Construction method of heightened steel structure factory building

By installing overlapping beams and temporary support frames between the foundation steel columns of the steel structure factory, using hydraulic push mechanisms to move the roof steel structure and add high-rise steel columns, the problems of high cost and structural damage during the heightening process of the steel structure factory are solved. Achieving a low-cost and low-destructive increase effect.

CN118911461APending Publication Date: 2024-11-08MCC WUKAN ENG CONSULTING (HUBEI) CO LTD
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202410927584.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-11
Publication Date
2024-11-08

Smart Images

  • Figure CN118911461A_ABST
    Figure CN118911461A_ABST
Patent Text Reader

Abstract

The invention discloses a construction method for heightening a steel structure factory building, and relates to the technical field of steel structure construction, the construction method comprises the following construction steps: S1, disconnecting a roof steel structure from a foundation steel column; s2, a temporary supporting frame is erected between every two adjacent foundation steel columns; s3, the roof steel structure is horizontally pushed to be supported above the temporary supporting frame, and the left row of foundation steel columns are exposed; s4, a first heightened steel column is installed above the foundation steel column on one side, and a second heightened steel column is fixed to the lower portion of the right side of the roof steel structure; and S5, the roof steel structure is integrally hoisted upwards till the first heightened steel columns and the second heightened steel columns are in butt joint with the foundation steel columns below in a one-to-one correspondence mode and are fixed. According to the construction method, the original structure of the steel structure factory building is fully reserved, an additional construction site is not needed, the heightening construction cost of the steel structure factory building is less, the construction cost is lower, and damage to the original structure of the steel structure factory building is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of steel structure construction, and in particular to a construction method for raising a steel structure factory building. Background Art

[0002] Steel structures are widely used in the construction of industrial plants due to their light weight and high strength. Steel structure plants have the advantages of high strength, light weight, good seismic resistance, fast construction speed, environmental protection and energy saving.

[0003] With the gradual development of technology, industrial plants are being used. Due to the improvement of production processes, industrial production equipment is also upgraded. The height of the original steel structure plant is difficult to meet the installation and transformation requirements of the equipment. The plant needs to be raised to meet the requirements of installing new equipment; or the original plant needs to be used for other purposes, which requires a higher space; or the plant needs to be added to increase the usable area. In order to meet the higher space needs, demolition and reconstruction are often adopted. If a new steel structure plant is rebuilt, the cost is high, resulting in shutdowns, and additional sites are required for construction. The construction time is long, the reconstruction cost is high, and the construction waste has a certain impact on the surrounding environment. Summary of the invention

[0004] In order to solve the problem of raising the height of steel structure factories in the prior art, the present application provides a construction method for raising the height of steel structure factories, which can make full use of the original structure of the steel structure factory building, so that the construction cost of raising the height of the steel structure factory building is less, the construction cost is lower and the damage to the original structure of the steel structure factory building is reduced.

[0005] In order to achieve the above technical purpose, the present invention provides a construction method for heightening a steel structure factory building, wherein the method is for heightening a steel frame structure of a steel structure factory building, wherein the frame structure of the steel structure factory building comprises two rows of foundation steel columns arranged in parallel and a roof steel structure erected on top of the two rows of foundation steel columns, and the heightening process of the steel frame structure of the steel structure factory building comprises the following construction steps:

[0006] S1: Install a lap beam between two adjacent foundation steel columns in each row of foundation steel columns, wherein the lap beam is arranged close to the roof steel structure, and disconnect the connection between the roof steel structure and each foundation steel column, and the disconnection point is located below the lap beam;

[0007] S2: A temporary support frame is set up between two adjacent foundation steel columns of each row of foundation steel columns, the height of the temporary support frame is lower than the lap beam, and a sliding track is installed on the top of each temporary support frame, the bottom of each lap beam is slidably connected to the corresponding sliding track, and the layout direction of the sliding track is perpendicular to the setting direction of the lap beam;

[0008] S3. Push the roof steel structure horizontally from the foundation steel columns on one side toward the foundation steel columns on the other side, so that all the lap beams move along the corresponding sliding tracks until the roof steel structure is separated from the foundation steel columns and erected above the temporary support frame, and one row of foundation steel columns is exposed;

