Large-span bridge steel guardrail hoisting equipment and method

By designing hand-held lifting equipment and using lever lifting devices and mechanical components, the problem of insufficient equipment flexibility in the installation of steel guardrails of large span bridges is solved, and efficient and accurate steel guardrail installation is achieved, reducing the number of workers and loads. Reduces construction risks and costs.

CN118929497APending Publication Date: 2024-11-12SHAANXI TRAFFIC CONTROL TECH DEV GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411339935.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-25
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

During the on-site installation of large-span bridge steel guardrails, the general lifting equipment lacks flexibility and mobility, resulting in a large number of workers, heavy loads, and low assembly efficiency and accuracy.

Method used

The hand-held lifting equipment including lever lifting devices, walking wheels, rotating components, auxiliary wheel components and lifting components is adopted. Through the lever principle and mechanical design, the lifting equipment is convenient, flexible and efficiently installed.

Benefits of technology

It reduces the number of workers and loads, improves the efficiency and accuracy of steel guardrail installation, reduces construction risks and equipment costs, and the equipment is simple and compact, and is easy to store and reuse.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118929497A_ABST
    Figure CN118929497A_ABST
Patent Text Reader

Abstract

The invention discloses a large-span bridge steel guardrail hoisting device and method, and belongs to the field of bridge steel guardrail transportation and installing.The large-span bridge steel guardrail hoisting device comprises a lever lifting device, the lever lifting device comprises a center shaft, and walking wheels are arranged at the two ends of the center shaft; a lifting frame and a main shaft with a rotating function are arranged on the center shaft, the main shaft is connected with the center shaft through a rotating assembly, the lifting frame is connected with the main shaft through a positioning rod, the bottom end of the lifting frame is rotationally connected with the main shaft, a hoisting assembly used for hoisting is arranged at the top end of the lifting frame, and an auxiliary wheel assembly with a height adjusting function is arranged on a main shaft shaft. The auxiliary wheel assembly is movably connected with the main shaft, a telescopic pipe with a telescopic function is arranged in the main shaft, and a handrail for a worker to push and pull is arranged at the top end of the telescopic pipe. On-site rapid installation of the large-span steel guardrail can be completed through the simple walking type hoisting equipment and a small number of workers, a crane is not needed, convenience and flexibility are achieved, the number and loads of the workers are reduced, and the installation efficiency and accuracy of the steel guardrail are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of transportation and installation of bridge steel guardrails, and in particular to a large-span bridge steel guardrail hoisting device and method. Background Art

[0002] Bridge guardrails are a very important part of bridge construction. They can effectively ensure traffic safety and have certain functions of adjusting the line shape and beautifying the environment. Large-span bridge anti-collision guardrails have become the focus of designers. They have gradually evolved from early cement anti-collision walls and cement steel guardrails to prefabricated assembly forms such as steel structure anti-collision guardrails and rope guardrails.

[0003] In recent years, some large-span bridge anti-collision guardrail projects are mainly based on steel structure guardrails, which are tough, strong, rigid, bendable, weldable, corrosion-resistant, do not rust or delaminate under the sun and rain, are durable, luxurious and beautiful, and have good processing performance.

[0004] The steel structure guardrail is composed of multiple columns and multiple beams. It is prefabricated in the factory and then transported to the bridge deck for on-site assembly. There are a large number of components, which need to be assembled on site, and the weight of each component is large. During the assembly process, it is necessary to ensure the verticality and height of the column, and to position it accurately. A single column requires 3-4 people to carry and position it manually, and the workload of on-site transportation and installation is large. Large-scale general-purpose lifting equipment is bulky and lacks flexibility and maneuverability. Therefore, there is a lack of a dedicated small guardrail lifting equipment and method to reduce the number of workers, reduce the load on workers, and at the same time be able to conveniently and flexibly position and assemble steel guardrail columns and beams. Summary of the invention

[0005] In order to solve the problems in the above-mentioned background technology, the present invention provides a large-span bridge steel guardrail lifting equipment and method, which can complete the rapid on-site installation of large-span steel guardrails through simple hand-held lifting equipment and a small number of workers. No crane is required, which is convenient and flexible, reduces the number of workers, reduces the load on workers, and improves the efficiency and accuracy of steel guardrail installation.

