Double-crane lifting method

By determining the center of gravity and lifting point distance of the structural parts, calculating the crane lifting force and selecting the adapted crane for dual-machine lifting, the problem of the crane lifting weight the same or the need for trial lifting when lifting structural parts with a large weight in the prior art is solved. Efficient and accurate lifting operations are achieved, saving costs and time.

CN118929403APending Publication Date: 2024-11-12CHINA HUAYE GROUP
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411166218.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-23
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

When lifting steel structural components with larger weights, the existing dual-machine lifting method requires the same lifting capacity or trial lifting operation. The operation is cumbersome and time-consuming, making it difficult to apply to structural components with larger weights.

Method used

By determining the center of gravity position and lifting point distance of the structural parts to be lifted, calculating and allocating the lifting force of the crane, selecting the adapted crane for dual-machine lifting, and hoisting through wire rope binding and lifting ring locks, the crane lifting weight is allowed to be different. Adapt to structural parts of different weights.

Benefits of technology

It realizes accurate lifting of structural parts with larger weight, improves the flexibility and accuracy of lifting, saves mechanical shift costs and lifting site occupation, and reduces operating time.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118929403A_ABST
    Figure CN118929403A_ABST
Patent Text Reader

Abstract

The invention provides a double-crane lifting method. The double-crane lifting method comprises the steps that the gravity center position of a to-be-lifted structural part, the first horizontal distance between the lifting point of a first crane and the gravity center position and the second horizontal distance between the lifting point of a second crane and the gravity center position are determined; determining a first hoisting force of the first crane and a second hoisting force of the second crane according to the weight of the to-be-hoisted structural member, the first horizontal distance and the second horizontal distance; according to the first lifting force and the second lifting force, the first crane and the second crane which are matched with the rated lifting capacity are selected; and the two lifting points of the to-be-lifted structural part are bound through a steel wire rope, and double-crane lifting is conducted through the first crane and the second crane. By means of the double-machine-table hoisting device, double-machine-table hoisting operation can be achieved through the two cranes different in hoisting capacity, trial hoisting is not needed, and the double-machine-table hoisting device can be suitable for hoisting operation of heavy structural parts.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of hoisting construction, and more specifically, to a double-machine lifting method. Background Art

[0002] At present, the lifting of large steel structure components is a major task in steel structure installation projects. This process is not only labor-intensive but also difficult. In particular, the lifting of steel structure components exceeding a certain weight often requires dual lifting, that is, the steel structure components are lifted by two lifting machines at the same time.

[0003] However, the conventional dual-machine lifting method generally uses two cranes with the same rated lifting capacity to perform dual-machine lifting, or determines the weight shared by each crane in advance through a trial lifting method. This method is not suitable for heavy structural parts, and the operation is cumbersome, time-consuming and labor-intensive. Summary of the invention

[0004] In view of the above problems, the purpose of the present invention is to provide a dual-machine lifting method to solve the problems existing in the existing dual-machine lifting method, such as the lifting weight of the cranes must be the same, or a trial lifting operation is required, it is not suitable for heavy structural parts, and it is time-consuming and labor-intensive.

[0005] The double crane lifting method provided by the present invention comprises: determining the center of gravity position of the structure to be lifted, a first horizontal distance between the lifting point of the first crane and the center of gravity position, and a second horizontal distance between the lifting point of the second crane and the center of gravity position;

[0006] Determining a first lifting force of the first crane and a second lifting force of the second crane according to the weight of the structure to be lifted, the first horizontal distance, and the second horizontal distance;

[0007] Selecting a first crane and a second crane with matching rated lifting capacities according to the first lifting force and the second lifting force;

[0008] The two lifting points of the structure to be hoisted are bound by steel wire ropes, and the first crane and the second crane are used for double-machine lifting.

[0009] In addition, an optional structural feature is that the determining the center of gravity position of the structure to be hoisted includes:

[0010] For a structure to be hoisted with uniform mass, the center of gravity position is determined by the geometric center of the structure to be hoisted;

[0011] For a hoisting structure with uneven mass, the center of gravity position is determined by a hanging method or a traction method.

[0012] In addition, an optional structural feature is that the formula for determining the first lifting force of the first crane and the second lifting force of the second crane is:

[0013] F1+F2=G

[0014] F1*L1=F2*L2

[0015] Among them, F1 represents the first lifting force, F2 represents the second lifting force, G represents the gravity of the structure to be lifted, L1 represents the first horizontal distance, and L2 represents the second horizontal distance.