[0009] S4: Install a first heightening steel column above each foundation steel column of the exposed row of foundation steel columns, and install a plurality of second heightening steel columns below the roof steel structure away from the exposed row of foundation steel columns, and each second heightening steel column is installed at the disconnection position between the roof steel structure and each foundation steel column;

[0010] S5: hoist and move the roof steel structure upward as a whole, so that each disconnection point on the side of the roof steel structure that is not connected to the second heightening column corresponds one-to-one with the basic steel column on which the first heightening steel column is installed, and each disconnection point is docked and fixed with the corresponding first heightening steel column; at the same time, the second heightening steel column on the other side of the roof steel structure corresponds one-to-one with the basic steel column without the first heightening steel column installed, and each second heightening steel column is docked and fixed with the corresponding basic steel column; complete the heightening of the steel frame structure of the steel structure workshop.

[0011] A further technical solution of the present invention is as follows: the roof steel structure comprises a plurality of groups of parallel roof supports, the two ends of each group of roof supports are respectively erected on the tops of two corresponding foundation steel columns, and are connected to the corresponding foundation steel columns through connecting columns; the lap beam in step S1 is installed between two adjacent connecting columns to disconnect each connecting column from the corresponding foundation steel column.

[0012] A further technical solution of the present invention: in the step S2, a hydraulic pushing member is provided at the end of each sliding guide rail, the setting positions and pushing strokes of the multiple hydraulic pushing members on both sides are the same, and a sliding member is installed at the bottom of each lap beam, and the sliding member is slidably set on the sliding guide rail, and the piston end of the hydraulic pushing member is connected to the corresponding sliding member; in the step S3, multiple hydraulic pushing members are controlled simultaneously to push the corresponding sliding member to move along the sliding guide rail with the lap beam.

[0013] A further technical solution of the present invention is as follows: a connecting component is fixed to the bottom of each first elevated steel column and each second elevated steel column, and the connecting component includes a base plate and a fixing plate fixed on the base plate, the fixing plate is attached to the side wall of the basic steel column, and the fixing plate and the basic steel column are connected by a plurality of high-strength bolts.

[0014] A preferred technical solution of the present invention: Ribbed plates are fixed on each side of the first heightened steel column and the second heightened steel column near the bottom;

[0015] In step S4, after the second heightened steel column is installed on the roof steel structure, a load-releasing cable is installed on the ribbed plate, one end of the load-releasing cable away from the ribbed plate is fixed to the roof steel structure, and the load-releasing cable is tensioned.

[0016] A better technical solution of the present invention is as follows: a corbel is arranged above each of the foundation steel columns; after step S5, a transverse beam is installed between two adjacent steel columns of each row of foundation steel columns; a plurality of longitudinal beams are installed between two rows of foundation steel columns; both ends of the longitudinal beams are respectively fixedly connected to the corbels; and an intermediate structural floor is constructed above the transverse beams and the longitudinal beams.

[0017] A more preferred technical solution of the present invention: in the step S5, when hoisting the roof steel structure, cranes are arranged at the four corners of the roof steel structure, and each crane is connected to a plurality of hoisting points on the roof steel structure.

[0018] A preferred technical solution of the present invention: in the step S4, the second heightened steel column is installed at the lower end of each connecting column on the side of the roof steel structure away from the exposed row of foundation steel columns; in the step S5, the first heightened steel column is docked and fixed one by one with the connecting column on the side of the roof steel structure that is not connected to the second heightened column.

[0019] A further technical solution of the present invention is as follows: the basic steel column is an I-beam, and the fixing plate is provided with a plurality of pieces;

[0020] In step S4, when the first heightening steel column is connected to the basic steel column, the web and flange of the basic steel column are clamped between a plurality of fixing plates, and the end surface of the basic steel column abuts against the surface of the fixing plate.

[0021] A further technical solution of the present invention is as follows: after step S5, concrete is poured under the ribbed plates of the first elevated steel column and the second elevated steel column, and the connection nodes between the basic steel column and the first elevated steel column on one side and the connection nodes between the basic steel column and the second elevated steel column on the other side are both wrapped in concrete.

[0022] Beneficial effects of the present invention:

[0023] (1) The construction method of the present application fully retains the original structure of the steel structure factory building, and does not require an additional construction site, so that the heightening construction of the steel structure factory building consumes less materials, has lower construction costs, and reduces damage to the original structure of the steel structure factory building.

