Optimization control method and device for variable-frequency air-supplying enthalpy-increasing system

By adjusting the compressor frequency and the first-stage throttle valve step in the variable frequency gas replenishment and enthalpy increase system, and optimizing and controlling according to the temperature difference, the problem that the system cannot be adjusted in the actual environment is solved, and performance optimization and energy efficiency improvement are achieved .

CN118912707APending Publication Date: 2024-11-08ZHUHAI GREE REFRIGERATION TECH CENT OF ENERGY SAVING & ENVIRONMENTAL PROTECTION
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411169301.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-23
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

The variable frequency gas replenishment and enthalpy increase system cannot or is difficult to quickly adjust the appropriate control parameters according to the actual operating parameters in the actual working environment, resulting in the inability to effectively perform performance.

Method used

After the start-up operation time of the variable-frequency gas-enhancing system of the water heater is greater than a certain time, the temperature difference between the temperature after the first-stage throttling and the temperature of the enthalpy port is obtained, and the compressor operation frequency or first-stage choke is adjusted according to the difference value. The number of steps of the flow valve is until the difference is within a predetermined range; then the difference between the temperature before the first-stage throttling and the inlet temperature is obtained, and the number of steps of the first-stage throttling valve is adjusted to achieve optimal performance.

Benefits of technology

The system of variable frequency gas replenishment and enthalpy is realized to achieve accurate and rapid adjustment, reach the optimal performance point, and improve the energy efficiency and performance of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118912707A_ABST
    Figure CN118912707A_ABST
Patent Text Reader

Abstract

The invention discloses an optimal control method and device for a variable-frequency air supply enthalpy increasing system. The method comprises the steps that after the start-up operation duration of the variable-frequency air supply enthalpy increasing system of the water heater is larger than first preset duration, a first temperature difference value between the temperature after first-stage throttling and the temperature of an enthalpy increasing opening is obtained; if the temperature difference is not within the preset temperature difference range, the operation frequency of a compressor or the step number of a first-stage throttling valve is adjusted; on the contrary, a second temperature difference value between the temperature before first-stage throttling and the water inlet temperature is obtained; if the temperature difference is not within the preset temperature difference range, the operation frequency of the compressor is controlled to be unchanged, the step number of the first-stage throttling valve is adjusted, and the adjusted step number is obtained; and controlling the variable-frequency air-supplying enthalpy-increasing system to operate according to the operating frequency and the adjusted step number, so that the variable-frequency air-supplying enthalpy-increasing system achieves the optimal performance. According to the invention, the technical problem that the frequency conversion enthalpy increasing system in the prior art cannot or is difficult to quickly adjust a group of appropriate control parameters according to the actual operation parameters in the actual working environment so as to effectively exert the performance of the unit is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of intelligent control technology, and in particular to an optimization control method and device for a variable frequency air supplementation and enthalpy increase system. Background Art

[0002] At present, most of the low ambient temperature air energy heat pump water heaters on the market use air replenishment and enthalpy increase systems, but generally the units can only perform better under standard conditions. It is impossible or difficult to quickly adjust a set of suitable control parameters according to the actual operating parameters to effectively exert the performance of the unit. The limitations are large and affect the use of customers. For non-enthalpy increase systems or fixed-frequency enthalpy increase systems, the difference between the first-stage pre-throttling temperature and the inlet water temperature is usually used as the reference control valve step number. For variable frequency air replenishment and enthalpy increase systems, the first-stage pre-throttling temperature is affected by the frequency, and sometimes it is impossible to accurately find the optimal performance point of the unit when participating in the control.

[0003] To address the above-mentioned problems, no effective solution has been proposed yet. Summary of the invention

[0004] An embodiment of the present invention provides an optimization control method and device for a variable frequency air supply and reheat increasing system, so as to at least solve the technical problem in the related art that the variable frequency reheat increasing system cannot or is difficult to quickly adjust a set of suitable control parameters according to the actual operating parameters in the actual working environment to effectively exert the performance of the unit.

[0005] According to one aspect of an embodiment of the present invention, there is provided an optimization control method for a variable frequency air-injection and reheat-increasing system, comprising: after the startup operation time of the variable frequency air-injection and reheat-increasing system of the water heater is greater than a first predetermined time, obtaining a first temperature difference between the first-stage throttling temperature and the reheat-increasing port temperature of the water heater, wherein the first-stage throttling temperature is the saturation temperature corresponding to the actual pressure of the first-stage throttling valve of the water heater after the first-stage throttling, and the reheat-increasing port temperature is the actual temperature after the solenoid valve in the water heater; when the first temperature difference is not within the predetermined temperature difference range, adjusting the operating frequency of the compressor of the water heater or the number of steps of the first-stage throttling valve of the water heater until the first temperature is within the predetermined temperature range. when the first temperature difference is within the predetermined temperature difference range, obtaining a second temperature difference between the first-stage pre-throttling temperature and the inlet water temperature of the water heater, wherein the first-stage pre-throttling temperature is the actual temperature before the first-stage throttling valve, and the inlet water temperature is the inlet water temperature on the condenser side of the water heater; when the second temperature difference is not within the predetermined temperature difference range, controlling the operating frequency of the compressor to remain unchanged, adjusting the step number of the first-stage throttling valve, and obtaining the adjusted step number; controlling the variable frequency air-injection and re-enthalpy-increasing system to operate according to the operating frequency and the adjusted step number, so that the variable frequency air-injection and re-enthalpy-increasing system achieves optimal performance.

[0006] Optionally, after the startup operation time of the variable frequency air-injection and reheat increasing system of the water heater is greater than a first predetermined time, a first temperature difference between the first-stage throttling temperature and the reheat increasing port temperature of the water heater is obtained, including: after the water heater receives the startup instruction and starts normally, counting the startup operation time of the variable frequency air-injection and reheat increasing system; after the startup operation time reaches the first predetermined time, obtaining the first-stage throttling temperature of the water heater and the reheat increasing port temperature of the water heater; obtaining the temperature difference between the first-stage throttling temperature and the reheat increasing port temperature to obtain the first temperature difference.

[0007] Optionally, when the first temperature difference is not within a predetermined temperature difference range, the operating frequency of the compressor of the water heater or the step number of the first-level throttle valve of the water heater is adjusted until the first temperature difference is within the predetermined temperature difference range, including: comparing the first temperature difference with the minimum value and the maximum value of the predetermined temperature difference range, respectively, to obtain a first comparison result; when the first comparison result indicates that the first temperature difference is less than the minimum value, comparing the first temperature difference with a first value, to obtain a second comparison result, wherein the first value is less than the minimum value; when the second comparison result indicates that the first temperature difference is less than the first value, increasing the operating frequency of the compressor by a first predetermined frequency so that the first temperature difference is within the predetermined temperature difference range; when the second comparison result indicates that the first temperature difference is less than the minimum value and greater than or equal to the first value, adjusting the step number of the first-level throttle valve so that the first temperature difference is within the predetermined temperature difference range.

[0008] Optionally, the optimization control method of the variable frequency air supplement and reheat increasing system also includes: when the first comparison result indicates that the first temperature difference is greater than the maximum value, comparing the first temperature difference with the second value to obtain a third comparison result, wherein the second value is greater than the maximum value; when the third comparison result indicates that the first temperature difference is greater than the second value, increasing the operating frequency of the compressor by a second predetermined frequency so that the first temperature difference is within the predetermined temperature difference range; when the third comparison result indicates that the first temperature difference is less than or equal to the second value and greater than the maximum value, adjusting the number of steps of the first-stage throttle valve so that the first temperature difference is within the predetermined temperature difference range.

