Construction method for combining river channel and permanent drainage pipeline in crossing site
By adopting a cross-sectional horizontal 'product' shaped concrete box culvert structure and a secondary recovery tank at the intersection of the river channel and the drainage pipeline in the site, the problems of water resource diversion and recycling are solved, and the effective diversion and secondary of rainwater, sewage and river water are realized. Recycling improves construction safety and water resource utilization efficiency.
Patent Information
- Application Number
- CN202411189895.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-28
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2044-08-28
AI Technical Summary
The existing technology cannot solve the problem of water resource diversion and secondary recycling during the cross-construction of rivers and rainwater pipes on the site at one time, resulting in water resource waste and pollution.
A cross-sectional transverse ‘product’ shaped concrete box culvert structure is used to combine rainwater and sewage diversion, and a secondary recovery tank is set up after the construction is completed to meet the water needs, and rainwater overload is treated through the overflow outlet, and secondary recycling is used for rainwater and river water.
The effective diversion of rainwater, sewage and river water and the secondary recycling and utilization of some water resources have been achieved, the drainage effect and construction safety have been improved, and the risks of water resource waste and pollution have been reduced.
Smart Images

Figure CN118911262A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of in-site drainage construction, and specifically to a construction method combining a river within a site and a permanent drainage pipeline. Background Art
[0002] In view of the construction intersection of a transverse river and in-site rain and sewage drainage pipelines within a site, there is no corresponding construction method to solve the problems of rainwater, sewage, and river water diversion and partial secondary recycling of water resources at one time, and water resource waste and pollution events are likely to occur.
[0003] Therefore, a construction method for solving the combination and utilization of a river within a site and in-site drainage pipelines is a problem worthy of research. Summary of the Invention
[0004] The present invention aims to overcome the defects of the prior art and provides a construction method combining a river within a site and a permanent drainage pipeline, which solves the cross-construction of a river within a site and in-site rain and sewage pipelines, and solves the cross-diversion of in-site rain, sewage, and river water and partial water resource recycling at one time.
[0005] To solve the above technical problems, the present invention is realized as follows: A construction method combining a river within a site and a permanent drainage pipeline, characterized in that: First, the original river crossing within the site is excavated by earthwork slope, and the river alignment and slope are measured and set out for positioning; Second, a cross-section transverse "pin" - shaped concrete box culvert structure is constructed along the river; Then, a secondary recycling pool structure is added at the in-site water use points to meet the in-site water use requirements; Finally, after the structure construction is completed, the earthwork is backfilled and compacted, and the road surface is hardened.
[0006] The described construction method combining a river within a site and a permanent drainage pipeline is characterized in that: The overall combination and diversion of rain, sewage, and river water are solved by a cross-section transverse "pin" - shaped concrete box culvert. A dedicated river water circulation channel is set on one side, and the other side is divided into two layers. The upper part is provided with a rainwater drainage channel, and the lower part is provided with a sewage drainage channel.
[0007] The described construction method combining a river within a site and a permanent drainage pipeline is characterized in that: The upper rainwater channel is discharged by汇入 (should be "merged into" or "flowed into") the in-site rainwater pipeline on one side. An overflow port is set on the other side of the rainwater channel. When the in-site rainwater volume is too large, it can overflow through the overflow port to the river channel for discharge, which can effectively enhance the drainage effect.
[0008] The described construction method combining a river within a site and a permanent drainage pipeline is characterized in that: A secondary recycling pool can be set beside the cross-section transverse "pin" - shaped concrete box culvert to supply in-site greening and car washing water by rainwater recycling and secondary river water replenishment.
[0009] A construction method combining a river channel and a permanent drainage pipe within a site is characterized in that the "pin"-shaped concrete box culvert can be prefabricated or cast-in-place, and anti-seepage concrete is used. When precast concrete construction is adopted, anti-seepage measures should be taken at the joint part.
[0010] A construction method combining a river channel and a permanent drainage pipe within a site is characterized in that after the concrete box culvert structure of the concrete structure is constructed, the soil is backfilled and compacted, and the top is hardened.
[0011] The beneficial effects of the present invention are as follows: It can be seen from the above technical solutions that the present application provides a construction method combining a river channel and a permanent drainage pipe within a site. The "pin"-shaped concrete box culvert structure in the transverse section is simple, has high bearing capacity, and the construction technology is mature. It can effectively realize the diversion of rainwater, sewage, and river water and the secondary recycling of part of the water resources. After the "pin"-shaped concrete box culvert structure in the transverse section is constructed, it can be backfilled and hardened, improving the cross-river commuting efficiency and reducing the risk of people falling into the river. Description of the Drawings
[0012] The present invention will be further described in detail below in conjunction with the drawings and embodiments: Figure 1 It is a "pin"-shaped box culvert in the transverse section; Figure 2 It is a sectional view taken along line 1-1; Figure 3 It is a sectional view taken along line 2-2; Figure 4 It is a plan view of the secondary recovery pool; Figure 5 It is a sectional view taken along line 4-4 (sectional view of the secondary recovery pool); Figure 6 It is a sectional view taken along line 3-3 (structural diagram of the secondary recovery pool). Specific Embodiments
[0013] The technical solutions of the embodiments of the present application will be clearly and completely described below in conjunction with the drawings. Obviously, the described embodiments are part of the embodiments of the present application, rather than all of the embodiments. All other embodiments obtained by those of ordinary skill in the art based on the embodiments in the present application without creative efforts shall fall within the scope claimed by the present application. Such as Figure 1-6As shown: A construction method combining a river channel across a site with a permanent drainage pipe, characterized in that: First, the original river channel across the site is excavated by earthwork slope, and the alignment and slope of the river channel are measured and set out; Second, a transverse "pin" - shaped concrete box culvert structure is constructed along the river; Then, a secondary recovery pool structure is added at the water - using points in the site to meet the water - using requirements in the site; Finally, after the structure construction is completed, the earthwork is backfilled and compacted, and the road surface is hardened.
