Waterproof structure for combination part of super-large and super-thick raft and existing side wall
By setting up two waterproof structures at the joints of the super-large and super-thick raft panels and existing side walls, including self-adhesive polymer coils and permeable crystal waterproof coatings, the problem of poor waterproofing effect in the existing technology is solved, and low difficulty is achieved Construction and strong anti-leakage extend the service life of the building.
Patent Information
- Application Number
- CN202411165758.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-23
- Publication Date
- 2024-11-08
AI Technical Summary
The waterproofing problem of the basement concrete raft slab and existing side walls is complex and has poor results, resulting in difficult construction and high later maintenance costs, and there is a hidden danger of leakage.
Two waterproof structures are adopted: the first one is equipped with self-adhesive polymer coils and synthetic polymer pre-paved reverse-adhesive waterproof coils on the reserved post-pouring cushion layer, and is connected to the existing waterproof layer through double-sided butyl tape. Fixed seal; the second way is to chisel the side wall and apply the permeable crystal waterproof coating, arrange the water-swelling glue strips when exposed to water, and set up a repeatable grouting tube in the gap to close the gaps and holes.
It significantly improves the waterproof treatment effect, reduces construction difficulty and later maintenance costs, enhances the structure's leakage resistance and extends the service life of the building.
Smart Images

Figure CN118911208A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a building waterproof structure, in particular to a waterproof structure of a joint portion of an extra-large and extra-thick raft plate and an existing side wall. Background Art
[0002] With the acceleration of urbanization, super-large commercial complexes continue to emerge. The waterproofing problem of the joint between the basement concrete raft slab and the existing side wall has always been a difficult problem that plagues the construction industry. Due to the particularity of the structure, it often becomes a weak link in waterproofing. Traditional waterproofing methods have problems such as complex construction, poor waterproofing effect, and difficult maintenance.
[0003] Therefore, the known waterproofing method for the joint between the basement concrete raft slab and the existing side wall has the above-mentioned inconveniences and problems. Summary of the invention
[0004] The purpose of the present invention is to provide a safe and reliable waterproof structure for the joint of an extra-large and extra-thick raft and an existing side wall.
[0005] To achieve the above purpose, the technical solution of the present invention is: A waterproof structure for the joint of an extra-large and extra-thick raft and an existing side wall, comprising a first waterproof structure and a second waterproof structure, characterized in that: The first waterproof structure reserves a post-cast cushion layer at the joint of the existing side wall, arranges an additional layer of roll material on the post-cast cushion layer, arranges a self-adhesive polymer roll material and a synthetic polymer pre-laid reverse-adhesive waterproof roll material on the additional layer of roll material, uses double-sided butyl tape to connect the newly laid waterproof layer with the existing waterproof layer, and uses metal strips to fix and seal all waterproof layers; The second waterproof structure is to roughen the existing side walls of the new raft area and apply penetrating crystalline waterproof coating, arrange three waterstop strips from bottom to top, and set a repeatable grouting pipe between the first and second waterstop strips to prevent water seepage in the structure. Grouting liquid is injected through the grouting pipe to seal and block the gaps and holes in the joint area.
[0006] The waterproof structure of the joint portion between the super-large and super-thick raft and the existing side wall of the present invention can be further realized by adopting the following technical measures.
[0007] In the aforementioned waterproof structure of the joint between the super-large and super-thick raft and the existing side wall, the material of the additional layer of coiled material is a polymer coiled material.
[0008] The waterproof structure of the joint between the aforementioned super-large and super-thick raft slab and the existing side wall, wherein the water-stopping rubber strip is a water-swelling water-stopping rubber strip.
