Fiber cement board based on industrial waste and preparation method thereof
By using industrial waste and carbonization maintenance technology to prepare fiber cement boards, the problems of raw material waste and dust pollution in the production of traditional fiber cement boards are solved, resource conservation and environmental protection are achieved, and the performance of the boards is improved.
Patent Information
- Application Number
- CN202411108709.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-13
- Publication Date
- 2024-11-12
AI Technical Summary
There is a lot of waste of raw materials and dust pollution in the production process of traditional fiber cement boards, and the energy consumption is large. It is urgent to develop new preparation methods to reduce resource and energy investment.
Using the preparation method of fiber cement board based on industrial waste, the production waste collected during the production process of carbon mineralized fiber cement board and the fine powder generated during the post-treatment process are used as raw materials, and the board is prepared in combination with carbonization and maintenance methods to reduce resources and energy. Consumption and reduce environmental pollution.
It realizes effective recycling and reuse of waste materials, significantly saves resources and energy, reduces production costs, reduces environmental pollution, and improves the density and physical and mechanical properties of the plates.
Smart Images

Figure SMS_1
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building materials, and in particular to a fiber cement board based on industrial waste and a preparation method thereof. Background Art
[0002] With the development of society, people's demand for building decoration materials is increasing. Fiber cement board is widely used as a typical building decoration material.
[0003] Traditional fiber cement board is a board made of cement as a gelling material combined with reinforcing fibers through molding, pressurization (or non-pressurization), autoclaving (or non-autoclaving) curing. Traditional fiber cement board will generate a lot of raw material waste and dust pollution during the production process. First of all, traditional fiber cement board is usually prepared by copying method or slurry method, which will produce a large number of unqualified wet blanks in the early stage of preparation. These wet blanks are often treated as waste, resulting in a large amount of raw material waste and environmental pollution. Secondly, a large amount of dust pollution will be generated in the post-processing stage of fiber cement board products. These dusts cannot be reused and are dumped at will, causing pollution to the air environment. Not only that, traditional fiber cement board usually uses autoclave curing as a curing method to provide strength source, which causes a large amount of energy input.
[0004] Regarding the resource and energy consumption caused by the production of fiber cement boards, it is urgent to develop new preparation methods to reduce resource and energy input. Summary of the invention
[0005] The purpose of the present invention is to overcome the above technical deficiencies, propose a fiber cement board based on industrial waste and a preparation method thereof, and solve the technical problems in the prior art that traditional fiber cement boards generate a large amount of raw material waste and dust pollution during the production process.
[0006] In a first aspect, the present invention provides a fiber cement board based on industrial waste, wherein the raw materials include, by weight: 60-85 parts of carbon mineralized cementitious material, 0-15 parts of first production waste, 0-25 parts of second production waste, and 5-10 parts of fiber; wherein the first production waste is the wet blank of the board discarded during the production process of the carbon mineralized fiber cement board; the second production waste is the fine powder produced during the post-processing process of the carbon mineralized fiber cement board; and the first production waste and the second production waste are not both zero.
[0007] In a second aspect, the present invention provides a method for preparing a fiber cement board based on industrial waste, comprising the following steps: The raw materials of the fiber cement board based on industrial waste are mixed uniformly to obtain a production slurry; preparing the production slurry into wet board blanks; The wet board is pressurized and pre-cured in sequence, and then cured in a CO2 atmosphere to obtain a fiber cement board based on industrial waste.
[0008] Compared with the prior art, the beneficial effects of the present invention include: The present invention uses production waste recycled in the production process of carbon mineralized fiber cement board as raw material composition, and combines carbonization curing to prepare fiber cement board based on industrial waste, which has significant energy-saving and environmental protection benefits. DETAILED DESCRIPTION
[0009] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0010] In a first aspect, the present invention provides a fiber cement board based on industrial waste, wherein the raw materials include, by weight: 60-85 parts of carbon mineralized cementitious material, 0-15 parts of first production waste, 0-25 parts of second production waste, and 5-10 parts of fiber; wherein the first production waste is the wet blank of the board discarded during the production process of the carbon mineralized fiber cement board; the second production waste is the fine powder produced during the post-processing process of the carbon mineralized fiber cement board; and the first production waste and the second production waste are not both zero.
