Calculation method for temporary plugging pressure required by temporary plugging and fracturing of pore type reservoir seam
The temporary plug pressure is calculated through numerical theory, combined with the fluid flow in the seam and the rock deformation equation, the problem of temporary plug pressure calculation in the temporary plug fracturing of the porous reservoir joint outlet is solved, and low-cost and efficient capacity improvement is achieved.
Patent Information
- Application Number
- CN202410947624.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-16
- Publication Date
- 2024-11-08
AI Technical Summary
The prior art is difficult to accurately calculate the temporary blocking pressure required for temporary blocking and fracturing of pore reservoir joints, which leads to high cost and long time consuming, and cannot effectively increase the single well production capacity and output.
By obtaining geological and engineering parameters, the fluid flow equation, rock deformation equation and stress equilibrium equation in the joint joint, combined with the crack expansion criteria, the temporary plugging pressure is calculated using numerical theoretical methods, including the finite volume method and the boundary element method, and the joint mouth is judged by judging the joint mouth with a numerical theoretical method. The pressure of the lower reservoir to rupture is temporarily blocked.
The temporary blockage pressure is calculated quickly and at low cost, which improves efficiency, and can quickly explore the impact of different factors on temporary blockage pressure, and provide theoretical and scientific guidance for the design of temporary blockage pressure, reducing experimental costs and time.
Smart Images

Figure CN118916580A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to an oil and gas field fracturing production increasing technology, in particular to a method for calculating the temporary plugging pressure required for temporary plugging fracturing of porous reservoir seams, and belongs to the field of oil and gas field production increasing transformation. Background Art
[0002] As oil and gas exploration and development move towards deep layers, the burial depth gradually increases, the compaction effect becomes obvious, the reservoir porosity and permeability become significantly lower, and the natural production capacity of a single well is very limited. The industry generally believes that hydraulic fracturing and acid fracturing are one of the main means of increasing the production of oil and gas reservoirs. However, for porous reservoirs with low brittleness index and large horizontal stress difference, a conventional fracturing operation can only obtain a simple artificial fracture, and the post-fracturing transformation volume is very small, the single well production capacity is small, and the production decreases rapidly. Therefore, temporary plugging fracturing technology came into being. The principle of this technology is mainly: relying on the diverter to temporarily plug the artificial fractures that have been formed, under the combined effects of the pressure at the bottom of the well and in the fracture under injection, the fluid filtering into the reservoir, and the induced stress generated by the artificial fractures, the reservoir breaks again to generate new fractures; after the construction is completed, the diverter automatically degrades to restore the production capacity of the temporarily blocked artificial fractures, and together with the formed new fractures, a complex fracture network is formed, thereby increasing the transformation volume and greatly improving the production capacity and output of a single well. However, it is not clear how much temporary plugging pressure is needed to cause the reservoir to re-rupture during temporary plugging fracturing. Currently, the temporary plugging pressure is mostly determined through indoor and mineral experiments, which has problems such as high cost and time-consuming. Summary of the invention
[0003] The purpose of the present invention is to solve the above-mentioned problems and propose a method for calculating the temporary plugging pressure required for temporary plugging fracturing of porous reservoirs. The specific technical scheme is as follows: Figure 1 shown.
[0004] Step S1: Obtain geological and engineering parameters. Geological parameters include reservoir burial depth, geostress, rock mechanical parameters (Young's modulus, Poisson's ratio, fracture toughness, tensile strength, etc.), physical parameters (porosity and permeability, etc.), pore elastic constant, reservoir pore pressure, etc. Engineering parameters include perforation location, viscosity and density of fracturing fluid or acid, injection rate and time.
[0005] Step S2: The fluid flow equation in the fracture, the rock deformation equation, and the stress balance equation are combined, and the artificial fractures formed by the first stage of fluid injection fracturing are calculated in combination with the fracture extension criterion.
[0006] Based on the principle of mass conservation, for incompressible fluid, the flow equation of the fluid in the crack is:
[0007]
[0008] Where: w——crack width, m; μ——viscosity of fracturing fluid or acid, Pa·s; pf ——Fracturing fluid or acid pressure in the fracture, Pa; t——Construction time, s; V L ——Fracturing fluid or acid loss rate, m / s; q l ——Fracturing fluid or acid injection rate, m / s. Use the finite volume method to solve the fluid flow equation in the fracture.
