Fabricated building design and construction integrated decision optimization method and system based on BIM

By introducing multi-level administrator accounts and AIoT models into the BIM system, the problems of information barriers and supervision difficulties are solved, real-time information sharing and cost optimization of architectural design and construction are realized, and construction quality and profitability are improved.

CN118916950APending Publication Date: 2024-11-08湖北恒信铭扬置业集团有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410842351.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-26
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

When existing technology uses BIM for architectural design, management and construction, it is difficult for management departments to effectively understand and obtain information from the design and construction departments, resulting in information barriers and supervision difficulties, affecting construction progress and cost control.

Method used

Adopt the integrated decision-making optimization method and system of prefabricated building design and construction based on BIM, through basic construction, cloud construction and substantive management construction, combined with multi-level administrator accounts, artificial intelligence and engineering Internet of Things, equipped with AIoT models to realize real-time information Sharing and regulation.

Benefits of technology

It has achieved real-time grasp and control of construction, design and supervision information by the management department, improved project dynamic management and cost optimization capabilities, and improved construction quality and profitability.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The invention discloses a BIM-based fabricated building design and construction integrated decision optimization method and system, and the method comprises basic construction, cloud construction and substantial management construction, the basic construction comprises a BIM model, and the cloud construction comprises engineering Internet of Things construction, administrator construction and artificial intelligence construction. The substantial management construction comprises project actual construction and project process construction, and the basic construction is bridged with the cloud construction; relates to the technical field of BIM optimization methods and systems. According to the invention, by designing multiple levels of administrator accounts and applying different permissions to different levels of administrator accounts, the management department can effectively grasp information of related departments such as construction, design and supervision in real time when the project is implemented, and the construction cost, the BIM design effect and the supervision effect are mastered; therefore, an administrator is effectively helped to master the dynamic state of the project, and an effective management method and means are provided for the administrator to coordinate project execution and supervise the project.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of BIM optimization methods and systems, and in particular to a BIM-based prefabricated building design and construction integrated decision-making optimization method and system. Background Art

[0002] BIM stands for Building Information Modeling, which can help realize the integration of building information. From the design, construction, operation to the end of the building's life cycle, various information is always integrated in a three-dimensional model information database. Design teams, construction units, facility operation departments, owners and other parties can work together based on BIM to effectively improve work efficiency, save resources, reduce costs, and achieve sustainable development.

[0003] The core of BIM is to establish a virtual three-dimensional model of the construction project and use digital technology to provide this model with a complete and actual construction project information database. This information database not only contains geometric information, professional attributes and status information describing the building components, but also contains status information of non-component objects (such as space and motion behavior). With the help of this three-dimensional model containing construction project information, the degree of information integration of the construction project is greatly improved, thus providing a platform for engineering information exchange and sharing for the stakeholders of the construction project.

[0004] BIM has the following characteristics: it can be used not only in design, but also in the entire life cycle of construction projects; design with BIM is digital design; BIM's database is dynamically changing and is constantly updated, enriched and enriched during the application process; it provides a platform for collaborative work for all parties involved in the project.

[0005] When using BIM to generate building information such as building design, building management, construction management, personnel management and cost budget, existing technologies make it difficult to pass down the management regulations of the management department to the design department, construction department and supervision department, resulting in information barriers among the management department, design department, construction department and supervision department, making it difficult to obtain, execute and feedback work information without obstacles, and unable to effectively supervise, affecting the progress and effect of design and construction;

[0006] Furthermore, since each project in the existing technology is relatively independent, it is difficult for offline construction, design, management and supervision units to obtain industry information in a timely manner and to modify their own projects, resulting in offline projects being unable to modify their own design and construction methods in a timely manner. When establishing projects, designing and constructing projects under conditions of backward information, there will be a problem of reduced profitability, and there is room for improvement. Summary of the invention

[0007] The purpose of the present invention is to provide a BIM-based prefabricated building design and construction integrated decision-making optimization method and system to solve the problems raised in the above background technology.

[0008] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a BIM-based integrated decision-making optimization method and system for prefabricated building design and construction, including a basic construction, a cloud construction and an actual management construction, the basic construction including a BIM model, the cloud construction including an engineering Internet of Things construction, an administrator construction and an artificial intelligence construction, the actual management construction including an actual project construction and a project process construction, the basic construction is bridged with the cloud construction, and the actual management construction is bridged with the cloud construction; the BIM model construction includes a BIM construction drawing design model, a BIM cost control model and a BIM tracking model, the administrator construction is provided with multiple levels of administrator accounts, and the management authority of the multiple levels of the administrator accounts increases step by step with the serial number, the artificial intelligence construction is bridged with the engineering Internet of Things construction and is carried on the AIoT model for use, the BIM construction drawing design model, the BIM cost control model, the BIM tracking model and the administrator account can all interact with the AIoT model to realize project design, project management and project supervision functions.