[0009] Optionally, when the second temperature difference is not within the predetermined temperature difference range, the operating frequency of the compressor is controlled to remain unchanged, and the step number of the first-level throttle valve is adjusted to obtain the adjusted step number, including: comparing the second temperature difference with the minimum value and the maximum value of the predetermined temperature difference range, respectively, to obtain a fourth comparison result; when the fourth comparison result indicates that the second temperature difference is less than the minimum value, the operating frequency of the compressor is controlled to remain unchanged, and the step number of the first-level throttle valve is increased by a first predetermined number of steps to obtain the adjusted step number; when the fourth comparison result indicates that the second temperature difference is greater than the maximum value, the operating frequency of the compressor is controlled to remain unchanged, and the step number of the first-level throttle valve is reduced by a second predetermined number of steps to obtain the adjusted step number.

[0010] Optionally, when the first temperature difference is within the predetermined temperature difference range, obtaining the second temperature difference between the first-stage pre-throttling temperature and the water inlet temperature of the water heater also includes: recording the current operating frequency of the compressor and the current step number of the first-stage throttling valve.

[0011] Optionally, the optimization control method of the variable frequency air-injection and reheat-increasing system also includes: when the second temperature difference is within the predetermined temperature difference range, controlling the compressor to operate according to the current operating frequency, and controlling the variable frequency air-injection and reheat-increasing system to operate according to the current number of steps, so that the variable frequency air-injection and reheat-increasing system achieves optimal performance.

[0012] According to another aspect of an embodiment of the present invention, an optimization control device for a variable frequency air-injection and reheat-increasing system is also provided, including: a first acquisition module, used to obtain a first temperature difference between the first-stage throttling temperature and the reheat-increasing port temperature of the water heater after the startup operation time of the variable frequency air-injection and reheat-increasing system of the water heater is greater than a first predetermined time, wherein the first-stage throttling temperature is the saturation temperature corresponding to the actual pressure of the first-stage throttling valve of the water heater after the first-stage throttling, and the reheat-increasing port temperature is the actual temperature after the solenoid valve in the water heater; a first adjustment module, used to adjust the operating frequency of the compressor of the water heater or the number of steps of the first-stage throttling valve of the water heater when the first temperature difference is not within a predetermined temperature difference range, until the first temperature difference is within a predetermined temperature difference range. Within the predetermined temperature difference range; a second acquisition module, used for obtaining the second temperature difference between the first-level pre-throttling temperature and the inlet water temperature of the water heater when the first temperature difference is within the predetermined temperature difference range, wherein the first-level pre-throttling temperature is the actual temperature before the first-level throttling valve, and the inlet water temperature is the inlet water temperature on the condenser side of the water heater; a second adjustment module, used for controlling the operating frequency of the compressor to remain unchanged when the second temperature difference is not within the predetermined temperature difference range, and adjusting the step number of the first-level throttling valve to obtain the adjusted step number; a control module, used for controlling the variable frequency air-injection and reheat-injection system to operate according to the operating frequency and the adjusted step number, so that the variable frequency air-injection and reheat-injection system achieves optimal performance.

[0013] Optionally, the first acquisition module includes: a statistical unit, used to count the startup operation time of the variable frequency air-injection and reheat-increasing system after the water heater receives the startup instruction and starts normally; a first acquisition unit, used to obtain the first-level throttling temperature of the water heater and the reheat-increasing port temperature of the water heater after the startup operation time reaches the first predetermined time; a second acquisition unit, used to obtain the temperature difference between the first-level throttling temperature and the reheat-increasing port temperature, to obtain the first temperature difference.

[0014] Optionally, the first adjustment module includes: a first comparison unit, used to compare the first temperature difference with the minimum value and the maximum value of the predetermined temperature difference range respectively to obtain a first comparison result; a second comparison unit, used to compare the first temperature difference with a first numerical value to obtain a second comparison result when the first comparison result indicates that the first temperature difference is less than the minimum value, wherein the first numerical value is less than the minimum value; a first increase unit, used to increase the operating frequency of the compressor by a first predetermined frequency when the second comparison result indicates that the first temperature difference is less than the first numerical value, so that the first temperature difference is within the predetermined temperature difference range; a first adjustment unit, used to adjust the number of steps of the first-stage throttle valve when the second comparison result indicates that the first temperature difference is less than the minimum value and greater than or equal to the first numerical value, so that the first temperature difference is within the predetermined temperature difference range.

[0015] Optionally, the optimization control device of the variable frequency air supplement and reheat increasing system also includes: a third comparison unit, used to compare the first temperature difference with a second value to obtain a third comparison result when the first comparison result indicates that the first temperature difference is greater than the maximum value, wherein the second value is greater than the maximum value; a second increase unit, used to increase the operating frequency of the compressor by a second predetermined frequency when the third comparison result indicates that the first temperature difference is greater than the second value, so that the first temperature difference is within the predetermined temperature difference range; a second adjustment unit, used to adjust the number of steps of the first-stage throttle valve when the third comparison result indicates that the first temperature difference is less than or equal to the second value and greater than the maximum value, so that the first temperature difference is within the predetermined temperature difference range.

[0016] Optionally, the second adjustment module includes: a fourth comparison unit, used to compare the second temperature difference with the minimum value and the maximum value of the predetermined temperature difference range, respectively, to obtain a fourth comparison result; a third increase unit, used to control the operating frequency of the compressor to remain unchanged, and increase the step number of the first-level throttle valve by a first predetermined number of steps to obtain the adjusted step number when the fourth comparison result indicates that the second temperature difference is less than the minimum value; and a decrease unit, used to control the operating frequency of the compressor to remain unchanged, and reduce the step number of the first-level throttle valve by a second predetermined number of steps to obtain the adjusted step number when the fourth comparison result indicates that the second temperature difference is greater than the maximum value.

[0017] Optionally, the optimization control device of the variable frequency air replenishment and enthalpy increase system also includes: a recording unit, which is used to obtain the second temperature difference between the first-stage pre-throttling temperature and the water inlet temperature of the water heater when the first temperature difference is within the predetermined temperature difference range, and record the current operating frequency of the compressor and the current step number of the first-stage throttling valve.

[0018] Optionally, the optimization control device of the variable frequency air inhalation and reheat increase system also includes: a control unit, which is used to control the compressor to operate according to the current operating frequency when the second temperature difference is within the predetermined temperature difference range, and control the variable frequency air inhalation and reheat increase system to operate according to the current number of steps, so that the variable frequency air inhalation and reheat increase system achieves optimal performance.

[0019] According to another aspect of an embodiment of the present invention, an optimization control system for a variable frequency air-injection and reheat-increasing system is also provided, and the optimization control system for the variable frequency air-injection and reheat-increasing system uses any of the optimization control methods for the variable frequency air-injection and reheat-increasing system described above.

[0020] According to another aspect of an embodiment of the present invention, a computer-readable storage medium is further provided, wherein the computer-readable storage medium includes a stored program, wherein the program executes the optimization control method of the variable frequency air supplementation and enthalpy increase system described in any one of the above.

[0021] According to another aspect of an embodiment of the present invention, a processor is further provided, the processor being used to run a program, wherein when the program is run, the optimization control method of the variable frequency air supplementation and enthalpy increase system described in any one of the above is executed.