[0006] To achieve the above-mentioned purpose, the present invention provides a large-span bridge steel guardrail lifting equipment, including a lever lifting device, the lever lifting device including a central axis, walking wheels are arranged at both ends of the central axis, a lifting frame and a main shaft with a rotation function are arranged on the central axis, the main shaft is connected to the central axis through a rotating assembly, the lifting frame is connected to the main shaft through a positioning rod, a lifting assembly for lifting is arranged at the top of the lifting frame, an auxiliary wheel assembly with a height adjustment function is arranged on the main shaft, the auxiliary wheel assembly is movably connected to the main shaft, a telescopic tube with a telescopic function is arranged in the main shaft, and a handrail for workers to push and pull is arranged at the top of the telescopic tube.

[0007] Preferably, both ends of the central shaft are connected to the center of the traveling wheel through bearings.

[0008] Preferably, the lifting frame includes two fixing tubes arranged in a triangle, a plurality of cross beams are arranged between the two fixing tubes, and the bottom ends of the fixing tubes are rotatably connected to the central axis.

[0009] Preferably, the rotating assembly includes a rotating sleeve 1 and a rotating sleeve 2, both of which are rotatably connected to the central axis, the bottom end of the main shaft is connected to the rotating sleeve 1, and oblique fixing rods are provided on both sides of the main shaft, which are connected to the rotating sleeve 2.

[0010] Preferably, a fixing sleeve is provided on the crossbeam, a hook is provided at one end of the positioning rod, the hook is arranged in the fixing sleeve, and the other end of the positioning rod is hinged to the main shaft.

[0011] Preferably, the telescopic tube is inserted into the main shaft and is slidably connected to the main shaft. A threaded hole 1 is provided on the main shaft, a threaded groove is provided inside the main shaft, a threaded hole 2 is provided in the telescopic tube, and a threaded rod with threads is provided on the main shaft. The threaded rod passes through the threaded hole 1, the threaded hole 2 and the threaded groove in sequence and is locked.

[0012] Preferably, the auxiliary wheel assembly includes a movable sleeve and a sliding tube, the top end of the movable sleeve is hinged to the main shaft, the sliding tube is slidably arranged in the movable sleeve, the movable sleeve is provided with a positioning hole 1, and the sliding tube is provided with a plurality of positioning holes 2, the movable sleeve and the sliding tube are locked by an insertion rod, the insertion rod is inserted into the positioning hole 1 and the positioning hole 2, the bottom end of the sliding tube is connected to the transverse tube, the two ends of the transverse tube are provided with fixed seats, and the fixed seats are provided with universal wheels.

[0013] Preferably, the lifting assembly includes a mounting plate arranged at the top of the lifting frame, a motor is arranged on the mounting plate, an output shaft of the motor is connected to a reel, a steel wire rope is wound around the reel, and a hook for lifting is connected to the steel wire rope.

[0014] The present invention also provides a method for hoisting a large-span bridge steel guardrail hoisting device, comprising the following steps:

[0015] Step 1: Move the lifting equipment used to lift the bridge steel guardrail column to the lifting location. After the lifting equipment is in place, open the auxiliary wheel assembly on the lifting equipment to make the lifting equipment in a self-supporting state;

[0016] Step 2: Open the lifting frame of the lifting equipment and fix it with a positioning rod, adjust the lifting assembly at the top of the lifting frame to make the lifting equipment in working state, and add auxiliary counterweight at the handrail position of the lifting equipment;

[0017] Step 3: The wire rope is hooked to the top drop point of the bridge steel guardrail column through a hook, and the motor is started. The motor drives the turntable to rotate and then drives the wire rope to rise, so that the bridge steel guardrail column is adjusted from a horizontal state to an upright state and leaves the ground;

[0018] Step 4: Manually put in place and remove the auxiliary counterweight, push and pull the lifting equipment and drive the bridge steel guardrail column to the position of the embedded anchor bolt, put it in place and install it, and the motor drives the hook back to its position;

[0019] In step 4, one person presses down the handrail of the lifting equipment to apply force to the handrail, and another person releases the auxiliary counterweight. After releasing the auxiliary counterweight, the person pressing the handrail adjusts the direction of the lifting equipment, pushes and pulls the lifting equipment, and drives the bridge steel guardrail column to move through the running wheels and auxiliary wheels. During the pushing and pulling process, another person holds the bridge steel guardrail column by hand to stabilize the bridge steel guardrail column;

[0020] Step 5: Repeat steps 1 to 4 to install the bridge steel guardrail columns and beams in sequence.

