Method for reinforcing space steel structure joints

By using composite materials of carbon fiber unidirectional cloth, SMA memory alloy wire and wire rope on complex space steel structure nodes, the difficulty of reinforcement of complex space steel nodes is solved, and uniform load transfer and improvement of node mechanical properties is achieved.

CN118911460AActive Publication Date: 2024-11-08GUILIN UNIVERSITY OF TECHNOLOGY

Patent Information

Application Number
CN202410868929.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-01
Publication Date
2024-11-08
Estimated Expiration
2044-07-01

AI Technical Summary

Technical Problem

The prior art is difficult to effectively reinforce complex space steel structure nodes, especially welding hollow ball nodes and intersecting steel nodes. Traditional methods such as welding rib plates and carbon fiber cloth reinforcement have structural damage and difficulty in pasting.

Method used

Using a composite material that combines carbon fiber unidirectional cloth, SMA memory alloy wire and wire rope, by analyzing the stress characteristics of the nodes, wrapping and fixing these materials on the anchor rod and auxiliary stress rod, using epoxy resin colloid and prestressing technology , realize uniform transfer and reinforcement of node loads.

Benefits of technology

Without damaging the original structure, the bearing capacity and safety of the steel structure nodes are improved and the service life is extended, which is suitable for the reinforcement and transformation of complex space steel structures.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911460A_ABST
    Figure CN118911460A_ABST
Patent Text Reader

Abstract

The invention relates to a method for reinforcing a space steel structure joint, and belongs to the field of reinforcement. Comprising the following steps that S1, stress characteristics are analyzed, and an anchoring rod piece, an auxiliary stress rod piece and a construction auxiliary rod piece are selected; s2, the length of the steel wire ropes, the length of the carbon fiber one-way cloth and the length of the SMA wires are determined; s3, a working face is cleaned; s4, a steel wire rope is wound on the anchoring rod piece and the auxiliary stress rod piece; s5, the anchoring rod piece is coated with bottom layer epoxy resin colloid; s6, winding bottom-layer carbon fiber unidirectional cloth on the bottom-layer epoxy resin colloid; s7, winding SMA (shape memory alloy) wires on the bottom-layer carbon fiber unidirectional cloth; s8, the anchoring rod piece is sleeved with the heat preservation device and heated; s9, the anchoring rod piece in the step S8 is coated with middle-layer epoxy resin colloid; s10, winding top-layer carbon fiber unidirectional cloth on the middle-layer epoxy resin colloid; s11, the top-layer carbon fiber unidirectional cloth is coated with top-layer epoxy resin colloid; and S12, the steel wire rope of the construction auxiliary section is removed. The method is beneficial to reinforcing the complex space steel structure joints.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of structural reinforcement, and in particular to a method for reinforcing spatial steel structure nodes. Background Art

[0002] Steel structures have the characteristics of high reliability, high strength, light weight, excellent plasticity and toughness, strong adaptability, and recyclability. They are widely used in high-rise buildings, large-span bridges, and marine structures. However, it is well known that all steel structure infrastructures have their service life. Steel structures that have been used for a certain number of years will generally face problems such as structural displacement, changes in bearing capacity patterns, and poor stress due to corrosion, increased load capacity, fatigue, etc., and many existing steel structure infrastructures also have construction errors and low safety factors. Therefore, the number of steel structure infrastructures and housing buildings that need to be reinforced and preventively reinforced is increasing.

[0003] Traditional reinforcement methods for steel structure nodes include increasing the cross-section, gluing steel reinforcement, adding ribs, grouting, changing the structural system, prestressing reinforcement, and gluing carbon fiber cloth reinforcement. Among the existing reinforcement methods, there are not many reinforcement schemes for complex space steel nodes (welded hollow ball nodes, intersecting steel nodes, etc.). In engineering examples of complex space steel node reinforcement, nodes are generally reinforced by welding ribs, that is, by setting stiffening ribs to increase structural stiffness and improve the mechanical properties of nodes, thereby extending the service life of the structure; another solution is to enhance the mechanical properties of nodes by gluing carbon fiber cloth; another solution is to create a suitable reinforcement device or component according to the specific node conditions, and set it at the node for reinforcement and protection.

[0004] The solution of adding ribs will destroy the original structure itself, and the welding method will leave residual stress and poor mechanical properties of the weld, making it difficult to ensure quality. The carbon fiber cloth reinforcement method has a wide range of applications and is effective for K-type nodes and T-type nodes, but it cannot solve the problem of reinforcing complex spatial steel nodes (welded hollow ball nodes, intersecting steel nodes, etc.). In complex spatial steel structure nodes, carbon fiber cloth basically cannot be smoothly and comfortably pasted to the original structure, that is, it cannot effectively reinforce the structure. Summary of the invention

[0005] The technical problem to be solved by the present invention is to provide a method for reinforcing spatial steel structure nodes to solve the above-mentioned problem.

[0006] The technical solution of the present invention to solve the above technical problem is as follows: A method for reinforcing a spatial steel structure node comprises the following steps:

[0007] S1: Analyze the stress characteristics of the spatial steel structure nodes to be reinforced, and select the anchor rods, auxiliary stress rods and construction auxiliary rods involved in the reinforcement;

[0008] S2: Determine the number and length of steel wire ropes, the length of carbon fiber unidirectional cloth, and the length of SMA memory alloy wire required for reinforcement according to the force value and geometric parameters of the anchor rod;

[0009] S3: Clean the working surface;

[0010] S4: Winding the steel wire rope around the anchor rod and the auxiliary force-bearing rod, and tightening and locking the steel wire rope on the construction auxiliary rod;

[0011] S5: applying a base layer of epoxy resin colloid on the anchor rod wrapped with the steel wire rope;

[0012] S6: wrapping the bottom carbon fiber unidirectional fabric on the bottom epoxy resin colloid;

[0013] S7: wrapping SMA memory alloy wire on the bottom carbon fiber unidirectional cloth;

[0014] S8: putting a heat preservation device on the anchor rod in step S7, and heating the heat preservation device;

[0015] S9: removing the heat preservation device and applying a middle layer of epoxy resin colloid on the anchor rod in step S8;

[0016] S10: Wrapping the top layer of carbon fiber unidirectional fabric on the middle layer of epoxy resin colloid;

[0017] S11: Apply the top layer of epoxy resin colloid on the top layer of carbon fiber unidirectional cloth;

[0018] S12: Wait for the epoxy resin to completely solidify before removing the steel wire rope from the auxiliary construction section.

[0019] The beneficial effect of the present invention is as follows: compared with the reinforcement method of complex spatial steel structure in the prior art, the present invention uses a composite material composed of carbon fiber unidirectional cloth, SMA memory wire, steel wire rope and epoxy resin colloid. Under the condition of not damaging the original structure, when the steel node is not cracked or displaced, part of the load of the dangerous rod with greater force in the steel structure node is transferred to the safety rod with less force. When the steel structure node is cracked or displaced, the load on the node or rod is transferred to the safety rod through the composite material, so that all rods in the entire steel structure node are evenly stressed, thereby improving the bearing capacity, ductility and safety of the node, strengthening the mechanical properties of the node, avoiding the failure of the entire node due to damage to some poorly stressed rods in the structural node, and achieving the effect of reinforcement and preventive reinforcement. This method is applicable to general bridge steel structure nodes, building steel structure nodes, and sub-safe steel nodes caused by construction errors. It is especially suitable for complex spatial steel structures with narrow space and difficult construction, such as stadiums with steel structure roofs, Bailey steel bridges, steel frame factories, shopping malls, etc., as well as reinforcement and renovation projects of spatial steel structure nodes subject to various complex loads.