[0022] According to another aspect of an embodiment of the present invention, a computer program product is provided, including computer instructions, wherein the computer instructions are executed by a processor to implement any one of the above-mentioned optimization control methods for the variable frequency air supplementation and enthalpy increase system.

[0023] In an embodiment of the present invention, after the startup operation time of the variable frequency air-inflation and enthalpy-increasing system of the water heater is greater than the first predetermined time, a first temperature difference between the first-stage throttling temperature and the enthalpy-increasing port temperature of the water heater is obtained, wherein the first-stage throttling temperature is the saturation temperature corresponding to the actual pressure of the first-stage throttling valve of the water heater after the first-stage throttling, and the enthalpy-increasing port temperature is the actual temperature after the solenoid valve in the water heater; when the first temperature difference is not within the predetermined temperature difference range, the operating frequency of the compressor of the water heater or the number of steps of the first-stage throttling valve of the water heater is adjusted until the first temperature difference is within the predetermined temperature difference range. difference range; when the first temperature difference is within the predetermined temperature difference range, obtain the second temperature difference between the first-stage pre-throttling temperature and the inlet water temperature of the water heater, wherein the first-stage pre-throttling temperature is the actual temperature before the first-stage throttling valve, and the inlet water temperature is the inlet water temperature on the condenser side of the water heater; when the second temperature difference is not within the predetermined temperature difference range, control the operating frequency of the compressor to remain unchanged, adjust the number of steps of the first-stage throttling valve, and obtain the adjusted number of steps; control the variable frequency air-injection enthalpy-injection system to operate according to the operating frequency and the adjusted number of steps, so that the variable frequency air-injection enthalpy-injection system can achieve optimal performance. Through the technical solution provided by the present invention, for the variable frequency air supply and reheat increasing system, the difference between the saturation temperature corresponding to the pressure after the first-level throttling and the temperature of the reheat increasing port is used as a reference value for adjusting the number of steps of the first-level throttling valve and the frequency of the compressor, and the number of steps of the first-level valve is fine-tuned according to the difference between the temperature before the first-level throttling and the inlet water temperature as a reference value, thereby achieving the technical effect of accurately and quickly reaching the optimal performance point of the system, improving the energy efficiency and performance of the system, and further solving the technical problem in the related technology that the variable frequency reheat increasing system cannot or is difficult to quickly adjust a set of suitable control parameters according to the actual operating parameters in the actual working environment for effectively exerting the performance of the unit. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of this application. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:

[0025] Figure 1 It is a hardware structure block diagram of a mobile terminal of an optimization control method of a variable frequency air supplementation and enthalpy increase system according to an embodiment of the present invention;

[0026] Figure 2 is a system diagram of an integrated variable frequency air source heat pump water heater unit according to an embodiment of the present invention;

[0027] Figure 3 is a flow chart of an optimization control method for a variable frequency air supplementation and enthalpy increase system according to an embodiment of the present invention;

[0028] Figure 4 is a flow chart of an optional optimization control method of a variable frequency air supplementation and enthalpy increase system according to an embodiment of the present invention;

[0029] Figure 5 Schematic diagram of an optimization control device for a variable frequency air supplementation and enthalpy increase system according to an embodiment of the present invention. DETAILED DESCRIPTION

[0030] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0031] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0032] As introduced in the background technology, the technical problem in the related art is that the variable frequency reheating system cannot or is difficult to quickly adjust a set of appropriate control parameters according to the actual operating parameters in the actual working environment to effectively exert the performance of the unit. In view of the above defects, an optimization control method and device for a variable frequency air supply and reheating system, an optimization control system for a variable frequency air supply and reheating system, a computer-readable storage medium, a processor, and a computer program product are provided in the embodiments of the present invention.

[0033] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0034] The method embodiments provided in the embodiments of the present invention can be executed in a mobile terminal, a computer terminal or a similar computing device. Taking running on a mobile terminal as an example, Figure 1 1 is a hardware structure block diagram of a mobile terminal of an optimization control method for a variable frequency air supplementation and enthalpy increase system according to an embodiment of the present invention. Figure 1 As shown, the mobile terminal may include one or more ( Figure 1Only one is shown in the figure) a processor 102 (the processor 102 may include but is not limited to a processing device such as a microprocessor MCU or a programmable logic device FPGA) and a memory 104 for storing data, wherein the mobile terminal may also include a transmission device 106 and an input / output device 108 for communication functions. It can be understood by those skilled in the art that Figure 1 The structure shown is only for illustration and does not limit the structure of the mobile terminal. Figure 1 More or fewer components as shown, or with Figure 1 Different configurations are shown.

[0035] The memory 104 can be used to store computer programs, for example, software programs and modules of application software, such as the computer program corresponding to the optimization control method of the variable frequency air supplementation and enthalpy increase system in the embodiment of the present invention. The processor 102 executes various functional applications and data processing by running the computer program stored in the memory 104, that is, to implement the above method. The memory 104 may include a high-speed random access memory, and may also include a non-volatile memory, such as one or more magnetic storage devices, flash memory, or other non-volatile solid-state memory. In some examples, the memory 104 may further include a memory remotely arranged relative to the processor 102, and these remote memories can be connected to the mobile terminal via a network. Examples of the above network include but are not limited to the Internet, corporate intranets, local area networks, mobile communication networks and combinations thereof. The transmission device 106 is used to receive or send data via a network. The specific example of the above network may include a wireless network provided by a communication provider of the mobile terminal. In one example, the transmission device 106 includes a network adapter (Network Interface Controller, referred to as NIC), which can be connected to other network devices through a base station so as to communicate with the Internet. In one example, the transmission device 106 may be a radio frequency (RF) module, which is used to communicate with the Internet wirelessly.

[0036] According to an embodiment of the present invention, a method embodiment of an optimization control method for a variable frequency air supplementation and enthalpy increase system is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.

[0037] Figure 2 is a system diagram of an integrated variable frequency air source heat pump water heater unit according to an embodiment of the present invention, such as Figure 2As shown, the description background of the method is an integrated variable frequency air source heat pump hot water unit, wherein the hot water unit adopts a flash evaporator two-stage throttling system, and the flash evaporator two-stage throttling system here may include: a compressor, a condenser, a primary throttling valve, a flash evaporator, a secondary throttling valve, an evaporator, and a gas-liquid separator, etc.

[0038] Among them, the above Figure 2 The unit shown is a water heater. The normal operation of the water heater is the heating mode. When it is operated for a long time under low temperature conditions, the evaporator will be frosted. At this time, the defrost mode needs to be operated to remove the frost on the evaporator. After the defrost is completed, the heating mode will continue to operate (the defrost mode is the cooling mode of the air conditioner). The heating path is as follows: compressor-four-way valve-condenser-first-stage throttle valve-flash evaporator (auxiliary line) / secondary throttle valve (main line)-compressor (auxiliary line) / evaporator (main line)-four-way valve-gas-liquid separator-compressor; the defrost path (opposite to heating) is as follows: compressor-four-way valve-evaporator-secondary throttle valve-first-stage throttle valve-condenser-four-way valve-gas-liquid separator-compressor.

[0039] Figure 3 FIG. 1 is a flow chart of an optimization control method for a variable frequency air supplementation and enthalpy increase system according to an embodiment of the present invention. Figure 3 As shown, the method comprises the following steps:

[0040] Step S302, after the startup operation time of the variable frequency air replenishment and enthalpy increase system of the water heater is greater than the first predetermined time, obtain the first temperature difference between the first-stage throttling temperature and the enthalpy increase port temperature of the water heater, wherein the first-stage throttling temperature is the saturation temperature corresponding to the actual pressure of the first-stage throttling valve of the water heater after the first-stage throttling, and the enthalpy increase port temperature is the actual temperature after the solenoid valve in the water heater.

