Energy storage power generation system and control method thereof
By optimizing the energy storage converter architecture and real-time monitoring of the grid status, using the short-term overload capacity of the energy storage converter, the stable operation and grid support of the energy storage power generation system during transient overload of the power grid is achieved, and the existing system is solved The problem of insufficient transient current overload capacity improves system efficiency and grid stability.
Patent Information
- Application Number
- CN202410888889.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-03
- Publication Date
- 2024-11-08
AI Technical Summary
When the existing energy storage power generation system is transiently overloaded in the power grid, the transient current overload capacity is insufficient, resulting in an increase in the stability risk of the power grid. How to improve the transient current overload capacity of the energy storage converter network system to enhance the support capacity of the power grid. .
By optimizing the energy storage converter architecture design of the energy storage power generation system, making full use of the short-term overload capability of the semiconductor devices inside the energy storage converter, designing the energy storage converter to enter a steady-state working mode when meeting the preset conditions. Switch to the transient working mode when the conditions are not met, and use real-time monitoring of the grid voltage and frequency, timely switching to cope with grid faults, and reduce the number of energy storage converters to reduce costs.
It improves the transient overload capacity of the energy storage power generation system, simplifies the system architecture, improves the system efficiency and grid support effect, reduces system costs, and ensures the stable operation of the power grid under transient overload conditions.
Smart Images

Figure CN118920538A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of power electronics, and in particular to an energy storage power generation system and a control method. Background Art
[0002] With the continuous development and application of new energy power generation systems, the proportion of new energy grid-connected power generation systems, represented by photovoltaic power generation and wind power generation, in the power system is increasing. As the proportion of new energy installed capacity in the power system increases, the system inertia of the power system and the short-circuit current it can provide gradually decrease, and the instability risk of the power system is increasing.
[0003] The inverter grid control technology can simulate the control characteristics of synchronous generators, enhance the ability of power generation / power supply equipment to access weak power grids, and thus improve the system inertia and stability of the power system. Generally speaking, the stronger the transient current overload capacity of the inverter grid system, the better the grid stability performance of the inverter grid system.
[0004] As a type of converter networking system, the energy storage converter networking system must have a certain transient current overload capacity when a short circuit fault or other unstable grid fault occurs in the grid. How to improve the transient current overload capacity of the energy storage converter networking system, thereby improving the support capacity of the energy storage converter networking system for the grid, has become a key research and investment direction for academia and industry. Summary of the invention
[0005] The present application provides an energy storage power generation system and a control method thereof. The energy storage power generation system can fully utilize the short-term overload capacity of the semiconductor devices inside the energy storage inverter, optimize the energy storage inverter architecture design of the energy storage power generation system, thereby simplifying the system, improving the system working efficiency, and reducing the system device cost.
[0006] In a first aspect, an embodiment of the present application discloses an energy storage power generation system, which includes an energy storage container and multiple energy storage inverters; the energy storage container includes a battery for storing electric energy; the DC side ports of the multiple energy storage inverters are connected to the energy storage container, and the AC side ports of the multiple energy storage inverters are connected in parallel and used to connect to a power grid, and the multiple energy storage inverters are used to realize current conversion between the energy storage container and the power grid; the multiple energy storage inverters are used to enter a steady-state working mode when preset conditions are met, and enter a transient working mode from the steady-state working mode when the preset conditions are not met; the preset conditions are to simultaneously meet the following three conditions, and the three conditions include: the grid voltage is within a preset voltage range, the grid frequency is within a preset frequency range The rate of change of the power grid frequency within the rate interval is less than or equal to the frequency change rate threshold; the active power output by the multiple energy storage converters in the steady-state working mode is less than the active power output by the multiple energy storage converters in the transient working mode, and the apparent power output by the multiple energy storage converters in the steady-state working mode is less than the apparent power output by the multiple energy storage converters in the transient working mode; wherein the ratio of the sum of the rated powers of the multiple energy storage converters to the rated power of the energy storage container is m, the ratio of the effective value of the sum of the currents output by the multiple energy storage converters in the transient working mode to the effective value of the sum of the currents output by the multiple energy storage converters at the rated power in the steady-state working mode is n, and m is less than n, and m is greater than 1.
[0007] In this embodiment, compared with the energy storage power generation system that does not need to support the power grid, in order to enable the energy storage power generation system in this embodiment to have the ability to support the power grid, the number of energy storage converters needs to be expanded. This embodiment requires that the parallel expansion multiple of the energy storage power generation system is less than the transient overload multiple. Under this design, the energy storage converter will be overloaded when a transient overload occurs in the energy storage power generation system. This design is feasible for the following reasons. First, the design takes into account that the duration of transient overload in the energy storage power generation system is usually very short. Therefore, even if the energy storage converter is overloaded during the transient overload, the energy storage converter can also quickly resume normal operation after the energy storage power generation system quickly returns to normal, that is, quickly exit the overload state. Furthermore, the semiconductor devices inside the energy storage converter itself have a certain short-term overload capacity, and this short-term overload capacity can fully ensure that the energy storage converter safely passes through the above-mentioned short-term overload operation state. In addition, the scheme monitors the voltage and frequency of the power grid in real time, and detects power grid faults in a timely and accurate manner. After a transient overload fault occurs in the power grid, it can quickly switch from a steady-state working mode to a transient working mode to achieve support for the power grid under various conditions. This embodiment makes full use of the physical characteristics of transient overload and the short-term overload capacity of the energy storage converter itself, simplifies the system architecture, and improves the system efficiency. It is easy to understand that since the number of energy storage converters is reduced, the system cost is also reduced. The scheme is accurate and reliable, and the power grid support effect is good.
[0008] According to the first aspect, in a possible implementation, the circuit of the energy storage converter includes an NPC circuit, and the NPC circuit includes: a DC bus; two capacitors, the two capacitors are connected in series between the positive electrode of the DC bus and the negative electrode of the DC bus; a switch tube bridge arm, the switch tube bridge arm is connected between the positive electrode of the DC bus and the negative electrode of the DC bus, including two outer switch tubes and a pair of inner switch tubes connected in series, the two switch tubes in the pair of inner switch tubes are connected in series, one of the two outer switch tubes is connected between the positive electrode of the DC bus and the pair of inner switch tubes, and the other of the two outer switch tubes is connected between the negative electrode of the DC bus and the pair of inner switch tubes; a pair of diodes, the two diodes in the pair of diodes are connected in series, the two ends of the pair of diodes are respectively connected to the two connection points of the two outer switch tubes and the pair of inner switch tubes, and the midpoint of the pair of diodes is connected to the midpoint of the two capacitors; the current carrying capacity of any one of the two outer switch tubes is less than the current carrying capacity of any one of the pair of diodes.
[0009] In this implementation, the circuit of the energy storage converter includes an NPC circuit, and it is particularly required that the current carrying capacity of the first switch tube and the fourth switch tube is greater than the current carrying capacity of the fifth diode and the sixth diode. This design can significantly enhance the short-term overload capacity of the energy storage converter, thereby enhancing the reliability of the energy storage power generation system during transient overload.
[0010] According to the first aspect, in a possible implementation manner, each of the two outer switch tubes and the pair of inner switch tubes is connected in parallel with a body diode.