[0020] Based on the above technical solution, the present invention can also be improved as follows.

[0021] Further, step S1 includes the following steps:

[0022] S101: Establish a finite element digital model of the spatial steel structure to be reinforced;

[0023] S102: Use the finite element digital model to perform digital simulation calculations to analyze the stress characteristics of all rods in the spatial steel structure to be reinforced;

[0024] S103: Selecting the anchor rod, the auxiliary force-bearing rod and the construction auxiliary rod according to the force characteristics and the actual on-site conditions of the node.

[0025] The beneficial effect of adopting the above further scheme is: using the finite element digital model and the actual situation on site to analyze the stress characteristics of all rods in the steel structure is conducive to intuitively judging which rods connected to the nodes in the steel structure have safety hazards, thereby determining the anchor rods.

[0026] Further, in step S1, the anchor rod and the auxiliary force-bearing rod are connected via a node, and the anchor rod and the construction auxiliary rod are connected via a steel wire rope.

[0027] The beneficial effect of adopting the above further scheme is that it is conducive to connecting the anchor rods, auxiliary force-bearing rods and construction auxiliary rods with steel wire ropes, and reinforcing the anchor rods with carbon fiber unidirectional cloth, SMA memory alloy wire and epoxy resin colloid.

[0028] Further, step S2 includes the following steps:

[0029] S201: Determine the force required to pull a single steel wire rope out of an epoxy resin gel:

[0030] If the number of turns of the steel wire rope around the anchor rod is greater than or equal to 1, the tension required to pull a single steel wire rope out of the epoxy resin colloid is calculated as follows:

[0031]

[0032] Wherein, f1 is the tension required to pull a single steel wire rope out of the epoxy resin colloid, d is the diameter of the steel wire rope, p is the average bonding stress between the steel wire rope and the epoxy resin colloid, l1 is the length of the anchoring section, a is the number of turns of the steel wire rope wound on the anchoring rod, D is the circumference of the anchoring rod, a1 is the integer after a is rounded down, and if a is an integer, a=a1;

[0033] If the number of turns of the steel wire rope around the anchor rod is less than 1, the tension required to pull a single steel wire rope out of the epoxy resin colloid is calculated as follows:

[0034]

[0035] Wherein, f1 is the pulling force required to pull a single steel wire rope out of the epoxy resin colloid, d is the diameter of the steel wire rope, p is the average bonding stress between the steel wire rope and the epoxy resin colloid, l1 is the length of the anchoring section, D is the circumference of the anchoring rod, and a is the number of turns of the steel wire rope wrapped around the anchoring rod;

[0036] S202: Determine the number of steel wire ropes based on the pulling force required to pull a single steel wire rope out of the epoxy resin colloid:

[0037] If the pulling force required to pull a single steel wire rope out of the epoxy resin colloid is less than the ultimate bearing capacity of a single steel wire rope, the number of steel wire ropes is calculated as follows:

[0038]

[0039] Wherein, F is the tension value when the anchor rod is connected to the node, n is the number of steel wire ropes, and f1 is the tension required to pull a single steel wire rope out of the epoxy resin colloid;

[0040] If the pulling force required to pull a single steel wire rope out of the epoxy resin colloid is greater than the ultimate bearing capacity of a single steel wire rope, the number of steel wire ropes is calculated as follows:

[0041] F = n × f,

[0042] Wherein, F is the tension value when the anchor rod is connected to the node, n is the number of steel wire ropes, and f is the ultimate bearing capacity of a single steel wire rope;

[0043] S203: Determine the length of the wire rope:

[0044] If the number of turns of the steel wire rope around the anchor rod is greater than or equal to 1, the length of the steel wire rope is calculated as follows:

[0045]

[0046] Wherein, L1 is the length of the steel wire rope, l3 is the length of the construction auxiliary section, l1 is the length of the anchoring section, a is the number of turns of the steel wire rope wound on the anchoring rod, D is the circumference of the anchoring rod, a1 is the integer after a is rounded down, if a is an integer, a=a1, l2 is the length of the auxiliary force-bearing section, and l4 is the reserved length of the steel wire rope;

[0047] If the number of turns of the steel wire rope around the anchor rod is less than 1, the length of the steel wire rope is calculated as follows:

[0048]

[0049] Wherein, L1 is the length of the steel wire rope, l3 is the length of the construction auxiliary section, l1 is the length of the anchoring section, D is the circumference of the anchoring rod, a is the number of turns of the steel wire rope wound on the anchoring rod, l2 is the length of the auxiliary force-bearing section, and l4 is the reserved length of the steel wire rope;

[0050] S204: Determine the length of the carbon fiber unidirectional cloth:

[0051] L2=D×l1 / b1+l5,

[0052] Wherein, L2 is the length of the carbon fiber unidirectional cloth, D is the circumference of the anchor rod, l1 is the length of the anchor section, b1 is the spacing value of the carbon fiber unidirectional cloth spirally wound on the anchor section, and l5 is the reserved length of the carbon fiber unidirectional cloth;

[0053] S205: Determine the length of the SMA memory alloy wire before pre-tensioning;

[0054] L3=D×l1 / b2+l6,

[0055] Among them, L3 is the length of the SMA memory alloy wire before pre-tensioning, D is the circumference of the anchor rod, l1 is the length of the anchoring section, b2 is the spacing value of the spiral winding of the SMA memory alloy wire on the anchoring section, and l6 is the reserved length of the SMA memory alloy wire during construction operation.

[0056] The beneficial effect of adopting the above further scheme is that it is conducive to obtaining the most suitable number and length of steel wire ropes for reinforcing anchor rods, as well as the length of carbon fiber unidirectional cloth and the length of SMA memory alloy wire before pre-tensioning, thereby reducing material loss and maximizing resource utilization.

[0057] Further, step S4 includes the following steps:

[0058] S401: a steel buckle key is provided at one end of the anchor rod away from the node, and a wire rope tightener is provided on the construction auxiliary rod;

[0059] S402: Winding the middle position of the steel wire rope around one end of the auxiliary force-bearing rod close to the node, thereby dividing the steel wire rope into two strands;

[0060] S403: spirally winding two strands of steel wire ropes on the anchor rod in a symmetrically crossed manner;

[0061] S404: Passing two steel wire ropes through the steel buckle and leading them to the construction auxiliary rod;

[0062] S405: Both ends of the steel wire rope are made into a ring structure;

[0063] S406: Connect the ring structures at both ends of the steel wire rope to two tension digital display dynamometers one by one, and connect the two tension digital display dynamometers to the steel wire rope tightener;

[0064] S407: starting the wire rope tensioner, and locking the two wire ropes on the construction auxiliary rod after observing that the tension value on the tension digital display dynamometer is within a preset tension range;

[0065] S408: Repeat the above steps to wind all the steel wire ropes side by side on the anchor rod and the auxiliary force-bearing rod along the path of the first steel wire rope, and lock them on the construction auxiliary rod after tightening.

[0066] The beneficial effects of adopting the above further scheme are: on the one hand, it is conducive to making the steel wire rope fit closely on the anchor rod to achieve reinforcement of the anchor rod; on the other hand, it is conducive to tightening and locking the steel wire rope by using the construction auxiliary rod.

[0067] Further, the specific operation of step S6 is: spirally winding the bottom carbon fiber unidirectional cloth on the anchor rod, and applying a circle of epoxy resin colloid for each circle of the bottom carbon fiber unidirectional cloth, so that the bottom carbon fiber unidirectional cloth is closely fitted to the anchor rod.

