Strong and weak alternate control continuous mining and continuous filling process

By adopting a continuous mining and filling process with alternating strength and weakness control in coal mining, combined with the coordinated bearing role of odd and even tunnels, the problem of high filling costs and mismatch of surface subsidence control is solved, and surrounding rock stability and filling are achieved Optimization of the effect reduces filling costs and improves mining efficiency.

CN118911682APending Publication Date: 2024-11-08SHANDONG UNIV OF TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411212884.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-30
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

The existing continuous mining and continuous filling process faces the problem of high filling costs and mismatch of surface subsidence control in coal mining. The excessive strengthening of odd-numbered filling bodies leads to neglecting the stability of surrounding rocks, and the weakening of even-numbered filling bodies leads to intensifying the deformation of covered rocks.

Method used

The continuous production and filling process with alternating strength and weakness control is adopted. By alternately distributing strong and weak control filling branch lanes in a single working surface and between multiple working surfaces, the filling rate and filling body strength are reasonably controlled, and odd and even lanes are used. The coordinated load-bearing effect of the whole negative pressure ventilation system is formed to optimize the filling effect.

Benefits of technology

The reasonable bearing of surrounding rocks is achieved, the filling cost is reduced, the surface subsidence control is optimized, the load bearing capacity of the filling body is maximized, and the near-zero damage mining is achieved. By regulating the strength and filling rate of the filling body, the material is reduced. Slurry cost and improve delivery efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911682A_ABST
    Figure CN118911682A_ABST
Patent Text Reader

Abstract

The invention discloses a strong and weak alternate control continuous mining and continuous filling process, relates to the technical field of coal mine filling mining, and solves the problem of coal mine filling body roof control. According to the strong and weak alternate control continuous mining and filling process, when a single working face is filled, strong control filling branch roadway filling improves the strength and the filling compactness of a filling body, full filling and strong filling are achieved, the strong control filling branch roadway is formed, weak control filling branch roadway filling reduces the strength and the filling compactness of the filling body, insufficient filling and weak filling are achieved, and the weak control filling branch roadway is formed; strong and weak control filling branch roadways are alternately distributed in the working face; and during multi-working-face filling, the strong and weak control filling branch roadways of the adjacent working faces are alternately distributed. Longitudinal and transverse cooperative bearing effects of the filling bodies in different filling stages can be cooperated, the filling rate and the filling body strength are determined according to the overlying strata deformation control grade, the filling cost is reduced, and economic benefits are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of coal mine filling mining, and in particular to a strong-weak alternating control continuous mining and filling process. Background Art

[0002] Backfilling coal mining technology is an important way to release the "three-under pressure coal". The cemented backfilling process is widely used in mining areas with high surface subsidence control levels due to its high deformation control characteristics. Especially in mining of coal under buildings (structures) and pressurized underwater mining, the tunnel-type cemented backfilling coal mining process can stabilize the surrounding rock and reduce structural damage to the surrounding rock. However, it faces problems such as mining-backfilling contradictions and low backfilling efficiency. The continuous mining and backfilling process proposed by this method achieves maximum resource development and controls overburden deformation by rationally arranging the working face.

[0003] At present, the continuous mining and filling technology still faces problems such as high filling cost and mismatch between filling control effect and surface subsidence level control. Existing research shows that the filling body of the odd-numbered lanes serves as the main bearing structure to maintain the stability of the surrounding rock, while the filling body of the even-numbered lanes serves as a supplementary structure to play an auxiliary bearing role. The bearing function of the filling body of the even-numbered tunnel is reflected in the two aspects of longitudinal support and lateral constraint, that is, it cooperates with the filling body of the odd-numbered tunnel in the longitudinal direction and provides lateral constraint for the filling body of the odd-numbered tunnel in the lateral direction ([1]Xu Bin, Li Yongliang, Wang shushuai, et al. Study on the strengthcharacteristics and failure characteristics of the composite load-bearingstructure in the cemented filling field[J]. Construction and BuildingMaterials, 2022, 330: 127242. [2] Xu Bin, Yue Zhongwen, Li Yongliang, et al.Research on the control of overburden deformation by filling ratio ofcementing filling method with continuous mining and continuous backfilling[J]. Environmental science and pollution research international, 2022, 30(10): 26764-26777.). Therefore, the filling of the odd-numbered tunnel is the main controlling factor causing the significant deformation of the overburden structure, and the filling of the even-numbered tunnel should be based on the premise of ensuring that the filling body of the odd-numbered tunnel can exert reasonable bearing capacity. Based on this, the present invention proposes a continuous mining and filling process with strong and weak alternating control according to the overburden deformation control standard. Summary of the invention

[0004] The purpose of the present invention is to provide a strong-weak alternating controlled continuous mining and filling process, which can reasonably control the filling rate and the filling body strength according to the overburden deformation control standard.

