Alarm and processing method and system based on equipment fault and related equipment
By acquiring and pre-processing equipment abnormal data, determining the fault type and service type, calculating the alarm level and retrieving the corresponding solution, the problem of low fault processing efficiency in the existing technology is solved, and a highly targeted fault processing is achieved.
Patent Information
- Application Number
- CN202411070029.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-06
- Publication Date
- 2024-11-08
AI Technical Summary
The existing equipment alarm system cannot effectively distinguish the severity of the fault, resulting in low fault handling efficiency and lack of targeted treatment methods.
By obtaining equipment abnormal data information, pre-processing is performed to determine the fault type and business type, and based on this information determine the alarm classification and level, use subjective and objective empowerment methods to calculate the comprehensive weight, retrieve the corresponding processing plan and feedback it to the operation and maintenance personnel. .
The efficiency of equipment failure repair is improved, and operation and maintenance personnel can implement fault repairs in a timely manner according to different alarm levels, reducing the time to find processing plans and improving processing efficiency.
Smart Images

Figure CN118915569A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of fault processing, and in particular to an alarm and processing method and system based on equipment faults and related equipment. Background Art
[0002] At present, the factory production process involves a lot of mechanical equipment, the equipment control system is complex, the number of equipment is large, and the operation process is cumbersome. In order to ensure the stable and safe operation of the on-site production process, most companies have set up an alarm system, that is, by collecting on-site process system parameters and the system parameters under the normal state of the process system, when there is an abnormality, the process system alarm is transmitted to the operation and maintenance personnel through sound alarms or photon alarms.
[0003] In the existing equipment alarm system, a unified alarm method is often used for all faults, which cannot effectively distinguish the severity of the fault, resulting in the inability of the handler to quickly judge and handle serious faults. In addition, the existing alarm system usually lacks targeted treatment method guidance, so when faced with a fault, the handler needs to spend a lot of time looking for a solution, resulting in low efficiency in fault handling.
[0004] In view of this, a method, system and related equipment for alarming and processing based on equipment failure are needed. Summary of the invention
[0005] The embodiment of the present application provides an alarm and processing method based on equipment failure, which is used to solve the problem of low efficiency of fault processing.
[0006] The first aspect of the embodiment of the present application provides an alarm and processing method based on equipment failure, including:
[0007] When a device fails, obtain abnormal data information about the device;
[0008] Preprocessing the device abnormality data information, and determining the device fault type and the device service type based on the preprocessed device abnormality data information;
[0009] Determine the equipment fault alarm classification according to the equipment fault type and the equipment service type;
[0010] Determine the equipment fault alarm level based on the equipment fault alarm classification;
[0011] The corresponding processing plan is retrieved according to the equipment fault alarm level, and the processing plan is fed back to the operation and maintenance personnel.
[0012] Furthermore, the determining the equipment fault alarm level based on the equipment fault alarm classification includes:
[0013] Determine the comprehensive weight corresponding to the equipment fault alarm classification by setting a subjective weighting method and an objective weighting method;
[0014] The equipment fault alarm level is calculated according to the comprehensive weight.
[0015] Furthermore, the expression of the comprehensive weight is as follows:
[0016]
[0017] Where: ω1 and ω2 are the subjective weight and objective weight respectively, λ1 and λ2 are the linear coefficients of the subjective weight and objective weight respectively.
[0018] Furthermore, the preprocessing of the abnormal data information of the device includes:
[0019] Perform data cleaning, data conversion, data reduction and outlier detection on equipment abnormal data information.
[0020] Furthermore, the determining of the equipment fault type and the equipment service type based on the pre-processed equipment abnormal data information includes:
[0021] Feature extraction based on the pre-processed equipment abnormal data information;
[0022] Set the coding label according to the fault type and obtain the corresponding feature vector;
[0023] Use the logistic regression model to optimize the target feature parameters as input parameters to train the prediction model;
[0024] Evaluate the prediction model based on the cross entropy loss function, and optimize the prediction model based on the evaluation results;
[0025] The prediction results of equipment failure type and equipment business type are output based on the optimized prediction model.