[0041] Figure 4 FIG. 1 is a flow chart of an optional optimization control method of a variable frequency air supplementation and enthalpy increase system according to an embodiment of the present invention. Figure 4 As shown, after the startup and running time of the variable frequency air-injection and reheat-increasing system of the water heater is greater than 15 minutes (i.e., the first predetermined time), the difference between the saturation temperature corresponding to the first-level throttling pressure of the water heater and the reheat-increasing port temperature is calculated and recorded as difference 1 (i.e., the first temperature difference) to evaluate the performance of the variable frequency air-injection and reheat-increasing system of the water heater and to discover system problems in a timely manner.

[0042] Step S304, when the first temperature difference is not within the predetermined temperature difference range, adjusting the operating frequency of the compressor of the water heater or the number of steps of the primary throttle valve of the water heater until the first temperature difference is within the predetermined temperature difference range.

[0043] In this embodiment, when the difference 1 is not within [-1, 1] (ie, a predetermined temperature range), the operating frequency of the compressor of the water heater or the number of steps of the primary throttle valve of the water heater can be adjusted to make the difference 1 fall within the range.

[0044] Specifically, by comparing the saturation temperature and enthalpy increase temperature after the first-stage throttling, when the two temperatures are close, that is, within the predetermined temperature range, the superheat of the enthalpy increase circuit (flash evaporator-solenoid valve-compressor) is relatively small and there is no liquid, the system performance is optimal at this time. Based on this standard, the two temperatures can be made close by adjusting the compressor frequency and the number of first-stage valve steps.

[0045] Step S306, when the first temperature difference is within a predetermined temperature difference range, obtain a second temperature difference between the first-stage pre-throttling temperature and the inlet water temperature of the water heater, wherein the first-stage pre-throttling temperature is the actual temperature before the first-stage throttling valve, and the inlet water temperature is the inlet water temperature on the condenser side of the water heater.

[0046] like Figure 4 As shown, when the difference 1 is within [-1, 1], the difference between the actual temperature before the first-stage throttling of the water heater and the inlet water temperature is obtained, which is recorded as the difference 2 (ie, the second temperature difference).

[0047] Step S308, when the second temperature difference is not within the predetermined temperature difference range, the operating frequency of the compressor is controlled to remain unchanged, and the step number of the primary throttle valve is adjusted to obtain an adjusted step number.

[0048] In this embodiment, after the saturation temperature and enthalpy increase temperature after the first-stage throttling are adjusted, the actual temperature and the inlet water temperature before the first-stage throttling are compared. When the difference 2 is not within [-1,1], the operating frequency of the compressor is kept unchanged, and only the steps of the first-stage throttling valve are adjusted, and finally the corrected first-stage valve steps are obtained.

[0049] Step S310, controlling the variable frequency air-injection and reheat-increasing system to operate according to the operating frequency and the adjusted number of steps, so that the variable frequency air-injection and reheat-increasing system can achieve optimal performance.

[0050] In this embodiment, controlling the variable frequency air supply and reheat enthalpy increase system to operate according to the operating frequency and the adjusted number of steps can enable the system to maintain optimal performance under different working conditions, effectively improve the system's operating efficiency and energy utilization, and extend the service life of the equipment.

[0051] That is, first determine the compressor frequency, and adjust the number of first-stage valve steps while keeping the compressor frequency unchanged, so that the system can achieve optimal performance.

[0052] It should be noted that the basis for adjusting the number of steps of the first-stage valve mentioned above is: the first-stage valve is the main valve of the system, and the refrigerant flow in the system can be controlled by adjusting the opening of the valve, thereby affecting the heat exchange on the condensing side and the evaporating side; the adjustment method is to use frequency modulation or valve adjustment according to the range of the difference.

[0053] In addition, if the system operates normally according to the actual working conditions, and the ambient water temperature change value does not exceed 5°C within 10 minutes, the second-stage valve step number is automatically adjusted according to the suction superheat by default, and no control adjustment is required.

[0054] From the above, it can be seen that in the embodiment of the present invention, after the startup operation time of the variable frequency air-inflation and reheat-increasing system of the water heater is greater than the first predetermined time, a first temperature difference between the first-stage throttling temperature and the reheat-increasing port temperature of the water heater is obtained, wherein the first-stage throttling temperature is the saturation temperature corresponding to the actual pressure of the first-stage throttling valve of the water heater after the first-stage throttling, and the reheat-increasing port temperature is the actual temperature after the solenoid valve in the water heater; when the first temperature difference is not within the predetermined temperature difference range, the operating frequency of the compressor of the water heater or the number of steps of the first-stage throttling valve of the water heater is adjusted until the first temperature difference is within the predetermined temperature difference range; when the first temperature difference is within the predetermined temperature difference range, a second temperature difference between the first-stage throttling temperature before the water heater and the water inlet temperature is obtained, wherein the first-stage throttling temperature is the first-stage throttling temperature before the first stage throttling. The actual temperature before the valve, the inlet water temperature is the inlet water temperature on the condenser side of the water heater; when the second temperature difference is not within the predetermined temperature difference range, the operating frequency of the compressor is controlled to remain unchanged, and the step number of the first-stage throttling valve is adjusted to obtain the adjusted step number; the variable frequency air-injection reheat increasing system is controlled to operate according to the operating frequency and the adjusted step number, so that the variable frequency air-injection reheat increasing system can achieve the optimal performance, and achieve the variable frequency air-injection reheat increasing system. The difference between the saturation temperature corresponding to the pressure after the first-stage throttling and the enthalpy increase port temperature is used as a reference value for adjusting the first-stage throttling valve steps and the compressor frequency, and the purpose of fine-tuning the first-stage valve steps is based on the difference between the temperature before the first-stage throttling and the inlet water temperature as a reference value, thereby achieving the technical effect of accurately and quickly reaching the optimal performance point of the system and improving the energy efficiency and performance of the system.

[0055] The above-mentioned technical solution provided by the embodiment of the present invention solves the technical problem in the related technology that the variable frequency enthalpy increase system cannot or is difficult to quickly adjust a set of suitable control parameters according to the actual operating parameters in the actual working environment to effectively exert the performance of the unit.

[0056] According to the above embodiment of the present invention, after the startup operation time of the variable frequency air-injection and reheat increasing system of the water heater is greater than the first predetermined time, the first temperature difference between the first-stage throttling temperature and the reheat increasing port temperature of the water heater is obtained, including: after the water heater receives the startup instruction and starts normally, counting the startup operation time of the variable frequency air-injection and reheat increasing system; after the startup operation time reaches the first predetermined time, obtaining the first-stage throttling temperature of the water heater and the reheat increasing port temperature of the water heater; obtaining the temperature difference between the first-stage throttling temperature and the reheat increasing port temperature, and obtaining the first temperature difference.

[0057] In this embodiment, after the water heater receives the power-on command and starts normally, the startup time of the variable frequency air supply and reheat enthalpy increase system is counted. After the system startup time is greater than 15 minutes, the first-stage throttling temperature of the water heater and the reheat increase port temperature of the water heater are obtained, and the difference between the first-stage throttling temperature and the reheat increase temperature is recorded as the difference 1.