[0024] (2) In the process of raising the height in the present application, it is only necessary to build a temporary support next to the steel column, move the roof of the steel structure factory building to the temporary support through a special hydraulic driving mechanism, and then raise the steel column, and then hoist the roof to the top of the raised steel column and fix it; the whole raising process is simple and convenient, with fewer construction steps.

[0025] (3) When the first heightening steel column is arranged above the basic steel column, the connection stability between the basic steel column and the first heightening steel column, and between the basic steel column and the second heightening steel column can be improved by arranging a connecting member.

[0026] (4) The construction method of the present application can make full use of the original steel structure factory building, and install transverse beams between the foundation steel columns, and install fixed longitudinal beams on the corbels of the foundation steel columns, thereby realizing the construction of the intermediate structure floor slab inside the heightened steel structure factory building. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 is a schematic diagram of a steel structure of a plant for installing lap beams in step S1 of the embodiment;

[0028] Figure 2 It is a side view of the steel structure of the factory building before the translation of the roof steel structure in the present invention;

[0029] Figure 3 It is a side view of the steel structure of the factory building after the roof steel structure is translated in the present invention;

[0030] Figure 4 It is a schematic diagram of the three-dimensional structure of the factory building steel structure after the roof steel structure is translated in the present invention;

[0031] Figure 5 yes Figure 4 The enlarged schematic diagram of point A in the middle;

[0032] Figure 6 It is a schematic diagram of the local structure of the connection between the basic steel column and the first heightened steel column in the present invention;

[0033] Figure 7 It is a schematic diagram of the structure of the first heightened steel column with a connecting piece installed in the present invention;

[0034] Figure 8 It is a schematic diagram of the structure of the connection between the second heightened steel column and the connecting column in the present invention;

[0035] Fig. 9 It is a three-dimensional schematic diagram of the heightening of the steel structure columns of the factory building in the present invention;

[0036] Fig.10 It is a schematic diagram of the steel structure of the plant after the construction of the present invention is completed.

[0037] In the accompanying drawings, the components represented by the reference numerals are listed as follows:

[0038] 1. Roof steel structure; 100. Roof support; 2. Foundation steel column; 200. Corbel; 3. Temporary support frame; 300. Sliding guide rail; 301. Hydraulic pusher; 302. Sliding member; 4. First heightened steel column; 400. Ribbed plate; 5. Second heightened steel column; 6. Connecting member; 600. Foundation plate; 601. Fixed plate; 7. Unloading cable; 8. Transverse beam; 9. Longitudinal beam; 10. Lap beam, 11. Connecting column. DETAILED DESCRIPTION

[0039] The present invention will be further described below in conjunction with the accompanying drawings and embodiments. Figures 1 to 9 The drawings are all of embodiments, which are drawn in a simplified manner and are only used for the purpose of clearly and concisely illustrating the embodiments of the present invention. The technical solutions shown in the following drawings are specific solutions of the embodiments of the present invention and are not intended to limit the scope of the invention claimed for protection. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0040] In the description of the present invention, it should be understood that the terms "upper", "lower", "inner", "outer", "left", "right", etc. indicate the orientation or position relationship based on the orientation or position relationship shown in the drawings, or the orientation or position relationship in which the product of the invention is usually placed when in use, or the orientation or position relationship commonly understood by those skilled in the art, which is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", etc. are only used to distinguish the description, and cannot be understood as indicating or implying relative importance.

[0041] It should be noted that the drawings of this application only show the internal load-bearing components of the steel structure factory building, and do not depict the external protective structure of the steel structure factory building as well as structures such as windows and door openings.

[0042] The embodiment provides a construction method for heightening a steel structure factory building, wherein the steel frame structure of the steel structure factory building is heightened. Figure 1 As shown, it includes two rows of parallel basic steel columns 2 and a roof steel structure 1 erected on the top of the two rows of basic steel columns 2, and the roof steel structure 1 includes a plurality of groups of parallel roof brackets 100, and the two ends of each group of roof brackets 100 are respectively fixedly erected on the tops of the corresponding two basic steel columns 2; the specific heightening process of the steel frame structure of the steel structure factory building includes the following construction steps:

[0043] S1. First, Figure 1As shown, from inside the steel structure factory, a lap beam 10 is installed between each adjacent row of foundation steel columns 2. The lap beam 10 is arranged close to the roof steel structure 1, and both ends of the lap beam 10 are fixed to the foundation steel column 2 by high-strength bolts and welding. The lap beam 10 can specifically be a steel structure beam such as an I-beam, a rectangular channel steel, etc.