[0021] Preferably, the auxiliary wheels are deployed so that the main axis is 20° to the ground in the working state. After the positioning rod is installed, the angle between the lifting frame and the main axis is 100°, and the angle between the lifting frame and the ground is 60°.

[0022] Therefore, the present invention adopts the above-mentioned large-span bridge steel guardrail lifting equipment and method, which has the following beneficial effects:

[0023] (1) The combination of manual labor and lifting equipment makes it easier to control the force and angle, and the construction is flexible, ensuring the construction safety and component positioning accuracy;

[0024] (2) Good construction performance, operating the mechanical lever principle, reducing the burden on workers, speeding up the construction process, multiple devices can operate at the same time, simple construction and reducing construction risks;

[0025] (3) The equipment is simple, compact, flexible, and foldable, making it easy to process, store, and reuse;

[0026] (4) Excellent economic performance, low equipment cost, but greatly saves labor, and the construction method has excellent economic performance;

[0027] (4) Multiple lifting equipments work at the same time. The lifting equipments use universal wheels combined with wheels, which are convenient for turning on the spot and easy to operate. Multiple equipments work at the same time without affecting each other, which can further improve the construction efficiency.

[0028] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 A three-dimensional diagram of a lifting device according to an embodiment of the present invention;

[0030] Figure 2 A top view of a lifting device according to an embodiment of the present invention;

[0031] Figure 3 This is a schematic diagram of the hinged connection between the auxiliary wheel assembly and the main shaft according to an embodiment of the present invention;

[0032] Figure 4 A top view of the main shaft and the telescopic tube locking in an embodiment of the present invention;

[0033] Figure 5 A cross-sectional view of the locking of the main shaft and the telescopic tube according to an embodiment of the present invention;

[0034] Figure 6 is a flow chart of the installation method according to an embodiment of the present invention;

[0035] Figure 7 This is a schematic diagram of the angles of the lifting frame and the main shaft after the positioning rod is installed in an embodiment of the present invention.

[0036] Reference numerals

[0037] 1. Central axis; 2. Travel wheel; 3. Lifting frame; 4. Fixed tube; 5. Crossbeam; 6. Rotating sleeve 1; 7. Rotating sleeve 2; 8. Oblique fixed rod; 9. Fixed sleeve; 10. Positioning rod; 11. Hook; 12. Main shaft; 13. Telescopic tube; 14. Threaded hole 1; 15. Threaded hole 2; 16. Threaded groove; 17. Threaded rod; 18. Rotating handle; 19. Movable sleeve; 20. Sliding tube; 21. Positioning hole 1; 22. Positioning hole 2; 23. Cross tube; 24. Fixed seat; 25. Universal wheel; 26. Mounting plate; 27. Motor; 28. Reel; 29. ​​Wire rope; 30. Hook; 31. Handrail. DETAILED DESCRIPTION

[0038] In order to make the purpose, technical scheme and advantages disclosed in the embodiments of the present invention clearer, the embodiments of the present invention are further described in detail in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the embodiments of the present invention and are not intended to limit the embodiments of the present invention. Based on the embodiments in this application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application. Examples of the embodiments are shown in the accompanying drawings, where the same or similar reference numerals throughout represent the same or similar elements or elements with the same or similar functions.

[0039] It should be noted that the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, system, product or server that includes a series of steps or units is not necessarily limited to those steps or units explicitly listed, but may include other steps or units that are not explicitly listed or inherent to these processes, methods, products or methods.

[0040] Like reference numerals and letters denote similar items in the following drawings, and thus, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.

[0041] In the description of the present invention, it should be noted that the terms "upper", "lower", "inside", "outside", etc. indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, or are directions or positional relationships in which the product of the invention is usually placed when in use. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as a limitation on the present invention.

[0042] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "setting", "installation" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0043] The invention can be completed by simple lifting equipment and a small number of workers (1-2 persons).

[0044] like Figure 1 , Figure 2 As shown, a large-span bridge steel guardrail lifting device described in the present invention includes a lever lifting device, which includes a central axis 1, and two ends of the central axis 1 are provided with running wheels 2. The two ends of the central axis 1 are connected to the center of the running wheel 2 through bearings. The running wheel 2 facilitates the movement of the equipment, and two running wheels 2 are provided, so that the equipment can be turned around the contact position between the running wheel 2 and the ground, which is convenient to operate.

