Tunnel water outburst and mud outburst test system and method under multi-factor linkage
By designing a tunnel water and mud burst test system under multi-factor chain movement, the superposition of high ground stress, high water pressure and high ground temperature was simulated, and the problem of high temperature disaster-causing factors in the existing technology was solved, and the tunnel was opened. Scientific simulation and prevention of water and mud burst disasters in the excavation surface provide a scientific basis for preventing water and mud bursts.
Patent Information
- Application Number
- CN202411081950.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-08
- Publication Date
- 2024-11-08
AI Technical Summary
The existing model of tunnel water and mud burst research has not fully considered high ground temperature as a disaster factor, resulting in complex disaster mechanisms and lack of simulated water and mud burst evolution process under the superposition of multiple factors during deep buried tunnel excavation, making it difficult to determine the prevention of bursts. The minimum safety thickness of rock mass and the scientific basis for preventing water and mud disasters.
Design a tunnel water and mud burst test system under multi-factor chain movement, including constant temperature cylinder parts, water collection and permeability parts, pressurized components, tunnel excavation boring mechanism and visual resistivity monitoring mechanism to simulate high ground stress and high water pressure The superposition of high ground temperature is to monitor the instability mode and apparent resistivity changes of rock mass samples through constant temperature hot water storage device and hydraulic cylinder base, and to monitor the crack cracking and expansion process in real time.
Able to analyze the instability mode of rock mass in high ground stress, high water pressure and high temperature disaster-causing environments, reveal the influence of multiple coupling effects on the minimum safety thickness of water-incidence rock mass in front of tunnel excavation, and provide prevention of water-incidence mud The scientific basis for disasters and improve the testing accuracy of the test system.
Smart Images

Figure CN118914514A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of tunnel and underground engineering tests, and in particular relates to a tunnel water and mud inrush test system and method under multi-factor chain action. Background Art
[0002] In recent years, with the large-scale construction of railway and highway transportation infrastructure in my country, more and more deep mountain tunnels, such as the Qinghai-Tibet Railway, Sichuan-Tibet Railway and other major national projects, are built in deep rock masses. These deep rock masses have experienced long-term geological tectonic movements, and the rock masses usually contain various types of structural defects: such as faults, joints, and fissures. On the one hand, these structural defects reduce the mechanical strength of the fractured rock mass, showing obvious heterogeneity, discontinuity and anisotropy. On the other hand, they also provide storage space and seepage channels for groundwater, thereby causing the risk of sudden water and mud intrusion at the tunnel excavation face.
[0003] Model tests can effectively simulate the evolution process of sudden water and mud in deep buried tunnels, and are one of the important means to study the mechanism of sudden water and mud in tunnels. Existing model tests involving the study of sudden water and mud in tunnels only consider the disaster-causing factors of high water pressure and high ground stress, and do not pay enough attention to the whole process of the formation of sudden water channels. In fact, high ground temperature is also one of the disaster-causing factors of sudden water and mud in tunnels. It can soften hard rock and cause rock thermal stress effect, making the disaster mechanism more complicated.
[0004] In summary, it is necessary to develop a model test system that can take into account the chain-action superposition of multiple factors such as high ground stress, high water pressure, high ground temperature and engineering disturbance to simulate the entire evolution process of water and mud inrush during deep tunnel excavation, so as to clarify the influencing factors of the minimum safe thickness of rock mass to prevent water inrush, reveal the multivariate information characteristics of water inrush precursors, and provide a scientific basis for the prevention and control of water and mud inrush disasters. Summary of the invention
[0005] The purpose of the present invention is to provide a tunnel water and mud inrush test system and method under multi-factor chain action to solve the above-mentioned problems and achieve the purpose of simulating the whole evolution process of water and mud inrush occurring during deep tunnel excavation under the superposition of multi-factor chain action such as high ground stress, high water pressure, high ground temperature and engineering disturbance.