[0011] The present invention uses waste materials generated during the production of carbon mineralized fiber cement boards to prepare fiber cement boards based on industrial waste materials, which helps to achieve "self-production and self-sale" of waste materials. The carbon mineralized fiber cement board uses a carbon mineralized cementitious material with low hydration activity as an adhesive, which prevents the wet blank of the waste board generated during the molding process from solidifying for a long time, thereby ensuring that it has good dispersibility when reused. The carbon mineralized fiber cement board uses carbonization curing as a curing method for its strength source. The main mineral phase calcium carbonate generated by the carbon mineralized cementitious material after carbonization curing fills the pores to form a dense board matrix. A large amount of dust is discharged during the post-processing stage of the production of the carbon mineralized fiber cement board. The present invention reuses these discharged dusts as raw materials to produce fiber cement boards based on industrial waste materials. These powders with calcium carbonate as the main component phase can play two roles in the fiber cement board based on industrial waste materials of the present invention: one is that they can serve as nucleation sites for calcium carbonate to promote the nucleation and growth of calcium carbonate during carbonization curing; the other is that they can serve as fillers to further fill the pores to make the board matrix denser. The present invention recovers production waste of carbon mineralized fiber cement boards and prepares fiber cement boards based on industrial waste by combining carbonization curing means, which not only saves resources and energy, thereby reducing production costs, but also alleviates environmental pollution.
[0012] In the present invention, it should be pointed out that the carbon mineralized fiber cement board refers to a fiber cement board formed by carbonizing the above-mentioned carbon mineralized gelling material as a main raw material, which may include the fiber cement board based on industrial waste provided by the present invention.
[0013] The present invention does not limit the composition of the first production waste material, as long as it is the waste wet board blanks generated in the process of producing carbon mineralized fiber cement boards; the present invention does not limit the source of the second production waste material, as long as it comes from the fine powder produced in the post-processing process of carbon mineralized fiber cement boards (including sanding, edging, chamfering and cutting, etc.).
[0014] In the present invention, the first production waste is mixed according to the mass after drying.
[0015] In this embodiment, the carbon mineralized cementitious material includes one or more of calcium silicate ore powder, steel slag powder rich in calcium silicate ore phase, and magnesium slag powder rich in calcium silicate ore phase. In the present invention, when the carbon mineralized cementitious material is a mixture, the present invention has no special limitation on the ratio of different types of carbon mineralized cementitious materials, and any ratio is acceptable.
[0016] Preferably, the calcium silicate includes one or more of γ-type dicalcium silicate (γ-C2S), tricalcium disilicate (C3S2) and monocalcium silicate (CS). In the present invention, when the calcium silicate is several of the above, the present invention has no special limitation on the ratio of different types of calcium silicate, and any ratio is acceptable.
[0017] Preferably, the mineral phase composition of the steel slag powder rich in calcium silicate mineral phase includes γ-type dicalcium silicate, RO phase, calcium ferrite, tricalcium silicate, free calcium oxide and free magnesium oxide; wherein the total mass content of γ-type dicalcium silicate and tricalcium silicate is more preferably >40%. The present invention has no special limitation on the source of the steel slag powder rich in calcium silicate mineral phase, and any steel slag powder rich in calcium silicate mineral phase with the above-mentioned composition and source known in the art can be used.
[0018] Preferably, the mineral phase composition of the magnesium slag powder rich in calcium silicate mineral phase preferably includes γ-type dicalcium silicate, β-type dicalcium silicate and magnesium oxide; wherein the total mass content of dicalcium silicate is more preferably>50%. The present invention has no particular limitation on the source of the magnesium slag powder rich in calcium silicate mineral phase, and any magnesium slag powder rich in calcium silicate mineral phase including the above-mentioned composition from any source known in the art can be used.
[0019] In this embodiment, the average particle size of the carbon mineralized gelling material is less than 50 μm.
[0020] In this embodiment, the average particle size of the second production waste is less than 50 μm.
[0021] In the present invention, by controlling the particle sizes of the carbon mineralized gelling material and the second production waste material within the above range, it is more conducive to achieving uniform dispersion of the particles.
[0022] In this embodiment, the fiber includes one or more of pulp fiber, wood pulp fiber, PVA fiber, and PP fiber.
[0023] In this embodiment, the average length of the fibers is 2 to 12 mm.
[0024] Preferably, the fiber is at least one of pulp fiber or wood pulp fiber, and the average length of the fiber is 2-3 mm.
[0025] Preferably, the fiber is at least one of PVA fiber or PP fiber, and the average length of the fiber is 6 to 12 mm.