[0045] The central shaft 1 is provided with a lifting frame 3 and a main shaft 12 with a rotating function, and the main shaft 12 is connected to the central shaft 1 through a rotating assembly. The rotating assembly includes a rotating sleeve 1 6 and a rotating sleeve 2 7, both of which are rotatably connected to the central shaft 1, the bottom end of the main shaft 12 is connected to the rotating sleeve 1 6, and oblique fixing rods 8 are provided on both sides of the main shaft 12, and the oblique fixing rods 8 are connected to the rotating sleeve 2 7.

[0046] The lifting frame 3 is connected to the main shaft 12 through the positioning rod 10. The lifting frame 3 includes two fixed tubes 4 arranged in a triangle, and a plurality of cross beams 5 are arranged between the two fixed tubes 4. A fixing sleeve 9 is arranged on the cross beam 5, and a hook 11 is arranged at one end of the positioning rod 10, and the hook 11 is arranged in the fixing sleeve 9, and the other end of the positioning rod 10 is hinged to the main shaft 12. After the end of the positioning rod 10 with the hook 11 is taken out from the fixing sleeve 9, the positioning rod 10 can be rotated and folded for storage. The bottom end of the fixed tube 4 of the lifting frame 3 is rotatably connected to the central shaft 1, and the structure of the rotatable connection is a rotating ring that is the same as the rotating sleeve 1 6 and the rotating sleeve 2 7. Both fixed tubes 4 are rotatably connected to the central shaft 1 through the rotating ring.

[0047] like Figure 4 , Figure 5 As shown, a telescopic tube 13 with telescopic function is provided in the main shaft 12, and a handrail 31 for workers to push and pull is provided at the top of the telescopic tube 13. The telescopic tube 13 is inserted into the main shaft 12 and slidably connected with the main shaft 12. A threaded hole 14 is provided on the main shaft 12, a threaded groove 16 is provided inside the main shaft 12, a threaded hole 2 15 is provided in the telescopic tube 13, and a threaded rod 17 with threads is provided on the main shaft 12. The threaded rod 17 passes through the threaded hole 14, the threaded hole 2 15 and is locked with the threaded groove 16 in sequence. A rotating handle 18 is provided at the top of the threaded rod 17. By twisting the rotating handle 18, the threaded rod 17 can be driven to rotate in the threaded hole 14, the threaded hole 2, and the threaded groove 16 to tighten or loosen. The telescopic tube 13 can be retracted into the main shaft when not in use, which is convenient for folding and storage. Moreover, the telescopic tube 13 is extended, and according to the principle of lever, the power arm is increased, thereby reducing the force required to be applied by the telescopic rod.

[0048] The main shaft 12 is provided with an auxiliary wheel assembly with a height adjustment function, and the auxiliary wheel assembly is movably connected to the main shaft 12. The auxiliary wheel assembly includes a movable sleeve 19 and a sliding tube 20, such as Figure 3 As shown, the top of the movable sleeve 19 is hinged with the main shaft 12, and the sliding tube 20 is slidably arranged in the movable sleeve 19. The movable sleeve 19 is provided with a positioning hole 1 21, and the sliding tube 20 is provided with a plurality of positioning holes 22. The movable sleeve 19 and the sliding tube 20 are locked by an insertion rod, and the insertion rod is inserted into the positioning hole 1 21 and the positioning hole 2 22. The bottom end of the sliding tube 20 is connected to the transverse tube 23, and the two ends of the transverse tube 23 are provided with a fixed seat 24, and the fixed seat 24 is provided with a universal wheel 25. The universal wheel 25 facilitates the steering of the equipment and plays a supporting role. At the same time, the top of the movable sleeve 19 of the auxiliary wheel assembly is hinged with the main shaft 12, which is convenient for folding and storage; and the height of the universal wheel 25 can be adjusted by sliding the sliding tube 20 in the movable sleeve 19 to cooperate with the insertion rod, the positioning hole 1 21, and the positioning hole 22.

