Spraying equipment for slowly descending building dismounting platform

By introducing rubber tubes into the spraying equipment and wrapping them on the rotor drum and using a combination of pressure sensors and electronically controlled valves, combining the design of gears and sponge blocks, the spray heads are automatically sprayed and cleaned during the demolition process, and the equipment is solved Blockage and dirt problems improve the reliability and efficiency of the equipment.

CN118925405APending Publication Date: 2024-11-12AK AUTOMATA CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202411306567.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-19
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

Existing spray equipment is easily blocked or damaged due to dust adhesion during the demolition process, and the residual water on the spray head comes into contact with the dust to form dirt, affecting the efficiency and safety of the equipment.

Method used

A spraying device including a water conveying assembly, a spraying assembly and a cleaning assembly is designed, and it is wound around the drum through a rubber tube, and it is automatically sprayed using a pressure sensor and an electronically controlled valve, and is combined with a gear and a sponge block. Make sure the nozzle is cleaned during rotation to avoid dust adhering.

Benefits of technology

It realizes automatic spraying and cleaning of the spray head during the demolition platform, avoiding clogging and dirt formation, improving the reliability and efficiency of the equipment, and extending the service life.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118925405A_ABST
    Figure CN118925405A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of spraying equipment, in particular to spraying equipment for a slowly-descending building dismounting platform, which comprises a base, a water conveying assembly is arranged on the base, the water conveying assembly comprises a supporting rod, a rotating drum, a spiral plate, a rubber pipe, a groove, a clockwork spring and a pressure sensor, and a spraying assembly is arranged on the base. The spraying assembly comprises a moving seat, a support, a telescopic rod, a sliding seat, a rotating pipe and a spraying head, the support is provided with a cleaning assembly, the cleaning assembly comprises a fixing rod and a sponge block, and the base is further provided with an auxiliary assembly; the spraying device can move along with the building dismounting platform, spraying operation is automatically carried out in the moving process, a spraying head can be cleaned in the spraying process, and the problem that the spraying head is blocked due to too much dust is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of spraying equipment, in particular to a spraying equipment used for a slow-descending building demolition platform. Background Art

[0002] During building demolition, a large amount of dust will be generated at the construction site because the concrete structure is destroyed. Therefore, in order to prevent the dust from spreading, dust reduction treatment is required. The most common method of dust reduction is water spraying, which can absorb the dust and drop it to the ground.

[0003] The patent with announcement number CN211081117U discloses an aerial building demolition machine, which includes multiple towers, lifting platforms, ceilings, lighting systems, spray equipment, crushing equipment, pulverizing equipment, cleaning equipment, and garbage disposal systems. The aerial building demolition machine is suitable for high-rise buildings, and the construction operation is free and flexible, which can reduce environmental pollution such as accumulation of debris and dust on site, and has the advantages of high demolition efficiency, short operation period and low labor intensity. The aerial building demolition machine has strong adaptability and is suitable for a variety of site conditions. Most of the equipment can be reused, which is conducive to reducing costs.

[0004] However, in this patent, the spraying equipment will move with the lifting platform, so the spraying equipment will be close to the dust generation location during the entire demolition process. Therefore, if ordinary spraying equipment is used, dust will definitely adhere to its surface, and there will be water remaining at the nozzle position after the spraying is completed. This water will come into contact with the remaining dust to form dirt. This dirt can easily cause blockage or damage to the spraying equipment. Therefore, a spraying equipment that can solve this problem is needed. Summary of the invention

[0005] In order to solve the above technical problems, the present invention proposes a spraying device for a slow-descending building demolition platform, which can move with the building demolition platform and automatically perform spraying operations during the movement. The nozzle can be cleaned during the spraying process to avoid the problem of nozzle clogging due to excessive dust.