[0016] In addition, an optional structural feature is that after determining the first lifting force of the first crane and the second lifting force of the second crane, the method further comprises:

[0017] determining whether the dynamic load of the first lifting force meets the load range of the first crane, and whether the dynamic load of the second lifting force of the second crane meets the load range of the second crane;

[0018] When the dynamic loads of the first lifting force and the second lifting force both meet the load range, a double-machine lifting operation is performed.

[0019] In addition, an optional structural feature is that the lifting capacities of the first crane and the second crane are different.

[0020] In addition, an optional structural feature is that the two lifting points of the structure to be hoisted are bound by a steel wire rope, including:

[0021] Circular corners are respectively provided at the lifting points, and the circular corners are distributed at all corners of the structure to be lifted; and

[0022] The steel wire rope is bound outside the circular wrap angle.

[0023] In addition, an optional structural feature is that evenly distributed reinforcing ribs are provided on the structural member to be hoisted.

[0024] In addition, an optional structural feature is that four steel wire ropes are provided, and the four steel wire ropes are used for double-rope encircling hoisting of two hoisting points respectively.

[0025] In addition, an optional structural feature is that a lifting ring and a lock are respectively provided on the first crane and the second crane;

[0026] The lifting ring is connected to the steel wire rope, and the lock is used to lock and position the steel wire rope.

[0027] Utilizing the above-mentioned dual-machine lifting method, the weight shared by the two cranes can be determined in advance based on the lifting point location and distance information, and the weight shared by the dual-machine lifting can be reasonably adjusted and distributed, thereby accurately selecting various suitable lifting machinery. It is no longer a single choice of cranes with the same lifting capacity for lifting. The lifting accuracy is high and the flexibility is greater. Dual cranes with different rated lifting capacities can be accurately selected for lifting operations, which can save machinery shift costs and reduce the occupation of the lifting site.

[0028] In order to achieve the above and related purposes, one or more aspects of the present invention include the features that will be described in detail later. The following description and the accompanying drawings describe some exemplary aspects of the present invention in detail. However, these aspects indicate only some of the various ways in which the principles of the present invention can be used. In addition, the present invention is intended to include all these aspects and their equivalents. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] By referring to the following description in conjunction with the accompanying drawings, and with a more comprehensive understanding of the present invention, other objects and results of the present invention will become more apparent and easy to understand. In the accompanying drawings:

[0030] Figure 1 is a flow chart of a double-machine lifting and hoisting method according to an embodiment of the present invention;

[0031] Figure 2 A schematic diagram of a double-machine lifting and hoisting method according to an embodiment of the present invention;

[0032] Figure 3 is a circular wrap angle distribution diagram according to an embodiment of the present invention.

[0033] The reference numerals include: a first crane 1, a second crane 2, and a structure to be hoisted 3.

[0034] The same reference numerals throughout the drawings indicate similar or corresponding features or functions. DETAILED DESCRIPTION

[0035] In the following description, for the purpose of illustration, in order to provide a comprehensive understanding of one or more embodiments, many specific details are set forth. However, it is apparent that these embodiments may also be implemented without these specific details. In other examples, for ease of describing one or more embodiments, known structures and devices are shown in the form of block diagrams.

[0036] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product, or server that includes a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products, or devices.

[0037] It will be understood by those skilled in the art that, unless otherwise defined, all terms (including technical and scientific terms) used herein have the same meaning as those generally understood by those skilled in the art in the art to which the present invention belongs. It should also be understood that terms such as those defined in common dictionaries should be understood to have meanings consistent with the meanings in the context of the prior art, and will not be interpreted with idealized or overly formal meanings unless defined as herein.

[0038] In order to describe the double-machine lifting and hoisting method in the present invention in detail, the specific embodiments of the present invention will be described in detail below with reference to the accompanying drawings.

[0039] Figure 1 The schematic flow chart of the dual-machine lifting and hoisting method according to an embodiment of the present invention is shown. Figure 2 and Figure 3 The schematic principles of the dual-machine lifting and hoisting method according to an embodiment of the present invention are respectively shown.

[0040] like Figures 1 to 3 As shown together, the double-machine lifting and hoisting method of an embodiment of the present invention includes:

[0041] S100: Determine the center of gravity position of the structure to be hoisted, a first horizontal distance between the lifting point of the first crane and the center of gravity position, and a second horizontal distance between the lifting point of the second crane and the center of gravity position.