[0044] S2. After the construction of the lap beam 10 is completed, the external enclosure structure of the steel structure factory building near the roof steel structure 1 is dismantled, and the connection between the roof steel structure 1 and each foundation steel column 2 is disconnected, and the disconnection point is set below the lap beam 10; specifically, the foundation steel column 2 can be cut off from near the roof steel structure 1. If the roof steel structure 1 and the foundation steel column 2 are connected by high-strength bolts, the roof steel structure 1 and the foundation steel column 2 are disconnected by releasing the connection of the high-strength bolts; after the roof steel structure 1 and the foundation steel column 2 are disconnected, the part of the foundation steel column 2 connected to the roof steel structure 1 serves as the connecting column 11, and the remaining part still serves as the foundation steel column 2.

[0045] S3. Reference Figures 2 to 5 A temporary support frame 3 is set up between two adjacent foundation steel columns 2 in each row of foundation steel columns 2, and the top of the temporary support frame 3 is located below the lap beam 10; a sliding guide rail 300 is installed on the top of each temporary support frame 3, and the length of the sliding guide rail 300 meets the distance that the roof steel structure 1 slides from the top of the foundation steel column 2 to the distance that it is separated from the foundation steel column; the setting direction of the sliding guide rail 300 is perpendicular to the direction of the lap beam 10, and the sliding guide rail 300 extends from the left row of foundation steel columns toward the right row of foundation steel columns. The lap beam 10 is located above the sliding guide rail 300, and a hydraulic pusher 301 is installed on each sliding guide rail 300. The hydraulic pusher 301 is installed at the end of the sliding guide rail 300, and the hydraulic pusher 301 can directly A hydraulic cylinder is used and arranged along the sliding direction of the sliding guide rail 300, and the piston rod of each hydraulic pusher 301 is directed toward the lap beam 10 between two adjacent foundation steel columns 2, mainly to push the lap beam 10 to drive the entire roof steel structure 1 to move horizontally; in order to facilitate movement, a sliding member 302 is installed under each lap beam 10, and the sliding member 302 is slidably connected to the sliding guide rail 300, and each sliding member 302 is fixedly connected to the piston rod of the corresponding hydraulic pusher 301, and the sliding member 302 is driven to move on the sliding guide rail 300 through the extension and retraction of the hydraulic pusher 301, thereby pushing the lap beam 10 to drive the entire roof steel structure 1 to move horizontally; the hydraulic pusher 301 can specifically be an electric hydraulic push rod.

[0046] The temporary support frame 3 adopts a truss structure, which can be constructed by a floor-standing scaffold, a portal scaffold, or a structure similar to the tower crane foundation section, so that the bearing capacity of the temporary support frame 3 is stronger. The drawings of this application only show that the temporary support frame 3 is set up between two adjacent foundation steel columns 2. If the setting in the drawings cannot meet the bearing requirements according to the force calculation, the erection range of the temporary support frame 3 can also be expanded to meet the bearing requirements in subsequent steps.

[0047] S4: Reference Figures 2 to 3 As shown, the multiple hydraulic pushers 301 are synchronously driven to push the sliding member 302 to slide along the sliding guide rail 300, so that the roof steel structure 1 moves horizontally from the left row of basic steel columns to the right row of basic steel columns, until the roof steel structure 1 is separated from the two rows of basic steel columns 2 and the left row of basic steel columns 2 is exposed, as shown in FIG. Figure 3 and Figure 4 As shown, at this time, the roof steel structure 1 is supported by a temporary support frame 3.

