Concrete column reinforcing device and method based on spiral steel strand-arc striking panel

By pasting UHPC prefabricated curved panels on the concrete columns and laying spiral steel strands, the coordinated stress between UHPC and reinforced concrete columns is achieved, and the problem that the existing UHPC cast-in-place reinforced structure and reinforced concrete columns cannot coordinated stress are solved. , improves the reinforcement effect and construction efficiency.

CN118911463APending Publication Date: 2024-11-08XI'AN UNIVERSITY OF ARCHITECTURE AND TECHNOLOGY

Patent Information

Application Number
CN202410967752.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-18
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

The existing UHPC cast-in-place reinforced structure and reinforced concrete column cannot achieve coordinated stress, resulting in a reduced reinforcement effect.

Method used

The concrete column reinforcement device based on spiral steel strand-arced panel is adopted. By pasting UHPC prefabricated arc-arced panels and laying spiral steel strands on the outside, the prestress of the spiral steel strands are used to actively restrain the arc-arced panels. Improve the bonding performance and coordinated stress resistance of the curved panel and concrete column.

Benefits of technology

Improve the bearing capacity and ductility of concrete columns, avoid the impact of UHPC self-shrinkage on interface bonding performance, simplify the reinforcement construction procedures, shorten the construction period, and reduce the cross-section enlargement rate through arc-based design, enhance the constraint efficiency .

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911463A_ABST
    Figure CN118911463A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of concrete structure reinforcing, and discloses a concrete column reinforcing device and method based on spiral steel strand-arc striking panels. The four arc-starting panels are sequentially adhered to the periphery of the outer side of the to-be-reinforced concrete column, and the four arc-starting panels are encircled to form a cylindrical reinforcing part; the arc striking panel is prefabricated by adopting UHPC (Ultra High Performance Concrete); the spiral steel strand is spirally arranged on the outer side of the cylindrical reinforcing piece, and the spiral steel strand is a prestressed steel strand; the starting end of the spiral steel strand starts from the center of the bottom end of the arc starting face plate of the first arc starting face plate and is spirally arranged along the outer side of the cylindrical reinforcing piece from bottom to top till the center of the top end of the arc starting face plate of the first arc starting face plate. According to the invention, active constraint is formed on the cambered surface plate by utilizing the prestress effect of the spiral steel strand, so that the bonding performance between the cambered surface plate and the to-be-reinforced concrete column is improved, the synergistic stress of the cambered surface plate and the concrete column is realized, and the bearing capacity and ductility of the concrete column are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of concrete structure reinforcement, and in particular relates to a concrete column reinforcement device and method based on a spiral steel strand-arc-starting panel. Background Art

[0002] In existing building structures, due to changes in building functions, structural aging, or design and construction of the original structure, the reinforced concrete columns may have insufficient bearing capacity, stiffness, and ductility under long-term design or seismic conditions, which seriously affects the normal use of reinforced concrete structures. Ultra-high performance concrete (UHPC) is a new type of cement-based material with ultra-high strength, high toughness, and high durability. Its compressive strength can generally reach 120MPa and its tensile strength can reach more than 5MPa. The steel fibers in the UHPC matrix can also significantly improve its toughness and compressive deformation capacity. Therefore, in When reinforcing reinforced concrete columns, especially when they are under compression, the use of UHPC sleeve reinforcement has a significant effect; using UHPC instead of traditional concrete for reinforcement can reduce the cross-sectional size of the new structure and has little effect on the stiffness of the existing structure; but the reinforced structure is a secondary stress structure, and the strain of the UHPC reinforced structural layer lags behind that of the existing reinforced concrete column. At the same time, because the peak compressive strain of UHPC is significantly higher than that of ordinary concrete, the strength utilization rate of the UHPC cast-in-place reinforced structural layer is low and the collaborative working performance with the reinforced concrete column is poor, which greatly reduces the reinforcement effect. Summary of the invention

[0003] In view of the technical problems existing in the prior art, the present invention provides a concrete column reinforcement device and method based on spiral steel strands-arc-starting panels to solve the technical problem that the UHPC cast-in-place reinforcement structure and the reinforced concrete column cannot achieve coordinated force, which greatly reduces the reinforcement effect.