[0026] In this embodiment, the raw material of the fiber cement board based on industrial waste further includes: an activator. The present invention can promote the carbonization process by adding the activator.
[0027] Preferably, the activating agent is chitosan.
[0028] Preferably, the activator accounts for 0.5% to 1% of the total mass of the carbon mineralized gelling material, the first production waste material, the second production waste material, and the fiber.
[0029] In this embodiment, the raw material of the fiber cement board based on industrial waste further includes: an admixture.
[0030] Preferably, the additive is a flocculant. The present invention can improve the dispersibility of the suspension by adding the additive.
[0031] More preferably, the additive includes at least one of polyacrylamide, polyaluminium chloride and cellulose flocculant.
[0032] Preferably, the admixture accounts for 0.1% to 0.3% of the total mass of the carbon mineralized cementitious material, the first production waste material, the second production waste material, and the fiber.
[0033] In this embodiment, the fiber cement board based on industrial waste, calculated by weight, includes the following raw materials: 70-85 parts of carbon mineralized cementitious material, 0-10 parts of first production waste, 0-20 parts of second production waste, 5-10 parts of fiber, 0.5-1 parts of activator, and 0.1-0.3 parts of admixture.
[0034] Preferably, the fiber cement board based on industrial waste comprises, by weight, 70-80 parts of carbon mineralized cementitious material, 6-8 parts of first production waste, 10-15 parts of second production waste, 7-8 parts of fiber, 0.5-1 part of activator, and 0.1-0.3 part of admixture.
[0035] In this embodiment, the raw material of the fiber cement board based on industrial waste further includes: water. The present invention has no special limitation on the water used, and industrial water can be used.
[0036] Preferably, the solid-water mass ratio of the raw materials of the fiber cement board based on industrial waste is 1:(5-30).
[0037] In a second aspect, the present invention provides a method for preparing a fiber cement board based on industrial waste, comprising the following steps: S1, mixing raw materials of fiber cement board based on industrial waste evenly to obtain production slurry; S2, preparing the production slurry into a wet blank of a plate; S3. Pressurize and pre-cure the wet board in sequence, and then cure it in a CO2 atmosphere to obtain a fiber cement board based on industrial waste.
[0038] In this implementation, step S1 includes: S11, uniformly mixing the first production waste material and part of the water to obtain a waste slurry; S12, uniformly mixing the carbon mineralized cementitious material, the waste slurry, the second production waste material, the fiber, and optionally the activator and the admixture with the remaining water to obtain the production slurry.
[0039] The first production waste is unqualified wet blanks of boards, which are in block form. The present invention is more conducive to achieving uniform dispersion of the first production waste by adopting the above steps, thereby improving the performance of the fiber cement board based on industrial waste.
[0040] Preferably, during the preparation of the waste slurry, the mass ratio of the first production waste to water is 1:(5-20).
[0041] Preferably, during the preparation of the waste slurry, the mixing time is 10 to 20 minutes.
[0042] Preferably, during the preparation of the production slurry, the mass ratio of the solid phase (including the carbon mineralized cementitious material, the solid phase composition in the waste slurry, the second production waste, the fiber, the activator, and the admixture) to water is 1:(5-30).
[0043] Preferably, during the preparation of the production slurry, the mixing time is 10 to 20 minutes.
[0044] In this embodiment, in step S2, the production slurry is prepared into a wet blank of the board by using a slurrying method or a slurrying method. The present invention has no limitation on the process requirements of the slurrying method and the slurrying method, and the process can be carried out according to the process well known in the art.
[0045] In this embodiment, in step S3, during the pressurization process, the peak pressure is 10-30 MPa, preferably 15-25 MPa; the pressure holding time is 1-5 min, preferably 1-3 min.
[0046] In this embodiment, in step S3, the pre-curing condition is: placing in a natural environment for 2 to 4 hours. The present invention has no limitation on the ambient temperature of the pre-curing, preferably the temperature is 25 to 30°C, and has no limitation on the relative humidity of the pre-curing environment, preferably the relative humidity is ≤50%RH.
[0047] In this embodiment, in step S3, the CO2 curing conditions are: pressure 0.1-0.3MPa, preferably 0.1MPa; temperature 5-90°C, preferably 20-40°C; time 2-48h, preferably 6-12h; concentration ≥20%VOL, preferably 30-40%VOL. There is no requirement for the source of CO2 gas in the present invention, and industrial flue gas or enriched CO2 that meets the concentration requirements can be used.