[0049] A lifting assembly for lifting is provided at the top of the lifting frame 3. The lifting assembly includes a mounting plate 26 disposed at the top of the lifting frame 3, a motor is provided on the mounting plate 26, the output shaft of the motor is connected to a reel 28, a steel wire rope 29 is wound around the reel 28, and a hook 30 for lifting is connected to the steel wire rope 29. The motor drives the reel 28 to rotate, and the rotation of the reel 28 drives the steel wire rope 29 to lift, and then drives the hook 30 to lift, thereby lifting the steel guardrail column. An opening for the steel wire rope 29 to pass through is provided on the mounting plate 26, and the opening is provided below the reel 28.

[0050] like Figure 6 As shown, the hoisting method of a large-span bridge steel guardrail hoisting equipment according to the present invention comprises the following steps:

[0051] Step 1: Move the lifting equipment used to lift the bridge steel guardrail column to the lifting location. After the lifting equipment is in place, open the auxiliary wheel assembly on the lifting equipment, insert the sliding tube 20 into the movable sleeve 19, adjust the height of the universal wheel 25, and insert the insertion rod into the positioning hole 1 21 and the positioning hole 2 22 to complete the fixing of the auxiliary wheel, so that the lifting equipment is in a self-supporting state.

[0052] Step 2: Open the lifting frame 3 of the lifting equipment and fix it with the positioning rod 10, adjust the lifting assembly at the top of the lifting frame 3 to make the lifting equipment in working state, and perform auxiliary counterweight at the position of the handrail 31 of the lifting equipment.

[0053] Step 3: The steel wire rope 29 is hooked to the top drop point of the bridge steel guardrail column through the hook 30, and the motor 27 is started. The motor 27 drives the turntable to rotate and then drives the steel wire rope 29 to rise, so that the bridge steel guardrail column is adjusted from a horizontal state to an upright state and leaves the ground; the height of the bridge steel guardrail column from the ground is 20 cm.

[0054] Step 4: Manually put in place and remove the auxiliary counterweight, push and pull the lifting equipment and drive the bridge steel guardrail column to the embedded anchor bolt position, put it in place and install it, and the motor 27 drives the hook 30 to return to its position.

[0055] In step four, one person presses down the handrail 31 of the lifting equipment to apply force to the handrail 31, and another person releases the auxiliary counterweight. After releasing the auxiliary counterweight, the person pressing the handrail 31 adjusts the direction of the lifting equipment, pushes and pulls the lifting equipment, and drives the bridge steel guardrail column to move through the walking wheels 2 and the auxiliary wheels. During the pushing and pulling process, another person holds the bridge steel guardrail column to stabilize the hand-held bridge steel guardrail column.

[0056] Step 5: Repeat steps 1 to 4 to install the bridge steel guardrail columns and beams 5 in sequence.

[0057] The running wheels 2 are two wheels with a diameter of 80 cm, and the universal wheels 25 are two small wheels with a diameter of 20 cm. When the universal wheels 25 are unfolded, the main axis 12 is at a 20° angle to the ground. Figure 7 As shown, after the positioning rod 10 is installed, the angle between the lifting frame 3 and the main shaft 12 is 100 degrees, and the angle between the lifting frame 3 and the ground is 60 degrees.

[0058] Therefore, the present invention adopts the above-mentioned large-span bridge steel guardrail lifting equipment and method, and can complete the rapid on-site installation of large-span steel guardrails through simple hand-held lifting equipment and a small number of workers. No crane is required, which is convenient and flexible, reduces the number of workers, reduces the burden on workers, and improves the efficiency and accuracy of steel guardrail installation.

[0059] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that they can still modify or replace the technical solution of the present invention with equivalents, and these modifications or equivalent replacements cannot cause the modified technical solution to deviate from the spirit and scope of the technical solution of the present invention.

Claims

1. A large-span bridge steel guardrail lifting equipment, Features: It includes a lever lifting device, which includes a central axis. Both ends of the central axis are provided with walking wheels. A lifting frame and a main shaft with a rotating function are provided on the central axis. The main shaft is connected to the central axis through a rotating component. The lifting frame is connected to the main shaft through a positioning rod. A lifting component for lifting is provided on the top of the lifting frame. An auxiliary wheel component with a height adjustment function is provided on the main shaft. The auxiliary wheel assembly is movably connected to the main shaft. A telescopic tube with a telescopic function is provided in the main shaft. A handrail for workers to push and pull is provided on the top of the telescopic tube.

2. The long-span bridge steel guardrail lifting equipment according to claim 1, Features: Both ends of the central shaft are connected to the center of the travel wheel through bearings.