[0048] S5. Install the first heightened steel column 4 above each foundation steel column 2 of the left row of foundation steel columns, and install the second heightened steel column 5 below each connecting column 11 on the right side of the roof steel structure 1, such as Figure 4 As shown, at this time, the second heightened steel column 5 on the right side is connected to the roof steel structure 1 as a whole; the first heightened steel column 4 and the second heightened steel column 5 have the same structural form, and the structures of the two heightened steel columns are described below by taking the first heightened steel column 4 as an example;

[0049] Reference Figure 6 and Figure 7 , the first heightened steel column 4 is an I-beam of the same model as the basic steel column 2, and a connecting member 6 is provided at the bottom end of the first heightened steel column 4, and the connecting member 6 and the first heightened steel column 4 are integrally produced and formed in the factory. The connecting member 6 includes a base plate 600 fixed to the bottom end of the first heightened steel column 4 and a plurality of fixing plates 601 fixed to the side of the base plate 600 away from the first heightened steel column 4; in addition, a plurality of triangular ribs are provided between the base plate 600 and the plate surface of the first heightened steel column 4 to strengthen the ability of the connection between the base plate 600 and the first heightened steel column 4 to resist bending moment.

[0050] When installing the first elevated steel column 4, the surface of the base plate 600 is abutted against the top of the first elevated steel column 4. At this time, the surfaces of multiple fixed plates 601 are all in contact with the web and wing plates of the first elevated steel column 4, and the web and wing plates of the first elevated steel column 4 are clamped between the two fixed plates 601; a stable connection between the connecting member 6 and the base steel column 2 is achieved by multiple high-strength bolts and welding.

[0051] Further, see Figure 3 and Figure 6, the first heightened steel column 4 is provided with a plurality of ribbed plates 400 at a position close to the connection member 6, and the plurality of ribbed plates 400 are fixed around the circumference of the first heightened steel column 4. After the second heightened steel column 5 is installed to the right side of the roof steel structure 1, a load-releasing cable 7 is installed on the ribbed plates 400 of the second heightened steel column 5, and the other end of the load-releasing cable 7 is fixed to the main frame of the roof steel structure 1. By tensioning the load-releasing cable 7, part of the self-weight of the second heightened steel column 5 can be borne by the roof steel structure 1, so that when the roof steel structure 1 is hoisted in the subsequent steps, the connection between the second heightened steel column 5 and the roof steel structure 1 is subjected to less force, thereby improving the safety during the hoisting process and reducing the occurrence of the second heightened steel column 5 and the roof steel structure 1 being separated.

[0052] Specifically, refer to Figure 8 When the second heightened steel column 5 is connected to the connecting column 11, the end face of the second heightened steel column 5 needs to be firmly connected to one end of the connecting column 11. Specifically, a plurality of ear plates are installed at the joint of the second heightened steel column 5 and the connecting column 11, and the ear plates are fixed to the second heightened steel column 5 and the connecting column 11 at the same time by a plurality of high-strength bolts; at the same time, the connection node of the second heightened steel column 5 and the connecting column 11 is fully welded and fixed.

[0053] S6. The roof steel structure 1 is hoisted upward as a whole until the first heightened steel column 4 and the second heightened steel column 5 correspond to the base steel column 2 below, and the first heightened steel column 4 and the second heightened steel column 5 are fixed to the corresponding base steel column 2, such as Fig. 9 As shown; during the hoisting process, the basic steel column 2 needs to be inserted into the connecting member 6 below the second heightening steel column 5, and at the same time, the first heightening steel column 4 and the multiple connecting columns 11 of the roof steel structure 1 need to be aligned one by one.

[0054] When hoisting the roof steel structure 1, at least a mobile crane is arranged at the four corners of the roof steel structure 1, and multiple lifting points are set between each mobile crane and the roof steel structure 1. The roof panel of the roof steel structure 1 is partially removed, and the lifting rope of the mobile crane is connected to the main frame structure of the roof steel structure 1 to achieve hoisting. If the area of ​​the roof steel structure 1 is large, multiple mobile cranes need to be arranged at intervals around the side of the roof steel structure 1 to meet the hoisting requirements.

[0055] After the hoisting is completed, the first heightened steel column 4 and the connecting column 11 are immediately connected through the ear plate. The connection node of the first heightened steel column 4 and the connecting column 11 is as shown in FIG. Figure 7 During construction, the connecting member 6 below the second heightened steel column 5 is firmly connected to the foundation steel column 2 by high-strength bolts.