[0009] Based on the boundary element method, the deformation equation of element i in the rock mass is (Du J, Chen X, Liu PL, et al., Numerical Modeling of Fracture Height Propagation in Multilayer Formations Considering the Plastic Zone and Induced Stress[J]. ACS Omega 2022 7(21), 17868-17880):
[0010]
[0011] Where: C ij ns , C ij nn , C ij ss and C ij sn ——Influence coefficient of unit j on unit i, Pa / m; D n and D s ——Normal and tangential displacement discontinuities of the element, m; σ n and σ s ——Normal and tangential stresses of the unit, Pa; N——The crack in the rock mass is divided into N units. The crack width w is equal to the crack normal displacement discontinuity D n .
[0012] For a vertical seam, the stress equilibrium equation for element i is:
[0013]
[0014] Where: H and σ h ——horizontal maximum and minimum principal stresses, Pa; ψ——the angle between element i and the direction of minimum horizontal principal stress, rad.
[0015] The crack extension criterion uses the maximum tensile stress criterion to determine whether the crack extends and the extension direction.
[0016] Step S3: Calculate the induced stress generated by the artificial fracture under temporary plugging of the fracture mouth. After obtaining the displacement discontinuity of the fracture unit, the induced stress generated by the artificial fracture under temporary plugging of the fracture mouth on any point (point p) in the rock mass can be calculated based on the displacement discontinuity method:
[0017]
[0018] Where: C pj xy , C pj xx , C pj yy and C pj yx ——Stress influence coefficient of element j at point p, Pa / m; Δσ p xx and Δσ p yy ——induced stress in x and y directions at point p, Pa; h——crack height, m; d pj ——the distance between elements j and p, m; x and y——the directions of horizontal minimum and maximum principal stresses.
[0019] Step S4: Calculate the circumferential stress at any point in the rock mass under the combined effects of temporary plugging, geostress, induced stress and fluid injection. Based on the theory of elastic mechanics, the circumferential stress at any point (point p) in the rock mass is:
[0020]
[0021] in:
[0022]
[0023] Where: θ is the angle between the line connecting point p and the center of the wellbore and the y direction of the coordinate axis, rad; α is the pore elastic constant; p e ——reservoir pore pressure, Pa; ν——Poisson’s ratio.
[0024] Step S5: Calculate the pressure of the reservoir re-rupture under the temporary plugging of the fracture. The maximum tensile stress criterion is used to judge the reservoir rupture, and the expression is:
[0025]
[0026] Where: ——effective circumferential stress, Pa; σ t ——Tensile strength of rock, Pa.
[0027] If the reservoir permeability is high, the fracturing fluid or acid loss is obvious, and the effective circumferential stress for:
[0028]
[0029] Then, considering the filtration loss, the pressure of the reservoir re-rupture under the temporary plugging of the fracture is:
[0030]
[0031] If the reservoir is dense, the loss of fracturing fluid or acid can be ignored, and the effective circumferential stress for:
[0032]
[0033] Then, ignoring the filtration loss, the pressure of the reservoir re-rupture under the temporary plugging of the fracture is:
[0034]
[0035] Step S6: Calculate the temporary plugging pressure required for the reservoir to re-break down after the temporary plugging of the fracture. For the temporary plugging fracturing of the porous reservoir fracture, the temporary plugging pressure refers to the pressure difference that the diverting agent is subjected to when the reservoir is re-broken after the temporary plugging, such as Figure 2 As shown, it is expressed as:
[0036]
[0037] Where: P div ——temporary plugging pressure, Pa; ——Minimum fracture pressure around the well, Pa; P fr ——Pressure inside the seam at the front end of the diverter, Pa.
[0038] The inventors found that the existing patent CN115822538A discloses a method and device for determining temporary plugging agents for multi-scale shale temporary plugging and fracturing. The temporary plugging pressure is obtained by experimental means, which requires the use of large-sized rock samples. The source of rock samples is very limited, generally cement blocks or outcrop rock samples. The experiment is time-consuming and labor-intensive, and the cost is extremely high. Compared with the existing patents, the main differences of the present invention are: (1) The method for obtaining temporary plugging pressure is different. The present invention is a numerical theoretical calculation method; (2) The present invention is more efficient and less costly.
[0039] The benefits of the present invention are as follows: the present invention is a numerical theoretical calculation method, which is low in cost and high in efficiency, can quickly explore the influence of different factors on temporary plugging pressure, and provide theoretical scientific guidance for temporary plugging pressure design. Other advantages, objectives and features of the present invention will be reflected in part through the following description, and in part will be understood by those skilled in the art through research and practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] Figure 1 This is a flow chart for calculating the temporary plugging pressure required for temporary plugging fracturing of porous reservoir fractures.