[0011] According to the first aspect, in a possible implementation, the energy storage power generation system includes a control interface, and the control interface is used to set the steady-state maximum active dispatching power and the steady-state maximum apparent dispatching power of each of the energy storage inverters, the steady-state maximum active dispatching power is the maximum active power of each of the energy storage inverters when the energy storage power generation system is in a steady-state working mode, and the steady-state maximum apparent dispatching power is the maximum apparent power of each of the energy storage inverters when the energy storage power generation system is in a steady-state working mode. By setting the steady-state maximum active dispatching power and the steady-state maximum apparent dispatching power for the energy storage inverter, the power output of the energy storage inverter can be controlled when the energy storage power generation system is in a steady state, ensuring that the energy storage inverter outputs on demand, thereby maintaining the continuous, stable and reliable operation of the entire energy storage power generation system.
[0012] According to the first aspect, in a possible implementation, the steady-state maximum active dispatching power is the ratio of the maximum active dispatching power of the energy storage power generation system to the number of the multiple energy storage inverters when the energy storage power generation system is in a steady-state working mode, and the steady-state maximum apparent dispatching power is the ratio of the maximum apparent dispatching power of the energy storage power generation system to the number of the multiple energy storage inverters when the energy storage power generation system is in a steady-state working mode. The active dispatching power and apparent dispatching power of a single energy storage inverter are determined by the composition of the energy storage power generation system, and the operating parameters of the energy storage inverter match the operating parameters of the entire energy storage power generation system, so that the scheme can be adapted to energy storage power generation systems in various scenarios, with good flexibility and a wide range of applications. By using this embodiment, the entire energy storage power generation system can be maintained to operate continuously, stably and reliably.
[0013] According to the first aspect, in a possible implementation, the maximum active dispatching power of the energy storage power generation system or the maximum dispatching apparent power of the energy storage power generation system is the rated power of the energy storage container. By setting specific values, the specific values are related to the energy storage container, thereby enhancing the reliability of the energy storage power generation system.
[0014] According to the first aspect, in a possible implementation, the energy storage power generation system includes a control interface, and the control interface is used to set the transient maximum active power and the transient maximum apparent power of each of the energy storage inverters, the transient maximum active power is the maximum active power of each of the energy storage inverters when the energy storage power generation system is in a transient working mode, and the transient maximum apparent power is the maximum apparent power of each of the energy storage inverters when the energy storage power generation system is in a transient working mode. By setting the transient maximum active power and the transient maximum apparent power of the energy storage inverter, the power output of the energy storage inverter can be controlled when the energy storage power generation system is in a transient overload, ensuring that the energy storage inverter outputs on demand, thereby maintaining the continuous, stable and reliable operation of the entire energy storage power generation system.
[0015] According to the first aspect, in a possible implementation, the transient maximum active power is the ratio of the maximum active power of the energy storage power generation system to the number of the multiple energy storage inverters when the energy storage power generation system is in a transient working mode, and the maximum apparent power is the ratio of the maximum apparent power of the energy storage power generation system to the number of the multiple energy storage inverters when the energy storage power generation system is in a transient working mode. The active power and apparent power of a single energy storage inverter are determined by the composition of the energy storage power generation system, so that the operating parameters of the energy storage inverter in this embodiment match the operating parameters of the entire energy storage power generation system. When a transient overload occurs in the energy storage power generation system, the energy storage inverter can operate at full load or even overload, thereby maintaining continuous, stable and reliable operation of the entire energy storage power generation system.
[0016] According to the first aspect, in a possible implementation, the transient maximum active power of the energy storage power generation system or the transient maximum apparent power of the energy storage power generation system is the rated power of the energy storage container. By setting specific values, the specific values are related to the energy storage container, thereby enhancing the reliability of the energy storage power generation system.
[0017] According to the first aspect, in a possible implementation, the energy storage container includes a plurality of battery clusters and a plurality of cluster-level controllers, the plurality of battery clusters and the plurality of cluster-level controllers are connected one-to-one, and the cluster-level controllers are used to perform DC / DC conversion. In this implementation, each battery cluster can be controlled by a corresponding cluster-level controller, so that the consistency requirements of the battery clusters in the embodiment of the present application are lower, so that the selection and design of the battery clusters are easier, and the corresponding battery cluster costs are lower.
[0018] According to the first aspect, in a possible implementation, each of the cluster-level controllers includes a battery cluster side port and an energy storage inverter side port, the battery cluster side port is used to connect to the battery cluster, and the energy storage inverter side port is used to connect to the energy storage inverter; the battery cluster side ports of the multiple cluster-level controllers are connected in parallel to form the positive and negative poles of the energy storage container, and the DC side ports of the multiple energy storage inverters are connected in parallel to the positive and negative poles of the energy storage container. The energy storage power generation system architecture provided in this embodiment, since the DC side of the energy storage inverter is connected in parallel and the AC side of the energy storage inverter is also connected in parallel, in the embodiment of the present application, the expansion of the energy storage inverter is very easy, so that the embodiment of the present application can be applied to countries or regions with different grid transient overload multiples requirements, and has a wide range of application scenarios.
[0019] According to the first aspect, in a possible implementation, each of the cluster-level controllers includes a battery cluster side port and an energy storage converter side port, the battery cluster side port is used to connect to the battery cluster, and the energy storage converter side port is used to connect to the energy storage converter; the multiple energy storage converters include multiple groups of energy storage converters, each group of energy storage converters includes at least two energy storage converters, the DC side ports of the energy storage converters in each group of energy storage converters are connected in parallel, and the multiple groups of energy storage converters are respectively connected one by one with the multiple cluster-level controllers. The energy storage power generation system architecture provided in this embodiment, since the DC side of the energy storage converters are connected in parallel in groups, and the AC side of the energy storage converters are also connected in parallel, in the embodiment of the present application, the expansion of the energy storage converter is relatively easy, so that the embodiment of the present application can be applied to countries or regions with different requirements for transient overload multiples of the network, and the application scenarios are relatively wide.
[0020] In a second aspect, an embodiment of the present application discloses a control method for an energy storage power generation system, the method controlling multiple energy storage converters to enter a steady-state working mode when a preset condition is met, and to enter a transient working mode from the steady-state working mode when the preset condition is not met; the preset condition is to simultaneously meet the following three conditions, the three conditions including: the voltage of the power grid is within a preset voltage range, the frequency of the power grid is within a preset frequency range, and the rate of change of the frequency of the power grid is less than or equal to a frequency change rate threshold; the active power output by the multiple energy storage converters in the steady-state working mode is less than the active power output by the multiple energy storage converters in the transient working mode, and the apparent power output by the multiple energy storage converters in the steady-state working mode is less than the apparent power output by the multiple energy storage converters in the transient working mode. The apparent power output by the converter; wherein the ratio of the sum of the rated powers of the multiple energy storage converters to the rated power of the energy storage container is m, the ratio of the effective value of the sum of the currents output by the multiple energy storage converters in the transient working mode to the effective value of the sum of the currents output by the multiple energy storage converters at the rated power in the steady-state working mode is n, the m is less than the n, and the m is greater than 1; the energy storage power generation system comprises the energy storage container, the multiple energy storage converters, the energy storage container comprises a battery for realizing the storage of electric energy, the DC side ports of the multiple energy storage converters are connected to the energy storage container, the AC side ports of the multiple energy storage converters are connected in parallel and used to be connected to the power grid, and the multiple energy storage converters are used to realize the current conversion between the energy storage container and the power grid.