[0048] To avoid redundancy, in the following embodiments and comparative examples of the present invention, when the fiber used is pulp fiber, the average length is 2 mm; when the fiber used is PVA fiber, the average length is 6 mm; the average particle size of quartz powder is ≤50 μm; the first production waste material and the second production waste material used are both waste materials generated in the production process of the fiber cement board based on industrial waste materials of the present invention.
[0049] Example 1 The present embodiment provides a fiber cement board based on industrial waste, which is prepared from the following components in parts by weight: 75 parts of γ-C2S, 8 parts of first production waste, 10 parts of second production waste, 7 parts of pulp fiber, 0.5 parts of chitosan, and 0.2 parts of polyacrylamide.
[0050] The preparation method is as follows: (1) mixing the first production waste material and water at a mass ratio of 1:10 for 15 minutes to obtain a waste slurry; (2) mixing the carbon mineralized cementitious material, the waste slurry, the second production waste material, the fiber, the activator, the admixture and water at a solid-water mass ratio of 1:20 in the raw materials for 15 minutes to obtain a production slurry; (3) Using the papermaking method to prepare the production slurry into a wet sheet; (4) Pressurizing and pre-curing the wet board in sequence; wherein the pressurizing conditions are: grouting pressure 20 MPa, pressure holding 2 min; pre-curing conditions are: temperature 30 ° C, time 3 h; then curing in a CO2 atmosphere, CO2 curing conditions are: pressure 0.1 MPa, temperature 25 ° C, time 12 h, concentration 40% VOL, to obtain the fiber cement board based on industrial waste.
[0051] Example 2 The present embodiment provides a fiber cement board based on industrial waste, which is prepared from the following components in parts by weight: 75 parts of magnesium slag, 8 parts of first production waste, 10 parts of second production waste, 7 parts of pulp fiber, 0.5 parts of chitosan, and 0.2 parts of polyacrylamide.
[0052] The preparation method is the same as that of Example 1.
[0053] Example 3 The present embodiment provides a fiber cement board based on industrial waste, which is prepared from the following components in parts by weight: 75 parts of steel slag, 8 parts of first production waste, 10 parts of second production waste, 7 parts of pulp fiber, 0.5 parts of chitosan, and 0.2 parts of polyacrylamide.
[0054] The preparation method is the same as that of Example 1.
[0055] Example 4 The present embodiment provides a fiber cement board based on industrial waste, which is prepared from the following components in parts by weight: 75 parts of γ-C2S, 8 parts of first production waste, 10 parts of second production waste, 7 parts of PVA fiber, 0.5 parts of chitosan, and 0.2 parts of polyacrylamide.
[0056] The preparation method is the same as that of Example 1.
[0057] Example 5 The present embodiment provides a fiber cement board based on industrial waste, which is prepared from the following components in parts by weight: 68 parts of γ-C2S, 15 parts of first production waste, 10 parts of second production waste, 7 parts of pulp fiber, 0.5 parts of chitosan, and 0.2 parts of polyacrylamide.
[0058] The preparation method is the same as that of Example 1.
[0059] Example 6 The present embodiment provides a fiber cement board based on industrial waste, which is prepared from the following components in parts by weight: 60 parts of γ-C2S, 8 parts of first production waste, 25 parts of second production waste, 7 parts of pulp fiber, 0.5 parts of chitosan, and 0.2 parts of polyacrylamide.
[0060] The preparation method is the same as that of Example 1.
[0061] Example 7 The present embodiment provides a fiber cement board based on industrial waste, which is prepared from the following components in parts by weight: 83 parts of γ-C2S, 10 parts of second production waste, 7 parts of pulp fiber, 0.5 parts of chitosan, and 0.2 parts of polyacrylamide.
[0062] The preparation method is as follows: (1) mixing the carbon mineralized cementitious material, the second production waste material, the fiber, the activator, the admixture and the water at a solid-water mass ratio of 1:20 in the raw materials for 15 minutes to obtain a production slurry; (2) Using the papermaking method to prepare the production slurry into a wet sheet; (3) Pressurizing and pre-curing the wet board in sequence; wherein the pressurizing conditions are: grouting pressure 20 MPa, pressure holding 2 min; pre-curing conditions are: temperature 30 ° C, time 3 h; then curing in a CO2 atmosphere, CO2 curing conditions are: pressure 0.1 MPa, temperature 25 ° C, time 12 h, concentration 40% VOL, to obtain the fiber cement board based on industrial waste.