[0006] The technical solution to achieve the purpose of the present invention is: a spray device for a slow-descending building demolition platform, comprising a base, a water delivery component is arranged on the base, the water delivery component comprises a support rod, a rotating drum, a spiral plate, a rubber tube, a groove, a spring and a pressure sensor, the two support rods are fixedly connected to the base, the rotating drum is rotatably connected between the two support rods, the spiral plate is fixedly connected to the rotating drum, the rubber tube is wound around the rotating drum, the two grooves are respectively opened at the two ends of the rotating drum, the pressure sensor is fixedly connected to a support rod, one end of the two springs is respectively fixedly connected to the inner walls of the two grooves, and the other ends of the two springs are respectively connected to one The support rod and the pressure sensor are fixedly connected, and a spray assembly is arranged on the base, and the spray assembly includes a movable seat, a bracket, a telescopic rod, a sliding seat, a rotating tube and a spray head. The telescopic rod is slidably connected to the base, and the movable seat is fixedly connected to the telescopic rod, and the bracket is fixedly connected to the movable seat, and the sliding seat is slidably connected to the bracket. One end of the rubber tube is connected to the sliding seat, and the rotating tube is rotatably connected to the sliding seat. The spray head is fixedly connected to the rotating tube. A cleaning assembly is arranged on the bracket, and the cleaning assembly includes a fixed rod and a sponge block. The fixed rod is fixedly connected to the bracket, and the sponge block is fixedly connected to the fixed rod. An auxiliary assembly is also arranged on the base.

[0007] Preferably, the cleaning assembly further comprises a gear and a rack, the gear is fixedly connected to the rotating tube, the rack is fixedly connected to the bracket, the rack is meshed with the gear, and the rack passes through the sliding seat.

[0008] Preferably, the cleaning assembly further comprises a partition, the partition is fixedly connected to the inner wall of the sliding seat, and one end of the rotating tube is rotatably connected to the partition.

[0009] Preferably, the auxiliary component includes a slide groove, a slide rod and a shell, the slide groove is opened on the base, the slide rod is slidably connected to the inside of the slide groove, the shell is fixedly connected to the slide rod, and one end of the rubber tube is connected to the inner wall of the shell.

[0010] Preferably, the auxiliary component also includes a water inlet pipe and an electric control valve, the water inlet pipe is fixedly connected to the shell, the electric control valve is arranged on the water inlet pipe, the electric control valve cooperates with the pressure sensor, and the water inlet pipe is connected to the rubber tube.

[0011] Preferably, the auxiliary component also includes round rods and compression springs, a plurality of the round rods are slidably connected to the inner wall of the shell, a plurality of the compression springs are respectively fixedly connected between the plurality of round rods and the inner wall of the shell, and the plurality of round rods are respectively located on both sides of the rubber tube.

[0012] Preferably, three nozzles are provided, and the three nozzles are distributed on the rotating tube in a circular array, and multiple fixing rods are provided, and the multiple fixing rods are distributed on the bracket in a linear array.

[0013] Preferably, the rubber tube is spirally wound on the drum, and the rubber tube is in close contact with the spiral plate.

[0014] Compared with the prior art, the present invention has the following significant advantages:

[0015] First: In the present invention, by arranging a water delivery component, when the demolition platform is working, it will move forward, thereby driving the moving seat to move. When the moving seat moves, the bracket and the sliding seat on the bracket will also move accordingly. Since one end of the rubber tube is connected to the sliding seat, the rubber tube will be pulled. Since the rubber tube is wrapped around the rotating drum, as the rubber tube is pulled, the rubber tube will be unwound on the rotating drum and force the rotating drum to rotate. When the rotating drum rotates, the clockwork spring will be twisted accordingly, so that the pressure sensor is subjected to pressure. After receiving the pressure, the pressure sensor will send a signal to the control system, thereby opening the electric control valve, and connecting the water inlet pipe to an external water source. After the electric control valve is opened, water enters the water inlet pipe, and then enters the rubber tube, and enters the interior of the sliding seat along the rubber tube, and is finally sprayed out through various nozzles, thereby achieving dust reduction.

[0016] Secondly, in the present invention, by arranging a spray assembly and a cleaning assembly, as the demolition platform moves, the rubber tube wrapped around the rotating drum is continuously untied, so the sliding seat will deviate to a certain extent on the bracket, that is, the sliding seat will slide on the bracket, and during the sliding process, due to the meshing of the gear and the rack, the gear will rotate and drive the rotating tube to rotate, and the rotation of the rotating tube can drive the rotation of the spray head. Under the rotation of the spray head, the sprayed water will also increase the spraying range due to inertia. At the same time, since the sliding seat slides horizontally, the spray head will pass through each fixed rod in turn during the movement of the sliding seat. During this process, the sponge block will wipe the surface of the spray head. Therefore, during the entire spraying process, the spray head will be wiped several times to avoid excessive dust adhesion around the spray head.

