Shielding net cable space structure frame and construction method

Through the design of the space structural frame of the shielding mesh cable, the tension locking of locking piles, vertical columns and main cables, combined with snaps and limit buckles, the production difficulties and long cycle problems in shielding construction are solved, and rapid construction and The masking effect and extends the service life of the main cable.

CN118911426AActive Publication Date: 2024-11-08CHINA CONSTR EIGHT ENG DIV CORP LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202411263412.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-10
Publication Date
2024-11-08
Estimated Expiration
2044-09-10

AI Technical Summary

Technical Problem

In the prior art, there are problems such as difficult production and long construction cycle when covering important buildings.

Method used

The space structural frame of the shielded mesh cable is adopted, and the tensioning and locking is carried out by setting up locking piles, vertical columns and main cables. Combined with snaps, limit buckles and auxiliary cables, the rapid expansion and installation of the shielded mesh is achieved, and the construction progress is accelerated by using human traction.

Benefits of technology

The simplification and rapid completion of shielding construction is achieved, reducing the construction difficulty and cycle, and at the same time, the service life of the main cable is extended through sleeve and arc-shaped design, and the strength and service time of the shielding net are enhanced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911426A_ABST
    Figure CN118911426A_ABST
Patent Text Reader

Abstract

The invention relates to a shielding net cable space structure frame and a construction method, and relates to the technical field of building construction, the shielding net cable space structure frame is used for shielding equipment on a construction site, the structure frame comprises locking piles arranged on the two sides of the equipment on the construction site, and a plurality of reserved holes are formed in the locking piles; the vertical columns are arranged on the sides, close to equipment on a construction site, of the locking piles at intervals, the main cables are connected to the oppositely-arranged vertical columns, the one-way tensioning force of the main cables is adopted for structural supporting, the two ends of the main cables and reserved holes in the locking piles are tensioned and locked, then the main cables are supported through the vertical columns, and therefore the construction efficiency is improved. The vertical stand columns on the two sides are rapidly connected, the structural supporting effect of the vertical stand columns is achieved after tension is applied, the shielding net is dragged below the main rope through manpower, a simple shielding mode is rapidly provided for important building shielding construction or important facility hidden operation, and the effect of simple construction is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of building construction, in particular to a shielding net cable space structure frame and a construction method. Background Art

[0002] For important buildings that require concealed construction or important facilities that require concealed operation, or other situations that require similar large-span space requirements, the required sheltered space is large, and it is often necessary to use dark excavation or build large-span steel structures for sheltering. However, the existing technology is difficult to manufacture when covering important buildings, and the construction period is long. Therefore, it is necessary to provide measures to solve the problems of difficulty in manufacturing and long construction period. Summary of the invention

[0003] The purpose of the present invention is to overcome the defects of the prior art, provide a shielding net cable space structure frame and construction method, and solve the problems of difficult production and long construction period in existing buildings.

[0004] The technical solution to achieve the above purpose is: a shielding net cable space structure frame and construction method, which is used to shield the equipment on the construction site, and the structure frame includes:

[0005] Locking piles are arranged on both sides of the equipment at the construction site, and the locking piles are provided with a plurality of reserved holes;

[0006] A plurality of vertical columns are arranged at intervals on the locking piles close to a side of the equipment on the construction site;

[0007] A main cable connected to oppositely arranged vertical columns, one end of which passes through a reserved hole on a locking pile on one side of the site equipment and is locked, and the other end of which passes through the top of the vertical columns on both sides of the site equipment and then through the reserved hole on the locking pile on the other side to be tensioned and locked;

[0008] A shielding net connected to a vertical column on one side of the equipment on the construction site, wherein buckles are provided on the shielding net at intervals corresponding to the main cables, the buckles are sleeved on the corresponding main cables, and the shielding net is slidably connected to the main cables via the buckles. The shielding net can be unfolded along the main cables toward the vertical column on the other side of the equipment on the construction site.

[0009] The technical solution of the present invention is further improved in that: the shielding net is provided with a limit buckle toward the vertical column located on the other side of the equipment on the construction site, and the bottom of the limit buckle is connected to the top of the buckle.

[0010] The technical solution of the present invention is further improved in that: a diagonal bracing column is connected to one side of the vertical column close to the locking pile.