[0004] In order to achieve the above object, the technical solution adopted by the present invention is:

[0005] The present invention provides a concrete column reinforcement device based on spiral steel strands and arc-starting panels, comprising four arc-starting panels and spiral steel strands;

[0006] Four arc-starting panels are sequentially pasted around the outer sides of the concrete column to be reinforced, and the four arc-starting panels enclose a cylindrical reinforcement member; wherein the arc-starting panels are prefabricated with UHPC; the inner side of the arc-starting panel is a plane, and the outer side is an arc-starting surface; the highest point of the arc-starting surface is located on the side center axis of the concrete column to be reinforced;

[0007] The spiral steel strand is spirally arranged on the outside of the cylindrical reinforcement member, and the spiral steel strand is a prestressed steel strand; wherein the starting end of the spiral steel strand starts from the bottom center of the arc-starting surface of the first arc-starting panel, and is spirally arranged from bottom to top along the outside of the cylindrical reinforcement member until it terminates at the top center of the arc-starting surface of the first arc-starting panel.

[0008] Furthermore, a cylindrical structural adhesive layer is provided between the arc-starting panel and the concrete column to be reinforced; wherein the cylindrical structural adhesive layer is used to bond and fix the arc-starting panel to the side surface of the concrete column to be reinforced.

[0009] Furthermore, it also includes a steel strand support component, which is arranged between the spiral steel strand and the first arc-starting panel; wherein the steel strand support component is vertically arranged at the highest point of the arc-starting surface of the first arc-starting panel; the first side of the steel strand support component is embedded in the arc-starting surface of the first arc-starting panel, and the second side of the steel strand support component extends to the outside of the arc-starting surface of the first arc-starting panel; when the spiral steel strand passes through the highest point of the arc-starting surface of the first arc-starting panel, it passes through the second side of the steel strand support component.

[0010] Further, it also includes a steel strand anchor;

[0011] The steel strand anchors are distributed on both sides of the steel strand support component, and are arranged at intervals along the long axis direction of the first arc-starting panel, and are located on the spiral path of the spiral steel strand; wherein the first end of the steel strand anchor passes through the first arc-starting panel and is anchored on the side of the concrete column to be reinforced; the second end of the steel strand anchor extends to the outside of the arc-starting surface of the first arc-starting panel and is connected to the spiral steel strand.

[0012] Furthermore, the steel strand anchor comprises an anchoring screw and a lifting eye nut;

[0013] The first end of the anchor screw passes through the first arc-starting panel and is anchored to the side of the concrete column to be reinforced; the second end of the anchor screw extends to the outside of the arc-starting surface of the first arc-starting panel, the eye nut is installed in cooperation with the second end of the anchor screw, and the spiral steel strand passes through the eye hole of the eye nut.

[0014] Furthermore, a support installation groove is opened at the highest point of the arc-starting surface of the first arc-starting panel, and the support installation groove is arranged along the long axis direction of the first arc-starting panel; the first side of the steel strand support component is fixedly arranged in the support installation groove, and the first side of the steel strand support component and the surface of the support installation groove are bonded and fixed together with a panel surface structural adhesive layer.

[0015] Furthermore, the steel strand support component is a groove-shaped steel structure, and an opening of the steel strand support component is arranged toward the outer side of the arc-starting surface of the first arc-starting panel.

[0016] Furthermore, steel strand accommodating grooves are provided on the arc-starting surfaces of the second arc-starting panel, the third arc-starting panel and the fourth arc-starting panel; the steel strand accommodating grooves are along the spiral path of the spiral steel strand and are opened at the contact position between the spiral steel strand and the arc-starting surface of the second arc-starting panel, the third arc-starting panel or the fourth arc-starting panel; the spiral steel strand is cooperatively arranged in the steel strand accommodating groove when passing through the arc-starting surface of the second arc-starting panel, the third arc-starting panel or the fourth arc-starting panel.

[0017] Furthermore, the concrete column to be reinforced is a reinforced concrete column, and the cross-section of the reinforced concrete column is a rectangular structure.