[0058] According to the above embodiment of the present invention, when the first temperature difference is not within the predetermined temperature difference range, the operating frequency of the compressor of the water heater or the step number of the first-level throttle valve of the water heater is adjusted until the first temperature difference is within the predetermined temperature difference range, including: comparing the first temperature difference with the minimum value and the maximum value of the predetermined temperature difference range respectively to obtain a first comparison result; when the first comparison result indicates that the first temperature difference is less than the minimum value, comparing the first temperature difference with the first value to obtain a second comparison result, wherein the first value is less than the minimum value; when the second comparison result indicates that the first temperature difference is less than the first value, increasing the operating frequency of the compressor by a first predetermined frequency so that the first temperature difference is within the predetermined temperature difference range; when the second comparison result indicates that the first temperature difference is less than the minimum value and is greater than or equal to the first value, adjusting the step number of the first-level throttle valve so that the first temperature difference is within the predetermined temperature difference range.

[0059] In this embodiment, the difference 1 can be compared with the minimum and maximum values ​​of [-1,1] respectively to determine whether the difference 1 is within [-1,1]. If the difference 1 is less than -1 (i.e., the first comparison result), the frequency is increased or the number of steps of the first-stage valve is decreased. Since the effect of the frequency increase on the change of the difference 1 is greater than that of the valve adjustment, when the difference 1 is less than -5 (i.e., the first numerical value), the frequency increase is used to increase the operating frequency of the compressor by a first predetermined frequency. When the difference 1 is within [-5,-1), the valve adjustment is used to adjust the number of steps of the first-stage throttle valve so that the first temperature difference is within the predetermined temperature difference range.

[0060] According to the above embodiment of the present invention, the optimization control method of the variable frequency air supplement and reheat increasing system also includes: when the first comparison result indicates that the first temperature difference is greater than the maximum value, the first temperature difference is compared with the second value to obtain a third comparison result, wherein the second value is greater than the maximum value; when the third comparison result indicates that the first temperature difference is greater than the second value, the operating frequency of the compressor is increased by a second predetermined frequency so that the first temperature difference is within the predetermined temperature difference range; when the third comparison result indicates that the first temperature difference is less than or equal to the second value and greater than the maximum value, the step number of the first-stage throttle valve is adjusted so that the first temperature difference is within the predetermined temperature difference range.

[0061] In this embodiment, when the difference 1>1, the frequency can be reduced or the number of steps of the first-stage valve can be increased. When the difference 1>5 (i.e., the second value), the frequency reduction method is adopted. When the difference is within (1,5], the valve adjustment method is adopted to make the first temperature difference within the predetermined temperature difference range. By monitoring the temperature difference of the water heater and the difference between the enthalpy increase port temperature, the operating efficiency of the compressor and the number of steps of the first-stage throttle valve can be adjusted in real time to ensure that the temperature of the water heater is always within the predetermined range.

[0062] According to the above embodiment of the present invention, when the second temperature difference is not within the predetermined temperature difference range, the operating frequency of the compressor is controlled to remain unchanged, and the step number of the first-stage throttle valve is adjusted to obtain the adjusted step number, including: comparing the second temperature difference with the minimum value and the maximum value of the predetermined temperature difference range respectively to obtain a fourth comparison result; when the fourth comparison result indicates that the second temperature difference is less than the minimum value, the operating frequency of the compressor is controlled to remain unchanged, and the step number of the first-stage throttle valve is increased by a first predetermined step number to obtain the adjusted step number; when the fourth comparison result indicates that the second temperature difference is greater than the maximum value, the operating frequency of the compressor is controlled to remain unchanged, and the step number of the first-stage throttle valve is reduced by a second predetermined step number to obtain the adjusted step number.

[0063] In this embodiment, the difference 2 (i.e., the second temperature difference, the difference between the first-stage pre-throttling temperature and the inlet water temperature) is compared with the minimum and maximum values ​​of the predetermined temperature difference range to determine whether the difference 2 is within [-1,1]. If the difference 2 is less than -1, the first-stage valve step number needs to be increased; if the difference 2 is greater than 1, the first-stage valve step number needs to be reduced to achieve control and regulation of the system temperature. When the difference 2 exceeds the predetermined range, it indicates that the temperature fluctuates too much, and the water flow needs to be adjusted by increasing or decreasing the first-stage valve step number to keep the system temperature within the set range.

[0064] According to the above embodiment of the present invention, when the first temperature difference is within a predetermined temperature difference range, the second temperature difference between the first-stage pre-throttling temperature of the water heater and the water inlet temperature is obtained, and it also includes: recording the current step number of the first-stage throttling valve of the current operating frequency of the compressor.

[0065] In this embodiment, when the difference 1 is within [-1,1], recording the compressor frequency (i.e., the current operating frequency of the compressor) and the number of first-stage valve steps can help monitor the operating status of the water heater, understand the operating frequency of the water heater and the opening of the throttle valve, and then determine the workload and efficiency of the water heater.

[0066] It should be noted that if the optimal compressor frequency and the number of first-stage valve steps can be determined through the above adjustment means, the optimal number of first-stage valve steps can be determined through the next adjustment means.

[0067] According to the above embodiment of the present invention, the optimization control method of the variable frequency air inhalation and reheat increase system also includes: when the second temperature difference is within a predetermined temperature difference range, controlling the compressor to operate at the current operating frequency, and controlling the variable frequency air inhalation and reheat increase system to operate according to the current number of steps, so that the variable frequency air inhalation and reheat increase system achieves optimal performance.

[0068] In this embodiment, when the difference 2 is within [-1,1], the valve step number is determined to be the optimal first-level valve step number under the working condition, the compressor is controlled to operate according to the current operating frequency, and the variable frequency air supply and reheat increase system is controlled to operate according to the current step number, so that the variable frequency air supply and reheat increase system can achieve optimal performance.

[0069] Through the technical solution provided by the above-mentioned embodiment of the present invention, a control optimization solution for a variable frequency air supply and reheat enthalpy increase system is proposed. This solution uses the difference between the saturation temperature corresponding to the pressure after the first-level throttling and the temperature at the enthalpy increase port as a reference value for adjusting the first-level throttling valve steps and the compressor frequency. After the compressor frequency is determined and the first-level valve steps are initially determined, the first-level valve steps are fine-tuned based on the difference between the temperature before the first-level throttling and the inlet water temperature as a reference value, so as to accurately and quickly reach the optimal performance point of the system.

[0070] That is, the above-mentioned technical scheme provided by the embodiment of the present invention comprehensively considers various factors, adopts a suitable flash evaporator two-stage throttling system, and an advanced adjustment method, which can accurately and quickly find the optimal compressor frequency and valve steps, so that the system can perform at its best, and solves the following technical problems: the general variable frequency air replenishment and reheat increase system can achieve the optimal performance of the unit more quickly and accurately through this control scheme in an actual working environment.

[0071] It should be noted that, for the aforementioned method embodiments, for the sake of simplicity, they are all expressed as a series of action combinations, but those skilled in the art should be aware that the present application is not limited by the described order of actions, because according to the present application, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required by the present application.

[0072] Through the description of the above implementation methods, those skilled in the art can clearly understand that the method according to the above embodiment can be implemented by means of software plus a necessary general hardware platform, and of course by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present application, or the part that contributes to the prior art, can be embodied in the form of a software product, which is stored in a storage medium (such as ROM / RAM, magnetic disk, optical disk), and includes a number of instructions for a terminal device (which can be a mobile phone, computer, server, or network device, etc.) to execute the methods of each embodiment of the present application.