[0068] The beneficial effect of adopting the above further solution is that it is conducive to further reinforcing the anchor rod by using the carbon fiber unidirectional cloth, thereby improving the stability of the anchor rod.

[0069] Further, step S7 includes the following steps:

[0070] S701: Pre-tensioned SMA memory alloy wire;

[0071] S702: Using a lock buckle, fix one end of the SMA memory alloy wire in step S701 to one end of the anchor rod wrapped with the bottom carbon fiber unidirectional cloth;

[0072] S703: spirally winding the SMA memory alloy wire in step S701 on the bottom carbon fiber unidirectional cloth;

[0073] S704: Using a lock buckle, fix the other end of the SMA memory alloy wire in step S701 to the other end of the anchor rod wrapped with the bottom carbon fiber unidirectional cloth.

[0074] The beneficial effect of adopting the above further scheme is that after the SMA memory alloy wire undergoes permanent deformation at room temperature, it can restore its original shape at high temperature. By utilizing this characteristic, by limiting the deformation of the SMA memory alloy wire and activating it by heating, the shape memory effect is used to generate prestress in the structure, providing pre-compression stress for the entire reinforced structure, so that the reinforced structure is firmly fixed on the anchor rod.

[0075] Further, step S8 includes the following steps:

[0076] S801: manufacturing a heat preservation device having the same length as the anchoring rod;

[0077] S802: Mounting two high temperature resistant silicone inflatable sealing rings on both ends of the anchor rod in a one-to-one correspondence;

[0078] S803: Sleeve the heat preservation device on the anchor rod, so that the heat preservation device and the anchor rod are sealed;

[0079] S804: inserting the detection end of the digital thermometer into the heat preservation device from one side of the heat preservation device;

[0080] S805: Insert the muzzle of the hot air gun into the heat preservation device from the side wall of the heat preservation device;

[0081] S806: Start the heat gun and observe the digital thermometer to maintain the temperature inside the insulation device in the range of 90-110°C for 10-15 minutes.

[0082] The beneficial effect of adopting the above further solution is that it is conducive to restoring the length of the SMA memory alloy wire before pre-tensioning by heating, thereby providing pre-compression stress for the anchor rod and further improving the stability of the anchor rod reinforcement.

[0083] Further, the specific operation of step S10 is: spirally winding the top carbon fiber unidirectional cloth on the anchor rod, and applying a circle of epoxy resin colloid for each circle of the top carbon fiber unidirectional cloth, so that the top carbon fiber unidirectional cloth is closely fitted to the anchor rod.

[0084] The beneficial effect of adopting the above further scheme is that the top layer of carbon fiber unidirectional cloth and epoxy resin colloid are conducive to stably fixing all parts used for reinforcement on the anchor rods, ensuring that all parts used for reinforcement can work normally, and further improving the corrosion resistance of the reinforced structure and extending its service life.

[0085] Further, step S12 includes the following steps:

[0086] S1201: Leave the entire reinforced structure for 3-5 days to wait for all epoxy resin colloids to fully cure.

[0087] Full solidification;

[0088] S1202: Starting from the steel buckle key, a steel wire rope having a length of 1.5 to 2 times the circumference of the anchor rod is reserved in the direction of the construction auxiliary rod;

[0089] S1203: Remove the steel buckle key and cut the wire rope from the reserved point;

[0090] S1204: spirally winding a reserved steel wire rope around the end of the anchor rod and locking it;

[0091] S1205: Apply epoxy resin colloid to the wire rope locking and winding areas.

[0092] The beneficial effect of adopting the above further solution is that it is conducive to fixing the reserved steel wire rope on the anchor rod, so that the entire reinforcement structure forms a whole. BRIEF DESCRIPTION OF THE DRAWINGS

[0093] Figure 1 A flow chart of a method provided by an embodiment of the present invention;

[0094] Figure 2 A schematic diagram of a spatial steel structure before reinforcement provided by an embodiment of the present invention;

[0095] Figure 3 A schematic diagram of a space steel structure after being wound with a steel wire rope provided by an embodiment of the present invention;

[0096] Figure 4 A schematic diagram of a reinforced spatial steel structure provided in an embodiment of the present invention;

[0097] Figure 5 A schematic diagram of a steel wire rope provided in an embodiment of the present invention being spirally wound around an anchor rod in a symmetrically crossed manner and passed through a steel buckle key;

[0098] Figure 6 A schematic diagram of a ring structure made by using the head of a steel wire rope provided in an embodiment of the present invention;

[0099] Figure 7 A schematic diagram of a heating device provided in an embodiment of the present invention being sleeved on an anchor rod;

[0100] Figure 8 A schematic diagram of the relationship between the displacement of a node after reinforcement and the most unfavorable load percentage provided by an embodiment of the present invention;

[0101] Fig. 9 Schematic diagram of the relationship between the node displacement after reinforcement and the most unfavorable load percentage provided for the comparative example;

[0102] Fig.10 This is a schematic diagram of naming all the rods in the spatial steel structure to be reinforced when the stress analysis is performed on the spatial steel structure to be reinforced in step S1 of an embodiment of the present invention.

[0103] in, Figure 8 and Fig. 9 The horizontal axis represents the most unfavorable load percentage, and the vertical axis represents the horizontal and vertical displacement of the node under the corresponding load percentage, in millimeters. The square points represent vertical displacement, and the diamond points represent lateral displacement.

[0104] In the accompanying drawings, the components represented by the reference numerals are listed as follows:

[0105] 1. Anchor rods; 2. Auxiliary load-bearing rods; 3. Construction auxiliary rods. DETAILED DESCRIPTION

[0106] The principles and features of the present invention are described below. The examples given are only used to explain the present invention and are not used to limit the scope of the present invention.

[0107] like Figure 1 As shown, a method for reinforcing a spatial steel structure node comprises the following steps:

[0108] S1: Analyze the stress characteristics of the spatial steel structure node to be reinforced, and select the anchor rod 1, auxiliary stress rod 2 and construction auxiliary rod 3 involved in the reinforcement;

[0109] S2: Determine the number and length of steel wire ropes, the length of carbon fiber unidirectional cloth and the length of SMA memory alloy wire required for reinforcement according to the force value and geometric parameters of the anchor rod 1;

[0110] S3: Clean the working surface;

[0111] S4: Winding the steel wire rope around the anchor rod 1 and the auxiliary force-bearing rod 2, and tightening and locking the steel wire rope on the construction auxiliary rod 3;

[0112] S5: applying a base layer of epoxy resin colloid on the anchor rod 1 wound with the steel wire rope;

[0113] S6: wrapping the bottom carbon fiber unidirectional fabric on the bottom epoxy resin colloid;

[0114] S7: wrapping SMA memory alloy wire on the bottom carbon fiber unidirectional cloth;

[0115] S8: putting a heat preservation device on the anchor rod 1 in step S7, and heating the heat preservation device;

[0116] S9: remove the heat preservation device and apply a middle layer of epoxy resin colloid on the anchor rod 1 in step S8;

[0117] S10: Wrapping the top layer of carbon fiber unidirectional fabric on the middle layer of epoxy resin colloid;

[0118] S11: Apply the top layer of epoxy resin colloid on the top layer of carbon fiber unidirectional cloth;

[0119] S12: Wait for the epoxy resin to completely solidify before removing the steel wire rope from the auxiliary construction section.