[0005] The present invention discloses a continuous mining and filling process with strong and weak alternating control. When a single working face is filled, the filling of the branch tunnels with strong control improves the strength of the filling body and the filling density, realizes full filling and strong filling, and forms a branch tunnel with strong control. The filling of the branch tunnels with weak control reduces the strength of the filling body and the filling density, realizes under-filling and weak filling, and forms a branch tunnel with weak control. The branch tunnels with strong and weak control are alternately distributed within the working face. When multiple working faces are filled, the branch tunnels with strong and weak control are alternately distributed between adjacent working faces.

[0006] The specific steps of the strong and weak alternating control continuous mining and filling process are as follows: (1) Working face layout: The mining area is divided into multiple working faces according to the longwall layout. The working face width is 50-100 m. Transport chute 1, return air chute 2, and cut-eye 3 are excavated in advance along the working face to form a full negative pressure ventilation system. (2) Branch tunnel division: reserve a 5-10 m protection coal pillar 4 next to the cutting eye 3, and divide the remaining working face into several branch tunnels at intervals of 4-6 m along the strike; (3) Strong controlled filling branch tunnel filling: adopt the skip mining method, use the continuous miner and the loader to mine only the coal pillars of the odd-numbered tunnels, and use the anchor trolley to provide simple support for the roof; at the same time, seal the two ends of the adjacent mined branch tunnels, prepare high-strength filling slurry at the filling station on the well, and pump it to the filling branch tunnel through the pipeline, so that the filling body 5 of the strong controlled filling branch tunnel after initial setting is completely connected to the roof, completing the full filling and strong filling of the strong controlled filling branch tunnel, and forming a strong controlled filling branch tunnel; (4) Weakly controlled filling branch tunnel filling: The same method as the strongly controlled filling branch tunnel filling is adopted to mine the coal pillars of the even-numbered tunnels; the two ends of the branch tunnels close to the mined tunnels are blocked, and low-strength filling slurry is prepared at the filling station above the well and pumped to the filling branch tunnels through pipelines. The filling body 6 of the weakly controlled filling branch tunnel after initial setting is not connected to the top, and the under-filling and weak-filling of the weakly controlled filling branch tunnel are completed to form a weakly controlled filling branch tunnel; (5) The adjacent working faces are mined in the same way, with the original return air chute 2 used as the transport chute 1 of the adjacent working face. The strong control filling branch tunnels of the adjacent working faces give priority to the mining of even-numbered tunnels. The even-numbered tunnels are fully filled and strongly filled, while the odd-numbered tunnels are underfilled and weakly filled. After the filling is completed, the strong and weak control filling branch tunnels are alternately distributed within a single working face and between adjacent working faces.

[0007] Beneficial effects of the present invention: Compared with the existing related inventions, the present invention has the following advantages: (1) Through strong and weak alternating control, it not only ensures that the filling body can bear reasonable loads, but also exerts the bearing capacity of the surrounding rock, thereby solving the problem of excessive emphasis on strong control and neglect of surrounding rock stability and weak control leading to aggravated deformation of the overburden; (2) The purpose of filling mining is to achieve near-zero damage mining. According to the surface subsidence level, the filling effect is optimized by adjusting the strong and weak control levels; (3) Through high-strength, fully filled strong control filling branch tunnel filling bodies, the deformation of the overburden structure is controlled to achieve strong support, and by adjusting the strength and under-filling height of the weak control filling branch tunnel filling bodies, the auxiliary bearing function of the even-numbered tunnel filling bodies is maximized; (4) By adjusting the strength and filling rate of the even-numbered tunnel filling bodies, the cost of filling slurry is reduced, the slurry transportation efficiency is improved, and the purpose of reducing costs and increasing efficiency is achieved; (5) Through the coordinated arrangement of multiple working faces, strong and weak alternating control within a single working face and between multiple working faces is achieved. BRIEF DESCRIPTION OF THE DRAWINGS

[0008] Figure 1 It is a schematic diagram of the working surface layout; Figure 2 It is a full negative pressure ventilation system; Figure 3 It is a schematic diagram of filling of a single working surface; Figure 4 This is a schematic diagram of double filling of branch lanes with strong control filling; Figure 5 This is a schematic diagram of the filling body distribution of the strongly controlled filling branch tunnel and the weakly controlled filling branch tunnel.