[0073] According to an embodiment of the present invention, there is also provided an optimization control device for a variable frequency air supplementation and enthalpy increase system for implementing the optimization control method for the variable frequency air supplementation and enthalpy increase system. Figure 5 is a schematic diagram of an optimization control device for a variable frequency air supplementation and enthalpy increase system according to an embodiment of the present invention, such as Figure 5 As shown, the device includes: a first acquisition module 501, a first adjustment module 503, a second acquisition module 505, a second adjustment module 507 and a control module 509. The optimization control device of the variable frequency air supplementation and enthalpy increase system is described below.

[0074] The first acquisition module 501 is used to obtain the first temperature difference between the first-stage throttling temperature and the enthalpy increase port temperature of the water heater after the variable frequency air supply and enthalpy increase system of the water heater is started and operated for longer than a first predetermined time, wherein the first-stage throttling temperature is the saturation temperature corresponding to the actual pressure of the first-stage throttling valve of the water heater after the first-stage throttling, and the enthalpy increase port temperature is the actual temperature after the solenoid valve in the water heater.

[0075] The first adjustment module 503 is used to adjust the operating frequency of the compressor of the water heater or the number of steps of the primary throttle valve of the water heater when the first temperature difference is not within the predetermined temperature difference range, until the first temperature difference is within the predetermined temperature difference range.

[0076] The second acquisition module 505 is used to obtain the second temperature difference between the first-stage pre-throttling temperature and the inlet water temperature of the water heater when the first temperature difference is within a predetermined temperature difference range, wherein the first-stage pre-throttling temperature is the actual temperature before the first-stage throttling valve, and the inlet water temperature is the inlet water temperature on the condenser side of the water heater.

[0077] The second adjustment module 507 is used to control the operating frequency of the compressor to remain unchanged and adjust the step number of the primary throttle valve to obtain the adjusted step number when the second temperature difference is not within the predetermined temperature difference range.

[0078] The control module 509 is used to control the variable frequency air-injection and reheat-increasing system to operate according to the operating frequency and the adjusted number of steps, so that the variable frequency air-injection and reheat-increasing system can achieve optimal performance.

[0079] It should be noted here that the above-mentioned first acquisition module 501, first adjustment module 503, second acquisition module 505, second adjustment module 507 and control module 509 correspond to steps S202 to S210 in the above-mentioned embodiments, and the five modules are the same as the instances and application scenarios implemented by the corresponding steps, but are not limited to the contents disclosed in the above-mentioned embodiments.

[0080] As can be seen from the above, in the scheme recorded in the above-mentioned embodiment of the present invention, firstly, the first acquisition module can be used to obtain the first temperature difference between the first-stage throttling temperature and the enthalpy increase port temperature of the water heater after the startup operation time of the variable frequency air-injection enthalpy increase system of the water heater is greater than the first predetermined time, wherein the first-stage throttling temperature is the saturation temperature corresponding to the actual pressure of the first-stage throttling valve of the water heater after the first-stage throttling, and the enthalpy increase port temperature is the actual temperature after the solenoid valve in the water heater; then, the first adjustment module can be used to adjust the operating frequency of the compressor of the water heater or the number of steps of the first-stage throttling valve of the water heater when the first temperature difference is not within the predetermined temperature difference range, until the first temperature difference is within the predetermined temperature difference range; secondly, the second acquisition module can be used to obtain the second temperature difference between the first-stage throttling temperature and the water inlet temperature of the water heater when the first temperature difference is within the predetermined temperature difference range, wherein, The temperature before the first stage throttling is the actual temperature before the first stage throttling valve, and the inlet water temperature is the inlet water temperature on the condenser side of the water heater; then the second adjustment module can be used to control the operating frequency of the compressor to remain unchanged when the second temperature difference is not within the predetermined temperature difference range, and the number of steps of the first stage throttling valve can be adjusted to obtain the adjusted number of steps; finally, the control module can be used to control the variable frequency air supply and reheat increase system to operate according to the operating frequency and the adjusted number of steps, so that the variable frequency air supply and reheat increase system can achieve the optimal performance, and achieve the purpose of using the difference between the saturation temperature corresponding to the pressure after the first stage throttling and the reheat increase port temperature as a reference value for adjusting the number of steps of the first stage throttling valve and the frequency of the compressor for the variable frequency air supply and reheat increase system, and fine-tuning the number of steps of the first stage valve according to the difference between the temperature before the first stage throttling and the inlet water temperature as a reference value, thereby achieving the technical effect of accurately and quickly reaching the optimal performance point of the system and improving the energy efficiency and performance of the system.

[0081] The above-mentioned technical solution provided by the embodiment of the present invention solves the technical problem in the related technology that the variable frequency enthalpy increase system cannot or is difficult to quickly adjust a set of suitable control parameters according to the actual operating parameters in the actual working environment to effectively exert the performance of the unit.

[0082] In an optional embodiment, the first acquisition module includes: a statistical unit, which is used to count the startup operation time of the variable frequency air supply and enthalpy increase system after the water heater receives the startup command and starts normally; a first acquisition unit, which is used to obtain the first-level throttling temperature of the water heater and the enthalpy increase port temperature of the water heater after the startup operation time reaches a first predetermined time; a second acquisition unit, which is used to obtain the temperature difference between the first-level throttling temperature and the enthalpy increase port temperature to obtain a first temperature difference.

[0083] In an optional embodiment, the first adjustment module includes: a first comparison unit, used to compare the first temperature difference with the minimum value and the maximum value of the predetermined temperature difference range respectively to obtain a first comparison result; a second comparison unit, used to compare the first temperature difference with the first numerical value to obtain a second comparison result when the first comparison result indicates that the first temperature difference is less than the minimum value, wherein the first numerical value is less than the minimum value; a first increase unit, used to increase the operating frequency of the compressor by a first predetermined frequency when the second comparison result indicates that the first temperature difference is less than the first numerical value, so that the first temperature difference is within the predetermined temperature difference range; a first adjustment unit, used to adjust the number of steps of the first-stage throttle valve to make the first temperature difference within the predetermined temperature difference range when the second comparison result indicates that the first temperature difference is less than the minimum value and greater than or equal to the first numerical value.

[0084] In an optional embodiment, the optimization control device of the variable frequency air supplement and reheat increasing system also includes: a third comparison unit, which is used to compare the first temperature difference with the second value when the first comparison result indicates that the first temperature difference is greater than the maximum value, so as to obtain a third comparison result, wherein the second value is greater than the maximum value; a second increase unit, which is used to increase the operating frequency of the compressor by a second predetermined frequency when the third comparison result indicates that the first temperature difference is greater than the second value, so that the first temperature difference is within a predetermined temperature difference range; and a second adjustment unit, which is used to adjust the number of steps of the first-stage throttle valve when the third comparison result indicates that the first temperature difference is less than or equal to the second value and greater than the maximum value, so that the first temperature difference is within a predetermined temperature difference range.

[0085] In an optional embodiment, the second adjustment module includes: a fourth comparison unit, used to compare the second temperature difference with the minimum value and the maximum value of the predetermined temperature difference range respectively to obtain a fourth comparison result; a third increase unit, used to control the operating frequency of the compressor to remain unchanged when the fourth comparison result indicates that the second temperature difference is less than the minimum value, and increase the step number of the first-stage throttle valve by a first predetermined number of steps to obtain an adjusted step number; a decrease unit, used to control the operating frequency of the compressor to remain unchanged when the fourth comparison result indicates that the second temperature difference is greater than the maximum value, and reduce the step number of the first-stage throttle valve by a second predetermined number of steps to obtain an adjusted step number.