[0120] It should be noted that the steel wire rope used in the present invention is a stainless steel wire rope;

[0121] In step S3, cleaning the working surface means using ether to remove surface impurities of the anchor rod 1 and the auxiliary force-bearing rod 2 on the existing steel structure node, exposing the node and the material of the anchor rod 1 and the auxiliary force-bearing rod 2, and then using a steel brush and sandpaper to polish the anchor rod 1 and the auxiliary force-bearing rod 2 until the surface is rough;

[0122] In the technical solution of the present invention, all epoxy resin colloids are thixotropic, that is, they flow only when touched, have poor fluidity and high viscosity, and all epoxy resin colloids are applied with a thickness of 1-2 mm, and the application length is equal to the length l1 of the anchoring section.

[0123] The beneficial effect of the present invention is as follows: compared with the reinforcement method of complex spatial steel structure in the prior art, the present invention uses a composite material composed of carbon fiber unidirectional cloth, SMA memory wire, steel wire rope and epoxy resin colloid. Under the condition of not damaging the original structure, when the steel node is not cracked or displaced, part of the load of the dangerous rod with greater force in the steel structure node is transferred to the safety rod with less force. When the steel structure node is cracked or displaced, the load on the node or rod is transferred to the safety rod through the composite material, so that all rods in the entire steel structure node are evenly stressed, thereby improving the bearing capacity, ductility and safety of the node, strengthening the mechanical properties of the node, avoiding the failure of the entire node due to damage to some poorly stressed rods in the structural node, and achieving the effect of reinforcement and preventive reinforcement. This method is applicable to general bridge steel structure nodes, building steel structure nodes, and sub-safe steel nodes caused by construction errors. It is especially suitable for complex spatial steel structures with narrow space and difficult construction, such as stadiums with steel structure roofs, Bailey steel bridges, steel frame factories, shopping malls, etc., as well as reinforcement and renovation projects of spatial steel structure nodes subject to various complex loads.

[0124] Preferably, step S1 comprises the following steps:

[0125] S101: Establish a finite element digital model of the spatial steel structure to be reinforced;

[0126] S102: Use the finite element digital model to perform digital simulation calculations to analyze the stress characteristics of all rods in the spatial steel structure to be reinforced;

[0127] S103: Selecting the anchor rod 1, the auxiliary stress-bearing rod 2 and the construction auxiliary rod 3 according to the stress characteristics and the actual on-site conditions of the node.

[0128] Among them, it should be noted that: in the actual situation on site, there may be poor welding, damaged rods, damage to the connection between rods and nodes, etc.;

[0129] In the technical solution of the present invention, the anchor rod 1 is a dangerous rod that is poorly stressed at the node, has large local stress, or has safety hazards at the connection with the node, and is very easy to be damaged. This type of rod is the rod anchored by the reinforced structure; the auxiliary force-bearing rod 2 is the anchor rod 1 compared to the rod on the opposite side of the node, and its internal force is smaller and it is not easy to yield or damage; the construction auxiliary rod 3 is a rod corresponding to the anchor rod 1, which is only used when tightening the wire rope and is disassembled after the reinforced structure is stable. If there is no rod corresponding to the anchor rod 1 in the spatial steel structure, other fixed points can also be selected as the construction auxiliary rod 3. In other words, as long as it is a part that can install equipment for tightening the wire rope and provide stable support for the installation of the reinforced structure, it can be used as the construction auxiliary rod 3.

[0130] The beneficial effect of adopting the above preferred scheme is: using the finite element digital model and the actual situation on site to analyze the stress characteristics of all rods in the steel structure, it is helpful to intuitively determine which rods connected to the nodes in the steel structure have safety hazards, thereby determining the anchor rods.

[0131] Preferably, Figure 2 and Figure 3 As shown, the anchor rod 1 and the auxiliary force-bearing rod 2 are connected via a node, and the anchor rod 1 and the construction auxiliary rod 3 are connected via a steel wire rope.

[0132] The beneficial effect of adopting the above preferred solution is that it is conducive to connecting the anchor rods, auxiliary force-bearing rods and construction auxiliary rods with steel wire ropes, and reinforcing the anchor rods with carbon fiber unidirectional cloth, SMA memory alloy wire and epoxy resin colloid.

[0133] Preferably, step S2 comprises the following steps:

[0134] S201: Determine the force required to pull a single steel wire rope out of an epoxy resin gel:

[0135] If the number of turns of the steel wire rope on the anchor rod 1 is greater than or equal to 1, the tension required to pull a single steel wire rope out of the epoxy resin colloid is calculated as follows:

[0136]

[0137] Wherein, f1 is the tension required to pull a single steel wire rope out of the epoxy resin colloid, d is the diameter of the steel wire rope, p is the average bonding stress between the steel wire rope and the epoxy resin colloid, l1 is the length of the anchoring section, a is the number of turns of the steel wire rope wound on the anchoring rod 1, D is the circumference of the anchoring rod 1, a1 is an integer rounded down from a, and if a is an integer, a=a1;

[0138] If the number of turns of the steel wire rope around the anchor rod 1 is less than 1, the tension required to pull out a single steel wire rope from the epoxy resin colloid is calculated as follows:

[0139]

[0140] Wherein, f1 is the pulling force required to pull a single steel wire rope out of the epoxy resin colloid, d is the diameter of the steel wire rope, p is the average bonding stress between the steel wire rope and the epoxy resin colloid, l1 is the length of the anchoring section, D is the circumference of the anchoring rod 1, and a is the number of turns of the steel wire rope wound on the anchoring rod 1;

[0141] S202: Determine the number of steel wire ropes based on the pulling force required to pull a single steel wire rope out of the epoxy resin colloid:

[0142] If the pulling force required to pull a single steel wire rope out of the epoxy resin colloid is less than the ultimate bearing capacity of a single steel wire rope, the number of steel wire ropes is calculated as follows:

[0143]

[0144] Wherein, F is the tension value when the anchor rod 1 is connected to the node, n is the number of steel wire ropes, and f1 is the tension required to pull a single steel wire rope out of the epoxy resin colloid;

[0145] If the pulling force required to pull a single steel wire rope out of the epoxy resin colloid is greater than the ultimate bearing capacity of a single steel wire rope, the number of steel wire ropes is calculated as follows:

[0146] F = n × f,

[0147] Wherein, F is the tension value when the anchor rod 1 is connected to the node, n is the number of steel wire ropes, and f is the ultimate bearing capacity of a single steel wire rope;

[0148] S203: Determine the length of the wire rope:

[0149] If the number of turns of the steel wire rope wound around the anchor rod 1 is greater than or equal to 1, the length of the steel wire rope is calculated as follows:

[0150]

[0151] Wherein, L1 is the length of the steel wire rope, l3 is the length of the construction auxiliary section, l1 is the length of the anchoring section, a is the number of turns of the steel wire rope wound on the anchoring rod 1, D is the circumference of the anchoring rod 1, a1 is the integer after a is rounded down, if a is an integer, a=a1, l2 is the length of the auxiliary force-bearing section, and l4 is the reserved length of the steel wire rope;

[0152] If the number of turns of the steel wire rope around the anchor rod 1 is less than 1, the length of the steel wire rope is calculated as follows:

[0153]

[0154] Wherein, L1 is the length of the steel wire rope, l3 is the length of the construction auxiliary section, l1 is the length of the anchoring section, D is the circumference of the anchoring rod 1, a is the number of turns of the steel wire rope wound on the anchoring rod 1, l2 is the length of the auxiliary force-bearing section, and l4 is the reserved length of the steel wire rope;

[0155] S204: Determine the length of the carbon fiber unidirectional cloth:

[0156] L2=D×l1 / b1+l5,

[0157] Wherein, L2 is the length of the carbon fiber unidirectional cloth, D is the circumference of the anchor rod 1, l1 is the length of the anchoring section, b1 is the spacing value of the carbon fiber unidirectional cloth spirally wound on the anchoring section, and l5 is the reserved length of the carbon fiber unidirectional cloth;

[0158] S205: Determine the length of the SMA memory alloy wire before pre-tensioning;

[0159] L3=D×l1 / b2+l6,

[0160] Among them, L3 is the length of the SMA memory alloy wire before pre-tensioning, D is the circumference of the anchor rod 1, l1 is the length of the anchoring section, b2 is the spacing value of the spiral winding of the SMA memory alloy wire on the anchoring section, and l6 is the reserved length of the SMA memory alloy wire during construction operation.