[0009] As a further solution of the present invention: the actual construction of the project includes the project department, design department, engineering department and supervision department, and the project process construction includes project overall management, project design planning, project on-site construction and project on-site acceptance. The actual construction of the project and the project process construction are both bridged with the administrator account.

[0010] As a further solution of the present invention: the engineering Internet of Things construction includes a cloud server, a control terminal and an edge computing module. The cloud server and the edge computing module are bridged with the control terminal. The administrator account can transmit data to the edge computing module through the control terminal, and the administrator account can transmit data to the cloud server through the control terminal.

[0011] As a further solution of the present invention: the AIoT model simulates the BIM cost control model, BIM construction drawing design model and BIM tracking model in sequence and generates cost control series data, construction drawing and construction process series data, and supervision and inspection data.

[0012] As a further solution of the present invention: the project department and project overall management are bridged with the fourth-level administrator account, the design department and project design planning are bridged with the third-level administrator account, the engineering department and project on-site construction are bridged with the second-level administrator account, and the supervision department and project on-site acceptance are bridged with the first-level administrator account.

[0013] As a further solution of the present invention: the fourth-level administrator account has the authority to manage, modify and view cost control series data, construction drawings and construction process series data, and supervision and inspection data; the third-level administrator account has the authority to manage, modify and view construction drawings and construction process series data; the second-level administrator account has the authority to view construction drawings and construction process series data and supervision and inspection data; the first-level administrator account has the authority to manage, modify and view supervision and inspection data.

[0014] As a further solution of the present invention: the AIoT model is bridged with several terminals through the engineering Internet of Things, and a correction model is provided in the AIoT model. The AIoT model corrects the data in the BIM cost control model, the BIM construction drawing design model and the BIM tracking model through the correction model.

[0015] As a further solution of the present invention: the fourth-level administrator account has the authority to view and modify the cost control series data, construction drawings and construction process series data, and supervision and inspection data of the AIoT model; the third-level administrator account has the authority to view and modify the construction drawings and construction process series data of the AIoT model; the second-level administrator account has the authority to view and modify the construction drawings and construction process series data and supervision and inspection data of the AIoT model; the first-level administrator account has the authority to view and modify the supervision and inspection data of the AIoT model.

[0016] As a further solution of the present invention: the AIoT model divides the BIM cost control model into a cost budget area, a benefit budget area and a personnel management area; the AIoT model divides the BIM construction drawing design model into a building drawing model building area and a building construction process model building area; the AIoT model divides the BIM tracking model into a project follow-up construction management area and a finished product acceptance area; the four-level administrator account has the authority to view, modify and manage the cost budget area, the benefit budget area and the personnel management area; the four-level administrator account has the authority to view, modify and manage the building drawing model building area, the building construction process model building area, the project follow-up construction management area and the finished product acceptance area The third-level administrator account has the authority to view, modify and manage the building drawing model building area and the building construction process model building area. The third-level administrator account has the authority to view the cost budget area, the personnel management area and the finished product acceptance area. The second-level administrator account has the authority to view the personnel management area, the building drawing model building area, the building construction process model building area and the finished product acceptance area. The first-level administrator account has the authority to view the personnel management area, the building drawing model building area and the building construction process model building area. The administrator account has the authority to view, modify and manage the project follow-up construction management area and the finished product acceptance area.

[0017] As a further solution of the present invention: the AIoT model can randomly generate a key to the terminal, and the administrator account needs to log in and use the key.

[0018] Compared with the prior art, the present invention has the following beneficial effects:

[0019] 1. By designing multi-level administrator accounts and applying different permissions to administrator accounts of different levels, the management department can effectively grasp the information of relevant departments such as construction, design and supervision in real time during project implementation, and control the construction cost, BIM design effect and supervision effect, thereby effectively helping the administrator to grasp the project dynamics and providing effective management methods and means for the administrator to coordinate project execution and conduct project supervision;

[0020] 2. By bridging the AIoT model equipped with artificial intelligence and the engineering Internet of Things with the BIM model, the BIM cost control model for project fund management, the BIM construction drawing design model for project drawings and construction process management, and the BIM tracking model for project execution, construction and supervision are designed. The AIoT model can obtain data from multiple projects through the engineering Internet of Things, and use artificial intelligence to optimize the data algorithm, so as to supervise and optimize funds at the data level and improve profitability, optimize drawings at the design level and improve building quality, supervise the site at the construction level and supervision level to ensure building quality, and help administrators realize project management and cost optimization capabilities. DETAILED DESCRIPTION

[0021] The following will be combined with the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0022] In the description of the present invention, it should be noted that, for those skilled in the art, the specific meanings of the above terms in the present invention can be understood in specific situations. The following describes an embodiment of the present invention based on its overall structure.