[0017] Thirdly, in the present invention, an auxiliary component is provided so that when the rotating drum rotates, one end of the rubber tube is stretched and moves along with the demolition platform, while the other end of the rubber tube is gradually unwound due to the rotation of the rotating drum. Therefore, the length of the rubber tube between the rotating drum and the shell body will increase. The compression spring in the shell body is initially in a compressed state. Therefore, when the rubber tube is extended, the compression spring will be extended, thereby pushing each round rod. The movement of the round rod causes the rubber tube to be pulled into the shell body. Therefore, when the length of the rubber tube between the rotating drum and the shell body increases, the excess rubber tube will be pulled into the shell body for storage, thereby avoiding the problem of the excess rubber tube being dragged outside and possibly entangled and knotted.

[0018] Fourthly, in the present invention, after the work of the demolition platform is completed, it will return to the original route. During this process, the clockwork spring between the rotating drum and the support rod will reverse the rotating drum through elastic force, so that the rubber tube will be rewound around the rotating drum. Therefore, when the demolition platform is reset, each structure on the spraying equipment will also be reset. At this time, the pressure sensor is no longer under pressure, the electric control valve is closed, and no water is sprayed out. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] The present invention will be further explained below in conjunction with the accompanying drawings and embodiments:

[0020] Figure 1 The three-dimensional structure of the present invention is shown in FIG. Figure 1 ;

[0021] Figure 2 The three-dimensional structure of the present invention is shown in FIG. Figure 2 ;

[0022] Figure 3 The three-dimensional structure of the present invention is shown in FIG. Figure 3 ;

[0023] Figure 4 It is a schematic diagram of the structure of the water delivery component, the spray component and the cleaning component in the present invention;

[0024] Figure 5 It is a three-dimensional structural schematic diagram of the rotary drum and the spiral plate in the present invention;

[0025] Figure 6 is a cross-sectional view of the internal structure of the sliding seat in the present invention;

[0026] Figure 7 is a cross-sectional view of the internal structure of the housing in the present invention;

[0027] Figure 8 The present invention Figure 3 An enlarged view of the structure of part A is shown.

[0028] Description of reference numerals:

[0029] 1. Base; 2. Water delivery component; 21. Support rod; 22. Rotating drum; 23. Spiral plate; 24. Rubber tube; 25. Groove; 26. Spring; 27. Pressure sensor; 3. Spray component; 31. Moving seat; 32. Bracket; 33. Telescopic rod; 34. Sliding seat; 35. Rotating tube; 36. Spray head; 4. Cleaning component; 41. Partition; 42. Gear; 43. Rack; 44. Fixed rod; 45. Sponge block; 5. Auxiliary component; 51. Slide groove; 52. Sliding rod; 53. Shell; 54. Water inlet pipe; 55. Electric control valve; 56. Round rod; 57. Compression spring. DETAILED DESCRIPTION

[0030] The present invention is described in detail below, and the technical solutions in the embodiments of the present invention are clearly and completely described. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0031] The present invention provides a spraying device for a slow-down building demolition platform through improvement. The technical solution of the present invention is:

[0032] like Figure 1-Figure 8 As shown, a spraying device for a slow-descending building demolition platform comprises a base 1, on which a water delivery assembly 2 is arranged, the water delivery assembly 2 comprises a support rod 21, a rotating drum 22, a spiral plate 23, a rubber tube 24, a groove 25, a spring 26 and a pressure sensor 27, two support rods 21 are fixedly connected to the base 1, the rotating drum 22 is rotatably connected between the two support rods 21, the spiral plate 23 is fixedly connected to the rotating drum 22, the rubber tube 24 is wound around the rotating drum 22, two grooves 25 are respectively opened at both ends of the rotating drum 22, the pressure sensor 27 is fixedly connected to one support rod 21, one end of two springs 26 are respectively fixedly connected to the inner walls of the two grooves 25, and the other ends of the two springs 26 are respectively fixed to one support rod 21 and the pressure sensor 27. The base 1 is fixedly connected, and a spray assembly 3 is arranged on the base 1. The spray assembly 3 includes a movable seat 31, a bracket 32, a telescopic rod 33, a sliding seat 34, a rotating tube 35 and a nozzle 36. The telescopic rod 33 is slidably connected to the base 1, the movable seat 31 is fixedly connected to the telescopic rod 33, the bracket 32 ​​is fixedly connected to the movable seat 31, the sliding seat 34 is slidably connected to the bracket 32, one end of the rubber tube 24 is connected to the sliding seat 34, the rotating tube 35 is rotatably connected to the sliding seat 34, the nozzle 36 is fixedly connected to the rotating tube 35, and a cleaning assembly 4 is arranged on the bracket 32. The cleaning assembly 4 includes a fixed rod 44 and a sponge block 45. The fixed rod 44 is fixedly connected to the bracket 32, and the sponge block 45 is fixedly connected to the fixed rod 44. An auxiliary assembly 5 is also arranged on the base 1.