[0018] The present invention also provides a method for reinforcing a concrete column based on a spiral steel strand-arc-starting panel, using the device for reinforcing a concrete column based on a spiral steel strand-arc-starting panel;

[0019] The method for reinforcing a concrete column based on a spiral steel strand-arc-starting panel comprises the following steps:

[0020] Paste four arc-starting panels in sequence on the areas to be reinforced around the outer sides of the concrete column to be reinforced, and enclose them to form a cylindrical reinforcement member;

[0021] Helically arranging the spiral steel strand on the outside of the cylindrical reinforcement member;

[0022] Prestress is applied to the spiral steel strand to make the spiral steel strand in close contact with the arc-starting panel.

[0023] Compared with the prior art, the present invention has the following beneficial effects:

[0024] The present invention provides a concrete column reinforcement device and method based on spiral steel strand-arc-starting panel, wherein four arc-starting panels prefabricated from UHPC are pasted on the sides of the concrete column to be reinforced, and spiral steel strands are arranged on the outer sides of the arc-starting panels to fix the arc-starting panels and apply active constraints; the prestressed effect of the spiral steel strands is used to form active constraints on the arc-starting panels, thereby improving the bonding performance between the arc-starting panels and the concrete column to be reinforced, thereby achieving coordinated force between the arc-starting panels and the concrete column, playing the role of shear resistance and enhanced protection, thereby improving the bearing capacity of the concrete column. and ductility; secondly, the use of UHPC prefabricated arc-starting panels can give full play to the ultra-high strength of UHPC, avoid the self-shrinkage of UHPC during cast-in-place, and avoid on-site casting and maintenance; at the same time, it can not only avoid the adverse effects of early shrinkage of cast-in-place UHPC on the interface bonding performance, but also simplify the reinforcement construction procedures and greatly shorten the construction period; in addition, by setting up arc-starting panels, the cross-sectional increase rate of concrete columns can be reduced, and the rectangular cross-section of concrete columns can be rounded, which can weaken the stress concentration at the corners, increase the effective constraint area of ​​the concrete column, and improve the constraint efficiency of the spiral steel strand.

[0025] Furthermore, by arranging a steel strand support component between the spiral steel strand and the first arc-starting panel, the spiral steel strand is supported by the steel strand support component, thereby facilitating application of prestress to the spiral steel strand.

[0026] Furthermore, the spiral steel strand is connected to the concrete column to be reinforced by using a steel strand anchor, which can achieve precise positioning of the spiral steel strand and enhance the active restraint effect of the spiral steel strand, thereby ensuring the integrity of the reinforcement device.

[0027] Furthermore, the steel strand anchor adopts a combined structure of an anchoring screw and a lifting eye nut, and the spiral steel strand is penetrated into the lifting eye hole of the lifting eye nut to avoid interference when prestressing the spiral steel strand; at the same time, it is easy to install the steel strand.

[0028] Furthermore, by providing a steel strand placement groove on the arc-starting panel, the spiral steel strand is prevented from slipping on the arc-starting panel, thereby improving the reliability of the device. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 It is a schematic diagram of the overall structure of the concrete column reinforcement device of the present invention;

[0030] Figure 2 is a cross-sectional view of the concrete column reinforcement device of the present invention;

[0031] Figure 3 It is a schematic diagram of the assembly structure of the arc-starting panel and the steel strand support component in the present invention.

[0032] Among them, 1 is an arc-starting panel, 2 is a steel strand supporting component, 3 is a spiral steel strand, 4 is a steel strand anchor, 5 is a column structure adhesive layer, 6 is a plate structure adhesive layer; 11 is a steel strand placement groove; 100 is a concrete column to be reinforced. DETAILED DESCRIPTION

[0033] In order to make the technical problems, technical solutions and beneficial effects solved by the present invention more clearly understood, the present invention is further described in detail in the following specific embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0034] Take the reinforcement process of a reinforced concrete column as an example; the cross section of the reinforced concrete column is a rectangular structure; as shown in the attached Figure 1-3 As shown, the present invention provides a concrete column reinforcement device based on spiral steel strands and arc-starting panels, including four arc-starting panels 1, a steel strand support component 2, a spiral steel strand 3, a steel strand anchor 4, a column structure adhesive layer 5 and a panel structure adhesive layer 6.

