Waste heat power generation circulating water system for iron and steel enterprises and control method of waste heat power generation circulating water system

By automatically adjusting the frequency of the circulating water pump, the problem of circulating water waste in the waste heat generation circulating water system of steel enterprises is solved, the system efficiency and economy are improved, the power consumption is reduced, and production is improved. Ability and competitiveness.

CN118911795APending Publication Date: 2024-11-08ZHENSHI GROUP EASTERN SPECIAL STEEL
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411158631.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-22
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

In the waste heat power generation circulating water system of steel enterprises, due to the unstable main steam flow, the water supply control method of circulating cooling water is wasted, the condenser is supercooled and the unit is poor, which restricts operating efficiency and cost control.

Method used

The calculated frequency value controls the water supply of the circulating water pump, automatically adjusts the frequency of the circulating water pump inverter, and according to the main steam inlet, the circulating water temperature and the condenser vacuum value, ensures that the circulating water always meets production needs and improves the condensation steam The heat exchange efficiency of the device and reduces power waste.

Benefits of technology

Effectively reduce the power consumption of circulating water systems, keep the condensate supercooling degree of minimum, improve the unit operation efficiency, reduce production costs, improve the overall production efficiency, and achieve a power saving rate of 32.43%.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911795A_ABST
    Figure CN118911795A_ABST
Patent Text Reader

Abstract

The invention relates to a waste heat power generation circulating water system for iron and steel enterprises and a control method thereof, and belongs to the field of waste heat power generation circulating water systems. On the basis of production process requirements, economic index requirements and operation control, a PLC control system or a DCS control system is formed to calculate the measured main steam flow, circulating water inlet temperature and condenser vacuum value through a formula to obtain a frequency given value of a circulating water pump frequency converter so as to adjust the water supply amount of a circulating water pump. The power consumption of the circulating water system can be effectively reduced, the subcooling degree of condensed water is kept to be the lowest, and the unit operation efficiency is improved; the production capacity of enterprises is improved, the core competitiveness of the enterprises is enhanced, the production cost is reduced, and the overall production efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a system and a control method thereof, in particular to a waste heat power generation circulating water system for a steel enterprise and a control method thereof, and belongs to the field of waste heat power generation circulating water systems. Background Art

[0002] The gas production of the main steam for waste heat power generation in steel enterprises is unstable due to production factors, and the fluctuation range is large. The circulating cooling water supply control method, according to the traditional quantitative control method of the power plant, is very wasteful. When the main steam flow is reduced, it is easy to produce a large degree of condenser subcooling, poor unit economy, and increased unit heat consumption rate, which restricts the development of the economic indicators of waste heat power generation in steel enterprises.

[0003] A Chinese patent with a publication date of July 11, 2023 and a publication number of CN116412011A discloses an invention patent entitled "A method and system for generating electricity from waste heat of lubricating oil of a steam turbine generator". This patent uses an evaporator to transfer the waste heat carried by the lubricating oil of a steam turbine generator to an organic working fluid, so that the organic working fluid undergoes a phase change after absorbing heat. The organic working fluid that undergoes a phase change converts thermal energy into mechanical energy through an organic Rankine cycle, and drives the generator to output electrical energy, thereby realizing waste heat power generation of lubricating oil of a steam turbine generator; the system of the present invention includes a waste heat absorption system, an organic working fluid circulation system, and a power generation system; the present invention effectively utilizes the waste heat carried by the lubricating oil return oil in the steam turbine generator, thereby reducing energy loss. The system of this patent is not suitable for the waste heat power generation circulating water system of steel enterprises, and the method is also obviously different, so it cannot solve the above-mentioned problems. Summary of the invention

[0004] The purpose of the present invention is to overcome the above-mentioned deficiencies in the prior art and to provide a system with reasonable system design, safety and reliability, which controls the water supply of the circulating water pump through the calculated frequency value, effectively reduces the power consumption of the circulating water system, keeps the condensate water supercooling to the minimum, improves the unit operation efficiency, and reduces the production cost. The system is used for steel enterprise waste heat power generation circulating water system and its control method.