[0042] The process of determining the center of gravity position of the structure 3 to be hoisted includes: for the structure 3 to be hoisted with uniform mass, the center of gravity position is determined by the geometric center of the structure 3 to be hoisted; for the hoisting structure 3 with uneven mass, the center of gravity position is determined by the hanging method or the traction method. During the hoisting construction process, the structure 3 to be hoisted is usually a steel structure or a concrete structure and the mass is mostly evenly distributed. At this time, the center of gravity of the structure can be determined by a geometric method, for example, the center of gravity is located at the geometric center of the axis, center point, etc. of the structure, and then the center of gravity position is marked to facilitate the subsequent acquisition of the first horizontal distance and the second horizontal distance.

[0043] It can be seen that since it is a double-machine lifting operation, the structure 3 to be hoisted needs to be located between the two cranes, and the position of the lifting point is located directly below the hook of the crane on the corresponding side. After the positions of the two lifting points are determined, the first horizontal distance and the second horizontal distance can be determined based on the center position.

[0044] S200: Determine a first lifting force of the first crane 1 and a second lifting force of the second crane 2 according to the weight of the structure to be lifted, the first horizontal distance, and the second horizontal distance.

[0045] Specifically, the formula for determining the first lifting force of the first crane 1 and the second lifting force of the second crane 2 is:

[0046] F1+F2=G

[0047] F1*L1=F2*L2

[0048] Among them, F1 represents the first lifting force, F2 represents the second lifting force, G represents the gravity of the structure to be lifted, L1 represents the first horizontal distance, and L2 represents the second horizontal distance. Since G, L1 and L2 are known quantities, the values ​​of F1 and F2 can be determined according to the above equations, and the appropriate crane can be selected accordingly.

[0049] S300: Selecting the first crane 1 and the second crane 2 with matching rated lifting capacities according to the first lifting force and the second lifting force.

[0050] Among them, after the first lifting force and the second lifting force are determined, the dynamic load of the first crane 1 at F1 and the dynamic load of the second crane 2 at F2 can be determined according to the dynamic load coefficient 1.1, and then the crane with the appropriate lifting capacity can be selected according to the crane performance table.

[0051] It should be noted that, since it is a double-machine lifting and hoisting, in order to solve the defect that two cranes (or cranes) with the same lifting capacity must be used and different types of cranes on site cannot be flexibly selected, in the hoisting method of the embodiment of the present invention, the positions of the two hoisting points can be adjusted according to the center of gravity position of the structural member 3 to be hoisted, and then adapted to the lifting capacity of the existing hoisting machine. For example, when the lifting capacities of the only two hoisting machines on site differ greatly, one of the hoisting points can be adjusted to a position slightly farther from the center of gravity, and the other hoisting point can be adjusted to a position slightly closer to the center of gravity, etc.

[0052] Therefore, in a specific embodiment of the present invention, after determining the first lifting force of the first crane 1 and the second lifting force of the second crane 2, it also includes: judging whether the dynamic load of the first lifting force meets the load range of the first crane 1, and whether the dynamic load of the second lifting force of the second crane 2 meets the load range of the second crane 2; when the dynamic loads of the first lifting force and the second lifting force both meet the load range, the double-machine lifting operation can be performed. It can be seen that the lifting capacities of the first crane 1 and the second crane 2 can be different.

[0053] S400: Binding two lifting points of the structure to be lifted by steel wire ropes, and lifting by dual cranes using the first crane 1 and the second crane 2.

[0054] Specifically, during the hoisting process of the structural parts, the structural parts can be bundled with steel wire ropes, and then the structural parts can be lifted in cooperation with the hook of the crane. In addition, in order to prevent the lifting ropes from causing damage to the structural parts, circular wrap angles can be set at the lifting points, so that the circular wrap angles are distributed at all corners of the structural parts 3 to be lifted or at positions that need to contact with the steel wire ropes, so that the steel wire ropes are bound outside the circular wrap angles, thereby achieving the effect of lifting protection.

[0055] Furthermore, evenly distributed reinforcing ribs may be provided on the structure 3 to be hoisted. The thickness of each reinforcing rib may be 20 mm and they are distributed at intervals of 150 mm, thereby ensuring the stability and safety of the structure during the hoisting process.

[0056] As a specific example, Figure 2 As shown in a specific embodiment of the present invention, the total weight of the structure 3 to be hoisted is 120t, the horizontal span is 71m, the oblique length is 72.477m, the angle is 11.351 degrees, the height in place is 25.869-42.427m, and it is hoisted by a 650t truck crane and a 500t crane. The steel wire ropes are 4 22m long φ60 steel wire ropes, and the steel wire ropes are hoisted by double ropes. The lifting rings and locks total 5t (the lifting rings are connected to the steel wire ropes, and the locks are used to lock and position the steel wire ropes), so the total hoisting weight is 125t.

