LNG ship supplementary plate design method

By calculating the stress and pressure under static and dynamic pressure conditions, adjusting the ribs and patch area in the LNG ship filling design, the problem of low design efficiency in the existing technology is solved, and the LNG ship filling design is realized effective verification and optimization.

CN118928689AActive Publication Date: 2024-11-12HUDONG ZHONGHUA SHIPBUILDINGGROUP
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202410973325.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-19
Publication Date
2024-11-12
Estimated Expiration
2044-07-19

AI Technical Summary

Technical Problem

The existing technology lacks a simple and efficient LNG ship patch design method, and it is difficult to effectively distinguish the relationship between the normal stress and shear stress on the bone material penetrates through the incision and the pressure, spacing, connection coefficient and connection area, resulting in insufficiency of design.

Method used

By calculating the static pressure and dynamic pressure under static pressure conditions and dynamic pressure, combining the position of the through bone material, determining the normal stress and shear stress, adjusting the rib and patching design, increasing or reducing the connection area, Ensure that the design complies with allowable stresses and use specific formulas and design processes for verification.

Benefits of technology

Simple and efficient judgment is made on whether the LNG ship patch design meets the design requirements, improves design efficiency, and ensures that the stress and shear stress of the bone material are within a safe range.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118928689A_ABST
    Figure CN118928689A_ABST
Patent Text Reader

Abstract

The invention provides an LNG (Liquefied Natural Gas) ship reinforcing plate design method, which comprises the following steps of: calculating normal stress and shear stress at a position passing through an aggregate by calculating corresponding static pressure and dynamic pressure under a static pressure working condition and a dynamic pressure working condition; on the basis of the normal stress and the shear stress as well as the allowable normal stress and the allowable shear stress, comparing and judging whether the design scheme of the preliminary reinforcing plate needs to be optimized or modified or not; if the normal stress and the shear stress are larger than the corresponding allowable stress, the connecting area is increased by adjusting the design of the reinforcing bars and the design of the reinforcing plates; on the contrary, if the normal stress and the shear stress are smaller than the corresponding allowable stress, the corresponding connecting area is reduced, and the penetrating mode that the reinforcing bars are not arranged or the reinforcing plates are not arranged is adopted. According to the technical scheme, by establishing the relation between the normal stress and shear stress borne by the penetrating aggregate at the penetrating notch of the LNG ship and the pressure, the distance between the penetrating aggregate, the distance between the strong frames / the distance between the supporting webs, the connection coefficient and the connection area, whether the LNG ship supplementary plate design meets the design requirement or not can be simply, conveniently and efficiently judged, and the design efficiency is further improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of ship design and manufacturing, and in particular relates to a LNG ship patching design method. Background Art

[0002] The cutouts and related patching arrangements for the passage of the frame through the web of the main supporting member should be designed to minimize the stress concentration on the surrounding and main supporting member web stiffeners. According to the relevant methods and regulations in ship structural mechanics and specifications, there are quite detailed design instructions and calculation verification methods for the arrangement of cutouts and related patching, the positive stress of the web stiffeners of the main supporting member (if any), and the shear stress of the shear connection of the web. However, there is currently no detailed and simple design method for the patching design of special ship types LNG ships.

[0003] Therefore, how to provide a LNG ship patching design method, establish the relationship between the normal stress and shear stress and pressure of the passing frame at the through-cut of the LNG ship, the spacing of the passing frame, the spacing of the strong frame / support web, the connection coefficient and the connection area, and simply and efficiently determine whether the LNG ship patching design meets the design requirements and improve the design efficiency has become a technical problem that needs to be solved urgently. Summary of the invention

[0004] An embodiment of the present invention provides a LNG ship patch design method. By establishing a relationship between the normal stress and shear stress and pressure of the passing frame at the through-cut of the LNG ship, the spacing of the passing frame, the spacing of the strong frame / the spacing of the supporting web, the connection coefficient and the connection area, it is possible to simply and efficiently determine whether the LNG ship patch design meets the design requirements, thereby further improving the design efficiency.