[0009] After adopting the above technical solution, the waterproof structure of the joint between the super-large and super-thick raft and the existing side wall of the present invention has the following advantages: 1. By setting up two waterproof structures, the problems of poor waterproofing effect of the existing raft and the existing side wall and high subsequent maintenance costs are solved; 2. The construction difficulty is low, and the structure has strong waterproof and anti-leakage capabilities, which solves the hidden danger of basement leakage in the later period; 3. Extend the service life of buildings. BRIEF DESCRIPTION OF THE DRAWINGS
[0010] Figure 1 Schematic diagram of the waterproof structure of an embodiment of the present invention. DETAILED DESCRIPTION
[0011] The present invention is further described below in conjunction with embodiments and accompanying drawings.
[0012] Example 1 Please refer to Figure 1 The waterproof structure of the joint between the super-large and super-thick raft and the existing side wall of the present invention includes a first waterproof structure and a second waterproof structure.
[0013] In the first waterproof structure: a post-cast cushion layer is reserved at the joint of the existing side wall, and a polymer waterproof additional layer 3 is laid on the concrete cushion 7, which serves to reinforce and waterproof the weak parts. Then, self-adhesive polymer coiled material 4 and synthetic polymer pre-laid reverse-adhesive waterproof coiled material 5 are laid, and double-sided butyl tape 2 is used to connect the newly laid waterproof layer with the existing building waterproof layer 1. Finally, metal strips 6 are used to fix and seal the entire waterproof layer to prevent groundwater from flowing back into the waterproof layer.
[0014] In the second waterproof structure: the existing side walls in the newly built raft area are roughened, and the roughened side walls are painted with penetrating crystallized waterproof coating 8, which is used to block tiny cracks and pores to form a dense waterproof layer. Then three water-swellable waterproof strips 9 are arranged from bottom to top, and a repeatable grouting pipe 10 is arranged between the first and second waterproof strips. Its function is to inject grouting liquid through the grouting pipe when water seepage occurs in the structure, so as to close and block the gaps and holes in the joint area and stop leakage.
[0015] The present invention has substantial characteristics and significant technical progress. Compared with the prior art, the waterproof structure of the super-large and super-thick raft and the existing side wall of the present invention solves the problems of poor waterproof treatment effect of the existing raft and the existing side wall and high later maintenance costs by setting two waterproof structures. In addition, the construction difficulty is low, the structural waterproof and anti-leakage ability is strong, and the hidden danger of basement leakage in the later period is solved. Thus, the service life of the building is extended, and the market application prospect is good.
[0016] The above embodiments are only for the purpose of illustrating the present invention, but not for limiting the present invention. A person skilled in the art may make various changes or modifications without departing from the spirit and scope of the present invention. Therefore, all equivalent technical solutions should also belong to the scope of the present invention and should be defined by the claims.
Claims
1. A waterproof structure for the joint of an extra-large and extra-thick raft and an existing side wall, comprising a first waterproof structure and a second waterproof structure, characterized in that: The first waterproof structure reserves a post-cast cushion layer at the joint of the existing side wall, arranges an additional layer of roll material on the post-cast cushion layer, arranges a self-adhesive polymer roll material and a synthetic polymer pre-laid reverse-adhesive waterproof roll material on the additional layer of roll material, uses double-sided butyl tape to connect the newly laid waterproof layer with the existing waterproof layer, and uses metal strips to fix and seal all waterproof layers; The second waterproof structure is to roughen the existing side walls of the new raft area and apply penetrating crystalline waterproof coating, arrange three waterstop strips from bottom to top, and set a repeatable grouting pipe between the first and second waterstop strips to prevent water seepage in the structure. Grouting liquid is injected through the grouting pipe to seal and block the gaps and holes in the joint area.
2. The waterproof structure of the joint between the super-large and super-thick raft and the existing side wall as claimed in claim 1 is characterized in that: The material of the additional layer of coiled material is a polymer coiled material.
3. The waterproof structure of the joint between the super-large and super-thick raft and the existing side wall as claimed in claim 1 is characterized in that: The waterproof adhesive strip is a waterproof adhesive strip that expands when exposed to water.