[0063] Example 8 The present embodiment provides a fiber cement board based on industrial waste, which is prepared from the following components in parts by weight: 85 parts of γ-C2S, 8 parts of first production waste, 7 parts of pulp fiber, 0.5 parts of chitosan, and 0.2 parts of polyacrylamide.
[0064] Preparation method: (1) mixing the first production waste material and water at a mass ratio of 1:10 for 15 minutes to obtain a waste slurry; (2) mixing the carbon mineralized cementitious material, waste slurry, fiber, activator, admixture and water at a solid-water mass ratio of 1:20 in the raw materials for 15 minutes to obtain production slurry; (3) Using the papermaking method to prepare the production slurry into a wet sheet; (4) Pressurizing and pre-curing the wet board in sequence; wherein the pressurizing conditions are: grouting pressure 20 MPa, pressure holding 2 min; pre-curing conditions are: temperature 30 ° C, time 3 h; then curing in a CO2 atmosphere, CO2 curing conditions are: pressure 0.1 MPa, temperature 25 ° C, time 12 h, concentration 40% VOL, to obtain the fiber cement board based on industrial waste.
[0065] Comparative Example 1 This comparative example provides a fiber cement board based on industrial waste, which is prepared from the following components in parts by weight: 93 parts of γ-C2S, 7 parts of pulp fiber, 0.5 parts of chitosan, and 0.2 parts of polyacrylamide.
[0066] Preparation method: (1) mixing the carbon mineralized cementitious material, fiber, activator, admixture and water at a solid-water mass ratio of 1:20 in the raw materials for 15 minutes to obtain a production slurry; (2) Using the papermaking method to prepare the production slurry into a wet blank of the board; (3) Pressurizing and pre-curing the wet board in sequence; wherein the pressurizing conditions are: grouting pressure 20 MPa, pressure holding 2 min; pre-curing conditions are: temperature 30 ° C, time 3 h; then curing in a CO2 atmosphere, CO2 curing conditions are: pressure 0.1 MPa, temperature 25 ° C, time 12 h, concentration 40% VOL, to obtain the fiber cement board based on industrial waste.
[0067] Comparative Example 2 This comparative example provides a fiber cement board based on industrial waste, which is prepared from the following components in parts by weight: 75 parts of γ-C2S, 8 parts of first production waste, 10 parts of quartz powder, 7 parts of pulp fiber, 0.5 parts of chitosan, and 0.2 parts of polyacrylamide.
[0068] The preparation method is the same as Example 1.
[0069] Experimental Group The physical properties of the fiber cement boards prepared in Examples 1 to 8 and Comparative Examples 1 to 2 were tested. The flexural strength, water absorption rate and porosity were tested in accordance with GB / T 7019-2014. The flexural strength was tested on the samples before and after saturation with water. The test results are shown in Table 1.
[0070] Table 1 Physical properties of fiber cement boards prepared in Examples 1 to 8 and Comparative Examples 1 to 2
[0071] It can be seen from the results of Examples 1 to 8 that the fiber cement board based on industrial waste prepared within the technical solution and proportion range provided by the present invention has excellent physical and mechanical properties, and its saturated flexural strength can reach the R3 strength grade of fiber cement board Class A.
[0072] It can be seen from the results of Example 1 and Examples 5 to 6 that the fiber cement board based on industrial waste prepared within a certain ratio range has more excellent performance, and too much first or second production waste will affect the performance of the fiber cement board to a certain extent. When there is too much first production waste, the first production waste is prone to uneven dispersion and agglomeration, which can easily lead to uneven slurry, thereby affecting the quality of the produced board. When there is too much second production waste, it is equivalent to an increase in the proportion of inert components in the board composition. The performance loss caused by the presence of inert components is greater than the strength improvement brought by the provision of calcium carbonate nucleation sites, so it is not conducive to the performance development of fiber cement boards based on industrial waste. At the same time, combined with the results of Example 1 and Comparative Example 2, it can be seen that compared with the inert filler (quartz powder), the addition of the second production waste is more conducive to improving the performance of the fiber cement board.
[0073] It can be seen from the results of Examples 1 to 8 and Comparative Example 1 that the technical solution provided by the present invention, which recycles production waste materials in combination with carbonization curing to prepare fiber cement boards based on industrial waste materials, although the physical and mechanical properties of the obtained fiber cement boards based on industrial waste materials are not as good as those of fiber cement boards prepared without adding production waste materials, the performance can still meet the application requirements, which is conducive to saving resources and energy, thereby reducing production costs and reducing environmental pollution.