[0033] The arrangement of the spiral plate 23 allows the rubber tube 24 to be wound around the drum 22 along the track of the spiral plate 23 . The material of the rubber tube 24 is relatively hard and will not be squeezed and deformed during the winding process.

[0034] Furthermore, the cleaning assembly 4 also includes a gear 42 and a rack 43. The gear 42 is fixedly connected to the rotating tube 35, and the rack 43 is fixedly connected to the bracket 32. The rack 43 is meshed with the gear 42, and the rack 43 passes through the sliding seat 34. The rack 43 is fixed and does not move. When the sliding seat 34 moves, the gear 42 will move accordingly, thereby rotating by meshing with the rack 43.

[0035] Furthermore, the cleaning component 4 also includes a partition 41, which is fixedly connected to the inner wall of the sliding seat 34. One end of the rotating tube 35 is rotatably connected to the partition 41. The function of the partition 41 is to prevent water from passing through the partition 41 and contacting the rack 43 and the gear 42. After entering the sliding seat 34, the water will directly pass through the partition 41 and enter the rotating tube 35.

[0036] Furthermore, the auxiliary component 5 includes a slide groove 51, a slide rod 52 and a shell 53. The slide groove 51 is opened on the base 1, the slide rod 52 is slidably connected to the inside of the slide groove 51, and the shell 53 is fixedly connected to the slide rod 52. One end of the rubber tube 24 is connected to the inner wall of the shell 53. The shell 53 is used to store the rubber tube 24. As the demolition platform moves, the other end of the rubber tube 24 will gradually untie due to the rotation of the rotating drum 22. Therefore, the length of the rubber tube 24 between the rotating drum 22 and the shell 53 will increase, and the excess rubber tube 24 will be pulled into the shell 53 to complete the storage, so as to avoid the problem of excess rubber tube 24 being dragged outside and possibly tangled.

[0037] Furthermore, the auxiliary component 5 also includes a water inlet pipe 54 and an electric control valve 55. The water inlet pipe 54 is fixedly connected to the shell 53, and the electric control valve 55 is arranged on the water inlet pipe 54. The electric control valve 55 cooperates with the pressure sensor 27. The water inlet pipe 54 is connected to the rubber tube 24, and the water inlet pipe 54 is connected to the water source. When the pressure sensor 27 is subjected to pressure, it will send a signal to the external control system, thereby controlling the electric control valve 55 to start, so that water can enter the water inlet pipe 54.

[0038] Furthermore, the auxiliary component 5 also includes round rods 56 and compression springs 57. The multiple round rods 56 are slidably connected to the inner wall of the shell 53, and the multiple compression springs 57 are respectively fixedly connected between the multiple round rods 56 and the inner wall of the shell 53. The multiple round rods 56 are respectively located on both sides of the rubber tube 24. The compression springs 57 are initially in a compressed state. Therefore, when the length of the rubber tube 24 is extended, the compression springs 57 will push the round rods 56, so that the excess rubber tube 24 is stored in the shell 53.

[0039] Furthermore, three nozzles 36 are provided, and the three nozzles 36 are distributed in a circular array on the rotating tube 35. A plurality of fixing rods 44 are provided, and the plurality of fixing rods 44 are distributed in a linear array on the bracket 32. The nozzles 36 will rotate with the rotating tube 35. Therefore, when the nozzles 36 distributed in a circular array rotate with the rotating tube 35, the water sprayed by the nozzles 36 will be thrown away, thereby expanding the range of the spray.