[0086] In an optional embodiment, the optimization control device of the variable frequency air replenishment and enthalpy increase system also includes: a recording unit, which is used to obtain the second temperature difference between the first-stage pre-throttling temperature and the water inlet temperature of the water heater when the first temperature difference is within a predetermined temperature difference range, and record the current step number of the first-stage throttling valve of the current operating frequency of the compressor.

[0087] In an optional embodiment, the optimization control device of the variable frequency air inhalation and reheat increase system also includes: a control unit, which is used to control the compressor to operate at the current operating frequency when the second temperature difference is within a predetermined temperature difference range, and control the variable frequency air inhalation and reheat increase system to operate according to the current step number, so that the variable frequency air inhalation and reheat increase system achieves optimal performance.

[0088] According to another aspect of an embodiment of the present invention, an optimization control system for a variable frequency air-injection and reheat-increasing system is provided. The optimization control system for a variable frequency air-injection and reheat-increasing system uses any of the above optimization control methods for a variable frequency air-injection and reheat-increasing system.

[0089] According to another aspect of an embodiment of the present invention, a processor is further provided, and the processor is used to run a program, wherein when the program is run, any one of the above-mentioned optimization control methods for the variable frequency air supplementation and enthalpy increase system is executed.

[0090] According to another aspect of an embodiment of the present invention, there is also provided a computer program product, including computer instructions, where the computer instructions are executed by a processor to implement any one of the above-mentioned optimization control methods for the variable frequency air supplementation and enthalpy increase system.

[0091] According to another aspect of an embodiment of the present invention, a computer-readable storage medium is further provided, the computer-readable storage medium comprising a stored program, wherein the program executes any one of the above-mentioned optimization control methods for the variable frequency air supplementation and enthalpy increase system.

[0092] Optionally, in this embodiment, the computer-readable storage medium may be located in any one of the computer terminals in a computer terminal group in a computer network, or in any one of the communication devices in a communication device group.

[0093] Optionally, in this embodiment, the computer-readable storage medium is configured to store program codes for executing the following steps: after the startup operation time of the variable frequency air-injection enthalpy-increasing system of the water heater is greater than a first predetermined time, obtaining a first temperature difference between the first-stage throttling temperature and the enthalpy-increasing port temperature of the water heater, wherein the first-stage throttling temperature is the saturation temperature corresponding to the actual pressure of the first-stage throttling valve of the water heater after the first-stage throttling, and the enthalpy-increasing port temperature is the actual temperature after the solenoid valve in the water heater; when the first temperature difference is not within the predetermined temperature difference range, adjusting the operating frequency of the compressor of the water heater or the number of steps of the first-stage throttling valve of the water heater. Adjust until the first temperature difference is within the predetermined temperature difference range; when the first temperature difference is within the predetermined temperature difference range, obtain the second temperature difference between the first-stage pre-throttling temperature and the inlet water temperature of the water heater, wherein the first-stage pre-throttling temperature is the actual temperature before the first-stage throttling valve, and the inlet water temperature is the inlet water temperature on the condenser side of the water heater; when the second temperature difference is not within the predetermined temperature difference range, control the operating frequency of the compressor to remain unchanged, adjust the step number of the first-stage throttling valve, and obtain the adjusted step number; control the variable frequency air-injection enthalpy-injection system to operate according to the operating frequency and the adjusted step number, so that the variable frequency air-injection enthalpy-injection system can achieve optimal performance.

[0094] Optionally, in this embodiment, the computer-readable storage medium is configured to store program codes for executing the following steps: after the water heater receives a power-on command and starts normally, counting the power-on operation time of the variable frequency air supply and enthalpy increase system; after the power-on operation time reaches a first predetermined time, obtaining the first-stage throttling temperature of the water heater and the enthalpy increase port temperature of the water heater; obtaining the temperature difference between the first-stage throttling temperature and the enthalpy increase port temperature to obtain a first temperature difference.

[0095] Optionally, in this embodiment, the computer-readable storage medium is configured to store program code for performing the following steps: comparing the first temperature difference with the minimum value and the maximum value of a predetermined temperature difference range, respectively, to obtain a first comparison result; when the first comparison result indicates that the first temperature difference is less than the minimum value, comparing the first temperature difference with the first numerical value, to obtain a second comparison result, wherein the first numerical value is less than the minimum value; when the second comparison result indicates that the first temperature difference is less than the first numerical value, increasing the operating frequency of the compressor by a first predetermined frequency so that the first temperature difference is within the predetermined temperature difference range; when the second comparison result indicates that the first temperature difference is less than the minimum value and greater than or equal to the first numerical value, adjusting the number of steps of the first-stage throttle valve so that the first temperature difference is within the predetermined temperature difference range.

[0096] Optionally, in this embodiment, the computer-readable storage medium is configured to store program code for performing the following steps: when the first comparison result indicates that the first temperature difference is greater than a maximum value, comparing the first temperature difference with the second value to obtain a third comparison result, wherein the second value is greater than the maximum value; when the third comparison result indicates that the first temperature difference is greater than the second value, increasing the operating frequency of the compressor by a second predetermined frequency so that the first temperature difference is within a predetermined temperature difference range; when the third comparison result indicates that the first temperature difference is less than or equal to the second value and greater than the maximum value, adjusting the number of steps of the first-stage throttle valve so that the first temperature difference is within the predetermined temperature difference range.

[0097] Optionally, in this embodiment, the computer-readable storage medium is configured to store program code for executing the following steps: comparing the second temperature difference with the minimum value and the maximum value of the predetermined temperature difference range, respectively, to obtain a fourth comparison result; when the fourth comparison result indicates that the second temperature difference is less than the minimum value, controlling the operating frequency of the compressor to remain unchanged, and increasing the number of steps of the first-stage throttle valve by a first predetermined number of steps to obtain an adjusted number of steps; when the fourth comparison result indicates that the second temperature difference is greater than the maximum value, controlling the operating frequency of the compressor to remain unchanged, and reducing the number of steps of the first-stage throttle valve by a second predetermined number of steps to obtain an adjusted number of steps.

[0098] Optionally, in this embodiment, the computer-readable storage medium is configured to store program codes for executing the following steps: recording the current operating frequency of the compressor and the current step number of the primary throttle valve.

[0099] Optionally, in this embodiment, the computer-readable storage medium is configured to store program codes for executing the following steps: when the second temperature difference is within a predetermined temperature difference range, controlling the compressor to operate at the current operating frequency, and controlling the variable frequency air supply and reheat increase system to operate at the current number of steps, so that the variable frequency air supply and reheat increase system achieves optimal performance.

[0100] The serial numbers of the above embodiments of the present invention are only for description and do not represent the advantages or disadvantages of the embodiments.

[0101] In the above embodiments of the present invention, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0102] In the several embodiments provided in this application, it should be understood that the disclosed technical content can be implemented in other ways. Among them, the device embodiments described above are only schematic. For example, the division of the units can be a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of units or modules, which can be electrical or other forms.

[0103] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple units. Some or all of the units may be selected according to actual needs to achieve the purpose of the present embodiment.

[0104] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0105] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions for a computer device (which can be a personal computer, a server or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), mobile hard disk, magnetic disk or optical disk and other media that can store program codes.

