to configure 1 to 1.1 times of negative buoyancy in the initial stage, gradually increase to 1.2 times of negative buoyancy after the sinking posture of the corridor to be installed is stable, and adjust to more than 1.5 times of negative buoyancy after continuing to sink to the seabed.
8. The method for loading a submarine corridor in soft geology according to claim 1 is characterized by: The positions where the loads are filled in step S1 are arranged in a skipping or full-house manner.
9. The method for loading a submarine corridor in soft geology according to claim 1, characterized in that: In step S2, the mud-water mixture is sucked by the suction device and sent to the first layer of unit cells, which is the bottom layer of the layered unit cells, followed from bottom to top by the second layer of unit cells, the third layer of unit cells and the fourth layer of unit cells.
10. The method for loading a submarine corridor in soft geology according to claim 9, characterized in that: Step S4: draining and consolidating to form permanent loading includes the following steps: 1) Filling the second unit compartment: After the first unit compartment is filled with the mud-water mixture, the electromagnetic spring in the second unit compartment is adjusted to a set height, and its valve is opened to fill the mud-water mixture; 2) Draining and consolidating the first unit compartment: loosening the electromagnetic spring of the first unit compartment, the mud-water mixture is drained and consolidated under the weight of the second unit compartment, and compressed to the minimum volume; 3) Filling the first unit compartment: after the water in the first unit compartment is discharged to the water collecting ditch through the drainage side pipe, the electromagnetic spring of the first unit compartment is adjusted to a set height, and its valve is opened to continue filling the mud-water mixture; 4) Repeat the above operation to make the space of the first unit cell completely filled with solid particles in the mud-water mixture, and repeat the above operation for the remaining unit cells according to the requirements of permanent loading.