[0021] In this embodiment, compared with the energy storage power generation system that does not need to support the power grid, in order to enable the energy storage power generation system in this embodiment to have the ability to support the power grid, the number of energy storage converters needs to be expanded. This embodiment requires that the parallel expansion multiple of the energy storage power generation system is less than the transient overload multiple. Under this design, the energy storage converter will be overloaded when a transient overload occurs in the energy storage power generation system. This design is feasible for the following reasons. First, the design takes into account that the duration of transient overload in the energy storage power generation system is usually very short. Therefore, even if the energy storage converter is overloaded during the transient overload, the energy storage converter can also quickly resume normal operation after the energy storage power generation system quickly returns to normal, that is, quickly exit the overload state. Furthermore, the semiconductor devices inside the energy storage converter itself have a certain short-term overload capacity, and this short-term overload capacity can fully ensure that the energy storage converter safely passes through the above-mentioned short-term overload operation state. In addition, the scheme monitors the voltage and frequency of the power grid in real time, and detects power grid faults in a timely and accurate manner. After a transient overload fault occurs in the power grid, it can quickly switch from a steady-state working mode to a transient working mode to achieve support for the power grid under various conditions. Therefore, this embodiment makes full use of the physical characteristics of transient overload and the short-term overload capacity of the energy storage converter itself, simplifies the system architecture, and improves the system efficiency. It is easy to understand that since the number of energy storage converters is reduced, the system cost is also reduced. The scheme is accurate and reliable, and the power grid support effect is good.
[0022] According to the second aspect, in a possible implementation, the steady-state maximum active dispatching power and the steady-state maximum apparent dispatching power of each of the energy storage inverters are set through a control interface, the steady-state maximum active dispatching power is the maximum active power of each of the energy storage inverters when the energy storage power generation system is in a steady-state working mode, the steady-state maximum apparent dispatching power is the maximum apparent power of each of the energy storage inverters when the energy storage power generation system is in a steady-state working mode, and the energy storage power generation system includes the control interface. By setting the steady-state maximum active dispatching power and the steady-state maximum apparent dispatching power for the energy storage inverter, the power output of the energy storage inverter can be controlled when the energy storage power generation system is in a steady state, ensuring that the energy storage inverter outputs on demand, thereby maintaining the continuous, stable and reliable operation of the entire energy storage power generation system.
[0023] According to the second aspect, in a possible implementation, the steady-state maximum active dispatching power is the ratio of the rated power of the energy storage container to the number of the multiple energy storage inverters, and the steady-state maximum apparent dispatching power is the ratio of the energy storage power generation system dispatching apparent power to the number of the multiple energy storage inverters when the energy storage power generation system is in a steady-state working mode. Through specific numerical setting, the operating parameters of the energy storage inverter in this embodiment are matched with the operating parameters of the entire energy storage power generation system, maintaining the continuous stable and reliable operation of the entire energy storage power generation system.
[0024] According to the second aspect, in a possible implementation, the transient maximum active power and the transient maximum apparent power of each of the energy storage inverters are set through the control interface, the transient maximum active power being the maximum active power of each of the energy storage inverters when the energy storage power generation system is in a transient working mode, and the transient maximum apparent power being the maximum apparent power of each of the energy storage inverters when the energy storage power generation system is in a transient working mode. By setting the transient maximum active power and the transient maximum apparent power for the energy storage inverter, the power output of the energy storage inverter can be controlled when the energy storage power generation system is in a transient overload, ensuring that the energy storage inverter outputs on demand, thereby maintaining the continuous, stable and reliable operation of the entire energy storage power generation system.
[0025] According to the second aspect, in a possible implementation, the transient maximum active power is the ratio of the rated power of the energy storage container to the number of the multiple energy storage inverters, and the transient maximum apparent power is the ratio of the apparent power dispatched by the energy storage power generation system to the number of the multiple energy storage inverters when the energy storage power generation system is in a transient working mode. The active power and apparent power of a single energy storage inverter are determined by the composition of the energy storage power generation system, so that the operating parameters of the energy storage inverter in this embodiment match the operating parameters of the entire energy storage power generation system. When the energy storage power generation system is transiently overloaded, the energy storage inverter can operate at full load or even overload, thereby maintaining the continuous, stable and reliable operation of the entire energy storage power generation system.
[0026] According to the second aspect, in a possible implementation, the energy storage container includes a plurality of battery clusters and a plurality of cluster-level controllers, the plurality of battery clusters and the plurality of cluster-level controllers are connected one-to-one, and the cluster-level controllers are used to perform DC / DC conversion. In this implementation, each battery cluster can be controlled by a corresponding cluster-level controller, so that the consistency requirements of the battery clusters in the embodiment of the present application are lower, so that the selection and design of the battery clusters are easier, and the corresponding battery cluster costs are lower.
[0027] According to the second aspect, in a possible implementation, each of the cluster-level controllers includes a battery cluster side port and an energy storage inverter side port, the battery cluster side port is used to connect to the battery cluster, and the energy storage inverter side port is used to connect to the energy storage inverter; the battery cluster side ports of the multiple cluster-level controllers are connected in parallel to form the positive and negative poles of the energy storage container, and the DC side ports of the multiple energy storage inverters are connected in parallel to the positive and negative poles of the energy storage container. In the energy storage power generation system architecture provided in this embodiment, since the DC side of the energy storage inverter is connected in parallel and the AC side of the energy storage inverter is also connected in parallel, in the embodiment of the present application, the expansion of the energy storage inverter is very easy, so that the embodiment of the present application can be applied to countries or regions with different grid transient overload multiples requirements, and has a wide range of application scenarios.
[0028] According to the second aspect, in a possible implementation, each of the cluster-level controllers includes a battery cluster side port and an energy storage converter side port, the battery cluster side port is used to connect to the battery cluster, and the energy storage converter side port is used to connect to the energy storage converter; the multiple energy storage converters include multiple groups of energy storage converters, each group of energy storage converters includes at least two energy storage converters, the DC side ports of the energy storage converters in each group of energy storage converters are connected in parallel, and the multiple groups of energy storage converters are respectively connected one by one with the multiple cluster-level controllers. The energy storage power generation system architecture provided in this embodiment, since the DC side of the energy storage converters are connected in parallel in groups, and the AC side of the energy storage converters are also connected in parallel, in the embodiments of the present application, the expansion of the energy storage converter is relatively easy, so that the embodiments of the present application can be applied to countries or regions with different requirements for transient overload multiples of the network, and the application scenarios are relatively wide. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 It is a schematic diagram of an energy storage power generation system provided in an embodiment of the present application;
[0030] Figure 2 It is a schematic diagram of another energy storage power generation system provided in an embodiment of the present application;
[0031] Figure 3 It is a schematic diagram of another energy storage power generation system provided in an embodiment of the present application;
[0032] Figure 4 is a PCS circuit topology diagram provided in an embodiment of the present application;
[0033] Figure 5 It is a schematic diagram of a fault ride-through of a power grid transient short-circuit fault energy storage power generation system provided in an embodiment of the present application;
[0034] Figure 6 It is a schematic diagram of another energy storage power generation system provided in an embodiment of the present application;
[0035] Figure 7 It is a schematic diagram of another energy storage power generation system provided in an embodiment of the present application;
[0036] Figure 8 It is a schematic diagram of another energy storage power generation system provided in an embodiment of the present application;
[0037] Fig. 9 It is a flow chart of a control method of an energy storage power generation system provided in an embodiment of the present application. DETAILED DESCRIPTION
[0038] The technical solution in this application will be described below in conjunction with the accompanying drawings.