[0023] In an embodiment of the present invention, a BIM-based integrated decision-making optimization method and system for prefabricated building design and construction includes a basic construction, a cloud construction and an actual management construction. The basic construction includes a BIM model, the cloud construction includes an engineering Internet of Things construction, an administrator construction and an artificial intelligence construction, and the actual management construction includes a project actual construction and a project process construction. The basic construction is bridged with the cloud construction, and the actual management construction is bridged with the cloud construction; the BIM model construction includes a BIM construction drawing design model, a BIM cost control model and a BIM tracking model. The administrator construction is provided with multiple levels of administrator accounts, and the management authority of the multiple levels of the administrator accounts increases step by step with the serial number. The artificial intelligence construction is bridged with the engineering Internet of Things construction and is carried on the AIoT model for use. The BIM construction drawing design model, the BIM cost control model, the BIM tracking model and the administrator account can all interact with the AIoT model to realize project design, project management and project supervision functions.

[0024] By designing multi-level administrator accounts and applying different permissions to administrator accounts of different levels, the management department can effectively grasp the information of relevant departments such as construction, design and supervision in real time during project implementation, and control the construction cost, BIM design effect and supervision effect, which effectively helps the administrator to grasp the project dynamics and provides effective management methods and means for the administrator to coordinate project execution and conduct project supervision;

[0025] In addition, by bridging the AIoT model equipped with artificial intelligence to build and connect the engineering Internet of Things with the BIM model, the BIM cost control model for project fund management, the BIM construction drawing design model for project drawings and construction process management, and the BIM tracking model for project execution, construction and supervision are designed. The AIoT model can obtain data from multiple projects through the engineering Internet of Things, and use artificial intelligence to optimize the data through algorithms, to supervise and optimize funds at the data level and improve profitability, optimize drawings at the design level and improve building quality, supervise the site at the construction and supervision levels and ensure building quality, helping administrators to achieve project management and cost optimization capabilities.

[0026] As a further solution of the present invention: the actual construction of the project includes the project department, design department, engineering department and supervision department; the project process construction includes project overall management, project design planning, project on-site construction and project on-site acceptance; the actual construction of the project and the project process construction are both bridged with the administrator account; the BIM model construction includes BIM construction drawing design model, BIM cost control model and BIM tracking model; the administrator construction is provided with multi-level administrator accounts, and the management authority of the multi-level administrator accounts increases step by step with the serial number; the artificial intelligence construction is bridged with the engineering Internet of Things construction and is carried on the AIoT model for use; the BIM construction drawing design model, BIM cost control model, BIM tracking model and administrator account can all interact with the AIoT model to realize project design, project management and project supervision functions.

[0027] Similarly, based on the AIoT model, the actual project construction, including the project department, design department, engineering department and supervision department, can be managed and calculated by model, and the senior administrator account can manage the project department, design department, engineering department and supervision department.

[0028] As a further solution of the present invention: the engineering Internet of Things construction includes a cloud server, a control terminal and an edge computing module. The cloud server and the edge computing module are bridged with the control terminal. The administrator account can transmit data to the edge computing module through the control terminal, and the administrator account can transmit data to the cloud server through the control terminal.

[0029] Similarly, the engineering Internet of Things can be used to aggregate data from multiple project departments in the cloud, and then optimize calculations through artificial intelligence to coordinate the data of each project department and improve offline projects.

[0030] As a further solution of the present invention: the AIoT model simulates the BIM cost control model, BIM construction drawing design model and BIM tracking model in sequence and generates cost control series data, construction drawing and construction process series data, and supervision and inspection data.

[0031] As a further solution of the present invention: the project department and project overall management are bridged with the fourth-level administrator account, the design department and project design planning are bridged with the third-level administrator account, the engineering department and project on-site construction are bridged with the second-level administrator account, and the supervision department and project on-site acceptance are bridged with the first-level administrator account.

[0032] As a further solution of the present invention: the fourth-level administrator account has the authority to manage, modify and view cost control series data, construction drawings and construction process series data, and supervision and inspection data; the third-level administrator account has the authority to manage, modify and view construction drawings and construction process series data; the second-level administrator account has the authority to view construction drawings and construction process series data and supervision and inspection data; the first-level administrator account has the authority to manage, modify and view supervision and inspection data.