[0009] Explanation of the reference numerals: transport chute 1, return air chute 2, cut eye 3, protective coal pillar 4, strong control filling branch tunnel filling body 5, weak control filling branch tunnel filling body 6, nylon bag 7. DETAILED DESCRIPTION

[0010] The present invention is further described below in conjunction with the accompanying drawings and specific implementation examples, which are only used to disclose the present invention and are not limited to the examples. After reading the present invention, all equivalent substitutions and modifications made within the principles of the present invention belong to the protection scope of the present invention.

[0011] The working principle of the present invention is as follows: (1) Longitudinal bearing function of the filling body: The filling body of the strongly controlled filling branch tunnel is always in a top-connected state and is responsible for the main bearing of the overburden structure. When the filling body of the weakly controlled filling branch tunnel is in top contact, it plays an auxiliary bearing role and realizes the longitudinal bearing function of the overburden structure by coordinating the bearing capacity of the two-stage filling bodies; (2) Lateral limit constraint function of the filling body of the weakly controlled filling branch tunnel: The filling body of the weakly controlled filling branch tunnel constrains the lateral deformation of the filling body of the strongly controlled filling branch tunnel through the lateral limit, thereby improving the longitudinal bearing capacity of the filling body of the strongly controlled filling branch tunnel and playing an indirect top control role; (3) Cost reduction and efficiency improvement function: By reasonably controlling the filling rate of the weakly controlled filling branch tunnel, the filling volume is reduced, the filling time is shortened and the filling cost is reduced; (4) Full negative pressure ventilation system: Before the working face is filled, the fresh air is transferred from the transport chute to the return air chute through the cut eye. After the working face is filled, the cut eye is closed and the fresh air is transferred from the transport chute to the return air chute through the filling branch tunnel, thereby fully ensuring circulating ventilation.

[0012] like Figures 1 to 5 As shown, when a single working face is filled, the filling of the strongly controlled filling branch tunnels increases the strength and density of the filling body, achieves full filling and strong filling, and forms a strongly controlled filling branch tunnel; the filling of the weakly controlled filling branch tunnels reduces the strength and density of the filling body, achieves under-filling and weak filling, and forms a weakly controlled filling branch tunnel. The strongly and weakly controlled filling branch tunnels are alternately distributed within the working face; when multiple working faces are filled, the strongly and weakly controlled filling branch tunnels of adjacent working faces are alternately distributed.

[0013] like Figures 1 to 5 As shown in the figure, the specific steps of the strong and weak alternating control continuous mining and filling process are as follows: (1) Working face layout: The mining area is divided into multiple working faces according to the longwall layout. The working face width is 50-100 m. Transport drift 1, return air drift 2, and cut-off 3 are excavated in advance along the working face to form a full negative pressure ventilation system. (2) Branch tunnel division: reserve a 5-10 m protection coal pillar 4 next to the cutting eye 3, and divide the remaining working face into several branch tunnels at intervals of 4-6 m along the strike; (3) Strong controlled filling branch tunnel filling: adopt the skip mining method, use the continuous miner and the loader to mine only the coal pillars of the odd-numbered tunnels, and use the anchor trolley to provide simple support for the roof; at the same time, seal the two ends of the adjacent mined branch tunnels, prepare high-strength filling slurry at the filling station on the well, and pump it to the filling branch tunnel through the pipeline, so that the filling body 5 of the strong controlled filling branch tunnel after initial setting is completely connected to the roof, completing the full filling and strong filling of the strong controlled filling branch tunnel, and forming a strong controlled filling branch tunnel; (4) Weakly controlled filling branch tunnel filling: The same method as the strongly controlled filling branch tunnel filling is adopted to mine the coal pillars of the even-numbered tunnels; the two ends of the branch tunnels close to the mined tunnels are blocked, and low-strength filling slurry is prepared at the filling station above the well and pumped to the filling branch tunnels through pipelines. The filling body 6 of the weakly controlled filling branch tunnel after initial setting is not connected to the top, and the under-filling and weak-filling of the weakly controlled filling branch tunnel are completed to form a weakly controlled filling branch tunnel; (5) The adjacent working faces are mined in the same way, with the original return air chute 2 used as the transport chute 1 of the adjacent working face. The strong control filling branch tunnels of the adjacent working faces give priority to the mining of even-numbered tunnels. The even-numbered tunnels are fully filled and strongly filled, while the odd-numbered tunnels are underfilled and weakly filled. After the filling is completed, the strong and weak control filling branch tunnels are alternately distributed within a single working face and between adjacent working faces.