[0039] In this application, unless otherwise specified and limited, the term "connection" should be understood in a broad sense. For example, "connection" can be a fixed connection, a detachable connection, or an integral connection; it can be directly connected or indirectly connected through an intermediate medium. For ease of understanding, some of the special terms involved in this application are first explained.
[0040] PCS: Power Conversion System, which can control the charging and discharging process of the battery, perform AC / DC conversion, and directly supply power to AC loads when there is no power grid. When there is a power grid, it can adjust the active power and reactive power of the power grid.
[0041] Grid-forming: Grid-forming control technology (GFM), the role of energy storage power generation system in the power grid includes: providing active or reactive support for the system, improving the ability of new energy grid connection, participating in peak load regulation and frequency regulation, short-term power supply during faults, etc. Using grid-forming control technology to control energy storage converters can improve the stability of new power systems.
[0042] Transient: The transient state of the power system refers to the process in which system parameters (such as voltage, current, frequency, etc.) change instantaneously after a sudden fault or external disturbance (such as instantaneous short circuit, sudden load change, etc.) occurs in the system.
[0043] Steady state: The steady state of the power system refers to the voltage, current, frequency, power angle and power of the power system remaining constant under normal operation.
[0044] Transient overload multiple: the ratio of the maximum output current effective value of the energy storage power generation system when transient overload occurs to the rated output current effective value of the energy storage power generation system. Among them, the maximum output current effective value of the energy storage power generation system when transient overload occurs is the effective value of the sum of the currents output by multiple PCSs when a three-phase zero voltage short circuit occurs in the power grid; the rated output current effective value of the energy storage power generation system is the effective value of the sum of the currents output by multiple PCSs when the power grid is in a steady state and the energy storage power generation system is operating at rated power.
[0045] Parallel expansion multiple: In the energy storage power generation system, the ratio of the sum of the rated powers of the PCSs connected in parallel to the rated power of the energy storage container.
[0046] NPC: Neutral Point Clamped, three-level midpoint clamping circuit.
[0047] Current carrying capacity: The operating current that a power electronic device can operate for a long time.
[0048] The energy storage power generation system provided by the embodiment of the present application can make full use of the short-term overload capacity of the semiconductor devices inside the energy storage converter, optimize the energy storage converter architecture design of the energy storage power generation system, thereby simplifying the system, improving the system working efficiency, and reducing the system device cost. The following is a detailed introduction.
[0049] See also Figure 1 , Figure 1 Schematic diagram of an energy storage power generation system provided in an embodiment of the present application. The energy storage power generation system includes an energy storage container, multiple PCSs and a box transformer, and the multiple PCSs are connected between the energy storage container and the box transformer. When the energy storage power generation system discharges to the power grid, the energy storage container acts as a DC power source and outputs DC power to the multiple PCSs. The multiple PCSs convert the DC power into AC power, which is then transmitted to the box transformer. Under normal circumstances, the power grid ( Figure 1 (not shown) has a relatively large voltage, so the above AC power needs to be stepped up by the box transformer before being transmitted to the power grid; when the power grid charges the energy storage power generation system, the power conversion process is just the opposite of the above discharge process. The box transformer acts as an AC power source, and steps down the AC power from the power grid and transmits it to multiple PCSs. Multiple PCSs convert the AC power into DC power, which is then transmitted to the energy storage container and then stored by the batteries in the energy storage container. More specifically, in the energy storage power generation system provided in this embodiment, the energy storage container includes three battery clusters, namely battery cluster 1, battery cluster 2, and battery cluster 3. The energy storage container also includes three cluster-level controllers, namely cluster-level controller 1, cluster-level controller 2, and cluster-level controller 3. The three battery clusters are connected to the three cluster-level controllers one by one, and the three cluster-level controllers are also connected to multiple PCSs. For the convenience of description, the port connecting the cluster-level controller to the battery cluster is recorded as the battery cluster side port of the cluster-level controller, and the port connecting the cluster-level controller to multiple PCSs is recorded as the PCS side port of the cluster-level controller. In this embodiment, the battery cluster side ports of the three cluster-level controllers are respectively connected to the positive and negative electrodes of the three battery clusters, and the PCS side ports of the three cluster-level controllers are connected in parallel, that is, the positive electrodes of the PCS side ports of the three cluster-level controllers are interconnected to form the positive electrode of the energy storage container, and the negative electrodes of the PCS side ports of the three cluster-level controllers are interconnected to form the negative electrode of the energy storage container. Each cluster-level controller can adjust the voltage or current of the battery cluster to which it is connected. In view of this, this embodiment does not require high consistency of the included battery clusters, and is easier to select and design the battery cluster. The DC side ports of the three PCSs are all connected in parallel to the positive and negative electrodes of the above-mentioned energy storage container, and the AC side ports of the three PCSs are also connected in parallel to form a three-phase output port connected to the box transformer. Under this PCS connection mode, the expansion of the PCS is also relatively easy for scenarios where the energy storage power generation system needs to expand power.
[0050] In this embodiment, the battery selection and design and PCS expansion are relatively easy, which is very conducive to the design or transformation of energy storage power generation systems under different grid conditions. In addition, each battery cluster contains multiple batteries and multiple optimizers, and the optimizer can also perform DC / DC conversion on the output or input of the battery, thereby further fine-tuning the management of battery cluster power consumption and reducing the design requirements for battery consistency.
[0051] When the energy storage power generation system is connected to the power system, when the power system is in transient operation, the energy storage power generation system is also in transient operation state; when the power system is in steady state operation, the energy storage power generation system is also in steady state operation state.
[0052] When the energy storage power generation system provided in the above embodiment is used to form a grid-building system, it must meet the overload capacity requirements of the grid-building system in different countries or regions. In order to facilitate the explanation of the principle of the technical solution of this application, the following contents of this application are all illustrated by taking the grid-building system as an example that it needs to have a 3-fold overload capacity, that is, the following transient overload multiples are all equal to 3. It should be understood that in actual applications, the specific value of the overload capacity is not limited to this, and the transient overload multiple may not be 3, and can be adjusted according to different countries or regions.
[0053] refer to Figure 2 , Figure 2 It is another schematic diagram of an energy storage power generation system provided in an embodiment of the present application. For ease of understanding, this embodiment introduces specific power parameters of each device in the energy storage power generation system. In this embodiment, the rated power of the energy storage container is 1MW, the rated power of the PCS is 0.2MW, and the number of PCSs in parallel is 15. Therefore, in this energy storage power generation system, the parallel expansion multiple is 0.2*15 / 1=3, and the parallel expansion multiple is just equal to the transient overload multiple. Therefore, the energy storage power generation system can output 3 times the overload reactive current when a transient overload occurs in the power grid. In this embodiment, during the period when the power grid is transiently overloaded, the power of the PCS will not exceed the rated power of the PCS itself. Therefore, this embodiment is more reliable and has better power grid support capabilities for transient power grid faults of longer duration. In this embodiment, the PCS of the energy storage power generation system can be easily expanded through the parallel connection of the PCS AC side and the DC side. While the energy storage power generation system has the overload capacity required for grid construction, the rated power of the PCS is ensured to match the rated power of the energy storage container, and there is no need to add additional energy storage containers.