[0005] The technical solution adopted by the present invention to solve the above-mentioned problem is: the waste heat power generation circulating water system for steel enterprises includes a generator, a steam turbine, a condenser system and a circulating water system, and is characterized in that: the condenser system includes a condenser, a circulating water pump and a decondensing water pump, the main steam enters the steam turbine to do work so that the steam turbine drives the generator to generate electricity, the steam that has done work is discharged from the last stage of the low-pressure cylinder of the steam turbine and enters the condenser, the circulating water pump allows the circulating water to flow continuously to absorb and take away the heat so that the steam that has done work is condensed into water in the condenser and a high vacuum is established in the condenser while maintaining the condenser subcooling economic index; the condenser The water is pumped out by the decondensation water pump and finally used as boiler feed water. The improvement of the circulating water system control enables the circulating water to automatically adjust the circulating water pump inverter frequency according to the main steam inlet volume, circulating water temperature, and condenser vacuum value, so that the circulating water volume always maintains the optimal amount required by the production process; it is used to improve the heat exchange efficiency of the condenser, improve the economic indicators such as the subcooling of the condensate and the power waste of the circulating water pump when the circulating water pump is running at a fixed frequency, and completely solve the problem that the manual adjustment of the circulating water pump inverter frequency cannot respond to the fluctuations of the main steam flow and the heat exchange requirements of the condenser in a timely manner, thereby causing power waste and restricting production development.

[0006] Preferably, the present invention also includes a main steam flow meter, the control system adopts PLC or DCS, the steam flow is measured by the main steam flow meter, the temperature is measured by a thermal resistor, the negative pressure is measured by a differential pressure transmitter, and the circulating water pump is driven by a frequency converter to form a closed-loop measurement and control system.

[0007] Preferably, the circulating water pump of the present invention comprises a circulating water pump No. 1, a circulating water pump No. 2 and a circulating water pump No. 3 connected in parallel.

[0008] The present invention also provides a control method for a waste heat power generation circulating water system in a steel enterprise, which is characterized by the following specific steps:

[0009] The value obtained by multiplying the ratio of the real-time measured main steam inlet flow rate to the designed maximum steam inlet flow rate by the ratio of the circulating water inlet temperature to the highest temperature of the circulating water affected by the ambient temperature, multiplying by the difference between the maximum frequency of the circulating water pump and the minimum frequency set for the circulating water pump, adding the minimum frequency set for the circulating water pump, and finally adding the frequency compensation value, is the frequency value of the circulating water pump. The calculation formula is as follows:

[0010] Hz=(Q\Q MAX )*(T / T MAX )*(Hz MAX -Hz Min )+Hz Min +Hz 补偿 ;

[0011] Where: Hz—frequency;

[0012] Q—Main steam flow

[0013] Q MAX —Maximum flow rate of main steam;

[0014] T—circulating water inlet temperature;

[0015] T MAX — Maximum circulating water inlet temperature;

[0016] Hz MAX — Maximum frequency of circulating water pump;

[0017] Hz Min —Minimum frequency of circulating water pump;

[0018] Hz 补偿 —When the condenser vacuum value is >-85Kpa, it is Hz MAX *10%, Hz when condenser vacuum value <-95Kpa Min *-10%.

[0019] Compared with the prior art, the present invention has the following advantages and effects: the overall system design is reasonable, safe and reliable, based on production process requirements, economic index requirements and operation control, forming a PLC control system or a DCS control system to measure the main steam flow, circulating water inlet temperature, condenser vacuum value, and calculate the frequency setting value of the circulating water pump inverter through a formula, thereby adjusting the water supply of the circulating water pump, which can effectively reduce the power consumption of the circulating water system, keep the condensate water subcooling to the minimum, and improve the unit operation efficiency. It can solve the problem of improving the production capacity of enterprises, enhancing the core competitiveness of enterprises, reducing production costs, and improving overall production efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a schematic diagram of the process flow of an embodiment of the present invention for a waste heat power generation circulating water system in a steel enterprise.