[0011] The technical solution of the present invention is further improved in that: a sleeve is connected to the top of the vertical column, the inner wall of the sleeve is in contact with the surface of the main cable, and the main cable is tensioned by passing through the sleeve.

[0012] The technical solution of the present invention is further improved in that: an inner wall of one side of the sleeve facing the locking pile is provided with an arc extending from the inside to the outside.

[0013] The technical solution of the present invention is further improved in that: the side of the locking pile away from the diagonal bracing member is connected with an anchor cable, and the anchor cable is buried in the construction site.

[0014] The technical solution of the present invention is further improved in that: the shielding net is connected with auxiliary cables perpendicular to the main cables, and the auxiliary cables are arranged on the shielding net at intervals.

[0015] The technical solution of the present invention is further improved in that: the tops of the vertical columns located on the same side are connected to a connecting cross frame, and the connecting cross frame is connected to a plurality of fixing hooks;

[0016] The side of the shielding net close to the connecting horizontal frame is connected with a plurality of tie ropes, and the tie ropes are tied to the fixing hooks.

[0017] The technical solution of the present invention is further improved in that: a crossed auxiliary bracket is connected between two adjacent vertical columns and close to the bottom of the connecting cross frame.

[0018] A construction method for a shielded cable space structure frame comprises the following steps:

[0019] Step 1: Provide locking piles and set them on both sides of the equipment on the construction site;

[0020] Step 2: Provide vertical columns and set them at intervals close to both sides of the equipment on the construction site;

[0021] Step 3: Provide the main cable, pass one end of the main cable through the locking pile to connect and lock it, and then pass the other end of the main cable through the tops of two oppositely arranged vertical columns to connect to the locking pile on the other side and lock it after tensioning;

[0022] Step 4: Provide a shielding net, connect the shielding net to the vertical column on one side of the equipment on the construction site, then place the shielding net on the main cable, and stretch the other end of the shielding net on the main cable so that the shielding net is unfolded on the main cable.

[0023] By using the above technical solution, the present invention has the following technical effects compared with the prior art:

[0024] The present invention provides a shielding net cable space structure frame and a construction method, which uses the unidirectional tensioning force of the main cable to achieve the effect of structural support, so that the two ends of the main cable are tensioned and locked with the reserved holes on the locking piles, and then the main cable is supported by vertical columns, and the vertical columns on both sides are quickly connected to achieve the structural support function after the tension is applied. By using manpower to pull the shielding net under the main cable, a relatively simple shielding method is quickly provided for the shielding construction of important buildings or the concealed operation of important facilities, thereby achieving the effect of simple construction.

[0025] The sleeve at the top of the vertical column can utilize the arc-shaped inner wall at the end of the sleeve to reduce the wear on the surface of the main cable, prevent the surface of the main cable from being damaged during the connection process, and increase the service life of the main cable.

[0026] The auxiliary cables can make the shielding net foldable on the main cables, which increases the strength and service life of the shielding net, provides conditions for the construction and installation of the net cable space structure, enables the net cable structure to be quickly recovered, and speeds up the construction period. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 The present invention is a plan view of a shielding net cable space structure frame and its construction method.

[0028] Figure 2 This is a plan view of a single-span vertical column at location A of a shielding net cable space structure frame and construction method of the present invention.

[0029] Figure 3 The present invention is a cross-sectional view of a shielding net cable space structure frame and its construction method.

[0030] Figure 4 The present invention provides a vertical column plan view of a shielding cable space structure frame and a construction method.

[0031] Figure 5 The present invention provides a shielding mesh cable space structure frame and a mesh cable tie cross-section diagram of the construction method.

[0032] Figure 6 The present invention is a schematic diagram of a shielding net cable space structure frame and a construction method for installing a shielding net on a main cable.

[0033] Figure 7 The present invention provides a shielding net cable space structure frame and a shielding net sewing cross-section diagram of the construction method.

[0034] Figure 8 The invention discloses a space structure frame for shielding net cables and a construction method, wherein a limit buckle is sleeved on a main cable plane.

[0035] Fig. 9 The present invention discloses a main cable penetration and sleeve cross-sectional view of a shielding net cable space structure frame and a construction method.

[0036] Fig.10 The present invention is a bottom plan view of a vertical column of a shielding net cable space structure frame and a construction method.