[0161] It should be noted that: the length l1 of the anchoring section is equal to the length of the anchoring rod 1 minus 100 mm, the length l2 of the auxiliary force-bearing section is equal to the length of the wire rope starting from the anchoring rod 1 near the node end, around the auxiliary force-bearing rod 2 and then back to the anchoring rod 1 near the node end, and the length l3 of the construction auxiliary section is equal to the distance from the steel buckle to the construction auxiliary rod 3;

[0162] The tension value F when the anchor rod 1 is connected to the node is the data obtained by force characteristic analysis in step S1;

[0163] The number of wire ropes n calculated by the above formula may not be an integer, so it needs to be rounded up;

[0164] When calculating the length L1 of the wire rope, the final result needs to be rounded up;

[0165] When calculating the length L2 of the carbon fiber unidirectional fabric, the value of the length l1 of the anchoring section divided by the spacing value b1 of the carbon fiber unidirectional fabric spirally wound on the anchoring section needs to be rounded up, and the final result also needs to be rounded up. The spacing value b1 of the carbon fiber unidirectional fabric spirally wound on the anchoring section is 30-60mm;

[0166] When calculating the length L3 of the SMA memory alloy wire before pre-tensioning, the value of the length l1 of the anchoring section divided by the spacing value b2 of the SMA memory alloy wire spirally wound on the anchoring section needs to be rounded up, and the final result also needs to be rounded up. The spacing value b2 of the SMA memory alloy wire spirally wound on the anchoring section is 30-60mm;

[0167] In a preferred embodiment of the present invention, the width of the carbon fiber unidirectional cloth is a standard width of 150 mm;

[0168] In the above formula for calculating the number of steel wire ropes, except for the number of steel wire ropes n, other data are known quantities or can be calculated through existing data.

[0169] The beneficial effect of adopting the above preferred scheme is that it is conducive to obtaining the most suitable number and length of steel wire ropes for reinforcing anchor rods, as well as the length of carbon fiber unidirectional cloth and the length of SMA memory alloy wire before pre-tensioning, thereby reducing material loss and maximizing resource utilization.

[0170] Preferably, step S4 comprises the following steps:

[0171] S401: a steel buckle key is provided at one end of the anchor rod 1 away from the node, and a wire rope tightener is provided on the construction auxiliary rod 3;

[0172] S402: Winding the middle position of the steel wire rope around one end of the auxiliary force-bearing rod 2 close to the node, thereby dividing the steel wire rope into two strands;

[0173] S403: spirally winding two strands of steel wire ropes on the anchor rod 1 in a symmetrical and cross manner;

[0174] S404: Pass the two steel wire ropes through the steel buckle and lead them to the construction auxiliary rod 3;

[0175] S405: Both ends of the steel wire rope are made into a ring structure;

[0176] S406: Connect the ring structures at both ends of the steel wire rope to two tension digital display dynamometers one by one, and connect the two tension digital display dynamometers to the steel wire rope tightener;

[0177] S407: Start the wire rope tensioner, and after observing that the tension value on the tension digital display dynamometer is within the preset tension range, lock the two wire ropes on the construction auxiliary rod 3;

[0178] S408: Repeat the above steps, wind all the steel wire ropes side by side on the anchor rod 1 and the auxiliary force-bearing rod 2 along the path of the first steel wire rope, and lock them on the construction auxiliary rod 3 after tightening.

[0179] It should be noted that: in step S401, the position of the steel buckle key is set at the end of the anchor rod 1 away from the node, and a space is left to ensure that the steel wire rope can be led to the construction auxiliary rod 3 after passing through the steel buckle key;

[0180] In step S403, Figure 5As shown, the two steel wire ropes are wound from the anchor rod 1 close to the node end to the node end away from the node end. In the process of spiral winding of the two steel wire ropes, the positions of the two steel wire ropes separated by the node when crossing on the anchor rod 1 should be symmetrically arranged alternately compared with the axis of the anchor rod 1. For example, the positions of the two steel wire ropes when crossing on the anchor rod 1 are on the upper surface and the lower surface of the anchor rod 1. The two steel wire ropes should be arranged alternately at the crossing position, and one steel wire rope shall not be arranged continuously under or above the other steel wire rope. On the upper surface or the lower surface of the anchor rod 1, the spacing between two adjacent crossing positions is 200-400mm, which can be adjusted according to actual conditions. The steel wire rope is required to be smooth as a whole and well fitted on the original structure. The spacing between the crossing positions of the steel wire ropes on the anchor rod 1 should be uniform and beautiful.

[0181] In step S405, Figure 6 As shown, bend the head of the wire rope back and align it with the wire rope about 100mm behind the rope head, and use a basket bolt to lock the head of the wire rope with the wire rope behind the head, so as to form a small ring structure at the head of the wire rope;

[0182] In step S406, the ring structures at both ends of the steel wire rope are first connected to two tension digital display dynamometers respectively, and then the other ends of the tension digital display dynamometers are connected to two steel wire rope tighteners respectively;

[0183] In step S407, the wire rope tensioner maintains the axial force of the wire rope between 1.5-2.0 kN, so that the wire rope fits tightly on the anchor rod 1 and is in a taut state. After tightening the wire rope, the two strands of wire rope are locked on the construction auxiliary rod 3 using a basket bolt.

[0184] The beneficial effects of adopting the above-mentioned preferred scheme are: on the one hand, it is conducive to making the steel wire rope fit tightly on the anchor rods, auxiliary load-bearing rods and construction auxiliary rods to achieve reinforcement of the anchor rods; on the other hand, it is conducive to tightening and locking the steel wire rope using the construction auxiliary rods.

[0185] Preferably, the specific operation of step S6 is: spirally winding the bottom carbon fiber unidirectional cloth on the anchor rod 1, and applying a circle of epoxy resin colloid for each circle of the bottom carbon fiber unidirectional cloth, so that the bottom carbon fiber unidirectional cloth is tightly fitted to the anchor rod 1.

[0186] It should be noted that the length of the wrapping range of the bottom carbon fiber unidirectional fabric is equal to the length l1 of the anchoring section.

[0187] The beneficial effect of adopting the above preferred solution is that it is conducive to further reinforcing the anchor rod by using the carbon fiber unidirectional cloth, thereby improving the stability of the anchor rod.

[0188] Preferably, step S7 comprises the following steps:

[0189] S701: Pre-tensioned SMA memory alloy wire;

[0190] S702: Using a lock buckle, fix one end of the SMA memory alloy wire in step S701 to one end of the anchor rod 1 wrapped with the bottom carbon fiber unidirectional cloth;

[0191] S703: spirally winding the SMA memory alloy wire in step S701 on the bottom carbon fiber unidirectional cloth;

[0192] S704: Using a lock buckle, fix the other end of the SMA memory alloy wire in step S701 to the other end of the anchor rod 1 wrapped with the bottom carbon fiber unidirectional cloth.