[0005] In an embodiment of the present invention, a method for designing a LNG ship plate patch is provided, comprising:

[0006] S101. Based on the preliminary patch design, calculate the connection area A1 between the web stiffener and / or bracket and the through-frame, the direct connection area A2 between the through-cut and the through-frame, and the connection area A3 between the patch or collar and the through-frame. According to the location of the through-frame, the two conditions are divided into static pressure condition and dynamic pressure condition, and the corresponding static pressure and dynamic pressure under the two conditions are calculated.

[0007] S102, based on the known actual arrangement of the through-aggregate spacing s and the strong frame spacing / support web spacing l, determine the connection coefficient Cs corresponding to the through-aggregate, and calculate the normal stress and shear stress at the through-aggregate position according to the static pressure, dynamic pressure, connection area, through-aggregate spacing s, strong frame spacing / support web spacing l and the connection coefficient Cs, according to the correlation, divide into static pressure condition and dynamic pressure condition;

[0008] S103, based on the normal stress and shear stress and the allowable normal stress and allowable shear stress, comparing and judging whether the design scheme of the preliminary patching plate needs to be optimized or modified;

[0009] S104. If the normal stress and shear stress are greater than the corresponding allowable stress, the connection area is increased by adjusting the design of the ribs and the patch plate. On the contrary, if the normal stress and shear stress are less than the corresponding allowable stress, the corresponding connection area is reduced and the penetration form is not provided with ribs or patch plates.

[0010] Furthermore, according to the position of the passing aggregate, it is divided into a static pressure condition and a dynamic pressure condition, and the corresponding static pressure and dynamic pressure under the two conditions are calculated, including:

[0011] The static pressure includes: water pressure and cabin internal pressure. The water pressure is positively correlated with the water pressure head, which depends on the maximum value of the following four calculated distances: the distance from the calculation point to the 2 / 3 position of the overflow pipe outlet from the cabin top; the distance between the calculation point and the position point above the cabin top determined by the length of the ship; the distance between the calculation point and the structural draft position; the distance between the calculation point and the 2 / 3 position of the sealing bulkhead or freeboard deck; in addition to the deep tank pressure, the cabin internal pressure also needs to consider the effects of liquid cargo pressure and steam pressure at the cabin hull bulkhead in the cargo hold area;

[0012] The dynamic pressure is the pressure of the liquid on the hull caused by the movement of the ship, including the combined force of liquid pressure and / or sloshing force; wherein, the bow and stern areas of the LNG ship also include impact pressure shear stress.

[0013] Furthermore, the method comprises:

[0014] The shear stress calculation and verification under static pressure conditions and the shear stress under dynamic pressure conditions are performed separately to determine the shear stress calculation formula:

[0015]

[0016] In the formula, τ dc is the shear force of the shear connection with the PSM web, N / mm 2 , p is the calculated pressure at the reinforcement, which is divided into two working conditions: static pressure and dynamic pressure, both of which must meet the requirements, N / mm 2 , C s is the connection coefficient. When the passing frame is a symmetrical reinforcement form, the connection coefficient is 1; when the passing frame is an asymmetrical reinforcement and only directly connected, the connection coefficient is 1.41; when the passing frame is an asymmetrical reinforcement and has a filler plate or a collar plate, the connection coefficient is 1.12.

[0017] Furthermore, the method comprises:

[0018] The normal stress calculation and verification under static pressure conditions and the normal stress under dynamic pressure conditions are performed separately to determine the normal stress calculation formula:

[0019]

[0020] In the formula, σ fb is the normal stress in the connection with the PSM web stiffener bracket, N / mm 2 .

[0021] Furthermore, the method includes: patch plate design and rib design;

[0022] The patch plate design includes: the design of the cutout pattern and the design of the patch plate pattern; the design of the cutout pattern determines the direct connection area A2 between the cutout and the passing frame, and the design of the patch plate pattern determines the connection area A3 between the patch plate or collar plate and the passing frame;

[0023] The reinforcement design includes: whether to select reinforcement, reinforcement size selection, whether reinforcement has arc soft toe, and whether reinforcement has bracket or back bracket. The reinforcement design determines the connection area A1 between the web stiffener and the through-frame.