[0026] Furthermore, the logistic regression model is expressed as follows:
[0027]
[0028] Where: w is the weight vector, b is the bias term, w T x is the dot product of the weight vector and the feature vector.
[0029] Furthermore, the cross entropy loss function is expressed as follows:
[0030]
[0031] Where: y (i) is the true label of the i-th sample, p (i) is the probability predicted by the model.
[0032] Furthermore, the retrieving a corresponding processing solution according to the equipment fault alarm level and feeding back the processing solution to the operation and maintenance personnel includes:
[0033] Setting a data solution library, wherein the data solution library includes a first-level alarm handling solution, a second-level alarm handling solution, a third-level alarm handling solution, a fourth-level alarm handling solution, and a fifth-level alarm handling solution;
[0034] A handling solution in the data solution library is matched according to the equipment alarm level.
[0035] A second aspect of the embodiment of the present application provides an alarm and processing system based on equipment failure, including:
[0036] An abnormal data information acquisition unit is used to acquire abnormal data information of the device when a device fails;
[0037] A fault type and service type determination unit, configured to preprocess the device abnormality data information, and determine the device fault type and device service type based on the preprocessed device abnormality data information;
[0038] A fault alarm classification determination unit, used to determine the equipment fault alarm classification according to the equipment fault type and the equipment service type;
[0039] A fault alarm level determination unit, configured to determine a device fault alarm level based on the device fault alarm classification;
[0040] The processing solution feedback unit is used to retrieve the corresponding processing solution according to the equipment fault alarm level and feed back the processing solution to the operation and maintenance personnel.
[0041] A third aspect of an embodiment of the present application provides a computer device, including a memory, a processor, and computer-readable instructions stored in the memory and executable on the processor, wherein when the processor executes the computer-readable instructions, the steps of the alarm and processing method based on equipment failure as described in any one of the above are implemented.
[0042] It can be seen from the above technical solutions that the embodiments of the present application have the following advantages:
[0043] When a device fails, the present application first obtains device abnormal data information, pre-processes the device abnormal data information, determines the device fault type and device service type based on the pre-processed device abnormal data information, then determines the device fault alarm classification based on the device fault type and device service type, and then determines the device fault alarm level based on the device fault alarm classification, and finally retrieves the corresponding processing plan based on the device fault alarm level, and feeds back the plan to the operation and maintenance personnel, so that the operation and maintenance personnel can promptly implement fault repair according to different processing plans for different alarm levels, without spending time looking for processing plans, and effectively improving the efficiency of equipment fault repair. BRIEF DESCRIPTION OF THE DRAWINGS
[0044] Figure 1 The figure is a flow chart of an embodiment of an alarm and processing method based on equipment failure in the present invention;
[0045] Figure 2 The structure diagram of an embodiment of an alarm and processing system based on equipment failure in the present invention;
[0046] Figure 3 The figure is a structural block diagram of a computer device in the present invention. DETAILED DESCRIPTION
[0047] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0048] The alarm and processing method based on equipment failure in this embodiment is used to improve the efficiency of equipment failure maintenance. The implementation method in this embodiment can be implemented in the system, can be implemented in the server, and can also be implemented in the terminal, and the specific details are not clearly limited.
[0049] Embodiment 1
[0050] See also Figure 1 , an embodiment of an alarm and processing method based on equipment failure in the present invention comprises the following steps:
[0051] S11. When a device fails, obtain device abnormal data information;
[0052] When a device fails, the system will automatically collect abnormal data information about the device, including basic information and operating status information of the device. The basic information generally includes the device name, equipment classification and material information of the device. The operating status information also includes abnormal status and abnormal duration, etc.
[0053] S12. Preprocess the device abnormal data information, and determine the device fault type and device service type based on the preprocessed device abnormal data information;
[0054] In this embodiment, after the abnormal data is collected, the data is preprocessed including data cleaning, data conversion, data reduction and outlier detection. Data cleaning includes missing value processing and noise data processing. Missing value processing can fill missing values with mean, median, mode, etc.; noise data processing detects and removes noise data by binning, clustering, regression and other methods.