[0054] See also Figure 2 and Fig. 9 , in control Figure 2 When the energy storage power generation system shown outputs overload power, the following steps are adopted:
[0055] (1) Real-time detection of grid voltage and grid frequency;
[0056] (2) When the grid voltage and grid frequency are in the steady-state operating range, the absolute value of the active power is limited not to exceed the reference active power set according to the interface, and the absolute value of the reactive power and the total apparent power is limited not to exceed the reference apparent power set according to the interface. The grid voltage and grid frequency are in the steady-state operating range, which means that the grid voltage is within the voltage dead zone near the rated voltage of the energy storage system (i.e. [rated voltage - voltage dead zone, rated voltage + voltage dead zone]); the grid frequency is in the steady-state operating range, which means that the grid frequency is within the frequency dead zone near the rated frequency of the energy storage system (i.e. [rated frequency - frequency dead zone, rated frequency + frequency dead zone]), and the absolute value of the grid frequency change rate is less than the frequency change rate dead zone.
[0057] When the grid voltage amplitude is in the transient working range, the active power is limited not to exceed the maximum active power set in the interface; when the grid frequency is in the transient working range, the reactive power and apparent power are limited not to exceed the maximum apparent power set in the interface. The grid voltage and grid frequency are in the steady-state working range, which means that the grid voltage is in the voltage dead zone near the rated voltage of the energy storage system (i.e. [rated voltage-voltage dead zone, rated voltage+voltage dead zone]); the grid frequency is in the steady-state working range, which means that the grid frequency is in the frequency dead zone near the rated frequency of the energy storage system (i.e. [rated frequency-frequency dead zone, rated frequency+frequency dead zone]), and the absolute value of the grid frequency change rate is less than the frequency change rate dead zone.
[0058] For example, for Figure 2The energy storage power generation system shown has an AC rated line voltage effective value of 800V and a rated grid frequency of 50Hz. The voltage dead zone is preset to 40V, the frequency dead zone is 0.03Hz, and the frequency change rate dead zone is 0.1Hz / s. The reference active power is set to 66.7kW, the reference apparent power is set to 66.7kVA, the maximum active power is set to 83.3kW, and the maximum apparent power is set to 200kVA through the interface. Then, when the grid voltage is between 760V and 840V, the grid frequency is between 49.97Hz and 50.03Hz, and the absolute value of the grid frequency change rate is less than 0.1Hz / s, each PCS in the energy storage power generation system detects the grid voltage and grid frequency and determines that the grid voltage and grid frequency are in the steady-state working range. Therefore, each PCS limits its own active power absolute value to no more than 66.7kW, and limits its own reactive power and apparent power to no more than 66.7kVA. When the grid voltage is below 760V or above 840V, or the grid frequency is below 49.97Hz or above 50.03Hz, or the absolute value of the grid frequency change rate exceeds 0.1Hz / s, each PCS in the energy storage power generation system detects the grid voltage and grid frequency to confirm that the grid voltage and grid frequency are in the transient operating range. Therefore, each PCS limits its own active power absolute value to no more than 83.3kW, and limits its own reactive power and apparent power to no more than 200kVA.
[0059] In actual scenarios, abnormal grid overload does not occur often, and each occurrence will not last long. The overload duration is usually in seconds. This means that even if the parallel expansion multiple of the energy storage power generation system is slightly smaller than the transient overload multiple, the short-term overload capacity of the semiconductor devices inside the PCS and the PCS's better circuit design can allow the semiconductor devices inside the PCS to operate in an overload state for a short time. This will enable the energy storage power generation system to operate stably and support the grid when a transient overload occurs in the grid.
[0060] See also Figure 3 and Figure 4 , Figure 3 Schematic diagram of another energy storage power generation system provided in the embodiment of the present application. Figure 2 The difference in the embodiment is that Figure 3In the energy storage power generation system shown in the embodiment, the number of parallel PCS is 12, so in the energy storage power generation system, the parallel expansion multiple is 0.2*12 / 1=2.4. This embodiment also has the 3 times overload capacity required for the network system, and the reasons are as follows: when the power grid is stable, the various devices in the energy storage power generation system are in a stable operating state. In this state, the power of the PCS is low and the temperature of the whole machine is also low. When the power grid is transiently overloaded, the PCS continues to support the power grid. Compared with when the power grid is stable, the power of the PCS will increase. During the transient overload of the power grid, the power of the PCS will exceed the rated power of the PCS itself. However, since the transient overload of the power grid is not long, even if the PCS power exceeds the rated power of the PCS itself and causes the PCS temperature to rise, the temperature after the increase is still within the range that the PCS can bear, and the energy storage power generation system can still stably support the operation of the power grid. In this embodiment of the power grid, the parallel expansion multiple of the energy storage power generation system is smaller than the transient overload multiple, which can fully utilize the short-term overload capacity of the PCS itself, reduce the number of parallel PCSs, and reduce system costs.
[0061] See also Figure 4 , Figure 4 This is the PCS circuit topology provided in the embodiment of the present application. Figure 4 for Figure 3 A part of the circuit topology adopted by the PCS in the embodiment is an NPC topology. Specifically, the NPC topology includes: 4 switch tubes T1, switch tube T2, switch tube T3 and switch tube T4. The above 4 switch tubes are connected in series in sequence and connected between BUS+ and BUS-, and the above 4 switch tubes are also connected in parallel with 4 body diodes D1, body diode D2, body diode D3 and body diode D4 respectively; 2 diodes, including diode D5 and diode D6, and two series-connected diodes D5 and diode D6 are also connected in parallel at both ends of the series-connected switch tubes T2 and switch tube T3; 2 capacitors, including capacitor C1 and capacitor C2, capacitor C1 and capacitor C2 are connected in series between BUS+ and BUS-, and the connection end of capacitor C1 and capacitor C2 is connected to the connection end of diode D5 and diode D6; the connection end of switch tube T2 and switch tube T3 serves as the output end of the NPC topology.
[0062] In this embodiment, in order to make the PCS using the NPC topology have a strong short-term overload capacity, the NPC topology needs to meet the following design: the current carrying capacity of the diode D5 and the diode D6 is greater than the current carrying capacity of the switch tube T1 and the switch tube T4. In one possible implementation, the diode D5 and the diode D6 are configured with 3 wafers with a current carrying capacity of 1I, so that D5 and D6 have a current carrying capacity of 3I respectively, and the switch tube T1 and the switch tube T4 are configured with 2 wafers with a current carrying capacity of 1I, so that T1 and T4 have a current carrying capacity of 2I respectively. In another possible implementation, the diode D5 and the diode D6 are configured with 3 wafers with a current carrying capacity of 1.5I, so that D5 and D6 have a current carrying capacity of 4.5I respectively, and the switch tube T1 and the switch tube T4 are configured with 3 wafers with a current carrying capacity of 1I, so that T1 and T4 have a current carrying capacity of 3I respectively. When the grid is transiently overloaded, the voltage output by the PCS is lower. Compared with the case where the grid is operating stably, the diodes D5 and D6 will be in the on state for a longer time and have greater losses. Therefore, the diodes D5 and D6 need to have a larger current capacity to enhance the short-term overload capacity of the PCS.