[0006] To achieve the above object, the present invention provides the following scheme: a tunnel water and mud inrush test system under multi-factor chain action, comprising:
[0007] A test sample loading mechanism, the test sample loading mechanism comprising a constant temperature cylinder, a water collecting and permeable member is arranged inside the constant temperature cylinder, a rock sample is arranged between the water collecting and permeable member and the constant temperature cylinder, a pressurizing component is arranged at one end of the water collecting and permeable member away from the rock sample, the pressurizing component is used to squeeze the water in the water collecting and permeable member to make the water penetrate into the rock sample, simulating a high-pressure water storage disaster-causing structure encountered in front of a tunnel excavation face;
[0008] A tunnel excavation and excavation driving mechanism, the tunnel excavation and excavation driving mechanism is arranged at one end of the constant temperature cylinder away from the pressurizing assembly, and the tunnel excavation and excavation driving mechanism is used to drill from one end of the rock sample away from the water collecting and permeable member toward the water collecting and permeable member;
[0009] A constant temperature hot water storage device, wherein a weighing load sensor is arranged at the bottom of the constant temperature hot water storage device, and the weighing load sensor is used to monitor the weight change of the constant temperature hot water storage device. The constant temperature hot water in the constant temperature hot water storage device is pumped into the water collecting and permeable part through a pumping part.
[0010] Preferably, it also includes an apparent resistivity monitoring mechanism, which includes a DC electrical method host, a current base station, and a plurality of power supply electrodes and a plurality of measuring electrodes arranged in the rock sample, the DC electrical method host is electrically connected to the current base station, and the plurality of power supply electrodes and the plurality of measuring electrodes are electrically connected to the current base station respectively.
[0011] Preferably, the circumferential side of the rock sample is wrapped with a high-temperature resistant latex film, and an air port is opened on the constant temperature cylinder, and the air port is connected to an air compression device. The high-temperature resistant latex film is used to transfer uniform confining pressure to the rock sample under the action of the high-pressure gas in the constant temperature cylinder.
[0012] Preferably, the constant temperature cylinder comprises a steel cylinder body, a silicone heating plate is fixedly sleeved on the side wall of the steel cylinder body, a top plate and a bottom plate are detachably connected at both ends of the steel cylinder body, a fixed pressure plate is fixedly connected to the top plate, a through pipe is arranged in the center of the fixed pressure plate, the through pipe provides a drilling channel for the tunnel excavation mechanism, the through pipe passes through the top plate, and a screw sleeve is detachably connected in the through pipe, one end of the rock sample is fitted with the fixed pressure plate, and a destructible pressure plate is abutted between the end of the screw sleeve close to the rock sample and the rock sample.
[0013] Preferably, the water collecting and permeable part includes a water collecting cavity, one end of the water collecting cavity is slidably connected to a movable pressure plate, the movable pressure plate is used to change the volume of the water collecting cavity, thereby changing the water pressure in the water collecting cavity, the movable pressure plate is fixedly connected to the pressurizing assembly, the other end of the water collecting cavity is provided with an opening, a stainless steel permeable plate is fixedly connected to the opening, the rock sample is fitted with the stainless steel permeable plate, and the stainless steel permeable plate is used to allow the water in the water collecting cavity to penetrate into the rock sample.
[0014] Preferably, the pressurizing assembly includes a hydraulic cylinder base, which is fixedly connected to a side of the base plate away from the steel cylinder, a linear bearing is fixedly connected between the hydraulic cylinder base and the base plate, a push rod is slidably connected to the linear bearing, one end of the push rod passes through the base plate and is fixedly connected to the movable pressure plate, and a hydraulic cylinder is fixedly connected between the other end of the push rod and the hydraulic cylinder base.
[0015] Preferably, the tunnel excavation mechanism includes a rotary reduction gearbox arranged at one end of the constant temperature cylinder away from the pressurizing assembly, one end of a rotating rod is fixedly connected to the rotary reduction gearbox, the other end of the rotating rod is coaxially fixedly connected to an auger rod, the other end of the auger rod is fixedly connected to a cutting disc, and a propulsion reduction gearbox is also provided, and the propulsion reduction gearbox is used to push the rotating rod to move in the direction of the rock sample.
[0016] Preferably, the pumping member comprises a booster water pump, and the booster water pump is used to pump the constant temperature hot water in the constant temperature hot water storage device into the water collecting cavity.
[0017] Preferably, a laser displacement meter is fixedly connected to the hydraulic cylinder base, and the laser displacement meter is used to monitor the displacement distance of the rotary reduction box.
[0018] A tunnel water and mud inrush test method under multi-factor chain action, the operation steps include:
[0019] The rock sample is placed between the water collecting and permeable member and the constant temperature cylinder, and a plurality of power supply electrodes and a plurality of measuring electrodes in the rock sample are electrically connected to the current base station;
[0020] The water-collecting and permeable parts are filled with hot water at constant temperature, and pressure is transmitted to the water-collecting and permeable parts through the pressurizing components to simulate the high-pressure water storage disaster-causing structure encountered in front of the tunnel excavation face;
[0021] The tunnel excavation driving mechanism is used to drill into the rock sample, and a number of power supply electrodes and a number of measuring electrodes are used to detect the apparent resistivity of the rock sample. When the high-pressure hot water in the water-collecting and permeable parts flows toward the tunnel excavation face, the excavation is stopped.