[0037] Fig.11 The present invention discloses a shielding net cable space structure frame and a plan view of the diagonal bracing members and locking pile surfaces of the construction method.

[0038] Fig.12 The present invention discloses a shielding net cable space structure frame and a construction method thereof, wherein the shielding net is folded and hoisted.

[0039] Fig.13 The present invention is a schematic diagram of artificial traction of a shielding net cable space structure frame and its construction method.

[0040] In the figure: 1. vertical column; 2. diagonal brace; 3. locking pile; 4. shielding net; 5. main cable; 6. pile body; 7. fixing hook; 8. tie rope; 9. connecting cross frame; 10. auxiliary bracket; 11. sleeve; 12. anchor cable; 13. auxiliary cable; 14. suture rope; 15. limit buckle; 16. buckle; 17. metal ring; 18. stiffening plate; 19. grouting material; 20. anchor. DETAILED DESCRIPTION

[0041] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.

[0042] The present invention provides a shielding net cable space structure frame and a construction method, which is intended to reduce the construction difficulty and construction period when important buildings have shielding construction requirements, and can achieve the advantage of rapid construction. The shielding net cable space structure frame and the construction method are described below.

[0043] See also Figure 1 , showing a plan view of a shielding cable space structure frame and its construction method of the present invention. Figure 2 , showing an enlarged view of point A of a shielding net cable space structure frame and construction method of the present invention. Figure 3 , showing a cross-sectional view of a shielding cable space structure frame and its construction method of the present invention. Figure 4 , showing a vertical column plan view of a shielding cable space structure frame and construction method of the present invention. Figure 5 , showing a cross-sectional view of a shielding cable space structure frame and a construction method of the present invention. Figure 6 , showing a schematic diagram of a shielding net cable space structure frame and a construction method of the present invention, wherein the shielding net is installed on the main cable. Figure 7 , showing a cross-sectional view of a shielding net stitching of a shielding net cable space structure frame and construction method of the present invention. Figure 8, showing a space structure frame of a shielding net cable and a construction method of the present invention, wherein the limit buckle is connected to the main cable plane. Fig. 9 , showing a main cable and sleeve cross-sectional view of a shielding net cable space structure frame and construction method of the present invention. Fig.10 , showing a bottom plan view of a vertical column of a shielding cable space structure frame and construction method of the present invention. Fig.11 , showing a plan view of the diagonal bracing members and locking pile surfaces of a shielding net cable space structure frame and its construction method of the present invention. Fig.12 , showing a folded and hoisted shielding net of the present invention, a shielding net cable space structure frame and construction method. Fig.13 , showing a schematic diagram of artificial traction of a shielding net cable space structure frame and construction method of the present invention. Figures 1 to 13 , the structure of the shielding net cable space structure frame and the construction method of the present invention are explained.

[0044] See also Figure 1 , Figure 2 , Fig.11The present invention provides a shielding net cable space structure frame and a construction method for shielding equipment on a construction site. The structure frame includes: a vertical column 1, a locking pile 3, a shielding net 4, a main cable 5, and a buckle 16. The locking pile 3 is arranged on both sides of the equipment on the construction site. The locking pile 3 is provided with a plurality of reserved holes. The vertical columns 1 are arranged at intervals on the locking pile 3 near the equipment on the construction site. The vertical column 1 is provided with a plurality of main cables 5 connected to the vertical columns 1 arranged oppositely. One end of the main cable 5 passes through the reserved hole on the locking pile 3 on one side of the site equipment and is locked. The other end of the main cable 5 is locked through the reserved hole on the locking pile 3 on the side of the site equipment. One end passes through the top of the vertical column 1 on both sides of the site equipment and then passes through the reserved holes on the locking pile 3 on the other side for tensioning and locking. The shielding net 4 is connected to the vertical column 1 on one side of the equipment on the construction site. Buckles 16 are provided at the intervals corresponding to the main cables 5 on the shielding net 4. The buckles 16 are sleeved on the corresponding main cables 5. The shielding net 4 is slidably connected to the main cables 5 through the buckles 16. The shielding net 4 can be unfolded along the main cables 5 toward the vertical column on the other side of the equipment on the construction site. By locking one end of the main cable 5 on the reserved hole of the locking pile 3, the locking pile 3 is away from the vertical column. 1 is connected to one side of the anchor cable 12, which is buried in the construction site. The site is leveled according to the spatial elevation requirements. After leveling, the anchor cable 12 of the locking pile 3 is constructed first. Before the locking pile 3 is constructed, the anchor cable 12 needs to be drilled and lowered. The specifications, length, and layout of the anchor cable 12 need to be calculated according to the tension value of the main cable 5. The construction of the anchor cable 12 should ensure that the position is consistent and corresponds to the position of the locking pile 3, so as to facilitate the tensioning and locking after the subsequent construction of the locking pile 3. The main cable 5 and the anchor cable 12 are provided with anchors 20 at the reserved holes on the locking pile 3. According to the span, The upper load measured by height and other factors requires the use of vertical columns 1 to first carry out pile construction, and then carry out the construction of the foundation pedestal and locking piles 3. The vertical column 1 is used to support the main cable 5, and then the other end of the main cable 5 is connected to the reserved hole of the locking pile 3 on the other side through tensioning and locked. Before locking, the main cable 5 is tensioned again to make the main cable 5 tensioned on the vertical column 1. The locking pile 3 is used to transmit the tensioning force of the main cable 5 to the underground, and then the vertical column 1 and the locking pile 3 are used to support the space between the shielding net 4 and the main cable 5 to achieve the effect of linear force and form a stable structure.