[0056] Usually, a steel structure factory building is provided with a bracket 200 on the foundation steel column 2 for supporting the crane beam. After the roof steel structure 1 is hoisted, multiple longitudinal beams 9 can be installed between the left and right rows of foundation steel columns, and both ends of each longitudinal beam 9 are connected and fixed to the bracket 200 through ear plates. The connection method is also referred to in Figure 8 , by welding ear plates and connecting with high-strength bolts; at the same time, a transverse beam 8 is installed between two adjacent foundation steel columns 2 in each row. The construction of the transverse beam 8 and the longitudinal beam 9 can be selected according to the needs of the factory building. If a double-layer steel structure factory building is required, after the transverse beam 8 and the longitudinal beam 9 are constructed, the intermediate structural floor slab can be constructed on the transverse beam 8 and the longitudinal beam 9, thereby forming a double-layer steel structure factory building.

[0057] Furthermore, after the construction of the intermediate structural floor is completed, concrete is poured under the ribbed plate 400 of the first heightened steel column 4 and the second heightened steel column 5, so that the entire foundation steel column 2, the connection node between the foundation steel column 2 and the first heightened steel column 4, and the connection node between the foundation steel column 2 and the second heightened steel column 5 are all wrapped in concrete. By pouring concrete outside the foundation steel column 2, on the one hand, the connection strength at the connection node between the foundation steel column 2 and the first heightened steel column 3 or the second heightened steel column 4 is improved; on the other hand, the bearing capacity of the foundation steel column 2 is improved, so that the foundation steel column 2 can better bear the heightened steel structure factory building.

[0058] If there is no need to form a double-layer steel structure factory building, that is, there is no need to construct the transverse beam 8 and the longitudinal beam 9, the concrete outside the first heightened steel column 4 can be constructed immediately after the first heightened steel column 4 is hoisted in step S5.

[0059] The present application discloses a construction method for heightening a steel structure factory building, which is applicable to the heightening construction of a portal steel structure factory building. Since the main load-bearing components of the portal steel structure are multiple parallel and spaced steel frame columns, which are directly connected to the foundation and are scattered, and there are no floor decking, beams and columns inside the steel structure factory building, it is difficult to heighten the portal steel structure factory building through the traditional concrete structure heightening construction method. In addition, since the steel frame columns are directly connected to the foundation, the steel structure factory building cannot be heightened from the bottom. On the one hand, the construction method provided by the present application preserves the structure of the original steel structure factory building and reduces construction consumables as much as possible. In addition, the construction method of the present application has a simple process, and only requires setting up a temporary support frame and hoisting through the corresponding construction process. The construction method makes the best use of the light and simple structure of the portal steel structure factory building, making the heightening construction of the steel structure factory building more economical and efficient.

[0060] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A construction method for raising a steel structure factory building, wherein the steel frame structure of the steel structure factory building is raised, wherein the frame structure of the steel structure factory building comprises two rows of foundation steel columns arranged in parallel and a roof steel structure erected on top of the two rows of foundation steel columns, and wherein: The heightening process of the steel frame structure of the steel structure factory building includes the following construction steps: S1: Install a lap beam between two adjacent foundation steel columns in each row of foundation steel columns, wherein the lap beam is arranged close to the roof steel structure, and disconnect the connection between the roof steel structure and each foundation steel column, and the disconnection point is located below the lap beam; S2: A temporary support frame is set up between two adjacent foundation steel columns of each row of foundation steel columns, the height of the temporary support frame is lower than the lap beam, and a sliding track is installed on the top of each temporary support frame, the bottom of each lap beam is slidably connected to the corresponding sliding track, and the layout direction of the sliding track is perpendicular to the setting direction of the lap beam; S3. Push the roof steel structure horizontally from the foundation steel columns on one side toward the foundation steel columns on the other side, so that all the lap beams move along the corresponding sliding tracks until the roof steel structure is separated from the foundation steel columns and erected above the temporary support frame, and one row of foundation steel columns is exposed; S4: Install a first heightening steel column above each foundation steel column of the exposed row of foundation steel columns, and install a plurality of second heightening steel columns below the roof steel structure away from the exposed row of foundation steel columns, and each second heightening steel column is installed at the disconnection position between the roof steel structure and each foundation steel column; S5: hoist and move the roof steel structure upward as a whole, so that each disconnection point on the side of the roof steel structure that is not connected to the second heightening column corresponds one-to-one with the basic steel column on which the first heightening steel column is installed, and each disconnection point is docked and fixed with the corresponding first heightening steel column; at the same time, the second heightening steel column on the other side of the roof steel structure corresponds one-to-one with the basic steel column without the first heightening steel column installed, and each second heightening steel column is docked and fixed with the corresponding basic steel column; complete the heightening of the steel frame structure of the steel structure workshop.