[0074] The specific implementation of the present invention described above does not constitute a limitation on the protection scope of the present invention. Any other corresponding changes and modifications made based on the technical concept of the present invention should be included in the protection scope of the claims of the present invention.
Claims
1. A fiber cement board based on industrial waste, It is characterized in that The raw materials include, by weight: 60-85 parts of carbon mineralized cementitious materials, 0-15 parts of first production waste materials, 0-25 parts of second production waste materials, and 5-10 parts of fibers; wherein, The first production waste material is wet board blanks discarded during the production of carbon mineralized fiber cement boards; The second production waste material is fine powder produced during the post-processing of carbon mineralized fiber cement board; The first production waste and the second production waste are not all zero.
2. The fiber cement board based on industrial waste according to claim 1, It is characterized in that The carbon mineralized cementitious material comprises one or more of calcium silicate ore powder, steel slag powder rich in calcium silicate ore phase, and magnesium slag powder rich in calcium silicate ore phase; wherein, The calcium silicate includes one or more of γ-type dicalcium silicate, tricalcium disilicate and monocalcium silicate.
3. The fiber cement board based on industrial waste according to claim 1, It is characterized in that The average particle size of the carbon mineralized cementitious material is less than 50 μm; and / or, The average particle size of the second production waste is less than 50 μm; and / or, The fibers include one or more of pulp fibers, wood pulp fibers, PVA fibers, and PP fibers; and / or, The average length of the fibers is 2 to 12 mm.
4. The fiber cement board based on industrial waste according to claim 1, It is characterized in that The raw material of the fiber cement board based on industrial waste also includes: an activator; wherein, The activator is chitosan; and / or, The activator accounts for 0.5% to 1% of the total mass of the carbon mineralized gelling material, the first production waste material, the second production waste material and the fiber.
5. The fiber cement board based on industrial waste according to claim 1, It is characterized in that The raw materials of the fiber cement board based on industrial waste also include: admixtures; wherein, The additive is a flocculant; and / or, The admixture accounts for 0.1% to 0.3% of the total mass of the carbon mineralized cementitious material, the first production waste material, the second production waste material and the fiber.
6. The fiber cement board based on industrial waste according to claim 1, It is characterized in that Calculated by weight, the raw materials include: 70-85 parts of carbon mineralized cementitious materials, 0-10 parts of first production waste materials, 0-20 parts of second production waste materials, 5-10 parts of fibers, 0.5-1 parts of activators, and 0.1-0.3 parts of admixtures.
7. The fiber cement board based on industrial waste according to claim 1, It is characterized in that The raw material of the fiber cement board based on industrial waste also includes water, and the solid-water mass ratio of the raw material of the fiber cement board based on industrial waste is 1: (5-30).
8. A method for preparing a fiber cement board based on industrial waste as claimed in any one of claims 1 to 7, It is characterized in that The following steps are involved: The raw materials of the fiber cement board based on industrial waste are mixed uniformly to obtain a production slurry; The production slurry is prepared into a wet blank of a board; The wet blank of the plate is pressurized and pre-cured in sequence, and then 2 Curing in air to obtain fiber cement board based on industrial waste.
9. The method for preparing the fiber cement board based on industrial waste according to claim 8, It is characterized in that The preparation process of the production slurry includes: uniformly mixing the first production waste material and a portion of water to obtain a waste slurry; The carbon mineralized cementitious material, waste slurry, second production waste, fiber, and optionally an activator and an admixture are uniformly mixed with the remaining water to obtain a production slurry; wherein, In the process of uniformly mixing the first production waste material and part of water, the mass ratio of the first production waste material to water is 1:(5-20); and / or, In the process of uniformly mixing the first production waste material and part of the water, the mixing time is 10 to 20 minutes; and / or, In the process of uniformly mixing the carbon mineralized cementitious material, the waste slurry, the second production waste, the fiber and optionally the activator and the admixture with the remaining water, the mixing time is 10 to 20 minutes.
10. The method for preparing the fiber cement board based on industrial waste according to claim 8, It is characterized in that During the pressurization process, the peak pressure is 10-30 MPa and the pressure holding time is 1-5 min; and / or, The pre-curing conditions are: placing in a natural environment for 2 to 4 hours; and / or, The CO 2 The curing conditions in atmosphere are: pressure 0.1~0.3MPa, temperature 5~90℃, time 2~48h, concentration ≥20%VOL.