[0024] Furthermore, the method comprises:

[0025] The size of the connection area A1 between the web stiffener and / or bracket and the passing frame is positively correlated with the plate thickness of the web stiffener and / or bracket and the length of the connection contact surface; the size of the direct connection area A2 between the through cut and the passing frame is positively correlated with the web thickness and the length of the direct connection contact surface between the cut and the passing frame; the size of the connection area A3 between the patch or collar plate and the passing frame is positively correlated with the web thickness and the length of the connection contact surface between the patch or collar plate and the passing frame.

[0026] Furthermore, the bracing ribs include three forms: ordinary straight bracing ribs, bracing ribs with circular arcs, and a combination of bracing ribs and back elbow plates. Among them, the combination of bracing ribs and back elbow plates is better than the bracing ribs with circular arcs and better than ordinary straight bracing ribs.

[0027] Furthermore, the patch plate includes at least one or more of a floor patch plate, a non-floor patch plate, a watertight patch plate, an embedded patch plate and a ball-end patch plate. The embedded patch plate is stronger than a watertight patch plate, a ball-end patch plate, a floor patch plate and a non-floor patch plate.

[0028] The beneficial effects brought by the present invention are as follows:

[0029] It can be seen from the above scheme that the embodiment of the present invention provides a LNG ship patch design method, which calculates the normal stress and shear stress at the position of the passing frame by calculating the corresponding static pressure and dynamic pressure under static pressure conditions and dynamic pressure conditions; based on the normal stress and shear stress and the allowable normal stress and allowable shear stress, compare and judge whether the design scheme of the preliminary patch needs to be optimized or modified; if the normal stress and shear stress are greater than the corresponding allowable stress, the connection area is increased by adjusting the rib design and the patch design; conversely, if the normal stress and shear stress are less than the corresponding allowable stress, the corresponding connection area is reduced, and no ribs or patch penetration forms are provided. The technical scheme of the present invention, by establishing a relationship between the normal stress and shear stress and pressure of the passing frame at the through-cut of the LNG ship, the spacing of the passing frame, the spacing of the strong frame / the spacing of the supporting web, the connection coefficient and the connection area, can simply and efficiently determine whether the design of the LNG ship patch meets the design requirements, and further improve the design efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 A flow chart showing a method for designing a patching plate for an LNG ship according to an embodiment of the present invention;

[0031] Figure 2 A schematic diagram showing a static pressure head of a LNG ship patching design method according to an embodiment of the present invention;

[0032] Figure 3 A schematic diagram showing the definition of connection surface geometric parameters of a method for designing a patch plate for an LNG ship according to an embodiment of the present invention;

[0033] In the figure, h0 is the height of the calculated position of the through-frame from the baseline, h1 is the height of the tank top from the baseline, h2 is the height of the overflow pipe outlet from the tank top, h3 is the height of the (virtual) freeboard deck from the baseline, h4 is the height of the load line from the baseline, h5 is the height of the cargo tank inner shell deck from the baseline, A1 is the connection area between the web stiffener and / or bracket and the through-frame, A2 is the direct connection area between the cutout and the through-frame, and A3 is the connection area between the patch or collar and the through-frame. DETAILED DESCRIPTION

[0034] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution in the embodiment of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiment of the present invention. Obviously, the described embodiment is a part of the embodiment of the present invention, not all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0035] In an embodiment of the present invention, a method for designing a patching plate for an LNG ship is proposed for an LNG ship. The normal stress of the stiffener (if any) and the shear stress of the web and patching plate of the main supporting member are linked by the static load / dynamic load, the connection area between the stiffener or bracket (if any) and the patching plate, and the web and the frame, and the material yield strength through the corresponding calculation formula. By comparing the calculated normal stress of the stiffener (if any) and the shear stress of the web or patching plate with the allowable normal stress and the allowable shear stress, it is judged whether the patching plate design of the LNG ship meets the design requirements.

[0036] like Figure 1 As shown, Figure 1 A flow chart of a LNG ship patching design method according to an embodiment of the present invention is shown.

[0037] Figure 1 A method for designing a plate patch for an LNG ship includes:

[0038] S101. Based on the preliminary patch design, calculate the connection area A1 between the web stiffener and / or bracket and the through-frame, the direct connection area A2 between the through-cut and the through-frame, and the connection area A3 between the patch or collar and the through-frame. According to the location of the through-frame, the two conditions are divided into static pressure condition and dynamic pressure condition, and the corresponding static pressure and dynamic pressure under the two conditions are calculated.