[0035] The four arc-starting panels 1 are sequentially pasted on the four outer sides of the concrete column 100 to be reinforced, and the four arc-starting panels 1 are enclosed to form a cylindrical reinforcement member; wherein the cylindrical reinforcement member is a hollow cylindrical structure, the outer edge of the cross-section of the cylindrical reinforcement member is an arc-shaped structure, and the inner edge of the cross-section of the cylindrical reinforcement member is a rectangular structure adapted to the cross-section of the concrete column to be reinforced; the outer surface of the joint of two adjacent arc-starting panels 1 adopts an arc transition to effectively reduce the stress concentration at the corners.

[0036] The inner side of the arc-starting panel 1 is a plane, the outer side of the arc-starting panel 1 is an arc-starting surface, and the long axis of the arc-starting panel 1 is consistent with the axial direction of the concrete column 100 to be reinforced; that is, the inner edge of the cross-section of the arc-starting panel 1 is a straight line, and the outer edge of the cross-section of the arc-starting panel 1 is an arc structure.

[0037] The inner side of the arc-starting panel 1 is adhesively fixedly connected to the side of the concrete column 100 to be reinforced, and the outer side of the arc-starting panel 1 is arranged away from the side of the concrete column 100 to be reinforced; the highest point of the arc-starting surface of the arc-starting panel 1 is located on the side center axis of the concrete column 100 to be reinforced, and the height of the arc-starting surface of the arc-starting panel 1 is designed according to actual engineering conditions; preferably, the thickness of the arc-starting panel 1 is 12-25mm.

[0038] The arc-starting panel 1 is prefabricated with ultra-high performance concrete (UHPC), and the raw materials of the UHPC include cement, fine sand, finely ground quartz sand powder, mineral admixtures, high-efficiency water reducer and steel fiber; wherein the volume content of the steel fiber is 0.5%-1.5%; the compressive strength of the UHPC is greater than or equal to 120MPa, and the tensile strength is greater than or equal to 5MPa; during the prefabrication of the arc-starting panel 1, steam curing method is adopted for prefabrication.

[0039] The spiral steel strand 3 is spirally arranged on the outside of the cylindrical reinforcement. The prestressed steel strand of the spiral steel strand 3 applies prestress through the spiral steel strand 3 to improve the utilization rate of the UHPC material of the arc-starting panel, and at the same time plays an active constraint role, effectively weakening and eliminating the secondary force problem; the combined constraint effect of the spiral steel strand 3 and the arc-starting panel 1 is adopted to improve the compressive deformation capacity of the concrete column 100 to be reinforced, so that the arc-starting panel 1 and the concrete column 100 to be reinforced can be stressed synergistically; specifically, the starting end of the spiral steel strand 3 is opened from the center of the bottom end of the arc-starting surface of the first arc-starting panel, and is spirally arranged from bottom to top along the outside of the cylindrical reinforcement until it terminates at the center of the top end of the arc-starting surface of the first arc-starting panel; it should be noted that the starting end and the ending end of the spiral steel strand 3 are respectively located on both sides of the steel strand support component 2.

[0040] It should be noted that the first arc-starting panel is any one of the four arc-starting panels 1; when one of the four arc-starting panels 1 is recorded as the first arc-starting panel, the remaining three arc-starting panels are respectively recorded as the second arc-starting panel, the third arc-starting panel and the fourth arc-starting panel; wherein, the first arc-starting panel and the fourth arc-starting panel are arranged opposite to each other, and the second arc-starting panel and the third arc-starting panel are respectively located at both ends of the first arc-starting panel; the first arc-starting panel is bonded and fixed to the first side surface of the concrete column 100 to be reinforced, the second arc-starting panel is bonded and fixed to the second side surface of the concrete column 100 to be reinforced, the third arc-starting panel is bonded and fixed to the third side surface of the concrete column 100 to be reinforced, and the fourth arc-starting panel is bonded and fixed to the fourth side surface of the concrete column 100 to be reinforced.