[0055] Data transformation includes standardization, normalization, logarithmic transformation and discretization. Standardization is to transform the data with a mean of 0 and a standard deviation of 1. The calculation formula is as follows:
[0056]
[0057] Where: x is the original data, μ is the mean of the data, and σ is the standard deviation of the data.
[0058] Normalization is to scale the data to a specified range, such as [0,1]. The calculation formula is as follows:
[0059]
[0060] Where: x min and x max are the minimum and maximum values in the data, respectively.
[0061] Logarithmic transformation converts the skewed distribution into a distribution close to normal. The calculation formula is as follows:
[0062] x log =log(x);
[0063] Where: x is the distribution data.
[0064] Discretization is the process of converting continuous variables into categorical variables.
[0065] Data reduction includes principal component analysis and cluster analysis. Principal component analysis is to reduce the dimension of the data set while retaining the main information in the data set; cluster analysis is to divide the objects in the data set into several groups or clusters, so that the objects in the same cluster are as similar as possible, and the objects in different clusters are as different as possible. Outlier detection includes detection based on statistical methods and model methods, among which statistical methods include Z-score, IQR (interquartile range), etc., and model methods include using clustering algorithms to identify outliers.
[0066] The above data preprocessing methods are selected based on the structure and quantity of the data. These methods can be used simultaneously to process the data in a hierarchical manner, or one of the methods can be selected according to the structure of the data. Ultimately, both methods can improve data reliability and practicality, and provide an effective data basis for subsequent model training and generating alarm levels.
[0067] The above preprocessed data is used as training samples and input into the set model for training to obtain the predicted equipment failure type and equipment service type, which specifically includes the following steps:
[0068] 1. Feature extraction based on preprocessed equipment abnormal data information;
[0069] 2. Set the coding label according to the fault type and obtain the corresponding feature vector;
[0070] 3. Use the logistic regression model to optimize the target feature parameters as input parameters to train the prediction model;
[0071] 4. Evaluate the prediction model based on the cross entropy loss function, and optimize the prediction model based on the evaluation results;
[0072] 5. Output the prediction results of equipment failure type and equipment business type based on the optimized prediction model.
[0073] Specifically, feature extraction depends on the specific device and sensor data. Here, n features are extracted, which can be represented as a vector x = [x1, x2, x3, ..., x n' ]. The coded label is set according to the fault type, and the label can be expressed as y∈{1,2,…,m}. The expression of the logistic regression model is as follows:
[0074]
[0075] Where: w is the weight vector, b is the bias term, w T x is the dot product of the weight vector and the feature vector.
[0076] The expression of the cross entropy loss function is as follows:
[0077]
[0078] Where: y (i) is the true label of the i-th sample, p (i) is the probability predicted by the model.
[0079] Based on the above prediction model, the optimization algorithm is to update the weights and bias terms to minimize the loss function, which is expressed as follows:
[0080]
[0081] Where: α is the learning rate.
[0082] When a new data point x is generated new , use the trained model to make predictions, the expression is as follows: The fault type and business type are predicted through the trained model, so that the alarm level can be set according to the fault type and business type.
[0083] S13. Determine the equipment failure alarm classification according to the equipment failure type and equipment business type;
[0084] S14. Determine the equipment fault alarm level based on the equipment fault alarm classification;
[0085] Specifically, the equipment fault alarm level is determined based on the equipment fault alarm classification, including:
[0086] Determine the comprehensive weight corresponding to the equipment fault alarm classification by setting the subjective weighting method and the objective weighting method;
[0087] The equipment fault alarm level is calculated according to the comprehensive weight.
[0088] The expression of comprehensive weight is as follows:
[0089]
[0090] Where: ω1 and ω2 are subjective weight and objective weight respectively, and are the optimized linear coefficients of subjective weight and objective weight respectively.