[0014] Specifically, the combined diversion of overall rainwater, sewage and river water is solved by a transverse "pin" - shaped concrete box culvert. A special river - water circulation channel is set on one side, and on the other side, it is divided into two layers. The upper part is set with a rainwater drainage channel, and the lower part is set with a sewage drainage channel.
[0015] The upper - part rainwater channel converges and discharges through the rainwater pipes on one side of the site. An overflow port is set on the other side of the rainwater channel. When the rainwater volume in the site is too large, it can overflow through the overflow port and be discharged into the river channel, which can effectively enhance the drainage effect.
[0016] A secondary recovery pool can be set beside the transverse "pin" - shaped concrete box culvert to supply water for the greening and car - washing in the site by using rainwater recovery and secondary river water replenishment.
[0017] The "pin" - shaped concrete box culvert can be constructed by pre - casting or in - situ casting, and anti - seepage concrete is used; When pre - cast concrete construction is adopted, anti - leakage measures should be taken for the joint part.
[0018] After the construction of the concrete box culvert structure of the concrete structure is completed, the earthwork is backfilled and compacted, and the top is hardened.
[0019] In the present invention, the original river channel across the site is excavated by earthwork slope, and the alignment and slope of the river channel are measured and set out. A transverse "pin" - shaped concrete box culvert structure (such as Figure 1 ) is constructed along the river. A secondary recovery pool structure (such as Figure 4 ) is added at the water - using points in the site to meet the water - using requirements in the site. After the structure construction is completed, the earthwork is backfilled and compacted, and the road surface is hardened.
[0020] The above are the embodiments provided by this application and are not used to limit this application. Although this application has been described in detail with reference to the embodiments, for those skilled in the art, they can still modify the technical solutions recorded in the foregoing embodiments, or perform equivalent substitution on some of the technical features. However, any modification, equivalent substitution, improvement, etc. made within the spirit and principle of this application shall be included within the protection scope of this application.
Claims
1. A construction method combining a river channel within a site with a permanent drainage pipe, characterized in that: First, the original river channel across the site is excavated by means of earthwork slope cutting, and the alignment and slope of the river channel are measured and set out; secondly, a cross-section transverse "pin"-shaped concrete box culvert structure is constructed along the river; then, a secondary recovery pool structure is added at the water usage points within the site to meet the water usage requirements within the site; finally, after the structure construction is completed, the earthwork is backfilled and compacted, and the road surface is hardened.
2. The construction method combining a river channel within a site with a permanent drainage pipe according to claim 1, characterized in that: The combined diversion of rainwater, sewage and river water is solved through a cross-section transverse "pin"-shaped concrete box culvert. A special river water circulation channel is set on one side, and on the other side, it is divided into 2 layers. The upper part is provided with a rainwater drainage channel, and the lower part is provided with a sewage drainage channel.
3. The construction method combining a river channel within a site with a permanent drainage pipe according to claim 1, characterized in that: The upper rainwater channel is discharged by converging into the on-site rainwater pipe on one side. An overflow port is provided on the other side of the rainwater channel. When the on-site rainwater volume is too large, it can overflow through the overflow port and be discharged into the river channel, which can effectively enhance the drainage effect.
4. The construction method combining a river channel within a site with a permanent drainage pipe according to claim 1, characterized in that: A secondary recovery pool can be set beside the cross-section transverse "pin"-shaped concrete box culvert to supply water for on-site greening and car washing by using rainwater recovery and secondary river water replenishment.
5. The construction method combining a river channel within a site with a permanent drainage pipe according to claim 1, characterized in that: The "pin"-shaped concrete box culvert can be constructed by precast or in-situ casting, and anti-seepage concrete is used; when precast concrete construction is adopted, anti-seepage measures should be taken for the joint part.
6. The construction method combining a river channel within a site with a permanent drainage pipe according to claim 1, characterized in that: After the construction of the concrete box culvert structure of the concrete structure is completed, the earthwork is backfilled and compacted, and the top is hardened.
Citation Information
Patent Citations
Construction method and system for box culvert section relocation and transformation of river channel
CN117488868A
Rainwater and sewage box culvert and rain and sewage diversion system for solving problem of black and odorous river channel
CN214833234U
Urban river channel complex
CN215801371U
Comprehensive pipeline arrangement structure suitable for ancient city transformation
CN218149996U
Separator of rubbish in sewage purifier
JP1996135002A