[0039] S102, based on the known actual arrangement of the through-aggregate spacing s and the strong frame spacing / support web spacing l, determine the connection coefficient Cs corresponding to the through-aggregate, and calculate the normal stress and shear stress at the through-aggregate position according to the static pressure, dynamic pressure, connection area, through-aggregate spacing s, strong frame spacing / support web spacing l and the connection coefficient Cs, according to the correlation, divide into static pressure condition and dynamic pressure condition;

[0040] S103, based on the normal stress and shear stress and the allowable normal stress and allowable shear stress, comparing and judging whether the design scheme of the preliminary patching plate needs to be optimized or modified;

[0041] S104. If the normal stress and shear stress are greater than the corresponding allowable stress, the connection area is increased by adjusting the design of the ribs and the patch plate. On the contrary, if the normal stress and shear stress are less than the corresponding allowable stress, the corresponding connection area is reduced and the penetration form is not provided with ribs or patch plates.

[0042] In another embodiment of the present invention, according to the location of the passing aggregate, it is divided into a static pressure condition and a dynamic pressure condition, and the static pressure and dynamic pressure corresponding to the two conditions are calculated, including:

[0043] The static pressure includes: water pressure and cabin internal pressure. The water pressure is positively correlated with the water pressure head, which depends on the maximum value of the following four calculated distances: the distance from the calculation point to the 2 / 3 position of the overflow pipe outlet from the cabin top; the distance between the calculation point and the position point above the cabin top determined by the length of the ship; the distance between the calculation point and the structural draft position; the distance between the calculation point and the 2 / 3 position of the sealing bulkhead or freeboard deck; in addition to the deep tank pressure, the cabin internal pressure also needs to consider the effects of liquid cargo pressure and steam pressure at the cabin hull bulkhead in the cargo hold area;

[0044] The dynamic pressure is the pressure of the liquid on the hull caused by the movement of the ship, including the combined force of liquid pressure and / or sloshing force; wherein, the bow and stern areas of the LNG ship also include impact pressure shear stress.

[0045] In another embodiment of the present invention, the method comprises:

[0046] The shear stress calculation and verification under static pressure conditions and the shear stress under dynamic pressure conditions are performed separately to determine the shear stress calculation formula:

[0047]

[0048] In the formula, τ dc is the shear force of the shear connection with the PSM web, N / mm 2 , p is the calculated pressure at the reinforcement, which is divided into two working conditions: static pressure and dynamic pressure, both of which must meet the requirements, N / mm 2 , C s is the connection coefficient. When the passing frame is a symmetrical reinforcement form, the connection coefficient is 1; when the passing frame is an asymmetrical reinforcement and only directly connected, the connection coefficient is 1.41; when the passing frame is an asymmetrical reinforcement and has a filler plate or a collar plate, the connection coefficient is 1.12.

[0049] In another embodiment of the present invention, the method comprises:

[0050] The normal stress calculation and verification under static pressure conditions and the normal stress under dynamic pressure conditions are performed separately to determine the normal stress calculation formula:

[0051]

[0052] In the formula, σ fb is the normal stress in the connection with the PSM web stiffener bracket, N / mm 2 .

[0053] In another embodiment of the present invention, the method includes: designing a patch plate and a reinforcement bar;

[0054] The patch plate design includes: the design of the cutout pattern and the design of the patch plate pattern; the design of the cutout pattern determines the direct connection area A2 between the cutout and the passing frame, and the design of the patch plate pattern determines the connection area A3 between the patch plate or collar plate and the passing frame;

[0055] The reinforcement design includes: whether to select reinforcement, reinforcement size selection, whether reinforcement has arc soft toe, and whether reinforcement has bracket or back bracket. The reinforcement design determines the connection area A1 between the web stiffener and the through-frame.