[0033] As a further solution of the present invention: the AIoT model is bridged with several terminals through the engineering Internet of Things, and a correction model is provided in the AIoT model. The AIoT model corrects the data in the BIM cost control model, the BIM construction drawing design model and the BIM tracking model through the correction model.

[0034] As a further solution of the present invention: the fourth-level administrator account has the authority to view and modify the cost control series data, construction drawings and construction process series data, and supervision and inspection data of the AIoT model; the third-level administrator account has the authority to view and modify the construction drawings and construction process series data of the AIoT model; the second-level administrator account has the authority to view and modify the construction drawings and construction process series data and supervision and inspection data of the AIoT model; the first-level administrator account has the authority to view and modify the supervision and inspection data of the AIoT model.

[0035] As a further solution of the present invention: the AIoT model divides the BIM cost control model into a cost budget area, a benefit budget area and a personnel management area; the AIoT model divides the BIM construction drawing design model into a building drawing model building area and a building construction process model building area; the AIoT model divides the BIM tracking model into a project follow-up construction management area and a finished product acceptance area; the four-level administrator account has the authority to view, modify and manage the cost budget area, the benefit budget area and the personnel management area; the four-level administrator account has the authority to view, modify and manage the building drawing model building area, the building construction process model building area, the project follow-up construction management area and the finished product acceptance area The third-level administrator account has the authority to view, modify and manage the building drawing model building area and the building construction process model building area. The third-level administrator account has the authority to view the cost budget area, the personnel management area and the finished product acceptance area. The second-level administrator account has the authority to view the personnel management area, the building drawing model building area, the building construction process model building area and the finished product acceptance area. The first-level administrator account has the authority to view the personnel management area, the building drawing model building area and the building construction process model building area. The administrator account has the authority to view, modify and manage the project follow-up construction management area and the finished product acceptance area.

[0036] As a further solution of the present invention: the AIoT model can randomly generate a key to the terminal, and the administrator account needs to log in and use the key.

[0037] The working principle of the present invention is: when the existing technology uses BIM to generate building information such as building design, building management, construction management, personnel management and cost budget, it is difficult to pass the management regulations of the management department to the design department, construction department and supervision department, resulting in information barriers among the management department, design department, construction department and supervision department, making it difficult to obtain, execute and feedback work information without obstacles, and unable to effectively supervise, affecting the progress and effect of design and construction;

[0038] Furthermore, since each project in the existing technology is relatively independent, it is difficult for offline construction, design, management and supervision units to obtain industry information in a timely manner and to modify their own projects, resulting in offline projects being unable to modify their own design and construction methods in a timely manner. When establishing projects, designing and constructing projects under conditions of backward information, there will be a problem of reduced profitability, and there is room for improvement.

[0039] In the course of work, this application designs multi-level administrator accounts and imposes different permissions on administrator accounts of different levels. When the project is implemented, the management department can grasp the information of relevant departments such as construction, design and supervision in real time and effectively, and control the construction cost, BIM design effect and supervision effect, thereby effectively helping the administrator to grasp the project dynamics and providing effective management methods and means for the administrator to coordinate project execution and conduct project supervision; and, by bridging the AIoT model equipped with artificial intelligence construction and engineering Internet of Things with the BIM model, the BIM cost control model for project fund management, the BIM construction drawing design model for project drawings and construction process management, and the BIM tracking model for project execution, construction and supervision are designed. The AIoT model can obtain data from multiple projects through the engineering Internet of Things, and the artificial intelligence can optimize the data algorithmically, so as to supervise and optimize funds at the data level and improve profitability, optimize drawings at the design level and improve building quality, supervise the site at the construction level and supervision level, and ensure building quality, so as to help administrators realize project management and cost optimization capabilities.

[0040] What has been described above are only preferred specific implementations of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field, within the technical scope disclosed by the present invention, can make equivalent replacements or changes based on the technical solutions and inventive concepts of the present invention, which should be covered by the protection scope of the present invention.