[0022] Compared with the prior art, the present invention has the following advantages and technical effects:
[0023] (1) The present invention can analyze the instability mode of the rock mass for preventing water inrush in front of the tunnel excavation face under the combined superposition effect of high ground stress, high water pressure and high temperature disaster-causing environmental factors, and reveal the influence of multi-field coupling on the minimum safe thickness of the rock mass for preventing water inrush in front of the tunnel excavation face.
[0024] (2) The present invention constructs a rock mass apparent resistivity field monitoring system in the process of simulating the induction of water and mud inrush disasters on the tunnel excavation face, which can monitor the crack initiation and expansion process inside the anti-water inrush rock mass in real time to explore the formation process of seepage channels under the multi-field coupling effect.
[0025] (3) The rock sample size of the present invention is relatively small, and multiple tests can be carried out with less cost and time, providing statistical analysis results for the influence mechanism of multi-field coupling effect on the minimum safe thickness of rock mass for preventing water inrush when tunnels pass through high-energy geological environments.
[0026] (4) The present invention can accurately simulate the dynamic disturbance effect of tunnel excavation on the instability and destruction of rock mass against water inrush under the coupling of three fields, and provide a reference basis for the establishment of an evaluation method for the chain superposition effect of multiple disasters such as water inrush and mud inrush in tunnels.
[0027] (5) The present invention can accurately determine the critical moment of sudden water and mud disasters by monitoring the weight change of the remaining water in the constant temperature hot water storage device, thereby improving the test accuracy of the test system. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0029] Figure 1 It is a schematic diagram of the layout of the test system of the present invention;
[0030] Figure 2 It is a schematic diagram of the test sample loading mechanism of the present invention;
[0031] Figure 3 A schematic diagram of a tunnel excavation mechanism according to the present invention;
[0032] Among them, 1. DC method host; 2. Current base station; 3. Tunnel excavation and excavation mechanism; 4. Test sample loading mechanism; 5. Test bench; 6. Booster pump; 7. Constant temperature hot water storage device; 8. Hydraulic control electric control cabinet; 9. Hydraulic station; 10. Fixed pressure plate; 11. O-ring; 12. Top plate; 13. Steel cylinder; 14. Silicone heating plate; 15. Water collection cavity; 16. Movable pressure plate; 17. Water inlet joint; 18. Bottom plate; 19. Hydraulic cylinder; 20. Hydraulic cylinder base; 21. Laser displacement meter; 22. Linear bearing; 23. Pressure sensor; 24. Permeable stone; 25. Stainless steel permeable plate; 26. High temperature resistant latex film; 27. Step seal; 28. Screw sleeve; 29. Destructible pressure plate; 30. Wire hole; 31. Cutting disc; 33. Organic glass protective cover; 34. Auger rod; 36. Stepper motor; 37. Propulsion reduction box; 38. Rotating rod; 39. Rotating reduction box; 41. Push rod. DETAILED DESCRIPTION
[0033] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0034] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.
[0035] Reference Figure 1-Figure 3 The present invention provides a tunnel water and mud inrush test system under multi-factor chain motion, comprising:
[0036] The test sample loading mechanism 4 comprises a constant temperature cylinder, a water collecting and permeable member is arranged in the constant temperature cylinder, a rock sample is arranged between the water collecting and permeable member and the constant temperature cylinder, and a pressurizing component is arranged at one end of the water collecting and permeable member away from the rock sample, the pressurizing component is used to squeeze the water in the water collecting and permeable member to make the water penetrate into the rock sample, so as to simulate the high-pressure water storage disaster-causing structure encountered in front of the tunnel excavation face;
[0037] A tunnel excavation and excavation driving mechanism 3, which is arranged at one end of the constant temperature cylinder away from the pressurizing assembly, and is used for drilling from one end of the rock sample away from the water collecting and permeable member towards the water collecting and permeable member;
[0038] A constant temperature hot water storage device 7 is provided with a weighing load sensor (not shown in the figure) at the bottom of the constant temperature hot water storage device 7, and the weighing load sensor is used to monitor the weight change of the constant temperature hot water storage device 7. The constant temperature hot water in the constant temperature hot water storage device 7 is pumped into the water collecting and permeable part through a pumping part.