[0091] Coefficient and The optimization process is as follows:
[0092]
[0093] Find the first-order derivative, and the solution obtained is the optimal combination of subjective weight and objective weight. The derivative condition calculation formula is as follows:
[0094]
[0095] The weight coefficients λ1 and λ2 are obtained and normalized. The calculation formula is as follows:
[0096]
[0097] The level of each alarm is determined by the above-mentioned comprehensive weights optimized based on subjective weights and objective weights. Based on the above-mentioned equipment failure types and business types, the weights are calculated from subjective and objective aspects for the core businesses such as the toll collection system, monitoring system, communication system, and power distribution and lighting system in the highway, as well as some auxiliary monitoring equipment, backup systems, and some non-critical equipment. The comprehensive weight is then calculated based on the subjective and objective weights. For example, the comprehensive weight of the toll collection system as the core business is 0.9, the comprehensive weight of the monitoring system as the core business is 0.85, and the comprehensive weight of the backup system as a non-core business is 0.3, etc. The alarm level is then determined by the calculated weights combined with the alarm classification.
[0098] The alarm level is set to five levels according to the alarm classification. The first-level alarm corresponds to a very long business interruption time, which seriously affects the operation of the highway and public travel. The time can be set to 8 hours here. At this time, the toll station may be completely paralyzed, and a large number of vehicles are backlogged. Emergency measures need to be taken quickly to restore traffic; the second-level alarm corresponds to a long business interruption time, which has a great impact on the operation of the highway and public travel. The time can be set to between 2 hours and 8 hours here. At this time, some lanes of the toll station may not be passable, and the processing speed needs to be accelerated to reduce the impact; the third-level alarm corresponds to a short business interruption time, but affects the normal use of core businesses (such as the toll collection system). The time can be set to between 1 hour and 2 hours here. For example, a toll lane is impassable due to equipment failure, but other lanes can still work normally. At this time, the faulty lane needs to be located and repaired quickly; the category corresponding to the fourth-level alarm is that the business interruption time is short, but it has a certain impact on the core business. The time can be set to less than 1 hour here, but the core business (such as the toll collection system) is briefly affected. It may be caused by a brief failure of a key equipment and needs to be checked and restored in time; the category corresponding to the fifth-level alarm is that the business interruption time is extremely short and only affects minor businesses. The time can be set to less than 1 hour here, and non-core businesses (such as office equipment, non-critical communication equipment, etc.) are affected. Although this type of failure has little impact on the overall operation, it still needs to be paid attention to and recorded for subsequent analysis and improvement.
[0099] According to the determined alarm level, the system will issue different levels of warning alarm signals. For example, the first level alarm may be a flashing yellow light with a short warning tone, the second level alarm may be a flashing red light with a longer alarm tone, and the third level alarm may be a continuous red light and a harsh alarm tone to ensure that the operator can quickly identify the severity of the fault.
[0100] S15. Retrieve the corresponding processing plan according to the equipment fault alarm level, and feedback the processing plan to the operation and maintenance personnel.
[0101] First, a data solution library is set up, where the data solution library includes a first-level alarm handling solution, a second-level alarm handling solution, a third-level alarm handling solution, a fourth-level alarm handling solution and a fifth-level alarm handling solution; then the handling solution in the data solution library is matched according to the equipment alarm level.
[0102] Specifically, the processing plan can be set to handle core and non-core faults according to the level involved. For example, the items corresponding to the core fault handling plan are: 1. Immediately initiate the emergency response mechanism and notify relevant personnel to handle it urgently; 2. Automatically or manually trigger equipment shutdown or isolation measures to avoid further expansion of the fault; 3. Rapidly diagnose the cause of the fault remotely or on-site, and repair it; 4. Real-time record of the fault handling process to provide data support for subsequent fault analysis.
[0103] The items corresponding to the disposal plan for core functions affected are: 1. Assess the impact of the fault on the main functions of the equipment and determine whether immediate shutdown is required; 2. If immediate shutdown is not required, activate the backup plan or downgrade the service to ensure the basic operation of the core functions; 3. Arrange professional personnel to troubleshoot and repair the fault as soon as possible; 4. Test and verify the equipment after the fault is repaired to ensure that the function is restored to normal.