[0014] like Figure 1 , 2 As shown, the strong and weak alternating control continuous mining and filling process adopts a full negative pressure ventilation system. Fresh air enters through the transport chute 1 and is transmitted to the return air chute 2 by the cutting eye 3, forming a ventilation cycle. During the filling of the working face, fresh air is transmitted to the return air chute 2 through the branch tunnel, forming a new ventilation system for each filling stage.

[0015] like Figure 1 , 3 As shown in the figure, the width of the strongly controlled filling branch tunnel and the weakly controlled filling branch tunnel is determined by the working space of mechanical equipment such as the continuous miner loader and the overburden control level. The width of the strongly controlled filling branch tunnel is greater than or equal to the weakly controlled filling branch tunnel, and the width ratio between the two is between 1:1 and 3:2.

[0016] like Figure 1 , 3 As shown, before filling the branch tunnel, the entrance and the end of the tunnel are densely sealed, and the formwork is removed after the filling slurry solidifies. The filling body 5 of the strongly controlled filling branch tunnel is densely connected to the top, and the filling body 6 of the weakly controlled filling branch tunnel is not completely connected to the top. Nylon bags 7 filled with sand are used and stacked above the filling bodies at the entrance and the end of the weakly controlled filling branch tunnel to seal the filling branch tunnel.

[0017] like Figure 1 , 3 As shown in Figures 4 and 5, the filling slurry is made of a mixture of gangue, fly ash, cement and water. The strength of the filling body is controlled by adjusting the proportion of cement and fly ash. The strength of the filling body 5 of the strongly controlled filling branch tunnel is 4~10MPa, and the strength of the filling body 6 of the weakly controlled filling branch tunnel is 2~4MPa. The high-strength slurry used for filling the strongly controlled filling branch tunnel includes coarse-grained gangue mixed slurry and fine-grained gangue mixed slurry. The gangue particle size used in the coarse-grained gangue mixed slurry is between 0~20mm, and the gangue particle size used in the fine-grained gangue mixed slurry is between 0~5mm.

[0018] like Figure 1 , 3As shown in Figure 4, the filling of the strongly controlled filling branch tunnel includes multiple fillings. The initial filling uses coarse-grained gangue mixed slurry. After the slurry is initially solidified, fine-grained gangue mixed slurry is used for secondary filling. Depending on the degree of contact between the filling body and the roof after the secondary filling, it is decided whether to fill again.

[0019] like Figure 1 , 5 As shown, the filling rate and filling body strength of the weakly controlled filling branch tunnels are adjusted according to the surrounding rock stability, surface subsidence control level, odd-numbered tunnel filling body stability and other conditions; when the above conditions are relatively stable, the filling rate and filling body strength can be reduced, and the filling body of the weakly controlled filling branch tunnels is in a state of under-connection to the top, and only plays a role of lateral restraint; when the above conditions are less stable, the filling rate and filling body strength can be increased, and the filling body of the weakly controlled filling branch tunnels is in a state of contact with the top, and plays a role of lateral restraint and bearing; when the above conditions are very stable, no filling is required.

Claims

1. A strong and weak alternating control continuous mining and filling process, characterized in that When filling a single working face, the filling of the strongly controlled filling branch tunnels increases the strength and density of the filling body, achieves full filling and strong filling, and forms strongly controlled filling branch tunnels. The filling of the weakly controlled filling branch tunnels reduces the strength and density of the filling body, achieves under filling and weak filling, and forms weakly controlled filling branch tunnels. The strongly and weakly controlled filling branch tunnels are alternately distributed within the working face; when filling multiple working faces, the strongly and weakly controlled filling branch tunnels of adjacent working faces are alternately distributed.