[0021] Figure 2 The invention relates to a control method for a waste heat power generation circulating water system in a steel enterprise.

[0022] In the figure: generator 1, steam turbine 2, condenser system 3, circulating water system 4, cooling tower 5, equalizing pressure tank 6, main steam flowmeter 7, condenser 31, circulating water pump 32, decondensing water pump 33; circulating water pump No. 1 32-1, circulating water pump No. 2 32-2, circulating water pump No. 3 32-3; circulating water inlet temperature 41, circulating water outlet temperature 42; condenser steam inlet temperature 311, condenser water temperature 312, condenser vacuum 313. DETAILED DESCRIPTION

[0023] The present invention will be further described in detail below with reference to the accompanying drawings and by way of examples. The following examples are intended to explain the present invention but the present invention is not limited to the following examples.

[0024] Example

[0025] See also Figure 1 to Figure 2 The waste heat power generation circulating water system for steel enterprises in this embodiment includes a generator 1, a steam turbine 2, a condenser system 3, a circulating water system 4, a cooling tower 5 and a pressure equalizing tank 6. The condenser system 3 includes a condenser 31, a circulating water pump 32, a decondensation water pump 33 and an exhauster. The main steam enters the steam turbine 2 to do work so that the steam turbine 2 drives the generator 1 to generate electricity. The steam that has done work is discharged from the last stage of the low-pressure cylinder of the steam turbine 2 and enters the condenser 31. The circulating water pump 32 allows the circulating water to flow continuously to absorb and take away the heat so that the steam that has done work is condensed into water in the condenser 31 and a high vacuum is established in the condenser while maintaining the economic index of the subcooling degree of the condenser 31; the condensed water is extracted by the decondensation water pump 33 and finally used as boiler feed water.

[0026] The improvement of the control of the circulating water system 4 in this embodiment enables the circulating water to automatically adjust the circulating water pump inverter frequency according to the main steam inlet volume, the circulating water temperature, and the condenser vacuum value, so that the circulating water volume always maintains the optimal amount required by the production process; it is used to improve the heat exchange efficiency of the condenser, improve the economic indicators such as the subcooling of the condensate and the power waste of the circulating water pump when the circulating water pump is running at a fixed frequency, and completely solve the problem that the manual adjustment of the circulating water pump inverter frequency cannot respond to the fluctuations of the main steam flow and the heat exchange requirements of the condenser in time, thereby causing power waste and restricting production development.

[0027] The circulating water pumps 32 in this embodiment include a 1# circulating water pump 32-1, a 2# circulating water pump 32-2 and a 3# circulating water pump 32-3.

[0028] The circulating water system 4 in this embodiment is provided with a circulating water inlet temperature 41 and a circulating water outlet temperature 42, and the condenser system 3 is provided with a condenser steam inlet temperature 311, a condenser water temperature 312 and a condenser vacuum degree 313; the main steam inlet amount is measured by the main steam flowmeter 7, and the condenser vacuum value is measured by the condenser vacuum degree 313.

[0029] See also Figure 1 The main function of circulating cooling water in waste heat power generation is to quickly cool the steam exhausted after driving the steam turbine to work and condense it into water to achieve heat exchange after the circulating water enters the condenser 31. During the heat exchange process, the exhaust steam volume is drastically reduced, and a high vacuum is formed in the space originally filled with steam.

[0030] During the entire heat exchange process, the cooling area, cooling water volume and cooling water temperature are important factors to measure whether the most favorable vacuum can be achieved, whether the quality of the condensed water can be guaranteed, and whether the supercooling of the condensed water can be kept to the minimum.