[0041] The arc-starting surfaces of the second arc-starting panel, the third arc-starting panel and the fourth arc-starting panel are all provided with steel strand accommodating grooves 11, which are used to position the spiral steel strand 3, so as to prevent the spiral steel strand 3 from slipping on the arc-starting surface of the arc-starting panel 1, thereby ensuring the reliability of the device; the steel strand accommodating grooves 11 are along the spiral path of the spiral steel strand 3, and are opened at the contact position between the spiral steel strand 3 and the arc-starting surface of the second arc-starting panel, the third arc-starting panel or the fourth arc-starting panel; the spiral steel strand 3 is cooperatively arranged in the steel strand accommodating grooves 11 when passing through the arc-starting surface of the second arc-starting panel, the third arc-starting panel or the fourth arc-starting panel; wherein, the opening depth of the steel strand accommodating grooves 11 is adaptively designed according to the different contact positions between the spiral steel strand 3 and the arc-starting panel 1.

[0042] A support installation groove is opened at the highest point of the arc-starting surface of the first arc-starting panel, and the support installation groove is arranged along the long axis direction of the first arc-starting panel; wherein, the support installation groove is used to install the steel strand support component 2; specifically, the support installation groove is an open groove structure, and the cross-sectional shape of the support installation groove matches the cross-sectional shape of the steel strand support component 2; the long axis centerline of the support installation groove coincides with the line connecting the highest point of the arc-starting surface of the first arc-starting panel, and the opening of the support installation groove is connected with the arc-starting surface of the first arc-starting panel; preferably, the support installation groove is a U-shaped groove structure.

[0043] The steel strand support component 2 is cooperatively arranged in the support installation groove and placed between the spiral steel strand 3 and the first arc-starting panel; specifically, the steel strand support component 2 is vertically arranged at the highest point of the arc-starting surface of the first arc-starting panel, that is, cooperatively installed in the support installation groove; the first side of the steel strand support component 2 is embedded in the support installation groove, and the second side of the steel strand support component 2 extends to the outside of the support installation groove; when the spiral steel strand 3 passes through the highest point of the arc-starting surface of the first arc-starting panel, it penetrates The second side of the steel strand support component 2 is arranged; preferably, the steel strand support component 2 is a groove-shaped steel structure, and the opening of the steel strand support component 2 is arranged toward the outer side of the arc-starting surface of the first arc-starting panel; the web of the steel strand support component 2 is bonded and fixed to the bottom of the support installation groove, and the two side flanges of the steel strand support component 2 are respectively bonded and fixed to the groove wall of the support installation groove; when the spiral steel strand 3 passes through the steel strand support component 2, it is arranged by sequentially passing through the preset holes on the two side flanges of the steel strand support component 2.

[0044] The steel strand anchors 4 are distributed on both sides of the steel strand support component 2, and are arranged at intervals along the long axis direction of the first arc-starting surface, and are located on the spiral path of the bolt steel strand 3; wherein, the first end of the steel strand anchor 4 passes through the first arc-starting panel and is anchored on the side of the concrete column 100 to be reinforced; the second end of the steel strand anchor 4 extends to the outside of the arc-starting surface of the first arc-starting panel and is connected to the spiral steel strand 3.

[0045] Specifically, reserved through holes are distributed on both sides of the support installation groove of the first arc-starting panel, and the reserved through holes are arranged at intervals along the long axis direction of the first arc-starting panel, and are all located on the spiral path of the spiral steel strand 3; wherein, the two ends of the reserved through holes are respectively connected to the plane and the arc-starting surface of the first arc-starting panel; preset holes are drilled correspondingly to the first side surface of the concrete column 100 to be reinforced, and the preset holes are arranged one-to-one with the reserved through holes; the first end of the steel strand anchor 4 passes through the reserved through hole and is anchored in the preset drill hole.

[0046] The steel strand anchor 4 includes an anchor screw and a lifting eye nut, wherein the first end of the anchor screw passes through the reserved through hole on the first arc-starting panel and is anchored in the preset drilled hole of the concrete column 100 to be reinforced; wherein the anchor screw and the reserved through hole are sealed; the lifting eye nut is installed in cooperation with the second end portion of the anchor screw, and the spiral steel strand 3 passes through the lifting eye hole of the lifting eye nut.

[0047] The cylindrical structural adhesive layer 5 is arranged between the arc-starting panel 1 and the concrete column 100 to be reinforced, and is used to bond and fix the arc-starting panel 1 to the side of the concrete column 100 to be reinforced; wherein, one side of the cylindrical structural adhesive layer 5 is bonded and fixed to the plane side of the arc-starting panel 1, and the other side of the cylindrical structural adhesive layer 5 is bonded and fixed to the side of the concrete column 100 to be reinforced; preferably, the cylindrical structural adhesive layer 5 adopts organic structural adhesive or inorganic structural adhesive.