[0063] See also Figure 3 and Fig. 9 , in control Figure 3 When the energy storage power generation system shown outputs overload power, the following steps are adopted:
[0064] (1) Real-time detection of grid voltage and grid frequency;
[0065] (2) When the grid voltage and grid frequency are in the steady-state operating range, the absolute value of the active power is limited not to exceed the reference active power set according to the interface, and the absolute value of the reactive power and the total apparent power is limited not to exceed the reference apparent power set according to the interface. The grid voltage and grid frequency are in the steady-state operating range, which means that the grid voltage is within the voltage dead zone near the rated voltage of the energy storage system (i.e. [rated voltage - voltage dead zone, rated voltage + voltage dead zone]); the grid frequency is in the steady-state operating range, which means that the grid frequency is within the frequency dead zone near the rated frequency of the energy storage system (i.e. [rated frequency - frequency dead zone, rated frequency + frequency dead zone]), and the absolute value of the grid frequency change rate is less than the frequency change rate dead zone.
[0066] When the grid voltage amplitude is in the transient working range, the active power is limited not to exceed the maximum active power set in the interface; when the grid frequency is in the transient working range, the reactive power and apparent power are limited not to exceed the maximum apparent power set in the interface. The grid voltage and grid frequency are in the steady-state working range, which means that the grid voltage is in the voltage dead zone near the rated voltage of the energy storage system (i.e. [rated voltage-voltage dead zone, rated voltage+voltage dead zone]); the grid frequency is in the steady-state working range, which means that the grid frequency is in the frequency dead zone near the rated frequency of the energy storage system (i.e. [rated frequency-frequency dead zone, rated frequency+frequency dead zone]), and the absolute value of the grid frequency change rate is less than the frequency change rate dead zone.
[0067] For example, for Figure 3 The energy storage power generation system shown has an AC rated line voltage effective value of 800V and a rated grid frequency of 50Hz. The voltage dead zone is preset to 40V, the frequency dead zone is 0.03Hz, and the frequency change rate dead zone is 0.1Hz / s. The reference active power is set to 83.3kW, the reference apparent power is set to 83.3kVA, the maximum active power is set to 105kW, and the maximum apparent power is set to 250kVA through the interface. Then, when the grid voltage is between 760V and 840V, the grid frequency is between 49.97Hz and 50.03Hz, and the absolute value of the grid frequency change rate is less than 0.1Hz / s, each PCS in the energy storage power generation system detects the grid voltage and grid frequency and determines that the grid voltage and grid frequency are in the steady-state working range. Therefore, each PCS limits its own active power absolute value to no more than 83.3kW, and limits its own reactive power and apparent power to no more than 83.3kVA. When the grid voltage is below 760V or above 840V, or the grid frequency is below 49.97Hz or above 50.03Hz, or the absolute value of the grid frequency change rate exceeds 0.1Hz / s, each PCS in the energy storage power generation system detects the grid voltage and grid frequency to confirm that the grid voltage and grid frequency are in the transient operating range. Therefore, each PCS limits its own active power absolute value to no more than 105kW, and limits its own reactive power and apparent power to no more than 250kVA.
[0068] See also Figure 5 , Figure 5 This is a schematic diagram of a transient energy storage power generation system fault crossing during a short circuit fault in a power grid provided in an embodiment of the present application. The waveforms shown in the first three rows of channels are the power grid voltage waveforms, and the waveforms shown in the last three rows of channels are the current waveforms output by the energy storage power generation system. It can be seen that after a transient short circuit overload fault occurs in the power grid, the energy storage power generation system provided in this embodiment can continuously output 3 times the current within a transient short circuit fault of the power grid lasting 10 seconds, achieving the performance indicator of supporting a 3-fold transient overload of the power grid.
[0069] In the above embodiment, by making full use of the short-term overload capacity of the PCS itself, when the parallel expansion multiple of the energy storage power generation system is less than the transient overload multiple, the performance index of supporting a transient overload of 3 times of the power grid can still be achieved. By using this principle, the design concept can also be applied to another energy storage power generation system, as follows.
[0070] See also Figure 6 , Figure 6 Schematic diagram of another energy storage power generation system provided in the embodiment of the present application. Figure 1 Similar to the embodiment, the energy storage power generation system includes an energy storage container, multiple PCSs and a box transformer, and the multiple PCSs are connected between the energy storage container and the box transformer. When the energy storage power generation system discharges to the power grid, the energy storage container acts as a DC power source and outputs DC power to the multiple PCSs. The multiple PCSs convert the DC power into AC power, which is then transmitted to the box transformer. Under normal circumstances, the power grid ( Figure 6 (not shown) has a relatively large voltage, so the above AC power needs to be stepped up by the box transformer before being transmitted to the power grid; when the power grid charges the energy storage power generation system, the power conversion process is just the opposite of the above discharge process. The box transformer acts as an AC power source, which steps down the AC power from the power grid and transmits it to multiple PCSs. Multiple PCSs convert the AC power into DC power, which is then transmitted to the energy storage container and then stored by the batteries in the energy storage container. More specifically, in the energy storage power generation system provided in this embodiment, the energy storage container includes three battery clusters, namely battery cluster 1, battery cluster 2 and battery cluster 3. The energy storage container also includes three cluster-level controllers, namely cluster-level controller 1, cluster-level controller 2 and cluster-level controller 3. The three battery clusters are connected to the three cluster-level controllers one by one, and the three cluster-level controllers are also connected to multiple PCSs. For the convenience of description, the port connecting the cluster-level controller to the battery cluster is recorded as the battery cluster side port of the cluster-level controller, and the port connecting the cluster-level controller to multiple PCSs is recorded as the PCS side port of the cluster-level controller. Figure 1 The difference from the embodiment is that in this embodiment, the battery cluster side ports of the three cluster-level controllers are respectively connected to the positive and negative electrodes of the three battery clusters, and the PCS side ports of the three cluster-level controllers are respectively connected to the three PCSs, that is, the energy storage container with three cluster-level controllers has 2*3=6 ports, and the energy storage container is connected to the PCS through 6 ports. Figure 1 Similar to the embodiment, the AC side ports of the three PCSs are also connected in parallel to form a three-phase output port connected to the box-type transformer.
[0071] Similarly, in order to meet the overload capacity requirements of different countries or regions for the grid-building system when the energy storage power generation system is built, Figure 6 The number of PCSs in the embodiment is expanded. For the convenience of explanation, an example is also given below with a transient overload multiple of 3.
[0072] refer to Figure 7 , Figure 7 This is another schematic diagram of an energy storage power generation system provided in the embodiment of the present application. For ease of understanding, the power parameters of each device cited in this embodiment refer to Figure 2 The embodiments will not be described in detail here. In this embodiment, the PCS side port of each cluster-level controller is connected in parallel to 1*5=5 PCSs, and the energy storage container containing 3 cluster-level controllers is connected to 5*3=15 PCSs accordingly, and the AC sides of the 15 PCSs are all connected in parallel. In this embodiment, the rated power of the energy storage container is 1MW, the rated power of the PCS is 0.2MW, and the number of PCSs in parallel is 15. Therefore, in this energy storage power generation system, the parallel expansion multiple is 0.2*15 / 1=3, which is exactly equal to the transient overload multiple. Therefore, this energy storage power generation system is Figure 2 The same as the embodiment, it can also output 3 times the overload reactive current when the grid is transiently overloaded. In this embodiment, during the transient overload of the grid, the power of the PCS will not exceed the rated power of the PCS itself, so this embodiment is also relatively reliable, and has a good grid support capability for transient grid faults of longer duration. In this embodiment, multiple PCSs with expanded capacity are connected in parallel through a cluster-level connector PCS side port, and the PCS AC side is connected in parallel, so that the PCS of this energy storage power generation system can be easily expanded, and the energy storage power generation system has the overload capacity required for networking, while ensuring that the rated power of the PCS matches the rated power of the energy storage container, and there is no need to add additional energy storage containers.