[0031] A notable feature of waste heat power generation in steel enterprises is that the generation of main steam is restricted by production factors, resulting in unstable steam output. At the same time, the circulating water is a closed circulating water system, and the circulating water temperature is greatly affected by the ambient temperature.

[0032] See also Figure 2 In this embodiment, the main steam flow rate, the circulating water inlet temperature 41, and the condenser vacuum value are combined to calculate the circulating water pump variable frequency given value through the PLC system (DCS system), so that the circulating water volume always changes according to the main steam flow rate, the circulating water inlet temperature 41, and the condenser vacuum value.

[0033] The steam production of the main steam for waste heat power generation in steel enterprises is restricted by production factors, the flow rate is unstable, the fluctuation range is large, and the circulating cooling water temperature itself is affected by the ambient temperature. The circulating cooling water supply control method follows the quantitative control method of the power plant, which is very wasteful; the indicators for measuring the efficiency and operating economy of the generator set include condenser subcooling and condenser vacuum value; excessive circulating water volume will increase the power consumption of the circulating pump and the circulating water will take away more heat in the condenser, resulting in high subcooling and poor unit economy; too little circulating water volume will result in a smaller condenser vacuum, a smaller effective enthalpy drop of steam in the turbine, increased steam consumption, lower output, and reduced power generation.

[0034] This embodiment invents the following frequency calculation method by combining the measured main steam flow, circulating water inlet temperature 41, and condenser vacuum value, and obtains the circulating water pump frequency value through PLC system (DCS system) program calculation to adjust the water supply of the circulating water pump 32.

[0035] In this embodiment, the value obtained by multiplying the ratio of the real-time measured main steam inlet flow rate to the designed maximum steam inlet flow rate by the ratio of the circulating water inlet temperature 41 to the highest temperature of the circulating water affected by the ambient temperature, multiplying it by the difference between the maximum frequency of the circulating water pump and the minimum frequency set for the circulating water pump, adding the minimum frequency set for the circulating water pump, and finally adding the frequency compensation value, is the frequency value for controlling the circulating water pump.

[0036] The frequency calculation formula is:

[0037] Hz=(Q\Q MAX )*(T / T MAX )*(Hz MAX -Hz Min )+Hz Min +Hz 补偿 ;

[0038] Where: Hz—frequency;

[0039] Q—Main steam flow

[0040] Q MAX —Maximum flow rate of main steam;

[0041] T—circulating water inlet temperature;

[0042] T MAX — Maximum circulating water inlet temperature;

[0043] Hz MAX — Maximum frequency of circulating water pump;

[0044] Hz Min —Minimum frequency of circulating water pump;

[0045] Hz 补偿 —When the condenser vacuum value is >-85Kpa, it is Hz MAX *10%, Hz when condenser vacuum value <-95Kpa Min *-10%.

[0046] Controlling the circulating water pump through the calculated frequency value can effectively reduce the power consumption of the circulating water system, keep the condensate water subcooling at the lowest level, and improve the unit's operating efficiency. The power saving rate after the transformation is 32.43% compared with before the transformation.

[0047] This embodiment is mainly used to improve the control of the circulating water system, so that the circulating water automatically adjusts the circulating water pump inverter frequency according to the main steam inlet, the circulating water temperature, and the condenser vacuum value, so that the circulating water volume always maintains the optimal amount required by the production process. It is used to improve the heat exchange efficiency of the condenser, improve the economic indicators such as the subcooling of the condensed water and the power waste of the circulating water pump when the circulating water pump is running at a fixed frequency, and completely solve the problem that the circulating water pump inverter frequency cannot respond to the fluctuation of the main steam flow and the heat exchange demand of the condenser in time, thereby causing power waste and other problems that restrict production development.

[0048] This embodiment has low investment cost and high safety, and solves economic indicators such as improving the waste heat power generation production capacity, enhancing the heat exchange efficiency of the condenser, reducing the power consumption of the circulating water pump, and improving the overall operating efficiency of the waste heat power generation unit.