Claims

1. Integrated decision-making optimization method and system for prefabricated building design and construction based on BIM, including basic construction, cloud construction and actual management construction, Features: The basic construction includes a BIM model, the cloud construction includes an engineering IoT construction, an administrator construction, and an artificial intelligence construction, the substantial management construction includes a project actual construction and a project process construction, the basic construction is bridged with the cloud construction, and the substantial management construction is bridged with the cloud construction; The BIM model construction includes a BIM construction drawing design model, a BIM cost control model and a BIM tracking model. The administrator construction is provided with multiple levels of administrator accounts, and the management authority of the multiple levels of administrator accounts increases step by step with the serial number. The artificial intelligence construction is bridged with the engineering Internet of Things construction and is carried on the AIoT model for use. The BIM construction drawing design model, BIM cost control model, BIM tracking model and administrator account can all interact with the AIoT model to realize project design, project management and project supervision functions.

2. According to the BIM-based prefabricated building design and construction integrated decision-making optimization method and system according to claim 1, It is characterized in that The actual construction of the project includes the project department, design department, engineering department and supervision department. The project process construction includes project overall management, project design planning, project on-site construction and project on-site acceptance. The actual construction of the project and the project process construction are both bridged with the administrator account.

3. According to the BIM-based prefabricated building design and construction integrated decision-making optimization method and system according to claim 2, It is characterized in that The engineering Internet of Things construction includes a cloud server, a control terminal and an edge computing module. The cloud server and the edge computing module are bridged with the control terminal. The administrator account can transmit data to the edge computing module through the control terminal, and the administrator account can transmit data to the cloud server through the control terminal.

4. According to the BIM-based prefabricated building design and construction integrated decision-making optimization method and system according to claim 3, It is characterized in that The AIoT model simulates the BIM cost control model, BIM construction drawing design model and BIM tracking model in sequence and generates cost control series data, construction drawing and construction process series data, and supervision and inspection data.

5. According to the BIM-based prefabricated building design and construction integrated decision-making optimization method and system according to claim 4, It is characterized in that The project department and project overall management are bridged with the fourth-level administrator account, the design department and project design planning are bridged with the third-level administrator account, the engineering department and project on-site construction are bridged with the second-level administrator account, and the supervision department and project on-site acceptance are bridged with the first-level administrator account.

6. According to the BIM-based prefabricated building design and construction integrated decision-making optimization method and system according to claim 5, It is characterized in that The fourth-level administrator account has the authority to manage, modify and view cost control series data, construction drawings and construction process series data, and supervision and inspection data; the third-level administrator account has the authority to manage, modify and view construction drawings and construction process series data; the second-level administrator account has the authority to view construction drawings and construction process series data and supervision and inspection data; the first-level administrator account has the authority to manage, modify and view supervision and inspection data.

7. According to claim 6, the BIM-based prefabricated building design and construction integrated decision-making optimization method and system, It is characterized in that The AIoT model is bridged with several terminals through the engineering Internet of Things. A correction model is provided in the AIoT model. The AIoT model corrects the data in the BIM cost control model, the BIM construction drawing design model and the BIM tracking model through the correction model.

8. According to the BIM-based prefabricated building design and construction integrated decision-making optimization method and system according to claim 7, It is characterized in that The fourth-level administrator account has the authority to view and modify the cost control series data, construction drawings and construction process series data, and supervision and inspection data through the AIoT model; the third-level administrator account has the authority to view and modify the construction drawings and construction process series data through the AIoT model; the second-level administrator account has the authority to view and modify the construction drawings and construction process series data and supervision and inspection data through the AIoT model; the first-level administrator account has the authority to view and modify the supervision and inspection data through the AIoT model.

9. According to the BIM-based prefabricated building design and construction integrated decision-making optimization method and system of claim 8, It is characterized in that The AIoT model divides the BIM cost control model into a cost budget area, a benefit budget area and a personnel management area. The AIoT model divides the BIM construction drawing design model into a building drawing model building area and a construction process model building area. The AIoT model divides the BIM tracking model into a project follow-up construction management area and a finished product acceptance area. The fourth-level administrator account has the authority to view, modify and manage the cost budget area, the benefit budget area and the personnel management area. The fourth-level administrator account has the authority to view the building drawing model building area, the construction process model building area, the project follow-up construction management area and the finished product acceptance area. The third-level administrator account has the authority to view, modify and manage the building drawing model building area and the construction process model building area. The third-level administrator account has the authority to view the cost budget area, the personnel management area and the completion acceptance area. The second-level administrator account has the authority to view the personnel management area, the building drawing model building area, the construction process model building area and the finished product acceptance area. The first-level administrator account has the authority to view the personnel management area, the building drawing model building area and the construction process model building area. The administrator account has the authority to view the project follow-up construction management area and the finished product acceptance area.

10. According to the BIM-based prefabricated building design and construction integrated decision-making optimization method and system according to claim 9, It is characterized in that The AIoT model can randomly generate a key to the terminal, and the administrator account needs to log in and use the key.