[0039] The main function of the constant temperature cylinder is to provide a suitable high temperature environment for the rock sample; the main function of the water-collecting and permeable component is to provide high-pressure water and make the high-pressure water penetrate into the rock sample; the main function of the pressurizing component is to squeeze the water-collecting and permeable component so that the water in the water-collecting and permeable component is in a high-pressure state; the main function of the tunnel excavation and advancement mechanism 3 is to drill into the rock sample to simulate tunnel excavation; the weighing load sensor can monitor the weight of the constant temperature hot water storage device, and determine whether the critical moment of water inrush is reached by monitoring whether the weight changes suddenly, thereby improving the accuracy of the test process. On the whole, the present invention can consider the model test system of the chain-action superposition of multiple factors such as high ground stress, high water pressure, high ground temperature and engineering disturbance to simulate the whole process of evolution of water and mud inrush during deep tunnel excavation, thereby clarifying the influencing factors of the minimum safe thickness of the rock mass to prevent water inrush, revealing the multivariate information characteristics of water inrush precursors, and providing a scientific basis for preventing water and mud inrush disasters and governance.
[0040] A further optimization scheme also includes an apparent resistivity monitoring mechanism, which includes a DC electrical method host 1, a current base station 2, and a number of power supply electrodes and a number of measuring electrodes arranged in the rock sample. The DC electrical method host 1 is electrically connected to the current base station 2, and the number of power supply electrodes and the number of measuring electrodes are electrically connected to the current base station 2, respectively.
[0041] like Figure 1 As shown, a test bench 5 is also provided, and a test sample loading mechanism 4, a tunnel excavation and digging mechanism 3, a DC current method host 1 and a current base station 2 are respectively fixedly connected to the test bench 5.
[0042] like Figure 1 and Figure 2 As shown, the DC electrical method host 1 and the current base station 2 are connected by wires. The DC electrical method host 1 can set the apparent resistivity monitoring parameters of the current base station 2 and receive the apparent resistivity data sent back by the current base station 2. The current base station 2 is connected to a number of power supply electrodes and measuring electrodes by wires. The electrodes are pre-buried in the rock sample at the same interval along the longitudinal direction of the cylinder when the sample is cast. The power supply electrode generates an artificial electric field in the rock sample, which will present different distribution forms according to the discontinuity, groundwater flow field and temperature field inside the rock sample; according to the apparent resistivity cloud map received by the measuring electrode, the distribution of water-filled cracks inside the rock sample can be intuitively observed, and the whole evolution process of the seepage channel penetration can be inverted, revealing the destruction characteristics of the progressive instability of the anti-water inrush rock mass in front of the tunnel excavation face under the multi-field coupling effect and the evolution process of the water inrush channel.
[0043] To further optimize the solution, the circumferential side of the rock sample is wrapped with a high-temperature resistant latex film 26, an air port is opened on the constant temperature cylinder, the air port is connected to an air compression device, and the high-temperature resistant latex film 26 is used to transfer uniform confining pressure to the rock sample under the action of the high-pressure gas in the constant temperature cylinder.
[0044] like Figure 2 As shown, the air compression device fills the constant temperature cylinder with high pressure gas through the air port. The high temperature resistant latex membrane 26 can be bundled on the circumferential side of the cylindrical rock sample by tying the rubber strip, and its main function is to prevent the high pressure gas in the constant temperature cylinder from flowing into the rock sample or the water collection and permeable member when applying confining pressure to the rock sample.
[0045] A further optimized solution is provided, in which the constant temperature cylinder comprises a steel cylinder 13, a silicone heating plate 14 is fixedly sleeved on the side wall of the steel cylinder 13, a top plate 12 and a bottom plate 18 are detachably connected to the two ends of the steel cylinder 13, a fixed pressure plate 10 is fixedly connected to the top plate 12, a through pipe is arranged in the center of the fixed pressure plate 10, the through pipe provides a channel for the drilling of the tunnel excavation mechanism 3, the through pipe passes through the top plate 12, and a screw sleeve 28 is detachably connected in the through pipe, one end of the rock sample is fitted with the fixed pressure plate 10, and a destructible pressure plate 29 is abutted between the end of the screw sleeve 28 close to the rock sample and the rock sample.