[0057] Among them, according to the moment length distribution of the lifting point of the structure 3 to be hoisted, it can be known that the lifting point of the 55t crane is L2=30995mm away from the center of gravity, and the lifting point of the 650-ton truck crane is L1=22141mm away from the center of gravity. According to the above calculation, it is known that F1=70t and F2=50t. According to the crane performance table, the rated load of the 650t crane with a 74.7-meter arm length and a 16-meter turning radius is about 104.6t, and the rated load of the 500t crane is 65t when the turning radius is 14m and the arm length is 68.2m. Among them, the dynamic load at F1 of the first crane is 70*1.1*1.1=84.7<104.6t, which meets the requirements, and the dynamic load at F2 of the second crane is 50*1.1*1.1=60.5<65t, which meets the requirements.

[0058] The above-mentioned dual-machine lifting and hoisting method according to an embodiment of the present invention can estimate the relationship between the lifting point position and the shared weight in advance, making the dual-machine lifting and sharing weight more reasonable, thereby accurately selecting various suitable lifting machinery, and avoiding the single selection of cranes with the same lifting capacity for lifting. The lifting accuracy is high, and dual machines with different rated lifting capacities can be selected for lifting operations according to the site, saving machine shift costs and reducing lifting site occupancy and time.

[0059] The double-machine lifting and hoisting method according to the present invention is described as an example with reference to the accompanying drawings. However, those skilled in the art should understand that various improvements can be made to the double-machine lifting and hoisting method proposed by the present invention without departing from the content of the present invention. Therefore, the protection scope of the present invention should be determined by the content of the attached claims.

Claims

1. A double-machine lifting and hoisting method, characterized in that: include: Determining the center of gravity position of the structure to be hoisted, a first horizontal distance between the lifting point of the first crane and the center of gravity position, and a second horizontal distance between the lifting point of the second crane and the center of gravity position; Determining a first lifting force of the first crane and a second lifting force of the second crane according to the weight of the structure to be lifted, the first horizontal distance, and the second horizontal distance; Selecting a first crane and a second crane with matching rated lifting capacities according to the first lifting force and the second lifting force; The two lifting points of the structure to be hoisted are bound by steel wire ropes, and the first crane and the second crane are used for double-machine lifting.

2. The double-machine lifting and hoisting method according to claim 1 is characterized in that: Determining the center of gravity position of the structure to be hoisted includes: For a structure to be hoisted with uniform mass, the center of gravity position is determined by the geometric center of the structure to be hoisted; For a hoisting structure with uneven mass, the center of gravity position is determined by a hanging method or a traction method.

3. The double-machine lifting and hoisting method according to claim 1 is characterized in that: The formula for determining the first lifting force of the first crane and the second lifting force of the second crane is: F1+F2=G F1*L1=F2*L2 Among them, F1 represents the first lifting force, F2 represents the second lifting force, G represents the gravity of the structure to be lifted, L1 represents the first horizontal distance, and L2 represents the second horizontal distance.

4. The double-machine lifting and hoisting method according to claim 1 is characterized in that: After determining the first lifting force of the first crane and the second lifting force of the second crane, the method further includes: determining whether the dynamic load of the first lifting force meets the load range of the first crane, and whether the dynamic load of the second lifting force of the second crane meets the load range of the second crane; When the dynamic loads of the first lifting force and the second lifting force both meet the load range, a double-machine lifting operation is performed.

5. The double-machine lifting and hoisting method according to claim 1 is characterized in that: The first crane and the second crane have different lifting capacities.

6. The double-machine lifting and hoisting method according to claim 1 is characterized in that: The step of binding the two lifting points of the structure to be hoisted by means of a steel wire rope comprises: Circular corners are respectively provided at the lifting points, and the circular corners are distributed at all corners of the structure to be lifted; and The steel wire rope is bound outside the circular wrap angle.

7. The double-machine lifting and hoisting method according to claim 1 is characterized in that: Evenly distributed reinforcing ribs are arranged on the structural member to be hoisted.

8. The double-machine lifting and hoisting method according to claim 1 is characterized in that: The four steel wire ropes are provided, and the four steel wire ropes respectively perform double-rope encircling hoisting on two hoisting points.

9. The double-machine lifting and hoisting method according to claim 1, characterized in that: The first crane and the second crane are respectively provided with a lifting ring and a lock; The lifting ring is connected to the steel wire rope, and the lock is used to lock and position the steel wire rope.

Citation Information

Cited By

  • Method, device and controller for cooperatively hoisting object by double cranes

    CN119349419A