[0193] It should be noted that: in step S701, the length of the SMA memory alloy wire after pre-tensioning is equal to the length L3 of the SMA memory alloy wire before pre-tensioning multiplied by 108%-112%;

[0194] In step S703, the SMA memory alloy wire needs to be pressed within the range of the bottom carbon fiber unidirectional cloth during the spiral winding process, and the spacing between each two adjacent circles of the SMA memory alloy wire is required to be 30-60 mm, and the SMA memory alloy wire cannot be wound with the edge of the bottom carbon fiber unidirectional cloth, so that the SMA memory alloy wire is pressed just in the middle of the bottom carbon fiber unidirectional cloth with a spacing of 30-60 mm per circle;

[0195] In step S704, the entire SMA memory alloy wire should be tightly attached to the bottom carbon fiber unidirectional cloth. After the SMA memory alloy wire is fixed, if there is excess length outside the lock buckle, it can be cut off.

[0196] The beneficial effect of adopting the above-mentioned preferred scheme is that after the SMA memory alloy wire undergoes permanent deformation at room temperature, it can restore its original shape at high temperature. By utilizing this characteristic, by limiting the deformation of the SMA memory alloy wire and activating it by heating, the shape memory effect is utilized to generate prestress in the structure, providing pre-compression stress for the entire reinforced structure, so that the reinforced structure is firmly fixed on the anchor rod.

[0197] Preferably, step S8 comprises the following steps:

[0198] S801: manufacturing a heat-insulating device having the same length as the anchoring rod 1;

[0199] S802: Two high temperature resistant silicone inflatable sealing rings are mounted on both ends of the anchor rod 1 in a one-to-one correspondence;

[0200] S803: putting a heat preservation device on the anchor rod 1 so that the heat preservation device and the anchor rod 1 are sealed;

[0201] S804: inserting the detection end of the digital thermometer into the heat preservation device from one side of the heat preservation device;

[0202] S805: Insert the muzzle of the hot air gun into the heat preservation device from the side wall of the heat preservation device;

[0203] S806: Start the heat gun and observe the digital thermometer to maintain the temperature inside the insulation device in the range of 90-110°C for 10-15 minutes.

[0204] Among them, it should be noted that: in step S801, the insulation device is composed of a stainless steel wire mesh, insulating asbestos, and tin foil. First, according to the specifications of the anchor rod 1, a wire mesh of equal length and 20-30 mm larger in radius than the anchor rod 1 is cut; then 2 mm of insulating asbestos is laid on both sides of the front and back, and the insulating asbestos is fixed to the wire mesh with tape; then a layer of tin foil is laid on the outer insulating asbestos, and it is also fixed to the wire mesh with tape; finally, two air inlet holes are opened on the side wall of the insulation device at a distance of 25%-35% from the upper and lower edges. The size of the holes should be the same as the size of the muzzle of the hot air gun, and the exposed wire mesh, asbestos, and tin foil at the opening position are wrapped with tape, such as Figure 7 As shown;

[0205] In step S802, a high temperature resistant silicone inflatable sealing ring is arranged at the end of the anchor rod 1 near the node side, and another high temperature resistant silicone inflatable sealing ring is arranged at the inner side of the steel fastener on the anchor rod 1 near the node;

[0206] In step S804, the muzzle of the hot air gun is inserted into the interior of the heat preservation device through the hole on the side wall of the heat preservation device.

[0207] The beneficial effect of adopting the above preferred solution is that it is conducive to restoring the length of the SMA memory alloy wire before pre-tensioning by heating, thereby providing pre-compression stress for the anchor rod and further improving the stability of the anchor rod reinforcement.

[0208] Preferably, the specific operation of step S10 is: spirally winding the top carbon fiber unidirectional cloth on the anchor rod 1, and applying a circle of epoxy resin colloid for each circle of the top carbon fiber unidirectional cloth, so that the top carbon fiber unidirectional cloth is tightly fitted to the anchor rod 1.

[0209] It should be noted that the length of the wrapping range of the top carbon fiber unidirectional fabric is equal to the length l1 of the anchoring section.

[0210] The beneficial effect of adopting the above preferred scheme is that the top layer of carbon fiber unidirectional cloth and epoxy resin colloid are conducive to stably fixing all components used for reinforcement on the anchor rods, ensuring that all components used for reinforcement can work normally, and further improving the corrosion resistance of the reinforced structure and extending its service life.

[0211] Preferably, step S12 comprises the following steps:

[0212] S1201: Leave the entire reinforced structure for 3-5 days to wait for all epoxy resin colloids to fully cure.

[0213] Full solidification;

[0214] S1202: Starting from the steel buckle, a steel wire rope having a length of 1.5 to 2 times the circumference of the anchor rod 1 is reserved in the direction of the construction auxiliary rod 3;

[0215] S1203: Remove the steel buckle key and cut the wire rope from the reserved point;

[0216] S1204: spirally winding a reserved steel wire rope around the end of the anchor rod 1 and locking it;

[0218] S1205: Apply epoxy resin colloid to the wire rope locking and winding areas.

[0219] It should be noted that: in step S1202, the reserved steel wire rope is two strands, and the length of the two strands of steel wire rope is 1.5-2 times the circumference of the anchor rod 1;

[0220] In step S1204, the reserved steel wire rope is spirally wound around the end of the anchor rod 1 and fixed with a basket lock at the intersection of the two steel wire ropes.

[0221] The beneficial effect of adopting the above preferred solution is that it is conducive to fixing the reserved steel wire rope on the anchor rod, so that the entire reinforcement structure forms a whole.

[0222] The present invention is further described below by an embodiment and a comparative example:

[0223] like Figure 2 Shown is the steel structure of the anchor head assembly of the feed cabin at a certain location. Since the stress conditions at the connection position between the anchor head assembly of the feed cabin and the star frame are complex and they are all lap welded on site, the welds are inconvenient to detect and the flaw detection results are difficult to control, and it is impossible to grasp the development of weld defects. Therefore, it is necessary to preventively reinforce the connection position between the anchor head assembly and the star frame. When reinforcing, it is necessary to consider that two of the three anchor head assemblies are covered by the cabin cover, and the operating space is small.

[0224] Through the analysis of the stress of each rod and the understanding of the on-site welding conditions, such as Fig.10 As shown, there are safety hazards at the connection positions of rods 4, 5, and 8 with the nodes, so these three rods are selected as anchor rods; the lower base of the node is located on the opposite side of the anchor rod relative to the node, and the internal force of the lower base is small, and it is not easy to yield or be damaged. The lower base can be set as an auxiliary force-bearing rod; rods 19, 14, and 16 correspond to the positions of the three anchor rods, and can be used as construction auxiliary rods to tighten the wire rope.

[0225] Through the finite element digital model analysis, it can be seen that under the action of the ultimate load, the tensile force F of the connection between rod 4, rod 5, rod 8 and the node is 117kN, 215kN and 109kN respectively, the ultimate bearing capacity of the wire rope is f = 23.5kN, the diameter of the wire rope is d = 6mm, the length of the anchoring section is l1 = 800mm, the number of turns a of the wire rope wound on rod 4, rod 5, and rod 8 is 1.5 turns, the circumference of the anchor rod is D = 399mm, the average bonding stress p between the wire rope and the epoxy resin colloid is 5.08MPa, and finally the following conclusions are drawn through the formula:

[0226] Rod 4 and rod 8 are bidirectionally wound with 4 turns of steel wire rope, with a total of 8 steel wire ropes under stress, and the ultimate force value of the steel wire rope bundle is ≥23.5X8=188kN; rod 5 is bidirectionally wound with 5 turns of steel wire rope, with a total of 10 steel wire ropes under stress, and the ultimate force value of the steel wire rope bundle is ≥23.5X10=235kN, both of which meet the stress under the ultimate load.