[0046] As a further optimization scheme, a wire hole 30 is reserved on the top plate 12 for passing connecting wires on a plurality of power supply electrodes and a plurality of measuring electrodes, and a sealing ring is installed between the wire and the wire hole 30 .
[0047] According to a further optimization scheme, an O-ring 11 is provided on the top plate 12 , and the O-ring 11 is fitted with the steel cylinder 13 to improve the sealing between the top plate 12 and the steel cylinder 13 .
[0048] like Figure 2 As shown, the main function of the silicone heating plate 14 is to transfer heat to the inside of the steel cylinder 13 during the test, so that the rock sample can maintain the required constant temperature during the test. In addition, the other materials that constitute the constant temperature cylinder are all heat-insulating materials, which reduce the heat dissipation of the rock sample during the test.
[0049] The outer wall of the through-tube on the fixed pressure plate 10 is sealed and connected to the top plate 12 via a step seal 27 to prevent gas leakage in the steel cylinder 13 and cause pressure fluctuations.
[0050] like Figure 2 As shown, the top plate 12 and the bottom plate 18 are connected to the steel cylinder 13 by high-strength screws. The destructible pressure plate 29 is pressed against the rock sample through the screw sleeve 28 to prevent stress concentration from occurring at the excavation surface of the rock sample during the process of applying load.
[0051] A further optimized solution is provided, in which the water collecting and permeable part includes a water collecting cavity 15, one end of which is slidably connected with a movable pressure plate 16, and the movable pressure plate 16 is used to change the volume of the water collecting cavity 15, thereby changing the water pressure in the water collecting cavity 15, and the movable pressure plate 16 is fixedly connected to the pressurizing component, and the other end of the water collecting cavity 15 is provided with an opening, and a stainless steel permeable plate 25 is fixedly connected in the opening, and the rock sample is fitted with the stainless steel permeable plate 25, and the stainless steel permeable plate 25 is used to allow the water in the water collecting cavity 15 to penetrate into the rock sample.
[0052] To further optimize the solution, a permeable stone 24 is arranged on the stainless steel permeable plate 25 .
[0053] A further optimized solution is that the pressurizing assembly includes a hydraulic cylinder base 20, which is fixedly connected to the side of the base plate 18 away from the steel cylinder 13, and a linear bearing 22 is fixedly connected between the hydraulic cylinder base 20 and the base plate 18, and a push rod 41 is slidably connected to the linear bearing 22, one end of the push rod 41 passes through the base plate 18 and is fixedly connected to the movable pressure plate 16, and a hydraulic cylinder 19 is fixedly connected between the other end of the push rod 41 and the hydraulic cylinder base 20.
[0054] According to a further optimized solution, a pressure sensor 23 is fixedly connected between the push rod 41 and the hydraulic cylinder 19 .
[0055] To further optimize the solution, a hydraulic control electric control cabinet 8 and a hydraulic station 9 are also provided. The hydraulic station 9 is used to provide hydraulic oil to the hydraulic cylinder 19, and the hydraulic control electric control cabinet 8 controls the extension and contraction of the hydraulic cylinder 19 by controlling the hydraulic station 9.
[0056] like Figure 2 As shown, the movable pressure plate 16 is provided with axial pressure by the hydraulic cylinder 19. Under the pushing action of the movable pressure plate 16, the water in the water collecting cavity 15 transmits axial pressure to the rock sample, and at the same time, cracks are generated in the rock sample, and then the high-pressure water penetrates into the rock sample along the cracks and further expands the cracks and finally penetrates with the tunnel excavation surface to form a water gushing channel.
[0057] A further optimized solution is that the tunnel excavation mechanism 3 includes a rotary reduction box 39 arranged at one end of the constant temperature cylinder away from the pressurizing assembly, one end of a rotating rod 38 is fixedly connected to the rotary reduction box 39, the other end of the rotating rod 38 is coaxially fixedly connected to an auger rod 34, the other end of the auger rod 34 is fixedly connected to a cutting disc 31, and a propulsion reduction box 37 is also provided. The propulsion reduction box 37 is used to push the rotating rod 38 to move in the direction of the rock sample.
[0058] According to a further optimized solution, the input shaft of the propulsion reduction box 37 is transmission-connected to the stepping motor 36, and the input shaft of the rotation reduction box is transmission-connected to the power motor (not shown in the figure).