[0073] Similarly, according to the duration of grid overload, the short-term overload capacity of the semiconductor devices inside the PCS, and the better circuit design of the PCS, the semiconductor devices inside the PCS are allowed to operate in an overload state for a short time, which will enable the energy storage power generation system to operate stably and support the grid when the grid is transiently overloaded. Therefore, the number of PCS in the energy storage power generation system can be reduced by appropriately reducing the parallel expansion multiple, but the energy storage power generation system can still be guaranteed to have an overload capacity for stable operation.
[0074] See also Figure 8 , Figure 8 Schematic diagram of another energy storage power generation system provided in the embodiment of the present application. Figure 7The difference between the embodiments is that, in this embodiment, the PCS side port of each cluster-level controller is connected in parallel to 1*4=4 PCSs, and the energy storage container containing 3 cluster-level controllers is connected to 4*3=12 PCSs accordingly. Therefore, in this energy storage power generation system, the parallel expansion multiple is 0.2*12 / 1=2.4. This embodiment also has the 3 times overload capacity required for the network system, and the reasons are as follows: when the power grid is stable, the various devices in the energy storage power generation system are in a stable operating state. In this state, the power of the PCS is low and the temperature of the whole machine is also low. When the power grid is transiently overloaded, the PCS continues to support the power grid. Compared with the stability of the power grid, the power of the PCS will increase. During the transient overload of the power grid, the power of the PCS will exceed the rated power of the PCS itself. However, since the transient overload of the power grid is not long, even if the PCS power exceeds the rated power of the PCS itself and causes the PCS temperature to rise, the temperature after the increase is still within the range that the PCS can bear, and the energy storage power generation system can still stably support the operation of the power grid. In this embodiment of the power grid, the parallel expansion multiple of the energy storage power generation system is smaller than the transient overload multiple, which can fully utilize the short-term overload capacity of the PCS itself, reduce the number of parallel PCSs, and reduce system costs.
[0075] Figure 4 The NPC topology shown in the embodiment can also be applied to Figure 8 In the PCS in the embodiment, the PCS applying the NPC topology has a strong short-term overload capability, which will not be described in detail here.
[0076] In order to ensure that the energy storage power generation system can support the stable operation of the power grid in both steady-state and transient short-circuit overload fault conditions, the PCS needs to be specifically controlled. This application provides the following control method.
[0077] Application Figure 3 The embodiment shown or Figure 8 In the PCS of the embodiment shown, the user can set the operating parameters of each PCS through the control interface, wherein the operating parameters include operating power, and the operating power includes active power and apparent power. It should be understood that the control interface can be integrated inside the energy storage container, or can be independently set outside the energy storage container, or can be distributed on each PCS, and this application is not limited thereto.
[0078] For the case where the power grid is in a steady state, since the number of PCSs in the energy storage power generation system is 12 and the rated power of the energy storage container is 1MW (1000kW), the steady-state maximum active dispatching power of each PCS is set to 1000kW / 12=83.3kW. The steady-state maximum active dispatching power is the control reference value of each PCS in steady-state active power dispatching when the power grid is in a steady state. The actual physical meaning of the steady-state maximum active dispatching power is that when the power grid is in a steady state, the active power of the PCS will not exceed the steady-state maximum active dispatching power when responding to the superior dispatching instruction. Such a setting ensures that the output power of the energy storage power generation system will not exceed 1MW when the power grid is in a steady state and accepts active power dispatching. Because the energy storage power generation system does not need to output apparent power of transient overload multiples when the power grid is in a steady state, the maximum steady-state apparent dispatching power of each PCS is set to 1000kVA / 12=83.3kVA. The maximum steady-state apparent dispatching power is the control reference value of each PCS for steady-state apparent power dispatching when the power grid is in a steady state. The actual physical meaning of the maximum steady-state apparent dispatching power is that when the power grid is in a steady state, the apparent power of the PCS will not exceed the maximum steady-state apparent dispatching power when responding to the superior dispatching instruction. This setting ensures that the output power of the energy storage power generation system will not exceed 1MVA when the power grid is in a steady state and accepts apparent power dispatching.
[0079] In case of transient overload of the power grid, since there are 12 PCSs in the energy storage power generation system and the rated power of the energy storage container is 1MW (1000kW), the transient maximum active power of each PCS is set to 1000kW / 12=83.3kW. The transient maximum active power is the active power limit value of each PCS in response to the transient output of the power grid when the power grid has a transient frequency or voltage deviation. The actual physical meaning of the maximum active power is that when the power grid is transiently overloaded, the active power output by the PCS will not exceed the maximum active power. This setting ensures that the output power of the energy storage power generation system will not exceed 1MW when the power grid is transiently overloaded. Because when the grid is transiently overloaded, in order to support the operation of the grid, the energy storage power generation system needs to output an apparent power with a multiple of the transient overload, so the transient maximum apparent power of each PCS is set to 1000kVA*3 / 12=250kVA. The transient maximum apparent power is the apparent power limit value of each PCS in response to the transient output of the grid when the grid has a transient frequency or voltage deviation. The actual physical meaning of the maximum apparent power is that when the grid is transiently overloaded, the apparent power output by the PCS will not exceed the transient maximum apparent power. This setting ensures that when the grid is transiently overloaded, the apparent power of the energy storage power generation system will not exceed 3MW. While ensuring that the energy storage power generation system has a 3-fold transient overload performance, it ensures that the energy storage power generation system works within its tolerable range, thereby ensuring the reliability of the operation of the entire energy storage power generation system.
[0080] It should be understood that the above method of setting active or apparent power for each PCS can also be replaced by setting active or apparent current for each PCS. Because power and current are usually in a corresponding relationship with each other, in order to comply with the principle of simplicity, this application will not go into details here.
[0081] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.
Claims
1. An energy storage power generation system, characterized in that: The energy storage power generation system includes an energy storage container and a plurality of energy storage converters; The energy storage container includes a battery for storing electrical energy; The DC side ports of the multiple energy storage converters are connected to the energy storage container, the AC side ports of the multiple energy storage converters are connected in parallel and used to be connected to the power grid, and the multiple energy storage converters are used to realize current conversion between the energy storage container and the power grid; The multiple energy storage converters are used to enter a steady-state working mode when a preset condition is met, and enter a transient working mode from the steady-state working mode when the preset condition is not met; The preset condition is to simultaneously meet the following three conditions, the three conditions including: the grid voltage is within a preset voltage range, the grid frequency is within a preset frequency range, and the change rate of the grid frequency is less than or equal to a frequency change rate threshold; The active power output by the multiple energy storage converters in the steady-state working mode is less than the active power output by the multiple energy storage converters in the transient working mode, and the apparent power output by the multiple energy storage converters in the steady-state working mode is less than the apparent power output by the multiple energy storage converters in the transient working mode; Among them, the ratio of the sum of the rated powers of the multiple energy storage inverters to the rated power of the energy storage container is m, the ratio of the effective value of the sum of the currents output by the multiple energy storage inverters in the transient working mode to the effective value of the sum of the currents output by the multiple energy storage inverters at the rated power in the steady-state working mode is n, and m is less than n, and m is greater than 1.