[0040] Furthermore, the rubber tube 24 is spirally wound on the drum 22, and the rubber tube 24 fits with the spiral plate 23. Under the action of the drum 22, the rubber tube 24 will always be in a straight state. Therefore, in conjunction with the spiral plate 23, the rubber tube 24 can be wound around the drum 22 along the spiral plate 23.

[0041] The specific working method is: first fix the base 1 on the demolition machine, and then connect the movable seat 31 and the movable demolition platform, so that the movable seat 31 will move with the demolition platform when it is working, so as to spray the front of the demolition platform during the demolition process to achieve the effect of dust reduction.

[0042] When the demolition platform is working, it will move forward, thereby driving the moving seat 31 to move. When the moving seat 31 moves, the bracket 32 ​​and the sliding seat 34 on the bracket 32 ​​will also move accordingly. Since one end of the rubber tube 24 is connected to the sliding seat 34, the rubber tube 24 will be pulled, and the rubber tube 24 is wound on the rotating drum 22. Therefore, as the rubber tube 24 is pulled, the rubber tube 24 will be unwound on the rotating drum 22 and force the rotating drum 22 to rotate. When the rotating drum 22 rotates, the clockwork spring 26 will be twisted accordingly, so that the pressure sensor 27 is subjected to pressure. After receiving the pressure, the pressure sensor 27 will send a signal to the control system, thereby opening the electric control valve 55, and the water inlet pipe 54 is connected to an external water source. After the electric control valve 55 is opened, water enters the water inlet pipe 54, and then enters the rubber tube 24, and enters the inside of the sliding seat 34 along the rubber tube 24, and is finally sprayed out through each nozzle 36, thereby achieving dust reduction.

[0043] As the demolition platform moves, the rubber tube 24 wrapped around the rotating drum 22 is continuously untied, so the sliding seat 34 will deviate to a certain extent on the bracket 32, that is, the sliding seat 34 will slide on the bracket 32. During the sliding process, since the gear 42 is meshed with the rack 43, the gear 42 will rotate and drive the rotating tube 35 to rotate. The rotation of the rotating tube 35 can drive the nozzle 36 to rotate. Under the rotation of the nozzle 36, the sprayed water will also increase the spraying range due to inertia. At the same time, since the sliding seat 34 slides horizontally, the nozzle 36 will pass through each fixed rod 44 in turn during the movement of the sliding seat 34. During this process, the sponge block 45 will wipe the surface of the nozzle 36. Therefore, during the entire spraying process, the nozzle 36 will be wiped several times to avoid excessive dust adhesion around the nozzle 36.

[0044] As the drum 22 rotates, one end of the rubber tube 24 is stretched and moves with the demolition platform, and the other end of the rubber tube 24 is gradually unwound due to the rotation of the drum 22. Therefore, the length of the rubber tube 24 between the drum 22 and the shell 53 will increase. The compression spring 57 in the shell 53 is initially in a compressed state. Therefore, when the rubber tube 24 is extended, the compression spring 57 will be extended, thereby pushing each round rod 56. The round rod 56 moves so that the rubber tube 24 is pulled into the shell 53. Therefore, when the length of the rubber tube 24 between the drum 22 and the shell 53 increases, the excess rubber tube 24 will be pulled into the shell 53 to complete the storage, thereby avoiding the problem of excess rubber tube 24 being dragged outside and possibly tangled.

[0045] After the work on the demolition platform is completed, it will return along the original route. During this process, the clockwork spring 26 between the rotating drum 22 and the support rod 21 will reverse the rotating drum 22 through elastic force, so that the rubber tube 24 will be rewound around the rotating drum 22. Therefore, when the demolition platform is reset, all structures on the spraying equipment will also be reset. At this time, the pressure sensor 27 is no longer under pressure, the electric control valve 55 is closed, and no water is sprayed out.

[0046] The technical means disclosed in the solution of the present invention are not limited to the technical means disclosed in the above technical means, but also include technical solutions composed of equivalent replacement of the above technical features. Matters not covered in the present invention belong to the common knowledge of those skilled in the art.