[0056] In another embodiment of the present invention, the method comprises:

[0057] The size of the connection area A1 between the web stiffener and / or bracket and the passing frame is positively correlated with the plate thickness of the web stiffener and / or bracket and the length of the connection contact surface; the size of the direct connection area A2 between the through cut and the passing frame is positively correlated with the web thickness and the length of the direct connection contact surface between the cut and the passing frame; the size of the connection area A3 between the patch or collar plate and the passing frame is positively correlated with the web thickness and the length of the connection contact surface between the patch or collar plate and the passing frame.

[0058] In another embodiment of the present invention, the stiffeners include three forms: ordinary straight stiffeners, stiffeners with circular arcs, and combinations of stiffeners and back elbow plates. Among them, the combination of stiffeners and back elbow plates is better than stiffeners with circular arcs and ordinary straight stiffeners.

[0059] In another embodiment of the present invention, the patch plate includes at least one or more of a floor patch plate, a non-floor patch plate, a watertight patch plate, an embedded patch plate and a ball-end patch plate, and the embedded patch plate is stronger than a watertight patch plate, a ball-end patch plate, a floor patch plate and a non-floor patch plate.

[0060] In the embodiment of the present invention, according to the structural characteristics of the LNG ship, a patch design method different from the patch design method introduced in the common structural specifications of bulk carriers and oil tankers is adopted to check whether the patch design of the LNG ship meets the mechanical design requirements by establishing new calculation formulas corresponding to normal stress and shear stress and comparing them with the allowable normal stress and allowable shear stress. A relationship is established between the normal stress and shear stress and the pressure of the passing frame at the through-cut of the LNG ship, the spacing of the passing frame, the spacing of the strong frame / the spacing of the supporting web, the connection coefficient and the connection area. As long as the connection area connected to the passing frame is adjusted, it can be easily and efficiently judged whether the patch design of the LNG ship meets the design requirements, thereby improving the design efficiency and having strong practicality.

[0061] like Figure 2 and Figure 3 As shown, Figure 2 A schematic diagram showing a static pressure head of a LNG ship patching design method according to an embodiment of the present invention; Figure 3 A schematic diagram showing the definition of connection surface geometric parameters of a method for designing a patch plate for an LNG ship according to an embodiment of the present invention.

[0062] Pressure calculation is divided into two working conditions: static pressure and dynamic pressure. Static pressure calculation generally adopts pressure head selection, such as Figure 2 The calculation position 1 is located in the ship hull area, and the four pressure heads corresponding to the water pressure head are |(h1+1300)-h0|, |h4-h0|, The water pressure head at position 1 is calculated by taking the larger one from the above four pressure heads. Figure 2 The calculation position 2 is located in the inner shell of the ship's cargo hold and will be affected by the LNG liquid cargo pressure and steam pressure. The LNG liquid cargo pressure head is |h5-h0|, and the steam pressure is the design value. Then the larger of the water pressure and the LNG liquid cargo static pressure is compared. The dynamic pressure calculation of the dynamic pressure condition can be calculated according to the requirements of the classification society's specifications, or by adding a safety factor based on the static pressure.

[0063] Shear stress calculation is divided into shear stress calculation verification under static pressure conditions and shear stress calculation verification under dynamic pressure conditions. The shear stress calculation formula is:

[0064]

[0065] The normal stress calculation is divided into the normal stress calculation verification under static pressure conditions and the normal stress calculation verification under dynamic pressure conditions. The normal stress calculation formula is:

[0066]

[0067] In the formula, τ dc is the shear force of the shear connection with the PSM web, N / mm 2 , p is the calculated pressure at the reinforcement, which is divided into two working conditions: static pressure and dynamic pressure, both of which must meet the requirements, N / mm 2 , C s is the connection coefficient. When the passing frame is a symmetrical reinforcement form, the connection coefficient is 1; when the passing frame is an asymmetrical reinforcement and only directly connected, the connection coefficient is 1.41; when the passing frame is an asymmetrical reinforcement and has a filler plate or a collar plate, the connection coefficient is 1.12.

[0068] Among them, the shear force calculation and normal stress calculation are divided into static pressure conditions and dynamic pressure conditions. The A1 / A2 / A3 corresponding to the static pressure condition corresponds to the construction size, and the A1 / A2 / A3 corresponding to the dynamic pressure condition corresponds to the net size after corrosion. The reinforcement ribs of flat steel and T-profiles are symmetrical reinforcement ribs, and the reinforcement ribs of ball flat steel and angle steel are asymmetrical reinforcement ribs.