[0048] The panel surface structural adhesive layer 6 is arranged between the steel strand support component 4 and the surface of the support installation groove, and is used to bond and fix the steel strand support component 4 in the support installation groove of the first arc-starting panel; wherein, one side of the panel surface structural adhesive layer 6 is bonded and fixed to the surface of the support installation groove, and the other side of the panel surface structural adhesive layer 6 is bonded and fixed to the first side outer surface of the steel strand support component 4.

[0049] The concrete column reinforcement device and method described in the present invention utilize UHPC to prefabricate an arc-starting panel, and perform arc surface processing on the outer side of the arc-starting panel to form an arc-starting surface, which can reduce the use of building area, weaken stress concentration at corners, increase the effective constraint area of ​​the original square column, and improve the constraint efficiency; spiral steel strands are spirally arranged on the outer side of the arc-starting panel, and prestressed, so as to form active constraints on the concrete column to be reinforced and the arc-starting panel, so as to improve the bearing capacity and ductility of the reinforced concrete column; at the same time, the bonding performance between the arc-starting panel and the concrete column is effectively improved, which plays a role in shear resistance and enhanced protection; the spiral steel strands are positioned by using steel strand support components and steel strand anchors, which is convenient for the prestressing operation of the spiral steel strands, and can ensure the installation accuracy and reliable use of the spiral steel strands.

[0050] Reinforcement methods and construction process:

[0051] During the construction of the concrete column reinforcement device based on spiral steel strands and arc-starting panels described in the present invention, firstly, four arc-starting panels 1 are sequentially pasted on the outer sides of the concrete column 100 to be reinforced around the area to be reinforced, and they are enclosed to form a cylindrical reinforcement member; then, the spiral steel strands 3 are spirally arranged on the outer side of the cylindrical reinforcement member; finally, prestress is applied to the spiral steel strands 3 so that the spiral steel strands 3 are in close contact with the arc-starting panels 1, and the construction of the concrete column reinforcement device is now completed.

[0052] Specifically, the construction process of the concrete column reinforcement device includes the following steps:

[0053] S1. Determine the structural dimensions of the arc-starting panel 1 according to the height, width and reinforcement range of the concrete column 100 to be reinforced; use UHPC to prefabricate the arc-starting panel 1 according to the predetermined structural dimensions of the arc-starting panel 1; wherein, during the prefabrication process, preset support installation grooves and reserved through holes are used on the first arc-starting panel.

[0054] S2. Drilling preset holes at corresponding positions of the first side surface of the concrete column 100 to be reinforced according to the preset reserved through holes on the first arc-starting panel.

[0055] S3. Apply structural adhesive on the plane side of the arc-starting panel 1; perform surface treatment and cleaning on the area to be reinforced of the concrete column 100 to be reinforced, and apply a sufficient amount of structural adhesive after the area to be reinforced of the concrete column 100 to be reinforced is clean and dry; then, bond the plane side of the arc-starting panel 1 coated with structural adhesive to the area to be reinforced of the reinforced concrete column 100 to be reinforced coated with structural adhesive, so as to form a cylindrical structural adhesive layer 5 between the arc-starting panel 1 and the reinforced concrete column 100 to be reinforced.

[0056] S4. After the cylindrical structural adhesive layer 5 is cured, the anchoring screw is passed through the reserved through hole and anchored in the preset drilled hole; then, the eye nut is installed on the exposed end of the anchoring screw.

[0057] S5. Apply structural adhesive on the surface of the support installation groove and the first side outer surface of the steel strand support component 4 respectively, and then arrange the first side of the steel strand support component 4 in the support installation groove to form a board surface structural adhesive layer 6 between the steel strand support component 4 and the support installation groove.

[0058] S6. According to the spiral path of the spiral steel strand 3, steel strand placement grooves 11 are respectively opened on the arc-starting surfaces of the second arc-starting panel, the third arc-starting panel and the fourth arc-starting panel.