[0059] like Figure 3 As shown, the cutting disc 31 is pushed into the through pipe and fits with the destructible pressure plate 29, and the pressure screw sleeve 28 is engraved with a thread that can be riveted with the spiral drill rod 34. At the initial stage of the test, the rotary reducer 39 provides cutting power to the cutting disc 31, and the cutting disc 31 excavates from one end of the destructible pressure plate 29 to the rock sample to simulate tunnel excavation and its disturbance effect on the stability of the rock mass to prevent water inrush. As the excavation process continues, the straight-line distance between the cutting disc 31 and the water collection cavity 15 gradually decreases, and due to the high temperature and high pressure and the dynamic effect of tunnel excavation, the internal cracks of the rock sample begin to crack and expand. When a through crack zone is formed between the tunnel excavation surface and the water collection cavity, it indicates that a water seepage channel is formed, and the high-pressure hot water in the water collection cavity 15 will flow from the water seepage channel to the tunnel excavation surface, forming a water and mud inrush disaster.
[0060] According to a further optimized solution, a plexiglass protective cover 33 is provided on the outer side of the auger rod 34 .
[0061] According to a further optimized solution, the pumping component includes a booster water pump 6 , which is used to pump the constant temperature hot water in the constant temperature hot water storage device 7 into the water collection cavity 15 .
[0062] According to a further optimization scheme, the movable pressure plate 16 is connected to a water inlet joint 17 , the water inlet joint 17 is connected to a water pipe, the water pipe passes through the bottom plate 18 and is connected to the water outlet of the booster water pump 6 .
[0063] like Figure 1 and Figure 2 As shown, the booster water pump 6 pumps the hot water in the constant temperature hot water storage device 7 into the water collection chamber 15 through the water pipe.
[0064] When a water gushing channel that penetrates the water collecting cavity 15 and the tunnel excavation cutting disc 31 appears inside the rock mass sample, the hot water in the water collecting cavity 15 instantly flows to the tunnel excavation surface through the channel under the action of high pressure, and the hot water in the constant temperature hot water storage device 7 is replenished to the water collecting cavity 15 in time under the pressure of the booster water pump 6, which will cause the weight of the hot water in the constant temperature hot water storage device 7 to decrease sharply, and the data received in real time by the weighing load sensor (not shown in the figure) will suddenly drop when the sudden water gushing disaster occurs in the tunnel. Therefore, when the hot water weight-time curve received by the weighing load sensor drops sharply, the critical moment of the sudden water and mud gushing disaster can be determined.
[0065] According to a further optimization scheme, a laser displacement meter 21 is fixedly connected to the hydraulic cylinder base 20 , and the laser displacement meter 21 is used to measure the displacement distance of the rotating reduction box 39 .
[0066] like Figure 1As shown, when a sudden water inrush disaster occurs, the minimum safe thickness of the rock mass to prevent water inrush can be obtained by subtracting the displacement distance of the rotary reducer 39 monitored by the current laser displacement meter 21 from the total thickness of the rock mass sample, that is, the excavation depth of the tunnel.
[0067] A tunnel water and mud inrush test method under multi-factor chain action, the operation steps include:
[0068] The rock sample is placed between the water collecting and permeable member and the constant temperature cylinder, and a plurality of power supply electrodes and a plurality of measuring electrodes in the rock sample are electrically connected to the current base station 2;
[0069] At the beginning of the test, the steel cylinder 13 is placed vertically, and the top plate 12, the destructible pressure plate 29, the screw sleeve 28 and other components are separated from the top of the steel cylinder 13. The rock sample with the buried electrode is placed in the steel cylinder 13 and aligned with the stainless steel permeable plate 25 on the upper part of the water collection cavity 15. Then the fixed pressure plate 10 is installed on the top of the rock sample, and the side of the rock sample is sealed with a high temperature resistant latex film 26. Then the top plate 12, the destructible pressure plate 29 and the screw sleeve 28 are installed on the top of the steel cylinder 13 in sequence, and the wires connecting the electrode and the current base station 2 are passed through the wire hole 30.