Claims

1. A spraying device for a slow-down demolition platform, comprising a base (1), Features: The base (1) is provided with a water delivery assembly (2), the water delivery assembly (2) comprising a support rod (21), a rotating drum (22), a spiral plate (23), a rubber tube (24), a groove (25), a spring spring (26) and a pressure sensor (27), the two support rods (21) being fixedly connected to the base (1), the rotating drum (22) being rotatably connected between the two support rods (21), the spiral plate (23) being fixedly connected to the rotating drum (22), the rubber tube (24) being wound around the rotating drum (22), the two grooves (25) being respectively opened at two ends of the rotating drum (22), the pressure sensor (27) being fixedly connected to one support rod (21), one end of the two spring springs (26) being respectively fixedly connected to the inner walls of the two grooves (25), the other ends of the two spring springs (26) being respectively fixedly connected to one support rod (21) and the pressure sensor (27), and the base (1) is provided with a spray assembly (3), The spray assembly (3) comprises a movable seat (31), a bracket (32), a telescopic rod (33), a sliding seat (34), a rotating tube (35) and a spray head (36); the telescopic rod (33) is slidably connected to the base (1); the movable seat (31) is fixedly connected to the telescopic rod (33); the bracket (32) is fixedly connected to the movable seat (31); the sliding seat (34) is slidably connected to the bracket (32); one end of the rubber tube (24) is connected to the sliding seat (36); The bracket (32) is connected to the sliding seat (34), the rotating tube (35) is rotatably connected to the sliding seat (34), the nozzle (36) is fixedly connected to the rotating tube (35), a cleaning component (4) is arranged on the bracket (32), the cleaning component (4) comprises a fixing rod (44) and a sponge block (45), the fixing rod (44) is fixedly connected to the bracket (32), the sponge block (45) is fixedly connected to the fixing rod (44), and an auxiliary component (5) is also arranged on the base (1).

2. A spraying device for a slow-down demolition platform according to claim 1, Features: The cleaning assembly (4) further comprises a gear (42) and a rack (43); the gear (42) is fixedly connected to the rotating tube (35); the rack (43) is fixedly connected to the bracket (32); the rack (43) is meshed with the gear (42), and the rack (43) passes through the sliding seat (34).

3. A spraying device for a slow-down demolition platform according to claim 2, Features: The cleaning assembly (4) further comprises a partition (41), wherein the partition (41) is fixedly connected to the inner wall of the sliding seat (34), and one end of the rotating tube (35) is rotatably connected to the partition (41).

4. A spraying device for a slow-down building demolition platform according to claim 1, Features: The auxiliary component (5) comprises a slide groove (51), a slide rod (52) and a shell (53); the slide groove (51) is opened on the base (1); the slide rod (52) is slidably connected to the inside of the slide groove (51); the shell (53) is fixedly connected to the slide rod (52); and one end of the rubber tube (24) is connected to the inner wall of the shell (53).

5. A spraying device for a slow-down building demolition platform according to claim 4, Features: The auxiliary component (5) further comprises a water inlet pipe (54) and an electric control valve (55); the water inlet pipe (54) is fixedly connected to the housing (53); the electric control valve (55) is arranged on the water inlet pipe (54); the electric control valve (55) cooperates with the pressure sensor (27); and the water inlet pipe (54) is connected to the rubber tube (24).

6. A spraying device for a slow-down building demolition platform according to claim 5, Features: The auxiliary component (5) further comprises round rods (56) and compression springs (57); the plurality of round rods (56) are slidably connected to the inner wall of the shell (53); the plurality of compression springs (57) are respectively fixedly connected between the plurality of round rods (56) and the inner wall of the shell (53); and the plurality of round rods (56) are respectively located on both sides of the rubber tube (24).

7. The spraying equipment for the slow-down demolition platform according to claim 1, Features: The nozzles (36) are provided in three numbers, and the three nozzles (36) are distributed on the rotating tube (35) in a circular array. The fixing rods (44) are provided in multiple numbers, and the fixing rods (44) are distributed on the bracket (32) in a linear array.

8. The spraying equipment for the slow-down demolition platform according to claim 1, Features: The rubber tube (24) is spirally wound on the rotating drum (22), and the rubber tube (24) is in close contact with the spiral plate (23).

Citation Information

Patent Citations

  • Lead storage device of electrocardiogram monitor

    CN211687812U

  • Material grabbing machine with spraying function

    CN215100578U

  • Storage battery inspection device

    CN215986411U

  • Intelligent building spraying dust falling device

    CN216572227U

  • A construction site spray cooling device

    CN218820757U