[0041] Figure 2 Schematic diagram of temporary plugging and fracturing of porous reservoir fractures.
[0042] Figure 3 This is a cloud diagram of rock fracture pressure near the wellbore when the porous reservoir fracture is temporarily blocked. DETAILED DESCRIPTION
[0043] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.
[0044] Temporary plugging and fracturing was carried out on a low-permeability sandstone gas reservoir. The geological parameters are shown in Table 1.
[0045] Table 1 Geological parameters
[0046]
[0047] The well was completed by casing perforation, with perforation only in the #2 layer, and injected through a 73.8mm outer diameter tubing. The density, viscosity, injection rate, and time of the fracturing fluid were 1000kg / m 3 , 50mPa·s, 3.5m 3 / min and 30min, the rock tensile strength is 5.4MPa, the pore elastic constant is 1, the reservoir pore pressure is 80MPa, and filtration loss is considered. Based on the above data, run steps S2 to S5 in sequence, the formula is a numerical solution, and the final calculation result is as follows Figure 3 As shown. Figure 3 The minimum pressure value for re-fracture of the rock around the wellbore after temporary plugging of the fracture can be obtained. is 189.6MPa, and the pressure in the front seam of the diverter is P fr If the temporary plugging pressure is 167.5MPa, the temporary plugging pressure should be no less than 22.1MPa.
[0048] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Although the present invention has been disclosed as a preferred embodiment as above, it is not used to limit the present invention. Any technician familiar with this profession can make some changes or modify the technical contents disclosed above into equivalent embodiments without departing from the scope of the technical solution of the present invention. However, any simple modification, equivalent change and modification made to the above embodiments according to the technical essence of the present invention without departing from the content of the technical solution of the present invention still fall within the scope of the technical solution of the present invention.
Claims
1. A method for calculating the temporary plugging pressure required for temporary plugging fracturing of porous reservoir fractures, characterized in that: The following steps are involved: S1: Obtain geological and engineering parameters; geological parameters include reservoir depth, geostress, rock mechanics parameters (Young's modulus, Poisson's ratio, fracture toughness, tensile strength, etc.), physical parameters (porosity and permeability, etc.), pore elastic constant, reservoir pore pressure, etc.; engineering parameters include perforation position, viscosity and density of fracturing fluid or acid, injection rate and time; S2: Combine the fluid flow equation in the fracture, the rock deformation equation, and the stress balance equation, and combine the maximum tensile stress crack extension criterion to calculate the artificial fractures formed by the first stage of hydraulic fracturing; S3: Use the displacement discontinuity method to calculate the induced stress generated by the artificial cracks under temporary plugging of the crack mouth; S4: Calculate the circumferential stress at any point of the rock mass under the combined effects of temporary plugging, geostress, induced stress and fluid injection; S5: Calculate the re-rupture pressure of the reservoir under temporary plugging of fractures using the maximum tensile stress criterion; S6: Calculate the temporary plugging pressure required for the reservoir to re-rupture under temporary plugging of the fracture.
2. The method for calculating the temporary plugging pressure required for temporary plugging fracturing of porous reservoir fractures according to claim 1, characterized in that: In step S4, the circumferential stress at any point (point p) in the rock mass is: in: Where: H and σ h ——maximum and minimum horizontal principal stresses, Pa; and ——induced stress in x and y directions at point p, Pa; θ——angle between the line connecting point p and the wellbore center and the y direction of the coordinate axis, rad; p f ——Fracturing fluid or acid pressure in the fracture, Pa; p e ——reservoir pore pressure, Pa; α——pore elastic constant; ν——Poisson's ratio.
3. The method for calculating the temporary plugging pressure required for temporary plugging fracturing of porous reservoir fractures according to claim 1, characterized in that: In step S5, the maximum tensile stress criterion is used to calculate the pressure of the reservoir re-rupture under the temporary plugging of the fracture: If filtration loss is considered, the effective circumferential stress for: Then, the pressure of the reservoir re-rupture under the temporary plugging of the fracture is: If filtration loss is neglected, the effective circumferential stress for: Then, the pressure of the reservoir re-rupture under the temporary plugging of the fracture is: Where: ——effective circumferential stress, Pa; σ t ——Tensile strength of rock, Pa.
4. The method for calculating the temporary plugging pressure required for temporary plugging fracturing of porous reservoir fractures according to claim 1, characterized in that: In step S6, the temporary blocking pressure is expressed as: Where: P div ——temporary plugging pressure, Pa; ——Minimum fracture pressure around the well, Pa; P fr ——Pressure inside the seam at the front end of the diverter, Pa.