[0069] Figure 3 In the design, the patch design and the rib design are usually considered together. The patch design includes the design of the cutout type and the design selection of the patch type. Figure 3 The design of the cutout type determines the direct connection area A2 between the cutout and the through-frame, and the design of the patch plate type determines the connection area A3 between the patch plate or collar plate and the through-frame. The reinforcement design includes whether to select reinforcement, reinforcement size, whether reinforcement has arc soft toe, and whether reinforcement has bracket or back bracket. The reinforcement design determines the connection area A1 between the web stiffener and the through-frame.

[0070] The allowable stress of the connection between the passing frame and PSM is designed based on experience. The corresponding allowable stress of LNG carrier is as follows:

[0071] Static pressure conditions:

[0072] σ perm =0.6f y , N / mm 2 , f y is the yield strength of the reinforcement bracket material;

[0073] τ perm =0.3f y , N / mm 2 , f y is the yield strength of the web / filler material;

[0074] Dynamic pressure condition:

[0075] σ perm =0.84S m f y , N / mm 2 , f y is the yield strength of the reinforcement bracket material, S m is the strength reduction factor;

[0076] τ perm =0.42S m f y , N / mm 2 , f y is the yield strength of the web / filler material, S m is the strength reduction factor.

[0077] in:

[0078] f y The corresponding value for ordinary steel is 235N / mm 2 , H32 high strength steel is taken as 315N / mm 2 , H36 high strength steel is taken as 315N / mm 2 ;

[0079] S mThe corresponding value for ordinary steel is 1.0, for H32 high-strength steel is 0.95, and for H36 high-strength steel is 0.908.

[0080] In an embodiment of the present invention, a method for designing a LNG ship patch is provided, by comparing the σ under static pressure conditions and dynamic pressure conditions. fb ≤σ perm , τ dc ≤τ perm Whether all the above conditions are met at the same time is determined by comparing the calculation results to decide the type of cutout in the patch design, the need for a patch and the type of patch, the need for stiffeners and the type and size of stiffeners, as well as the thickness and material of the web and stiffeners.

[0081] The above are preferred embodiments of the present invention. It should be pointed out that, for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present invention. These improvements and modifications should also be regarded as within the scope of protection of the present invention.

Claims

1. A design method for LNG ship patching. It is characterized in that The method comprises: S101. Based on the preliminary patching design, calculate the connection area A between the web stiffener and / or bracket and the through-frame. 1 , the direct connection area A between the through cut and the passing aggregate 2 , the connection area A between the patch plate or collar plate and the passing frame 3 , and according to the location of the passing aggregate, it is divided into a static pressure condition and a dynamic pressure condition, and the corresponding static pressure and dynamic pressure under the two conditions are calculated; S102, based on the known actual arrangement of the through-aggregate spacing s and the strong frame spacing / support web spacing l, determine the connection coefficient Cs corresponding to the through-aggregate, and calculate the normal stress and shear stress at the through-aggregate position according to the static pressure, dynamic pressure, connection area, through-aggregate spacing s, strong frame spacing / support web spacing l and the connection coefficient Cs, according to the correlation, divide into static pressure condition and dynamic pressure condition; S103, based on the normal stress and shear stress and the allowable normal stress and allowable shear stress, comparing and judging whether the design scheme of the preliminary patching plate needs to be optimized or modified; S104. If the normal stress and shear stress are greater than the corresponding allowable stress, the connection area is increased by adjusting the design of the ribs and the patch plate. On the contrary, if the normal stress and shear stress are less than the corresponding allowable stress, the corresponding connection area is reduced and the penetration form is not provided with ribs or patch plates.