[0104] The items corresponding to the non-core fault handling plan are: 1. Develop a corresponding handling plan based on the fault type and scope of impact; 2. If the fault does not affect the core function of the equipment, it can be repaired during the equipment's idle period; 3. Regularly summarize and analyze non-core faults to find out the root cause and prevent similar faults from happening again.
[0105] In addition, other troubleshooting solutions are included as follows:
[0106] The items corresponding to the offline disposal plan are: 1. When the device is offline, notify relevant personnel through other means (such as SMS, email, etc.); 2. Check the network connection and device status to determine the reason for offline; 3. If the offline is caused by a network problem, solve the network problem and reconnect the device; 4. If the offline is caused by a device failure, handle it according to the corresponding failure type.
[0107] The corresponding items of the IP unreachable solution are: 1. Check the network configuration and IP address settings of the device to ensure that the IP address is correct; 2. Check the network connection and network devices such as routers to ensure that the network is unobstructed; 3. If the IP unreachable is caused by a network device failure, replace or repair the network device; 4. If the IP unreachable is caused by a firewall or security policy, adjust the firewall or security policy settings.
[0108] The items corresponding to the power outage disposal plan are: 1. Check the power connection and power socket of the equipment to ensure that the power is supplied normally; 2. If the power outage is caused by a power failure, replace or repair the power supply equipment; 3. After the power is restored, restart and test the equipment to ensure the normal operation of the equipment.
[0109] The above embodiment automatically matches the corresponding handling plan by setting different alarm levels, and the operation and maintenance personnel do not need to search for the operation and maintenance plan again, which effectively improves the operation and maintenance efficiency.
[0110] Embodiment 2
[0111] See also Figure 2 An embodiment of an alarm and processing system based on equipment failure of the present invention comprises the following steps:
[0112] The abnormal data information acquisition unit 101 is used to acquire abnormal data information of the device when a device fails;
[0113] A fault type and service type determination unit 102 is used to pre-process the device abnormality data information and determine the device fault type and device service type based on the pre-processed device abnormality data information;
[0114] A fault alarm classification determination unit 103, configured to determine a device fault alarm classification according to a device fault type and a device service type;
[0115] A fault alarm level determination unit 104, configured to determine a device fault alarm level based on the device fault alarm classification;
[0116] The processing solution feedback unit 105 is used to retrieve the corresponding processing solution according to the equipment fault alarm level and feed back the processing solution to the operation and maintenance personnel.
[0117] For the specific definition of the alarm and processing system, please refer to the definition of the alarm and processing method above, which will not be repeated here. Each module in the above alarm and processing system can be implemented in whole or in part by software, hardware and a combination thereof. Each of the above modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory of the computer device in the form of software, so that the processor can call and execute the operations corresponding to each of the above modules.
[0118] Embodiment 3
[0119] See also Figure 3 The present invention provides a computer device, including a memory, a processor, and computer-readable instructions stored in the memory and executable on the processor. When the processor executes the computer-readable instructions, the steps of the above method are implemented.
[0120] Those of ordinary skill in the art will appreciate that the units of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, computer software, or a combination of the two. In order to clearly illustrate the interchangeability of hardware and software, the composition of each example has been generally described in terms of function in the above description. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.
[0121] In the embodiments provided by the present invention, it should be understood that the division of units is only a logical function division, and there may be other division methods in actual implementation, such as multiple units can be combined into one unit, one unit can be split into multiple units, or some features can be ignored. In addition, each functional unit in each embodiment of the present invention can be integrated into a processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit. The above-mentioned integrated unit can be implemented in the form of hardware or in the form of software functional units.
[0122] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, which is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, a server or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, read-only memory (ROM, Read-0nlyMemory), random access memory (RAM, RandomAccessMemory), mobile hard disk, magnetic disk or optical disk, etc., which can store program code.
[0123] It can be understood that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the above embodiments, or replace some or all of the technical features therein by equivalents. These modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the present invention, and they should all be included in the scope of the claims and specification of the present invention.