2. The strong and weak alternating control continuous mining and filling process according to claim 1 is characterized in that The specific steps are as follows: (1) Working face layout: The mining area is divided into multiple working faces according to the longwall layout. The working face width is 50-100 m. The transport chute (1), return air chute (2), and cut-off hole (3) are excavated in advance along the working face to form a full negative pressure ventilation system. (2) Branching: A 5-10 m protective coal pillar (4) is reserved adjacent to the cut (3), and the remaining working face to be mined is divided into several branch tunnels at intervals of 4-6 m along the strike direction; (3) Strong controlled filling branch tunnel filling: adopt the skip mining method, use the continuous miner and the loader to mine only the coal pillars of the odd-numbered tunnels, and use the anchor trolley to provide simple support for the roof; at the same time, seal the two ends of the adjacent mined branch tunnels, prepare high-strength filling slurry at the filling station on the well, and pump it to the filling branch tunnel through the pipeline, so that the filling body (5) of the strong controlled filling branch tunnel after initial setting is completely connected to the roof, completing the full filling and strong filling of the strong controlled filling branch tunnel, and forming a strong controlled filling branch tunnel; (4) Weakly controlled filling branch tunnel filling: The same method as the strongly controlled filling branch tunnel filling is adopted to mine the coal pillars of the even-numbered tunnels; the two ends of the branch tunnels close to the mined tunnels are sealed, and low-strength filling slurry is prepared at the filling station on the well and pumped to the filling branch tunnel through the pipeline. The filling body (6) of the weakly controlled filling branch tunnel after initial setting is not connected to the top, and the under-filling and weak-filling of the weakly controlled filling branch tunnel are completed to form a weakly controlled filling branch tunnel; (5) The adjacent working faces are mined in the same manner, with the original return air chute (2) used as the transport chute (1) of the adjacent working faces. The strongly controlled filling branch tunnels of the adjacent working faces give priority to the mining of even-numbered tunnels, with the even-numbered tunnels being fully filled and strongly filled, and the odd-numbered tunnels being underfilled and weakly filled. After the filling is completed, the strongly and weakly controlled filling branch tunnels are alternately distributed within a single working face and between adjacent working faces.

3. The strong-weak alternating control continuous mining and filling process according to claim 1 is characterized in that: The strong-weak alternating controlled continuous mining and filling process adopts a full negative pressure ventilation system, where fresh air enters through the transport chute (1) and is transferred from the cutting eye (3) to the return air chute (2), forming a ventilation cycle; during the filling of the working face, fresh air is transferred to the return air chute (2) via the branch tunnel, forming a new ventilation system for each filling stage.

4. The strong-weak alternating control continuous mining and filling process according to claim 1 is characterized in that: The width of the strongly controlled filling branch tunnel and the weakly controlled filling branch tunnel is determined by the working space of mechanical equipment such as continuous miners and loaders and the overburden control level. The width of the strongly controlled filling branch tunnel is greater than or equal to the weakly controlled filling branch tunnel, and the width ratio between the two is between 1:1 and 3:

2.

5. The strong-weak alternating control continuous mining and filling process according to claim 1 is characterized in that: Before filling the branch tunnel, the tunnel entrance and the tunnel end are densely sealed, and the template is removed after the filling slurry solidifies. The filling body (5) of the strongly controlled branch tunnel is densely connected to the top, and the filling body (6) of the weakly controlled branch tunnel is not completely connected to the top. Nylon bags are used to fill sand and soil, and are piled above the filling bodies at the tunnel entrance and the tunnel end of the weakly controlled branch tunnel to seal the branch tunnel.

6. The strong-weak alternating control continuous mining and filling process according to claim 1 is characterized in that: The filling slurry is made by mixing gangue, fly ash, cement and water. The strength of the filling body is controlled by adjusting the proportion of cement and fly ash. The strength of the filling body (5) of the strongly controlled filling branch tunnel is 4-10 MPa, and the strength of the filling body (6) of the weakly controlled filling branch tunnel is 2-4 MPa. The high-strength slurry used for filling the strongly controlled filling branch tunnel includes coarse-grained gangue mixed slurry and fine-grained gangue mixed slurry. The gangue particle size used in the coarse-grained gangue mixed slurry is between 0-20 mm, and the gangue particle size used in the fine-grained gangue mixed slurry is between 0-5 mm.

7. The strong-weak alternating control continuous mining and filling process according to claim 1 is characterized in that: The filling of the branch tunnel with strong controlled filling includes multiple fillings. The initial filling uses coarse-grained gangue mixed slurry. After the slurry is initially solidified, the secondary filling is carried out using fine-grained gangue mixed slurry. Depending on the degree of contact between the filling body and the roof after the secondary filling, it is decided whether to fill again.

8. The strong-weak alternating control continuous mining and filling process according to claim 1 is characterized in that: The filling rate and filling body strength of the weakly controlled filling branch tunnels are adjusted according to the surrounding rock stability, surface subsidence control level, odd-numbered tunnel filling body stability and other conditions; when the above conditions are relatively stable, the filling rate and filling body strength can be reduced, and the filling body of the weakly controlled filling branch tunnels is in a state of under-connection to the top, and only plays a role of lateral restraint; when the above conditions are less stable, the filling rate and filling body strength can be increased, and the filling body of the weakly controlled filling branch tunnels is in a state of contact with the top, playing a role of lateral restraint and bearing; when the above conditions are very stable, no filling is required.