2. A method for designing a LNG ship plate patch according to claim 1, It is characterized in that According to the location of the passing aggregate, it is divided into static pressure condition and dynamic pressure condition, and the corresponding static pressure and dynamic pressure under the two conditions are calculated, including: The static pressure includes: water pressure and cabin internal pressure. The water pressure is positively correlated with the water pressure head, which depends on the maximum value of the following four calculated distances: the distance from the calculation point to the 2 / 3 position of the overflow pipe outlet from the cabin top; the distance between the calculation point and the position point above the cabin top determined by the length of the ship; the distance between the calculation point and the structural draft position; the distance between the calculation point and the 2 / 3 position of the sealing bulkhead or freeboard deck; in addition to the deep tank pressure, the cabin internal pressure also needs to consider the effects of liquid cargo pressure and steam pressure at the cabin hull bulkhead in the cargo hold area; The dynamic pressure is the pressure of the liquid on the hull caused by the movement of the ship, including the combined force of liquid pressure and / or sloshing force; wherein, the bow and stern areas of the LNG ship also include impact pressure shear stress.

3. A method for designing a patch plate for an LNG ship according to claim 1, It is characterized in that The method comprises: The shear stress calculation and verification under static pressure conditions and the shear stress under dynamic pressure conditions are performed separately to determine the shear stress calculation formula: In the formula, τ dc is the shear force of the shear connection with the PSM web, N / mm 2 , p is the calculated pressure at the reinforcement, which is divided into two working conditions: static pressure and dynamic pressure, both of which must meet the requirements, N / mm 2 , C s is the connection coefficient. When the passing frame is a symmetrical reinforcement form, the connection coefficient is 1; when the passing frame is an asymmetrical reinforcement and only directly connected, the connection coefficient is 1.41; when the passing frame is an asymmetrical reinforcement and has a filler plate or a collar plate, the connection coefficient is 1.

12.

4. A method for designing a patch plate for an LNG ship according to claim 3, It is characterized in that The method comprises: The normal stress calculation and verification under static pressure conditions and the normal stress under dynamic pressure conditions are performed separately to determine the normal stress calculation formula: In the formula, σ fb is the normal stress in the connection with the PSM web stiffener bracket, N / mm 2 .

5. A method for designing a patch plate for an LNG ship according to claim 1, It is characterized in that The method comprises: a patch plate design and a reinforcement bar design; The patch design includes: the design of the cutout pattern and the design of the patch pattern; the design of the cutout pattern determines the direct connection area A between the cutout and the passing frame material. 2 The design of the patch plate type determines the connection area A between the patch plate or collar plate and the running frame. 3 ; The reinforcement design includes: whether to select reinforcement, reinforcement size, whether reinforcement has arc soft toe, and whether reinforcement has bracket or back bracket. The reinforcement design determines the connection area A between the web reinforcement and the through-frame. 1 .

6. A method for designing a patch plate for an LNG ship according to claim 5, It is characterized in that The method comprises: Connection area A between web stiffener and / or bracket and through-frame 1 The size of is positively correlated with the thickness of the web stiffener and / or bracket and the length of the connection contact surface; the direct connection area A between the through cut and the through frame 2 The size of is positively correlated with the thickness of the web plate and the length of the direct contact surface between the cutout and the through-frame. The connection area A between the filler plate or collar plate and the through-frame 3 The size is positively correlated with the thickness of the web plate and the length of the contact surface between the patch plate or collar plate and the penetrating frame.

7. A method for designing a patch plate for an LNG ship according to claim 5, It is characterized in that The bracing bars include three types: ordinary straight bracing bars, bracing bars with circular arcs, and a combination of bracing bars and back elbow plates. Among them, the combination of bracing bars and back elbow plates is better than the bracing bars with circular arcs and ordinary straight bracing bars.

8. A method for designing a patch plate for an LNG ship according to any one of claims 1 to 7, It is characterized in that The patching plates at least include one or more of floor-standing patching plates, non-floor-standing patching plates, watertight patching plates, embedded patching plates and ball-end patching plates. The embedded patching plates are stronger than watertight patching plates, ball-end patching plates, floor-standing patching plates and non-floor-standing patching plates.

Citation Information

Patent Citations

  • Rib board pulling method

    CN101204988A

  • Fabricating method for hull body block cut

    CN101811554A

  • Ship reinforcement structure

    CN108749999A

  • Container ship cargo hold bottom edge structure without cargo hold bottom break angle

    CN115384702A

  • Board device is mended to boats and ships tank