[0045] Preferably, if Figure 2 As shown, the upper end of the vertical column 1 can be supported by connecting the cross frame 9, so that the vertical column 1 is always in a vertical state, avoiding the upper end of the vertical column 1 from being skewed when erected.

[0046] Furthermore, if Fig.11As shown, the anchor 20 can be used to lock the main cable 5 and the anchor cable 12 after passing through the reserved holes on the locking pile 3, so that the main cable 5 and the anchor cable 12 are fixed after passing through the locking pile 3, and a high-strength grouting material 19 with slight expansion and no shrinkage is poured between the diagonal brace 2 and the locking pile 3. Before grouting, it is necessary to ensure that the diagonal brace 2 and the locking pile 3 are installed in place and completed acceptance.

[0047] Furthermore, during the installation of the steel support, the anchor cable 12 can be constructed at the same time. After the construction of the steel support and the anchor cable 12 is completed, grouting is carried out under the vertical column 1 and the diagonal brace 2. The vertical column 1 and the locking pile 3 form a linear force foundation at both ends of the cable mesh space, bearing the tension and self-weight load of the main cable 5 and the shielding net 4 at the upper part of the cable mesh space. A stable structure is formed by the locking crown beam of the vertical column 1, the diagonal brace 2, the main cable 5 and the locking pile 3.

[0048] refer to Figure 3 , Figure 4 , Fig.10 In a specific embodiment of the present invention, a limiting buckle 15 is provided corresponding to the buckle 16 of the shielding net 4, and the bottom of the limiting buckle 15 is connected to the top of the buckle 16. The limiting buckle 15 is provided with metal rings 17 connected to the shielding net 4 on both sides of the shielding net 4. After the shielding net 4 and the buckle 16 are sewn together, the net cable can be installed. The installation method is to lift the folded net cable to the main cable on the top of the column at the steel support position at one end, and then connect the special buckle 16 set on the net cable to the main cable 5 from far to near by pressing the opening ring.

[0049] Preferably, if Figure 8 , Fig.13 As shown, after ensuring that the main cable 5 is tensioned, the limit buckle 15 is used to be sleeved on the auxiliary cable 13, and then the metal ring 17 is used to reinforce the connection between the shielding net 4 and the limit buckle 15. The metal ring 17 is an annular eye buckle with a hole structure, and then it is sleeved on the main cable 5 through the buckle 16, so that the shielding net 4 is covered on the main cable 5. When the shielding net 4 is unfolded, the limit buckle 15 and the buckle 16 can be used to pull and stretch the main cable 5. The length of the main cable 5 is galvanized steel stranded wire, and the specifications are calculated according to the load. The length is calculated according to the span, height, deflection length, and tensioning reserved length. The traction method can be manual traction, and a traction rope is set at the end of the shielding net 4 in advance to achieve the traction effect, or an electric pulley is used for traction.