[0227] Compared with the prior art, the technology of the present invention has the following advantages and effects:

[0228] 1. The new composite reinforcement material composed of epoxy resin colloid, steel wire rope, carbon fiber unidirectional cloth and SMA memory alloy wire will not cause any damage to the original structure and work on the surface of the original structure;

[0229] 2. The new composite reinforcement material is not only suitable for large nodes with wide spaces, but also for small nodes with complex and narrow spaces where construction is difficult. Under the condition that the contact area of ​​the steel wire rope, carbon fiber unidirectional cloth, steel plate and colloid is the same, the surface area of ​​the original structure occupied by the steel wire rope is smaller, which can effectively improve the bearing capacity, ductility and safety of the reinforced structure, thereby improving the overall reinforcement effect;

[0230] 3. Introducing stainless steel wire ropes, using the flexibility and strength of the wire ropes, not only allows the reinforced structure to fit on the surface of the original structure, but also provides reliable strength to ensure the safety of the original structure;

[0231] 4. Introduce SMA memory alloy wire. After the SMA memory alloy wire is permanently deformed at room temperature, it can restore its original shape at high temperature. By utilizing this characteristic, by limiting the deformation of the SMA memory alloy wire and activating it by heating, the shape memory effect is used to generate prestress in the structure, providing pre-compression stress for the entire reinforcement structure, so that the reinforcement structure is firmly fixed on the anchor rod;

[0232] 5. New epoxy resin colloid. Compared with ordinary epoxy resin, the new epoxy resin has thixotropy and better durability. The thixotropy reduces the fluidity of the colloid, improves the plasticity of the colloid during the construction process, and makes the construction more convenient.

[0233] In a structural maintenance and reinforcement project of the feed cabin anchor head assembly at a certain location, since the connection position between the feed cabin anchor head assembly and the star frame is lap welded on-site, the quality of the welding position is difficult to guarantee, and it is a sub-safe position in the steel structure node. There are few solutions for reinforcing complex spatial steel nodes. In order to verify the effect of the present invention, a method of reinforcing the node with welded ribs is used as a comparative solution, that is, the reinforcing ribs are erected between the auxiliary load-bearing rods 2 and the anchor rods 1, and part of the load is transferred to the auxiliary load-bearing rods 2 through the reinforcing ribs. In order to make the experimental results intuitive, the sub-safe position in the steel structure node is directly disconnected completely, and then the technical solution of the present invention and the welded ribs are used for reinforcement respectively, and the displacement of the node is observed when the node is disconnected.

[0234] pass Figure 8 and Fig. 9 It can be seen that when the nodes are reinforced with the new composite reinforcement material composed of epoxy resin colloid, steel wire rope, carbon fiber unidirectional cloth and SMA memory alloy wire, when the most unfavorable load is 1.0 times, the nodes still continue to work, the node displacement increases evenly and the increment shows a downward trend, which indicates that the mechanical properties such as the bearing capacity and ductility of the nodes reinforced by the present invention are improved; while when the scheme of adding reinforced ribs acts on the structure at 0.65 times the most unfavorable load, the node displacement at the disconnection point increases suddenly, and cracks appear in the fillet welds at the welding points of the reinforced ribs.

[0235] In the description of the present invention, it is to be understood that the terms “center”, “longitudinal”, “lateral”, “length”, “width”, “thickness”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “horizontal”, “top”, “bottom”, “inside”, “outside”, “clockwise”, “counterclockwise”, “axial”, “radial”, “circumferential”, etc., indicating orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.

[0236] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0237] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0238] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0239] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.

[0240] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.

Claims

1. A method for reinforcing a spatial steel structure node, characterized in that: The following steps are involved: S1: Analyze the stress characteristics of the spatial steel structure node to be reinforced, and select the anchor rods (1), auxiliary stress rods (2) and construction auxiliary rods (3) involved in the reinforcement; S2: determining the number and length of steel wire ropes, the length of carbon fiber unidirectional cloth, and the length of SMA memory alloy wire required for reinforcement according to the force value and geometric parameters of the anchor rod (1); S3: Clean the working surface; S4: Winding the steel wire rope around the anchor rod (1) and the auxiliary force-bearing rod (2), and tightening and locking the steel wire rope on the construction auxiliary rod (3); S5: applying a base layer of epoxy resin colloid on the anchor rod (1) wrapped with the steel wire rope; S6: wrapping the bottom carbon fiber unidirectional fabric on the bottom epoxy resin colloid; S7: wrapping SMA memory alloy wire on the bottom carbon fiber unidirectional cloth; S8: putting a heat preservation device on the anchor rod (1) in step S7, and heating the heat preservation device; S9: removing the heat preservation device and applying a middle layer of epoxy resin colloid on the anchor rod (1) in step S8; S10: Wrapping the top layer of carbon fiber unidirectional fabric on the middle layer of epoxy resin colloid; S11: Apply the top layer of epoxy resin colloid on the top layer of carbon fiber unidirectional cloth; S12: Wait for the epoxy resin to completely solidify before removing the steel wire rope from the auxiliary construction section.

2. A method for reinforcing a spatial steel structure node according to claim 1, characterized in that: Step S1 includes the following steps: S101: Establish a finite element digital model of the spatial steel structure to be reinforced; S102: Use the finite element digital model to perform digital simulation calculations to analyze the stress characteristics of all rods in the spatial steel structure to be reinforced; S103: Selecting the anchor rod (1), the auxiliary force-bearing rod (2) and the construction auxiliary rod (3) according to the force characteristics and the actual on-site conditions of the node.

3. A method for reinforcing a spatial steel structure node according to claim 1, characterized in that: In step S1, the anchor rod (1) and the auxiliary force-bearing rod (2) are connected via a node, and the anchor rod (1) and the construction auxiliary rod (3) are connected via a steel wire rope.