[0059] S7. Install and tension the spiral steel strand 3 to apply prestress, so that the spiral steel strand 3 is in close contact with the arc-starting panel 1, and the composite reinforcement work of the concrete column is completed.

[0060] The concrete column reinforcement device and method disclosed in the present invention adopt UHPC casting and prefabricate arc-starting panels through steam curing, and directly stick the arc-starting panels to the sides of the concrete columns to be reinforced, which can give full play to the ultra-high strength of UHPC, avoid the self-shrinkage of UHPC during casting, and avoid on-site casting and curing; prefabricating ultra-high performance concrete into thin plates and sticking them on the surface of concrete columns not only avoids the adverse effects of early shrinkage of cast-in-place UHPC on interface bonding performance, but also simplifies the reinforcement construction procedure and greatly shortens the construction period; structural adhesive layers are arranged between the arc-starting panel and the concrete column, as well as between the steel strand support component and the arc-starting panel, and they are bonded and fixed by structural adhesive, and the bonding effect is effective and convenient and fast.

[0061] In the present invention, the arc-starting panel is designed to be circular, and the arc-starting panel is adhered to the four sides of the concrete column by using the cylindrical structural adhesive layer; a groove is opened on the arc-starting panel, and the steel strand support component is fixed on the arc-starting panel, and the spiral steel strand is tensioned on the outside of the arc-starting panel by using the steel strand support component, the anchor screw and the eye nut; wherein one end of the anchor screw is placed on the periphery of the arc-starting panel, and the other end passes through the reserved hole of the arc-starting panel and is inserted into the body of the concrete column; the arc-starting panel and the concrete column to be reinforced are bonded and fixed by the cylindrical structural adhesive layer, and the prestressed steel strand is surrounded, so as to fix the arc-starting UHPC thin plate and exert active constraints, the construction is simple and efficient, the reinforcement effect is good without increasing the cross-sectional size, and the stiffness, strength and durability of the reinforced concrete column can be effectively improved.

[0062] The above embodiment is only one of the implementation methods that can realize the technical solution of the present invention. The scope of protection claimed by the present invention is not limited only to this embodiment, but also includes changes, replacements and other implementation methods that can be easily thought of by any technician familiar with the technical field within the technical scope disclosed by the present invention.

Claims

1. A concrete column reinforcement device based on spiral steel strand-arc-starting panel, characterized in that: It comprises four arc-starting panels (1) and spiral steel strands (3); Four arc-starting panels (1) are sequentially pasted around the outer sides of the concrete column (100) to be reinforced, and the four arc-starting panels (1) are combined to form a cylindrical reinforcement member; wherein the arc-starting panels (1) are prefabricated using UHPC; the inner side of the arc-starting panel (1) is a plane, and the outer side is an arc-starting surface; the highest point of the arc-starting surface is located on the side center axis of the concrete column (100) to be reinforced; The spiral steel strand (3) is spirally arranged on the outside of the tubular reinforcement member, and the spiral steel strand (3) is a prestressed steel strand; wherein the starting end of the spiral steel strand (3) starts from the bottom center of the arc-starting surface of the first arc-starting panel, and is spirally arranged from bottom to top along the outside of the tubular reinforcement member until it terminates at the top center of the arc-starting surface of the first arc-starting panel.

2. A concrete column reinforcement device based on spiral steel strand-arc-starting panel according to claim 1, characterized in that: A cylindrical structural adhesive layer (5) is also provided between the arc-starting panel (1) and the concrete column (100) to be reinforced; wherein the cylindrical structural adhesive layer (5) is used to bond and fix the arc-starting panel (1) to the side surface of the concrete column (100) to be reinforced.

3. A concrete column reinforcement device based on spiral steel strand-arc-starting panel according to claim 1, characterized in that: It also includes a steel strand support component (2), which is arranged between the spiral steel strand (3) and the first arc-starting panel; wherein the steel strand support component (2) is vertically arranged at the highest point of the arc-starting surface of the first arc-starting panel; the first side of the steel strand support component (2) is embedded in the arc-starting surface of the first arc-starting panel, and the second side of the steel strand support component (2) extends to the outside of the arc-starting surface of the first arc-starting panel; when the spiral steel strand (3) passes through the highest point of the arc-starting surface of the first arc-starting panel, it passes through the second side of the steel strand support component (2).