[0070] The water-collecting and permeable parts are filled with hot water at constant temperature, and the pressure is transmitted to the water-collecting and permeable parts through the pressurizing components to simulate the high-pressure water storage disaster-causing structure encountered in front of the tunnel excavation face;
[0071] After the rock sample is loaded, compressed air is first input into the steel cylinder 13 through the air compression equipment to preload the rock sample so that the rock sample will not be separated from the original position after the steel cylinder 13 is placed horizontally. Then, the constant temperature hot water storage device 7 and the booster pump 6 are turned on to fill the water collection cavity 15 with hot water at a constant temperature, and the silicone heating plate 14 is turned on to treat the rock and hot water inside the test equipment at a constant temperature. Then, the crane equipment is used to place the test sample loading mechanism 4 horizontally, and the rock sample is pre-overloaded. By increasing the air pressure in the steel cylinder 13, the confining pressure is increased to several times the target confining pressure to reduce the porosity of the rock sample and restore the original properties of the rock as much as possible. Then, the confining pressure is reduced to the target value. Then, the thrust of the hydraulic cylinder 19 is set by the hydraulic control electric control cabinet 8 to transmit axial pressure to the water collection cavity 15, which can be regarded as simulating the water pressure in the water storage structure.
[0072] The tunnel excavation driving mechanism 3 is used to drill into the rock sample, and a plurality of power supply electrodes and a plurality of measuring electrodes are used to detect the apparent resistivity of the rock sample. When the high-pressure hot water in the water-collecting and permeable member flows toward the tunnel excavation face, the excavation is stopped.
[0073] The DC power method host 1 is turned on, and the excitation voltage, constant current time and acquisition interval of the current base station 2 are set to monitor the apparent resistivity of the rock sample in real time; the load weighing sensor in the constant temperature hot water storage device 7 is turned on to monitor the water volume change in the constant temperature hot water storage device in real time; the laser displacement meter 21 is turned on to monitor the tunnel excavation depth in real time. The cutting disc 31 is fitted with the destructible pressure plate 29, and the organic glass protective cover 33 is installed. Then the stepper motor 36 and the power motor are started, and the excavation speed of the cutting disc 31 is controlled according to the similarity relationship. Excavation is carried out in batches and steps until the water volume in the constant temperature hot water storage device 7 suddenly drops sharply, which means that a water inrush disaster has occurred, and excavation is stopped immediately.
[0074] After the test, the axial pressure and confining pressure on the rock sample are removed in turn, the test equipment is lowered to room temperature, and the water in the water collection cavity 15 is evacuated. Then, the damaged rock sample is taken out, the inside of the test device is cleaned, and the next set of tests is carried out.
[0075] In the description of the present invention, it is necessary to understand that the terms "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0076] The embodiments described above are only descriptions of the preferred modes of the present invention, and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should all fall within the protection scope determined by the claims of the present invention.
Claims
1. A tunnel water and mud inrush test system under multi-factor chain action, characterized in that: include: A test sample loading mechanism (4), the test sample loading mechanism (4) comprising a constant temperature cylinder, a water collecting and permeable member is arranged inside the constant temperature cylinder, a rock sample is arranged between the water collecting and permeable member and the constant temperature cylinder, a pressurizing component is arranged at one end of the water collecting and permeable member away from the rock sample, the pressurizing component is used to squeeze the water in the water collecting and permeable member so that the water penetrates into the rock sample, simulating a high-pressure water storage disaster-causing structure encountered in front of a tunnel excavation face; a tunnel excavation and excavation driving mechanism (3), the tunnel excavation and excavation driving mechanism (3) being arranged at an end of the constant temperature cylinder away from the pressurizing component, the tunnel excavation and excavation driving mechanism (3) being used for drilling from an end of the rock sample away from the water collecting and permeable member towards the water collecting and permeable member; A constant temperature hot water storage device (7), wherein a weighing load sensor is arranged at the bottom of the constant temperature hot water storage device (7), and the weighing load sensor is used to monitor the weight change of the constant temperature hot water storage device (7). The constant temperature hot water in the constant temperature hot water storage device (7) is pumped into the water collecting and permeable member through a pumping member.
2. The tunnel water and mud inrush test system under multi-factor chain motion according to claim 1 is characterized by: It also includes an apparent resistivity monitoring mechanism, which includes a direct current electrical method host (1), a current base station (2), and a plurality of power supply electrodes and a plurality of measuring electrodes arranged in the rock sample, the direct current electrical method host (1) being electrically connected to the current base station (2), and the plurality of power supply electrodes and the plurality of measuring electrodes being electrically connected to the current base station (2) respectively.
3. The tunnel water and mud inrush test system under multi-factor chain motion according to claim 1 is characterized by: The circumferential side of the rock sample is wrapped with a high-temperature resistant latex film (26), and the constant temperature cylinder is provided with an air port, which is connected to an air compression device. The high-temperature resistant latex film (26) is used to transfer uniform confining pressure to the rock sample under the action of the high-pressure gas of the constant temperature cylinder.