3. The long-span bridge steel guardrail lifting equipment according to claim 1, Features: The lifting frame comprises two fixing pipes arranged in a triangle shape, a plurality of cross beams are arranged between the two fixing pipes, and the bottom ends of the fixing pipes are rotatably connected with the central axis.

4. The long-span bridge steel guardrail lifting equipment according to claim 1, Features: The rotating assembly includes a rotating sleeve 1 and a rotating sleeve 2, both of which are rotatably connected to the central shaft, the bottom end of the main shaft is connected to the rotating sleeve 1, and oblique fixing rods are arranged on both sides of the main shaft, which are connected to the rotating sleeve 2.

5. The long-span bridge steel guardrail lifting equipment according to claim 3, Features: A fixing sleeve is arranged on the crossbeam, a curved hook is arranged at one end of the positioning rod, the curved hook is arranged in the fixing sleeve, and the other end of the positioning rod is hinged with the main shaft.

6. The long-span bridge steel guardrail lifting equipment according to claim 1, Features: The telescopic tube is inserted into the main shaft and slidably connected with the main shaft. A threaded hole 1 is arranged on the main shaft, a threaded groove is arranged inside the main shaft, a threaded hole 2 is arranged in the telescopic tube, and a threaded rod with a thread is arranged on the main shaft. The threaded rod passes through the threaded hole 1, the threaded hole 2 and the threaded groove in sequence and is locked.

7. The long-span bridge steel guardrail lifting equipment according to claim 1, Features: The auxiliary wheel assembly includes a movable sleeve and a sliding tube. The top end of the movable sleeve is hinged to the main shaft. The sliding tube is slidably arranged in the movable sleeve. A positioning hole 1 is arranged on the movable sleeve. A plurality of positioning holes 2 are arranged on the sliding tube. The movable sleeve and the sliding tube are locked by an insertion rod. The insertion rod is inserted into the positioning hole 1 and the positioning hole 2. The bottom end of the sliding tube is connected to the transverse tube. Fixed seats are arranged at both ends of the transverse tube. Universal wheels are arranged on the fixed seats.

8. The long-span bridge steel guardrail lifting equipment according to claim 1, Features: The hoisting assembly includes a mounting plate arranged at the top of the lifting frame, a motor is arranged on the mounting plate, an output shaft of the motor is connected to a reel, a steel wire rope is wound on the reel, and a hook for hoisting is connected to the steel wire rope.

9. A method for hoisting a large-span bridge steel guardrail hoisting device according to any one of claims 1 to 8, Features: The following steps are involved: Step 1: Move the lifting equipment used to lift the bridge steel guardrail column to the lifting location. After the lifting equipment is in place, open the auxiliary wheel assembly on the lifting equipment to make the lifting equipment in a self-supporting state; Step 2: Open the lifting frame of the lifting equipment and fix it with a positioning rod, adjust the lifting assembly at the top of the lifting frame to make the lifting equipment in working state, and add auxiliary counterweight at the handrail position of the lifting equipment; Step 3: The wire rope is hooked to the top drop point of the bridge steel guardrail column through a hook, and the motor is started. The motor drives the turntable to rotate and then drives the wire rope to rise, so that the bridge steel guardrail column is adjusted from a horizontal state to an upright state and leaves the ground; Step 4: Manually put in place and remove the auxiliary counterweight, push and pull the lifting equipment and drive the bridge steel guardrail column to the position of the embedded anchor bolt, put it in place and install it, and the motor drives the hook back to its position; In step 4, one person presses down the handrail of the lifting equipment to apply force to the handrail, and another person releases the auxiliary counterweight. After releasing the auxiliary counterweight, the person pressing the handrail adjusts the direction of the lifting equipment, pushes and pulls the lifting equipment, and drives the bridge steel guardrail column to move through the running wheels and auxiliary wheels. During the pushing and pulling process, another person holds the bridge steel guardrail column by hand to stabilize the bridge steel guardrail column; Step 5: Repeat steps 1 to 4 to install the bridge steel guardrail columns and beams in sequence.

10. The method for hoisting the long-span bridge steel guardrail hoisting equipment according to claim 9, Features: After the auxiliary wheels are unfolded, the main shaft is in a working state of 20° to the ground. After the positioning rod is installed, the angle between the lifting frame and the main shaft is 100°, and the lifting frame is 60° to the ground.