[0049] Through the above description, those skilled in the art can already implement it.

[0050] In addition, it should be noted that the shapes and names of the parts and components of the specific embodiments described in this specification may be different, and the above content described in this specification is only an example of the structure of the present invention. All equivalent changes or simple changes made based on the structure, features and principles described in the patent concept of the present invention are included in the protection scope of the patent of the present invention. Technicians in the technical field to which the present invention belongs can make various modifications or supplements to the specific embodiments described or replace them in a similar manner, as long as they do not deviate from the structure of the present invention or exceed the scope defined by the claims, they should all fall within the protection scope of the present invention.

Claims

1. A waste heat power generation circulating water system for a steel enterprise, comprising a generator, a steam turbine, a condenser system and a circulating water system, characterized in that: The condenser system includes a condenser, a circulating water pump and a decondensing water pump. The main steam enters the steam turbine to perform work so that the steam turbine drives the generator to generate electricity. The steam that has completed the work is discharged from the last stage of the low-pressure cylinder of the steam turbine and enters the condenser. The circulating water pump allows the circulating water to flow continuously to absorb and take away the heat so that the steam that has completed the work is condensed into water in the condenser and a high vacuum of the condenser is established while maintaining the condenser subcooling economic index; the condensed water is pumped out by the decondensing water pump and finally used as boiler feed water. The improvement of the circulating water system control enables the circulating water to automatically adjust the circulating water pump inverter frequency according to the main steam inlet, the circulating water temperature, and the condenser vacuum value, so that the circulating water volume always maintains the optimal amount required by the production process; It is used to improve the heat exchange efficiency of the condenser, improve the economic indicators of condensate subcooling and power waste of the circulating water pump when the circulating water pump is running at a fixed frequency, and completely solve the problem that manual adjustment of the circulating water pump inverter frequency cannot respond to the fluctuation of the main steam flow and the heat exchange requirements of the condenser in time, thereby causing power waste and restricting production development.

2. The waste heat power generation circulating water system for steel enterprises according to claim 1 is characterized by: It also includes a main steam flow meter. The system uses PLC or DCS. The steam flow is measured by the main steam flow meter, the temperature is measured by a thermal resistor, the negative pressure is measured by a differential pressure transmitter, and the circulating water pump is driven by a frequency converter to form a closed-loop measurement and control system.

3. The waste heat power generation circulating water system for steel enterprises according to claim 1 is characterized in that: The circulating water pumps include a No. 1 circulating water pump, a No. 2 circulating water pump and a No. 3 circulating water pump which are connected in parallel.

4. A control method for a waste heat power generation circulating water system in a steel enterprise, using any one of claims 1 to 3, characterized in that: The specific steps are as follows: The value obtained by multiplying the ratio of the real-time measured main steam inlet flow rate to the designed maximum steam inlet flow rate by the ratio of the circulating water inlet temperature to the highest temperature of the circulating water affected by the ambient temperature, multiplying by the difference between the maximum frequency of the circulating water pump and the minimum frequency set for the circulating water pump, adding the minimum frequency set for the circulating water pump, and finally adding the frequency compensation value, is the frequency value of the circulating water pump. The calculation formula is as follows: Hz=(Q\Q MAX )*(T / T MAX )*(Hz MAX -Hz Min )+Hz Min +Hz 补偿 ; Where: Hz—frequency; Q—Main steam flow Q MAX —Maximum flow rate of main steam; T—circulating water inlet temperature; T MAX — Maximum circulating water inlet temperature; Hz MAX — Maximum frequency of circulating water pump; Hz Min —Minimum frequency of circulating water pump; Hz 补偿 —When the condenser vacuum value is >-85Kpa, it is Hz MAX *10%, Hz when condenser vacuum value <-95Kpa Min *-10%.