4. The tunnel water and mud inrush test system under multi-factor chain motion according to claim 1 is characterized by: The constant temperature cylinder comprises a steel cylinder (13), a silicone heating plate (14) is fixedly sleeved on the side wall of the steel cylinder (13), a top plate (12) and a bottom plate (18) are detachably connected at both ends of the steel cylinder (13), a fixed pressure plate (10) is fixedly connected to the top plate (12), a through pipe is arranged in the center of the fixed pressure plate (10), the through pipe provides a channel for the drilling of the tunnel excavation mechanism (3), the through pipe passes through the top plate (12), and a screw sleeve (28) is detachably connected in the through pipe, one end of the rock sample is in contact with the fixed pressure plate (10), and a destructible pressure plate (29) is abutted between the end of the screw sleeve (28) close to the rock sample and the rock sample.
5. The tunnel water and mud inrush test system under multi-factor chain motion according to claim 4 is characterized by: The water collecting and permeable component comprises a water collecting cavity (15), one end of the water collecting cavity (15) is slidably connected to a movable pressure plate (16), the movable pressure plate (16) is used to change the volume of the water collecting cavity (15), and thus change the water pressure in the water collecting cavity (15), the movable pressure plate (16) is fixedly connected to the pressurizing component, the other end of the water collecting cavity (15) is provided with an opening, a stainless steel permeable plate (25) is fixedly connected in the opening, the rock sample is fitted with the stainless steel permeable plate (25), and the stainless steel permeable plate (25) is used to allow the water in the water collecting cavity (15) to penetrate into the rock sample.
6. The tunnel water and mud inrush test system under multi-factor chain motion according to claim 5 is characterized by: The pressurizing assembly comprises a hydraulic cylinder base (20), wherein the hydraulic cylinder base (20) is fixedly connected to a side of the base plate (18) away from the steel cylinder (13), a linear bearing (22) is fixedly connected between the hydraulic cylinder base (20) and the base plate (18), a push rod (41) is slidably connected to the linear bearing (22), one end of the push rod (41) passes through the base plate (18) and is fixedly connected to the movable pressure plate (16), and a hydraulic cylinder (19) is fixedly connected between the other end of the push rod (41) and the hydraulic cylinder base (20).
7. The tunnel water and mud inrush test system under multi-factor chain motion according to claim 6 is characterized by: The tunnel excavation mechanism (3) comprises a rotary reduction box (39) arranged at one end of the constant temperature cylinder away from the pressurizing assembly, one end of a rotating rod (38) is fixedly connected to the rotary reduction box (39), the other end of the rotating rod (38) is coaxially fixedly connected to a spiral drill rod (34), the other end of the spiral drill rod (34) is fixedly connected to a cutting disc (31), and a propulsion reduction box (37) is also provided, and the propulsion reduction box (37) is used to push the rotating rod (38) to move in the direction of the rock sample.
8. The tunnel water and mud inrush test system under multi-factor chain motion according to claim 5 is characterized by: The pumping member comprises a booster water pump (6), and the booster water pump (6) is used to pump the constant temperature hot water in the constant temperature hot water storage device (7) into the water collection cavity (15).
9. The tunnel water and mud inrush test system under multi-factor chain motion according to claim 7, characterized in that: A laser displacement meter (21) is fixedly connected to the hydraulic cylinder base (20), and the laser displacement meter (21) is used to monitor the displacement distance of the rotary reduction box (39).
10. A tunnel water and mud inrush test method under multi-factor chain action, based on a tunnel water and mud inrush test system under multi-factor chain action as claimed in claim 2, characterized in that: The steps include: The rock sample is placed between the water collecting and permeable component and the constant temperature cylinder component, and a plurality of power supply electrodes and a plurality of measuring electrodes in the rock sample are electrically connected to the current base station (2); The water-collecting and permeable parts are filled with hot water at constant temperature, and the pressure is transmitted to the water-collecting and permeable parts through the pressurizing components to simulate the high-pressure water storage disaster-causing structure encountered in front of the tunnel excavation face; The tunnel excavation driving mechanism (3) is used to drill into the rock sample, and a plurality of power supply electrodes and a plurality of measuring electrodes are used to detect the apparent resistivity of the rock sample. When the high-pressure hot water in the water collection and permeable member flows toward the tunnel excavation surface, the excavation is stopped.