[0050] In a specific embodiment of the present invention, a diagonal support column 2 is connected to one side of the vertical column 1 close to the locking pile 3, and the bottom of the vertical column 1 is connected to a pile body 6 that penetrates into the construction site. A stiffening plate 18 is provided on the surface of the vertical column 1 close to the ground, and a high-strength grouting material 19 with slight expansion and no shrinkage is poured between the vertical column 1 and the construction ground. Before grouting, it is necessary to ensure that the vertical column 1 is installed in place and completed the acceptance. After the grouting strength of the grouting material 19 meets the strength requirement and the anchor cable 13 grouting has reached the strength requirement, the main cable 5 is tensioned.

[0051] Furthermore, if Figure 3 , Figure 4 As shown, the pile body 6 deep in the site is used to strengthen the supporting effect of the vertical column 1, effectively preventing the vertical column 1 from tilting, and the main cable 5 can be restricted to the top of the vertical column 1 by the sleeve 11, so that the main cable 5 is not easily displaced when placed above the vertical column 1.

[0052] In a specific embodiment of the present invention, a sleeve 11 is connected to the top of the vertical column 1, and the inner wall of the sleeve 11 is in contact with the surface of the main cable 5. The main cable 5 is tensioned by passing through the sleeve 11.

[0053] refer to Fig. 9 In a specific embodiment of the present invention, the inner wall of the sleeve 11 facing the locking pile 3 is provided with an arc extending from the inside to the outside.

[0054] Furthermore, if Fig. 9 As shown, the inner diameter of the end of the sleeve 11 is set to be arc-shaped, which can prevent friction from occurring when the main rope 5 is passed through and reduce the wear of the inner diameter on the main rope 5.

[0055] refer to Figure 3 In a specific embodiment of the present invention, the side of the locking pile 3 away from the diagonal bracing member 2 is connected with an anchor cable 12, and the anchor cable 12 is buried in the construction site.

[0056] Preferably, if Figure 3 As shown, the anchor cable 12 can penetrate into the construction site to further fix the locking pile 3 in the construction site, thereby enhancing the stability of the locking pile 3.

[0057] refer to Figure 6 , Figure 7 In a specific embodiment of the present invention, the shielding net 4 is connected to an auxiliary rope 13 perpendicular to the main rope 5, the auxiliary rope 13 is arranged on the shielding net 4 at intervals, and the shielding net 4 is connected to a suture rope 14 for sew the shielding net 4 and the auxiliary rope 13 together.

[0058] Furthermore, if Figure 6 , Figure 7 As shown, the shielding net 4 can be folded by means of auxiliary ropes 13 arranged at intervals on the shielding net 4.

[0059] Furthermore, the connection between the shielding net 4 and the auxiliary rope 13 is sewn by setting a sewing rope 14, so that the two are more closely fitted and not easy to loosen.

[0060] refer to Figure 8 In a specific embodiment of the present invention, a connecting cross frame 9 is connected to the top of the vertical column 1 located on the same side, and a plurality of fixing hooks 7 are connected to the connecting cross frame 9. A plurality of tie ropes 8 are connected to the side of the shielding net 4 near the connecting cross frame 9, and the tie ropes 8 are tied to the fixing hooks 7.

[0061] Furthermore, if Figure 5 As shown, the shielding net 4 is placed on the top of the main rope 5, and the tie rope 8 on one side of the shielding net 4 is tied to the fixing hook 7 to connect, so as to fix the end of the shielding net 4.

[0062] refer to Figure 2 In a specific embodiment of the present invention, a crossed auxiliary bracket 10 is connected between two adjacent vertical columns 1 and close to the bottom of the connecting cross frame 9.

[0063] Furthermore, if Figure 2 As shown, the auxiliary bracket 10 is made of I-beam, and the vertical column 1 is supported by the auxiliary bracket 10 .