4. A method for reinforcing a spatial steel structure node according to claim 1, characterized in that: Step S2 includes the following steps: S201: Determine the force required to pull a single steel wire rope out of an epoxy resin gel: If the number of turns of the steel wire rope wound around the anchor rod (1) is greater than or equal to 1, the pulling force required to pull a single steel wire rope out of the epoxy resin colloid is calculated according to the following formula: Wherein, f1 is the tension required to pull a single steel wire rope out of the epoxy resin colloid, d is the diameter of the steel wire rope, p is the average bonding stress between the steel wire rope and the epoxy resin colloid, l1 is the length of the anchoring section, a is the number of turns of the steel wire rope wound on the anchoring rod (1), D is the circumference of the anchoring rod (1), a1 is an integer after a is rounded down, and if a is an integer, a=a1; If the number of turns of the steel wire rope wound around the anchor rod (1) is less than 1, the tension required to pull a single steel wire rope out of the epoxy resin colloid is calculated according to the following formula: Wherein, f1 is the tension required to pull a single steel wire rope out of the epoxy resin colloid, d is the diameter of the steel wire rope, p is the average bonding stress between the steel wire rope and the epoxy resin colloid, l1 is the length of the anchoring section, D is the circumference of the anchoring rod (1), and a is the number of turns of the steel wire rope wound around the anchoring rod (1); S202: Determine the number of steel wire ropes based on the pulling force required to pull a single steel wire rope out of the epoxy resin colloid: If the pulling force required to pull a single steel wire rope out of the epoxy resin colloid is less than the ultimate bearing capacity of a single steel wire rope, the number of steel wire ropes is calculated as follows: Wherein, F is the tension value when the anchor rod (1) is connected to the node, n is the number of steel wire ropes, and f1 is the tension required to pull a single steel wire rope out of the epoxy resin colloid; If the pulling force required to pull a single steel wire rope out of the epoxy resin colloid is greater than the ultimate bearing capacity of a single steel wire rope, the number of steel wire ropes is calculated as follows: F = n × f, Wherein, F is the tension value when the anchor rod (1) is connected to the node, n is the number of steel wire ropes, and f is the ultimate bearing capacity of a single steel wire rope; S203: Determine the length of the wire rope: If the number of turns of the steel wire rope wound around the anchor rod (1) is greater than or equal to 1, the length of the steel wire rope is calculated according to the following formula: l2+l4, Wherein, L1 is the length of the steel wire rope, l3 is the length of the construction auxiliary section, l1 is the length of the anchoring section, a is the number of turns of the steel wire rope wound on the anchoring rod (1), D is the circumference of the anchoring rod (1), a1 is an integer rounded down from a, if a is an integer, then a=a1, l2 is the length of the auxiliary force-bearing section, and l4 is the reserved length of the steel wire rope; If the number of turns of the steel wire rope wound around the anchor rod (1) is less than 1, the length of the steel wire rope is calculated according to the following formula: Wherein, L1 is the length of the steel wire rope, l3 is the length of the construction auxiliary section, l1 is the length of the anchoring section, D is the circumference of the anchoring rod (1), a is the number of turns of the steel wire rope wound around the anchoring rod (1), l2 is the length of the auxiliary force-bearing section, and l4 is the reserved length of the steel wire rope; S204: Determine the length of the carbon fiber unidirectional cloth: L2=D×l1 / b1+l5, Wherein, L2 is the length of the carbon fiber unidirectional cloth, D is the circumference of the anchor rod (1), l1 is the length of the anchoring section, b1 is the spacing value of the carbon fiber unidirectional cloth spirally wound on the anchoring section, and l5 is the reserved length of the carbon fiber unidirectional cloth; S205: Determine the length of the SMA memory alloy wire before pre-tensioning; L3=D×l1 / b2+l6, Wherein, L3 is the length of the SMA memory alloy wire before pre-tensioning, D is the circumference of the anchor rod (1), l1 is the length of the anchoring section, b2 is the spacing value of the SMA memory alloy wire spirally wound on the anchoring section, and l6 is the reserved length of the SMA memory alloy wire during construction operation.

5. A method for reinforcing a spatial steel structure node according to claim 1, characterized in that: Step S4 includes the following steps: S401: a steel buckle key is provided at one end of the anchor rod (1) away from the node, and a wire rope tightener is provided on the construction auxiliary rod (3); S402: Winding the middle position of the steel wire rope around one end of the auxiliary force-bearing rod (2) close to the node, thereby dividing the steel wire rope into two strands; S403: spirally winding two strands of steel wire ropes on the anchor rod (1) in a symmetrically crossed manner; S404: Passing the two steel wire ropes through the steel buckle and leading them to the construction auxiliary rod (3); S405: Both ends of the steel wire rope are made into a ring structure; S406: Connect the ring structures at both ends of the steel wire rope to two tension digital display dynamometers one by one, and connect the two tension digital display dynamometers to the steel wire rope tightener; S407: starting the wire rope tensioner, and locking the two wire ropes on the construction auxiliary rod (3) after observing that the tension value on the tension digital display dynamometer is within a preset tension range; S408: Repeat the above steps, wind all the steel wire ropes side by side on the anchor rod (1) and the auxiliary force-bearing rod (2) along the path of the first steel wire rope, and lock them on the construction auxiliary rod (3) after tightening.

6. A method for reinforcing a spatial steel structure node according to claim 1, characterized in that: The specific operation of step S6 is: spirally winding the bottom carbon fiber unidirectional cloth on the anchor rod (1), and applying a circle of epoxy resin colloid every time the bottom carbon fiber unidirectional cloth is wound, so that the bottom carbon fiber unidirectional cloth is tightly fitted to the anchor rod (1).

7. A method for reinforcing a spatial steel structure node according to claim 1, characterized in that: Step S7 includes the following steps: S701: Pre-tensioned SMA memory alloy wire; S702: Using a lock buckle, fix one end of the SMA memory alloy wire in step S701 to one end of the anchor rod (1) wrapped with the bottom carbon fiber unidirectional cloth; S703: spirally winding the SMA memory alloy wire in step S701 on the bottom carbon fiber unidirectional cloth; S704: Using a lock buckle, fix the other end of the SMA memory alloy wire in step S701 to the other end of the anchor rod (1) wrapped with the bottom carbon fiber unidirectional cloth.

8. The method for reinforcing a spatial steel structure node according to claim 1, characterized in that: Step S8 includes the following steps: S801: manufacturing a heat-insulating device having the same length as the anchoring rod (1); S802: Two high-temperature resistant silicone inflatable sealing rings are mounted one by one on both ends of the anchor rod (1); S803: Sleeve the heat preservation device onto the anchor rod (1) so that the heat preservation device and the anchor rod (1) are sealed; S804: inserting the detection end of the digital thermometer into the heat preservation device from one side of the heat preservation device; S805: Insert the muzzle of the hot air gun into the heat preservation device from the side wall of the heat preservation device; S806: Start the heat gun and observe the digital thermometer to maintain the temperature inside the insulation device in the range of 90-110°C for 10-15 minutes.

9. A method for reinforcing a spatial steel structure node according to claim 1, characterized in that: The specific operation of step S10 is: spirally winding the top carbon fiber unidirectional cloth on the anchor rod (1), and applying a circle of epoxy resin colloid every time the top carbon fiber unidirectional cloth is wound, so that the top carbon fiber unidirectional cloth is tightly fitted to the anchor rod (1).

10. A method for reinforcing a spatial steel structure node according to claim 1, characterized in that: Step S12 includes the following steps: S1201: Leave the entire reinforced structure to stand for 3-5 days to wait for all epoxy resin colloids to completely solidify; S1202: Starting from the steel buckle, a steel wire rope having a length of 1.5 to 2 times the circumference of the anchoring rod (1) is reserved in the direction of the construction auxiliary rod (3); S1203: Remove the steel buckle key and cut the wire rope from the reserved point; S1204: spirally winding a reserved steel wire rope around the end of the anchor rod (1) and locking it; S1205: Apply epoxy resin colloid to the wire rope locking and winding areas.

Citation Information

Patent Citations

  • Stay cable joint for open chord strengthening of space structure

    CN107313604A

  • Method for reinforcing K 'T-shaped nodes of circular tube structure space by using carbon fiber reinforced composite material

    CN114352066A

  • Reinforced (rfd) ancient building dowel fourth of twelve earthly branches node of embedding shape memory alloy stromatolite carbon cloth

    CN205077890U

  • Carbon fiber repairing and reinforcing structure of orthogonal space steel pipe structure

    CN211313464U

  • Ancient building wood structure dovetail joint loose joint reinforcing structure

    CN218149981U

Cited By

  • Targeted prestress reinforcing device and method for K-shaped joint crack by pasting SMA (Shape Memory Alloy) plate

    CN121228892A