4. A concrete column reinforcement device based on spiral steel strand-arc-starting panel according to claim 3, characterized in that: Also included is a steel strand anchor (4); The steel strand anchors (4) are distributed on both sides of the steel strand support component (2), and are arranged at intervals along the long axis direction of the first arc-starting panel, and are located on the spiral path of the spiral steel strand (3); wherein the first end of the steel strand anchor (4) passes through the first arc-starting panel and is anchored on the side of the concrete column (100) to be reinforced; the second end of the steel strand anchor (4) extends to the outside of the arc-starting surface of the first arc-starting panel and is connected to the spiral steel strand (3).

5. A concrete column reinforcement device based on spiral steel strand-arc-starting panel according to claim 4, characterized in that: The steel strand anchor (4) comprises an anchoring screw and a lifting eye nut; The first end of the anchoring screw passes through the first arc-starting panel and is anchored on the side of the concrete column (100) to be reinforced; the second end of the anchoring screw extends to the outside of the arc-starting surface of the first arc-starting panel, the eye nut is mounted on the second end of the anchoring screw, and the spiral steel strand (3) passes through the eye hole of the eye nut.

6. A concrete column reinforcement device based on spiral steel strand-arc-starting panel according to claim 3, characterized in that: A support installation groove is provided at the highest point of the arc-starting surface of the first arc-starting panel, and the support installation groove is arranged along the long axis direction of the first arc-starting panel; the first side of the steel strand support component (2) is fixedly arranged in the support installation groove, and the first side of the steel strand support component (2) and the surface of the support installation groove are bonded and fixed together using a panel surface structural adhesive layer (6).

7. A concrete column reinforcement device based on spiral steel strand-arc-starting panel according to claim 3, characterized in that: The steel strand support component (2) is a groove-shaped steel structure, and the opening of the steel strand support component (2) is arranged toward the outer side of the arc-starting surface of the first arc-starting panel.

8. The concrete column reinforcement device based on spiral steel strand-arc-starting panel according to claim 3 is characterized in that: The arc-starting surfaces of the second arc-starting panel, the third arc-starting panel and the fourth arc-starting panel are all provided with steel strand placement grooves (11); the steel strand placement grooves (11) are along the spiral path of the spiral steel strand (3) and are provided at the contact position between the spiral steel strand (3) and the arc-starting surface of the second arc-starting panel, the third arc-starting panel or the fourth arc-starting panel; the spiral steel strand (3) is cooperatively arranged in the steel strand placement grooves (11) when passing through the arc-starting surface of the second arc-starting panel, the third arc-starting panel or the fourth arc-starting panel.

9. A concrete column reinforcement device based on spiral steel strand-arc-starting panel according to claim 1, characterized in that: The concrete column (100) to be reinforced is a reinforced concrete column, and the cross section of the reinforced concrete column is a rectangular structure.

10. A method for reinforcing concrete columns based on spiral steel strands and arc-starting panels, characterized in that: A concrete column reinforcement device based on spiral steel strand-arc-starting panel as described in any one of claims 1 to 9; The method for reinforcing a concrete column based on a spiral steel strand-arc-starting panel comprises the following steps: The four arc-starting panels (1) are sequentially pasted on the areas to be reinforced around the outer sides of the concrete column (100) to be reinforced, and enclosed to form a cylindrical reinforcement member; Helically arranging the spiral steel strand (3) on the outside of the cylindrical reinforcement member; Prestress is applied to the spiral steel strand (3) so that the spiral steel strand (3) is in close contact with the arc-starting panel (1).

Citation Information

Patent Citations

  • Tensioned anchorage system for prestress steel strand reinforced concrete pillar

    CN101812924A

  • Embedded external prestress implementation system and reinforced RC column construction method thereof

    CN112096108A

  • External prestressed steel strand-UHPC (Ultra High Performance Concrete) composite reinforced concrete column and construction method thereof

    CN117449533A

  • JP1973053525A

  • The cross-lined steel wire rope support and thereinforcement method of construction using of thecross-lined steel wire rope support

    KR1020050061435A

Cited By

  • A spiral annular prestressed and uhpc plate shell collaborative constrained concrete column ductility reinforcement structure and a reinforcement method thereof

    CN122728480A