Claims
1. An alarm and processing method based on equipment failure, characterized in that: include: When a device fails, obtain abnormal data information about the device; Preprocessing the device abnormality data information, and determining the device fault type and the device service type based on the preprocessed device abnormality data information; Determine the equipment fault alarm classification according to the equipment fault type and the equipment service type; Determine the equipment fault alarm level based on the equipment fault alarm classification; The corresponding processing plan is retrieved according to the equipment fault alarm level, and the processing plan is fed back to the operation and maintenance personnel.
2. The alarm and processing method based on equipment failure according to claim 1 is characterized in that: The determining of the equipment fault alarm level based on the equipment fault alarm classification includes: Determine the comprehensive weight corresponding to the equipment fault alarm classification by setting a subjective weighting method and an objective weighting method; The equipment fault alarm level is calculated according to the comprehensive weight.
3. The alarm and processing method based on equipment failure according to claim 2 is characterized in that: The expression of the comprehensive weight is as follows: Where: ω1 and ω2 are subjective weight and objective weight respectively, and are the linear coefficients after optimization of subjective weight and objective weight respectively.
4. The alarm and processing method based on equipment failure according to claim 1 is characterized in that: The preprocessing of the abnormal data information of the device includes: Perform data cleaning, data conversion, data reduction and outlier detection on equipment abnormal data information.
5. The alarm and processing method based on equipment failure according to claim 4 is characterized in that: The determining of the equipment fault type and the equipment service type based on the pre-processed equipment abnormal data information includes: Feature extraction based on the pre-processed equipment abnormal data information; Set the coding label according to the fault type and obtain the corresponding feature vector; Use the logistic regression model to optimize the target feature parameters as input parameters to train the prediction model; Evaluate the prediction model based on the cross entropy loss function, and optimize the prediction model based on the evaluation results; The prediction results of equipment failure type and equipment business type are output based on the optimized prediction model.
6. The method for alarming and handling equipment failure according to claim 5, characterized in that: The expression of the logistic regression model is as follows: Where: w is the weight vector, b is the bias term, w T x is the dot product of the weight vector and the feature vector.
7. The method for alarming and handling equipment failure according to claim 5, characterized in that: The expression of the cross entropy loss function is as follows: Where: y (i) is the true label of the i-th sample, p (i) is the probability predicted by the model.
8. The method for alarming and handling equipment failure according to claim 1, characterized in that: The retrieving a corresponding processing solution according to the equipment fault alarm level and feeding back the processing solution to the operation and maintenance personnel includes: Setting a data solution library, wherein the data solution library includes a first-level alarm handling solution, a second-level alarm handling solution, a third-level alarm handling solution, a fourth-level alarm handling solution, and a fifth-level alarm handling solution; A handling solution in the data solution library is matched according to the equipment alarm level.
9. An alarm and processing system based on equipment failure, characterized in that: include: An abnormal data information acquisition unit is used to acquire abnormal data information of the device when a device fails; A fault type and service type determination unit, configured to preprocess the device abnormality data information, and determine the device fault type and device service type based on the preprocessed device abnormality data information; A fault alarm classification determination unit, used to determine the equipment fault alarm classification according to the equipment fault type and the equipment service type; A fault alarm level determination unit, configured to determine a device fault alarm level based on the device fault alarm classification; The processing solution feedback unit is used to retrieve the corresponding processing solution according to the equipment fault alarm level and feed back the processing solution to the operation and maintenance personnel.
10. A computer device comprising a memory, a processor, and computer-readable instructions stored in the memory and executable on the processor, characterized in that: When the processor executes the computer-readable instructions, the steps of the device failure-based alarm and processing method as described in any one of claims 1 to 8 are implemented.
Citation Information
Cited By
Offshore photovoltaic information management system and method, and electronic equipment
CN119477222A
Equipment fault alarm processing method and device, electronic equipment and medium
CN119814527A
Fault alarm method and system, storage medium and electronic equipment
CN119863105A
Storage device fault prediction method, electronic device, storage medium and program product
CN120386688A
Fault early warning method, device and equipment of automatic control system and storage medium
CN120891819A