2. The energy storage power generation system according to claim 1, characterized in that: The circuit of the energy storage converter includes an NPC circuit, and the NPC circuit includes: DC bus; Two capacitors, the two capacitors are connected in series between the positive electrode of the DC bus and the negative electrode of the DC bus; a switch tube bridge arm, the switch tube bridge arm being connected between the DC bus positive electrode and the DC bus negative electrode, comprising two outer switch tubes connected in series and a pair of inner switch tubes, two switch tubes in the pair of inner switch tubes being connected in series, one of the two outer switch tubes being connected between the DC bus positive electrode and the pair of inner switch tubes, and the other of the two outer switch tubes being connected between the DC bus negative electrode and the pair of inner switch tubes; A pair of diodes, wherein two diodes in the pair of diodes are connected in series, two ends of the pair of diodes are respectively connected to two connection points of the two outer switch tubes and the pair of inner switch tubes, and a midpoint of the pair of diodes is connected to a midpoint of the two capacitors; The current carrying capacity of any one of the two outer switching tubes is smaller than the current carrying capacity of any one of the pair of diodes.
3. The energy storage power generation system according to claim 2, characterized in that: The two outer switch tubes and the pair of inner switch tubes are each connected in parallel with a body diode.
4. The energy storage power generation system according to any one of claims 1 to 3, characterized in that: The energy storage power generation system includes a control interface, which is used to set the steady-state maximum active dispatching power and the steady-state maximum apparent dispatching power of each of the energy storage inverters. The steady-state maximum active dispatching power is the maximum active power of each of the energy storage inverters when the energy storage power generation system is in a steady-state working mode. The steady-state maximum apparent dispatching power is the maximum apparent power of each of the energy storage inverters when the energy storage power generation system is in a steady-state working mode.
5. The energy storage power generation system according to claim 4, characterized in that: The steady-state maximum active dispatching power is the ratio of the maximum active dispatching power of the energy storage power generation system to the number of the multiple energy storage inverters when the energy storage power generation system is in a steady-state working mode, and the steady-state maximum apparent dispatching power is the ratio of the maximum apparent dispatching power of the energy storage power generation system to the number of the multiple energy storage inverters when the energy storage power generation system is in a steady-state working mode.
6. The energy storage power generation system according to claim 5, characterized in that: The maximum active dispatching power of the energy storage power generation system or the maximum apparent dispatching power of the energy storage power generation system is the rated power of the energy storage container.
7. The energy storage and power generation system according to any one of claims 1 to 3, characterized in that: The energy storage power generation system includes a control interface, which is used to set the transient maximum active power and the transient maximum apparent power of each of the energy storage inverters. The transient maximum active power is the maximum active power of each of the energy storage inverters when the energy storage power generation system is in a transient working mode, and the transient maximum apparent power is the maximum apparent power of each of the energy storage inverters when the energy storage power generation system is in a transient working mode.
8. The energy storage power generation system according to claim 7, characterized in that: The transient maximum active power is the ratio of the maximum active power of the energy storage power generation system to the number of the multiple energy storage inverters when the energy storage power generation system is in a transient working mode, and the maximum apparent power is the ratio of the maximum apparent power of the energy storage power generation system to the number of the multiple energy storage inverters when the energy storage power generation system is in a transient working mode.
9. The energy storage power generation system according to claim 8, characterized in that: The maximum active power of the energy storage and power generation system or the maximum apparent power of the energy storage and power generation system is the rated power of the energy storage container.
10. The energy storage and power generation system according to any one of claims 1 to 9, characterized in that: The energy storage container includes a plurality of battery clusters and a plurality of cluster-level controllers, the plurality of battery clusters and the plurality of cluster-level controllers are connected in a one-to-one correspondence, and the cluster-level controllers are used for performing DC / DC conversion.
11. The energy storage power generation system according to claim 10, characterized in that: Each of the cluster-level controllers comprises a battery cluster side port and an energy storage converter side port, wherein the battery cluster side port is used to connect to the battery cluster, and the energy storage converter side port is used to connect to the energy storage converter; The battery cluster side ports of the multiple cluster-level controllers are connected in parallel to form the positive and negative electrodes of the energy storage container, and the DC side ports of the multiple energy storage converters are connected in parallel to the positive and negative electrodes of the energy storage container.
12. The energy storage power generation system according to claim 10, characterized in that: Each of the cluster-level controllers comprises a battery cluster side port and an energy storage converter side port, wherein the battery cluster side port is used to connect to the battery cluster, and the energy storage converter side port is used to connect to the energy storage converter; The multiple energy storage inverters include multiple groups of energy storage inverters, each group of energy storage inverters includes at least two energy storage inverters, the DC side ports of the energy storage inverters in each group of energy storage inverters are connected in parallel with each other, and the multiple groups of energy storage inverters are respectively connected to the multiple cluster-level cluster-level controllers one by one.
13. A control method for an energy storage power generation system, characterized in that: Controlling the plurality of energy storage converters to enter a steady-state operation mode when a preset condition is met, and to enter a transient operation mode from the steady-state operation mode when the preset condition is not met; The preset condition is to simultaneously meet the following three conditions, the three conditions including: the voltage of the power grid is within a preset voltage range, the frequency of the power grid is within a preset frequency range, and the change rate of the frequency of the power grid is less than or equal to a frequency change rate threshold; The active power output by the multiple energy storage converters in the steady-state working mode is less than the active power output by the multiple energy storage converters in the transient working mode, and the apparent power output by the multiple energy storage converters in the steady-state working mode is less than the apparent power output by the multiple energy storage converters in the transient working mode; Wherein, the ratio of the sum of the rated powers of the multiple energy storage converters to the rated power of the energy storage container is m, the ratio of the effective value of the sum of the currents output by the multiple energy storage converters in the transient working mode to the effective value of the sum of the currents output by the multiple energy storage converters at the rated power in the steady-state working mode is n, the m is less than the n, and the m is greater than 1; The energy storage power generation system includes the energy storage container and the multiple energy storage inverters. The energy storage container includes a battery for storing electric energy. The DC side ports of the multiple energy storage inverters are connected to the energy storage container. The AC side ports of the multiple energy storage inverters are connected in parallel and are used to connect to the power grid. The multiple energy storage inverters are used to realize current conversion between the energy storage container and the power grid.
14. The control method according to claim 13, characterized in that: Through the control interface, the steady-state maximum active dispatching power and the steady-state maximum apparent dispatching power of each of the energy storage inverters are set. The steady-state maximum active dispatching power is the maximum active power of each of the energy storage inverters when the energy storage power generation system is in a steady-state working mode. The steady-state maximum apparent dispatching power is the maximum apparent power of each of the energy storage inverters when the energy storage power generation system is in a steady-state working mode. The energy storage power generation system includes the control interface.
15. The control method according to claim 14, characterized in that: The steady-state maximum active dispatching power is the ratio of the rated power of the energy storage container to the number of the multiple energy storage inverters, and the steady-state maximum apparent dispatching power is the ratio of the dispatching apparent power of the energy storage power generation system to the number of the multiple energy storage inverters when the energy storage power generation system is in a steady-state working mode.
Citation Information
Cited By
Configuration method of energy storage system with high transient overload capacity and control method of energy storage system