2. The construction method of a heightened steel structure factory building according to claim 1, characterized in that: The roof steel structure includes multiple groups of parallel roof supports, and the two ends of each group of roof supports are respectively erected on the tops of two corresponding foundation steel columns and connected to the corresponding foundation steel columns through connecting columns; the lap beam in step S1 is installed between two adjacent connecting columns to disconnect each connecting column from the corresponding foundation steel column.

3. A construction method for heightening a steel structure factory building according to claim 1 or 2, characterized in that: In the step S2, a hydraulic pusher is provided at the end of each sliding guide rail, the setting positions and pushing strokes of the multiple hydraulic pushers on both sides are the same, and a sliding member is installed at the bottom of each lap beam, and the sliding member is slidably provided on the sliding guide rail, and the piston end of the hydraulic pusher is connected to the corresponding sliding member; in the step S3, multiple hydraulic pushers are controlled simultaneously to push the corresponding sliding member to move along the sliding guide rail with the lap beam.

4. A construction method for heightening a steel structure factory building according to claim 1 or 2, characterized in that: A connecting component is fixed to the bottom of each first elevated steel column and each second elevated steel column, and the connecting component includes a base plate and a fixing plate fixed on the base plate, the fixing plate is attached to the side wall of the basic steel column, and the fixing plate and the basic steel column are connected by a plurality of high-strength bolts.

5. A construction method for heightening a steel structure factory building according to claim 1 or 2, characterized in that: Ribbed plates are fixed on each side of the first heightened steel column and the second heightened steel column near the bottom; In step S4, after the second heightened steel column is installed on the roof steel structure, a load-releasing cable is installed on the ribbed plate, one end of the load-releasing cable away from the ribbed plate is fixed to the roof steel structure, and the load-releasing cable is tensioned.

6. A construction method for heightening a steel structure factory building according to claim 1 or 2, characterized in that: A corbel is arranged above each of the foundation steel columns. After step S5, a transverse beam is installed between two adjacent steel columns of each row of foundation steel columns, and a plurality of longitudinal beams are installed between two rows of foundation steel columns, and both ends of the longitudinal beams are fixedly connected to the corbels respectively; and an intermediate structural floor is constructed above the transverse beams and the longitudinal beams.

7. The construction method of a heightened steel structure factory building according to claim 1, characterized in that: In the step S5, when hoisting the roof steel structure, cranes are arranged at the four corners of the roof steel structure, and each crane is connected to a plurality of hoisting points on the roof steel structure.

8. The construction method of a heightened steel structure factory building according to claim 2, characterized in that: In step S4, the second heightened steel column is installed at the lower end of each connecting column on the side of the roof steel structure away from the exposed row of foundation steel columns; in step S5, the first heightened steel column is docked and fixed one by one with the connecting column on the side of the roof steel structure that is not connected to the second heightened column.

9. The construction method of a heightened steel structure factory building according to claim 4, characterized in that: The basic steel column is an I-beam, and the fixing plate is provided with a plurality of pieces; In step S4, when the first heightening steel column is connected to the basic steel column, the web and flange of the basic steel column are clamped between a plurality of fixing plates, and the end surface of the basic steel column abuts against the surface of the fixing plate.

10. The construction method of a heightened steel structure factory building according to claim 5, characterized in that: After step S5, concrete is poured under the ribbed plates of the first and second elevated steel columns, and the connection nodes between the basic steel column and the first elevated steel column on one side and the connection nodes between the basic steel column and the second elevated steel column on the other side are both wrapped in concrete.

Citation Information

Patent Citations

  • Method for increasing heights of roof truss beams of large-span workshops in online manner

    CN102518317A

  • Whole roof system synchronous jacking method

    CN107476597A

  • Construction method for newly-adding community underground space by using synchronous jacking and shifting device

    CN108518081A

  • Integral heightening and installation method of high-span steel structure of steel-making main plant

    CN110512910A

  • Sliding jig frame for temporary supporting of steel roof and using method of sliding jig frame

    CN114562116A