[0106] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. An optimization control method for a variable frequency air supply and enthalpy increase system, characterized in that: include: After the startup operation time of the variable frequency air-infusing enthalpy-increasing system of the water heater is greater than the first predetermined time, a first temperature difference between the first-stage throttling temperature and the enthalpy-increasing port temperature of the water heater is obtained, wherein the first-stage throttling temperature is the saturation temperature corresponding to the actual pressure of the first-stage throttling valve of the water heater after the first-stage throttling, and the enthalpy-increasing port temperature is the actual temperature after the solenoid valve in the water heater; When the first temperature difference is not within a predetermined temperature difference range, adjusting the operating frequency of the compressor of the water heater or the number of steps of the primary throttle valve of the water heater until the first temperature difference is within the predetermined temperature difference range; When the first temperature difference is within the predetermined temperature difference range, obtaining a second temperature difference between the primary pre-throttling temperature and the water inlet temperature of the water heater, wherein the primary pre-throttling temperature is the actual temperature before the primary throttling valve, and the water inlet temperature is the water inlet temperature on the condenser side of the water heater; When the second temperature difference is not within the predetermined temperature difference range, controlling the operating frequency of the compressor to remain unchanged, and adjusting the step number of the primary throttle valve to obtain the adjusted step number; The variable frequency air-injection and reheat-increasing system is controlled to operate according to the operating frequency and the adjusted number of steps, so that the variable frequency air-injection and reheat-increasing system achieves optimal performance.

2. The optimization control method of the variable frequency air supplement and enthalpy increase system according to claim 1 is characterized in that: After the startup operation time of the variable frequency air supply and enthalpy increase system of the water heater is greater than the first predetermined time, a first temperature difference between the primary throttling temperature and the enthalpy increase port temperature of the water heater is obtained, including: After the water heater receives the startup instruction and starts normally, counting the startup operation time of the variable frequency air replenishment and enthalpy increase system; After the startup operation time reaches the first predetermined time, obtaining the primary post-throttling temperature of the water heater and the enthalpy increase outlet temperature of the water heater; The temperature difference between the primary throttling temperature and the enthalpy increase port temperature is obtained to obtain the first temperature difference.

3. The optimization control method of the variable frequency air supplement and enthalpy increase system according to claim 1 is characterized in that: When the first temperature difference is not within a predetermined temperature difference range, adjusting the operating frequency of the compressor of the water heater or the number of steps of the primary throttle valve of the water heater until the first temperature difference is within the predetermined temperature difference range, including: Compare the first temperature difference with the minimum value and the maximum value of the predetermined temperature difference range respectively to obtain a first comparison result; When the first comparison result indicates that the first temperature difference is less than the minimum value, comparing the first temperature difference with the first value to obtain a second comparison result, wherein the first value is less than the minimum value; When the second comparison result indicates that the first temperature difference is less than the first value, increasing the operating frequency of the compressor by a first predetermined frequency so that the first temperature difference is within the predetermined temperature difference range; When the second comparison result indicates that the first temperature difference is less than the minimum value and greater than or equal to the first value, the step number of the primary throttle valve is adjusted to make the first temperature difference within the predetermined temperature difference range.

4. The optimization control method of the variable frequency air supplement and enthalpy increase system according to claim 3 is characterized in that: Also includes: When the first comparison result indicates that the first temperature difference is greater than the maximum value, comparing the first temperature difference with a second value to obtain a third comparison result, wherein the second value is greater than the maximum value; When the third comparison result indicates that the first temperature difference is greater than the second value, increasing the operating frequency of the compressor by a second predetermined frequency so that the first temperature difference is within the predetermined temperature difference range; When the third comparison result indicates that the first temperature difference is less than or equal to the second value and greater than the maximum value, the step number of the primary throttle valve is adjusted so that the first temperature difference is within the predetermined temperature difference range.

5. The optimization control method of the variable frequency air supplement and enthalpy increase system according to claim 1 is characterized in that: When the second temperature difference is not within the predetermined temperature difference range, controlling the operating frequency of the compressor to remain unchanged, and adjusting the step number of the primary throttle valve to obtain the adjusted step number, comprises: Compare the second temperature difference with the minimum value and the maximum value of the predetermined temperature difference range respectively to obtain a fourth comparison result; When the fourth comparison result indicates that the second temperature difference is less than the minimum value, the operating frequency of the compressor is controlled to remain unchanged, and the step number of the primary throttle valve is increased by a first predetermined step number to obtain the adjusted step number; When the fourth comparison result indicates that the second temperature difference is greater than the maximum value, the operating frequency of the compressor is controlled to remain unchanged, and the step number of the primary throttle valve is reduced by a second predetermined step number to obtain the adjusted step number.

6. The optimization control method of the variable frequency air supplement and enthalpy increase system according to claim 1 is characterized in that: When the first temperature difference is within the predetermined temperature difference range, obtaining a second temperature difference between the primary pre-throttling temperature and the water inlet temperature of the water heater further includes: Record the current operating frequency of the compressor and the current step number of the primary throttle valve.

7. The optimization control method of the variable frequency air supplement and enthalpy increase system according to claim 6 is characterized in that: Also includes: When the second temperature difference is within the predetermined temperature difference range, the compressor is controlled to operate according to the current operating frequency, and the variable frequency air-injection and reheat-increasing system is controlled to operate according to the current number of steps, so that the variable frequency air-injection and reheat-increasing system achieves optimal performance.

8. An optimization control device for a variable frequency air supply and enthalpy increase system, characterized in that: include: A first acquisition module is used to acquire a first temperature difference between a first-stage throttling temperature and an enthalpy increasing port temperature of the water heater after the startup operation time of the variable frequency air-supplying enthalpy increasing system of the water heater is greater than a first predetermined time, wherein the first-stage throttling temperature is a saturation temperature corresponding to an actual pressure of a first-stage throttling valve of the water heater after the first-stage throttling, and the enthalpy increasing port temperature is an actual temperature after the solenoid valve in the water heater; a first adjustment module, configured to adjust the operating frequency of the compressor of the water heater or the number of steps of the primary throttle valve of the water heater when the first temperature difference is not within the predetermined temperature difference range, until the first temperature difference is within the predetermined temperature difference range; a second acquisition module, configured to acquire a second temperature difference between a primary pre-throttling temperature and a water inlet temperature of the water heater when the first temperature difference is within the predetermined temperature difference range, wherein the primary pre-throttling temperature is an actual temperature before the primary throttling valve, and the water inlet temperature is the water inlet temperature on the condenser side of the water heater; A second adjustment module is used for controlling the operating frequency of the compressor to remain unchanged and adjusting the step number of the primary throttle valve to obtain the adjusted step number when the second temperature difference is not within the predetermined temperature difference range; The control module is used to control the variable frequency air-injection and reheat-increasing system to operate according to the operating frequency and the adjusted number of steps, so that the variable frequency air-injection and reheat-increasing system can achieve optimal performance.

9. A computer-readable storage medium, characterized in that: The computer-readable storage medium includes a stored program, wherein the program executes the optimization control method of the variable frequency air supplementation and enthalpy increase system according to any one of claims 1 to 7.

10. A processor, characterized in that: The processor is used to run a program, wherein when the program is run, the optimization control method of the variable frequency air supplementation and enthalpy increase system according to any one of claims 1 to 7 is executed.

11. A computer program product comprising computer instructions, characterized in that: When the computer instructions are executed by the processor, the optimization control method of the variable frequency air supplement and enthalpy increase system according to any one of claims 1 to 7 is performed.