[0064] A construction method for a shielded cable space structure frame comprises the following steps:

[0065] The first step: providing locking piles 3, setting the locking piles 3 on both sides of the equipment on the construction site, so as to facilitate the locking of the anchor cable for gripping the ground and the locking of the main cable tensioning;

[0066] Step 2: Provide vertical columns 1, and set the vertical columns 1 at intervals near both sides of the equipment on the construction site. If pile foundations are required according to the upper loads calculated based on span, height, etc., pile construction should be carried out first, and then the foundation cap and locking crown beam should be constructed. After the foundation cap reinforcement is installed, the anchor bolts need to be pre-buried, and the pre-buried position needs to correspond to the position of the column. Then provide diagonal braces 2, pile bodies 6, connecting cross frames 9, and sleeves 11, bury the pile bodies 6 at the bottom of the vertical columns 1 in the soil of the site to enhance the supporting effect of the vertical columns 1, and then install the diagonal braces 2 on the locking piles 3 and then connect them to the vertical columns 1. Use the diagonal braces 2 to reinforce and support the vertical columns 1, and then weld the connecting cross frames 9 between two adjacent vertical columns 1, and then install the sleeves 11 on the top of the vertical columns 1;

[0067] Step 3: Provide a main cable 5, pass one end of the main cable 5 through the locking pile 3 to connect and lock it, then pass the other end of the main cable 5 through the tops of two oppositely arranged vertical columns 1 to connect to the locking pile 3 on the other side and lock it after tensioning, then provide a fixing hook 7, install the fixing hook 7 on the top of the connecting cross bar 9, and use the setting of the fixing hook 7 to increase multiple connection points;

[0068] Step 4: Provide a shielding net 4, connect the shielding net 4 to the vertical column 1 on one side of the equipment on the construction site, then place the shielding net 4 on the main cable 5, stretch the other end of the shielding net 4 on the main cable 5 so that the shielding net 4 is unfolded on the main cable 5, then provide a tie rope 8, place the shielding net 4 on the main cable 5, connect the tie rope 8 to both ends of the shielding net 4 close to the connecting cross bar 9, first connect the tie rope 8 at one end to the fixed hook 7 connected to the cross bar 9 on one side, then stretch and unfold it on the main cable 5 through the shielding net 4, and then connect the tie rope 8 at the other end of the shielding net 4 to the fixed hook 7 connected to the cross bar 9 on the other side. After the construction of the shielding space structure is completed, the steel columns, steel strands, and anchor internal forces need to be regularly monitored, and the steel support area needs to be well protected to prevent mechanical damage to the structure.

[0069] Furthermore, the fourth step also includes: providing auxiliary cables 13, sutures 14, limit buckles 15, snap buckles 16, and metal rings 17, placing the auxiliary cables 13 horizontally on the shielding net 4, and then using the sutures 14 to sew the auxiliary cables 13 and the shielding net 4, then connecting the limit buckles 15 and the auxiliary cables, and then installing the snap buckles 16 to the bottom of the limit buckles 15, and then connecting the shielding net 4 and the limit buckles 15 through the metal rings 17, so that the shielding net 4 can drive the limit buckles 15 to move while moving, the net cables are sutured according to the designed spacing of the auxiliary cables 13, the shielding net 4 is selected according to the shielding requirements, the auxiliary cables 13 are selected and the specifications are determined according to the span of the main cables 5, the local wind load, etc., the sutures are sewn on site with nylon thread or directly processed and completed at the factory, and then by installing the snap buckles 16 on the main cables 5, the limit buckles 15 and the snap buckles 16 are used to pull and stretch the main cables 5.

[0070] The beneficial effects of the shielding net cable space structure frame and the construction method of the present invention are:

[0071] 1. Use a special buckle to connect the net cable structure to the main cable. The special buckle consists of two upper and lower rings. One side is fastened to fix on the net cable, and the other side can be pressed to open, which is convenient for connecting to the main cable and sliding the net cable on the main cable.

[0072] 2. By using the suture line to sew the main cable and the shielding net, the strength and service life of the shielding net are increased, providing conditions for the construction and installation of the net cable space structure, so that the net cable structure can be completed quickly and the construction period can be accelerated.

[0073] 3. The sleeve at the top of the vertical column can utilize the arc-shaped inner wall at the end of the sleeve to reduce the wear on the surface of the main cable, prevent the surface damage of the main cable during the connection process, and enhance the service life of the main cable.

[0074] The present invention is described in detail above in conjunction with the embodiments of the accompanying drawings. A person skilled in the art can make various variations of the present invention according to the above description. Therefore, certain details in the embodiments should not constitute a limitation of the present invention, and the scope of protection of the present invention shall be defined by the scope of the attached claims.

Claims

1. A shielding net cable space structure frame, used to shield equipment on a construction site, characterized by: The structural frame comprises: Locking piles (3) are arranged on both sides of the equipment on the construction site, and a plurality of reserved holes are arranged on the locking piles (3); A plurality of vertical columns (1) are arranged at intervals on the locking pile (3) and close to a side of the equipment on the construction site; A main cable (5) connected to oppositely arranged vertical columns (1), one end of the main cable (5) passes through a reserved hole on a locking pile (3) on one side of the site equipment to be locked, and the other end of the main cable (5) passes through the top of the vertical columns (1) on both sides of the site equipment and then passes through the reserved hole on the locking pile (3) on the other side to be tensioned and locked; A shielding net (4) is connected to a vertical column (1) located on one side of equipment on a construction site, and buckles (16) are provided on the shielding net (4) at intervals corresponding to the main cables (5). The buckles (16) are sleeved on the corresponding main cables (5). The shielding net (4) is slidably connected to the main cables (5) via the buckles (16), and the shielding net (4) can be unfolded along the main cables (5) toward the vertical column (1) located on the other side of the equipment on the construction site.

2. The shielding cable space structure frame according to claim 1, characterized in that: The shielding net (4) is provided with a limiting buckle (15) corresponding to the buckle (16), and the bottom of the limiting buckle (15) is connected to the top of the buckle (16).

3. The shielding net cable space structure frame according to claim 1, characterized in that: A diagonal support column (2) is connected to one side of the vertical column (1) close to the locking pile (3).

4. The shielding cable space structure frame according to claim 1, characterized in that: A sleeve (11) is connected to the top of the vertical column (1), the inner wall of the sleeve (11) is in contact with the surface of the main cable (5), and the main cable (5) is tensioned by passing through the sleeve (11).

5. The shielding cable space structure frame according to claim 4, characterized in that: An inner wall of one side of the sleeve (11) facing the locking pile (3) is provided with an arc extending from the inside to the outside.

6. The shielding cable space structure frame according to claim 1, characterized in that: The side of the locking pile (3) away from the diagonal bracing member (2) is connected to an anchor cable (12), and the anchor cable (12) is buried in the construction site.

7. The shielding cable space structure frame according to claim 1, characterized in that: The shielding net (4) is connected to auxiliary cables (13) which are perpendicular to the main cables (5), and the auxiliary cables (13) are arranged on the shielding net (4) at intervals.

8. The shielding cable space structure frame according to claim 1, characterized in that: A connecting cross frame (9) is connected to the top of the vertical columns (1) located on the same side, and a plurality of fixing hooks (7) are connected to the connecting cross frame (9); A plurality of tie ropes (8) are connected to the side of the shielding net (4) close to the connecting cross frame (9), and the tie ropes (8) are tied to the fixing hooks (7).

9. The shielding cable space structure frame according to claim 1, characterized in that: A cross-connected auxiliary support (10) is connected between two adjacent vertical columns (1) and close to the bottom of the connecting cross frame (9).

10. A construction method for a shielding cable space structure frame, characterized in that: The following steps are involved: The first step: providing locking piles (3), and setting the locking piles (3) on both sides of the equipment on the construction site; Step 2: Provide vertical columns (1), and set the vertical columns (1) close to both sides of the equipment on the construction site at intervals; Step 3: Provide a main cable (5), pass one end of the main cable (5) through the locking pile (3) to connect and lock it, and then pass the other end of the main cable (5) through the tops of two oppositely arranged vertical columns (1) to connect to the locking pile (3) on the other side and lock it after tensioning; Step 4: Provide a shielding net (4), connect the shielding net (4) to the vertical column (1) on one side of the equipment on the construction site, then place the shielding net (4) on the main cable (5), and stretch the other end of the shielding net (4) on the main cable (5) so that the shielding net (4) is unfolded on the main cable (5).

Citation Information

Patent Citations

  • Design method for pile group assembled anchor suitable for large-tonnage cable crane

    CN105625422A

  • Photovoltaic support system

    CN116707399A

  • Flexible support system and photovoltaic generator set

    CN117318589A

  • Exposed prestressed truss supporting cable net dry coal shed

    CN214463060U

  • Dustproof sunshade curtain for foundation pit construction operation

    CN216475051U